1 IWCF Well Control Level 5 Celle Drilling Conference 2017

2 Contents IWCF well control level 5 course program Background - who is it for Structure and contents Delivery approach Questions

3 Why? Level 5 background and audience

4 Level 5 background New training level recommended by the International Association of Oil & Gas Producers Report 476 recommends enhancements to well control training, examination and certification

5 Level 5 background Engineers and approving authorities training Part of role specific training (level 1, 2, 3, 4 and 5) Engineers, senior engineers, managers, team leaders, well examiners, technical authorities Drilling, completion, well services Operations, design, petroleum, regulator

6 Level 5 background Learning outcome Capable of planning and performing safe well design and intervention operations that maintain well control and Able to evaluate technically on deviations to the well operations plan and advise accordingly

7 Level 5 objectives Overall Guarantee well over the lifecycle Design and maintain well barriers for the well lifecycle Cross-discipline Well planning Drilling Well intervention Well abandonment Consistent Definitions Standards Procedures Competence requirements

8 Structure Level 5 program structure and contents

9 Level 5 structure Course structure and length 5 days / max 12 candidates Pre-work and case study project Drilling and well intervention participate together Written assessment with invigilation

10 Level 5 content and delivery method IWCF requirements Information on recent well control or well events Case studies Region-specific standards and regulatory requirements Scenario exercises on full-scale simulator If applicable, detailed course content is decided by the employer together with the training provider Minimum content according to IOGP 476, Appendix C

11 Well management and maintenance Well deliverables lifecycle phases Risk assessment techniques Risk management Well barriers Barrier verification Annular cement Inflow testing Formation strength testing Rock mechanics Kick tolerance Maintenance and failure of well Management of corrosive fluids Shallow gas Tertiary well control Well abandonment

12 References API Spec 6A/ISO 10423:2009: Specification for Wellhead and Christmas Tree Equipment API Std 65-2: Isolating Potential Flow Zones During Well Construction API Spec 16A/ISO 13533:2001: Specification for Drill-Through Equipment API Spec 16C: Choke and Kill Equipment API Spec 16D: Specification for Control Systems for Drilling Well Control Equipment and Control Systems for Diverter Equipment Guidelines for the Abandonment of Wells (Issue 5, July 2015) API RP 59: Recommended Practice for Well Control Operations API RP 64: Recommended Practice for Diverter Systems Equipment and Operations API Std 53: Blowout Prevention Equipment Systems for Drilling Wells API RP 90: Annular Casing Pressure Management for Offshore Wells API RP 96: Deepwater Well Design and Construction API Bull 97: Well Construction Interface Document Guidelines ISO Risk management - Risk assessment techniques IADC Deepwater Well Control Guidelines ISO : Well Life cycle governance Norsok D-010: Well in drilling and well operations 117 Recommended guidelines for Well Integrity - NEW REVISION OP119: Well Life Cycle Integrity Guidelines, Issue 3, March 2016 EU: Offshore Safety Directive 2013/30/EU Oil & Gas UK: Well Life Cycle Integrity Guidelines (Issue 3, March 2016) ISO Risk management

13 Well management and maintenance Well deliverables lifecycle phases Risk assessment techniques Risk management Well barriers Barrier verification Annular cement Inflow testing Formation strength testing Rock mechanics Kick tolerance Maintenance and failure of well Management of corrosive fluids Shallow gas Tertiary well control Well abandonment

14 Well management and maintenance Well deliverables lifecycle phases Risk assessment techniques Risk management Well barriers Barrier verification Annular cement Inflow testing Formation strength testing Rock mechanics Kick tolerance Maintenance and failure of well Management of corrosive fluids Shallow gas Tertiary well control Well abandonment

15 Well throughout the well lifecycle Enhance knowledge and skills in planning and performing safe well design and/or intervention operations to ensure well control and well is maintained throughout the well life cycle Well guidelines: Norsok: D-010 Well Integrity in drilling and well operations O&G UK: Well Life Cycle Integrity Guidelines EU: Offshore Safety Directive 2013/30/EU ISO :2017 Well Integrity Part 1: Life Cycle Governance

16 ISO 16530: well Minimum requirements to ensure management of well Assuring well comprises two main building blocks: 1. Ensure well during well design and construction 2. Manage well throughout the remaining well life thereafter Addresses minimum compliance requirements for well operators Developed by oil and gas operating companies Practical recommendations and techniques

17 Well management system Operators implement a WIMS to ensure that well is maintained throughout the well life cycle In the WIMS a combination of technical, operational and organizational processes are applied At the highest level, a well policy shall be defined

18 Well management system WIMS should address Risk assessment Organizational structure Well barriers Performance standards Well barrier verification Reporting and documentation Management of change process Continuous improvement process Auditing

19 Well management system Optional workflow Basis of design phase Design phase Construction phase Operational phase Intervention phase Abandonment phase Lessons learned WIMS elements are common to all phases

20 Delivery Insight into detailed contents and delivery approach

21 Well management and maintenance Well deliverables lifecycle phases Risk assessment techniques Risk management Well barriers Barrier verification Inflow testing Annular cement Formation strength testing Rock mechanics Kick tolerance Maintenance and failure of well Management of corrosive fluids Shallow gas Tertiary well control Well abandonment

22 Well management and maintenance Well deliverables lifecycle phases Risk assessment techniques Risk management Well barriers Barrier verification Inflow testing Annular cement Formation strength testing Rock mechanics Kick tolerance Maintenance and failure of well Management of corrosive fluids Shallow gas Tertiary well control Well abandonment

23 Risk assessment Delegates should be able to evaluate technically on deviations to the well operations plan and advise accordingly Example: during well execution, the casing got stuck 300m off bottom can t move up or down. Only option is to cement it in place. Now what?

