1 DST in Deep Water
2 Deep Water Definitions Depth of Water (Deepwater >1000ft (300m), Ultra- Deepwater > 5000ft (1500m)) Rig Type - Floaters (Drillships and Semi-Submersibles) Approach and Profile (risk, technology, cost) 2
3 Deep Water Major Growth Globally 500 Deepwater Fields Established Frontier Emerging
4 SUBSEA OVERVIEW Floating Rigs Semi-Submersible Drill Ship 4
5 SUBSEA OVERVIEW Subsea Safety Equipment MANDATORY 5
6 SUBSEA OVERVIEW All Fixed Rigs All Floating Rigs Just Below Rig Floor Ground level Sea level Sea bed BOP stack 6
7 SUBSEA OVERVIEW System provides a fast acting and reliable means to: Isolate the landing string from the test string Prevent discharge of landing string content (retainer valve) Disconnect the landing string from the test string Provide additional barriers in the flow path Pump through feature Cutting wireline & coil tubing feature 7
8 SUBSEA OVERVIEW BOP Disconnect 8
9 System Specifications 9
10 SUBSEA OVERVIEW 10
11 SUBSEA DST/TCP job sequence RIH with DST/TCP string, tubing and dummy landing string Land the fluted hanger and close pipe RAM s on the painted pipe Run W/L correlation POOH to the fluted hanger Space out Subsea tree and TCP Run back with Subsea and land FH Set the packer and flow the well End of the test 11
12 12
13 Packers for DW Operations Retrievable Packers: Posi-test Long stroke packers: used in NGC (no rotation, heaves < 32 ) Use of Slip joints is required: know how to calculate forces on major string? Know the landing string weight (tension required?), the major string weight Assume the worst case: empty pipe ID, Max applied pressure OD 13
14 Packers for DW Operations Permanent packers: HP: No IF connections, ratings limitations Completion Fluids constraint Be familiar with tubing movement calculation (Hydraulic Calculation handbook) Conduct a high end casing and stress analysis design of the system. E.g. Wellcat, TDAS. 14
15 Packers for DW Operations Permanent Packers Hydraulics 15
16 Packers for DW operations Major concern: Deep water Shallow reservoir Wells 16
17 Downhole Shut-in Valves PCTV, IRDV, DAV, PFSV can be used as the Downhole Shut-in valve Depending on the well parameters Depth, BHP, Applied pressure window, Temperature, Completion fluid, Duration, Test program the choice of shut-in valve and string selection is made PCTH-FF is suitable for most jobs with BHP up to 17.5K psi To minimize operating pressure and stay within the available applied pressure window N2 pre-charge can be increased - This will require RFQ for design review and qualification for the specific job conditions 17
18 Downhole Shut-in Valves IRDV is ideally suitable for Deepwater operations with integrated circulating valve and its simplicity to operate the valves. - Temperature is limited to 320F - IRDV-DA : Max Tubing 26K, max Annulus 25K (contact SRC if above 21K) - Pressure up and bleed off slowly and keep the rate at 1,000 psi/min to avoid ringing oscillations Slow down the operations. - Do not bleed off pressure quickly, - Do not close the choke back immediately after pressure gauge indicates 0-psi - Do not pressure up quickly and stop. - Stay at a steady bleed and pressure up rate. 18
19 Downhole Shut-in Valves All pump applied trigger pressure commands should be 200 to 500-psi greater than the tools surface set-up program. High pressure disable commands are preferred over Low pressure disable commands. Wait 10min before sending HP enable commands 19
20 PFSV-J as Downhole Shut-in Valve Ultra Deep water well conditions Exceeds current IRDV ratings in temperature, pressure, packer or produced fluid environment J-tools are ideal choice - J- tools, PFSV-J and SHRV-J are recommended - These tools bring simplicity to complex well operations - Provides ability to bull head or reverse out before POOH - Seals suitable for Explosive decompression, Extrusion resistant, Temperature resistant, Chemical resistant for high ph fluids and CO2/H2S in produced fluids - Limited by one downhole shut-in TTV-J (or TFTV-J) to pressure test while RIH and SHRV-J to reverse out 20
21 Deep water well conditions BHP > 25,000 psi Max. pressure > 30,000 psi (BHP + Applied) BHT >400 F Duration > 49 days (up to 90 days) Fluids - ZnBr2, Cesium Formate (proposed) Water depth > 6,000 ft 21
22 References # # # Test # # # Test Design Philosophy and Operating Guidelines for Deep Water Testing Deep Water DWCS System and Retrievable Packers Deep Water Well Surge with LS Packer and Subsea Tree Flowrate through by pass of 9 5/8" positrieve IRIS operations in Deep Water applications New Minimum Tension Requirements for all Subsea Trees (SSTT) 22
23 23 QUESTION?
