SUBSEA 101. Find more Subsea 101 case studies online

Size: px
Start display at page:

Download "SUBSEA 101. Find more Subsea 101 case studies online"

Transcription

1 SUBSEA 101 The purpose of this document is to help define some of the rationale behind the selection of a subsea tree configuration in a theoretical field for a project we are calling Project X. This section provides an example of the approach that our teams use to tailor our recommendations to the unique requirements of every project. The criteria in this document are specific to the deepwater high current environment in the UK North Sea. For other basins in the world, some of these criteria may or may not be valid. Find more case studies online Similar papers cover equipment selection criteria in different geographies, water depths and customer challenges.

2 Approach Option Identification The water depth on Project X, circa 3,280 ft (1,000 m), requires the use of BHGE s deepwater tree family our established DHXT deepwater horizontal tree, DVXT deepwater vertical tree, or our Aptara Lightweight Compact Tree, the newest variant of the vertical configuration, which has also been assessed due to its 10,000 ft (3,048 m) water depth rating. Subsea production trees can be segmented into two main types: horizontal and vertical. Horizontal trees are so called because the primary valves are arranged in a horizontal configuration (allowing easier access to the wellbore), and conversely Vertical Trees have the primary valves arranged in a vertical configuration (above the wellbore). Refer to the figures below. The original designs of subsea vertical trees and tubing hangers were of a dual bore configuration. Prior to removal of the blowout preventer (BOP), it was necessary to set plugs in both the production and annulus bores using complex dual bore risers. The current BHGE DVXT systems provide access to the A annulus through the tree design. This access to the A annulus is controlled by gate valves for vertical tree (VXT) on Tubing Head Spool (THS) and annulus isolation devices for VXT on Wellhead, rather than plugs. This enables operations with a monobore, less complex riser, or landing string with BOP on tree, delivering significant advantages in deepwater. 3,280 ft 3,280ft (1,000m) water depth for Project X

3 BHGE s latest tree design, the Aptara Lightweight Compact Tree is a vertical tree (VXT) configuration but with a new innovative flow path that reduces the effective height of the tree while providing footprint and weight benefits as well as improving life of field functionality and affording the same installation benefits of a traditional vertical tree. Refer to page 28 in section 2. VXT (dual bore) on wellhead Production Wing Valve (PWV) Master Valve Block (MVB) HXT on wellhead Production Master Valve (PMV) Master Valve Block (MVB) Crown Plugs Deepwater Vertical Trees (DVXT) The DVXT or Aptara systems can be provided in two configurations: tree on Wellhead or tree on THS: Aptara & DVXT on THS. The THS is landed on the wellhead prior to running the completion and TH into the well. A Annulus isolation is achieved by a valve in the THS. The TH is passively orientated by the THS. The THS permits the flowline connection to be moved off the tree onto the THS. Aptara & DVXT on Wellhead. The completion and TH can be installed after drilling the well, with the TH landing in the upper casing hanger. A Annulus isolation is achieved by a hydraulically operated Annulus Isolation Device (AID) in the TH. TH orientation is actively achieved with a hydraulically actuated BOP pin that engages with a helix and slot in the Tubing Hanger Running and Orientation Tool (THROT) within the landing string. Deepwater Horizontal Trees (DHXT) The DHXT is installed on the wellhead prior to running the completion and TH into the well. TH lands in the DHXT internal profile. A Annulus isolation is achieved by a valve in the DHXT. The TH is passively orientated by the DHXT. Drill-through DHXT has not been considered as existing infrastructure prevents its deployment, and Casing hanger arrangement is required to land the Production casing string through the tree head and into the wellhead. This system would not be compatible with the existing Appraisal Wellhead System. HP Wellhead LP Wellhead Tree Selection DHXT Passive TH orientation Most mature solution Requires multiple BOP trips Crown plug barriers Least flexible weather window installation Must pull completion to pull XT Average weight Maximizes WH fatigue Lowest CAPEX potentially higher OPEX Production Master Valve (PMV) Connector Tubing Hanger Casing Hangers Production Wing Valve (PWV) HP Wellhead LP Wellhead DVXT Active/passive TH orientation Mast maturity solution Can minimize BOP trips Gate valve barriers Flexible weather window installation Can pull XT without touching completion Average weight Maximizes WH fatigue On THS Higher stack-up so worse for wellhead fatigue Passive TH alignment 1 more BOP trip Reduced installation flexibility as THS on critical path Highest CAPEX, lower OPEX Tubing Hanger Connector Casing Hangers On Wellhead Lower stack-up so better for wellhead fatigue Active TH alignment (BOP Mod required) One less BOP trip Greater installation flexibility (if all ball valves used) as THS not on critical path Medium CAPEX, lower OPEX, lowest TOTEX

4 Evaluation Criteria A range of criteria has been identified that covers the tree performance from its initial design, through installation, operation, intervention, and finally decommissioning. Assessments made against these criteria are predominantly qualitative in nature but where possible initial quantitative assessments of likely economic impact have been captured in the commercial section. The criteria are shown in the table opposite. For each functional criterion a brief discussion is provided on the relative merits or limitations of the tree configuration options available, followed by a ranking assessment. For the commercial criteria, assessments are made against scenarios associated with the likely activities. Where information is not known, the assumptions made are clearly stated. Lifecycle Stage Functional Criteria Commercial Criteria Design and Manufacture Wellhead Fatigue CAPEX Lead Time Installation Equipment Required Flexibility/Options Afforded Barrier Philosophy Sequencing and Durations Operation Reliability OPEX Downhole Functions Pressure and Temperature Sensing Annulus Access Intervention Light Intervention Heavy Workover Tree Repair Well Kill Decommissioning Tree Retrieval A new innovative flow path reduces the footprint and weight of the tree. It also allows for improved life of field functionality through the life of field cap.

5 Functional assessments Design and Manufacture Wellhead Fatigue Impact Due to the harsh environmental conditions in the UK North Sea, the potential for wellhead fatigue is high and, where practicable, the selected subsea solutions should minimize this risk. Fatigue damage accumulated in the well will be cumulative across all BOP operations conducted upon it. Therefore, fatigue damage accumulated during drilling and completion detracts from the available fatigue capacity for future workovers and plug and abandonment operations. This is a key driver for other operators to move away from HXTs in the UK North Sea to VXTs on wellhead. Having the BOP connected directly onto the wellhead (rather than onto either a DHXT or THS located between the wellhead and BOP) ensures that the lowest possible bending moment is applied to the wellhead, reducing the level of applied fatigue damage. Having a tree or THS between the wellhead and BOP can typically reduce the fatigue life of a wellhead system by as much as 25%. Verdict Wellhead Fatigue 3rd 1st 2nd 1st VXT (WH) scores the highest by having the BOP connected directly to the wellhead. Drilling and Completion Schedule Alignment The intent of the project is to run the completions within eight months and for the first tree to be installed in 18 months, with subsequent trees delivered monthly thereafter. Both the HXT and THS need to be installed on the wellhead prior to running the upper completion and TH putting the THS or HXT on the critical path. The VXT on Wellhead option facilitates the installation of the upper completion and TH in the wellhead, thereby decoupling the XT or THS delivery from offshore completion schedules and de-risking the overall project schedule. Verdict Drilling Schedule Alignment (lead time) 3rd 1st 2nd 1st VXT (WH) scores the highest as neither the tree or THS is required prior to offshore installation of the completion. Installation Equipment Required Both DHXT and DVXT systems require the use of a specific suite of rental tooling. The DVXT tooling package requires more tooling than the HXT system and is therefore slightly more expensive. Both systems use a casing or landing string to run the completion through the BOP. DHXT The completion is normally run on a Subsea Test Tree (SSTT) within the marine riser and the tubing hanger is landed within the horizontal tree. Once the TH is landed in the tree, and the completion set, tested and the well cleaned up, wireline deployed crown plugs are located and tested in the TH. and the Emergency Disconnect Package (EDP). In a similar fashion to the subsea test tree, this system enables the drilling rig or vessel to safely disconnect from the well in the event of an emergency. WCP/EDP packages and associated open water riser systems represent considerable capital investments, typically in the order of tens of millions of dollars. By comparison, SSTT can be rented on the open market on a per day or per well basis. As a result, they have a much lower capital impact, and this was one of the key drivers for developing a similar approach for monobore VXT systems to eliminate the need for the costly dedicated test package and open water riser. Using hydraulically actuated suspension barrier ball valves that can be closed and tested during the completion installation, and then opened after VXT installation, eliminates the need for the LRP/EDP packages, as wireline intervention is not required to remove these barriers. This is particularly advantageous for the VXT on Wellhead, as actuation of the barrier valves is faster than the deployment of wireline plugs (reducing online rig time) and this also permits the rig to depart the well after the completion installation. All the XT installation activities can therefore be conducted off-line from the rig scopes of work by a lower cost installation vessel. Verdict Installation equipment required VXT (WH) and (THS) score the highest as the use of actuated completion barrier valves reduce the amount of wireline activities and reduce on-line rig time required offshore. Key 1st 2nd 3rd Product ranked first Product ranked second Product ranked third DVXT Well clean up, well testing and removal of wireline deployed barriers on a well that is intended for a vertical tree has traditionally only been carried out after the well has been suspended, the BOP removed, and the tree installed. Well access is achieved via a dedicated test package and open water riser. This test system comprises two main assemblies, the Well Control Package (WCP)

