WRS Artificial Lift System

Size: px
Start display at page:

Download "WRS Artificial Lift System"

Transcription

1 WRS Artificial Lift System Patent Pending Designed to adapt to any type of Artificial Lift Suspension!

2 Artificial Lift and Down hole gauge monitoring Is fast Becoming the go to in the oil production market. The WRS Artificial Lift suspension system will allow you to utilize the same Feed thru Wellhead and hanger system for all types of Artificial Lift Types. It also work equally as well with gauge wires, Fiber optic, etc., without the need for any penetrators or spliced connections.

3 Interchangeable inserts WRS Artificial lift hanger system ***Patent Pending*** This system was designed to aid in the installation of Multiple types of artificial lift systems without the need to change hangers or adapters. The system can handle ESP suspension without the need for wire splicing. Converts to Gas lift with the same equipment just change out inserts for different line pass thru styles. Convert to rod completion with same changes. Convert to Hydraulic with same changes. Convert to straight production with same changes. Will allow for the passage of gauge wires without the need to do any splicing or without any type of penetration device to get you thru the hanger. Utilizes seals and inserts to accommodate these changes. No need to re plumb after completion switch over. Concentric completion! Temporary Hang off capabilities! Permanent completion utilizing the same equipment! Easy handling and operation! Safe and tested to hold 5k working pressure. String weight is handled with the bottom plate allowing for maximum load capacity. Various seal combinations

4 Dual Wire ports ESP completion Any combination of ESP wire X capillary and gauge wire can be achieved with the system. Wire size and combinations can be addressed easily by changing out seals and inserts to fit the combination.

5 Dual wire ports Gas lift completion Dual capillary and gauge wires can easily be achieved with this system.

6 ESP Completion When installing the ESP, the last thing you need is to worry about unnecessary splices of the wires controlling your production number cost. Not only will this system allow for concentric completion avoiding costly eccentric setup, It will totally eliminate the need to cut and splice lines and wires during installation. The Patent Pending Hanger system is designed to be used during the running,with night time seal off capabilities, but it is also designed to be used at final completion. ESP installation

7 Step 1 When shutting down for the day or getting ready to complete the well, install the Hanger collar into the tubing box as shown using a 18 nipple threaded into the bottom of the hanger collar.

8 Step 2 Pull the hinge screw and open the Patent pending Split hanger and ready it to be installed around the grooved area of the collar.

9 Step 3 Install the Patent pending split wrap around in the slot in the collar to ensure positive up and down motion when raising and lowering the hanger into the well bore.

10 Step 4 Wrap around the collar. Pin to lock hanger in place. This places the hanger in that positive locked position to ensure up and down motion inside the BOP stack during installation and removal.

11 Step 5 Pull the pin to allow E line door to open. Strip back outer sheath from the E line to expose wires. (Caution should be taken not to damage the Lead Shield!!) Give yourself enough room to be able to separate the wires and insert them one at a time into the rubber of the hanger.

12 Step 6 a) Position the wires close to the hanger to begin inserting them into the rubber element. b) Starting from the back to the front. c) Lube the wires and slip them into position one at a time. d) Once there all in place ensure that the element has closed around each wire and is sitting firmly in place in its original form. (This also applies to gauge wires fiber optic, electric, capillary, etc. )

13 Step 7 Ensuring not to pinch the wires, close the door and pin with threaded shoulder bolt to encase the wires in the sealing pocket created inside the doors and seal element.

14 Step 8 Control line sealing. Pull the shoulder bolt to open the door. Lube the line and insert it into the seal element. Once in its position, inspect the element to ensure its back into position to allow for the door to be closed and pinned.

15 Step 9 Now that all the line have been inserted and secured in place. Finally inspection of the hanger should be done to insure that all the element splits are lined up with each opposing ends and that its ready to be lowered into the tubing head for the night.

16 Step 10 Lower it thru the stack and into the bowl. At this point the weight of the string will land on the bottom plate Lock down pins are now run in to contain the hanger in the bowl and seal off the well for the night by compressing down on the hanger and sealing off against the thru cables. ( E line, Control line, coupling, etc.)

17 Step 11 In a Temporary installation, When you return the next work day, its as easy as it was to un install as it was to install! Simply back off the lock down screws in the tubing head and lift the hanger out of the well. At this point, remove the pins holding the doors which are holding in the lines and remove the lines from the hanger. Re pin the doors. Pull the hanger pin and remove from the collar. Now, remove the collar nipple and collar from the string and save encase its needed again. At this point, you should be ready to take off where you left off the day before. If for some reason you would need to hang off the tubing again, simple repeat steps 1-10 and the system will perform the same way. At the end of the setting process, you will need to finish your well and this same system is designed to be utilized for that also. Its recommended to use a new element, unless it is inspected by competent parties and deemed usable.

