ANGLE WELLS, OZONE, AND MEMBRANES: A GREAT COMBINATION
|
|
- Barry McDonald
- 5 years ago
- Views:
Transcription
1 2007 Eastern South Dakota Water Conference and 52 nd Annual Midwest Ground Water Conference ANGLE WELLS, OZONE, AND MEMBRANES: A GREAT COMBINATION Presented by: Joseph Honner, P.E. Bartlett & West, Inc. in Cooperation w/ South Central Regional Water District
2
3 WATER SOURCE GOALS 9 Achieve SCWD Yield Objectives ¾ Phase 1 1,000 gpm ¾ Phase 2 2,400 gpm (Total, Ultimate Design) 9 Acquire Water Quality Comparable to Missouri River TDS 400 mg/l Fe 0.70 mg/l ¾ Hardness 220 mg/l (13 gr) Mn mg/l ¾ PIOC < MCL ¾ 9 Use Existing SCWD WTP/Well Site River Front Property ¾ Existing Riprap Protection ¾ Existing WTP Building & Power ¾ 9 Meet Budget Objectives ¾ $1.2 to $1.4 Million Capital Costs 9 Riverbank Filtration Practical Applications ¾ Conducive Soil Formations ¾
4 INTAKE FACILITIES CONSIDERED Vertical Wells (VW) Traditional Intake Sloped Pipe into River Horizontal Directional Drilled Wells (HDDW) Horizontal Collector Wells (HCW) Angle Wells (AW)
5 METHOD SELECTED Angle Wells Surface Water Influenced Missouri River
6 METHOD SELECTED Angle Wells ¾ Achieves All Objectives ¾ ¾ ¾ ¾ ¾ ¾ Estimated Construction Cost of $1.2 Million Test Well at gpm, was converted to a Production Well at a Cost of $135,000 4 Additional Angle Wells Under Phase 1; at 400 gpm 450 gpm each, Cost at $170,000 per Well 23 Additional Angle Wells Under Phase 2; at 400 gpm 450 gpm each, Cost at $170,000 per Well Total of 78 Wells, Firm Capacity of a minimum of 2,400 gpm Total Cost Approximately $1.2 million
7 Angle Well Layout
8 Angle Well Profile
9 Soil Formation
10 MuniPak Screen All but one of the Angle Wells utilized a MuniPak Screen which aides in eliminating silts and fine sands from the source water.
11 Angle Well Construction
12 23 Deg Angle Well
13 23 Deg Angle Well
14 14 Deg Angle Well
15 14 Deg Angle Well
16 Cost/Benefit Comparison Of Angle Wells To Vertical Wells & Horizontal Collector Wells 3.5 mgd water source capacity, unconfined aquifer, fine medium grain sands 33 Vertical wells; 80 gpm from each well; (Includes 3 wells for backup capacity) 1 Collector well with horizontal laterals; (No backup, & may only be 1200 to 1900 gpm) 7 Angle wells; gpm from each well; (1 for backup capacity)
17 Cost/Benefit Comparison Vertical Well Field (33): $553k per MGD $1.50 m capital cost $.45 m 10 year maintenance cost $1.95 m projected well field cost over 10 years Collector Well Field (1): $600k per MGD $2.00 m capital cost $.11 m 10 year maintenance cost $2.11 m projected well field cost over 10 years Angle Well Field (8): $383k per MGD $1.20 m capital cost $.14 m 10 year maintenance cost $1.34 m projected well field cost over 10 years
18 Angle Wells A Cost Efficient Design Alternative Reduces number of wells (compared to vertical well field design) Reduces capital cost (compared to horizontal collector well field design) Reduces Maintenance Cost Fewer wells Easier rehabilitation compared to collector wells
19 Treatment Objectives Remove Fe and Mn Reduce Total Dissolved Solids (TDS) Reduce Hardness Current and Pending Surface Water Standards
20 SCWD Source Water Parameters Iron (0.4 to 3.5 mg/l) Manganese (0.45 to 0.73 mg/l) Total Dissolved Solids (450 to 700 mg/l) Hardness (12 to 23 grains) Arsenic (7.4 to 9.2 ug/l) Total Organic Carbon (2.7 to 3.5 mg/l) Likely considered GWUDI
21 Deg Angle Well2, 127' Slope Length In Ground, 25' Screen Under River, Water Quality Elevation of Screen from 1592' to 1603' Tot Alk TDS Hardness (CaCO3) Fe Mn River 503 Gauge Ht TDS 4 m g /L Hardness ALK m g / l /28/2005 8/30/2005 8/31/2005 9/1/2005 9/20/2005 9/21/2005 9/22/2005 9/23/2005 9/26/ /3/ /10/ /17/ /24/2005 0