6 Flexibility Operational weather windows for rig and SURF installation activities are very short in harsh environments. Therefore, a key driver for subsea system selection is to minimize or remove scopes of work carried out on the rig. Reducing rig time at each well will also help to clear the field and create longer SURF installation windows. This will maximize value at the rig by making it available earlier for other scopes of work, and allowing dynamic re-prioritization and planning to maintain the overall schedule. Also, de-coupling major SPS hardware deliveries (tree and/or THS) from the rig activities minimizes the risk of potential hardware delays affecting the rig schedule. DHXT requires the tree to be installed on the wellhead between drilling the well and prior to completion installation. This increases the time spent on the well by the rig. VXT on THS requires the THS to be installed on the wellhead between drilling the well and prior to completion installation. This increases the time spent on the well by the rig. VXT on wellhead the full completion can be installed in the wellhead without the tree. This reduces the time spent on the well by the rig. Reducing the amount of time that the rig is on each well allows plans to be re-prioritized (e.g. fast track drilling and completion activities can be scheduled or a change in the order of activities with short notice can be made to capitalize on opportunities). DHXT and DVXT on THS make this very difficult, whereas DVXT on WH allows a higher flexibility in the rig operations. Verdict Installation flexibility 3rd 1st 2nd 1st VXT (WH) scores the highest by minimizing the rig time spent on the well. Reducing rig time at each well will also help to clear the field and create longer SURF installation windows.

7 Barrier Philosophy Two types of well barrier for suspension are available depending upon the tree system selected: VXT systems After the well has been drilled to TD (prior to VXT installation) the lower completion can be run, and formation isolated using a tubing deployed downhole barrier valve CBV Barrier Valve (ball valve, hydraulically opened by applying tubing pressure cycles). The upper completion is installed with an Orbit Valve (Hydraulically operated, Bi-directional downhole barrier ball valve). It is operated by two hydraulic lines through the TH, installation tooling and DVXT. This permits the BOP to be removed after completing the well with two tested barriers in place that can then be opened after VXT installation and eliminates the need for wireline recovery of these barriers via an open water WCP/EDP system. Well suspension diagram with vertical TH in wellhead and ball valve barriers in completion AID Orbit Barrier Valve TH Suspension Cap TRSCSSV Project X completion Well status (prior to XT installation) Primary barrier elements Element Qualification Monitoring Upper completion Orbit barrier valve above safety valve (ball valve, control line operated) Pressure tested from above Periodic ROV monitoring TRSCSSV Inflow tested Active barrier: inflow tests/function tests are required Gas lift mandrel Inflow test of check A-annulus pressure valves during completion CIV w/ injection line/valve Inflow test of check A-annulus pressure valves during completion Production packer Pressure tested from A-annulus pressure above and below Casing cement Job performance, cement bod log and FIT Not accessible Secondary barrier elements Element Qualification Monitoring Tubing hanger annulus isolation device Pressure tested from above Periodic ROV monitoring CBV Barrier Valve Lower completion CBV barrier valve (ball valve, hyd opened) Pressure tested from above Not accessible Wellhead Pressure tested Not accessible Casing hanger Pressure tested Not accessible Casing Pressure tested Not accessible Casing cement Job performance, cement bod log and FIT Not accessible Note: All pressures to be defined during well design. SPS hardware rated to 10ksi.

8 A typical well suspension diagram with a DHXT and Crown Plugs. Typical subsea production well with horizontal production tree Primary barrier elements Well barrier elements Comments Production packer 7 Completion string 25 Production tubing between production packer and SCSSV SCSSV 8 SCSSV 1 or SCSSV 2 Secondary barrier elements Well barrier elements Casing cement 22 Casing 2 Wellhead 5 Including casing hanger Tubing hanger 10 Tubing hanger plug 11 Subsea production tree 31 w/amv and PMV DVXT systems The BOP will be installed on the DHXT prior to running the completion. The Tubing Hanger and completion will be landed, suspended, locked and sealed within the HXT internal profile. Main barriers to the well bore are by wireline installed Crown Plugs. The Crown Plugs are landed, locked and sealed in profiles in the TH bore. Verdict Barrier Philosophy VXT (WH) and (THS) score the highest by using remotely operated ball valve barriers in the completion, thereby eliminating the requirement to run and recover wireline plugs.

9 Sequencing and Durations The high-level operational activities and a review of the additional number of BOP trips required for each system are as follows: DHXT System or VXT with THS System The following sequence would be typically required for the initial drilling and completion of each well, for a non-drill through DHXT or DVXT with THS: inch Conductor Housing and extension installed by vessel. 2. Top hole activities drilled by the selected Dynamic Positioning (DP) rig. 18-3/4-inch HP Wellhead Housing c/w 20-inch extension and 13-3/8-inch casing string run open water and installed in the well and landed, locked and cemented. 3. BOP installed on the wellhead. 4. Well drilled and 10-3/4-inch Casing Hanger c/w 10-3/4-inch 9-5/8-inch casing string run through the marine riser and BOP. Installed in the wellhead and landed, locked, cemented and pressure tested. 5. Well suspended. 6. BOP unlatched from the wellhead best case, it is bunny hopped onto another wellhead. 7. DHXT or THS landed, locked and tested on the wellhead. 8. BOP landed, locked on the DHXT and tested on the well. 9. Well suspension plugs/barriers drilled/ removed from well. 10. Well drilled to TD. 11. Lower completion installed and tested. 12. Upper Completion with TH installed, landed, locked in DHXT, packer set and completion (including TH) pressure tested. 13. Wireline crown plugs run, landed and locked in TH. 14. BOP unlatched and recovered to surface. 15. External tree cap installed on DHXT mandrel profile, or suspension cap installed on THS. This sequence (assuming vessel and HXT or THS availability) has the following number of BOP trips (with the associated on-line rig time): 1 BOP trip and 1 BOP unlatch/relatch/ pressure test: 4.5 days to run and test the BOP, 3.0 days to recover the BOP, 1.75 days to hop the BOP, 1.5 days to drill cement plugs. Total = days. VXT on Wellhead The following sequence would be typically required for the drilling and completion of each well: inch Conductor Housing and extension installed by vessel. 2. Top hole activities drilled by the selected Dynamic Positioning (DP) rig. 18-3/4-inch HP Wellhead Housing c/w 20-inch extension and 13-3/8-inch casing string run open water and installed in the well and landed, locked and cemented. 3. BOP installed on the wellhead. 4. Well drilled and 10-3/4-inch Casing Hanger c/w 10-3/4-inch 9-5/8-inch casing string run through the marine riser and BOP. Installed in the wellhead and landed, locked, cemented and pressure tested. 5. Well drilled to TD. 6. Lower completion installed and tested. Lower completion CBV barrier closed and tested. 7. Upper Completion with TH installed, landed, locked in wellhead, packer set and completion (including TH) pressure tested. 8. Upper completion Orbit barrier valve closed and tested. 9. BOP unlatched and recovered to surface. 10. Suspension cap installed on TH and wellhead. This sequence has the following number of BOP trips (with the associated on-line rig time): 1 BOP trip and 1 BOP unlatch/relatch/ pressure test: 4.5 days to run and test the BOP, 3 days to recover the BOP. Total = 7.5 days Verdict Sequencing & Durations 2nd 1st 2nd 1st VXT (WH) scores the highest by reducing the number of BOP trips/hops on the well.