24 Risk assessment: management of change The MOC process should include the following steps a) Identify a requirement for change. b) Identify the impact of the change and the key stakeholders involved. This includes identifying what standards, procedures, work practices, process systems, drawings, etc. would be impacted by the change. c) Perform an appropriate level of risk assessment in accordance with the well operator risk assessment process. This includes: identifying the change in risk level(s) via use of a risk assessment matrix or other means; identifying additional preventive and mitigating measures that can be applied to reduce the risk level; identifying the residual risk of implementing the change/deviation; reviewing the residual risk level against the well operator s risk tolerability/alarp acceptance criteria; updating the risk register accordingly. d) Submit the MOC proposal for review and approval in accordance with the well operator s MOC system.

25 Well management and maintenance Well deliverables lifecycle phases Risk assessment techniques Risk management Well barriers Barrier verification Annular cement Inflow testing Formation strength testing Rock mechanics Kick tolerance Maintenance and failure of well Management of corrosive fluids Shallow gas Tertiary well control Well abandonment

26 Well management and maintenance Well deliverables lifecycle phases Risk assessment techniques Risk management Well barriers Barrier verification Annular cement Inflow testing Formation strength testing Rock mechanics Kick tolerance Maintenance and failure of well Management of corrosive fluids Shallow gas Tertiary well control Well abandonment

27 Annular cement Objective of cementing operations is to successfully seal the annulus with cement Many wells suffer from sustained casing pressure or other well issues related to non-successful cementing operations API Standard 65 part 2 and API RP 10 series

28 Annular cement Isolating potential flow zones in wells during well construction Effective fluid displacement Loss of hydrostatic pressure when cement sets Practices and factors that affect cementing success

29 Well management and maintenance Well deliverables lifecycle phases Risk assessment techniques Risk management Well barriers Barrier verification Annular cement Inflow testing Formation strength testing Rock mechanics Kick tolerance Maintenance and failure of well Management of corrosive fluids Shallow gas Tertiary well control Well abandonment

30 Well management and maintenance Well deliverables lifecycle phases Risk assessment techniques Risk management Well barriers Barrier verification Annular cement Inflow testing Formation strength testing Rock mechanics Kick tolerance Maintenance and failure of well Management of corrosive fluids Shallow gas Tertiary well control Well abandonment

31 Well management and maintenance Well deliverables lifecycle phases Risk assessment techniques Risk management Well barriers Barrier verification Inflow testing Annular cement Formation strength testing Rock mechanics Kick tolerance Maintenance and failure of well Management of corrosive fluids Shallow gas Tertiary well control Well abandonment

32 Inflow testing Incomprehension about inflow testing Incorrect usage of horner plots Incorrect interpretation of horner plots (too quick) No official standard Are supervisors on the rig trained Supervisory personnel on the rig who have to make decisions are often not trained to make those

33 Flow rate (ltr/min) 3 INFLOW TEST Return flow is reducing due to cold fluid heating up Is this still fluid heating up or a barrier leak? 0 Time (minutes)

34 Summary IWCF Well Control Level 5 Training Guarantee well over the lifecycle Design and maintain well barriers for the well lifecycle Plan and perform safe well design and intervention operations Evaluate and act technically on deviations to the plan

35 The end any questions?

Oil and Gas UK Well Integrity Guidelines

Oil and Gas UK Well Integrity Guidelines Oil and Gas UK Well Integrity Guidelines The Well, the Completion and the Xmas Tree The Equipment and the People A Definition of Well Integrity Key UK Legislative Requirement for Well Integrity Oil and

More information

Defining the New Normal for Offshore Drilling Copenhagen 16 June Alan Spackman Vice President, Offshore Regulatory & Technical Affairs

Defining the New Normal for Offshore Drilling Copenhagen 16 June Alan Spackman Vice President, Offshore Regulatory & Technical Affairs Defining the New Normal for Offshore Drilling Copenhagen 16 June 2011 Alan Spackman Vice President, Offshore Regulatory & Technical Affairs Montara & Macondo Investigations Report of the Montara Commission

More information

4 Briefing. Responsible investor

4 Briefing. Responsible investor Issue Responsible investor 4 Briefing Wednesday 8 th February 2012 In 2010, we accepted all 26 recommendations made by the Bly Report our internal investigation into the Deepwater Horizon incident. BP

More information

7 Briefing. Responsible investor

7 Briefing. Responsible investor Issue Responsible investor 7 Briefing Monday, 5 th October 202 In 200, we accepted all 26 recommendations made by the Bly Report our internal investigation into the Deepwater Horizon incident. BP has committed

More information

Industry & Govt Changes Post Macondo

Industry & Govt Changes Post Macondo Cover graphic should fill and not exceed the defined grey box. Industry & Govt Changes Post Macondo Gary F. Devlin VP Quality & Customer Experience March 2013 Deepwater Industry / Focus Approach Joint

More information

EUOAG Workshop. Workshop on decommissioning of offshore installations Challenges, options and lessons learned PP&A

EUOAG Workshop. Workshop on decommissioning of offshore installations Challenges, options and lessons learned PP&A EUOAG Workshop Workshop on decommissioning of offshore installations Challenges, options and lessons learned PP&A Johnny Gundersen Principal Engineer, PSA Norway Content Requirements for PP&A in Norway

More information

Industry & Govt Changes Post Macondo. Charlie Williams Chief Scientist Shell Executive Director - Center for Offshore Safety

Industry & Govt Changes Post Macondo. Charlie Williams Chief Scientist Shell Executive Director - Center for Offshore Safety Industry & Govt Changes Post Macondo Charlie Williams Chief Scientist Shell Executive Director - Center for Offshore Safety 1 Deepwater Industry Focus/Approach Joint Industry Task Force Groups Offshore

More information

Industry Response - Post Macondo

Industry Response - Post Macondo Industry Response - Post Macondo Charlie Williams Chief Scientist Well Engineering Shell Energy Resource Company CSIS Energy and National Security Program - future of offshore oil & gas developments in

