1 Minutes of meeting Supervision of activities O-CoPNo To: Copy: From: Anna Kristine Oma, Eivind Sande, Gunnar H. Leistad, Bård Christian Jensen, Hilde Ødegård, participants of the companies Anne Vatten, F-Boring, O-CoPNo Claas v. d. Zwaag () Date of meeting: Place of meeting: NPD/Troll Present: Anna Kristine Oma, Eivind Sande, Gunnar H. Leistad, Bård Christian Jensen, Hilde Ødegård, Claas van der Zwaag, V. Thomas/NShell, S. Skoglund/NShell, K. Owren/Statoil, H. Boge/CoPNo, R. Nilsen/CoPNo, K. Sandve/CoPNo, Ø. Ekeli/CoPNo, Sælensminde/NHydro, K. Harestad/Esso, B. Williams, Esso, A. Huse/Pertra-DPT, J.E. Olvin/BP, A. Hide/BP, J. Bergem/BP Document no: 2003/1099 EXPERIENCE WITH ANNULAR SAFETY VALVES IN GAS LIFT OPERATIONS Summary A large inventory of lift gas under high pressure may amplify the risks and consequences of a blowout from gas lift wells. Regulations therefore demand that an annulus that is used for lift gas injections shall be equipped with a down hole safety valve, also called annular safety valve (ASV). The participating companies presented field cases on safety issues related to gas lift well completions. In particular, field experiences concerning ASV were discussed. Operating gas lift wells without such safety valves requires consent from the NPD. Exemptions are based on the assessment of operative risks and the evaluation of alternative solutions or compensating measures by the responsible/operator. The goal is to approach an equally safe or safer situation as with annular safety valves in gas lift wells. Cases that were discussed at the meeting differed in many aspects and demonstrated the difficulties to set a single safety standard to annular safety valves in gas lift operations. Such differences are e.g.: - Subsea vs. platform completions - Type of facility (steel jacket, buoy, GLB, TLP, FPSO or semi-sub) - Purpose of facility (wellhead platform alone or in combination with processing facilities, drilling modules or accomodation) - Production volumes and phase of production (plateau or tail) as well as remaining reservoir energy in relation to natural reservoir lift capacity - Annular volumes and pressure conditions. Major observations and conclusions were: - 6 out of 7 companies claim that workover operations related to installation or maintanance of ASV contribute substantially to the total risk in gas lift operations. - 6 out of 7 companies consider that ASV do not positively contribute to the safety of subsea gas lift completions. - There are a number of measures that successfully are used to reduce risks. These are e.g.: deepset safety valves below the GLV, GLV-qualification as barrier element, different types of safety valves installed at or in the wellhead, stringent monitoring and control routines. - Regulations should avoid detailed requirements related to ASV. The responsible should be able to demonstrate that safety on the installation is sufficiently recognised. A NORSOK standard or the like could be an adequate means to make risk assessments related to gas lift operations more systematic.

2 Minutes Agenda: Welcome and Introduction Presentation of Field Cases (w/ Exemptions) Draugen, Shell Ula, BP Ekofisk/Eldfisk, ConocoPhillips Varg, Pertra Lunch Presentation of Field Cases Grane, Norsk Hydro Jotun/Balder, Esso Heidrun/Veslefrikk, Statoil Discussion and Summary The meeting started with a brief introduction into NPD s current organisation. NPD continued with an orientation on present and past regulations concerning requirements to annular safety valves in gas lift operations. According to the new HES regulations, the Facilities Regulations 53 Equipment for completion and controlled wellflow demands down hole safety valves in the annulus, so called annular safety valves (ASV), if the production annulus is used for gas injection. Due to a large number of applications for exemptions in the last 2-3 years, the NPD asked whether regulations were perceived as too detailed in the industry, and, whether an attempt to work out better, functional requirements would maintain or even increase the safety level of gas lift wells. Norske Shell, Draugen Gas-lift on Draugen producers is performed both in subsea and platform wells. Subsea wells are completed with deepset safety valves as primary barrier elements. These are positioned below the gas lift valves (GLV). GLV are not qualified as barrier elements. The gas inventory in the annulus is considered to present a rather small risk regarding consequences and escalation in case of a major accidents on subsea installations. Workovers on ASV in subsea well completions, however, contribute substantially to the total risk in gas lift operations. Experiences with deepset safety valves has been positive so far. NSh referes furthermore to extensive experiences of the Shell group on gas lift installations world wide. Operations have shown that GLV often leak and that deepset valves or ASV may be more reliable barrier elements than GLV. Gas lift wells on the Draugen platform were designed with respect to some special features that distinguish Draugen from other cases: - The platform is built on a monohull concrete jacket. All risers are collected in the jacket. Operations require a defined hydrostatic balance in the monohull in order to avoid collapse. A blowout with gas and oil release into the monohull and a loss in hydrostatic balance may have catastrophic consequences. - Draugen is not equipped with a platform rig. Workovers on ASV would require a selfcontained rig. - Reservoir energy is still high and reservoir blowout is a relevant accident scenario.

3 Norske Shell (NSh) runs gas lift wells without ASV after consent by the NPD. Wellheads are equipped with doubleblock safety valves, so-called gas lift isolation safety valve (GLIS), while deepset safety valves are installed below the gas lift valves in subsea wells. The NPD put forward requirements to install ASV when working over wells, however, so far no well had to be worked over since production from Draugen started. Also, ASV would have to be placed relatively deep (650 m) due to technical considerations (cratering). The annular gas inventory would only be reduced from 40 m 3 injection gas at appr. 200 bar to 16 m 3, i.e. the inventory would not be substantially eliminated. NSh performed several risk assessment and consequence studies (safety and environmental risk analysis, HAZOP) before applying for exemptions. An explosion loading study for the well head area was performed. NSh reports that GLIS valves can take a fair amount of abuse and are build fairly robust. They would have been installed irrespective of the installation of ASV. ASV installation and maintanance demands a separate rig. ASV are therefore considered difficult to maintain and risk analyses indicate that the risk involved in a workover outweighs risks related to the gas inventory in the annulus. The Shell ALARP related to gas lift on Draugen includes in summary: - GLIS - Deepset SSCV as qualified and tested as barrier elements in subsea wells, i.e. any ASV if installed would not have a (reservoir) barrier function. - Deluge system - Gas detection system. Discussion: - NORSOK standard sets requirements to ASV in platform wells, however, the standard does not specify any requirements for subsea valves. This should be reconsidered. - 6 out of seven of the participating oil companies supported a general perception that ASV do not positively contribute to the safety of subsea completed gas lift wells. BP, Ula Ula was originally not designed for gas lift. Today, 7 of 14 wells are oil producers. 3 of the producers are now completed for gas lift. Flow energy on these wells is low and they would not produce without gas lift. 2 of the 3 gas lift wells were completed without ASV for low pressure (75 bar) gas lift operations in a campaign in 1992/93. These inject the lift gas at low depth into the production tubing. One well was completed as a high pressure (180 bar) gas lift well in 2001 with gas injections deeper down in the well. ASV were set at 270 m and after one year of operations, the ASV has performed troublefree. Some basic features that affect risk analyses of the Ula field case are: - Platforms are built on steel jackets. - The wellhead/production platform is separated from drilling and living quarters - Gas lift wells are equipped with gas lift valves (GLV) that are qualified and tested as barrier elements, i.e. any ASV if installed would not have a (reservoir) barrier function. Gas lift valves (GLV) in Ula wells are qualified and tested as barriers. Tests are carried out every 6 months. Leakage tests of GLV can take considerable time when carried out according to API procedure.