24 Space out
25 Slip Joint Internal Applied Pressure Balanced Slip joint No Internal Applied pressure effect
26 Slip Joint External Applied Pressure Balanced Slip joint F on Major String F on Minor String
27 Slip joint External Applied pressure 27 AW 24-Mar-08
28 Slip joint Internal Hydrostatic pressure 28 AW 24-Mar-08
29 Space out & correlation 1) Subsea Dummy run Done Prior to RIH with DST string - Dummy landing string will be run and fluted hanger position will be adjusted to well position the ram s in the slick joint - Now, x is fixed. Correlation will be made and space out is done by pulling out of hole up to fluted hanger and adding or removing some tubing lengths from the major string x 29
30 Space out & correlation 2) Subsea Dummy run Done with DST string -Dummy landing string will be run with the DST string: drill pipe above the adjustable joint is painted to acquire the mark of the pipe ram s - Correlation is done and top shot depth is defined - Space out procedure must compensate for y-x plus any X- over length change below the fluted hanger y x 30
International Well Control Forum Well Intervention Pressure Control Subsea Syllabus
International Well Control Forum Well Intervention Pressure Control Subsea Syllabus November 2017 Version 1.0 IWCF Well Intervention Pressure Control Subsea Syllabus Contents Guidance Notes... 1. Introduction...
More informationAn Introduction to Oil & Gas Drilling and Well Operations
An Introduction to Oil & Gas Drilling and Well Operations Educational Material from the IOM 3 Oil and Gas Division The global network for the materials cycle Introduction The Institute of Materials, Minerals
More informationRiserless Subsea P&A. Deepwater Decommissioning Workshop 2016 W I L D W E L L C O N T R O L S U B S E A I N T E R V E N T I O N
Riserless Subsea P&A Deepwater Decommissioning Workshop 2016 W I L D W E L L C O N T R O L S U B S E A I N T E R V E N T I O N 7 Series S U B S E A I N T E R V E N T I O N 7 Series Nominal Bore Size 7.375
More informationHeidrun Inverted Gas Lift System
Heidrun Inverted Gas Lift System ICoTA European Intervention Conference, Aberdeen Nov. 2014 Sivert Gartland, Well Intervention Engineer, Heidrun, Statoil Agenda Background - Field and drainage techniques
More informationThe intent of this guideline is to assist the Drilling Engineer in his preparation of the deepwater drill stem test design and procedure.
1 The intent of this guideline is to assist the Drilling Engineer in his preparation of the deepwater drill stem test design and procedure. This document is not intended to override any specific local
More informationInternational Well Control Forum IWCF. Well Control Training Syllabus. Drilling Level 2. 1 st January 2014 Version 3.0
International Well Control Forum IWCF Well Control Training Drilling Level 2 1 st January 2014 Version.0 Drilling Well Control Written Test Level 2 Surface & Subsea BOP Stack s and Structure Written Test
More informationULTRA-DEEPWATER RISERLESS INTERVENTION SYSTEM (RIS)
RPSEA PROJECT DW 2301 ULTRA-DEEPWATER RISERLESS INTERVENTION SYSTEM (RIS) DTC International, Inc. 5540 Brittmoore Road Houston, Texas 77041 23 March 2010 RIS PROJECT TEAM MEMBERS DTC International, Inc.
More informationNOT TO COPY -- NO DISSEMINATE WITHOUT WRITTEN AGREEMENT. Presentation JB AG JCN JR 1
Presentation JB AG JCN JR 1 Presentation JB AG JCN JR 2 SUMMARY - INTRODUCTION - ENVIRONMENTAL DATA ACQUISITION & RIG BEHAVIOUR - RIG DRILLING EQUIPMENT - surface equipment - Subsea equipment - R O V -
More informationSend your directly to
Welcome to Chess Subsea Production System Training - SPS Subsea production system (SPS) is associated with the overall process and all the equipment involved in drilling, field development, and field operation.