18 Rod completion collar This will help to show the major difference of the to collar subs. The Rod completion sub has only a connection on each end with a straight thru bore ID. The Permanent has internal BPV threads with an external S seal groove at the top to complete inside the adapter and seal off. Both would be connected to an 18 pipe nipple for easy handling. The weight loading of the assembly is on the lower plate, allowing the upper plate to float and utilize the wellhead lockdown pins for sealing pressure. Permanent collar

19 Interchangeable inserts allow for different styles of completion Multiple completion style adaptability An assortment of elements allow for the different completion styles. With interchangeable inserts and elements to match, the system can be utilized for a multitude of artificial lift types with only a small amount of expense.

20 Completion The system can be tailored to several types of completion scenarios. a)free flow pressure completion. 10k working pressure. b) ESP completion with 5Kvoid test. c) Hydraulic lift with 10k void test. d)gas lift with 10k void test. e) Rod lift with 10k void test. The system allows for miscellaneous sensor, electric, capillary and other types of penetrations thru the wellhead without the need for splicing.

21 Step 11 Completion Once the hanger is landed and the BPV is set, The BOP stack will be removed and now you will be ready to finish the adapter stage of the well head completion.

22 Step 12 Threading the e line and control line thru the ports in the adapter as it is lowered down over the hanger/bowl assembly is easy thru the larger ports. Take caution not to skin the wire or crimp the line as you come down.

23 Adapter Scenario's Because the hanger system has numerous types of combinations, we designed the system adapters to be able to handle all the different types of possibilities with minor parts to be changed. The exit cap and plug are the only items on the adapter that would need to be changed when switching between completion styles.

24 Step 12A As the adapter is lowered, pull outward on the lines to ensure the slack doesn t kink on the bottom side!!

25 Step 12B With everything in place, continue to lower the adapter flange into place. The neck of the coupling with its S seal will seal off the upper portion of the cavity. The hanger seal seals off the annulus. The ring gasket seals off the outside at the top. The next step is to seal the penetrations at the wire and the control/injection line.

26 Step 13 Our Patent pending wire compression fitting will seal off the wire penetration in a very easily installed process as shown. 1) Insert split wedge around the wire. 2) Insert split washer. 3) Insert seal element. 4) Insert secondary washer. 5) Screw on compression cap. This locks the wire in place and seals it at the same time.

27 Step 14 Sealing off the injection line is a simple process which involves and industry standard fitting which seals off the tubing with a swedgloc fitting. Should you be running this for gas lift, chances are we would furnish adapters and hangers with wire ports on each side to help to accommodate gauges and sensor cables along with capillary lines.

28 Final stage Installing the flow line.

29 System components E Line compression fitting Tubing Head Adapter Permanent Coupling 18 Nipples Patent Pending ESP Side door hanger

Wellhead Control Products, Inc. Hangers

Wellhead Control Products, Inc. Hangers Wellhead Control Products, Inc. Hangers The RH series was designed to be a highly workable coiled tubing hanger with greater reliability and more efficiency than other coiled tubing hanger systems. The

More information

Multi-Bowl Applications

Multi-Bowl Applications Multi-Bowl Applications Standard Off-the- Shelf Casing Head Lower Profile Solution Common Support Bushing Field Proven Sealing Designs FS Seals require No Plastic Packing C-22 Profile = Standard Off-the-

More information

Cameron MBO Multi-Bowl Wellhead System

Cameron MBO Multi-Bowl Wellhead System Cameron MBO Multi-Bowl Wellhead System MBO Multi-Bowl Wellhead System The Cameron MBO Multi-Bowl Wellhead System is a compact, unitized wellhead which can be used as an alternative to conventional wellhead

More information

General Four-Way Operation, Maintenance & Service Manual

General Four-Way Operation, Maintenance & Service Manual General Four-Way Operation, Maintenance & Service Manual SCOPE Included in the following pages you will find assembly drawings, exploded views, parts lists, assembly tips, operational descriptions and

More information

Assembly Instructions

Assembly Instructions InTandem Table System November 20 InTandem Table System - Worksurface #4 x/" 4 wood screw power beam Tools Provided T-0 Extended Torx Driver T-25 Torx Driver Additional Tools Required Soft protective