4 QRA were performed after exchanging information with Shell. Benefits from ASV were considered to be small. Studies showed that there is a high risk associated with installation and workover of ASV. PLL values were calculated and indicate a PLL-value of 1 per 5 to 90 yrs. Workover frequency was set to 1 per 25 years. The QRA concluded that there is virtually no increase in risk level for gas lift wells that are not equipped with ASV. Risk is on the same level as standard production wells (i.e. with no gas lift). Risk was assessed in terms of PLL-values. If gas lift is required, all new Ula-wells will be completed with ASV. ASV will be installed in new wells because there may be a small benefit related to the annular gas inventory. The main benefit of ASV is in their function as a 3 rd barrier and specifically as a barrier against unintenional flow of the lift gas from the annulus. ConocoPhillips, Ekofisk/Eldfisk CoPNo applied at the NPD for exemption from 53, Facilities Regulations, due to malfunctioning of the existing ASV. ASV were introduced on Ekofisk in 1996 at the start of the Eko II project. Eldfisk A and B also have ASV installed in new well completions. ASV are typically installed without being set a long time before gas lift operations commence. Of 56 installed ASV, 28 have now been set. CoPNo measures seal failures on 19 of these. Seal failures were identified as the predominating type of failure. GLV are qualified as primary barrier elements. A CoPNo performance measurement programme indicated 98% reliability of the GLV. To compensate for problems associated with ASV and at the same time reduce the risks associated with workovers, over the last 3 years, CoPNo designed and tested Annular Safety Check Valves (ASCV), a flapper type of valve derived from Coiled Tubing applications that is mounted into the wellhead. Several wellheads (total 6) on EKO X and ELD A have been equipped with ASCV on the lift gas injection side. On the opposite side of the wellhead a service valve is installed and may be opened for pressure control and bleeding off pressure for well maintenance. CoPNo presented a comparative risk analysis for 3 cases a) Gas lift with fully operational ASV b) No ASV/defective ASV c) as case 2 but with ASCV installed in the wellhead. Some guiding characteristics: - ASV installed and operational means that the loss of platforms is prevented in case of catastrophic hazardous events (collisions, explosions) - No ASV/ASCV means that hazardous events lead to loss of platform. - Maximum lift gas leakage volumes for alternative a) are appr. 5 m 3 at 150 bar and for alternative b) and c) 80 m 3 at 150 bar Risk analysis (so far) is based on blowout frequencies and shows that lower total frequencies are approached with the solution where ASCV are installed in the wellhead relative to the solution with fully operational ASV. The higher blowout frequency when ASV are installed is related to a substantial contribution of well intervention operations to blowout frequency.

5 When the maximum lift gas volume in the annulus is considered alone, risk related to leakage is higher for both cases that have no ASV installed (b and c). The difference in risk is especially large when calculating with 99.5% ASV reliability. However, when ASV reliability is reduced the difference gets smaller and at 60% ASV reliability any solution has the same risk level. Are the ASV less reliable as 60%, as in the current situation, risk levels for well completions without ASV are less risky. All calculations consider an ASCV-reliability of 98%. This value has been determined in CoPNo s ASCV study. ASCV-maintenance operations require bleeding off the annulus pressure via the manual valve at the wellhead. These are planned for every 3 month. The risk contribution of ASCV maintanance operation has not been included into the above risk calculations. Installation of ASCV on both sides of the wellhead have been evaluated earlier, however, two ASCV would prevent annular pressure observations when both ASCV are closed. This is in conflict with NORSOK requirements. CoPNo is in the process of assessing the risk impact of completing wells only on one side with ASCV. Discussion Q: Did CoPNo develop ASCV due to regulatory or safety issues? A: Combination of both. Q: Should ASCV be installed in all North Sea wells? A: Doing nothing may also be an option costs and benefits have to be assessed and compared. Comments: Shell/BP wouldn t have used ressources on the issue, however, the positive aspect of the ASCV as a safety element sheltered in the wellhead and the risk reducing effect become clear. Further Comments: - Shell/BP have co-operated on gas lift and ASV risk issues since quite a while. - CoPNo has done work on their own and in co-operation with consultants - Operators observe in general that safety issues related to gas lift wells are complex and require heavy weighters within risk analysis. The NPD should employ more risk analysis specialists. Pertra, Varg The Varg field is developed with an unmanned wellhead platform. The produced oil is pumped to the Varg FPSO. One of the Varg-producers is artificially lifted by gas lift. Gas lift is necessary due to high water cuts. There is some reservoir energy left and the well could be produced into a test separator without gas lift. Wells were completed in 1999 by Norsk Hydro and were initially not planned to be gas lifted. In september 2001 GLV were installed into the production tubing. Directed by Norsk Hydro, a gas lift comparative risk analysis for different options (with and without installation of ASV) was performed in summer This analysis showed that for the remaining field life (expected to be the end of 2002 at this time), installation of ASV would implicate a higher blowout frequency than running the gas lift well without ASV. This calculation had been made under consideration of the following compensating measures: 1. Installation of a double block valve at the wellhead 2. Frequent tests these valves to verify well integrity. 3. Annular pressure monitoring.

6 In march 2002, the field was purchased by Pertra. On application, the exemption to run gas lift without ASV was extended by the NPD to the end of Hydro/Grane-Brage All producers on Grane are planned with gas lift because of the viscous reservoir fluid. ASV will be installed at appr. 250 m depth. This results in a process gas volume above the ASV of 7 8 m 3 and a total annulus volume of m 3. Injection pressure is between 150 and 160 bar. Two GLV will be installed in each gas lift well. ASV are part of the primary barrier envelop, while GLV will not be qualified as barrier elements. With reference to current gas lift operations on the Brage field, NH reported that experiences with ASV have been good so far. In a few cases leaks were observed. In these cases, circulating Diesel helped to re-establish functionality. For Grane, in case of ASV-failure, Hydro currently works on a procedure where gas lift is going to be shut down before circulating Diesel or initiating any major workover operation. Esso/Balder, Jotun-Ringhorne Of 18 oil producers on Jotun/Ringhorne all are gas lifted. Balder comprises 12 oil producers of which also all are gas lifted. ASV/packer single are installed just below the tubing SCSSV on platform wells. In subsea wells ASV/packer are installed just below a dual hanger. Esso has not observed any problems with the ASV so far. One incident was registered related to a control line failure. ASV are installed and tested as primary barrier elements. In case of an ASV failure Esso would investigate the option to qualify the GLV as barrierelements. Esso confirms Shell s experience that leakages over GLVs are quite common. Statoil/Heidrun-Veslefrikk On Veslefrikk, 7 of 11 producers are completed as gas lift wells. On Heidrun producers are completed for gas lift (dual completions), yet gas lift is discontinuous. Failure during installations has prevented Statoil to run continuous gas lift on 2-3 wells. These wells need workover before commencing with continuous gas lift. ASV are installed (and set) on all gas lift wells. GLV are not defined as barrier elements. Statoil has seen problems with the reliability of GLV and the qualification of GLV as barrier elements. Discussions NS Regulations should avoid detailed requirements concerning annular safety valves. The responsible should be able to demonstrate that safety on the installation is sufficiently recognised. EM The discussion is mainly about old vs. new wells. Costs related to installation and maintanance of ASV in old wells will be too high to defend benefits. EM It was worthwhile to get information on other companies cases and information on what background applications for exemptions are put foreward. EM Observe that workovers are easier to defend economically when well production is high.