More information

Macondo Blowout Lessons Learned for Prevention and Mitigation

Macondo Blowout Lessons Learned for Prevention and Mitigation Macondo Blowout Lessons Learned for Prevention and Mitigation Lars Herbst, P.E. BSEE Gulf of Mexico Regional Director 05 October 2017 To promote safety, protect the environment and conserve resources offshore

More information

Well Life Cycle Integrity. IOM 3 / Energy Institute Technical Meeting 12 th March 2019

Well Life Cycle Integrity. IOM 3 / Energy Institute Technical Meeting 12 th March 2019 Well Life Cycle Integrity IOM 3 / Energy Institute Technical Meeting 12 th March 2019 Contents Agenda UK goal setting Regulations UK wells guidelines Principles of well integrity UK well integrity guidelines

More information

New Developments in Regulation of U.S. Offshore Oil and Gas Operations

New Developments in Regulation of U.S. Offshore Oil and Gas Operations New Developments in Regulation of U.S. Offshore Oil and Gas Operations Peking University Law School and The University of Texas School of Law Carol Dinkins Partner Vinson & Elkins, LLP August 21, 2012

More information

This document is a preview generated by EVS

This document is a preview generated by EVS TECHNICAL SPECIFICATION SPÉCIFICATION TECHNIQUE TECHNISCHE SPEZIFIKATION CEN ISO/TS 16530-2 December 2015 ICS 75.180.10 English Version integrity - Part 2: integrity for the operational phase (ISO/TS 16530-2:2014)

More information

Moduels in PetroTrainer. PetroTrainer. How PetroTrainer is used

Moduels in PetroTrainer. PetroTrainer. How PetroTrainer is used PetroTrainer E-Learning for the Petroleum industry PetroTrainer is probably the world s largest and most comprehensive tool made for training purposes in the petroleum industry. The ITC Boreskolen started

More information

Deepwater well design, construction & drilling operations

Deepwater well design, construction & drilling operations Deepwater well design, construction & drilling operations Training and development 1 Kingdom Drilling Services Ltd Our Mission Deliver a recognized excellence in deepwater industry training, education

More information

Training Fees 4,250 US$ per participant for Public Training includes Materials/Handouts, tea/coffee breaks, refreshments & Buffet Lunch

Training Fees 4,250 US$ per participant for Public Training includes Materials/Handouts, tea/coffee breaks, refreshments & Buffet Lunch Training Title WELL HEAD OPERATIONS Training Duration 5 days Training Venue and Dates REF OP035 Well Head Operations 5 08-12 May $4,250 Abu Dhabi, UAE Will be held in any of the 5 star hotels. The exact

More information

Overview and Update of API Standards

Overview and Update of API Standards Overview and Update of API Standards IADC South East Asia Chapter Meeting Kuala Lumpur, Malaysia March 21, 2017 Eric Ho American Petroleum Institute Singapore Scope of Presentation API Background API Standards

More information

ACCREDITATIONS AND ASSOCIATION MEMBERSHIPS

ACCREDITATIONS AND ASSOCIATION MEMBERSHIPS ABOUT US Well Control School (WCS) is a leading provider of accredited well control training. Since our inception in 1979, we have trained over 85,000 students globally through our training centers and

More information

International Well Control Forum IWCF. Well Control Training Syllabus. Drilling Level 2. 1 st January 2014 Version 3.0

International Well Control Forum IWCF. Well Control Training Syllabus. Drilling Level 2. 1 st January 2014 Version 3.0 International Well Control Forum IWCF Well Control Training Drilling Level 2 1 st January 2014 Version.0 Drilling Well Control Written Test Level 2 Surface & Subsea BOP Stack s and Structure Written Test

More information

SPE A Systematic Approach to Well Integrity Management Alex Annandale, Marathon Oil UK; Simon Copping, Expro

SPE A Systematic Approach to Well Integrity Management Alex Annandale, Marathon Oil UK; Simon Copping, Expro SPE 123201 A Systematic Approach to Well Integrity Management Alex Annandale, Marathon Oil UK; Simon Copping, Expro Copyright 2009, Society of Petroleum Engineers This paper was prepared for presentation

More information

In any of the 5 star hotel. The exact venue will be intimated prior to course commencement.

In any of the 5 star hotel. The exact venue will be intimated prior to course commencement. Training Title WELLHEAD OPERATION Training Duration 5 days Training Venue and Dates Wellhead Operations 5 19 23 May $3,750 Abu Dhabi, UAE In any of the 5 star hotel. The exact venue will be intimated prior

More information

Committee on Standardization of Oilfield Equipment & Materials (CSOEM) New Member Orientation

Committee on Standardization of Oilfield Equipment & Materials (CSOEM) New Member Orientation Committee on Standardization of Oilfield Equipment & Materials (CSOEM) New Member Orientation Roland Goodman Manager, Upstream Standards goodmanr@api.org New Member Orientation Presentation will cover:

More information

Committee on Standardization of Oilfield Equipment & Materials (CSOEM) New Member Orientation

Committee on Standardization of Oilfield Equipment & Materials (CSOEM) New Member Orientation Committee on Standardization of Oilfield Equipment & Materials (CSOEM) New Member Orientation Roland Goodman Manager, Upstream Standards goodmanr@api.org New Member Orientation Presentation will cover:

More information

On the Development of the Blowout Preventer PRA Model

On the Development of the Blowout Preventer PRA Model On the Development of the Blowout Preventer PRA Model Jan Swider *ac, Charley Gallo bc, Gregg Walz c, and Jim Raney c a Cogoto, Inc., Simi Valley, USA b The Frontline Group, Houston, USA c Anadarko Petroleum

More information

DE120 Successful Well Completion and Workover Practices:

DE120 Successful Well Completion and Workover Practices: DE120 Successful Well Completion and Workover Practices: A Practical Approach from Design to Field Operations H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E www.ictd.ae ictd@ictd.ae

More information

Spill Prevention and Spill Response. Canada-Newfoundland and Labrador Offshore Petroleum Board