More information

MSR/MSB Mechanical Setting Tool

MSR/MSB Mechanical Setting Tool Tech Unit No: 0620000004 Revision: C Approved By: Quality Engineer Date: 201-1-9 MSR/MSB Mechanical Setting Tool FEATURES: Special designed Bow Spring provides positive control and allows one size Mechanical

More information

MSR/MSB Mechanical Setting Tool

MSR/MSB Mechanical Setting Tool Tech Unit No: 0620000004 Revision: B Approved By: Quality Engineer Date: 2014-12-16 MSR/MSB Mechanical Setting Tool FEATURES: Special designed Bow Spring provides positive control and allows one size Mechanical

More information

Plumbing Part II - Hand Pump

Plumbing Part II - Hand Pump Plumbing Part II - Hand Pump Nelson Riedel Nelson@NelsonsLocomotive.com Initial: 7/17/03 Last Revised: 06/06/2004 The hand pump located in the tender water tank is a backup pump should the axel pump fail

More information

PORTABLE PULL TESTER

PORTABLE PULL TESTER 2425 West Vineyard Avenue, Escondido, California 92029-222 Phone: (800) 284-4460 Fax: (760) 746-4295 PORTABLE CABLE TERMINAL PULL TESTER AT520CT (Revised July 2003) AT520CT Portable Cable Terminal Pull

More information

M-5 PRO CORE BORE PARTS LIST DRILLING MACHINE. (March 2017) Part #

M-5 PRO CORE BORE PARTS LIST DRILLING MACHINE. (March 2017) Part # M- PRO CORE BORE DRILLING MACHINE PARTS LIST (March 07) Part #809 Table of Contents Description Page No. Carriage Assembly....... - Combo Base Assembly....... - 7 Anchor Base Assembly........8 Anchor

More information

INSTALLATION INSTRUCTIONS FOR HAND OPERATED MODELS: 170, 171-R, 171-N, 172, 260

INSTALLATION INSTRUCTIONS FOR HAND OPERATED MODELS: 170, 171-R, 171-N, 172, 260 INSTALLATION INSTRUCTIONS FOR HAND OPERATED MODELS: 170, 171-R, 171-N, 172, 260 I. SUSPENDED INSTALLATIONS NOTE: MODEL 260 FENSTEEL TRACK IS ASSEMBLED IN THE SAME MANNER AS DESCRIBED BELOW WITH THE EXCEPTION

More information

Operating Instructions

Operating Instructions Operating Instructions Holding the material against the angle gauge slide it into the forming head. Be sure that the material remains against the gauge until work is finished. NOTE: This machine will handle

More information

Fiber Splice Box (FSB-D) Installation Instructions

Fiber Splice Box (FSB-D) Installation Instructions Fiber Splice Box (FSB-D) Installation Instructions Table of Contents General Product Information... 1.0 Safety Precautions... 2.0 Tools Required... 3.0 Package Contents... 4.0 Installing the Product Unpacking...

More information

INSTALLATION INSTRUCTIONS HEAVY DUTY TILT WALL MOUNT Model: PPH-2000

INSTALLATION INSTRUCTIONS HEAVY DUTY TILT WALL MOUNT Model: PPH-2000 INSTALLATION INSTRUCTIONS HEAVY DUTY TILT WALL MOUNT Model: PPH-2000 Specifications: Accomodates Akira and Orion 84" displays without interface bracket; accomodates other large flat panel displays with

More information

DRIVE COMPONENTS REMOVAL. 9. FXCW/C: see Figure Remove bolt (9), sprocket retainer (8), and thrust washer (7). NOTE PRIMARY DRIVE LOCKING TOOL

DRIVE COMPONENTS REMOVAL. 9. FXCW/C: see Figure Remove bolt (9), sprocket retainer (8), and thrust washer (7). NOTE PRIMARY DRIVE LOCKING TOOL DRIVE COMPONENTS REMOVAL PART NUMBER HD-7977 TOOL NAME PRIMARY DRIVE LOCKING TOOL S To remove the primary chain, remove compensating sprocket, clutch assembly and primary chain as an assembly:. Remove

More information

Segmental ring types provided by F P McCann: Segments in stock are front bolted. Back bolted segments are available to order: Cross joint Corbel Ring

Segmental ring types provided by F P McCann: Segments in stock are front bolted. Back bolted segments are available to order: Cross joint Corbel Ring Building Manual for F P McCann `Smoothbore Shaft Linings with EPDM Gaskets (rev 04) (To be read in conjunction with the Segmental Shaft and Tunnel Safety Data Sheet) Segmental ring types provided by F

