Tore Aarsland. Chairman of the Editorial Revision Committee / Senior Design C6 Technologies. 10-Jan-13

Size: px
Start display at page:

Download "Tore Aarsland. Chairman of the Editorial Revision Committee / Senior Design C6 Technologies. 10-Jan-13"

Transcription

1 Tore Aarsland Chairman of the Editorial Revision Committee / Senior Design C6 Technologies 10-Jan-13

2

3 1. The well barrier philosophy of the standard is harmonised to NORSOK D-010. The use of the term tertiary well control is therefore discontinued. 2. The requirements of the final element of the secondary barrier has been expanded to reflect today's expectations and understanding.

4 3. External references has been updated and the number of them reduced. 4. Test requirements for pressure control equipment is further specified. 5. Requirements for subsea operations, hose management, dropped objects and lifting operations are added.

5 6. Mandates independent 3rd party verification of new designs, products and solutions related to the final element of the secondary barrier. 7. The structure is revised to increase readability.

6 8. The inclusion of operational requirements have been reduced as these are not included in the scope of the standard. Some are, however, kept as they are found to be critical for a safe operation. These are never preceded by the verbal form shall.

7 1. Scope 2. Normative and informative references 3. Terms, definitions and abbreviations 4. General requirements 5. Well control 6. Snubbing 7. Coil tubing 8. Wireline

8 The scope of this NORSOK standard is to provide common functional requirements for well intervention equipment used on the Norwegian Continental Shelf across the different operators. Tools and equipment intended for deployment inside a well is not covered.

9 Well intervention is the deployment of tools and equipment in a completed well. An intervention string is normally used to lower and retrieve the tools. Alternatively, the string can constitute the tool itself. Expected well pressure = reservoir pressure - minimum well fluid gradient + kill margin

10 Wireline is intervention using a continuous string without any internal bore. Coil tubing is intervention using a continuous string with an internal bore. Snubbing is intervention using jointed pipe

11 Equipment under the scope of this standard will by default fall into at least one of the following categories and shall satisfy the requirements of the corresponding standards: Topside Pressure Control Equipment: ISO Subsea Pressure Control Equipment: ISO Temporarily Equipment: NORSOK Z-015 Supporting Structures: NORSOK N-001

12 This standard is applicable for all well intervention equipment manufactured after the 1 st of January All well intervention equipment shall comply to this revision no later than the 1 st of January 2018.

13 All suppliers that design, manufacture or sell well intervention equipment shall have a quality management system based on ISO 9001 or equivalent. All new designs, products and solutions related to the final element of the secondary barrier, including the control of said device, shall be verified by an independent 3rd party.

14 Hose assemblies should be managed, inspected and replaced according to Guidelines for the management of flexible hose assemblies. These guidelines are published by Energy Institute in the UK.

15 Lifting equipment shall be designed according to NORSOK R-002. Lifting operations should be carried out in according to NORSOK R-003. Provisions shall be made for handling of BHAs in compliance with these lifting requirements.

16 Well intervention equipment shall be designed according to part 2 of Handbook Best Practice Dropped Object Management to reduce the risk of dropped objects. These are guidelines published by Samarbeid for Sikkerhet

17 The required product specification level (PSL) of pressure control equipment is determined by annex A in ISO Rams and valves under the scope of this standard shall be tested to performance requirement 2 (PR2) according to annex F in ISO

18

19 BOPs and safety heads having an vertical through-bore dimension equal or greater than 7 1/16" shall be designed, manufactured and tested according to ISO This replaces the above requirement to test according to annex F in ISO for such equipment.

20 Be able to shear the intervention string in use with less than 90% of the max hydraulic working pressure, demonstrated by a shear test according to ISO Annex C.2.3 Independent HPU (not shared with the primary barrier) SIL 2 (same as for a drilling BOP)

21 All connections forming the secondary barrier envelope shall have metal-to-metal seals Two control panels, one should be located in the control cabin HPU located in a non-hazardous area outside the wellhead area

22 There shall be at least two independent technical measures to prohibit the accumulation of multiple strands of severed intervention string through the secondary well barrier. This requirement is not applicable for intervention strings without any compressive strength.

23 A snubbing operation on the Norwegian Continental Shelf will most often be rig assisted due to the requirement for a remotely operated pipe handling system. This standard does not intend to introduce additional requirements for permanently installed drilling equipment which is covered by NORSOK D-001.

24 The requirement for dual redundant stationary snub slips have been removed. This is not used in recent operations because the safety interlock system implemented on all rigs is sufficient to ensure the retention of the string.

25 The possibility of using old, conventional tongs has been removed. Tongs shall be remote operated. 10-Jan

26 Control of the primary well barrier from the cabin added Increased required rate of grease injection, from 0.25 l/min to 0.75 l/min. Updated requirements for speed and tension 10-Jan

27 Creep Speed Full Speed Max pull Acceleration Wire size (outer diameter) (inner diameter) (outer diameter) [m/min] [m/min] [kg] [m/s 2 ] < 3/ /16" 7/32" > 7/

28 9: Documentation Annex A: Data Sheet Snubbing Equipment Annex B: Safety Head Requirements Annex C: Snubbing and Coil Tubing Rig-Up Annex D: Wireline Rig-Up

29 Provisions shall be made for handling all equipment and BHAs in compliance with lifting requirements 3 rd party verification of new designs, products and solutions related to the final element of the secondary barrier Two control panels for the final element of the secondary barrier, one of the shall be installed in the control cabin