10 Operation Reliability The proposed systems all use the same basic components (e.g. valves, actuators and forgings) but arranged slightly differently. Control system and tie connection configurations will be the same for all systems. As such, all systems will have similar reliability assessments. Verdict Reliability 1st 1st 1st 1st Downhole Functions The following maximum number of downhole functions through the tree and tubing hanger systems are as follows: VXT (WH): 7 hydraulic and 2 electrical DVXT (THS): 10 hydraulic and 2 electrical DHXT: 8 hydraulic and 2 electrical The total number of downhole functions is limited by the available real estate in the tubing hanger assemblies between the production bore and tubing hanger bodies. Verdict Downhole functions 1st 2nd 1st 2nd HXT and VXT (THS) scores the highest due to their capability to have one extra downhole hydraulic line. However, it should be noted that each of the tree systems downhole function capability exceeds the minimum requirements for the Project X wells. A Annulus Access The proposed systems all provide access to the A annulus, between the production tubing and the production casing. This is required for a number of functions, including pressure monitoring and gas lift. Any pressure build-up in the A annulus can be bled to the production flowline via a crossover loop on the tree. Access to the A annulus is incorporated into the tree design and controlled by gate valves. Verdict A Annulus Access 1st 1st 1st 1st All the tree solutions provide a similar method of control and annular access via a crossover spool connecting the annulus to the production and controlled via a hydraulically actuated gate valve.

11 Intervention Light Well Intervention (LWI) Each of the tree systems are configured to permit access via Light Well Intervention packages. Riserless Light Well Intervention provides safe access to a subsea well using a specialist LWI Vessel. The vessel has a well control stack that is deployed on wire to depth and latched onto the tree. However, a specific LWI adapter is required for the tree system to suit the LWI system provider. After installation of the LWI stack well on the VXT, well access is achieved by opening gate valves in the production bore of the VXT. On the DHXT well access can only be achieved once the Upper and Lower Crown Plugs have been recovered from the TH internal profile. Each Crown Plug retrieval and replacement requires separate trips of the open water lubricator wireline package before and after carrying out any in-well scopes of work. Typical scopes performed by LWI are Production Logging Trip (PLTs), well zonal isolation, cementing, scale squeeze and re-perforations. Verdict Light Well Intervention VXT (WH) and (THS) score the highest as well access is simplified by the opening of gate valves rather than having to recover Crown Plugs. Heavy Workover Heavy Workovers (i.e. full recovery of the completion by rig) is marginally easier with an HXT as the completion can be recovered without having to recover the HXT. However, as the planned completions are not complex, and the base case for the Project X development does not include the requirement for planned heavy workovers, the ease of completion recovery without removal of the tree has not been a driver in selection of the respective system. Verdict Heavy Workover 1st 2nd 2nd 2nd HXT scores the highest as the design lends itself to the requirement for heavy workovers. Tree Repair Although it is unlikely that the trees will require repair, the VXTs can be recovered without the need for a heavy workover, whereas a full heavy workover and completion recovery will be required for a DHXT. Verdict Tree Repair VXT (WH) and (THS) scores the highest as these trees can be recovered without disturbing the completions.

12 Well Kill In the event of a requirement to kill the well, this would involve the use of a drilling rig. The BOP would be landed, locked and tested on the upper profile of the tree or BOP adapter. A landing string with Subsea Test Tree (SSTT) and Tubing Hanger Running Tool (THRT) would be run through the marine riser and BOP. THRT would be landed, orientated and latch onto the DHXT TH or DVXT BOP adapter. Surface Well Test Spread would be hooked up and surface wireline BOPs installed above the Surface Flow Tree on the rig floor. DHXTs Wireline tooling can then be deployed to recover the Crown Plugs. After the Crown Plugs are recovered the well can be killed. VXTs gate valves in the production bore can be functioned open. After the gate valves are opened the well can be killed. Verdict Well Kill Decommissioning Tree Retrieval All BHGE tree systems are designed to be easily retrieved at the end of life and the field decommissioning, recovery methodology for each system is similar. Verdict Tree Retrieval 1st 1st 1st 1st Commercial assessments In this section we make initial quantitative assessments of the potential impact of tree selection on initial equipment purchase and installation (CAPEX) and subsequent life of field activities (OPEX). The numbers show directional trends to aid decision making and illustrate major differences rather than build up detailed numbers across common aspects. CAPEX Equipment Comparing vertical and horizontal tree solutions, in line with industry expectations, the horizontal tree is a lower CAPEX solution than traditional vertical trees. This is especially clear when the functionality of the THS is included in the vertical solution. Aptara, BHGE s new tree configuration, reduces the number of components, as well as the footprint and weight, removing cost from the entire manufacturing cycle. The result is a low CAPEX solution that is comparable to or more cost effective than a horizontal tree. Verdict CAPEX Equipment 1st 2nd 3rd 1st Installation For installation and subsequent intervention assessments, the following working assumptions on vessel rates have been used. Vessel MODU Rate (USD) Cat 2 Installation vessel (USD) Lightwell Intervention Vessel (USD) Example Rates to demonstrate evaluation 225,000 $/Day 115,000 $/Day 175,000 $/Day Timings are aligned to the major differences with additional detail sub-tasks provided where appropriate. The table below summarizes the anticipated differences in installation costs between the tree options assessed. The table below shows that the removal of the BOP hop for the VXT (WH) option saves approximately $730,000 per well in rig time over the DHXT or DVXT (THS) alternatives, which amounts to circa $6.5 million across the nine wells. The magnitude of these savings may be even higher if the BOP has to be pulled before running the HXT or THS from the rig, and then re-deploying the BOP. Verdict CAPEX Installation VXT (WH) and (THS) score the highest as the well can be accessed and killed after opening the actuated gate valves rather than having to recover Crown Plugs on wireline. 2nd 1st 2nd 1st Installation DHXT DVXT (THS) DVXT (WH) Activity Vessel Assumed duration (days) Corresponding cost Assumed duration (days) Corresponding cost Assumed duration (days) Corresponding cost BOP Trip MODU 7.5 $1,687, $1.687, $1.687,500 BOP Hop MODU 1.75 $393, $393,750 0 Drill Cement Plugs MODU 1.5 $337, $337,500 0 THS Installation LCV Cat $57,500 0 Tree Installation LCV Cat $57, $57, $57,500 Total Per Well $2,276, $2,533,750 8 $1,745,000 Total for 9 Wells $22,286, $22,803, $15,705,000

13 The Aptara vertical tree shows a clear TOTEX advantage. CAPEX summary Combining estimates of tree equipment and installation shows the following likely impact over the baseline nine-well development for Project X (again noting that the values shown are focused on key differences rather than providing total budget values). Verdict CAPEX Summary 2nd 2nd 3rd 1st From a CAPEX perspective, the Aptara on Wellhead solution is likely to offer best value for this specific application. OPEX Tree Repair Although tree failures are rare and hence unlikely on Project X, the potential shouldn t be ignored. VXTs can be recovered by vessel, while leaving the full completion in place. However, DHXTs will require a heavy workover with a drilling rig prior to recovering the tree. After the tree replacement, a full completion re-installation will be required. Therefore, the cost of a DHXT replacement will be significantly higher than that for a DVXT. Verdict OPEX Tree Repair Light Well Intervention Costs for LWI access will be heavily dependent upon the scope and extent of the activities planned. Prior to the commencement of these activities, well access with a VXT is achieved by opening gate valve in the production bore of the VXT. However, well access through a DHXT can only be achieved once the Upper and Lower Crown Plugs have been recovered from the TH internal profile. Every additional wireline trip will incur vessel time and associated costs, increasing the cost of LWI for DHXTs. Verdict OPEX Light Well Intervention Heavy Well Workover While heavy workovers of the completion are relatively rare for non-esp developments, they do occur. Crucially however, in the case of requiring a heavy workover, the cost and disruption to operations is already likely to be very high, so the additional act of first removing the VXT has limited additional impact. While the cost of retrieving a tree for maintenance would be more than 22 times for an HXT than a corresponding VXT, the cost of working over the well by pulling the VXT prior to the completion only represents around a 5% increase in costs over the equivalent HXT. Verdict OPEX Heavy Well Workover 1st 2nd 2nd 2nd OPEX summary It is difficult to assess the likely impact of tree selection through the life of the field without first understanding the anticipated frequency of operations. However, to provide guidance the following assumptions have been made (across the nine-well development for its life of field): 1 tree recovery in total 2 heavy workovers in total 2 light well interventions per well This results in the HXT incurring an additional estimated $13 million in OPEX costs across the life of the field. Removing the tree recovery from the assessment reduces this value to circa $5 million but the costs of HXTs will likely increase for each light intervention over a VXT and reduce for each heavy intervention. The magnitudes of these differences are broadly comparable, but light interventions are more likely on Project X, so it is anticipated that the VXT options will represent better value from an OPEX perspective as well as CAPEX.