22 South Central Regional Water District (SWCD) Microscopic Particulate Analysis Results Sample Date 10/2526/2005 9/1920/2005 8/1516/2005 8/1516/2005 Sample Source Missouri River 12" AW2 16" VW36' 2" HDD Sample Location Surface WaterRaw Under River Riverbank Under River Units Per 100 Gal Per 100 Gal Per 100 Gal Per 100 Gal Algae 10,000, Diatoms 30,000,000 5,514 9 Plant Debris Rotifers 20,000 Nematodes Pollen (pine) Ameba 6,000 Ciliates 3, Colorless Flagellates Crustaceans Other Arthropods 10,000 Other Giardia Detected #/100 L 58 <0.21 <0.25 <0.22 Cryptosporidium Detected #/100 L <58 <0.21 <0.25 <0.22
23 MF and RO Train MF System MidApril to early August RO System MidMay May to early August NF membranes installed for approx. last week Oxidants potassium perm. and chlorine midapril to midjune, ozone midjune to early August
24
25
26 T
27
28 MF and RO Train MF effluent Fe and Mn consistently below MCLs MF effluent consistently at 0.1 ntu Flux rates, backwash intervals adjusted to maintain minimum recovery of 95% (ozone did not impact) EFM was utilized throughout MF study (intervals varied) Arsenic after MF was nondetect Little TOC reduction through pretreatment and MF TOC reduced through RO RO and NF effluent lowered dissolved constituents as expected
29 Final Design Angle Wells Oxidation Basin Ozone MF Membranes Softening Membranes Contact Basin Ozone Clearwell
30
Plan Review and Standards
Plan Review and Standards Minnesota Rules, part 4720.0010, states that prior to the installation, alteration, or extension of any water supply infrastructure, plans and specifications must be submitted
More informationDewatering Case Study Rotary Press Versus Screw Press
Dewatering Case Study Rotary Press Versus Screw Press OWEA 2012 Annual Conference June 20, 2012 Kyle Novak, P.E. Presentation Overview Project Background Onsite Dewatering Consideration Case Study: Rotary
More informationAppendix F Surface Water and Sediment Monitoring Results
Appendix F Surface Water and Sediment Monitoring Results Table F1 Table F2 Table F3 Table F4 Surface Water Sampling: General Chemistry and Dissolved Metals Concentrations 2006-2008 Surface Water Sampling:
More informationPresented by: Brent Bode, P.E., Tetra Tech, Inc. Low Energy, Non Shear WAS Thickening Alternatives and Design for Grand Rapids, MI WWTP
Presented by: Brent Bode, P.E., Tetra Tech, Inc. Low Energy, Non Shear WAS Thickening Alternatives and Design for Grand Rapids, MI WWTP PRESENTATION AGENDA Project Background and Goals for GR WWTP WAS
More informationZONE 7 WATER AGENCY FILTER SURVEILLANCE REPORT FOR PATTERSON PASS WTP PERFORMED & PREPARED. By: ERS INDUSTRIAL SERVICES, INC.
ZONE 7 WATER AGENCY FILTER SURVEILLANCE REPORT FOR PATTERSON PASS WTP PERFORMED & PREPARED By: ERS INDUSTRIAL SERVICES, INC. ERS INDUSTRIAL SERVICES, INC. 2120 Warm Springs Ct. 510-770-0202 phone 510-490-3024
More informationInnovative Visualization Method For Demonstrating Natural And Enhanced Attenuation. Grant R. Carey Porewater Solutions
Innovative Visualization Method For Demonstrating Natural And Enhanced Attenuation Grant R. Carey Porewater Solutions SMART Remediation Ottawa, ON February 5, 208 SMART is Powered by: www.vertexenvironmental.ca
More informationAppendix B. Airport Master Plan Update William R. Fairchild International Airport Port Angeles, Washington AIRPORT LAYOUT PLAN CHECKLIST
APPENDICES Appendix B AIRPORT LAYOUT PLAN CHECKLIST 3 Airport Master Plan Update William R. Fairchild International Airport Port Angeles, Washington September 2011 AC 150/5070-6B (incl. Chg. 1, 5/1/07)
More informationMONTHLY UPDATE REPORT - PRIMROSE SOUTH W4M OCTOBER 7, 2013
MONTHLY UPDATE REPORT - PRIMROSE SOUTH 09-21-067-04 W4M OCTOBER 7, Introduction The Primrose South in situ oil sands project is located in the Cold Lake Air Weapons Range approximately 65 km north-northeast
More informationIn response to a request from Water Rights Branch, a short. In general, the sequence of post glacial events in the immediate. D. M.