More informationTore Aarsland. Chairman of the Editorial Revision Committee / Senior Design C6 Technologies. 10-Jan-13
Tore Aarsland Chairman of the Editorial Revision Committee / Senior Design Engineer @ C6 Technologies 10-Jan-13 1. The well barrier philosophy of the standard is harmonised to NORSOK D-010. The use of
More informationRPSEA PROJECT STATUS REPORT FEB 2011
RPSEA PROJECT STATUS REPORT FEB 2011 RPSEA Project 08121-2301-03 Ultra-Deepwater Riserless Intervention System (RIS) & RPSEA Project 09121-3500-07 Ultra-Deepwater Subsea Test Tree (SSTT) and Intervention
More informationSAFER, SMARTER, GREENER
OIL & GAS Introduction to Subsea Production Systems 04 Christmas Tree (XT) Systems August 2015 DNV GL 2013 August 2015 SAFER, SMARTER, GREENER Christmas Tree Systems Onshore tree Offshore tree Subsea tree
More informationHorizontalBore SUBSEA TREE
HorizontalBore SUBSEA TREE HorizontalBore SUBSEA TREE Dril-Quip s HorizontalBore Tree is a modular design subsea production component that accommodates numerous completion configuration possibilities.
More informationMarginal Project Development
Marginal Project Development A case study of the MC-66 / OCHRE Project Richard Weser MC66 OCHRE Joint Venture Project OCHRE PROSPECT DEVELOPMENT Mississippi Canyon 66 1 Gas Subsea 7.9-Mile Tieback to Taylor
More informationMarathon Drilling Indonesia
Marathon Drilling Indonesia Case History of Managed Pressure Drilling in Deepwater Marathon International Petroleum Indonesia Limited Introduction Marathon signed a PSC for Pasangkayu block in Makassar
More informationSubsea Well Engineering
Subsea Well Engineering Prof. Marcio Yamamoto UNIVERSITY OF SÃO PAULO Dept. of Mining and Petroleum Engineering December 11th, 2014 Kashiwa, Chiba Subsea Well Engineering Water Depth Petroleum Well Classification
More informationDrilling Systems. Cameron Drilling Control Systems Applications. 1 Semi-submersible Platform Applicaton
7 Drilling Systems Cameron has designed, manufactured and delivered surface and subsea drilling systems from the wellhead through the manifold to meet a wide variety of customer requirements and drilling
More informationOffshore Drilling Rigs
Offshore Drilling Rigs Drilling Offshore Drilling Rigs Many of the world s potential reserves of hydrocarbons lie beneath the sea, and the hydrocarbon industry has developed techniques suited to conditions
More informationNORWAY. Norwegian Industrial Property Office (12) APPLICATION (19) NO (21) (13) A1. (51) Int Cl.
(12) APPLICATION (19) NO (21) 11782 (13) A1 NORWAY (1) Int Cl. E21B 43/00 (06.01) E21B 43/01 (06.01) E21B 43/12 (06.01) Norwegian Industrial Property Office (21) Application nr 11782 (86) Int.application.day
More information@balance Deepwater. MPD services
@balance Deepwater MPD services Drill faster and reach farther with @balance Deepwater MPD services Achieve drilling objectives with closed-loop systems MPD provides a closed-loop circulation system in
More informationFriction Grip in Wellheads: An Innovative Approach to Load Support & Sealing
Friction Grip in Wellheads: An Innovative Approach to Load Support & Sealing Brent Harrald Principal Engineer Plexus Ocean Systems Ltd. December 2009 Page 1 Table of Contents Introduction Plexus Ocean
More informationModuels in PetroTrainer. PetroTrainer. How PetroTrainer is used
PetroTrainer E-Learning for the Petroleum industry PetroTrainer is probably the world s largest and most comprehensive tool made for training purposes in the petroleum industry. The ITC Boreskolen started
More informationAdvanced Well Completion Design. 30 Sep - 04 Oct 2018, Dubai. REP logo, PMI & PMP are registered trademarks of Project Management Institute, Inc.
30 Sep - 04 Oct 2018, Dubai Approved Centre REP logo, PMI & PMP are registered trademarks of Project Management Institute, Inc. Introduction Organisational Impact This Glomacs Advanced Well training seminar
More informationSubsea Pump System - Optimized for Rapid Deployment & Operation within the Primary Barrier. Brian Piccolo, Technology Development Mgr.
Subsea Pump System - Optimized for Rapid Deployment & Operation within the Primary Barrier Brian Piccolo, Technology Development Mgr. Agenda Pumped Riser System (PRS) Vision Initial Concept Operational
More informationEXPERIENCES FROM A VIRTUAL SIMULATOR ENVIRONMENT. Stavanger, October 20 th 2011
EXPERIENCES FROM A VIRTUAL SIMULATOR ENVIRONMENT Stavanger, October 20 th 2011 Overview Objectives: Provide a drilling simulation environment which: Give a trustworthy responsive from the well to actions
More informationOPERATING MANUAL SHOCK TOOL OWS WENZEL DOWNHOLE TOOLS LTD.