More information

Shetland Stalls Installation Instructions

Shetland Stalls Installation Instructions Shetland Stalls Installation Instructions RAMM Horse Fencing and Stalls 13150 Airport Hwy. Swanton, OH 43558-9615 1-800-434-8456 Rev. 1/9/18 Before you start Kit can accommodate up to 12 wide stall front

More information

MODEL D DIESEL PILE HAMMER

MODEL D DIESEL PILE HAMMER AMERICAN PILEDRIVING EQUIPMENT, INC. MODEL D125-42 DIESEL PILE HAMMER SPARE PARTS BOOK Corporate Office 7032 S. 196th Street Kent, WA, USA 98032 Tel: 1-800-248-8498 Tel: 1-253-872-0141 Fax: 1-253-872-8710

More information

For installation assistance, contact SARGENT at DOORS SHOWN HERE SWING IN FOR ILLUSTRATION PURPOSES ONLY.

For installation assistance, contact SARGENT at DOORS SHOWN HERE SWING IN FOR ILLUSTRATION PURPOSES ONLY. SARGENT Installation Instructions for LP8600 x LR8600 & 12-LP8600 x 12-LR8600 Series Low Profile Panic and Fire Exit Devices on Double Egress & Double Doors or LS8600 & 12-LS8600 Low Profile Exit Device

More information

Form No Assembly & Operating Instructions for: SAFETY PRECAUTIONS

Form No Assembly & Operating Instructions for: SAFETY PRECAUTIONS Form No. 0230 Assembly & Operating Instructions for: 833 20300 83 2220 837 0-0008 078 SHOP PRESS Max. Capacity: 2 Ton These instructions are intended for various shop presses. Some models are shipped assembled

More information

Dublin Stalls Installation Instructions

Dublin Stalls Installation Instructions Dublin Stalls Installation Instructions RAMM Horse Fencing and Stalls 13150 Airport Hwy. Swanton, OH 43558-9615 1-800-434-8456 Rev. 9/13/17 Part Identification Round Track Bracket (4) (Not Painted) Round

More information

SERVICE PARTS LIST PAGE 1 OF 6 BASE ASSEMBLY SPECIFY CATALOG NO. AND SERIAL NO. WHEN ORDERING PARTS 12" DUAL BEVEL COMPOUND MITER SAW B27B

SERVICE PARTS LIST PAGE 1 OF 6 BASE ASSEMBLY SPECIFY CATALOG NO. AND SERIAL NO. WHEN ORDERING PARTS 12 DUAL BEVEL COMPOUND MITER SAW B27B PAGE 1 OF 6 BASE ASSEMBLY 00 0 EXAMPLE: Component Parts (Small #) Are Included When Ordering The Assembly (Large #). SPECIFY CATALOG NO. AND NO. WHEN ORDERING PARTS = Part number change from previous service

More information

MUELLER E-5TM. and D-5TM. Drilling Machines. Reliable Connections. E-5 General Information 2. D-5 General Information 3. Operating Instructions 4-5

MUELLER E-5TM. and D-5TM. Drilling Machines. Reliable Connections. E-5 General Information 2. D-5 General Information 3. Operating Instructions 4-5 operation Instructions manual MUELLER E-5TM and D-5TM TAble of contents PAGE E-5 General Information 2 Drilling Machines D-5 General Information 3 Operating Instructions 4-5 E-5 Parts 6 D-5 Parts 7! WARNING:

More information

Installation Instructions for Vista Air Vertically Folding Walls

Installation Instructions for Vista Air Vertically Folding Walls Installation Instructions for Vista Air Vertically Folding Walls Use these instructions in conjunction with your shop drawings to see the specifics that are particular to the model you are installing.

More information

Diesel Pile Hammer D30-32 Part # 66508

Diesel Pile Hammer D30-32 Part # 66508 Diesel Pile Hammer D30-32 Part # 66508 2 Diesel Pile Hammer D30-32 Part # 66508 Pos Order No Pg Description Qty 66508 Diesel Pile Hammer D30-32 cmpl 1 1 108742 4 Cylinder Lower Part cmpl 1 2 60151 Inner

More information

Clocking a TD-04 Turbo Compressor Housing. Appendix A : AWIC Silicone and Tubing Fitting

Clocking a TD-04 Turbo Compressor Housing. Appendix A : AWIC Silicone and Tubing Fitting Clocking a TD-04 Turbo Compressor Housing Appendix A : AWIC Silicone and Tubing Fitting Revision A: 7-13-2015 Tools: Metric Sockets (10, 12, 14, 17mm) 5mm Hex Key Large Internal Snap Ring Pliers 3/8 Socket