Heidrun Inverted Gas Lift System

Heidrun Inverted Gas Lift System Heidrun Inverted Gas Lift System ICoTA European Intervention Conference, Aberdeen Nov. 2014 Sivert Gartland, Well Intervention Engineer, Heidrun, Statoil Agenda Background - Field and drainage techniques

More information

API RP 53 Recommend Practices for Blowout Prevention Equipment Systems for Drilling Wells vs. Standard 53 4 th Edition 2011

API RP 53 Recommend Practices for Blowout Prevention Equipment Systems for Drilling Wells vs. Standard 53 4 th Edition 2011 API RP 53 Recommend Practices for Blowout Prevention Equipment Systems for Drilling Wells vs. Standard 53 4 th Edition 2011 Meeting with BOEMRE March 1, 2011 Presented by: Frank Gallander Chevron Chair

More information

NTL No N05 Increased Safety Measures for Energy Development on the OCS Effective June 8, 2010

NTL No N05 Increased Safety Measures for Energy Development on the OCS Effective June 8, 2010 NTL No. 2010-N05 Increased Safety Measures for Energy Development on the OCS Effective June 8, 2010 Frequently Asked Questions (FAQ s) Updated July 9, 2010 A. General Questions QA1: With the issuance of

More information

Advanced Well Completion Design. 30 Sep - 04 Oct 2018, Dubai. REP logo, PMI & PMP are registered trademarks of Project Management Institute, Inc.

Advanced Well Completion Design. 30 Sep - 04 Oct 2018, Dubai. REP logo, PMI & PMP are registered trademarks of Project Management Institute, Inc. 30 Sep - 04 Oct 2018, Dubai Approved Centre REP logo, PMI & PMP are registered trademarks of Project Management Institute, Inc. Introduction Organisational Impact This Glomacs Advanced Well training seminar

More information

Advanced Well Completion Design

Advanced Well Completion Design An Intensive 5 Day Training Course Advanced Well Completion Design 30 Sep - 04 Oct 2018, Dubai 19-OCT-17 This course is Designed, Developed, and will be Delivered under iso Quality standards Advanced Well

More information

International Well Control Forum Well Intervention Pressure Control Subsea Syllabus

International Well Control Forum Well Intervention Pressure Control Subsea Syllabus International Well Control Forum Well Intervention Pressure Control Subsea Syllabus November 2017 Version 1.0 IWCF Well Intervention Pressure Control Subsea Syllabus Contents Guidance Notes... 1. Introduction...

More information

Moduels in PetroTrainer. PetroTrainer. How PetroTrainer is used

Moduels in PetroTrainer. PetroTrainer. How PetroTrainer is used PetroTrainer E-Learning for the Petroleum industry PetroTrainer is probably the world s largest and most comprehensive tool made for training purposes in the petroleum industry. The ITC Boreskolen started

More information

An Introduction to Oil & Gas Drilling and Well Operations

An Introduction to Oil & Gas Drilling and Well Operations An Introduction to Oil & Gas Drilling and Well Operations Educational Material from the IOM 3 Oil and Gas Division The global network for the materials cycle Introduction The Institute of Materials, Minerals

More information

Report. Temporary abandoned wells on NCS. Subtitle. Author(s) Nils Totland. SINTEF Petroleum Research Well Integrity

Report. Temporary abandoned wells on NCS. Subtitle. Author(s) Nils Totland. SINTEF Petroleum Research Well Integrity - Unrestricted Report Temporary abandoned wells on NCS Subtitle Author(s) Nils Totland SINTEF Petroleum Research Well Integrity 2011-08-24 SINTEF Petroleumsforskning AS SINTEF Petroleum Research Address:

More information

Riserless Subsea P&A. Deepwater Decommissioning Workshop 2016 W I L D W E L L C O N T R O L S U B S E A I N T E R V E N T I O N

Riserless Subsea P&A. Deepwater Decommissioning Workshop 2016 W I L D W E L L C O N T R O L S U B S E A I N T E R V E N T I O N Riserless Subsea P&A Deepwater Decommissioning Workshop 2016 W I L D W E L L C O N T R O L S U B S E A I N T E R V E N T I O N 7 Series S U B S E A I N T E R V E N T I O N 7 Series Nominal Bore Size 7.375

More information

Deep Water Definitions

Deep Water Definitions DST in Deep Water Deep Water Definitions Depth of Water (Deepwater >1000ft (300m), Ultra- Deepwater > 5000ft (1500m)) Rig Type - Floaters (Drillships and Semi-Submersibles) Approach and Profile (risk,

More information

AADE Houston Chapter. Group. 26 January 2011

AADE Houston Chapter. Group. 26 January 2011 AADE Houston Chapter Deepwater and Emerging Technologies Group 26 January 2011 BOEMRE Compliance Guidelines Department of Interior s Increased Safety Measures for Energy Development on the Outer Continental

More information

The intent of this guideline is to assist the Drilling Engineer in his preparation of the deepwater drill stem test design and procedure.