7 CoPNo It would be very useful to understand the different techniques to perform risk analyses. Available risk analyses on ASV-issues should be compared and differences should be evaluated. It would also be useful to collect data for leakage statsitics both for ASV and GLV. Statoil In general good experience on Heidrun and Veslefrikk. Gas lift is shut in in case of ASVfailure. ASV are barrier elements. GLV are not part of the barrier envelops. BP GLV vs. ASV failure rates should be assessed in a risk level project. All companies Any joint initiative to change (NORSOK) standards or define best practices would stand stronger if the NPD participates actively., Revision, Last revision,

8 NPD S PRESENTATION

9

10 NORSKE SHELL S PRESENTATION

11

12

13 BP S PRESENTATION

14

15

16

17 PERTRA S PRESENTATION 17

18

19

20 NORSK HYDRO S PRESENTATION

21 STATOIL S PRESENTATION 21

22 OP Oil Producers WI Water Injectors GI Gas Injectors Bal 4729U Site A Existing Balder Subsea Wells New Subsea Wells 12" Oil line 12" Oil line 10" Rich Gas line 6" Gas lift line Site B Fiber optic cable Site D 9 km Site C 5 Bal WELLHEAD PLATFORM SHUTTLE TANKER (not part of development project) FPSO ESSO NORGE S PRESENTATION Esso NorgeProducing Fields Overview NPD Meeting 5 June, OIL FIELDS GAS FIELDS OIL AND GAS FIELDS CONDENSATE FIELDS ESSO LICENSES OTHER LICENSES 0 50 km Annulus Safety Valves on Gas Lifted Wells Esso Norge JOTUN Bergen RINGHORNE BALDER Stavanger NPDMeetingACCSSVsJune03.ppt 6-Apr-05 Esso Norge AS An ExxonMobilSubsidiary NPDMeetingACCSSVsJune03.ppt 6-Apr-05 2 Esso Norge AS An ExxonMobilSubsidiary Balder / Ringhorne SubseaDevelopment Jotun and Ringhorne Platform Developments Drilling: - Phase I: Phase II: 2001 Subsea Wells - 12 Oil Producers (All Gas Lifted) - 3 Water Injectors - 1 Gas Injector - 1 Water Source Production to Floating Production Unit (FPU) BALDER FPU RINGHORNE PLATFORM Drilling: - Jotun Phase I: Jotun Phase II: Ringhorne: Platform Wells - 18 Oil Producers (All Gas Lifted) - 12 Additional Oil Producers Planned - 1 Water Injector - 2 Water Disposal Production to Floating Production, Storage and Offloading Units. NPDMeetingACCSSVsJune03.ppt 6-Apr-05 3 Esso Norge AS An ExxonMobilSubsidiary NPDMeetingACCSSVsJune03.ppt 6-Apr-05 4 Esso Norge AS An ExxonMobilSubsidiary Production Characteristics - Gas Lift Typical Platform Oil Producer Completions Typical Platform Oil Producers (Gas Lifted) Production Characteristics - Gas Lift - Gas Lift used for initial Well Kickoff and for Production Lift. - Gas Lift typically used during all phases of well life to supplement natural flow well capacity. - Wire Wrapped Screen Horizontal Completions - 5 1/2 tubing with hydraulic set permanent packer. - Tubing Safety Valve - Annulus Safety Valve / Packer Single Gas Lift Valve - Single Gas Lift Valve installed with initial completion NPDMeetingACCSSVsJune03.ppt 6-Apr-05 5 Esso Norge AS An ExxonMobilSubsidiary NPDMeetingACCSSVsJune03.ppt 6-Apr-05 6 Esso Norge AS An ExxonMobilSubsidiary

23 Typical Subsea Oil Producer Completions Safety Valve Characteristics RKB: 23m Water depth: 124.6m ASCSSV Seabed at 147.6m Typical Subsea Oil Producers (Gas Lifted) - Wire Wrapped Screen Horizontal Completions - 5 1/2 tubing with hydraulic set permanent packer. Safety Valve Depth - Production SCSSV - Driven primarily by Oil Wax Temperature PSCSSV / " x 9 / " m MD 30" m er MD to (Crossov m MD) / m MD / m TVD / Side Pocket Mandrel for Gas Lift Valve - Annulus Safety Valve / Packer (below Dual Bore Tubing hanger) - Tubing Safety Valve - Single Gas Lift Valve installed with initial completion - Annulus SCSSV - Platform Wells: Set immediately below Production SCSSV (allows retrieval of Prod. SCSSV and provide adequate work string weight for annulus packer release). - Subsea Wells: Set below annulus bore of dual bore tubing hanger m MD / m TVD / Production m MD/ m TVD / Quantum m MD/ m TVD / Top m MD / m TVD / Side Pocket Gauge Mandrel (SPGM) Pressure and Temperature m MD / m TVD / 70 5 Top 8 9 / " m MD / m TVD / OCRE m MD / m TVD / Final TD / " 8 x 9 / 3270m MD/ m TVD / ½" hole to 3791m MD / m TVD m MD / m TVD / 89.9 Annulus Safety Valve Type - Platform Wells: Integral Hydraulic-Set Annulus Packer / Safety Valve. Flapper type, spring to close. - Subsea Wells: Tubing Retrievable Flapper type. Spring to close. NPDMeetingACCSSVsJune03.ppt 6-Apr-05 7 Esso Norge AS An ExxonMobilSubsidiary NPDMeetingACCSSVsJune03.ppt 6-Apr-05 8 Esso Norge AS An ExxonMobilSubsidiary Annulus Safety Valve Experience Annulus Safety Valve Experience - 15 Subsea Wells and 18 Platform Well Completions. - Up to ca. 4 years production) - Annulus Safety Valve Failures - No safety valve bore leak failures to date - One hydraulic control line leak on initial installation (platform well) - Other Operating Characteristics - Extra costs associated with Annulus SCSSV / Packer on well workovers. - Extra completion costs associated with annulus safety valve installation - Production shut-in for annulus safety valve testing END NPDMeetingACCSSVsJune03.ppt 6-Apr-05 9 Esso Norge AS An ExxonMobilSubsidiary NPDMeetingACCSSVsJune03.ppt 6-Apr Esso Norge AS An ExxonMobilSubsidiary

37 th Gas-Lift Workshop Houston, Texas, USA February 3 7, Dag Almar Hansen, CEO Gas-Lift Workshop 1. Feb. 3-7, 2014

37 th Gas-Lift Workshop Houston, Texas, USA February 3 7, Dag Almar Hansen, CEO Gas-Lift Workshop 1. Feb. 3-7, 2014 37 th Gas-Lift Workshop Houston, Texas, USA February 3 7, 2014 Dag Almar Hansen, CEO Feb. 3-7, 2014 2014 Gas-Lift Workshop 1 37 th Gas-Lift Workshop Houston, Texas, USA February 3 7, 2014 Pressure management

More information

Heidrun Inverted Gas Lift System

Heidrun Inverted Gas Lift System Heidrun Inverted Gas Lift System ICoTA European Intervention Conference, Aberdeen Nov. 2014 Sivert Gartland, Well Intervention Engineer, Heidrun, Statoil Agenda Background - Field and drainage techniques

More information

Oil and Gas UK Well Integrity Guidelines

Oil and Gas UK Well Integrity Guidelines Oil and Gas UK Well Integrity Guidelines The Well, the Completion and the Xmas Tree The Equipment and the People A Definition of Well Integrity Key UK Legislative Requirement for Well Integrity Oil and

More information

An Introduction to Oil & Gas Drilling and Well Operations

An Introduction to Oil & Gas Drilling and Well Operations An Introduction to Oil & Gas Drilling and Well Operations Educational Material from the IOM 3 Oil and Gas Division The global network for the materials cycle Introduction The Institute of Materials, Minerals

More information

In any of the 5 star hotel. The exact venue will be intimated prior to course commencement.