OPERATING MANUAL SHOCK TOOL OWS WENZEL DOWNHOLE TOOLS LTD. Release Notes: Release 2 Issued May 2016 Document # OM ST 001, Shock Tool Operating Manual Reviewed By: RG 1 P age OPERATING MANUAL SHOCK TOOL
More informationMulti-Bowl Applications
Multi-Bowl Applications Standard Off-the- Shelf Casing Head Lower Profile Solution Common Support Bushing Field Proven Sealing Designs FS Seals require No Plastic Packing C-22 Profile = Standard Off-the-
More informationDE120 Successful Well Completion and Workover Practices:
DE120 Successful Well Completion and Workover Practices: A Practical Approach from Design to Field Operations H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E www.ictd.ae ictd@ictd.ae
More informationDesign and Concept Integration- MPD Technology in Deepwater Rigs. Julmar Shaun S. Toralde, Global Deepwater Managed Pressure Drilling Champion
Design and Concept Integration- MPD Technology in Deepwater Rigs Julmar Shaun S. Toralde, Global Deepwater Managed Pressure Drilling Champion Managed Pressure Drilling An adaptive drilling process used
More informationTesting Services Training. Field-proven training and competency development programs
Testing Services Training Field-proven training and competency development programs Develop Expertise in Characterization A well-trained team is essential to accurate reservoir characterization. Your well
More informationModule No. # 01 Lecture No. # 3 Safety in design and operations. (Refer Slide Time: 00:10)
Health, Safety and Environmental Management in Petroleum and offshore Engineering Prof. Dr. Srinivasan Chandrasekaran Department of Ocean Engineering Indian Institute Of Technology, Madras Module No. #
More informationSUBSEA 101. Find more Subsea 101 case studies online
SUBSEA 101 The purpose of this document is to help define some of the rationale behind the selection of a subsea tree configuration in a theoretical field for a project we are calling Project X. This section
More informationManaged Pressure Drilling New Convention in Deepwater Wells. Brian Grayson, Bhavin Patel, Alice Gomez Weatherford International
Managed Pressure Drilling New Convention in Deepwater Wells. Brian Grayson, Bhavin Patel, Alice Gomez Weatherford International June 18-19 2014 Vienna, Austria. 2011 Weatherford. All rights reserved. 1
More informationGE Oil & Gas Drilling & Production. VetcoGray subsea wellhead systems. Advanced solutions for extreme conditions
GE Oil & Gas Drilling & Production VetcoGray subsea wellhead systems Advanced solutions for extreme conditions VetcoGray subsea wellhead systems As offshore drilling pushes past 10,000-foot water depths
More informationThis figure shows the difference in real time resolution of azimuthal resistivity data
1 This figure shows the difference in real time resolution of azimuthal resistivity data with Sperry s AFR tool. The log on the right shows the IXO transmitted data in realtime and the log on the left
More informationLearn more at
Deepwater Riser System Challenges and Issues David Walters 2H Offshore Presentation Objectives Review riser system options Update on current industry status Highlight key issues Discuss current industry
More informationExpro Perforation Services
Expro Perforation Services www.exprogroup.com Expro provide reservoir optimised perforation solutions. From modelling, through to design, operations and validation, Expro provide a full package of services
More informationBP SWOPS Single Well Oil Production System. Sandy Meldrum CEng, MIMechE
Sandy Meldrum CEng, MIMechE Concept A means of producing oil from small offshore fields which would be uneconomic for fixed platforms or other conventional means. System Overview Comprised Production Vessel
More informationAdvanced Well Completion Design
An Intensive 5 Day Training Course Advanced Well Completion Design 30 Sep - 04 Oct 2018, Dubai 19-OCT-17 This course is Designed, Developed, and will be Delivered under iso Quality standards Advanced Well
More informationSingle / Dual Barrier HP Drilling Risers
Single / Dual Barrier HP Drilling Risers Acteon HPHT Subsea Community Breakfast Meeting 23rd March 2011 Tim Eyles Director 2H Offshore Engineering tim.eyles@2hoffshore.com / +44 1483 774908 Agenda Introduction
More informationSiem WIS. Siem WIS AS. Closed Loop Drilling CLD. August Siem WIS AS.