Spill Prevention and Spill Response. Canada-Newfoundland and Labrador Offshore Petroleum Board Spill Prevention and Spill Response BOP Stack Containment Boom Legislative Requirements Regulations Drilling and Production Regulations Certificate of Fitness Oil and Gas Debris and Spills Liability Petroleum

More information

An Introduction to Oil & Gas Drilling and Well Operations

An Introduction to Oil & Gas Drilling and Well Operations An Introduction to Oil & Gas Drilling and Well Operations Educational Material from the IOM 3 Oil and Gas Division The global network for the materials cycle Introduction The Institute of Materials, Minerals

More information

Drilling Courses

Drilling Courses 2017-2018 Drilling Courses Includes Prentice Training Company Courses Taught By: Calvin Barnhill NORTHSTAR TRAINING Northstar Training is very excited to be able to continue to teach the Prentice Training

More information

Title: Introducing Well Integrity Management Processes at 'Brownfield' Development Stage. Author Name: James King Author Company: Qatar Petroleum

Title: Introducing Well Integrity Management Processes at 'Brownfield' Development Stage. Author Name: James King Author Company: Qatar Petroleum Title: Introducing Well Integrity Management Processes at 'Brownfield' Development Stage Author Name: James King Author Company: Qatar Petroleum Abstract Well Integrity within Qatar Petroleum relies on

More information

subsea annulus management call for proposals

subsea annulus management call for proposals subsea annulus management call for proposals June 2013 Aims This is an open invitation to any organisation, from any sector, seeking partners and funding for innovative technologies in the oil and gas

More information

TABLE OF CONTENTS Page

TABLE OF CONTENTS Page 2 American Petroleum Institute TABLE OF CONTENTS Page POLICY................t... 8 FOREWORD......................................................................................................................f...

More information

API STANDARD 53 PROVES IDEAL TRAINING AIDE Michael Gibson, PhD; IDEAS Singapore Pte Ltd

API STANDARD 53 PROVES IDEAL TRAINING AIDE Michael Gibson, PhD; IDEAS Singapore Pte Ltd API STANDARD 53 PROVES IDEAL TRAINING AIDE Michael Gibson, PhD; IDEAS Singapore Pte Ltd This paper has been written for presentation at the API Axis Conference to held in Kuala Lumpur, Malaysia, 13-15

More information

NTL No N05 Increased Safety Measures for Energy Development on the OCS Effective June 8, 2010

NTL No N05 Increased Safety Measures for Energy Development on the OCS Effective June 8, 2010 NTL No. 2010-N05 Increased Safety Measures for Energy Development on the OCS Effective June 8, 2010 Frequently Asked Questions (FAQ s) Updated July 9, 2010 A. General Questions QA1: With the issuance of

More information

ER responsibility matrix (RACI) & Source Control ER Plan (SCERP)

ER responsibility matrix (RACI) & Source Control ER Plan (SCERP) ER responsibility matrix (RACI) & Source Control ER Plan (SCERP) 1 Context ER review jointly ER exercises RACI and SCERP Piper-α recommendations shallow water blowouts yearly large scale ER exercise 2

More information

AADE Houston Chapter. Group. 26 January 2011

AADE Houston Chapter. Group. 26 January 2011 AADE Houston Chapter Deepwater and Emerging Technologies Group 26 January 2011 BOEMRE Compliance Guidelines Department of Interior s Increased Safety Measures for Energy Development on the Outer Continental

More information

Wells Expert Committee Bulletin

Wells Expert Committee Bulletin COMMITTEE UPDATE DECEMBER 2016 Issue no. 2 Wells Expert Committee Bulletin The Global Industry Response Group (GIRG) was created in July 2010 with a remit to identify, learn and apply the lessons of Macondo

More information

From late-life reservoir management through to final permanent abandonment, we create bespoke solutions to meet your specific well requirements.

From late-life reservoir management through to final permanent abandonment, we create bespoke solutions to meet your specific well requirements. From late-life reservoir management through to final permanent abandonment, we create bespoke solutions to meet your specific well requirements. LATE-LIFE RESERVOIR MANAGEMENT All oil and gas fields will

More information

Integrity Management of Offshore Assets

Integrity Management of Offshore Assets OIL & GAS Integrity Management of Offshore Assets Opening session Leif Collberg 05 May 2017 1 DNV GL 2015 05 May 2017 SAFER, SMARTER, GREENER How regulations can solve the challenge of being performance

More information

University of Macondo

University of Macondo University of Macondo The need for a continuing conversation T HE SAFETY LESSONS OF THE MACONDO OIL SPILL of 2010 are elusive, as companies and regulators that were involved in the incident are reluctant

More information

Dynamic Approach to Quasi-static Nonlinear Problems for Sub-Sea Applications

Dynamic Approach to Quasi-static Nonlinear Problems for Sub-Sea Applications Dynamic Approach to Quasi-static Nonlinear Problems for Sub-Sea Applications Smitha G, Mahesh Bhat GE Oil & Gas, Bangalore Abstract: In deep-sea oil fields, metal seals play an important role to facilitate

More information

Veterans and Offshore Drilling

Veterans and Offshore Drilling Veterans and Offshore Drilling Why care, what it entails, and is it safe. Meeting begins at 3:00 PM Eastern Offshore Oil and Natural Gas Briefing Erik Milito Director, Upstream & Industry Operations American

More information

Advanced Well Completion Design. 30 Sep - 04 Oct 2018, Dubai. REP logo, PMI & PMP are registered trademarks of Project Management Institute, Inc.

Advanced Well Completion Design. 30 Sep - 04 Oct 2018, Dubai. REP logo, PMI & PMP are registered trademarks of Project Management Institute, Inc. 30 Sep - 04 Oct 2018, Dubai Approved Centre REP logo, PMI & PMP are registered trademarks of Project Management Institute, Inc. Introduction Organisational Impact This Glomacs Advanced Well training seminar

More information

C o n t a c t U s f o r S p e c i a l C o r p o r a t e R a t e N o w!