In any of the 5 star hotel. The exact venue will be intimated prior to course commencement. Training Title WELLHEAD OPERATION Training Duration 5 days Training Venue and Dates Wellhead Operations 5 19 23 May $3,750 Abu Dhabi, UAE In any of the 5 star hotel. The exact venue will be intimated prior

More information

Training Fees 4,250 US$ per participant for Public Training includes Materials/Handouts, tea/coffee breaks, refreshments & Buffet Lunch

Training Fees 4,250 US$ per participant for Public Training includes Materials/Handouts, tea/coffee breaks, refreshments & Buffet Lunch Training Title WELL HEAD OPERATIONS Training Duration 5 days Training Venue and Dates REF OP035 Well Head Operations 5 08-12 May $4,250 Abu Dhabi, UAE Will be held in any of the 5 star hotels. The exact

More information

SAFER, SMARTER, GREENER

SAFER, SMARTER, GREENER OIL & GAS Introduction to Subsea Production Systems 04 Christmas Tree (XT) Systems August 2015 DNV GL 2013 August 2015 SAFER, SMARTER, GREENER Christmas Tree Systems Onshore tree Offshore tree Subsea tree

More information

EUOAG Workshop. Workshop on decommissioning of offshore installations Challenges, options and lessons learned PP&A

EUOAG Workshop. Workshop on decommissioning of offshore installations Challenges, options and lessons learned PP&A EUOAG Workshop Workshop on decommissioning of offshore installations Challenges, options and lessons learned PP&A Johnny Gundersen Principal Engineer, PSA Norway Content Requirements for PP&A in Norway

More information

International Well Control Forum Well Intervention Pressure Control Subsea Syllabus

International Well Control Forum Well Intervention Pressure Control Subsea Syllabus International Well Control Forum Well Intervention Pressure Control Subsea Syllabus November 2017 Version 1.0 IWCF Well Intervention Pressure Control Subsea Syllabus Contents Guidance Notes... 1. Introduction...

More information

Introduction to Subsea Production Systems. What is Subsea? 02 What is Subsea? DNV GL DNV GL 2013 September 2014

Introduction to Subsea Production Systems. What is Subsea? 02 What is Subsea? DNV GL DNV GL 2013 September 2014 Introduction to Subsea Production Systems 02 What is Subsea? September 2014 DNV GL 2013 September 2014 SAFER, SMARTER, GREENER What is Subsea? 3 1 What is Subsea? 4 Subsea example 5 2 Subsea example 6

More information

Force Seminar, March 28th - 29th, 2001 "Value of Smart Wells"

Force Seminar, March 28th - 29th, 2001 Value of Smart Wells Development and first installation of the remote hydraulic completion concept in a subsea well at Snorre Authors: Egil Østvik (Norsk Hydro) Paul L. Browne (Halliburton) Lars Rasmussen (Norsk Hydro) Jim

More information

Subsea Intervention: Is It Worth It? Drummond Lawson

Subsea Intervention: Is It Worth It? Drummond Lawson Subsea Intervention: Is It Worth It? Drummond Lawson 1 Subsea Intervention Is It Worth It? Subsea development timeline Why Intervene? What can you achieve? Intervention methods Intervention drivers What

More information

Hans J Lindland FMC Kongsberg Subsea Innovative Technologies, Creative Solutions

Hans J Lindland FMC Kongsberg Subsea Innovative Technologies, Creative Solutions Lett Brønnintervensjon Hans J Lindland FMC Kongsberg Subsea Why Light Well Intervention? Reservoir recovery is significantly lower (oil) for subsea wells than for platform wells Cost for drilling units

More information

SPE A Systematic Approach to Well Integrity Management Alex Annandale, Marathon Oil UK; Simon Copping, Expro

SPE A Systematic Approach to Well Integrity Management Alex Annandale, Marathon Oil UK; Simon Copping, Expro SPE 123201 A Systematic Approach to Well Integrity Management Alex Annandale, Marathon Oil UK; Simon Copping, Expro Copyright 2009, Society of Petroleum Engineers This paper was prepared for presentation

More information

Kuala Lumpur 3 October 2012 State of the Industry of Riserless Light Well Interventions (RLWI)

Kuala Lumpur 3 October 2012 State of the Industry of Riserless Light Well Interventions (RLWI) Kuala Lumpur 3 October 2012 State of the Industry of Riserless Light Well Interventions (RLWI) Bevan Morrison, VP Global Subsea Intervention Solutions Agenda Subsea well intervention introduction Economic

More information

Recent advancement in well-control technology improves safety and allows cost savings for well designs

Recent advancement in well-control technology improves safety and allows cost savings for well designs Recent advancement in well-control technology improves safety and allows cost savings for well designs Simulation While Drilling and Relief Well Injection Spool 1 Doing More for Less What can we cut? Largest

More information

SPE Distinguished Lecturer Program

SPE Distinguished Lecturer Program SPE Distinguished Lecturer Program Primary funding is provided by The SPE Foundation through member donations and a contribution from Offshore Europe The Society is grateful to those companies that allow

More information

Send your directly to

Send your  directly to Welcome to Chess Subsea Production System Training - SPS Subsea production system (SPS) is associated with the overall process and all the equipment involved in drilling, field development, and field operation.

More information

Floating Systems. Capability & Experience

Floating Systems. Capability & Experience Floating Systems Capability & Experience Capability Overview INTECSEA has more than 30 years of extensive experience with all types of floating systems: TLPs, spars, monohulls and semi-submersibles. Key

More information

Deep Water Definitions

Deep Water Definitions DST in Deep Water Deep Water Definitions Depth of Water (Deepwater >1000ft (300m), Ultra- Deepwater > 5000ft (1500m)) Rig Type - Floaters (Drillships and Semi-Submersibles) Approach and Profile (risk,

More information

The intent of this guideline is to assist the Drilling Engineer in his preparation of the deepwater drill stem test design and procedure.

The intent of this guideline is to assist the Drilling Engineer in his preparation of the deepwater drill stem test design and procedure. 1 The intent of this guideline is to assist the Drilling Engineer in his preparation of the deepwater drill stem test design and procedure. This document is not intended to override any specific local

More information

Data Mining Operator Benchmarking Studies for Artificial Lift Statistics, Technology Trends and Equipment Details

Data Mining Operator Benchmarking Studies for Artificial Lift Statistics, Technology Trends and Equipment Details Data Mining Operator Benchmarking Studies for Artificial Lift Statistics, Technology Trends and Equipment Details Wonuola Scott & Aaron Duffus: Rushmore Reviews Cameron Laing: Laing Engineering & Training

More information

NORWAY. Norwegian Industrial Property Office (12) APPLICATION (19) NO (21) (13) A1. (51) Int Cl.