AS Closed Loop Drilling CLD August 2010 2010 AS. Technology summary has secured intellectual property rights (IPR) for all key components of its portfolio: CircSub To drill with constant Mud Circulation
More informationDesign Process for Completions and Workovers Core COPYRIGHT. Design Process. This section will cover the following learning objectives:
Learning Objectives Design Process for Completions and Workovers Core Design Process This section will cover the following learning objectives: Explain the work product of a completions engineer Describe
More informationSpeaker at the Americas: Decommissioning and Well Abandonment. September 23, 2015
Speaker at the Americas: Decommissioning and Well Abandonment September 23, 2015 TETRA Offshore Services TETRA Offshore Services ISO 9001:2008 Certified 2 Decommissioning Case Study - Agenda A general
More informationChallenges of Deep Water To Jackup Conductors And Risers
Challenges of Deep Water To Jackup Conductors And Risers Alex Rimmer Engineering Team Leader, 2H Offshore Subsea Europe 14-15th November 2011 Overview What is deep water for jackup rigs? Jackup conductor/riser
More informationDeepwater riserless (RLWI) enablers for increased oil recovery. Bringing shallow water experience to deepwater.
Deepwater riserless (RLWI) enablers for increased oil recovery. Bringing shallow water experience to deepwater. Well Intervention Services Deepwater RLWI success criteria RLWI history Technology Focus
More informationAppendix B Drilling Methods
Appendix B Drilling Methods B-1. Introduction A brief discussion of available drilling methods is included below. It is not the intent of this manual to include a detailed description of these methods.
More informationMutineer-Exeter Development Drilling & Completions Challenges Darren Greer & Peter Dodd
Mutineer-Exeter Development Drilling & Completions Challenges Darren Greer & Peter Dodd (10 March 2005) 1 Outline 1. Project Overview 2. Wells Overview 3. Drilling Challenges Outcomes 4. Completions Challenges
More informationGeoprober Drilling Moving from Ideas To Reality (Status August, 2005)
Geoprober Drilling Moving from Ideas To Reality (Status August, 2005) Reel A 4 OD Reel B 3-1/8 OD Anaconda CT Unit Drilling Rig 27 m derrick, 200 tonnes Heave comp 120 tonnes 4.8m Existing Equipment Refurbishment
More informationLand wellhead systems & offshore surface wellhead systems
Land wellhead systems & offshore surface wellhead systems Presented by Oseghale Lucas Okohue BEngr. Msc. CIPMP Objectives The objective of this chapter is to provide a brief overview of the types of wellhead
More informationCASING PATCHES. Operation
Overview Logan High Pressure Type L Packer Type Casing Patches are designed to engage and seal off a properly prepared casing string. The Casing Patch design leaves the operator with a casing string that
More informationYour Partner for Subsea Pumping
Your Partner for Subsea Pumping Our Experience Dedicated to Your Success With the drivers of increased oil recovery and the depletion of traditionally accessible oil fields, the trend in oil and gas is
More informationCasing while Drilling. Enhanced Casing Installation
Casing while Drilling Enhanced Casing Installation CWD Definition, History & Experience Casing while Drilling means utilizing the casing string as the drill string instead of drill pipe. 1907 Reuben Baker
More informationTraining Fees 4,250 US$ per participant for Public Training includes Materials/Handouts, tea/coffee breaks, refreshments & Buffet Lunch
Training Title WELL HEAD OPERATIONS Training Duration 5 days Training Venue and Dates REF OP035 Well Head Operations 5 08-12 May $4,250 Abu Dhabi, UAE Will be held in any of the 5 star hotels. The exact
More informationIn any of the 5 star hotel. The exact venue will be intimated prior to course commencement.