More information

3.2.3 Rear Door Window and Quarter Window Carrier Assembly

3.2.3 Rear Door Window and Quarter Window Carrier Assembly Tighten all bolts. Tighten bolts marked -1- and -2- in specified sequence. Tightening torque: 8 Nm Remaining bolts can be tightened in any sequence. Insert door window -3- through window recess without

More information

SERVICE PARTS LIST PAGE 1 OF 6 BASE ASSEMBLY SPECIFY CATALOG NO. AND SERIAL NO. WHEN ORDERING PARTS 12" SLIDING COMPOUND MITER SAW

SERVICE PARTS LIST PAGE 1 OF 6 BASE ASSEMBLY SPECIFY CATALOG NO. AND SERIAL NO. WHEN ORDERING PARTS 12 SLIDING COMPOUND MITER SAW PAGE 1 OF 6 BASE ASSEMBLY 00 0 CATALOG NO. EXAMPLE: SPECIFY CATALOG NO. AND NO. WHEN ORDERING PARTS 6955-20 1 02-80-0050 Thrust Bearing (1) 2 05-80-0510 M5 x 12mm Flat Head T-20 Screw (5) 3 05-81-0135

More information

Model: SCD430 SCD640. Installation & Operation Guide P/N SCD640-95

Model: SCD430 SCD640. Installation & Operation Guide P/N SCD640-95 Model: SCD430 SCD640 Installation & Operation Guide P/N SCD640-95 Model SCD430 and SCD640 Kurt has two Self-Centering vises, a four-inch jaw width (SCD430) and a six-inch jaw width (SCD640). Jaw opening

More information

Tools Required For Servicing: Needle Nose Pliers

Tools Required For Servicing: Needle Nose Pliers Danger Caution Danger of Life Do not attempt to perform service on a hot heat gun. Always allow unit to cool completely and disconnect from power source before performing any service on the heat gun. Fire

More information

DIAMOND CONCRETE SAW PARTS LIST MODEL CC1113-XL P R O D U C T S. June Part #

DIAMOND CONCRETE SAW PARTS LIST MODEL CC1113-XL P R O D U C T S. June Part # DIAMOND P R O D U C T S CONCRETE SAW PARTS LIST MODEL CC1113-XL June 013 Part #10 TABLE OF CONTENTS Description Page No. Saw Assembly (Normal Cut).... - Saw Assembly (Up-Cut)...... - Gas Engine Assembly......

More information

Signal Mirror Installation Instructions

Signal Mirror Installation Instructions Signal Mirror Installation Instructions 2006 2007 Honda Ridgeline THE safety accessory of the 21 st Century. P/N 210 0142 0 Rev. A (9/5/07), BTV 2007 Muth Company, LLC Professional Installation Recommended:

More information

Heidrun Inverted Gas Lift System

Heidrun Inverted Gas Lift System Heidrun Inverted Gas Lift System ICoTA European Intervention Conference, Aberdeen Nov. 2014 Sivert Gartland, Well Intervention Engineer, Heidrun, Statoil Agenda Background - Field and drainage techniques

More information

Sole Fitness E95 Elliptical Trainer TurnKey Delivery and Setup Training

Sole Fitness E95 Elliptical Trainer TurnKey Delivery and Setup Training Sole Fitness E95 Elliptical Trainer TurnKey Delivery and Setup Training Delivery Requirements Ground delivery Inside delivery to customer-specified location Unpack and assemble machine, and remove packing

More information

Serial Number Location

Serial Number Location GL/GLX STRENGTH TRAINING SYSTEM OWNERS MANUAL Serial Number Location SERIAL 3 4 5 7 8 Record your Serial number and purchase date here: S/N DATE: DEALER: Model No. BCG-GL BODYCRAFT is a division of Recreation

More information

SUPER PRO GUN & SUPER PRO GUN II

SUPER PRO GUN & SUPER PRO GUN II MAGNUM VENUS PRODUCTS Maintenance & Repair Manual Part No. M6707-1-1 Revision 04.14.01 Maintenance & Repair Corporate HQ & Mfg. Phone: (727) 573-2955 Fax: (727) 571-3636 Email: info@magind.com Web: www.magind.com

More information

The GAK using Ziv s GAK in the box

The GAK using Ziv s GAK in the box The GAK using Ziv s GAK in the box By Webslinger The Gonzo Air Kit or GAK has been around for a long time as a "Do-It-Yourself" performance modification. This is probably the least expensive way to increase