NORWAY. Norwegian Industrial Property Office (12) APPLICATION (19) NO (21) (13) A1. (51) Int Cl. (12) APPLICATION (19) NO (21) 11782 (13) A1 NORWAY (1) Int Cl. E21B 43/00 (06.01) E21B 43/01 (06.01) E21B 43/12 (06.01) Norwegian Industrial Property Office (21) Application nr 11782 (86) Int.application.day

More information

4 Briefing. Responsible investor

4 Briefing. Responsible investor Issue Responsible investor 4 Briefing Wednesday 8 th February 2012 In 2010, we accepted all 26 recommendations made by the Bly Report our internal investigation into the Deepwater Horizon incident. BP

More information

Tore Aarsland. Chairman of the Editorial Revision Committee / Senior Design C6 Technologies. 10-Jan-13

Tore Aarsland. Chairman of the Editorial Revision Committee / Senior Design C6 Technologies. 10-Jan-13 Tore Aarsland Chairman of the Editorial Revision Committee / Senior Design Engineer @ C6 Technologies 10-Jan-13 1. The well barrier philosophy of the standard is harmonised to NORSOK D-010. The use of

More information

Advanced Well Completion Design. 30 Sep - 04 Oct 2018, Dubai. REP logo, PMI & PMP are registered trademarks of Project Management Institute, Inc.

Advanced Well Completion Design. 30 Sep - 04 Oct 2018, Dubai. REP logo, PMI & PMP are registered trademarks of Project Management Institute, Inc. 30 Sep - 04 Oct 2018, Dubai Approved Centre REP logo, PMI & PMP are registered trademarks of Project Management Institute, Inc. Introduction Organisational Impact This Glomacs Advanced Well training seminar

More information

Contents. 1. Brief presentation of Eni. 2. General field information. 3. Challenges pre project sanctioning. 4. Development solution

Contents. 1. Brief presentation of Eni. 2. General field information. 3. Challenges pre project sanctioning. 4. Development solution Contents 1. Brief presentation of Eni 2. General field information 3. Challenges pre project sanctioning 4. Development solution 5. Status of the project execution 6. Challenges ahead Orkangerkonferansen

More information

Well Control Contingency Plan Guidance Note (version 2) 02 December 2015

Well Control Contingency Plan Guidance Note (version 2) 02 December 2015 Well Control Contingency Plan Guidance Note (version 2) 02 December 2015 Prepared by Maritime NZ Contents Introduction... 3 Purpose... 3 Definitions... 4 Contents of a Well Control Contingency Plan (WCCP)...

More information

Single / Dual Barrier HP Drilling Risers

Single / Dual Barrier HP Drilling Risers Single / Dual Barrier HP Drilling Risers Acteon HPHT Subsea Community Breakfast Meeting 23rd March 2011 Tim Eyles Director 2H Offshore Engineering tim.eyles@2hoffshore.com / +44 1483 774908 Agenda Introduction

More information

Introduction to Subsea Production Systems. What is Subsea? 02 What is Subsea? DNV GL DNV GL 2013 August 2015

Introduction to Subsea Production Systems. What is Subsea? 02 What is Subsea? DNV GL DNV GL 2013 August 2015 Introduction to Subsea Production Systems 02 What is Subsea? August 2015 DNV GL 2013 August 2015 SAFER, SMARTER, GREENER What is Subsea? 2 1 Goals Know the main building blocks forming a subsea production

More information

GTSC Rig for Hands-on Training

GTSC Rig for Hands-on Training GTSC Rig for Hands-on Training The Rig To meet the high demand of Petroleum Industry, GTSC has launched the Middle East s first fully operational Training Rig & Well in May 2010 at its main building location

More information

Offshore Drilling Rigs

Offshore Drilling Rigs Offshore Drilling Rigs Drilling Offshore Drilling Rigs Many of the world s potential reserves of hydrocarbons lie beneath the sea, and the hydrocarbon industry has developed techniques suited to conditions

More information

Enhancing international subsea well incident intervention

Enhancing international subsea well incident intervention Enhancing international subsea well incident intervention Y C 23 M 2 Y 0 K 63 K While we hope intervention equipment will never be needed, it is critical for the industry to be prepared Archie Smith, Chief

More information

Active Heating Potential Benefits to Field Development

Active Heating Potential Benefits to Field Development Active Heating Potential Benefits to Field Development Journées Annuelles du Pétrole 12/13 Octobre Paris Atelier Champs Matures et Satellites Technip Subsea Innovation Management (T-SIM) Contents 1. INTRODUCTION

More information

DE120 Successful Well Completion and Workover Practices:

DE120 Successful Well Completion and Workover Practices: DE120 Successful Well Completion and Workover Practices: A Practical Approach from Design to Field Operations H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E www.ictd.ae ictd@ictd.ae

More information

Speaker at the Americas: Decommissioning and Well Abandonment. September 23, 2015

Speaker at the Americas: Decommissioning and Well Abandonment. September 23, 2015 Speaker at the Americas: Decommissioning and Well Abandonment September 23, 2015 TETRA Offshore Services TETRA Offshore Services ISO 9001:2008 Certified 2 Decommissioning Case Study - Agenda A general

More information

PRESS KIT IVAR AASEN DET NORSKE OLJESELSKAP ASA

PRESS KIT IVAR AASEN DET NORSKE OLJESELSKAP ASA PRESS KIT IVAR AASEN DET NORSKE OLJESELSKAP ASA Table of content 1. INTRODUCTION... 2 1.1. Purpose of document... 2 1.2. Det norske oljeselskap... 2 1.3. HSE... 2 2. ABOUT THE IVAR AASEN FIELD... 2 2.1.

More information

HPHT Case Study: Kristin Field, North Sea

HPHT Case Study: Kristin Field, North Sea HPHT Case Study: Kristin Field, North Sea Craig Newman Senior Engineer, Subsea Systems NOV Texas Oil Tools 1 Personal info 2010 BSME Texas Tech University Joined TOT as Mechanical Engineer Worked with

More information

BP SWOPS Single Well Oil Production System. Sandy Meldrum CEng, MIMechE

BP SWOPS Single Well Oil Production System. Sandy Meldrum CEng, MIMechE Sandy Meldrum CEng, MIMechE Concept A means of producing oil from small offshore fields which would be uneconomic for fixed platforms or other conventional means. System Overview Comprised Production Vessel

More information

Siem WIS. Siem WIS AS. Closed Loop Drilling CLD. August Siem WIS AS.