The intent of this guideline is to assist the Drilling Engineer in his preparation of the deepwater drill stem test design and procedure. 1 The intent of this guideline is to assist the Drilling Engineer in his preparation of the deepwater drill stem test design and procedure. This document is not intended to override any specific local

More information

Hans J Lindland FMC Kongsberg Subsea Innovative Technologies, Creative Solutions

Hans J Lindland FMC Kongsberg Subsea Innovative Technologies, Creative Solutions Lett Brønnintervensjon Hans J Lindland FMC Kongsberg Subsea Why Light Well Intervention? Reservoir recovery is significantly lower (oil) for subsea wells than for platform wells Cost for drilling units

More information

SAFER, SMARTER, GREENER

SAFER, SMARTER, GREENER OIL & GAS Introduction to Subsea Production Systems 04 Christmas Tree (XT) Systems August 2015 DNV GL 2013 August 2015 SAFER, SMARTER, GREENER Christmas Tree Systems Onshore tree Offshore tree Subsea tree

More information

SPE A Systematic Approach to Well Integrity Management Alex Annandale, Marathon Oil UK; Simon Copping, Expro

SPE A Systematic Approach to Well Integrity Management Alex Annandale, Marathon Oil UK; Simon Copping, Expro SPE 123201 A Systematic Approach to Well Integrity Management Alex Annandale, Marathon Oil UK; Simon Copping, Expro Copyright 2009, Society of Petroleum Engineers This paper was prepared for presentation

More information

Speaker at the Americas: Decommissioning and Well Abandonment. September 23, 2015

Speaker at the Americas: Decommissioning and Well Abandonment. September 23, 2015 Speaker at the Americas: Decommissioning and Well Abandonment September 23, 2015 TETRA Offshore Services TETRA Offshore Services ISO 9001:2008 Certified 2 Decommissioning Case Study - Agenda A general

More information

ULTRA-DEEPWATER RISERLESS INTERVENTION SYSTEM (RIS)

ULTRA-DEEPWATER RISERLESS INTERVENTION SYSTEM (RIS) RPSEA PROJECT DW 2301 ULTRA-DEEPWATER RISERLESS INTERVENTION SYSTEM (RIS) DTC International, Inc. 5540 Brittmoore Road Houston, Texas 77041 23 March 2010 RIS PROJECT TEAM MEMBERS DTC International, Inc.

More information

Send your directly to

Send your  directly to Welcome to Chess Subsea Production System Training - SPS Subsea production system (SPS) is associated with the overall process and all the equipment involved in drilling, field development, and field operation.

More information

Wellhead Control Products, Inc. Hangers

Wellhead Control Products, Inc. Hangers Wellhead Control Products, Inc. Hangers The RH series was designed to be a highly workable coiled tubing hanger with greater reliability and more efficiency than other coiled tubing hanger systems. The

More information

Oil and Gas UK Well Integrity Guidelines

Oil and Gas UK Well Integrity Guidelines Oil and Gas UK Well Integrity Guidelines The Well, the Completion and the Xmas Tree The Equipment and the People A Definition of Well Integrity Key UK Legislative Requirement for Well Integrity Oil and

More information

Well Abandonment Services. Plug into a New Approach

Well Abandonment Services. Plug into a New Approach Well Abandonment Services Plug into a New Approach Get it Right the First Time Permanent Solutions to Your Well Abandonment Challenge Thousands of wells await safe and permanent abandonment. It s critical

More information

BigBore IIe. 15,000 psi 20,000 psi SUBSEA WELLHEAD SYSTEMS

BigBore IIe. 15,000 psi 20,000 psi SUBSEA WELLHEAD SYSTEMS BigBore IIe 15,000 psi 20,000 psi SUBSEA WELLHEAD SYSTEMS BigBore IIe SUBSEA WELLHEAD SYSTEM System Overview Dril-Quip s BigBore IIe Subsea Wellhead System meets the demands of HPHT well environments.

More information

Friction Grip in Wellheads: An Innovative Approach to Load Support & Sealing

Friction Grip in Wellheads: An Innovative Approach to Load Support & Sealing Friction Grip in Wellheads: An Innovative Approach to Load Support & Sealing Brent Harrald Principal Engineer Plexus Ocean Systems Ltd. December 2009 Page 1 Table of Contents Introduction Plexus Ocean

More information

RPSEA PROJECT STATUS REPORT FEB 2011

RPSEA PROJECT STATUS REPORT FEB 2011 RPSEA PROJECT STATUS REPORT FEB 2011 RPSEA Project 08121-2301-03 Ultra-Deepwater Riserless Intervention System (RIS) & RPSEA Project 09121-3500-07 Ultra-Deepwater Subsea Test Tree (SSTT) and Intervention

More information

MARS. Multiple application reinjection system

MARS. Multiple application reinjection system MARS Multiple application reinjection system Unique Technology. Universal Application. Historically, installing processing hardware on existing subsea trees has been a high-risk and costly activity due

More information

ISO INTERNATIONAL STANDARD

ISO INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 13628-8 First edition 2002-12-15 Petroleum and natural gas industries Design and operation of subsea production systems Part 8: Remotely Operated Vehicle (ROV) interfaces on

More information

4 Briefing. Responsible investor

4 Briefing. Responsible investor Issue Responsible investor 4 Briefing Wednesday 8 th February 2012 In 2010, we accepted all 26 recommendations made by the Bly Report our internal investigation into the Deepwater Horizon incident. BP

More information

SUBSEA WELL CONTAINMENT. Global Basis. Deepwater & Emerging Technologies Group (DETG) AADE Houston Chapter 25 January 2012

SUBSEA WELL CONTAINMENT. Global Basis. Deepwater & Emerging Technologies Group (DETG) AADE Houston Chapter 25 January 2012 SUBSEA WELL CONTAINMENT Global Basis Deepwater & Emerging Technologies Group (DETG) AADE Houston Chapter 25 January 2012 Bill Mahler Wild Well Control, Inc. Response Components - Plus Many More Components

More information

Subsea Pump System - Optimized for Rapid Deployment & Operation within the Primary Barrier. Brian Piccolo, Technology Development Mgr.