Training Title WELLHEAD OPERATION Training Duration 5 days Training Venue and Dates Wellhead Operations 5 19 23 May $3,750 Abu Dhabi, UAE In any of the 5 star hotel. The exact venue will be intimated prior
More informationUltra deep water and ultra deep drilling technologies for 21 st Century Mohole. Engineering Development Advisory Committee J-DESC, JAPAN
INVEST White Paper Ultra deep water and ultra deep drilling technologies for 21 st Century Mohole Engineering Development Advisory Committee J-DESC, JAPAN Corresponding Author: Yoshiyasu WATANABE, Tokai
More informationTo Jackup Conductors And Risers
Challenges of Deep Water To Jackup Conductors And Risers Alex Rimmer Engineering Team Leader, 2H Offshore SUT International Subsea Technical Conference 18th April 2012 Overview What is deep water for jackup
More informationFundamentals of Drilling Course Outline. (1)Basics of Rotary Drilling Rotary Operations/Coring
Fundamentals of Drilling Course Outline (1)Basics of Rotary Drilling (2)Rotary (2) Operations/Coring Rotary Operations/Coring (3)Directional -Drilling Drilling (4)Fishing-Roundtrip (5)Casing/Cementing
More informationGTSC Rig for Hands-on Training
GTSC Rig for Hands-on Training The Rig To meet the high demand of Petroleum Industry, GTSC has launched the Middle East s first fully operational Training Rig & Well in May 2010 at its main building location
More informationWellhead Control Products, Inc. Hangers
Wellhead Control Products, Inc. Hangers The RH series was designed to be a highly workable coiled tubing hanger with greater reliability and more efficiency than other coiled tubing hanger systems. The
More informationBT-4000 LIGHT WORKOVER UNIT
BT-4000 LIGHT WORKOVER UNIT BT-4000 LIGHT WORKOVER UNIT DESIGNED TO IMPROVE EFFICIENCY DURING WELL INTERVENTION OPERATIONS The BT-4000 LWO is the new generation DP-3 semi-submersible for efficient light
More informationDoing More With Lightweight. Well Intervention Subsea Europe Drummond Lawson. London, 30 th October Managing Director
Doing More With Lightweight Well Intervention Subsea Europe 2008 London, 30 th October 2008 Drummond Lawson Managing Director What Is It? Lightweight Subsea Well Intervention (LSWI) Re-entering existing
More informationChapter 02. Casing and Tubing
Chapter 02 Casing and Tubing Table of Contents Introduction 2-4 Topic Areas 2-4 Learning Objectives 2-4 Unit A: Casing and Tubing Uses 2-4 Unit A Quiz 2-5 Unit B: Typical Casing Strings 2-5 Conductor
More informationVelocity String Installation & Performance Review VERMILION ENERGY S.W. TUMMERS
Velocity String Installation & Performance Review VERMILION ENERGY S.W. TUMMERS VOGN Overview Entered the Netherlands in 2004 by acquiring TOTAL s onshore assets; Acquisition included ~2 million Nm 3 /day
More informationSUBSEA WELL CONTAINMENT. Global Basis. Deepwater & Emerging Technologies Group (DETG) AADE Houston Chapter 25 January 2012
SUBSEA WELL CONTAINMENT Global Basis Deepwater & Emerging Technologies Group (DETG) AADE Houston Chapter 25 January 2012 Bill Mahler Wild Well Control, Inc. Response Components - Plus Many More Components
More informationEC-Drill MPD Dual Gradient Drilling
16th US-Norway Technology Partnership Conference 2014 EC-Drill MPD Dual Gradient Drilling John A. Cohen, R&D Technology Manager AGR Enhanced Drilling February 26, 2014 Houston, Texas Enhanced Drilling
More informationBigBore IIe. 15,000 psi 20,000 psi SUBSEA WELLHEAD SYSTEMS
BigBore IIe 15,000 psi 20,000 psi SUBSEA WELLHEAD SYSTEMS BigBore IIe SUBSEA WELLHEAD SYSTEM System Overview Dril-Quip s BigBore IIe Subsea Wellhead System meets the demands of HPHT well environments.