Siem WIS. Siem WIS AS. Closed Loop Drilling CLD. August Siem WIS AS. AS Closed Loop Drilling CLD August 2010 2010 AS. Technology summary has secured intellectual property rights (IPR) for all key components of its portfolio: CircSub To drill with constant Mud Circulation

More information

Extreme quality with the highest level of flexibility Paul Charles Redfern CEO, Norvalves

Extreme quality with the highest level of flexibility Paul Charles Redfern CEO, Norvalves Extreme quality with the highest level of flexibility Paul Charles Redfern CEO, Norvalves Fast-Track & Bespoke valves HISTORY Long life time, short lead time Located at Ågotnes, Bergen 1,940 sqm of modern

More information

Subsea Lift. Inwell and caisson lifting systems

Subsea Lift. Inwell and caisson lifting systems Subsea Lift Inwell and caisson lifting systems Two Decades of Subsea Experience With more than 70 percent of the Earth s surface covered by water, it was inevitable for oil and gas fields to eventually

More information

Well Life Cycle Integrity. IOM 3 / Energy Institute Technical Meeting 12 th March 2019

Well Life Cycle Integrity. IOM 3 / Energy Institute Technical Meeting 12 th March 2019 Well Life Cycle Integrity IOM 3 / Energy Institute Technical Meeting 12 th March 2019 Contents Agenda UK goal setting Regulations UK wells guidelines Principles of well integrity UK well integrity guidelines

More information

Be a Differentiator in Management of Well Integrity and Risk for Deepwater O&G Wells

Be a Differentiator in Management of Well Integrity and Risk for Deepwater O&G Wells How Reliability Data and Software Solutions Can Be a Differentiator in Management of Well Integrity and Risk for Deepwater O&G Wells Presented by Einar Molnes, CTO and Founder einar.molnes@exprosoft.com

More information

Pilot Installation of Retrofit Gas Lift System Brae Bravo UK North Sea

Pilot Installation of Retrofit Gas Lift System Brae Bravo UK North Sea 36 th Gas-Lift Workshop Stavanger, Norway February 4 8, 2013 Retrofit Gas Lift Pilot Installation of Retrofit Gas Lift System Brae Bravo UK North Sea Alun Whittaker Business Development Manager Coiled

More information

IWCF Well Control Level 5. Celle Drilling Conference 2017

IWCF Well Control Level 5. Celle Drilling Conference 2017 IWCF Well Control Level 5 Celle Drilling Conference 2017 Contents IWCF well control level 5 course program Background - who is it for Structure and contents Delivery approach Questions Why? Level 5 background

More information

Advanced Well Completion Design

Advanced Well Completion Design An Intensive 5 Day Training Course Advanced Well Completion Design 30 Sep - 04 Oct 2018, Dubai 19-OCT-17 This course is Designed, Developed, and will be Delivered under iso Quality standards Advanced Well

More information

12Future developments

12Future developments eng_fakta_2005_kap11_15 12-04-05 15:34 Side 148 12Future developments Subsea template eng_fakta_2005_kap11_15 12-04-05 15:34 Side 149 Discoveries in the planning phase Excludes discoveries included under

More information

NTL No N06 Information Requirements for EPs, DPPs and DOCDs on the OCS Effective June 18, 2010

NTL No N06 Information Requirements for EPs, DPPs and DOCDs on the OCS Effective June 18, 2010 NTL No. 2010-N06 Information Requirements for EPs, DPPs and DOCDs on the OCS Effective June 18, 2010 Frequently Asked Questions (FAQ s) Updated July 15, 2010 Updated July 21, 2010 1. Q. What OCS areas

More information

Report. Temporary abandoned wells on NCS. Subtitle. Author(s) Nils Totland. SINTEF Petroleum Research Well Integrity

Report. Temporary abandoned wells on NCS. Subtitle. Author(s) Nils Totland. SINTEF Petroleum Research Well Integrity - Unrestricted Report Temporary abandoned wells on NCS Subtitle Author(s) Nils Totland SINTEF Petroleum Research Well Integrity 2011-08-24 SINTEF Petroleumsforskning AS SINTEF Petroleum Research Address:

More information

Dynamic Approach to Quasi-static Nonlinear Problems for Sub-Sea Applications

Dynamic Approach to Quasi-static Nonlinear Problems for Sub-Sea Applications Dynamic Approach to Quasi-static Nonlinear Problems for Sub-Sea Applications Smitha G, Mahesh Bhat GE Oil & Gas, Bangalore Abstract: In deep-sea oil fields, metal seals play an important role to facilitate

More information

Suspended Subsea Well Monitoring CaTS TM Wireless Technology. Donald Horsfall RPLM (ECIS)

Suspended Subsea Well Monitoring CaTS TM Wireless Technology. Donald Horsfall RPLM (ECIS) Suspended Subsea Well Monitoring CaTS TM Wireless Technology Donald Horsfall RPLM (ECIS) Tuesday 27 th June 2017 Agenda Introduction to CaTS Technology CaTS - Cable-less Telemetry System Industry guidelines

More information

Princess Subsea Gas Lift Start-Up

Princess Subsea Gas Lift Start-Up 40 th Gas-Lift Workshop Houston, Texas, USA Oct. 23 27, 2017 Princess Subsea Gas Lift Start-Up Belle Ibanez, Shell Steven Freeman, Shell 2017 Gas-Lift Workshop 1 Agenda Princess Field Background Subsea

More information

SAVE WEEKS DRILLING AND COMPLETING

SAVE WEEKS DRILLING AND COMPLETING SAVE WEEKS DRILLING AND COMPLETING New benchmarking study explains and quantifies exceptional time savings from cesium formate fluids Key findings and conclusions from an extensive benchmarking study by

More information

Faroe Petroleum plc ( Faroe, the Company ) Asset swap transaction Maria discovery swapped for Norwegian production assets

Faroe Petroleum plc ( Faroe, the Company ) Asset swap transaction Maria discovery swapped for Norwegian production assets 11 April 2010 Faroe Petroleum plc ( Faroe, the Company ) Asset swap transaction Maria discovery swapped for Norwegian production assets Faroe Petroleum, the independent oil and gas company focusing principally

More information

New Developments in Regulation of U.S. Offshore Oil and Gas Operations

New Developments in Regulation of U.S. Offshore Oil and Gas Operations New Developments in Regulation of U.S. Offshore Oil and Gas Operations Peking University Law School and The University of Texas School of Law Carol Dinkins Partner Vinson & Elkins, LLP August 21, 2012

More information

Increased Safety & Efficiency from a Dedicated Light Well Intervention Vessel on Deepwater Subsea Wells

Increased Safety & Efficiency from a Dedicated Light Well Intervention Vessel on Deepwater Subsea Wells Increased Safety & Efficiency from a Dedicated Light Well Intervention Vessel on Deepwater Subsea Wells A Truly Integrated Service Delivery 09 August 2017 Agenda Introduction to Light Well Intervention

More information

Offshore Development Concepts: Capabilities and Limitations. Kenneth E. (Ken) Arnold Sigma Explorations Holdings LTD April, 2013

Offshore Development Concepts: Capabilities and Limitations. Kenneth E. (Ken) Arnold Sigma Explorations Holdings LTD April, 2013 Offshore Development Concepts: Capabilities and Limitations Kenneth E. (Ken) Arnold Sigma Explorations Holdings LTD April, 2013 Outline Platforms Floating Structures Semi-Submersible/ Floating Production

More information

subsea annulus management call for proposals

subsea annulus management call for proposals subsea annulus management call for proposals June 2013 Aims This is an open invitation to any organisation, from any sector, seeking partners and funding for innovative technologies in the oil and gas

More information

International Well Control Forum IWCF. Well Control Training Syllabus. Drilling Level 2. 1 st January 2014 Version 3.0

International Well Control Forum IWCF. Well Control Training Syllabus. Drilling Level 2. 1 st January 2014 Version 3.0 International Well Control Forum IWCF Well Control Training Drilling Level 2 1 st January 2014 Version.0 Drilling Well Control Written Test Level 2 Surface & Subsea BOP Stack s and Structure Written Test

More information

SUBSEA 101. Find more Subsea 101 case studies online

SUBSEA 101. Find more Subsea 101 case studies online SUBSEA 101 The purpose of this document is to help define some of the rationale behind the selection of a subsea tree configuration in a theoretical field for a project we are calling Project X. This section