Subsea Pump System - Optimized for Rapid Deployment & Operation within the Primary Barrier. Brian Piccolo, Technology Development Mgr. Subsea Pump System - Optimized for Rapid Deployment & Operation within the Primary Barrier Brian Piccolo, Technology Development Mgr. Agenda Pumped Riser System (PRS) Vision Initial Concept Operational

More information

Intervention/Decommissioning

Intervention/Decommissioning Intervention/Decommissioning By Nicholas Samford Lloyds Register Intervention/Decommissioning SME Working together for a safer world Planning Decommissioning Operations Planning Decommissioning and P&A

More information

NORWAY. Norwegian Industrial Property Office (12) APPLICATION (19) NO (21) (13) A1. (51) Int Cl.

NORWAY. Norwegian Industrial Property Office (12) APPLICATION (19) NO (21) (13) A1. (51) Int Cl. (12) APPLICATION (19) NO (21) 11782 (13) A1 NORWAY (1) Int Cl. E21B 43/00 (06.01) E21B 43/01 (06.01) E21B 43/12 (06.01) Norwegian Industrial Property Office (21) Application nr 11782 (86) Int.application.day

More information

Specification for Subsea Umbilicals

Specification for Subsea Umbilicals Specification for Subsea Umbilicals Upstream Segment ANSI/API SPECIFICATION 17E FOURTH EDITION, OCTOBER 2010 EFFECTIVE DATE: APRIL 1, 2011 ISO 13628-5:2009 (Identical), Petroleum and natural gas industries

More information

TABLE OF CONTENTS Page

TABLE OF CONTENTS Page 2 American Petroleum Institute TABLE OF CONTENTS Page POLICY................t... 8 FOREWORD......................................................................................................................f...

More information

IWCF Well Control Level 5. Celle Drilling Conference 2017

IWCF Well Control Level 5. Celle Drilling Conference 2017 IWCF Well Control Level 5 Celle Drilling Conference 2017 Contents IWCF well control level 5 course program Background - who is it for Structure and contents Delivery approach Questions Why? Level 5 background

More information

API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS. API 17G4 Riserless Subsea Well Intervention Systems REVISION TASK GROUP STATUS

API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS. API 17G4 Riserless Subsea Well Intervention Systems REVISION TASK GROUP STATUS API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS API 17G4 Riserless Subsea Well Intervention Systems REVISION TASK GROUP STATUS 5 TH JANUARY 2016 1. STATUS Some progress has been made since the

More information

HorizontalBore SUBSEA TREE

HorizontalBore SUBSEA TREE HorizontalBore SUBSEA TREE HorizontalBore SUBSEA TREE Dril-Quip s HorizontalBore Tree is a modular design subsea production component that accommodates numerous completion configuration possibilities.

More information

Macondo Blowout Lessons Learned for Prevention and Mitigation

Macondo Blowout Lessons Learned for Prevention and Mitigation Macondo Blowout Lessons Learned for Prevention and Mitigation Lars Herbst, P.E. BSEE Gulf of Mexico Regional Director 05 October 2017 To promote safety, protect the environment and conserve resources offshore

More information

Suspended Subsea Well Monitoring CaTS TM Wireless Technology. Donald Horsfall RPLM (ECIS)

Suspended Subsea Well Monitoring CaTS TM Wireless Technology. Donald Horsfall RPLM (ECIS) Suspended Subsea Well Monitoring CaTS TM Wireless Technology Donald Horsfall RPLM (ECIS) Tuesday 27 th June 2017 Agenda Introduction to CaTS Technology CaTS - Cable-less Telemetry System Industry guidelines

More information

7 Briefing. Responsible investor

7 Briefing. Responsible investor Issue Responsible investor 7 Briefing Monday, 5 th October 202 In 200, we accepted all 26 recommendations made by the Bly Report our internal investigation into the Deepwater Horizon incident. BP has committed

More information

CECIMO position on the applicability of the. Pressure Equipment Directive (97/23/EC) to machine tools

CECIMO position on the applicability of the. Pressure Equipment Directive (97/23/EC) to machine tools CECIMO position on the applicability of the Pressure Equipment Directive (97/23/EC) to machine tools Summary: The Pressure Equipment Directive (97/23/EC) was enforced in a mandatory way on 29 May 2002.

More information

ISO INTERNATIONAL STANDARD

ISO INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 10407-2 First edition 2008-10-15 Petroleum and natural gas industries Rotary drilling equipment Part 2: Inspection and classification of used drill stem elements Industries du

More information

15,000 psi 20,000 psi. BigBore IIe HPHT SUBSEA WELLHEAD SYSTEMS

15,000 psi 20,000 psi. BigBore IIe HPHT SUBSEA WELLHEAD SYSTEMS 15,000 psi 20,000 psi BigBore IIe HPHT SUBSEA WELLHEAD SYSTEMS DXe Gasket Profile DXe Locking Profile BigBore IIe SUBSEA WELLHEAD SYSTEM Mud Stick 18 ¾" BigBore IIe Wellhead Housing The BigBore IIe Subsea

More information

International Well Control Forum IWCF. Well Control Training Syllabus. Drilling Level 2. 1 st January 2014 Version 3.0