. TO Dr. J. C. Foweraker......!...... C&* Groundwater Div i s ion... GOVERNMENT OF BRITISH COLUMBIA M EM0 RAN DU M D. M. Callan Groundwater Division... July 6th... 19... 71... SUBJECT GROUNDWATER INVESTIGATION
More informationDewatering. Deep Wells Vacuum Wellpoints Eductor Wells Artesian Conditions System Design Water Treatment.
Dewatering Deep Wells Vacuum Wellpoints Eductor Wells Artesian Conditions System Design Water Treatment www.malcolmdrilling.com Deep Wells Vacuum Wellpoints Eductor Wells Artesian Conditions System Design
More informationEssential Skills: Reading and Interpreting Maps and Plans
Essential Skills: Reading and Interpreting Maps and Plans Prepared for: NEW YORK STATE PLANNING FEDERATION April 14, 2015 Prepared by: BME ASSOCIATES Peter G. Vars, P.E. Stages of Plan Review Concept /
More informationGroundwater and Surface Water Monitoring Report, Third Quarter 2004
Groundwater and Surface Water Monitoring Report, Third Quarter 2004 PG&E Topock Compressor Station Needles, California Prepared for Pacific Gas and Electric Company December 28, 2004 Groundwater and Surface
More informationSUBSEA WATER QUALITY MEASUREMENT WHERE ARE WE? Dr,. Ming Yang, NEL, UK
SUBSEA WATER QUALITY MEASUREMENT WHERE ARE WE? Dr,. Ming Yang, NEL, UK NEL 13-11-28 Slide 1 Content Background What is subsea separation & PWRI / discharge? Subsea raw sea treatment? Benefits? Status of
More informationParts Per Million Dissolved Oxygen Systems
Parts Per Million Dissolved Oxygen Systems Model 900 Portable s Model 9100 Model 9200 Model 9300 The Royce line of PPM level dissolved oxygen (DO) analyzers is the largest, most varied line in the world.
More informationFor reliable and continuous measurement of water quality insist on Aqua SMARTPro Transmitters
For reliable and continuous measurement of water quality insist on Aqua SMARTPro Transmitters For over six decades, Forbes Marshall has been building steam engineering and control instrumentation solutions
More informationCrow Wing County Mound Design
Property Owner: Date: Mailing Address: City: State: Zip: Home Phone Number: - - Cell: - - Site Address: City: State: Zip: Driving directions if no address issued: Legal Description: Sec: Twp: Range: Township
More informationAPPENDIX D: DRAWING SUBMISSION STANDARDS
1.0 FIRST SUBMISSION CONCEPTUAL DESIGN Once the Developer has obtained approval for a Development Application where Park or Open Space improvements are required, a detailed Park or Open Space submission
More informationA Research article on - Benefits of Glauber s salt in Textile Wet processing 1. Introduction: By: Sushil Kumar Hada In order to understand the depth of the subject, one should understand the basics behind
More informationPiloting for Evaluation of Innovative Residuals Dewatering Technologies. Presented By: Jay Surti, PE, Northeast Residuals Practice Lead
Piloting for Evaluation of Innovative Residuals Dewatering Technologies Presented By: Jay Surti, PE, Northeast Residuals Practice Lead Agenda Operational overview Existing process Dewatering technologies
More informationVICINITY MAP LOCATION MAP GRAPHIC SCALES
VICINITY MAP LOCATION MAP GI-01 LEGEND TABLE OF CONTENTS CONSTRUCTION SEQUENCE NOTES GENERAL NOTES SEDIMENTATION & EROSION CONTROL ABBREVIATIONS GI-02 M P P P P M EXISTING HYDRAULIC PROFILE AND DEMOLITION
More informationScope of Work Temecula Valley Regional Water Reclamation Facility 23 MGD Expansion Engineering Services During Construction
CH2M HILL 6 Hutton Centre Drive Suite 700 Santa Ana, CA 92707 Phone: 714.429.2000 Fax: 714.429.2050 November 12, 2015 Mr. Erik Jorgensen, P.E. Eastern Municipal Water District 2270 Trumble Road Perris,
More informationTOBERMORY SEWAGE LAGOON
TOBERMORY SEWAGE LAGOON Annual Report January 1 to December 31, 2014 Prepared by: Cherie Young Process & Compliance Technician Ontario Clean Water Agency West Highlands Hub March 31, 2015 Ministry of the