More information

Case Histories of Life Cycle Well Integrity Management Using iwit Software

Case Histories of Life Cycle Well Integrity Management Using iwit Software Case Histories of Life Cycle Well Integrity Management Using iwit Software SPE London, Nov 29 th, 2011 Liane Smith and Ged Lunt, Intetech Ltd. INTEGRITY TECHNOLOGY Focus: - on integrity in design work

More information

Working for the future POSGRIP Technology

Working for the future POSGRIP Technology Working for the future POSGRIP Technology A Request for Joint Industry Support to enable roll-out of a new method of wellhead design October 2008 Page 1 1.1 - The Principals of POS-GRIP A New Method for

More information

ECDM System. November, Security Classification: Restricted - Status: Draft

ECDM System. November, Security Classification: Restricted - Status: Draft ECDM System November, 2014 Objective Enhance the ability to safely and efficiently drill deep-water wells High uncertainty in pore and fracture pressure gradients Narrow drilling margins Develop system

More information

RPSEA PROJECT STATUS REPORT FEB 2011

RPSEA PROJECT STATUS REPORT FEB 2011 RPSEA PROJECT STATUS REPORT FEB 2011 RPSEA Project 08121-2301-03 Ultra-Deepwater Riserless Intervention System (RIS) & RPSEA Project 09121-3500-07 Ultra-Deepwater Subsea Test Tree (SSTT) and Intervention

More information

Designing Subsea Wells for Abandonment & Suspension

Designing Subsea Wells for Abandonment & Suspension Designing Subsea Wells for Abandonment & Suspension Graeme Rae Rig Build Project Engineer Chevron Upstream Europe Aberdeen Designing Subsea Wells for Abandonment & Suspension Subsea Well Design Aspects

More information

WRS Artificial Lift System

WRS Artificial Lift System WRS Artificial Lift System Patent Pending Designed to adapt to any type of Artificial Lift Suspension! Artificial Lift and Down hole gauge monitoring Is fast Becoming the go to in the oil production market.

More information

MONTARA DEVELOPMENT PROJECT The Montara development project is located in the Timor Sea approx 650 km west of Darwin. PTTEP owns and operates 100 per

MONTARA DEVELOPMENT PROJECT The Montara development project is located in the Timor Sea approx 650 km west of Darwin. PTTEP owns and operates 100 per 1 2 MONTARA DEVELOPMENT PROJECT The Montara development project is located in the Timor Sea approx 650 km west of Darwin. PTTEP owns and operates 100 per cent of the Montara Development Project, which

More information

Kinsale Area Gas Fields Decommissioning Project Information Leaflet

Kinsale Area Gas Fields Decommissioning Project Information Leaflet Kinsale Area s Decommissioning Project Information Leaflet About Kinsale Energy PSE Kinsale Energy Limited has been operating a number of gas fields in the Celtic Sea, off the County Cork coast, since

More information

NTL No N05 Increased Safety Measures for Energy Development on the OCS Effective June 8, 2010

NTL No N05 Increased Safety Measures for Energy Development on the OCS Effective June 8, 2010 NTL No. 2010-N05 Increased Safety Measures for Energy Development on the OCS Effective June 8, 2010 Frequently Asked Questions (FAQ s) Updated July 9, 2010 A. General Questions QA1: With the issuance of

More information

7 Briefing. Responsible investor

7 Briefing. Responsible investor Issue Responsible investor 7 Briefing Monday, 5 th October 202 In 200, we accepted all 26 recommendations made by the Bly Report our internal investigation into the Deepwater Horizon incident. BP has committed

More information

Hunting Manufactures and distributes products that enable the extraction of oil and gas

Hunting Manufactures and distributes products that enable the extraction of oil and gas Hunting Manufactures and distributes products that enable the extraction of oil and gas Hunting PLC Global Footprint 2 2009 Corporate Highlights Completed three acquisitions 47.3m Sale of Hunting Energy

More information

Use of subsea Multiphase pumps as an alternative to ESP workover in a mature field development Kia Katoozi

Use of subsea Multiphase pumps as an alternative to ESP workover in a mature field development Kia Katoozi Use of subsea Multiphase pumps as an alternative to ESP workover in a mature field development Kia Katoozi May 216 1 Agenda The Otter Field ESP History Otter production & Injection scenarios MPP Feasibility

More information

Deepwater riserless (RLWI) enablers for increased oil recovery. Bringing shallow water experience to deepwater.

Deepwater riserless (RLWI) enablers for increased oil recovery. Bringing shallow water experience to deepwater. Deepwater riserless (RLWI) enablers for increased oil recovery. Bringing shallow water experience to deepwater. Well Intervention Services Deepwater RLWI success criteria RLWI history Technology Focus

More information

Dry trees for cost effective solution with the Wellhead Barge: WHB

Dry trees for cost effective solution with the Wellhead Barge: WHB Dry trees for cost effective solution with the Wellhead Barge: WHB Benjamin MAURIES SAIPEM PAU, FRANCE 5 7 APRIL 2016 Dry Tree Solution for Mild Environments Dry Tree solutions have been developed and

More information

Application of FRP Pipes & Other Composites in Oil & Gas Sector: Opportunities and Challenges

Application of FRP Pipes & Other Composites in Oil & Gas Sector: Opportunities and Challenges PRESENTATION ON Application of FRP Pipes & Other Composites in Oil & Gas Sector: Opportunities and Challenges NCRAC 2012, Hyderabad 15.06.2012 S.K. Dewri, Chief Engineer, ONGC, Institute of Engineering

More information

Enhancing Industry Capability for drilling Deepwater Wells A Chevron Perspective

Enhancing Industry Capability for drilling Deepwater Wells A Chevron Perspective Enhancing Industry Capability for drilling Deepwater Wells A Chevron Perspective Kevin Taylor September 26, 2011 Eleventh U.S.-China Oil and Gas Industry Forum Chevron is a Major Operator in Subsea and

More information

DrillWell Drilling and Well Centre for Improved Recovery

DrillWell Drilling and Well Centre for Improved Recovery DrillWell Drilling and Well Centre for Improved Recovery Outline Introduction Key results Drilling&Wells and IOR IOR Norway 2018 April 24-25, 2018 By Sigmund Stokka, Manager DrillWell 1 Drilling and Well

More information

Marginal Project Development

Marginal Project Development Marginal Project Development A case study of the MC-66 / OCHRE Project Richard Weser MC66 OCHRE Joint Venture Project OCHRE PROSPECT DEVELOPMENT Mississippi Canyon 66 1 Gas Subsea 7.9-Mile Tieback to Taylor

More information

WHITE ROSE OILFIELD COMPREHENSIVE STUDY REPORT SUBMITTED BY:

WHITE ROSE OILFIELD COMPREHENSIVE STUDY REPORT SUBMITTED BY: WHITE ROSE OILFIELD COMPREHENSIVE STUDY REPORT SUBMITTED BY: HUSKY OIL OPERATIONS LIMITED (AS OPERATOR) SUITE 801, SCOTIA CENTRE 235 WATER STREET ST. JOHN S, NF, A1C 1B6 TEL: (709) 724-3900 FAX: (709)

More information

Gaining an improved insight into subsea production

Gaining an improved insight into subsea production Gaining an improved insight into subsea production Terje Baustad, Emerson Process Management, Roxar One of the biggest challenges and most important drivers for operators in the offshore oil & gas sector