C o n t a c t U s f o r S p e c i a l C o r p o r a t e R a t e N o w! HPHT WELL CONTROL C o n t a c t U s f o r S p e c i a l C o r p o r a t e R a t e N o w! Course Overview This course covers the key aspects of HPHT Well Control in detail through the media of:- 1. Lectures

More information

Petrosync Distinguished Instructor

Petrosync Distinguished Instructor Wellhead Control System Petrosync Distinguished Instructor Magdi Taha El Naggar Managing Director Oil Fields Global Consultants (OFGC) Familiarize with wellhead control system components 27th - 31st July

More information

GTSC Rig for Hands-on Training

GTSC Rig for Hands-on Training GTSC Rig for Hands-on Training The Rig To meet the high demand of Petroleum Industry, GTSC has launched the Middle East s first fully operational Training Rig & Well in May 2010 at its main building location

More information

Suspended Subsea Well Monitoring CaTS TM Wireless Technology. Donald Horsfall RPLM (ECIS)

Suspended Subsea Well Monitoring CaTS TM Wireless Technology. Donald Horsfall RPLM (ECIS) Suspended Subsea Well Monitoring CaTS TM Wireless Technology Donald Horsfall RPLM (ECIS) Tuesday 27 th June 2017 Agenda Introduction to CaTS Technology CaTS - Cable-less Telemetry System Industry guidelines

More information

ADVANCED DRILLING AND WELL TECHNOLOGY

ADVANCED DRILLING AND WELL TECHNOLOGY page 1 / 5 page 2 / 5 advanced drilling and well pdf Parker Drilling (NYSE: PKD) helps energy companies accomplish their drilling and production goals efficiently, reliably, and safely. Our global team

More information

Bureau of Safety and Environmental Enforcement. [Docket ID: BSEE ; 15XE1700DX EEEE EX1SF0000.DAQ000]

Bureau of Safety and Environmental Enforcement. [Docket ID: BSEE ; 15XE1700DX EEEE EX1SF0000.DAQ000] 4310-VH-P DEPARTMENT OF THE INTERIOR Bureau of Safety and Environmental Enforcement 30 CFR Part 250 [Docket ID: BSEE-2015-0002; 15XE1700DX EEEE500000 EX1SF0000.DAQ000] RIN 1014 AA11 Oil and Gas and Sulphur

More information

DEA Quarterly Meeting 18 November Bill Pike NISC, an IBM Company

DEA Quarterly Meeting 18 November Bill Pike NISC, an IBM Company DEA Quarterly Meeting 18 November 2010 Bill Pike NISC, an IBM Company DISCLAIMER I am an employee of NISC, an IBM company, working under contract in the U.S. Department of Energy s National Energy Technology

More information

Well Control Contingency Plan Guidance Note (version 2) 02 December 2015

Well Control Contingency Plan Guidance Note (version 2) 02 December 2015 Well Control Contingency Plan Guidance Note (version 2) 02 December 2015 Prepared by Maritime NZ Contents Introduction... 3 Purpose... 3 Definitions... 4 Contents of a Well Control Contingency Plan (WCCP)...

More information

Designing Subsea Wells for Abandonment & Suspension

Designing Subsea Wells for Abandonment & Suspension Designing Subsea Wells for Abandonment & Suspension Graeme Rae Rig Build Project Engineer Chevron Upstream Europe Aberdeen Designing Subsea Wells for Abandonment & Suspension Subsea Well Design Aspects

More information

DE059: Hydrocarbon Production Operations

DE059: Hydrocarbon Production Operations DE059: Hydrocarbon Production Operations DE059 Rev.001 CMCT COURSE OUTLINE Page 1 of 5 Training Description: This five-day course will provide the participants with an integrated view of the hydrocarbon

More information

API RP 53 Recommend Practices for Blowout Prevention Equipment Systems for Drilling Wells vs. Standard 53 4 th Edition 2011

API RP 53 Recommend Practices for Blowout Prevention Equipment Systems for Drilling Wells vs. Standard 53 4 th Edition 2011 API RP 53 Recommend Practices for Blowout Prevention Equipment Systems for Drilling Wells vs. Standard 53 4 th Edition 2011 Meeting with BOEMRE March 1, 2011 Presented by: Frank Gallander Chevron Chair

More information

Chapter 02. Casing and Tubing

Chapter 02. Casing and Tubing Chapter 02 Casing and Tubing Table of Contents Introduction 2-4 Topic Areas 2-4 Learning Objectives 2-4 Unit A: Casing and Tubing Uses 2-4 Unit A Quiz 2-5 Unit B: Typical Casing Strings 2-5 Conductor

More information

Tore Aarsland. Chairman of the Editorial Revision Committee / Senior Design C6 Technologies. 10-Jan-13

Tore Aarsland. Chairman of the Editorial Revision Committee / Senior Design C6 Technologies. 10-Jan-13 Tore Aarsland Chairman of the Editorial Revision Committee / Senior Design Engineer @ C6 Technologies 10-Jan-13 1. The well barrier philosophy of the standard is harmonised to NORSOK D-010. The use of

More information

C o n t a c t U s f o r S p e c i a l C o r p o r a t e R a t e N o w!