More information

MUELLER GAS. DH-5 Drilling Machine. For use on 1 1 /2 & 2 Line Stopper Fittings. Reliable Connections. General Information 2

MUELLER GAS. DH-5 Drilling Machine. For use on 1 1 /2 & 2 Line Stopper Fittings. Reliable Connections. General Information 2 operating Instructions manual MUELLER GAS TAble of contents PAGE DH-5 Drilling Machine For use on 1 1 /2 & 2 Line Stopper Fittings General Information 2 Installing and Stopping-off 1 1 /2 and 2 Line Stopper

More information

Parts list continues on Page 2 HOUSE PARTS PACKED IN HOUSE BOX PARTS IN SMALL PLASTIC BAG (HARDWARE) POST PARTS PACKED IN THIS BOX (LARGE PLASTIC BAG)

Parts list continues on Page 2 HOUSE PARTS PACKED IN HOUSE BOX PARTS IN SMALL PLASTIC BAG (HARDWARE) POST PARTS PACKED IN THIS BOX (LARGE PLASTIC BAG) Form 05-07 Instructions and Parts List MSS- Martin Safety System NOTES: () A complete system is packed in two boxes post box and house box. House box contains hardware for both post and house assembly.

More information

Diesel Hammer Model D19-42 Part #

Diesel Hammer Model D19-42 Part # Diesel Hammer Model D19-42 Part # 120491 2 Diesel Pile Hammer Part # 120941 Pos Order No. Pg Description Qty 120941 Diesel Pile Hammer D19-42 (Bauer MNR:426514) 1 160198 4 Cylinder Lower Part cmpl 1 2

More information

Manufacturing Sun Cartridge Cavities

Manufacturing Sun Cartridge Cavities Manufacturing Sun Cartridge Cavities The following Technical Tip discusses a variety of points that should be considered when manufacturing a Sun cavity. Many of the items discussed could be classified

More information

BL-ER-P Ethernet Radio Unit for Pedestal Installation Guide

BL-ER-P Ethernet Radio Unit for Pedestal Installation Guide Assemble the Antenna Riser 1. Remove the antenna riser assembly and the antenna from its packaging. 2. Remove the plastic cap, the nut, and the lock washer from the stem of the antenna. 3. Put the stem

More information

LAN84207 Installation Instructions Single Point Hydraulic Kit for 50 Series STS Combines. 270 West Park Avenue Huron, SD

LAN84207 Installation Instructions Single Point Hydraulic Kit for 50 Series STS Combines. 270 West Park Avenue Huron, SD LAN84207 Installation Instructions Single Point Hydraulic Kit for 50 Series STS Combines. 270 West Park Avenue Huron, SD 57350 866-526-5682 1 Numerical Parts List Part Numbers Description Quantity LANH201368

More information

HANDWHEEL ASSEMBLY UPGRADE

HANDWHEEL ASSEMBLY UPGRADE HANDWHEEL ASSEMBLY UPGRADE PURPOSE The purpose of the notice is to document the procedures involved in removing old handwheel assembly parts and replacing them with new parts. The new parts allow the handwheel

More information

PAC-12 Kit Contents. Tools Needed Soldering iron Phillips screwdriver Wire stripper Wrenches, 7/16 and 1/2 Terminal crimp tool Pliers Solder

PAC-12 Kit Contents. Tools Needed Soldering iron Phillips screwdriver Wire stripper Wrenches, 7/16 and 1/2 Terminal crimp tool Pliers Solder PAC-2 Kit Contents Part Quantity Screws: 8/32 x 3/8 Screws: 8-32 x 5/6 Screw: 8-32 x /4 #8 internal tooth washers #8 solder lug ring terminals Bolt: Aluminum, /4-20 x.5 /4 internal tooth washer Nut: Aluminum

More information

Main Components. Pipe and Bolt Threading Machine 300/300A. Early Style. Printed in U.S.A. Ridge Tool Company/Elyria, Ohio, U.S.A.