14 Conclusions and recommendations Summary of Findings Summary of all findings linked to each of the assessment criteria is shown below. The collated verdict tables confirm that Aptara on Wellhead is the recommended tree option for use on Project X, with the highest number of top ratings from each category. Aptara (WH) DVXT (WH) DVXT (THS) DHXT 16 top ratings 15 top ratings 11 top ratings 7 top ratings Verdict DHXT DVXT (WH) DVXT (THS) Aptara (WH) Wellhead Fatigue 3rd 1st 2nd 1st Lead Time 3rd 1st 2nd 1st Installation Equipment Required Installation Flexibility 3rd 1st 2nd 1st Barrier Philosophy Sequencing and Durations 2nd 1st 2nd 1st Reliability 1st 1st 1st 1st Downhole Functions 1st 2nd 1st 2nd Aptara lightweight compact tree. A Annulus Access Light Well Intervention Heavy Workover Tree Repair Well Kill Tree Retrieval CAPEX Equipment CAPEX Installation OPEX Tree Repair OPEX Light Well Intervention OPEX Heavy Well Workover 1st 1st 1st 1st 1st 2nd 2nd 2nd 1st 1st 1st 1st 1st 2nd 3rd 1st 2nd 1st 2nd 1st 1st 2nd 2nd 2nd

15 Conclusion Tree Configuration for Project X Based on these assessments, a Vertical Tree on Wellhead configuration is recommended for the Project X development. The primary factors influencing this recommendation can be summarized as follows: 1. CAPEX Although the DVXT on Wellhead is more expensive than the DHXT for equipment supply, this increase is offset by the significant saving on the system installation, as the completion can be landed in the wellhead system with no planned BOP disconnection. When BHGE s Aptara tree is considered, the initial cost of the tree is comparable or favorable to a HXT, as well as having the installation cost advantages of a vertical tree. 2. OPEX With no planned heavy workovers on Project X, the easier access to the wellbore for light well interventions afforded by a vertical tree is likely to outweigh the benefits of being able to pull the completion without first retrieving the tree for heavy workovers. Further, in the unlikely event that a tree fault develops, requiring retrieval for diagnosis or maintenance, the impact of achieving this with a VXT is lower than with an HXT by significant orders of magnitude. 3. Installation Flexibility With the narrow working windows for both the rig and SURF installation scopes, reducing the time that the rig spends on the well provides increased operational windows for the SURF vessels. VXT on Wellhead offers the opportunity to reduce the rig time by just over three days per well. It also opens up the potential to re-plan or prioritize rig activities as circumstances change, where wells can be completed and suspended prior to tree delivery without the need to re-mobilize a rig at a later date. 4. Wellhead Fatigue VXT on Wellhead ensures that the BOP will only be installed directly onto the wellhead. Introduction of a DHXT or THS between the wellhead and BOP increases the bending moment between the BOP wellhead, which increases the potential for accelerated use of the wellhead s fatigue life. The VXT on Wellhead system minimizes that risk.

16 Recommendation Tree Type for Project X By considering the project specific requirements against the tree configurations available from BHGE, the Aptara lightweight compact tree on wellhead configuration is recommended for the Project X development. Historically, with the Project X field having greater than 2,460 ft (750 m) water depths, if a vertical tree was required, then only a traditional DVXT would be available. However, BHGE has recently introduced an optimized version of the DVXT designed specifically to take cost, weight and time out of subsea developments, while optimizing use through the life of the field. The system uses virtually all the same constituent parts as the DVXT but packages them in a more efficient manner to save approximately 50% of the size and weight. Central to this saving is a unique flow path that enables the choke (and, if required, the multi-phase flow meter) to be housed in an easily recoverable life-of-field cap. Not only does this make recovery easier, it also makes the tree simpler and lighter, as the equipment is positioned centrally through the axis of the body rather than being offset. Initial assessments of the anticipated cost of the comparable Aptara Lightweight Compact Vertical Tree on Wellhead across the nine-well development is 15% lower than the DVXT on Wellhead option (with installation and life-of-field costs being equivalent or lower). Furthermore, by using a vertical tree, it is possible to decouple the tree delivery from the drilling program. This opens up the potential benefits of the Aptara system. The downward interface with the tubing hanger system and the upward interface with riser systems, as well as the running tools, are all designed to be identical between the Aptara tree and the existing DVXT. An overview of the key benefits supporting the Aptara Lightweight Compact tree on Wellhead solution for Project X are summarized below: CAPEX equipment. Aptara total hardware price is 15% lower cost than the DVXT on Wellhead. Lighter. The Aptara is 50% lighter than a conventional VXT. This reduces the Aptara tree weight c/w cap to circa 40 tons against 75 tons for a DVXT. This reduction in weight may facilitate the use of lighter installation vessels and reduce installation costs. Easier use of life-of-field (LOF) cap vs flow control module. The LOF modular cap is more easily installed and recovered as it is located on the XT upper mandrel, clear of any adjacent hardware. The LOF cap is also configured to permit the introduction of other technologies in later field life, such as subsea pumping to increase overall field production. Flexibility. With Aptara you can have the same part number for the production and water injection trees to facilitate installation flexibility and potential future reconfiguration through long-term re-profiling of the reservoir. Simpler. There is the potential to eliminate the tree flow meter and use the distributed flow meter within the LWCT tree solution. The Aptara vertical tree on wellhead has been recommended as it provides improved performance at the lowest cost over the life of field. Aptara vertical tree on Wellhead has been recommended as it provides improved performance at the lowest cost over the life of field.

SAFER, SMARTER, GREENER

SAFER, SMARTER, GREENER OIL & GAS Introduction to Subsea Production Systems 04 Christmas Tree (XT) Systems August 2015 DNV GL 2013 August 2015 SAFER, SMARTER, GREENER Christmas Tree Systems Onshore tree Offshore tree Subsea tree

More information

Marginal Project Development

Marginal Project Development Marginal Project Development A case study of the MC-66 / OCHRE Project Richard Weser MC66 OCHRE Joint Venture Project OCHRE PROSPECT DEVELOPMENT Mississippi Canyon 66 1 Gas Subsea 7.9-Mile Tieback to Taylor

More information

International Well Control Forum Well Intervention Pressure Control Subsea Syllabus

International Well Control Forum Well Intervention Pressure Control Subsea Syllabus International Well Control Forum Well Intervention Pressure Control Subsea Syllabus November 2017 Version 1.0 IWCF Well Intervention Pressure Control Subsea Syllabus Contents Guidance Notes... 1. Introduction...

More information

MARS. Multiple application reinjection system

MARS. Multiple application reinjection system MARS Multiple application reinjection system Unique Technology. Universal Application. Historically, installing processing hardware on existing subsea trees has been a high-risk and costly activity due

More information

Well Abandonment Services. Plug into a New Approach

Well Abandonment Services. Plug into a New Approach Well Abandonment Services Plug into a New Approach Get it Right the First Time Permanent Solutions to Your Well Abandonment Challenge Thousands of wells await safe and permanent abandonment. It s critical

More information

The intent of this guideline is to assist the Drilling Engineer in his preparation of the deepwater drill stem test design and procedure.

The intent of this guideline is to assist the Drilling Engineer in his preparation of the deepwater drill stem test design and procedure. 1 The intent of this guideline is to assist the Drilling Engineer in his preparation of the deepwater drill stem test design and procedure. This document is not intended to override any specific local

More information

An Introduction to Oil & Gas Drilling and Well Operations

An Introduction to Oil & Gas Drilling and Well Operations An Introduction to Oil & Gas Drilling and Well Operations Educational Material from the IOM 3 Oil and Gas Division The global network for the materials cycle Introduction The Institute of Materials, Minerals

More information

Riserless Subsea P&A. Deepwater Decommissioning Workshop 2016 W I L D W E L L C O N T R O L S U B S E A I N T E R V E N T I O N

Riserless Subsea P&A. Deepwater Decommissioning Workshop 2016 W I L D W E L L C O N T R O L S U B S E A I N T E R V E N T I O N Riserless Subsea P&A Deepwater Decommissioning Workshop 2016 W I L D W E L L C O N T R O L S U B S E A I N T E R V E N T I O N 7 Series S U B S E A I N T E R V E N T I O N 7 Series Nominal Bore Size 7.375

More information

NORWAY. Norwegian Industrial Property Office (12) APPLICATION (19) NO (21) (13) A1. (51) Int Cl.

NORWAY. Norwegian Industrial Property Office (12) APPLICATION (19) NO (21) (13) A1. (51) Int Cl. (12) APPLICATION (19) NO (21) 11782 (13) A1 NORWAY (1) Int Cl. E21B 43/00 (06.01) E21B 43/01 (06.01) E21B 43/12 (06.01) Norwegian Industrial Property Office (21) Application nr 11782 (86) Int.application.day

More information

Doing More With Lightweight. Well Intervention Subsea Europe Drummond Lawson. London, 30 th October Managing Director

Doing More With Lightweight. Well Intervention Subsea Europe Drummond Lawson. London, 30 th October Managing Director Doing More With Lightweight Well Intervention Subsea Europe 2008 London, 30 th October 2008 Drummond Lawson Managing Director What Is It? Lightweight Subsea Well Intervention (LSWI) Re-entering existing

More information

HorizontalBore SUBSEA TREE

HorizontalBore SUBSEA TREE HorizontalBore SUBSEA TREE HorizontalBore SUBSEA TREE Dril-Quip s HorizontalBore Tree is a modular design subsea production component that accommodates numerous completion configuration possibilities.