C o n t a c t U s f o r S p e c i a l C o r p o r a t e R a t e N o w! DEEPWATER WELL CONTORL C o n t a c t U s f o r S p e c i a l C o r p o r a t e R a t e N o w! Course Overview This course covers the key aspects of Deepwater Well Control through the media of:- 1) Lectures

More information

DE123 Advanced Drilling Practice Technology

DE123 Advanced Drilling Practice Technology DE123 Advanced Drilling Practice Technology H.H. Sheikh Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E www.ictd.ae ictd@ictd.ae Course Introduction: This five-day advanced training course provide

More information

JOINT INDUSTRY OFFSHORE OPERATING PROCEDURES TASK FORCE, JOINT INDUSTRY OFFSHORE EQUIPMENT TASK FORCE, JOINT INDUSTRY SUBSEA WELL CONTROL AND

JOINT INDUSTRY OFFSHORE OPERATING PROCEDURES TASK FORCE, JOINT INDUSTRY OFFSHORE EQUIPMENT TASK FORCE, JOINT INDUSTRY SUBSEA WELL CONTROL AND JOINT INDUSTRY OFFSHORE OPERATING PROCEDURES TASK FORCE, JOINT INDUSTRY OFFSHORE EQUIPMENT TASK FORCE, JOINT INDUSTRY SUBSEA WELL CONTROL AND CONTAINMENT TASK FORCE, and JOINT INDUSTRY OIL SPILL PREPAREDNESS

More information

37 th Gas-Lift Workshop Houston, Texas, USA February 3 7, Dag Almar Hansen, CEO Gas-Lift Workshop 1. Feb. 3-7, 2014

37 th Gas-Lift Workshop Houston, Texas, USA February 3 7, Dag Almar Hansen, CEO Gas-Lift Workshop 1. Feb. 3-7, 2014 37 th Gas-Lift Workshop Houston, Texas, USA February 3 7, 2014 Dag Almar Hansen, CEO Feb. 3-7, 2014 2014 Gas-Lift Workshop 1 37 th Gas-Lift Workshop Houston, Texas, USA February 3 7, 2014 Pressure management

More information

NOIA ANNUAL MEETING CONCERNS/INITIATIVES. BSEE Update. Joe Levine BSEE Washington DC April 11, 2014

NOIA ANNUAL MEETING CONCERNS/INITIATIVES. BSEE Update. Joe Levine BSEE Washington DC April 11, 2014 NOIA ANNUAL MEETING Technology BSEE OCS Policy TECHNOLOGY Committee CONCERNS/INITIATIVES BSEE Update Joe Levine BSEE Washington DC April 11, 2014 Presentation Overview BSEE Research Program Research Drivers

More information

Lloyd s BOP Register energy Risk servicesmodel Project Development. Scotty Roper Project Manager Moduspec USA, Inc.

Lloyd s BOP Register energy Risk servicesmodel Project Development. Scotty Roper Project Manager Moduspec USA, Inc. Lloyd s BOP Register energy Risk servicesmodel Project Development Scotty Roper Project Manager Moduspec USA, Inc. October 18, 2012 Agenda Project summary Product demonstration Conclusion Who we are Lloyd

More information

Upstream / Upstream Safety Sessions

Upstream / Upstream Safety Sessions Upstream / Upstream Safety Sessions U01 API Spec Q2 Our Journey to theworld s First Oil and Gas Quality Management System Standard for Service Supply Organizations Euan Ramsay, Regional Business Development

More information

Report. Temporary abandoned wells on NCS. Subtitle. Author(s) Nils Totland. SINTEF Petroleum Research Well Integrity

Report. Temporary abandoned wells on NCS. Subtitle. Author(s) Nils Totland. SINTEF Petroleum Research Well Integrity - Unrestricted Report Temporary abandoned wells on NCS Subtitle Author(s) Nils Totland SINTEF Petroleum Research Well Integrity 2011-08-24 SINTEF Petroleumsforskning AS SINTEF Petroleum Research Address:

More information

Role of Industry Standards in improving Offshore Safety

Role of Industry Standards in improving Offshore Safety Role of Industry Standards in improving Offshore Safety Standards Background Role of Standards Standards and Regulations David Miller, PE, F. ASCE, Director, Standards 1 API Standards Background API established

More information

Drilling Courses Overview Pressure control and drilling equipment course offering

Drilling Courses Overview Pressure control and drilling equipment course offering Drilling Courses Pressure control and drilling equipment course offering Content Introduction 3 Pressure control equipment Multiplex (MUX) control system overview Mark III subsea BOP control system electrical

More information

Advancing Global Deepwater Capabilities

Advancing Global Deepwater Capabilities Advancing Global Deepwater Capabilities BP s commitments Determined to accelerate and further deploy the capabilities and practices that enhance safety in our company and the deepwater industry 200+ meetings

More information

Be a Differentiator in Management of Well Integrity and Risk for Deepwater O&G Wells

Be a Differentiator in Management of Well Integrity and Risk for Deepwater O&G Wells How Reliability Data and Software Solutions Can Be a Differentiator in Management of Well Integrity and Risk for Deepwater O&G Wells Presented by Einar Molnes, CTO and Founder einar.molnes@exprosoft.com

More information

NTL No N06 Information Requirements for EPs, DPPs and DOCDs on the OCS Effective June 18, 2010

NTL No N06 Information Requirements for EPs, DPPs and DOCDs on the OCS Effective June 18, 2010 NTL No. 2010-N06 Information Requirements for EPs, DPPs and DOCDs on the OCS Effective June 18, 2010 Frequently Asked Questions (FAQ s) Updated July 15, 2010 Updated July 21, 2010 1. Q. What OCS areas

More information

Enhancing Industry Capability for drilling Deepwater Wells A Chevron Perspective

Enhancing Industry Capability for drilling Deepwater Wells A Chevron Perspective Enhancing Industry Capability for drilling Deepwater Wells A Chevron Perspective Kevin Taylor September 26, 2011 Eleventh U.S.-China Oil and Gas Industry Forum Chevron is a Major Operator in Subsea and

More information

OBSERVATORY SERVICING AND MAINTENANCE

OBSERVATORY SERVICING AND MAINTENANCE OBSERVATORY SERVICING AND MAINTENANCE How to deploy and maintain a network of observatories around Europe? We don t built what we cannot maintain! Jean-François DROGOU IFREMER Steve ETCHEMENDY M.B.A.R.I

More information

Well Control Considerations of MPD on Deepwater Rigs

Well Control Considerations of MPD on Deepwater Rigs Well Control Considerations of MPD on Deepwater Rigs Don Hannegan, P.E., Strategic Technologies Development - Well Construction Products DEA Q1 - March, 2014 2013 Weatherford. All rights reserved. 1 MPD:

More information

International Well Control Forum Well Intervention Pressure Control Subsea Syllabus

International Well Control Forum Well Intervention Pressure Control Subsea Syllabus International Well Control Forum Well Intervention Pressure Control Subsea Syllabus November 2017 Version 1.0 IWCF Well Intervention Pressure Control Subsea Syllabus Contents Guidance Notes... 1. Introduction...