More informationTPi TPi. Model. Tilted Plate Interceptor Steel Oil Water Separators
Model Tilted Plate Interceptor Steel Oil Water Separators The Series oil water separators are designed per the American Petroleum Institute (API) separator design guidelines The Series Tilted Plate Interceptors
More informationDemonstration System Development for Advanced Shipboard Desalination FNC
AMENDMENT NUMBER 0002 BAA 11-010 ENTITLED Demonstration System Development for Advanced Shipboard Desalination FNC The purpose of Amendment 0001 is to provide answers to following questions: Q1- Do you
More informationCITY OF BAYTOWN CENTRAL DISTRICT WASTEWATER TREATMENT PLANT GRIT, SECURITY, AND SCADA IMPROVEMENTS SCOPE OF SERVICES
CITY OF BAYTOWN CENTRAL DISTRICT WASTEWATER TREATMENT PLANT GRIT, SECURITY, AND SCADA IMPROVEMENTS SCOPE OF SERVICES FINAL DESIGN, BID PHASE, AND CONSTRUCTION SERVICES BACKGROUND ARCADIS U.S., Inc. (ARCADIS)
More informationThe electronic anti-scale system
The electronic anti-scale system The green alternative to water softeners No Salt No Chemicals No Maintenance German Technology Absolutely Magnetism-Free MADE IN GERMANY FAQs - Frequently asked questions
More informationCity of Massillon Site Plan Checklist
City of Massillon Site Plan Checklist The following information MUST be included with all Site Plans submitted for review and processing in order to constitute a complete Site Plan Package. Incomplete
More informationCONTRACT 1 DISTRICT G WATER STORAGE TANK EASTHAM, MASSACHUSETTS DECEMBER 2014 LIST OF DRAWINGS EASTHAM TOWN ADMINISTRATOR
LIST OF DRAWINGS DISTRICT G TANK SITE LOCATION I G-1 GENERAL NOTES AND LEGEND SHEILA VANDERHOEF C-1 EXISTING CONDITIONS PLAN BOARD OF SELECTMEN C-2 PROPOSED WATER STORAGE TANK SITE PLAN CD - 2 CONSTRUCTION
More informationTip cleaning tools. stands. TT-A Tip tinner. CL6211 Cleaning sand. CL6205 Cleaning sand. CL6217 Metal brush. CL6790 Dry Cleaning system + Metal wood
Tip cleaning tools JBC introduces its new range of tip cleaning tools created to reduce tip oxidation caused by the frequent high, temperatures, aggressive fluxes and chemical components. The range is
More informationIntroduction. Planning
Introduction Since fencing is such an important part of a livestock grazing system, the USDA- Natural Resources Conservation Service (NRCS) has developed specific designs and specifications for landowners
More informationUse the Point-Slope Form to Write the Equation of a Line
Math 90 8.3 "Writing Equations of Lines" Objectives: * Use the point-slope form to write the equation of a line. * Use the slope-intercept form to write the equation of a line. * Use slope as an aid when
More informationA Residual Gas Analyzer for Dry Etching Process
FFeature Article Article Makoto MATSUHAMA Concerning the dry process of the semiconductor device manufacturing, the monitoring of etching chamber conditions (pressure, temperature, gas concentration,...)
More informationUTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1
UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1 ENGINEERING STANDARDS FOR UTILITY AND STREET CONSTRUCTION PLANS MARCH 2014 CONSTRUCTION PLAN SHEET FORMAT REQUIREMENTS REPRODUCIBLE MYLAR 1.
More informationWe Deliver Salt
We Deliver Salt 763-535-1800 WD-INFINITY- SERIES MANUAL head MODEL INFINITY 2510SXT Installation and start-up manual: WATER PRESSURE: A minimum of 20 pounds of water pressure is required for regeneration
More informationPLANNING AND DEVELOPMENT
OVERVIEW Effective January 1, 1992 all applications for multi-family residential and all non-residential building permits require site plan approval before permit issuance. All new developments and existing
More informationQUARTERLY ACTIVITY REPORT
FOR THE QUARTER ENDING 30 JUNE 2014 Titan Energy Ltd (ASX: TTE) ( Titan or the Company ) is pleased to provide the following report on its operations during the three-month period ending 30 June 2014.