More information

Welltec Pareto Offshore Conference September 4, 2013

Welltec Pareto Offshore Conference September 4, 2013 Welltec Pareto Offshore Conference September 4, 2013 Agenda for today s presentation 1. Introduction to Welltec 2. Welltec Well Intervention Services 3. Welltec Flex Well Completion 4. Q&A s 1. Introduction

More information

Comprehensive Plug and Abandonment Systems

Comprehensive Plug and Abandonment Systems Comprehensive Plug and Abandonment Systems Abandon Your Well. Abandon Uncertainty. Complete, single-trip systems for P&A Schlumberger comprehensive plug and abandonment systems bring certainty and rig-time

More information

Send your directly to

Send your  directly to Welcome to Chess Subsea Production System Training - SPS Subsea production system (SPS) is associated with the overall process and all the equipment involved in drilling, field development, and field operation.

More information

Standard Horizontal Subsea Trees. Integrated offshore offering for reliable, high-quality, and capitalefficient

Standard Horizontal Subsea Trees. Integrated offshore offering for reliable, high-quality, and capitalefficient Standard Horizontal Subsea Trees Integrated offshore offering for reliable, high-quality, and capitalefficient performance Standard Horizontal Subsea Trees Through standardized processes, common core components,

More information

Speaker at the Americas: Decommissioning and Well Abandonment. September 23, 2015

Speaker at the Americas: Decommissioning and Well Abandonment. September 23, 2015 Speaker at the Americas: Decommissioning and Well Abandonment September 23, 2015 TETRA Offshore Services TETRA Offshore Services ISO 9001:2008 Certified 2 Decommissioning Case Study - Agenda A general

More information

ULTRA-DEEPWATER RISERLESS INTERVENTION SYSTEM (RIS)

ULTRA-DEEPWATER RISERLESS INTERVENTION SYSTEM (RIS) RPSEA PROJECT DW 2301 ULTRA-DEEPWATER RISERLESS INTERVENTION SYSTEM (RIS) DTC International, Inc. 5540 Brittmoore Road Houston, Texas 77041 23 March 2010 RIS PROJECT TEAM MEMBERS DTC International, Inc.

More information

Subsea Intervention: Is It Worth It? Drummond Lawson

Subsea Intervention: Is It Worth It? Drummond Lawson Subsea Intervention: Is It Worth It? Drummond Lawson 1 Subsea Intervention Is It Worth It? Subsea development timeline Why Intervene? What can you achieve? Intervention methods Intervention drivers What

More information

Introducing Subsea Connect. Neil Saunders President & CEO, Oilfield Equipment, BHGE

Introducing Subsea Connect. Neil Saunders President & CEO, Oilfield Equipment, BHGE Introducing Subsea Connect Neil Saunders President & CEO, Oilfield Equipment, BHGE Global offshore (E&P CAPEX) 1 14-21 ($B) 400 Global offshore capital investment projected to grow at a CAGR of 16% with

More information

Increased Safety & Efficiency from a Dedicated Light Well Intervention Vessel on Deepwater Subsea Wells

Increased Safety & Efficiency from a Dedicated Light Well Intervention Vessel on Deepwater Subsea Wells Increased Safety & Efficiency from a Dedicated Light Well Intervention Vessel on Deepwater Subsea Wells A Truly Integrated Service Delivery 09 August 2017 Agenda Introduction to Light Well Intervention

More information

EDP/LRP. Drill Well 20 th September 2018 Rev2 Presenter: Simon Carpenter [INPEX]

EDP/LRP. Drill Well 20 th September 2018 Rev2 Presenter: Simon Carpenter [INPEX] EDP/LRP Drill Well 20 th September 2018 Rev2 Presenter: Simon Carpenter [INPEX] Purpose & Agenda Purpose Present functional overview, discuss selection criteria & associated Drilling considerations for

More information

Deepwater riserless (RLWI) enablers for increased oil recovery. Bringing shallow water experience to deepwater.

Deepwater riserless (RLWI) enablers for increased oil recovery. Bringing shallow water experience to deepwater. Deepwater riserless (RLWI) enablers for increased oil recovery. Bringing shallow water experience to deepwater. Well Intervention Services Deepwater RLWI success criteria RLWI history Technology Focus

More information

Siem WIS. Siem WIS AS. Closed Loop Drilling CLD. August Siem WIS AS.

Siem WIS. Siem WIS AS. Closed Loop Drilling CLD. August Siem WIS AS. AS Closed Loop Drilling CLD August 2010 2010 AS. Technology summary has secured intellectual property rights (IPR) for all key components of its portfolio: CircSub To drill with constant Mud Circulation

More information

BP SWOPS Single Well Oil Production System. Sandy Meldrum CEng, MIMechE

BP SWOPS Single Well Oil Production System. Sandy Meldrum CEng, MIMechE Sandy Meldrum CEng, MIMechE Concept A means of producing oil from small offshore fields which would be uneconomic for fixed platforms or other conventional means. System Overview Comprised Production Vessel

More information

Cameron MBO Multi-Bowl Wellhead System

Cameron MBO Multi-Bowl Wellhead System Cameron MBO Multi-Bowl Wellhead System MBO Multi-Bowl Wellhead System The Cameron MBO Multi-Bowl Wellhead System is a compact, unitized wellhead which can be used as an alternative to conventional wellhead

More information

RPSEA PROJECT STATUS REPORT FEB 2011

RPSEA PROJECT STATUS REPORT FEB 2011 RPSEA PROJECT STATUS REPORT FEB 2011 RPSEA Project 08121-2301-03 Ultra-Deepwater Riserless Intervention System (RIS) & RPSEA Project 09121-3500-07 Ultra-Deepwater Subsea Test Tree (SSTT) and Intervention

More information

Appendix F Lock-Down Sleeve Decision. Appendix F Lock-Down Sleeve Decision

Appendix F Lock-Down Sleeve Decision. Appendix F Lock-Down Sleeve Decision Appendix F Lock-Down Sleeve Decision Appendix F Lock-Down Sleeve Decision After the production casing has been installed in the well and cemented in place, the operator may elect to run a lock-down sleeve.

More information

A marginal field (re-)development using several alternative methodologies 1

A marginal field (re-)development using several alternative methodologies 1 Bart Heijermans Helix ESG Chief Operating Officer Company The Phoenix Update Project A marginal field (re-)development using several alternative methodologies 1 Our Mission Helix Producer I Helix Energy

More information

Subsea Chokes and Flow Modules

Subsea Chokes and Flow Modules Subsea Chokes and Flow Modules 2 Relia Designed for maximum flexibility and reliability, FMC s F Series Subsea Chokes and Flow Modules are ideal for production, injection, gas lift and waterflood applications.

More information

Mutineer-Exeter Development Drilling & Completions Challenges Darren Greer & Peter Dodd

Mutineer-Exeter Development Drilling & Completions Challenges Darren Greer & Peter Dodd Mutineer-Exeter Development Drilling & Completions Challenges Darren Greer & Peter Dodd (10 March 2005) 1 Outline 1. Project Overview 2. Wells Overview 3. Drilling Challenges Outcomes 4. Completions Challenges

More information

MSV Seawell. The vessel that pioneered subsea light well intervention

MSV Seawell. The vessel that pioneered subsea light well intervention MSV Seawell The vessel that pioneered subsea light well intervention PRODUCTION ENHANCEMENT WELL MAINTENANCE SATURATION DIVING WELL ABANDONMENT/FIELD DECOMMISSIONING MSV Seawell specifications Classification

More information

GE Oil & Gas Drilling & Production. VetcoGray subsea wellhead systems. Advanced solutions for extreme conditions

GE Oil & Gas Drilling & Production. VetcoGray subsea wellhead systems. Advanced solutions for extreme conditions GE Oil & Gas Drilling & Production VetcoGray subsea wellhead systems Advanced solutions for extreme conditions VetcoGray subsea wellhead systems As offshore drilling pushes past 10,000-foot water depths

More information

VIRTUS CONNECTION SYSTEMS Advanced Diverless Connection Solutions for any Subsea Field Application