International Well Control Forum IWCF. Well Control Training Syllabus. Drilling Level 2. 1 st January 2014 Version 3.0 International Well Control Forum IWCF Well Control Training Drilling Level 2 1 st January 2014 Version.0 Drilling Well Control Written Test Level 2 Surface & Subsea BOP Stack s and Structure Written Test

More information

EUOAG Workshop. Workshop on decommissioning of offshore installations Challenges, options and lessons learned PP&A

EUOAG Workshop. Workshop on decommissioning of offshore installations Challenges, options and lessons learned PP&A EUOAG Workshop Workshop on decommissioning of offshore installations Challenges, options and lessons learned PP&A Johnny Gundersen Principal Engineer, PSA Norway Content Requirements for PP&A in Norway

More information

Geoprober Drilling Moving from Ideas To Reality (Status August, 2005)

Geoprober Drilling Moving from Ideas To Reality (Status August, 2005) Geoprober Drilling Moving from Ideas To Reality (Status August, 2005) Reel A 4 OD Reel B 3-1/8 OD Anaconda CT Unit Drilling Rig 27 m derrick, 200 tonnes Heave comp 120 tonnes 4.8m Existing Equipment Refurbishment

More information

MIDDLE EAST WELL INTEGRITY WHITEPAPER

MIDDLE EAST WELL INTEGRITY WHITEPAPER MIDDLE EAST WELL INTEGRITY WHITEPAPER Konstantinos Christou Research PG Engineer University of Aberdeen Disclaimer: Whilst every effort has been made to ensure the accuracy of the information contained

More information

Multi-Bowl Applications

Multi-Bowl Applications Multi-Bowl Applications Standard Off-the- Shelf Casing Head Lower Profile Solution Common Support Bushing Field Proven Sealing Designs FS Seals require No Plastic Packing C-22 Profile = Standard Off-the-

More information

37 th Gas-Lift Workshop Houston, Texas, USA February 3 7, Dag Almar Hansen, CEO Gas-Lift Workshop 1. Feb. 3-7, 2014

37 th Gas-Lift Workshop Houston, Texas, USA February 3 7, Dag Almar Hansen, CEO Gas-Lift Workshop 1. Feb. 3-7, 2014 37 th Gas-Lift Workshop Houston, Texas, USA February 3 7, 2014 Dag Almar Hansen, CEO Feb. 3-7, 2014 2014 Gas-Lift Workshop 1 37 th Gas-Lift Workshop Houston, Texas, USA February 3 7, 2014 Pressure management

More information

BP SWOPS Single Well Oil Production System. Sandy Meldrum CEng, MIMechE

BP SWOPS Single Well Oil Production System. Sandy Meldrum CEng, MIMechE Sandy Meldrum CEng, MIMechE Concept A means of producing oil from small offshore fields which would be uneconomic for fixed platforms or other conventional means. System Overview Comprised Production Vessel

More information

Subsea Intervention: Is It Worth It? Drummond Lawson

Subsea Intervention: Is It Worth It? Drummond Lawson Subsea Intervention: Is It Worth It? Drummond Lawson 1 Subsea Intervention Is It Worth It? Subsea development timeline Why Intervene? What can you achieve? Intervention methods Intervention drivers What

More information

DEA Quarterly Meeting 18 November Bill Pike NISC, an IBM Company

DEA Quarterly Meeting 18 November Bill Pike NISC, an IBM Company DEA Quarterly Meeting 18 November 2010 Bill Pike NISC, an IBM Company DISCLAIMER I am an employee of NISC, an IBM company, working under contract in the U.S. Department of Energy s National Energy Technology

More information

New Developments in Regulation of U.S. Offshore Oil and Gas Operations

New Developments in Regulation of U.S. Offshore Oil and Gas Operations New Developments in Regulation of U.S. Offshore Oil and Gas Operations Peking University Law School and The University of Texas School of Law Carol Dinkins Partner Vinson & Elkins, LLP August 21, 2012

More information

API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS

API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS API 17G4 Riserless Subsea Well Intervention Systems REVISION TASK GROUP STATUS 8 TH JANUARY 2015 1. STATUS Last meeting held was a telecom meeting

More information

Industry Response - Post Macondo

Industry Response - Post Macondo Industry Response - Post Macondo Charlie Williams Chief Scientist Well Engineering Shell Energy Resource Company CSIS Energy and National Security Program - future of offshore oil & gas developments in

More information

Pressurised Subsea Pipeline Repair Recent Case Studies

Pressurised Subsea Pipeline Repair Recent Case Studies Despite good pipeline design and integrity management schemes, pipelines can and do get damaged and need to be repaired. Damage can be caused by any number of factors, such as dragged anchors, landslides,

More information

June 24, 2010 RPSEA Project 1502 Thomas E. Williams int.com

June 24, 2010 RPSEA Project 1502 Thomas E. Williams  int.com June 24, 2010 RPSEA Project 1502 Thomas E. Williams www.nautilus int.com RPSEA 1502 Coiled Tubing from a Small Vessel June 2010 Update Presentation Topics Background Project Objectives System Configuration

More information

Offshore Systems. Cameron s Subsea Production Philosophy

Offshore Systems. Cameron s Subsea Production Philosophy Offshore Systems In today s fast-paced, cost-conscious subsea production industry, Cameron has successfully met the challenge to deliver safe, reliable system solutions. This experience allows Cameron