More informationMærsk Deliverer. Ultra deepwater drilling and development. semi-submersible
Mærsk Deliverer Ultra deepwater drilling and development semi-submersible Maersk Drilling Mærsk Deliverer TYPE DPS2/M, Column stabilised dynamically positioned semisubmersible drilling rig with capability
More informationAADE 01-NC-HO-02. Copyright 2001 AADE National Drilling Technical Conference
AADE 01-NC-HO-02 Using Multi-Function Fishing Tool Strings to Improve Efficiency and Economics of Deepwater Plug and Abandonment Operations David B. Haughton and Walter S. Going, P.E., SPE, Baker Oil Tools
More informationWorking for the future POSGRIP Technology
Working for the future POSGRIP Technology A Request for Joint Industry Support to enable roll-out of a new method of wellhead design October 2008 Page 1 1.1 - The Principals of POS-GRIP A New Method for
More informationSuspended Subsea Well Monitoring CaTS TM Wireless Technology. Donald Horsfall RPLM (ECIS)
Suspended Subsea Well Monitoring CaTS TM Wireless Technology Donald Horsfall RPLM (ECIS) Tuesday 27 th June 2017 Agenda Introduction to CaTS Technology CaTS - Cable-less Telemetry System Industry guidelines
More informationDRILLING ENGINEERING SERVICES LOOK-AHEAD AWARENESS
DRILLING ENGINEERING SERVICES LOOK-AHEAD AWARENESS IDENTIFY AND AVOID POTENTIAL DRILLING ISSUES Successful drilling requires effective control of the rig, a sound understanding of engineering principles,
More information15,000 psi 20,000 psi. BigBore IIe HPHT SUBSEA WELLHEAD SYSTEMS
15,000 psi 20,000 psi BigBore IIe HPHT SUBSEA WELLHEAD SYSTEMS DXe Gasket Profile DXe Locking Profile BigBore IIe SUBSEA WELLHEAD SYSTEM Mud Stick 18 ¾" BigBore IIe Wellhead Housing The BigBore IIe Subsea
More informationLadiz Niroo Company (Joint Stuck) Supplier of Drilling Equipment. Drilling Catalogue
Ladiz Niroo Company (Joint Stuck) Supplier of Drilling quipment Drilling Catalogue LNCO is involved in the field of supplying consumable equipment for Oil & Gas Drilling Industries. 1 :Oil and Gas Drilling
More informationCOILED TUBING DESIGN & OPERATIONS
Training Title COILED TUBING DESIGN & OPERATIONS Training Date & Duration Will be held at any 5 star hotel- 5 Days Coiled Tubing Design & Operations 5 days 15-19 December 2013 US $ 4,250 Abu Dhabi Training
More informationOffshore Systems. Cameron s Subsea Production Philosophy
Offshore Systems In today s fast-paced, cost-conscious subsea production industry, Cameron has successfully met the challenge to deliver safe, reliable system solutions. This experience allows Cameron
More informationSeeing through software
Seeing through software Gefei Liu and Cissy Zhao, Pegasus Vertex Inc., USA, explain how the use of advanced software can help engineers see underground by predicting subsurface conditions. Oil well drilling
More informationHans J Lindland FMC Kongsberg Subsea Innovative Technologies, Creative Solutions
Lett Brønnintervensjon Hans J Lindland FMC Kongsberg Subsea Why Light Well Intervention? Reservoir recovery is significantly lower (oil) for subsea wells than for platform wells Cost for drilling units
More informationThe Future of Offshore Drilling: Beyond Ultra Deep. Chris Beckett, CEO Pacific Drilling S.A. September 22, 2014
The Future of Offshore Drilling: Beyond Ultra Deep Chris Beckett, CEO Pacific Drilling S.A. September 22, 2014 Pacific Drilling: Committed to being the Preferred Ultra Deepwater Driller Only 100% high
More informationIndustry & Govt Changes Post Macondo. Charlie Williams Chief Scientist Shell Executive Director - Center for Offshore Safety
Industry & Govt Changes Post Macondo Charlie Williams Chief Scientist Shell Executive Director - Center for Offshore Safety 1 Deepwater Industry Focus/Approach Joint Industry Task Force Groups Offshore
More informationA Wireless Compact Repeat Formation Pressure Tester Tool (MFT) Peter Williams Technology Champion
A Wireless Compact Repeat Formation Pressure Tester Tool (MFT) Peter Williams Technology Champion 2006 Weatherford. All rights reserved. Presentation Outline What Is Wireless Formation Testing? Wireless
More informationMSR/MSB Mechanical Setting Tool
Tech Unit No: 0620000004 Revision: C Approved By: Quality Engineer Date: 201-1-9 MSR/MSB Mechanical Setting Tool FEATURES: Special designed Bow Spring provides positive control and allows one size Mechanical
More informationAppendix F Lock-Down Sleeve Decision. Appendix F Lock-Down Sleeve Decision
Appendix F Lock-Down Sleeve Decision Appendix F Lock-Down Sleeve Decision After the production casing has been installed in the well and cemented in place, the operator may elect to run a lock-down sleeve.