VIRTUS CONNECTION SYSTEMS Advanced Diverless Connection Solutions for any Subsea Field Application VIRTUS CONNECTION SYSTEMS Advanced Diverless Connection Solutions for any Subsea Field Application 2 Virtus Subsea Connectors Delivering Long-Lasting Reliability at Each Subsea Connection Subsea production

More information

AADE Houston Chapter. Group. 26 January 2011

AADE Houston Chapter. Group. 26 January 2011 AADE Houston Chapter Deepwater and Emerging Technologies Group 26 January 2011 BOEMRE Compliance Guidelines Department of Interior s Increased Safety Measures for Energy Development on the Outer Continental

More information

HELIX ENERGY SOLUTIONS

HELIX ENERGY SOLUTIONS HELIX ENERGY SOLUTIONS OFFSHORE CAPABILITIES www.helixesg.com About Us WELL OPERATIONS SUBSEA WELL INTERVENTION PRODUCTION FACILITIES The purpose-built vessels of our Well Operations business units serve

More information

June 24, 2010 RPSEA Project 1502 Thomas E. Williams int.com

June 24, 2010 RPSEA Project 1502 Thomas E. Williams  int.com June 24, 2010 RPSEA Project 1502 Thomas E. Williams www.nautilus int.com RPSEA 1502 Coiled Tubing from a Small Vessel June 2010 Update Presentation Topics Background Project Objectives System Configuration

More information

ACID STIMULATION CASE STUDY

ACID STIMULATION CASE STUDY ACID STIMULATION CASE STUDY 07/03/2018 AGENDA Introduction Rigless system overview Operational considerations Case Study Interference Test objectives & Equipment Interference Test results Summary Conclusion

More information

@balance Deepwater. MPD services

@balance Deepwater. MPD services @balance Deepwater MPD services Drill faster and reach farther with @balance Deepwater MPD services Achieve drilling objectives with closed-loop systems MPD provides a closed-loop circulation system in

More information

Kuala Lumpur 3 October 2012 State of the Industry of Riserless Light Well Interventions (RLWI)

Kuala Lumpur 3 October 2012 State of the Industry of Riserless Light Well Interventions (RLWI) Kuala Lumpur 3 October 2012 State of the Industry of Riserless Light Well Interventions (RLWI) Bevan Morrison, VP Global Subsea Intervention Solutions Agenda Subsea well intervention introduction Economic

More information

From late-life reservoir management through to final permanent abandonment, we create bespoke solutions to meet your specific well requirements.

From late-life reservoir management through to final permanent abandonment, we create bespoke solutions to meet your specific well requirements. From late-life reservoir management through to final permanent abandonment, we create bespoke solutions to meet your specific well requirements. LATE-LIFE RESERVOIR MANAGEMENT All oil and gas fields will

More information

Offshore Systems. Cameron s Subsea Production Philosophy

Offshore Systems. Cameron s Subsea Production Philosophy Offshore Systems In today s fast-paced, cost-conscious subsea production industry, Cameron has successfully met the challenge to deliver safe, reliable system solutions. This experience allows Cameron

More information

Single / Dual Barrier HP Drilling Risers

Single / Dual Barrier HP Drilling Risers Single / Dual Barrier HP Drilling Risers Acteon HPHT Subsea Community Breakfast Meeting 23rd March 2011 Tim Eyles Director 2H Offshore Engineering tim.eyles@2hoffshore.com / +44 1483 774908 Agenda Introduction

More information

INTEGRATED SUBSEA PRODUCTION SYSTEMS Efficient Execution and Cost-Effective Technologies Deliver Project Success. Deepsea technologies

INTEGRATED SUBSEA PRODUCTION SYSTEMS Efficient Execution and Cost-Effective Technologies Deliver Project Success. Deepsea technologies INTEGRATED SUBSEA PRODUCTION SYSTEMS Efficient Execution and Cost-Effective Technologies Deliver Project Success Deepsea technologies Streamlining Subsea Production Systems for Smaller Fields AFGlobal

More information

Subsea Lift. Inwell and caisson lifting systems

Subsea Lift. Inwell and caisson lifting systems Subsea Lift Inwell and caisson lifting systems Two Decades of Subsea Experience With more than 70 percent of the Earth s surface covered by water, it was inevitable for oil and gas fields to eventually

More information

Well Control Contingency Plan Guidance Note (version 2) 02 December 2015

Well Control Contingency Plan Guidance Note (version 2) 02 December 2015 Well Control Contingency Plan Guidance Note (version 2) 02 December 2015 Prepared by Maritime NZ Contents Introduction... 3 Purpose... 3 Definitions... 4 Contents of a Well Control Contingency Plan (WCCP)...

More information

Heidrun Inverted Gas Lift System

Heidrun Inverted Gas Lift System Heidrun Inverted Gas Lift System ICoTA European Intervention Conference, Aberdeen Nov. 2014 Sivert Gartland, Well Intervention Engineer, Heidrun, Statoil Agenda Background - Field and drainage techniques

More information

Advanced Well Completion Design. 30 Sep - 04 Oct 2018, Dubai. REP logo, PMI & PMP are registered trademarks of Project Management Institute, Inc.

Advanced Well Completion Design. 30 Sep - 04 Oct 2018, Dubai. REP logo, PMI & PMP are registered trademarks of Project Management Institute, Inc. 30 Sep - 04 Oct 2018, Dubai Approved Centre REP logo, PMI & PMP are registered trademarks of Project Management Institute, Inc. Introduction Organisational Impact This Glomacs Advanced Well training seminar

More information

Offshore Drilling Rigs

Offshore Drilling Rigs Offshore Drilling Rigs Drilling Offshore Drilling Rigs Many of the world s potential reserves of hydrocarbons lie beneath the sea, and the hydrocarbon industry has developed techniques suited to conditions

More information

TEPZZ _49_B_T EP B1 (19) (11) EP B1 (12) EUROPEAN PATENT SPECIFICATION. (51) Int Cl.: E21B 33/035 ( ) E21B 33/076 (2006.

TEPZZ _49_B_T EP B1 (19) (11) EP B1 (12) EUROPEAN PATENT SPECIFICATION. (51) Int Cl.: E21B 33/035 ( ) E21B 33/076 (2006. (19) TEPZZ _49_B_T (11) EP 2 321 491 B1 (12) EUROPEAN PATENT SPECIFICATION (4) Date of publication and mention of the grant of the patent:.04.13 Bulletin 13/ (21) Application number: 0979092.3 (22) Date

More information

Deep Water Definitions

Deep Water Definitions DST in Deep Water Deep Water Definitions Depth of Water (Deepwater >1000ft (300m), Ultra- Deepwater > 5000ft (1500m)) Rig Type - Floaters (Drillships and Semi-Submersibles) Approach and Profile (risk,

More information

Oil and Gas UK Well Integrity Guidelines

Oil and Gas UK Well Integrity Guidelines Oil and Gas UK Well Integrity Guidelines The Well, the Completion and the Xmas Tree The Equipment and the People A Definition of Well Integrity Key UK Legislative Requirement for Well Integrity Oil and

More information

Investor Presentation

Investor Presentation Connecting What s Needed with What s Next Investor Presentation September 2017 Forward-Looking Statements Statements we make in this presentation that express a belief, expectation, or intention are forward

More information

Suspended Subsea Well Monitoring CaTS TM Wireless Technology. Donald Horsfall RPLM (ECIS)

Suspended Subsea Well Monitoring CaTS TM Wireless Technology. Donald Horsfall RPLM (ECIS) Suspended Subsea Well Monitoring CaTS TM Wireless Technology Donald Horsfall RPLM (ECIS) Tuesday 27 th June 2017 Agenda Introduction to CaTS Technology CaTS - Cable-less Telemetry System Industry guidelines

More information

15,000 psi 20,000 psi. BigBore IIe HPHT SUBSEA WELLHEAD SYSTEMS

15,000 psi 20,000 psi. BigBore IIe HPHT SUBSEA WELLHEAD SYSTEMS 15,000 psi 20,000 psi BigBore IIe HPHT SUBSEA WELLHEAD SYSTEMS DXe Gasket Profile DXe Locking Profile BigBore IIe SUBSEA WELLHEAD SYSTEM Mud Stick 18 ¾" BigBore IIe Wellhead Housing The BigBore IIe Subsea

More information

GTSC Rig for Hands-on Training

GTSC Rig for Hands-on Training GTSC Rig for Hands-on Training The Rig To meet the high demand of Petroleum Industry, GTSC has launched the Middle East s first fully operational Training Rig & Well in May 2010 at its main building location

More information

Standard Subsea Wellheads. Integrated offshore offering for reliable, high-quality, and capital-efficient performance