More informationDr. Ming Yang, NEL, UK
Measurement of Subsea Produced Water Quality the Importance and Challenges Dr. Ming Yang, NEL, UK Content Background What is subsea separation & PWRI / discharge? Subsea raw sea treatment? Benefits? Status
More informationTPi TPi. Model. Tilted Plate Interceptor Concrete Oil Water Separators
Model Tilted Plate Interceptor Concrete Oil Water Separators The Series oil water separators are designed per the American Petroleum Institute (API) separator design guidelines The Series Tilted Plate
More informationNOTICE OF BOARD MEETING & WORKSHOP
NOTICE OF BOARD MEETING & WORKSHOP OF THE BOARD OF DIRECTORS OF THE A MUNICIPAl WATER DISTRICT WILL BE HELD ON WEDNESDAY, NOVEMBER 5, 2014 10:00 A.M. AT THE OFFICE OF THE AGENCY 6075 KIMBALL A VENUE, BUILDING
More informationROUTES: 65 SECTIONS: miles in length. THE FOLLOWING ITEMS AND APPROXIMATE QUANTITIES ARE INVOLVED:
ARKANSAS DEPARTMENT OF TRANSPORTATION CA0801 HWY. 110 - CLINTON (WIDENING) (S) FEDERAL AID PROJECT ACNHPP-0071(31) THE PURPOSE OF THIS PROJECT IS TO WIDEN HIGHWAY 65 IN VAN BUREN COUNTY. THIS PROJECT CONSISTS
More informationLakes and Rivers Division, Mr. David Dale
Locks and Dams 2, 3, and 4 Monongahela River, PA (Lower Mon Project) Inland Waterways Users Board Lakes and Rivers Division, Mr. David Dale 25 February 2015 Braddock Dam US Army Corps of Engineers Charleroi
More informationTABLE OF CONTENTS 1200 PLAN PREPARATION
1200 PLAN PREPARATION TABLE OF CONTENTS PAGE 1201 General Plan Sheet Information... 12-1 1201.1 Introduction... 12-1 1201.2 Unit of Measure... 12-1 1201.3 Plan Sheet Materials and File Format... 12-1 1201.4
More informationTransmission System Evaluation. For Additional Capacity. In a Coastal Wastewater Collection System
Transmission System Evaluation For Additional Capacity In a Coastal Wastewater Collection System North Carolina AWWA-WEA 96 th Annual Conference November 14, 2016 2014 HDR, Inc., all rights reserved. Project
More informationLakes and Rivers Division, David Dale
Locks and Dams 2, 3, and 4 Monongahela River, PA (Lower Mon Project) Inland Waterways Users Board Lakes and Rivers Division, David Dale November 2014 David Dale, PE, PMP Braddock Dam US Army Corps of Engineers
More informationInformation for File # RMM
Information for File # 3-4-RMM Applicant:, L.P. Corps Contact: Ryan Malterud Address: 8 Fifth Street East, St. Paul, Minnesota 56 E-Mail: Ryan.M.Malterud@usace.army.mil Phone: (65) 9-586 Primary County:
More information8000 SERIES SLIDER - 2 LITE (DUAL SLIDE) (ELEVATION DRAWING)
- 2 LITE (DUAL SLIDE) (ELEVATION DRAWING) HEAD (MEETING RAIL) NOTE: ELEVATION VIEWED FROM THE OUTSIDE LOOKING IN. ELEVATION DRAWING 3" = 1' - 0" SL1.1 - 3 LITE (END VENT) (ELEVATION DRAWING) HEAD 3 LITE
More informationCHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN
N/A Waiver (1) Four (4) copies of application form. (2) Fifteen (15) copies of plan (3) Subdivision/site plan application fee & professional review escrow deposit (4) Variance application fee & professional
More informationWednesday, October 19, :19 AM
Spakes, Rita From: Sent: To: Subject: Attachments: Rec d Digitally 16-00199 AFIN: PMT#: 0254-S1-R4 S By spakes at 12:58 pm, Oct 19, 2016 W Hynum, Tammie DOC ID#: 70470 M Wednesday, October 19, 2016 11:19
More informationOrbost Gas Plant Upgrade Project Community Information Sessions. 18 & 19 September 2018
Community Information Sessions 18 & 19 September 2018 Site location 9/14/2018 2 Ownership Update APA Orbost Gas Plant Pty Ltd (APA) purchased the plant and the export pipeline from Cooper Energy (CoE)
More informationAPPENDIX I FLOODPLAIN ANALYSIS
APPENDIX I FLOODPLAIN ANALYSIS TECHNICAL MEMORANDUM Date: June 11, 2014 To: Bibiana Alvarez and Ryan Lee Sawyer, Analytical Environmental Services From: Melanie Carr, MS, PE, Tarick Abu- Aly, MS, PE, Rafael
More informationOil-Water Separator Design Checklist
CHECKLIST C3 Revised 5/2/2016 Oil-Water Separator Design Checklist DISCLAIMER - This checklist is provided to Consulting Engineers for the express purpose of assisting them in compiling private oil-water
More informationCentrifugal Casting Machine Company, Inc.
Centrifugal Casting Machine Company, Inc. The world leader in centrifugal casting and permanent mold technology Est. 1940 Art the The Centrifugal Casting Machine Company, Inc. (CCMCO) is the established
More informationMESSAGES. International Society for Soil Mechanics and Geotechnical Engineering
MESSAGES International Society for Soil Mechanics and Geotechnical Engineering 5 GROUPS Geotechnical Community Non-Geotechnical Professionals Clients The Public Decision Makers and Governments Different
More informationRECORD GROUP NUMBER 156
DEPARTMENT OF MENTAL HEALTH AND MENTAL RETARDATION HOSPITAL AND SCHOOL FOR THE RETARDED ARLINGTON, TENN. BLUEPRINTS, 1965 RECORD GROUP NUMBER 156 Processed by: David R. Sowell Archival Technical Services
More informationThis first partnership performed work throughout Missouri, Illinois and Kentucky, building roads and performing other concrete construction projects.