More information

Introduction to Subsea Production Systems. What is Subsea? 02 What is Subsea? DNV GL DNV GL 2013 September 2014

Introduction to Subsea Production Systems. What is Subsea? 02 What is Subsea? DNV GL DNV GL 2013 September 2014 Introduction to Subsea Production Systems 02 What is Subsea? September 2014 DNV GL 2013 September 2014 SAFER, SMARTER, GREENER What is Subsea? 3 1 What is Subsea? 4 Subsea example 5 2 Subsea example 6

More information

SUBSEA 101. Find more Subsea 101 case studies online

SUBSEA 101. Find more Subsea 101 case studies online SUBSEA 101 The purpose of this document is to help define some of the rationale behind the selection of a subsea tree configuration in a theoretical field for a project we are calling Project X. This section

More information

Deepwater riserless (RLWI) enablers for increased oil recovery. Bringing shallow water experience to deepwater.

Deepwater riserless (RLWI) enablers for increased oil recovery. Bringing shallow water experience to deepwater. Deepwater riserless (RLWI) enablers for increased oil recovery. Bringing shallow water experience to deepwater. Well Intervention Services Deepwater RLWI success criteria RLWI history Technology Focus

More information

OTC seems to be able to afford to fix the problems associated with downtime due to an incomplete design.

OTC seems to be able to afford to fix the problems associated with downtime due to an incomplete design. OTC 15194 DEEPWATER BOP CONTROL SYSTEMS - A LOOK AT RELIABILITY ISSUES Earl Shanks, Transocean; Andrew Dykes, ABS Consulting; Marc Quilici, ABS Consulting; John Pruitt, ABS Consulting Copyright 2003, Offshore

More information

Texas Oil Tools Bop Manual READ ONLINE

Texas Oil Tools Bop Manual READ ONLINE Texas Oil Tools Bop Manual READ ONLINE Our BOP parts, BOP spares, perform under the most demanding conditions and have great quality. We have parts for Cameron BOP's, Titan Oil Tools, Titan Oil Tools oilfield

More information

Marathon Drilling Indonesia

Marathon Drilling Indonesia Marathon Drilling Indonesia Case History of Managed Pressure Drilling in Deepwater Marathon International Petroleum Indonesia Limited Introduction Marathon signed a PSC for Pasangkayu block in Makassar

More information

ISO INTERNATIONAL STANDARD. Road vehicles Pneumatic braking systems Part 1: Pipes, male fittings and tapped holes with facial sealing surface

ISO INTERNATIONAL STANDARD. Road vehicles Pneumatic braking systems Part 1: Pipes, male fittings and tapped holes with facial sealing surface INTERNATIONAL STANDARD ISO 4039-1 First edition 1998-08-15 Road vehicles Pneumatic braking systems Part 1: Pipes, male fittings and tapped holes with facial sealing surface Véhicules routiers Dispositifs

More information

Consideration of External Pressure in the Design and Pressure Rating of Subsea Equipment API TECHNICAL REPORT 17TR12 FIRST EDITION, MARCH 2015

Consideration of External Pressure in the Design and Pressure Rating of Subsea Equipment API TECHNICAL REPORT 17TR12 FIRST EDITION, MARCH 2015 Consideration of External Pressure in the Design and Pressure Rating of Subsea Equipment API TECHNICAL REPORT 17TR12 FIRST EDITION, MARCH 2015 Special Notes API publications necessarily address problems

More information

Offshore Drilling Rigs

Offshore Drilling Rigs Offshore Drilling Rigs Drilling Offshore Drilling Rigs Many of the world s potential reserves of hydrocarbons lie beneath the sea, and the hydrocarbon industry has developed techniques suited to conditions

More information

TABLE OF CONTENTS FOREWORD... 3 INTRODUCTION SCOPE NORMATIVE REFERENCES... 4

TABLE OF CONTENTS FOREWORD... 3 INTRODUCTION SCOPE NORMATIVE REFERENCES... 4 TITLE SPECIFICATION FOR CRIMPED CONNECTING LUGS AND FERRULES PAGE: 1 OF 29 ISION DATE: SEPTEMBER 2014 TABLE OF CONTENTS Page FOREWORD... 3 INTRODUCTION... 4 1 SCOPE... 4 2 NORMATIVE S... 4 3 REQUIREMENTS...

More information

pipeline FSHR and tether for fatigue, stress, and any other abnormal condition (e.g., corrosion) that may negatively impact the riser or tether; and

pipeline FSHR and tether for fatigue, stress, and any other abnormal condition (e.g., corrosion) that may negatively impact the riser or tether; and (3) A description of how you met the design requirements, load cases, and allowable stresses for each load case according to API RP 2RD (as incorporated by reference in 250.198); (4) Detailed information

More information

NORSOK D-010. Well Integrity Standard. 2 Day Course

NORSOK D-010. Well Integrity Standard. 2 Day Course NORSOK D-010 Well Integrity Standard 2 Day Course The Norsok D-010 is the only holistic well integrity standard in the world... that addresses well integrity throughout the life cycle of the well, starting

More information

Enhancing Industry Capability for drilling Deepwater Wells A Chevron Perspective

Enhancing Industry Capability for drilling Deepwater Wells A Chevron Perspective Enhancing Industry Capability for drilling Deepwater Wells A Chevron Perspective Kevin Taylor September 26, 2011 Eleventh U.S.-China Oil and Gas Industry Forum Chevron is a Major Operator in Subsea and

More information

Siem WIS. Siem WIS AS. Closed Loop Drilling CLD. August Siem WIS AS.