Standard Subsea Wellheads. Integrated offshore offering for reliable, high-quality, and capital-efficient performance Standard Subsea Wellheads Integrated offshore offering for reliable, high-quality, and capital-efficient performance Standard Subsea Wellheads Through standardized processes, common core components, and

More information

Hans J Lindland FMC Kongsberg Subsea Innovative Technologies, Creative Solutions

Hans J Lindland FMC Kongsberg Subsea Innovative Technologies, Creative Solutions Lett Brønnintervensjon Hans J Lindland FMC Kongsberg Subsea Why Light Well Intervention? Reservoir recovery is significantly lower (oil) for subsea wells than for platform wells Cost for drilling units

More information

Subsea Production Market and Industry Teaming. Presented by: Bruce Crager Executive Vice President: Expert Advisory Group Endeavor Management

Subsea Production Market and Industry Teaming. Presented by: Bruce Crager Executive Vice President: Expert Advisory Group Endeavor Management Subsea Production Market and Industry Teaming Presented by: Bruce Crager Executive Vice President: Expert Advisory Group Endeavor Management February 28, 2017 Worldwide Progression of Water Depth Capabilities

More information

37 th Gas-Lift Workshop Houston, Texas, USA February 3 7, Dag Almar Hansen, CEO Gas-Lift Workshop 1. Feb. 3-7, 2014

37 th Gas-Lift Workshop Houston, Texas, USA February 3 7, Dag Almar Hansen, CEO Gas-Lift Workshop 1. Feb. 3-7, 2014 37 th Gas-Lift Workshop Houston, Texas, USA February 3 7, 2014 Dag Almar Hansen, CEO Feb. 3-7, 2014 2014 Gas-Lift Workshop 1 37 th Gas-Lift Workshop Houston, Texas, USA February 3 7, 2014 Pressure management

More information

White Paper. Deepwater Exploration and Production Minimizing Risk, Increasing Recovery

White Paper. Deepwater Exploration and Production Minimizing Risk, Increasing Recovery White Paper Deepwater Exploration and Production Minimizing Risk, Increasing Recovery Deepwater exploration, development and production present unique challenges to operators, and minimizing risk and maximizing

More information

BigBore IIe. 15,000 psi 20,000 psi SUBSEA WELLHEAD SYSTEMS

BigBore IIe. 15,000 psi 20,000 psi SUBSEA WELLHEAD SYSTEMS BigBore IIe 15,000 psi 20,000 psi SUBSEA WELLHEAD SYSTEMS BigBore IIe SUBSEA WELLHEAD SYSTEM System Overview Dril-Quip s BigBore IIe Subsea Wellhead System meets the demands of HPHT well environments.

More information

Your Partner for Subsea Pumping

Your Partner for Subsea Pumping Your Partner for Subsea Pumping Our Experience Dedicated to Your Success With the drivers of increased oil recovery and the depletion of traditionally accessible oil fields, the trend in oil and gas is

More information

Recent advancement in well-control technology improves safety and allows cost savings for well designs

Recent advancement in well-control technology improves safety and allows cost savings for well designs Recent advancement in well-control technology improves safety and allows cost savings for well designs Simulation While Drilling and Relief Well Injection Spool 1 Doing More for Less What can we cut? Largest

More information

In any of the 5 star hotel. The exact venue will be intimated prior to course commencement.

In any of the 5 star hotel. The exact venue will be intimated prior to course commencement. Training Title WELLHEAD OPERATION Training Duration 5 days Training Venue and Dates Wellhead Operations 5 19 23 May $3,750 Abu Dhabi, UAE In any of the 5 star hotel. The exact venue will be intimated prior

More information

Offshore Support Vessels Located in the US Gulf of Mexico in March 2018

Offshore Support Vessels Located in the US Gulf of Mexico in March 2018 Offshore Support Vessels Located in the US Gulf of Mexico in March 18 IMCA March 1, 18 Prepared by IMCA The International Marine Contractors Association (IMCA) is the international trade association representing

More information

SPE A Systematic Approach to Well Integrity Management Alex Annandale, Marathon Oil UK; Simon Copping, Expro

SPE A Systematic Approach to Well Integrity Management Alex Annandale, Marathon Oil UK; Simon Copping, Expro SPE 123201 A Systematic Approach to Well Integrity Management Alex Annandale, Marathon Oil UK; Simon Copping, Expro Copyright 2009, Society of Petroleum Engineers This paper was prepared for presentation

More information

pipeline FSHR and tether for fatigue, stress, and any other abnormal condition (e.g., corrosion) that may negatively impact the riser or tether; and

pipeline FSHR and tether for fatigue, stress, and any other abnormal condition (e.g., corrosion) that may negatively impact the riser or tether; and (3) A description of how you met the design requirements, load cases, and allowable stresses for each load case according to API RP 2RD (as incorporated by reference in 250.198); (4) Detailed information

More information

Case Study (GoM 2016): Enhanced Production Strategies Throughout Field Life Using Standardised Flow Access Modules (FAM) Ian Donald

Case Study (GoM 2016): Enhanced Production Strategies Throughout Field Life Using Standardised Flow Access Modules (FAM) Ian Donald Case Study (GoM 2016): Enhanced Production Strategies Throughout Field Life Using Standardised Flow Access Modules (FAM) Ian Donald Managing Director, Enpro Subsea idonald@enpro-subsea.com Agenda Enpro

More information

Learn more at

Learn more at Deepwater Riser System Challenges and Issues David Walters 2H Offshore Presentation Objectives Review riser system options Update on current industry status Highlight key issues Discuss current industry

More information

IMPROVES EFFICIENCY OF SUBSEA TREE CHANGE-OUTS

IMPROVES EFFICIENCY OF SUBSEA TREE CHANGE-OUTS WIRELESS BARRIER MONITORING JULY 2015 WIRELESS BARRIER MONITORING IMPROVES EFFICIENCY OF SUBSEA TREE CHANGE-OUTS LOCATION: North Atlantic PRODUCT: DATE: CASE STUDY: 1006/01 SERVICE: Deepwater Barrier Verification

More information

Tore Aarsland. Chairman of the Editorial Revision Committee / Senior Design C6 Technologies. 10-Jan-13

Tore Aarsland. Chairman of the Editorial Revision Committee / Senior Design C6 Technologies. 10-Jan-13 Tore Aarsland Chairman of the Editorial Revision Committee / Senior Design Engineer @ C6 Technologies 10-Jan-13 1. The well barrier philosophy of the standard is harmonised to NORSOK D-010. The use of

More information

Transition PPT Template. J.P. Morgan. June 2015 V 3.0. Energy Equity Conference June 27, 2017

Transition PPT Template. J.P. Morgan. June 2015 V 3.0. Energy Equity Conference June 27, 2017 Transition PPT Template J.P. Morgan June 2015 V 3.0 Energy Equity Conference 2017 June 27, 2017 Forward-Looking Statements This presentation contains forward-looking statements, including, in particular,

More information

Advancing Global Deepwater Capabilities

Advancing Global Deepwater Capabilities Advancing Global Deepwater Capabilities BP s commitments Determined to accelerate and further deploy the capabilities and practices that enhance safety in our company and the deepwater industry 200+ meetings

More information

Marine Well Containment Company Outer Continental Shelf Summer Seminar

Marine Well Containment Company Outer Continental Shelf Summer Seminar Marine Well Containment Company Outer Continental Shelf Summer Seminar June 4, 2015 INTRODUCTION 2 Why We re Here In order to receive a permit to drill in the U.S. Gulf of Mexico, regulations require operators

More information

Advanced Well Completion Design

Advanced Well Completion Design An Intensive 5 Day Training Course Advanced Well Completion Design 30 Sep - 04 Oct 2018, Dubai 19-OCT-17 This course is Designed, Developed, and will be Delivered under iso Quality standards Advanced Well

More information

Friction Grip in Wellheads: An Innovative Approach to Load Support & Sealing

Friction Grip in Wellheads: An Innovative Approach to Load Support & Sealing Friction Grip in Wellheads: An Innovative Approach to Load Support & Sealing Brent Harrald Principal Engineer Plexus Ocean Systems Ltd. December 2009 Page 1 Table of Contents Introduction Plexus Ocean

More information

Training Fees 4,250 US$ per participant for Public Training includes Materials/Handouts, tea/coffee breaks, refreshments & Buffet Lunch

Training Fees 4,250 US$ per participant for Public Training includes Materials/Handouts, tea/coffee breaks, refreshments & Buffet Lunch Training Title WELL HEAD OPERATIONS Training Duration 5 days Training Venue and Dates REF OP035 Well Head Operations 5 08-12 May $4,250 Abu Dhabi, UAE Will be held in any of the 5 star hotels. The exact

More information

COILED TUBING DESIGN & OPERATIONS

COILED TUBING DESIGN & OPERATIONS Training Title COILED TUBING DESIGN & OPERATIONS Training Date & Duration Will be held at any 5 star hotel- 5 Days Coiled Tubing Design & Operations 5 days 15-19 December 2013 US $ 4,250 Abu Dhabi Training

More information

Subsea Pump System - Optimized for Rapid Deployment & Operation within the Primary Barrier. Brian Piccolo, Technology Development Mgr.