More information

API RP 53 Recommend Practices for Blowout Prevention Equipment Systems for Drilling Wells vs. Standard 53 4 th Edition 2011

API RP 53 Recommend Practices for Blowout Prevention Equipment Systems for Drilling Wells vs. Standard 53 4 th Edition 2011 API RP 53 Recommend Practices for Blowout Prevention Equipment Systems for Drilling Wells vs. Standard 53 4 th Edition 2011 Meeting with BOEMRE March 1, 2011 Presented by: Frank Gallander Chevron Chair

More information

Table Of Contents Casing Head 02 Christmas Tree & Tubing Head Tubing Spool 04 Contact Us

Table Of Contents Casing Head 02 Christmas Tree & Tubing Head Tubing Spool 04 Contact Us Table Of Contents Casing Head 02 Christmas Tree & Tubing Head 03 Tubing Spool 04 Contact Us 05 1 www.sapwellsglobal.com Casing Head Specialized large-diameter pipe lowered into an open hole and cemented

More information

Offshore Systems. Cameron s Subsea Production Philosophy

Offshore Systems. Cameron s Subsea Production Philosophy Offshore Systems In today s fast-paced, cost-conscious subsea production industry, Cameron has successfully met the challenge to deliver safe, reliable system solutions. This experience allows Cameron

More information

Cautionary Note. Forward-Looking Statements

Cautionary Note. Forward-Looking Statements Cautionary Note Forward-Looking Statements During the course of this presentation we may make forward-looking statements regarding future events or the future performance of the company. No reliance should

More information

IMPROVES EFFICIENCY OF SUBSEA TREE CHANGE-OUTS

IMPROVES EFFICIENCY OF SUBSEA TREE CHANGE-OUTS WIRELESS BARRIER MONITORING JULY 2015 WIRELESS BARRIER MONITORING IMPROVES EFFICIENCY OF SUBSEA TREE CHANGE-OUTS LOCATION: North Atlantic PRODUCT: DATE: CASE STUDY: 1006/01 SERVICE: Deepwater Barrier Verification

More information

15,000 psi 20,000 psi. BigBore IIe HPHT SUBSEA WELLHEAD SYSTEMS

15,000 psi 20,000 psi. BigBore IIe HPHT SUBSEA WELLHEAD SYSTEMS 15,000 psi 20,000 psi BigBore IIe HPHT SUBSEA WELLHEAD SYSTEMS DXe Gasket Profile DXe Locking Profile BigBore IIe SUBSEA WELLHEAD SYSTEM Mud Stick 18 ¾" BigBore IIe Wellhead Housing The BigBore IIe Subsea

More information

Oil&Gas Subsea Production

Oil&Gas Subsea Production Oil&Gas Subsea Production Oil&Gas Subsea Production The first subsea technologies were developed in the 1970s for production at depths of a few hundred meters. Technology has advanced since then to enable

More information

Well Integrity Life Cycle Management for Subsea Field Development A Regulator s Perspective

Well Integrity Life Cycle Management for Subsea Field Development A Regulator s Perspective Well Integrity Life Cycle Management for Subsea Field Development A Regulator s Perspective John Kennedy, P. Eng., CRSP Director of Operations C NLOPB Who 2 C NLOPB Regulator for the Canada Newfoundland

More information

Subsea Asia Subsea Processing. June 2008 Dennis Lim Senior Field Development Engineer

Subsea Asia Subsea Processing. June 2008 Dennis Lim Senior Field Development Engineer Subsea Asia 2008 - Subsea Processing June 2008 Dennis Lim Senior Field Development Engineer Agenda Overview of FMC Subsea processing projects History and on-going projects Recent development within subsea

More information

EC-Drill MPD Dual Gradient Drilling

EC-Drill MPD Dual Gradient Drilling 16th US-Norway Technology Partnership Conference 2014 EC-Drill MPD Dual Gradient Drilling John A. Cohen, R&D Technology Manager AGR Enhanced Drilling February 26, 2014 Houston, Texas Enhanced Drilling

More information

Background Why? What are the business drivers? Subsea, Surface or FLNG? Subsea Dehydration & The SubCool Hybrid Concept

Background Why? What are the business drivers? Subsea, Surface or FLNG? Subsea Dehydration & The SubCool Hybrid Concept Background Why? What are the business drivers? Subsea, Surface or FLNG? Subsea Dehydration & The SubCool Hybrid Concept The Market :- Focus on Platform or Gas-to-Surface Replacement Summary Many global

More information

Tony Owen, Subsea and Pipelines Decommissioning Delivery Manager AOG February 2017

Tony Owen, Subsea and Pipelines Decommissioning Delivery Manager AOG February 2017 Decommissioning in Practice Tony Owen, Subsea and Pipelines Decommissioning Delivery Manager AOG February 2017 Disclaimer and important notice This presentation contains forward looking statements that

More information

Status på Dvalin-prosjektet. Roy Padget, Topside Host Manager

Status på Dvalin-prosjektet. Roy Padget, Topside Host Manager Status på Dvalin-prosjektet Roy Padget, Topside Host Manager Kristiansund, 31. mai 2018 A brief history of DEA in Norway 1973 1979 1980ies 1990 1991 1991 2010 2015 2016 2017 2018 Company established as

More information

High Pressure Intensifier Application on subsea HFL The Dalia Case

High Pressure Intensifier Application on subsea HFL The Dalia Case NH GRAND HOTEL KRASNAPOLSKY AMSTERDAM 3-5 APRIL 2017 High Pressure Intensifier Application on subsea HFL The Dalia Case Daniel Vunza Agenda Dalia SPS Overview Injection Umbilicals Context - SDU HP Lines

More information

RELIANCE INDUSTRIES LIMITED

RELIANCE INDUSTRIES LIMITED RELIANCE INDUSTRIES LIMITED Petroleum Business (E&P) Notice Inviting Expression of Interest (RIL/E&P/EOI/2012/07) (Under International Competitive Bidding) A] For All Oil & Gas Fields Reliance Industries

More information

Safety and Environment considerations override all other items and should be considered in all design aspects.

Safety and Environment considerations override all other items and should be considered in all design aspects. 서유택 해저공학 Lecture plan Introduction The design and operation of offshore production facilities are becoming a critical component as the industry goes to deeper water, longer tiebacks, higher temperature

More information

En strategi for å levere mer verdiskapende prosjekter

En strategi for å levere mer verdiskapende prosjekter En strategi for å levere mer verdiskapende prosjekter Marie Ravnestad VP Modification Projects AKER BP ASA Modifikasjonskonferansen 7. mars 2018 CORPORATE STRATEGY A focused portfolio on the NCS Skarv

More information

HorizontalBore SUBSEA TREE

HorizontalBore SUBSEA TREE HorizontalBore SUBSEA TREE HorizontalBore SUBSEA TREE Dril-Quip s HorizontalBore Tree is a modular design subsea production component that accommodates numerous completion configuration possibilities.

More information

This document is a preview generated by EVS

This document is a preview generated by EVS TECHNICAL SPECIFICATION SPÉCIFICATION TECHNIQUE TECHNISCHE SPEZIFIKATION CEN ISO/TS 16530-2 December 2015 ICS 75.180.10 English Version integrity - Part 2: integrity for the operational phase (ISO/TS 16530-2:2014)

More information