More informationECDM System. November, Security Classification: Restricted - Status: Draft
ECDM System November, 2014 Objective Enhance the ability to safely and efficiently drill deep-water wells High uncertainty in pore and fracture pressure gradients Narrow drilling margins Develop system
More informationCameron MBO Multi-Bowl Wellhead System
Cameron MBO Multi-Bowl Wellhead System MBO Multi-Bowl Wellhead System The Cameron MBO Multi-Bowl Wellhead System is a compact, unitized wellhead which can be used as an alternative to conventional wellhead
More informationSubsea Intervention: Is It Worth It? Drummond Lawson
Subsea Intervention: Is It Worth It? Drummond Lawson 1 Subsea Intervention Is It Worth It? Subsea development timeline Why Intervene? What can you achieve? Intervention methods Intervention drivers What
More informationForm No Assembly & Operating Instructions for: SAFETY PRECAUTIONS
Form No. 0230 Assembly & Operating Instructions for: 833 20300 83 2220 837 0-0008 078 SHOP PRESS Max. Capacity: 2 Ton These instructions are intended for various shop presses. Some models are shipped assembled
More informationUnderstanding Complex Well Restrictions. Access assurance for intervention operations
Understanding Complex Well Restrictions Know your well The risks associated with well accessibility are greatly reduced with the aid of advanced 3D modelling of multi-finger caliper data. 2 Contents Well
More informationOriginally Presented at: Gas Well Deliquification Workshop. European Conference Gas Well Deliquification. Holes in Tubing
Originally Presented at: Gas Well Deliquification Workshop Adams Mark Hotel, Denver, Colorado February 25-27, 2008 European Conference Gas Well Deliquification Holes in Tubing a Common Problem in Gas Wells
More informationEffects of Water Depth on Offshore Equipment and Operations Topic #3: Well Drilling & Completion Design and Barriers
Table of Contents General Purpose... 1 Introduction... 4 The Well Design Process... 4 Environmental and Operational Loads... 6 Casing Design... 6 Barriers... 7 Analysis... 9 A) Current Technologies & Challenges
More informationIndustry Response - Post Macondo
Industry Response - Post Macondo Charlie Williams Chief Scientist Well Engineering Shell Energy Resource Company CSIS Energy and National Security Program - future of offshore oil & gas developments in
More informationInvestor Relations Presentation April 30, 2013
Investor Relations Presentation April 30, 2013 FORWARD LOOKING STATEMENTS In addition to the historical data contained herein, this document may include forward-looking statements regarding the future
More informationNew Developments in Regulation of U.S. Offshore Oil and Gas Operations
New Developments in Regulation of U.S. Offshore Oil and Gas Operations Peking University Law School and The University of Texas School of Law Carol Dinkins Partner Vinson & Elkins, LLP August 21, 2012
More informationDesigning Subsea Wells for Abandonment & Suspension
Designing Subsea Wells for Abandonment & Suspension Graeme Rae Rig Build Project Engineer Chevron Upstream Europe Aberdeen Designing Subsea Wells for Abandonment & Suspension Subsea Well Design Aspects
More informationSWS Ultra deepwater drillship
SWS 12000 Ultra deepwater drillship SWS 12000 DP ultra deepwater drillship DRILLING FEATURES The SWS 12000 is designed for maximum flexibility for drilling operations in water depth up to 3,650 m. Focus
More informationMSR/MSB Mechanical Setting Tool
Tech Unit No: 0620000004 Revision: B Approved By: Quality Engineer Date: 2014-12-16 MSR/MSB Mechanical Setting Tool FEATURES: Special designed Bow Spring provides positive control and allows one size Mechanical
More informationMPD ACTIVE PRESSURE MANAGEMENT Next-generation MPD technology, built by manufacturing specialists
MPD ACTIVE PRESSURE MANAGEMENT Next-generation MPD technology, built by manufacturing specialists Our experienced service personnel have supported operators with more than 80+ wells drilled to date. Our
More information"All Electric", Challenges with a new set of interfaces
"All Electric", Challenges with a new set of interfaces As part of the process of introducing electrical actuators the interface between control systems and the Subsea products has moved. New All Electric
More informationC o n t a c t U s f o r S p e c i a l C o r p o r a t e R a t e N o w!
DEEPWATER DRILLING OPTIMISATION C o n t a c t U s f o r S p e c i a l C o r p o r a t e R a t e N o w! Course Overview Deepwater wells are amongst the most difficult and expensive to drill anywhere in
More informationSubSea MudLift Drilling: from JIP to the Classroom
Session 2478 SubSea MudLift Drilling: from JIP to the Classroom Jerome J. Schubert, Ph.D. PE Texas A&M University Abstract As the worlds proven oil reserves continue to be depleted through consumption
More informationTech Unit No: Approved By: Quality Engineer Date: Lock-Set Packer
Tech Unit No: 0802340000 Revision: A Approved By: Quality Engineer Date: 11-5-2014 Lock-Set Packer Description: The MAP Model Lock-Set Retrievable Casing Packer is a general purpose packer for production,