More information

Gaining an improved insight into subsea production

Gaining an improved insight into subsea production Gaining an improved insight into subsea production Terje Baustad, Emerson Process Management, Roxar One of the biggest challenges and most important drivers for operators in the offshore oil & gas sector

More information

Responding to Montara and Macondo Actions by Australia's oil and gas industry

Responding to Montara and Macondo Actions by Australia's oil and gas industry Responding to Montara and Macondo Actions by Australia's oil and gas industry International Regulators Offshore Safety Conference Mark McCallum Deputy Chief Executive Montara Incident 21 August 2009 Incident

More information

NAS Real-Time Monitoring of Offshore Oil and Gas Operations Committee Todd Durkee Director of Deepwater Drilling & Completions

NAS Real-Time Monitoring of Offshore Oil and Gas Operations Committee Todd Durkee Director of Deepwater Drilling & Completions December 5, 2014 NAS Real-Time Monitoring of Offshore Oil and Gas Operations Committee Todd Durkee Director of Deepwater Drilling & Completions Agenda Who is Anadarko Petroleum Corporation? What does Anadarko

More information

Consideration of External Pressure in the Design and Pressure Rating of Subsea Equipment API TECHNICAL REPORT 17TR12 FIRST EDITION, MARCH 2015

Consideration of External Pressure in the Design and Pressure Rating of Subsea Equipment API TECHNICAL REPORT 17TR12 FIRST EDITION, MARCH 2015 Consideration of External Pressure in the Design and Pressure Rating of Subsea Equipment API TECHNICAL REPORT 17TR12 FIRST EDITION, MARCH 2015 Special Notes API publications necessarily address problems

More information

UK Onshore Well Integrity

UK Onshore Well Integrity UK Onshore Well Integrity Project Report Conference Paper February 2016 CONTENTS 1. INTRODUCTION: PAGE 3 Purpose What is well integrity? Background Project driver 2. CONCLUSIONS & OBSERVATIONS: PAGE 5

More information

August 6, Re: Blowout Preventer Systems and Well Control Revisions, 1014 AA39. Via electronic submission to:

August 6, Re: Blowout Preventer Systems and Well Control Revisions, 1014 AA39. Via electronic submission to: August 6, 2018 Department of the Interior Bureau of Safety and Environmental Enforcement Attention: s and Standards Branch 45600 Woodland Road Sterling, VA 20166 Re: Blowout Preventer Systems and Well

More information

DNVGL-CP-0212 Edition March 2016

DNVGL-CP-0212 Edition March 2016 CLASS PROGRAMME Type approval DNVGL-CP-0212 Edition March 2016 The electronic pdf version of this document, available free of charge from http://www.dnvgl.com, is the officially binding version. FOREWORD

More information

Well Control Events. Well Flow Modeling. hydraulics and

Well Control Events. Well Flow Modeling. hydraulics and ABEL Engineering/Well Control Co. UBD Project Burgos Mexico 2003 ABEL Engineering/ /Well Control Co. Bill Abel, President Tel: +1 713 3555 3838 Mail: Mobile: +1 713 204-0294 Email: billabel@ @aol.com or

More information

Subsea Intervention: Is It Worth It? Drummond Lawson

Subsea Intervention: Is It Worth It? Drummond Lawson Subsea Intervention: Is It Worth It? Drummond Lawson 1 Subsea Intervention Is It Worth It? Subsea development timeline Why Intervene? What can you achieve? Intervention methods Intervention drivers What

More information

UNITED STATES DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT SERVICE GULF OF MEXICO OCS REGION

UNITED STATES DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT SERVICE GULF OF MEXICO OCS REGION UNITED STATES DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT SERVICE GULF OF MEXICO OCS REGION NOTICE TO LESSEES AND OPERATORS OF FEDERAL OIL, GAS, AND SULPHUR LEASES,OUTER CONTINENTAL SHELF, GULF OF MEXICO

More information

Heidrun Inverted Gas Lift System

Heidrun Inverted Gas Lift System Heidrun Inverted Gas Lift System ICoTA European Intervention Conference, Aberdeen Nov. 2014 Sivert Gartland, Well Intervention Engineer, Heidrun, Statoil Agenda Background - Field and drainage techniques

More information

Performance-Based Safety Regulation

Performance-Based Safety Regulation Performance-Based Safety Regulation Peter Bjerager, DNV GL National Academy of Sciences, 15 April 2016 1 SAFER, SMARTER, GREENER DNV GL in brief We classify, certify, verify and test against regulatory

More information

Experience, Role, and Limitations of Relief Wells

Experience, Role, and Limitations of Relief Wells Experience, Role, and Limitations of Relief Wells Introduction This white paper has been developed and issued on behalf of the Joint Industry Task Force on Subsea Well Control and Containment. This group

More information

Sinking of the Deepwater Horizon. 11 perish and 115 survive

Sinking of the Deepwater Horizon. 11 perish and 115 survive Sinking of the Deepwater Horizon 11 perish and 115 survive The Rig Rig cost about $500,000 per day to contract With all the drilling spread, helicopters, support vessels, other services cost about $1,000,000

More information

Introduction to Subsea Production Systems. What is Subsea? 02 What is Subsea? DNV GL DNV GL 2013 September 2014

Introduction to Subsea Production Systems. What is Subsea? 02 What is Subsea? DNV GL DNV GL 2013 September 2014 Introduction to Subsea Production Systems 02 What is Subsea? September 2014 DNV GL 2013 September 2014 SAFER, SMARTER, GREENER What is Subsea? 3 1 What is Subsea? 4 Subsea example 5 2 Subsea example 6