A partnership in 1920 among Edward F. Regenhardt and the Harrison brothers, Bob, Charles, and Arthur, led to the establishment of a series of construction and materials companies that would eventually
More informationACSA PLAN REVIEW CHECKLIST (Guideline Only) (4) Standard water and sewer general plan notes (attached).
ACSA PLAN REVIEW CHECKLIST (Guideline Only) Revised: December 3, 2015 General (1) Proper Title (2) Vicinity map on first sheet. (3) Date and latest plan revision. (4) Standard water and sewer general plan
More informationSECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS
SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS 101 General 102 Submittal Requirements A. Initial Submittal B. Second Submittal 103 Plan Requirements A. Subdivisions B. Site Plans 104 Approval of
More informationKKR S. 6 th St. to I-94 Bridge Project Location. Expanded Floodplains
Kinnickinnic River Watercourse Rehabilitation Early Out Project Achieving Multiple Design Objectives Thomas R. Sear, PE, CFM Short Elliott Hendrickson Patrick C. Elliott, PE Milwaukee Metropolitan Sewerage
More informationZero Spent Wash Discharge Technologies
Zero Spent Wash Discharge Technologies 8 th October, 2015 Mahesh Kulkarni, Praj Industries Limited, Pune Praj Industries Ltd www.praj.net In Focus Options for Zero Spent Wash Discharge Technology Raw Spent
More informationAnalytical Transmitters
Analytical Transmitters THORNTON Leading Pure Water Analytics M300 Transmitters Conductivity / Resistivity ph / ORP Dissolved Oxygen Dissolved Ozone Flow / Total Flow M300 Transmitters for Comprehensive
More informationPHASE V REMEDY OPERATION STATUS AND REMEDIAL MONITORING REPORT No. 10 August 1, 2011 through January 31, 2012
PHSE V REMEDY OPERTION STTUS ND REMEDIL MONITORING REPORT No. 10 ugust 1, 2011 through January 31, 2012 Sunoco Station 144 Newbury Street (Route 1) Peabody, Massachusetts 01960 DUNS No. 0495-7957 MDEP
More informationLincoln County Public Works Water and Sewer Submittal Application
Lincoln County Public Works Water and Sewer Submittal Application 1. Date Submitted: Submittal Number: 2. Project Name of Project: 3. Project Address/Location: 4. Owners Name: Address: Contact Number:
More information10010 RECORD DRAWING INFORMATION
SECTION 10000 RECORD DRAWING CHECK LIST All entities who construct public infrastructure, private streets, private storm drain collection systems and travel lanes, shall submit to the Town of Cary Engineering
More informationAPPENDIX K DEPARTMENT OF PLANNING AND CODE ENFORCEMENT SUBDIVISION APPLICATION CENTER SUBMITTAL CHECKLIST
VI-K -1 of 8 APPENDIX K DEPARTMENT OF PLANNING AND CODE ENFORCEMENT SUBDIVISION APPLICATION CENTER SUBMITTAL CHECKLIST Final Submittal Major Subdivision Project Name Subdivision Number Location (Street
More informationMercury Minimization Plan City of Otsego
Mercury Minimization Plan City of Otsego Updated January 2018 Otsego East WWTF MN0064190 Otsego West WWTF MN0066257 The City of Otsego has implemented a Mercury Minimization Program. The program is intended
More informationMINIMUM DRAWING REQUIREMENTS FOR WATER AND SEWER LINE PROJECTS
Public Works Department Water & Wastewater Services WATER & WASTEWATER ENGINEERING DIVISION 2555 West Copans Road Pompano Beach, Florida 33369 954-831-0745 FAX 954-831-0798/0925 MINIMUM DRAWING REQUIREMENTS
More informationPureAir. Oil-less Compressors
PureAir Oil-less Compressors 2 Oil-less Pure Air Series New Technology Creates New Applications With the perfection of oil-less air technology by Gardner Denver, new applications are being developed everyday:
More informationMATERIALS CENTER LEOBEN FORSCHUNG GMBH. Microelectronics CERTIFIED S O EXPERTISE & RELIABILITY
MATERIALS CENTER LEOBEN FORSCHUNG GMBH We Innovate Materials Microelectronics EXPERTISE & RELIABILITY I ISO 9001 CERTIFIED S O 0 9 1 0 MATERIALS CENTER LEOBEN MICROELECTRONICS Microelectronics We Innovate
More informationInstalla on Guide: Fence Distributors. YourNextFence.com