Subsea Pump System - Optimized for Rapid Deployment & Operation within the Primary Barrier. Brian Piccolo, Technology Development Mgr. Subsea Pump System - Optimized for Rapid Deployment & Operation within the Primary Barrier Brian Piccolo, Technology Development Mgr. Agenda Pumped Riser System (PRS) Vision Initial Concept Operational

More information

DXe SUBSEA WELLHEAD CONNECTORS

DXe SUBSEA WELLHEAD CONNECTORS DXe SUBSEA WELLHEAD CONNECTORS Illustration shown: DXe-3 Connector with DXe latching segment Upper Body Indicator Rod Ring Gasket Retainer Latch Segment Spreader Upper Split Ring Retractor Latch Port Ring

More information

Intervention/Decommissioning

Intervention/Decommissioning Intervention/Decommissioning By Nicholas Samford Lloyds Register Intervention/Decommissioning SME Working together for a safer world Planning Decommissioning Operations Planning Decommissioning and P&A

More information

Geoprober Drilling Moving from Ideas To Reality (Status August, 2005)

Geoprober Drilling Moving from Ideas To Reality (Status August, 2005) Geoprober Drilling Moving from Ideas To Reality (Status August, 2005) Reel A 4 OD Reel B 3-1/8 OD Anaconda CT Unit Drilling Rig 27 m derrick, 200 tonnes Heave comp 120 tonnes 4.8m Existing Equipment Refurbishment

More information

Marty Massey, Chief Executive Officer Marine Well Containment Company

Marty Massey, Chief Executive Officer Marine Well Containment Company Marty Massey, Chief Executive Officer Marine Well Containment Company Phil Smith, General Manager Emergency Management and Deepwater Regulatory, Shell Energy Resources Company About MWCC Leading deepwater

More information

Impact of Input Parameters on Wellhead Fatigue, and Alternative Solutions for Life Extension

Impact of Input Parameters on Wellhead Fatigue, and Alternative Solutions for Life Extension GE Oil & Gas Impact of Input Parameters on Wellhead Fatigue, and Alternative Solutions for Life Extension Hussain Hashemizadeh Vidar Strand 6 th December 2012 LEADING PROGRESS TOGETHER Introduction The

More information

Designing Subsea Wells for Abandonment & Suspension

Designing Subsea Wells for Abandonment & Suspension Designing Subsea Wells for Abandonment & Suspension Graeme Rae Rig Build Project Engineer Chevron Upstream Europe Aberdeen Designing Subsea Wells for Abandonment & Suspension Subsea Well Design Aspects

More information

2016 Employee Product Education Courses

2016 Employee Product Education Courses Houston Intercontinental Airport 45 John F. Kennedy Boulevard BELTWAY 8 Sam Houston Tollway 8 Fairbanks N. Houston Eldridge Rd. 290 59 tle York West Lit Recommended Hotel Omni Hotel e Parkway North Eldridg

More information

Rod Larson President & CEO

Rod Larson President & CEO Connecting What s Needed with What s Next Rod Larson President & CEO J.P. Morgan Energy Equity Conference June 27, 2017 New York, NY Forward-Looking Statements Statements we make in this presentation that

More information

4 Briefing. Responsible investor

4 Briefing. Responsible investor Issue Responsible investor 4 Briefing Wednesday 8 th February 2012 In 2010, we accepted all 26 recommendations made by the Bly Report our internal investigation into the Deepwater Horizon incident. BP

More information

Tony Owen, Subsea and Pipelines Decommissioning Delivery Manager AOG February 2017

Tony Owen, Subsea and Pipelines Decommissioning Delivery Manager AOG February 2017 Decommissioning in Practice Tony Owen, Subsea and Pipelines Decommissioning Delivery Manager AOG February 2017 Disclaimer and important notice This presentation contains forward looking statements that

More information

Drilling Systems. Cameron Drilling Control Systems Applications. 1 Semi-submersible Platform Applicaton

Drilling Systems. Cameron Drilling Control Systems Applications. 1 Semi-submersible Platform Applicaton 7 Drilling Systems Cameron has designed, manufactured and delivered surface and subsea drilling systems from the wellhead through the manifold to meet a wide variety of customer requirements and drilling

More information

Deepwater Precommissioning Services

Deepwater Precommissioning Services Deepwater Precommissioning Services Featuring Denizen remote subsea technologies Drilling Evaluation Completion Production Intervention Pipeline & specialty services Nitrogen services Pipeline services

More information

(12) United States Patent (10) Patent No.: US 6,715,554 B1. Cunningham et al. (45) Date of Patent: Apr. 6, 2004

(12) United States Patent (10) Patent No.: US 6,715,554 B1. Cunningham et al. (45) Date of Patent: Apr. 6, 2004 USOO6715554B1 (12) United States Patent (10) Patent No.: Cunningham et al. (45) Date of Patent: Apr. 6, 2004 (54) SLIMBORE SUBSEACOMPLETION SYSTEM 5,213,162. A 5/1993 Iato... 166/341 AND METHOD 5,280,766.

More information

International Well Control Forum IWCF. Well Control Training Syllabus. Drilling Level 2. 1 st January 2014 Version 3.0

International Well Control Forum IWCF. Well Control Training Syllabus. Drilling Level 2. 1 st January 2014 Version 3.0 International Well Control Forum IWCF Well Control Training Drilling Level 2 1 st January 2014 Version.0 Drilling Well Control Written Test Level 2 Surface & Subsea BOP Stack s and Structure Written Test

More information

Land wellhead systems & offshore surface wellhead systems

Land wellhead systems & offshore surface wellhead systems Land wellhead systems & offshore surface wellhead systems Presented by Oseghale Lucas Okohue BEngr. Msc. CIPMP Objectives The objective of this chapter is to provide a brief overview of the types of wellhead

More information

(12) United States Patent

(12) United States Patent (12) United States Patent Nobileau USOO6302212B1 (10) Patent No.: US 6,302.212 B1 (45) Date of Patent: *Oct. 16, 2001 (54) (75) (73) (21) (22) (63) (60) (51) (52) (58) TUBING HANGER AND TREE WITH 5,465,794

More information

Subsea Services. Providing the full scope of services, from installation to abandonment

Subsea Services. Providing the full scope of services, from installation to abandonment Subsea Services Providing the full scope of services, from installation to abandonment 2 Global Reach, Life-of-Field Focus Throughout the entire life cycle of a subsea field, from first discovery to abandonment,

More information

bakerhughes.com Hammerhead Ultradeepwater Integrated Completion and Production System Improve recovery and minimize risk in frontier plays

bakerhughes.com Hammerhead Ultradeepwater Integrated Completion and Production System Improve recovery and minimize risk in frontier plays bakerhughes.com Hammerhead Ultradeepwater Integrated Completion and Production System Improve recovery and minimize risk in frontier plays 2 Ultradeepwater plays represent one of the largest development

More information

UNITED STATES DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT SERVICE GULF OF MEXICO OCS REGION

UNITED STATES DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT SERVICE GULF OF MEXICO OCS REGION UNITED STATES DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT SERVICE GULF OF MEXICO OCS REGION NOTICE TO LESSEES AND OPERATORS OF FEDERAL OIL, GAS, AND SULPHUR LEASES,OUTER CONTINENTAL SHELF, GULF OF MEXICO

More information

The Marine Well Containment System. LSU Center for Energy Studies Energy Summit 2010 October 26, 2010

The Marine Well Containment System. LSU Center for Energy Studies Energy Summit 2010 October 26, 2010 The Marine Well Containment System LSU Center for Energy Studies Energy Summit 2010 October 26, 2010 Restoring Confidence in Deepwater Drilling Operations Our initiatives are aligned with Administration

More information

SUBSEA WELL CONTAINMENT. Global Basis. Deepwater & Emerging Technologies Group (DETG) AADE Houston Chapter 25 January 2012

SUBSEA WELL CONTAINMENT. Global Basis. Deepwater & Emerging Technologies Group (DETG) AADE Houston Chapter 25 January 2012 SUBSEA WELL CONTAINMENT Global Basis Deepwater & Emerging Technologies Group (DETG) AADE Houston Chapter 25 January 2012 Bill Mahler Wild Well Control, Inc. Response Components - Plus Many More Components

More information