Main Components. Pipe and Bolt Threading Machine 300/300A. Early Style. Printed in U.S.A. Ridge Tool Company/Elyria, Ohio, U.S.A. Pipe and Bolt Threading Machine 00/00A Main Components Early Style 0 0 * 0 0 0 For Information on Cutters, Die Heads and Reamers SEE INDEX Ref. 0 0 Catalog 0 00 00 0 0 0 00 0 0 0 0 0 0 0 00 0 00 00 00

More information

Assembly Instructions Nevins Phone Booth

Assembly Instructions Nevins Phone Booth Assembly Instructions Nevins Phone Booth Included Hardware Tools Required supplied by installer Drill & Bit Bolt A - (16) 1/4-20 x 1-1/2 hex head Bolt B - (20) 1/4-20 x 2-1/2 phillips head Screw 1 - (24)

More information

CATALOG OF REPLACEMENT PARTS

CATALOG OF REPLACEMENT PARTS CATALOG OF REPLACEMENT PARTS MODEL X13 SERIES SLICER FORM 43180 Rev. A (April 2013) F-43180 Rev. A (April 2013) - 2-2013 Table of Contents 5 ELECTRICAL COMPONENTS 7 RING GUARD AND CENTER PLATE 9 ARM ASSEMBLY

More information

Wellhead equipment CATALOG

Wellhead equipment CATALOG equipment CATALOG Wellhead & Christmas tree Fixed the drilled wellhead.connect wellhead casing ring,seal and control the annular of casing. suspend tubing,control wellhead pressure and adjust flow rate,also

More information

Click Here to Go Back

Click Here to Go Back Click Here to Go Back Fig. -94 Fig. -97 CC42D 10. Remove the cap screw securing the gear shift stopper plate pin retainer; then remove the retainer. Fig. -95 CC45D 12. Remove the link arm and account for

More information

ATTACH WALL PLATE TO WALL

ATTACH WALL PLATE TO WALL DANGER! The Elite ar m contains high p r e s s u r e g a s s p r i n g s. T h e following cautions MUST be observed to avoid serious injury. 1. Do not attempt to adjust your Elite arm until everything

More information

Optical Cable Entry Facility (OCEF) Installation Instructions

Optical Cable Entry Facility (OCEF) Installation Instructions Instruction Sheet 860380690 Uniprise Solutions Optical Cable Entry Facility (OCEF) Installation Instructions General The Optical Cable Entry Facility (OCEF) cabinets store optical fiber splices between

More information

Hardened Structures Hardened Shelters, LLC. Explosion Resistant Pre-hung Sealed Blast Door

Hardened Structures Hardened Shelters, LLC. Explosion Resistant Pre-hung Sealed Blast Door Hardened Structures Hardened Shelters, LLC Explosion Resistant Pre-hung Sealed Blast Door Drawing number: ASR-50-BD Revision: E Date: December 8, 2008 Table of Contents Contact Information... 3 Description...

More information

B-Too Drilling and Tapping Machine Instruction and Maintenance Manual

B-Too Drilling and Tapping Machine Instruction and Maintenance Manual B-Too Drilling and Tapping Machine Instruction and Maintenance Manual Thank you for your purchase of the B-Too Drilling and Tapping Machine. Please read and understand this short operation manual. Our

More information

PRINT MAY BE REDUCED - DO NOT SCALE. No Compression Load on Ceiling Possible Lateral Load of 8kg 2 Fixed Pins in Shear with Ceiling

PRINT MAY BE REDUCED - DO NOT SCALE. No Compression Load on Ceiling Possible Lateral Load of 8kg 2 Fixed Pins in Shear with Ceiling Date 05/207 By No Compression Load on Ceiling Possible Lateral Load of 8kg 2 Fixed Pins in Shear with Ceiling Technical Information: 2x Bugle Screw Guide Fixing Optional Non-penetrating Fixingss to Ground

More information

NEWLONG. r PORTABLE FILLED BAG CLOSING MACHINE NEWLONG MACHINE WORKS, LTD.

NEWLONG. r PORTABLE FILLED BAG CLOSING MACHINE NEWLONG MACHINE WORKS, LTD. NEWLONG r PORTABLE FILLED BAG CLOSING MACHINE * NEWLONG MACHINE WORKS, LTD. () THREAD TENSION AND COVER PARTS 0 () THREAD TENSION AND COVER PARTS Ref. No. Part No. Description Q ty Remarks 5 6 7 8 9 0

More information

00278 R1 AXLE, FOR 1-1/8" FREE WHEEL HUBS

00278 R1 AXLE, FOR 1-1/8 FREE WHEEL HUBS 00 ACTUATOR VALVE, O-RING PORTS 00 C-CLIP, /" 00 SPRING, VALVE SPOOL RETURN 00 COLLAR, / ID 00 WASHER, / USS, ZINC 00 HH CAP SCREW, /- NC X -/ G ZINC 0 FITTING, 0-- 00 O-RING, - FITTING 000-BO RELIEF VALVE,