More information

National Academies Committee Performance-Based Regulation

National Academies Committee Performance-Based Regulation National Academies Committee Performance-Based Regulation Oct 17, 2016 Washington, DC Elmer P. Danenberger III edanenberger@gmail.com Bud 80+ nations with offshore oil & gas programs Vision: Outstanding

More information

Regulatory Reforms in Mexico Energy Production and Environmental Protection. A Technical Regulator for a New Market Frame

Regulatory Reforms in Mexico Energy Production and Environmental Protection. A Technical Regulator for a New Market Frame Regulatory Reforms in Mexico Energy Production and Environmental Protection A Technical Regulator for a New Market Frame February 12th, 2014 CONTENT Legal Framework Strategic Design Regulatory Policy Gradual

More information

MONTARA DEVELOPMENT PROJECT The Montara development project is located in the Timor Sea approx 650 km west of Darwin. PTTEP owns and operates 100 per

MONTARA DEVELOPMENT PROJECT The Montara development project is located in the Timor Sea approx 650 km west of Darwin. PTTEP owns and operates 100 per 1 2 MONTARA DEVELOPMENT PROJECT The Montara development project is located in the Timor Sea approx 650 km west of Darwin. PTTEP owns and operates 100 per cent of the Montara Development Project, which

More information

Lessons Learned from the US Chemical Safety and Hazard Investigations Board. presented at

Lessons Learned from the US Chemical Safety and Hazard Investigations Board. presented at Lessons Learned from the US Chemical Safety and Hazard Investigations Board presented at The IAEA International Conference on Human and Organizational Aspects of Assuring Nuclear Safety Exploring 30 Years

More information

C o n t a c t U s f o r S p e c i a l C o r p o r a t e R a t e N o w!

C o n t a c t U s f o r S p e c i a l C o r p o r a t e R a t e N o w! HPHT DRILLING OPERATIONS C o n t a c t U s f o r S p e c i a l C o r p o r a t e R a t e N o w! HPHT DRILLING OPERATIONS Course Overview This course covers the key aspects HPHT Drilling Operations in detail

More information

Horizontal and Multilateral Wells

Horizontal and Multilateral Wells Training Title Horizontal and Multilateral Wells Training Date & Duration Will be held at any 5 star hotel- 5 Days Horizontal and Multilateral Wells 5 days 26-30 Oct 2013 US $ 4,250 Abu Dhabi Training

More information

Single / Dual Barrier HP Drilling Risers

Single / Dual Barrier HP Drilling Risers Single / Dual Barrier HP Drilling Risers Acteon HPHT Subsea Community Breakfast Meeting 23rd March 2011 Tim Eyles Director 2H Offshore Engineering tim.eyles@2hoffshore.com / +44 1483 774908 Agenda Introduction

More information

Send your directly to

Send your  directly to Welcome to Chess Subsea Production System Training - SPS Subsea production system (SPS) is associated with the overall process and all the equipment involved in drilling, field development, and field operation.

More information

Minutes of Meeting. Meeting attendees introduced themselves. Record of Meeting Attendance is included in the minutes.

Minutes of Meeting. Meeting attendees introduced themselves. Record of Meeting Attendance is included in the minutes. Minutes of Meeting 2009 Exploration & Production Standards Conference on Oilfield Equipment and Materials Meeting Tuesday, June 23, 2009 Drilling Well Control Equipment SC16 8:30 am 12:00 pm Chair: Mel

More information

NOIA FALL MEETING - OCTOBER JOINT INDUSTRY OIL SPILL PREPAREDNESS and RESPONSE TASK FORCE T JAY COLLINS

NOIA FALL MEETING - OCTOBER JOINT INDUSTRY OIL SPILL PREPAREDNESS and RESPONSE TASK FORCE T JAY COLLINS NOIA FALL MEETING - OCTOBER 2010 JOINT INDUSTRY OIL SPILL PREPAREDNESS and RESPONSE TASK FORCE T JAY COLLINS The Joint Industry Oil Spill Preparedness & Response Task Force (JITF) is comprised of 60+ task

More information

Employability Enhancement Program for Engineers. Transformation of an engineering degree holder to a real Engineer, who can do more at work.

Employability Enhancement Program for Engineers. Transformation of an engineering degree holder to a real Engineer, who can do more at work. TRACEZ Training Services Oman www.tracezglobal.com Employability Enhancement Program for Engineers Transformation of an engineering degree holder to a real Engineer, who can do more at work. EEP- Introduction

More information

Integrity Monitoring? New thinking in the approach to Subsea IMMR. Dr Karl Woods, Snr Subsea Reliability Engineer 22/2/2017

Integrity Monitoring? New thinking in the approach to Subsea IMMR. Dr Karl Woods, Snr Subsea Reliability Engineer 22/2/2017 Integrity Monitoring? New thinking in the approach to Subsea IMMR Dr Karl Woods, Snr Subsea Reliability Engineer 22/2/2017 Disclaimer and important notice This presentation contains forward looking statements

More information

GAS FORUM RAMADA PARC HOTEL, BUCHAREST OCTOBER 3 RD, 2012

GAS FORUM RAMADA PARC HOTEL, BUCHAREST OCTOBER 3 RD, 2012 ROMANIA GAS FORUM RAMADA PARC HOTEL, BUCHAREST OCTOBER 3 RD, 2012 AGENDA INTRODUCING IPM-PARTNERS PROJECTS SNAPSHOTS PROJECTS SNAPSHOTS - ONGOING TECHNICAL INSPECTIONS-OVERVIEW TECHNICAL INSPECTIONS- WHY?

More information

OCS leasing program draft PEIS comments Attachment A

OCS leasing program draft PEIS comments Attachment A Effective Oversight Requires Key Legislative, Regulatory, Enforcement and Transparency Upgrades Analysis by Lois N. Epstein, P.E. Engineer and Arctic Program Director The Wilderness Society Anchorage,

More information