TM YourNextFence.com Plan Your Fence each line by dividing the length of each line in inches by 97. Round any remainder up. 2 Calculate Materials Tools Needed Stakes Circular Saw String Line Drill Marking
More informationSECTION 9.00 AS-BUILT DRAWING REQUIREMENTS SUB-INDEX
SECTION 9.00 AS-BUILT DRAWING REQUIREMENTS SUB-INDEX 9.00 AS-BUILT DRAWING REQUIREMENTS 9.01 As-Built Check List 1 Supp 1 2016 Supp # 2 Aug. 2017 AS-BUILT DRAWING REQUIREMENTS As-Built Review Fee is $200.00
More informationAutomated Machine Guidance
Design Manual Chapter 5 - Roadway Design 5H - Automated Machine Guidance 5H-1 Automated Machine Guidance A. Concept Automated machine guidance (AMG) for grading is a process in which grading equipment,
More informationUse Slope-Intercept Form to Write the Equation of a Line
Math 35 2. "Writing Equations of Lines" Objectives: * Use the slope-intercept form to write the equation of a line. * Use the point-slope form to write the equation of a line. * Use slope as an aid when
More informationQ-Sox Installation Instructions
Q-Sox Installation Instructions Fabric Duct Systems, Inc. 1127 Riverwood Drive, Burnsville, MN 55337 U.S.A. Phone: 952.278.QSOX (7769) FAX: 952.252.7900 Website: www.qsox.com Installation Sequence For
More informationVolume V of V SAN ANTONIO WATER SYSTEM DOS RIOS WATER RECYCLING CENTER ELECTRICAL SYSTEM ASSESSMENT PROJECT SAWS JOB NO APRIL, 2012
in association with FINAL REPORT SAN ANTONIO WATER SYSTEM DOS RIOS WATER RECYCLING CENTER ELECTRICAL SYSTEM ASSESSMENT PROJECT SAWS JOB NO. 11-6501 APRIL, 2012 Final Submittal This document is released
More informationDrilled Rail Lubrication
APTA Rail Conference June 23, 2015 SKF Lincoln Lubrication Systems St Louis, MO Presented by Drew Welch Completed by Paul Conley Drew Welch SKF North American Railroad Specialist Drew Welch is the North
More informationA. Dewatering observation wells are part of dewatering allowance.
SECTION 312319 - DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationRAIL-LITE. The discreetness of recessed lighting + the flexibility of track lighting ARCHITECTURAL LIGHTING
RAIL-LITE The discreetness of recessed lighting + the flexibility of track lighting TM ARCHITECTURAL LIGHTING RAIL-LITE - THE REVOLUTION- IN RECESSED LIGHTING RAIL-LITE 's unique sliding system allows
More informationSECTION DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS
SECTION 312319 - DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More information7. Consider the following common offset gather collected with GPR.
Questions: GPR 1. Which of the following statements is incorrect when considering skin depth in GPR a. Skin depth is the distance at which the signal amplitude has decreased by a factor of 1/e b. Skin
More informationPURE VIEW GLASS RAILING
PURE VIEW GLASS RAILING SIMPLIFIED Gloss Black Aluminum (Preslotted & Full Glass), Iron (Preslotted) Limited Manufacturer Antique Bronze (Iron Preslotted) Lifetime Warranty White Aluminum (Preslotted &
More informationSatellite Monitoring of a Large Tailings Storage Facility
Satellite Monitoring of a Large Tailings Storage Facility Benjamin Schmidt and Matt Malgesini, Golder Associates Inc., USA Jim Turner, PhotoSat Ltd, Canada Jeff Reinson, Goldcorp Inc., Canada Presentation
More information580 - NOISE BARRIERS OPSS 580 INDEX
580 - OPSS 580 INDEX 580.1 GENERAL 580.1.1 Noise Barrier Design Elements 580.1.1.1 Wind-Load Designs 580.1.1.2 Sound-Absorptive Barriers 580.1.1.3 Noise Barrier Colour, Pattern and Texture 580.1.2 Grading
More informationQuestions and Answers
EKS Technology Development Program EKR-DT Process Process Optimisation Program COSIA Presentation Questions and Answers May 30, 2017 This document addresses some of outstanding questions that are related
More informationMSD STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY
MSD M etr o p olitan S e w e r Di s t r ict STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY 40203-1911 STANDARD DRAWINGS DIVISION
More informationNORTH BEND WWTP 2018 CRITICAL IMPROVEMENTS CITY OFFICIALS. City Administrator BRENDEN ELWOOD TREVOR KOSTANICH ALAN GOTHELF. City Council.