Siem WIS. Siem WIS AS. Closed Loop Drilling CLD. August Siem WIS AS. AS Closed Loop Drilling CLD August 2010 2010 AS. Technology summary has secured intellectual property rights (IPR) for all key components of its portfolio: CircSub To drill with constant Mud Circulation

More information

Kuala Lumpur 3 October 2012 State of the Industry of Riserless Light Well Interventions (RLWI)

Kuala Lumpur 3 October 2012 State of the Industry of Riserless Light Well Interventions (RLWI) Kuala Lumpur 3 October 2012 State of the Industry of Riserless Light Well Interventions (RLWI) Bevan Morrison, VP Global Subsea Intervention Solutions Agenda Subsea well intervention introduction Economic

More information

Industry & Govt Changes Post Macondo

Industry & Govt Changes Post Macondo Cover graphic should fill and not exceed the defined grey box. Industry & Govt Changes Post Macondo Gary F. Devlin VP Quality & Customer Experience March 2013 Deepwater Industry / Focus Approach Joint

More information

Well Life Cycle Integrity. IOM 3 / Energy Institute Technical Meeting 12 th March 2019

Well Life Cycle Integrity. IOM 3 / Energy Institute Technical Meeting 12 th March 2019 Well Life Cycle Integrity IOM 3 / Energy Institute Technical Meeting 12 th March 2019 Contents Agenda UK goal setting Regulations UK wells guidelines Principles of well integrity UK well integrity guidelines

More information

United States Patent (19) Cobb

United States Patent (19) Cobb United States Patent (19) Cobb 54 RAM-SHEAR AND SLIP DEVICE FOR WELL PIPE 75 Inventor: 73) Assignee: A. Tom Cobb, Seabrook, Tex. Continental Oil Company, Ponca City, Okla. 21 Appl. No.: 671,464 22 Filed:

More information

COILED TUBING DESIGN & OPERATIONS

COILED TUBING DESIGN & OPERATIONS Training Title COILED TUBING DESIGN & OPERATIONS Training Date & Duration Will be held at any 5 star hotel- 5 Days Coiled Tubing Design & Operations 5 days 15-19 December 2013 US $ 4,250 Abu Dhabi Training

More information

Standard for Subsea High Integrity Pressure Protection Systems (HIPPS) API STANDARD 17O SECOND EDITION, JULY 2014

Standard for Subsea High Integrity Pressure Protection Systems (HIPPS) API STANDARD 17O SECOND EDITION, JULY 2014 Standard for Subsea High Integrity Pressure Protection Systems (HIPPS) API STANDARD 17O SECOND EDITION, JULY 2014 Special Notes API publications necessarily address problems of a general nature. With respect

More information

WRS Artificial Lift System

WRS Artificial Lift System WRS Artificial Lift System Patent Pending Designed to adapt to any type of Artificial Lift Suspension! Artificial Lift and Down hole gauge monitoring Is fast Becoming the go to in the oil production market.

More information

Table Of Contents Casing Head 02 Christmas Tree & Tubing Head Tubing Spool 04 Contact Us

Table Of Contents Casing Head 02 Christmas Tree & Tubing Head Tubing Spool 04 Contact Us Table Of Contents Casing Head 02 Christmas Tree & Tubing Head 03 Tubing Spool 04 Contact Us 05 1 www.sapwellsglobal.com Casing Head Specialized large-diameter pipe lowered into an open hole and cemented

More information

Drilling Systems. Cameron Drilling Control Systems Applications. 1 Semi-submersible Platform Applicaton

Drilling Systems. Cameron Drilling Control Systems Applications. 1 Semi-submersible Platform Applicaton 7 Drilling Systems Cameron has designed, manufactured and delivered surface and subsea drilling systems from the wellhead through the manifold to meet a wide variety of customer requirements and drilling

More information

This document is a preview generated by EVS

This document is a preview generated by EVS INTERNATIONAL STANDARD ISO 15156-3 Third edition 2015-09-01 Petroleum and natural gas industries Materials for use in H2Scontaining environments in oil and gas production Part 3: Cracking-resistant CRAs

More information

White Paper. Deepwater Exploration and Production Minimizing Risk, Increasing Recovery

White Paper. Deepwater Exploration and Production Minimizing Risk, Increasing Recovery White Paper Deepwater Exploration and Production Minimizing Risk, Increasing Recovery Deepwater exploration, development and production present unique challenges to operators, and minimizing risk and maximizing

More information

How do we stretch the boundaries of oil and gas production?

How do we stretch the boundaries of oil and gas production? Maximum Pressure. High Pressure Technology Testing Equipment Hydraulics Pneumatics How do we stretch the boundaries of oil and gas production?» With high pressure equipment and pressure systems up to 25,000

More information

GB/T Translated English of Chinese Standard: GB/T NATIONAL STANDARD OF THE

GB/T Translated English of Chinese Standard: GB/T NATIONAL STANDARD OF THE Translated English of Chinese Standard: GB/T7307-2001 www.chinesestandard.net Sales@ChineseStandard.net GB NATIONAL STANDARD OF THE PEOPLE S REPUBLIC OF CHINA ICS 21.040.20 J 04 GB/T 7307-2001 eqv ISO

More information

Fundamentals of Drilling Course Outline. (1)Basics of Rotary Drilling Rotary Operations/Coring