NORTH BEND KING COUNTY WASHINGTON CITY OFFICIALS KENNETH G. HEARING Mayor LONDI LINDELL City Administrator BRENDEN ELWOOD TREVOR KOSTANICH ALAN GOTHELF City Council MARTIN VOLKEN MARK RIGOS, P.E. PUBLIC
More informationCONTRACT 1 DISTRICT G WATER STORAGE TANK EASTHAM, MASSACHUSETTS FEBRUARY 2015
LIST OF DRAWINGS DISTRICT G TANK SITE LOCATION I EASTHAM ENGINEER'S PROJECT NUMBER G-1 GENERAL NOTES AND LEGEND C-1 EXISTING CONDITIONS PLAN DWSRF PROJECT NUMBER C-2 PROPOSED WATER STORAGE TANK SITE PLAN
More informationPorter County Plan Commission
Plan Type: Development Plan Administrative DRC PC Primary Plan Administrative DRC PC Secondary Plat/Replat Administrative DRC PC PUD Conceptual Detailed Final Project Information Project Name: Developer
More informationZoning District: R-1, R-2, and R-4 Applicant: Exeter Rose Farm, LLC, 953 Islington Street #23D Portsmouth, NH 03801
2220.00, Town Planner Town Planning Office, Town of Exeter 10 Front Street Exeter, NH 03833 Re: Exeter Rose Farm Subdivision Design Review Engineering Services Exeter, New Hampshire Site Information: Tax
More informationGrease Interceptor Design Checklist
CHECKLIST C2 Revised 5/2/2016 Grease Interceptor Design Checklist Public Works DISCLAIMER - This checklist is provided to Consulting Engineers for the express purpose of assisting them in compiling private
More informationSERVING WESTERN CANADIAN METAL MANUFACTURING AND FABRICATION INDUSTRIES
SERVING WESTERN CANADIAN METAL MANUFACTURING AND FABRICATION INDUSTRIES Catalogue 312 CNC Turret Punch Presses 20 and 30 metric ton Hydraulic press drives 39 x 39 to 60 x 100 blank size Thick and thin
More informationGEO-SLOPE International Ltd, Calgary, Alberta, Canada Relief Well Spacing
1 Introduction Relief Well Spacing Relief wells are commonly installed on the downstream side of an earth dam to control the seepage and pore-pressures (e.g. levee; Figure 1). A key design requirement
More informationCaroline County Public Utilities Rate Increase Effective August 1, 2018
Caroline County Public Utilities Rate Increase Effective August 1, 2018 Understanding your Water and Sewer Utility Bill Your water/sewer bill is made up of several different components, based on the type
More informationWall mounting with holding profile
B Main profile C Edge profile D Wall spacer E Heradesign acoustic panel Edge distance max. 250 mm c Centre distance of basic section (see table) B max. 600 mm or 625 mm a Centre distance of spacer (see
More informationDrivetrain for Vehicles 2018
Drivetrain for Vehicles 2018 presentation of an innovation RoBoC = Roll Bond Core ADVANTAGES OFFER RoBoC - Keep the stator housing battery housing power unit housing junction box and other similar applications
More information0417 INFORMATION AND COMMUNICATION TECHNOLOGY
CAMBRIDGE INTERNATIONAL EXAMINATIONS Cambridge International General Certificate of Secondary Education MARK SCHEME for the October/November 2015 series 0417 INFORMATION AND COMMUNICATION TECHNOLOGY 0417/02
More informationDEVELOPMENT OF THE SECTIONS
DEVELOPMENT OF THE SECTIONS DEVELOPMENT OF SECTION A-A fig. 6.107 Early development sketch of section a-a; highlighting the need to create atrium spaces fig. 6.108 Three dimensional development of fig.
More informationOVIVO GB. Glass Beads Filters
OVIVO GB Glass Beads Filters OVIVO GB Glass Beads Filter OVIVO Glass Beads Media Filter The replacement for classic Sand or Multimedia Filters Ovivo has developed a new filtration media line of calibrated
More informationSPECIFICATIONS MS-10-5 MS Cutting capacity (Rated 80,000 PSI Tensile) Cutting length 62 in "
MS-25-10 STANDARD Low speed electric motor & low hydraulic working pressure ensures long life. If the remote foot-pedal control is released anywhere in the stroke the ram returns to "up" position. Two
More informationProduct Dimensions (Width x Length x Height) (inches)
Mr. Dennis Hallahan, P.E. Infiltrator Water Technologies 4 Business Park Road P.O. Box 768 Old Saybrook, CT 06475 RE: Product Registration Renewal #2 Notice of Proprietary Distribution Product Listing
More informationSPACEPORT AMERICA: WHERE WE OFFER THE WORLD AN INVITATION TO SPACE
SPACEPORT AMERICA: WHERE WE OFFER THE WORLD AN INVITATION TO SPACE Dec 7, 2012 CHRISTINE ANDERSON Executive Director New Mexico Spaceport Authority SPACEPORT AMERICA where we offer the world an invitation
More information