Fundamentals of Drilling Course Outline. (1)Basics of Rotary Drilling Rotary Operations/Coring Fundamentals of Drilling Course Outline (1)Basics of Rotary Drilling (2)Rotary (2) Operations/Coring Rotary Operations/Coring (3)Directional -Drilling Drilling (4)Fishing-Roundtrip (5)Casing/Cementing

More information

ISO INTERNATIONAL STANDARD. Petroleum and natural gas industries Design and operation of subsea production systems Part 5: Subsea umbilicals

ISO INTERNATIONAL STANDARD. Petroleum and natural gas industries Design and operation of subsea production systems Part 5: Subsea umbilicals INTERNATIONAL STANDARD ISO 13628-5 Second edition 2009-12-15 Petroleum and natural gas industries Design and operation of subsea production systems Part 5: Subsea umbilicals Industries du pétrole et du

More information

Module No. # 01 Lecture No. # 3 Safety in design and operations. (Refer Slide Time: 00:10)

Module No. # 01 Lecture No. # 3 Safety in design and operations. (Refer Slide Time: 00:10) Health, Safety and Environmental Management in Petroleum and offshore Engineering Prof. Dr. Srinivasan Chandrasekaran Department of Ocean Engineering Indian Institute Of Technology, Madras Module No. #

More information

Click to edit Master title style APPEA AWIC UPDATE. Self Audit Checklist Source Control First Response

Click to edit Master title style APPEA AWIC UPDATE. Self Audit Checklist Source Control First Response APPEA AWIC UPDATE Click to edit Mutual Master Aid subtitle style Self Audit Checklist Source Control First Response Presenter: Tom Nolan Perth 1st 4 th March, 2010 2012 WHAT IS APPEA? The Australian Petroleum

More information

RISER SYSTEMS. Our world class innovation solving your riser challenges

RISER SYSTEMS. Our world class innovation solving your riser challenges RISER SYSTEMS Our world class innovation solving your riser challenges OUR WORLD CLASS INNOVATION SOLVING YOUR RISER contents Riser Analysis 3 Subsea Riser Systems 4 Connectors (Subsea and Surface) Surface

More information

Working for the future POSGRIP Technology

Working for the future POSGRIP Technology Working for the future POSGRIP Technology A Request for Joint Industry Support to enable roll-out of a new method of wellhead design October 2008 Page 1 1.1 - The Principals of POS-GRIP A New Method for

More information

Drilling Courses Overview Pressure control and drilling equipment course offering

Drilling Courses Overview Pressure control and drilling equipment course offering Drilling Courses Pressure control and drilling equipment course offering Content Introduction 3 Pressure control equipment Multiplex (MUX) control system overview Mark III subsea BOP control system electrical

More information

Controls and Communications Connectors Diamould electrical connectors

Controls and Communications Connectors Diamould electrical connectors Controls and Communications Connectors Diamould electrical connectors APPLICATIONS Subsea production systems controls Connectivity to tree, manifold, choke, and chemical injection metering valve (CIMV)

More information

Integrated Modeling of Complex Gas-Condensate Networks

Integrated Modeling of Complex Gas-Condensate Networks Integrated Modeling of Complex Gas-Condensate Networks Elliott Dudley (Senior Consultant MSi Kenny) Subsea UK 2013 Aberdeen, UK Experience that Delivers Overview Agenda Integrated Modelling Methodology

More information

subsea annulus management call for proposals

subsea annulus management call for proposals subsea annulus management call for proposals June 2013 Aims This is an open invitation to any organisation, from any sector, seeking partners and funding for innovative technologies in the oil and gas

More information

Marginal Project Development

Marginal Project Development Marginal Project Development A case study of the MC-66 / OCHRE Project Richard Weser MC66 OCHRE Joint Venture Project OCHRE PROSPECT DEVELOPMENT Mississippi Canyon 66 1 Gas Subsea 7.9-Mile Tieback to Taylor

More information

This document is a preview generated by EVS

This document is a preview generated by EVS TECHNICAL SPECIFICATION SPÉCIFICATION TECHNIQUE TECHNISCHE SPEZIFIKATION CEN ISO/TS 16530-2 December 2015 ICS 75.180.10 English Version integrity - Part 2: integrity for the operational phase (ISO/TS 16530-2:2014)

More information

Pilot Installation of Retrofit Gas Lift System Brae Bravo UK North Sea

Pilot Installation of Retrofit Gas Lift System Brae Bravo UK North Sea 36 th Gas-Lift Workshop Stavanger, Norway February 4 8, 2013 Retrofit Gas Lift Pilot Installation of Retrofit Gas Lift System Brae Bravo UK North Sea Alun Whittaker Business Development Manager Coiled

More information

MSR/MSB Mechanical Setting Tool

MSR/MSB Mechanical Setting Tool Tech Unit No: 0620000004 Revision: B Approved By: Quality Engineer Date: 2014-12-16 MSR/MSB Mechanical Setting Tool FEATURES: Special designed Bow Spring provides positive control and allows one size Mechanical

More information

MASTER S THESIS. Faculty of Science and Technology. Study program/ Specialization: Spring semester, 2013

MASTER S THESIS. Faculty of Science and Technology. Study program/ Specialization: Spring semester, 2013 Faculty of Science and Technology MASTER S THESIS Study program/ Specialization: Master of Science in Petroleum Engineering, Drilling and Well Technology Writer: Daniel Toka Eshraghi Faculty supervisor:

More information