More information

Mechanical Frappe Press

Mechanical Frappe Press Mechanical Frappe Press Operation Manual CONTENTS OPERATIONAL INSTRUCTIONS PRECAUTIONS PART NAMES INCLUDED ITEMS BASIC OPERATION MAINTENANCE REPLACEMENT PARTS Thank you for using The Frapptastic Five Mechanical

More information

FABA. Installation Instructions. Conductor Bar System. Publication #FABA-03 3/1/04 Part Number: Copyright 2004 Electromotive Systems

FABA. Installation Instructions. Conductor Bar System. Publication #FABA-03 3/1/04 Part Number: Copyright 2004 Electromotive Systems FABA Conductor Bar System Installation Instructions Publication #FABA-03 3/1/04 Part Number: 005-1062 Copyright 2004 Electromotive Systems 1S 100 Z Installation Instructions Contents: Basic Diagram - -

More information

COYOTE Terminal Closure (Single Chamber) Hermetically Sealed With Hardened Adapters

COYOTE Terminal Closure (Single Chamber) Hermetically Sealed With Hardened Adapters JUNE 2006 COYOTE Terminal Closure (Single Chamber) Hermetically Sealed With Hardened Adapters Be sure to read and completely understand this procedure before applying product. Be sure to select the proper

More information

Bi-Color Signal Mirror Installation Instructions

Bi-Color Signal Mirror Installation Instructions Bi-Color Signal Mirror Installation Instructions 2005-2009 Toyota Tacoma THE safety accessory of the 21 st Century. P/N 210-0141-0 Rev. A2 (3/30/09), BTV 2007 Muth Mirror Systems, LLC Page 3 of 13PplPage

More information

OXYGEN INSTALLATION. Revision date

OXYGEN INSTALLATION. Revision date 12345 1 Hardware List 12345 Flat head wood screw #9 x 7/8 long with #2 Phillips drive, silver Used to attach surfaces and end panels Hex set screw ½-13 x 2 long with 1/4 hex drive, black Used on Legs Hex

More information

Assembly Instructions

Assembly Instructions Unite Panel System Hinge Door July 2016 #12 x / slotted hex washer head bolt Figure 1 threshold bracket frame Detail F threshold bracket threshold bracket (installed) #12 x / slotted hex washer head bolt

More information

NOTE: Top section pole (Q) is packed INSIDE bottom section pole (S)

NOTE: Top section pole (Q) is packed INSIDE bottom section pole (S) Form 0905-0 Instructions and Parts List TM- Mini Castle (modified) MARTIN SAFETY SYSTEM NOTES: () A complete system is packed in two boxes post box and house box. House box contains hardware for both post

More information

Signal Mirror Installation Instructions Honda Odyssey

Signal Mirror Installation Instructions Honda Odyssey Signal Mirror Installation Instructions 2005-2009 Honda Odyssey THE safety accessory of the 21st Century. P/N 210-0122-0 Rev. A4 (6/9/09), BTV 2006 Muth Company, LLC PROFESSIONAL INSTALLATION RECOMMENDED

More information

CONCRETE SAW PARTS LIST

CONCRETE SAW PARTS LIST CONCRETE SAW PARTS LIST MODEL CC00XL ELECTRIC & HYDRAULIC UNITS August, 0 Part # 0 Table of Contents Common Parts.. Front Axle Assembly... Rear Axle Assembly... Transmission Assembly... Blade Shaft Assembly

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS TM X-10 Type 1F HIGH SECURITY ELECTRONIC LOCK Table of Contents Introduction... 1 Basic Tools and Materials Needed... 1 Lock Parts for Installation... 1 Installation Kit Contents...

More information

Ruby 0-4-0T Kit Assembly Instructions

Ruby 0-4-0T Kit Assembly Instructions Ruby 0-4-0T Kit Assembly Instructions Ruby Parts List PART NO.& NAME QTY PART NO.& NAME QTY SHEET 1 1 Frame 2 2 Bracket 4 3 M2 x 4 Hex Head Screw 25 4 Wheelset (without eccentrics) 1 5 Wheelset (with eccentrics)

More information

BEAST THE. Tube and Pipe Notcher Operating Instructions. Notches In Bends Straight Notches. Angled Notches. Offset Notches

BEAST THE. Tube and Pipe Notcher Operating Instructions. Notches In Bends Straight Notches. Angled Notches. Offset Notches Copyright (c) 2007 J D SQUARED INC. www.jd2.com THE BEAST Tube and Pipe Notcher Operating Instructions Notches In Bends Straight Notches Angled Notches PATENT PENDING Offset Notches Assembly After unpacking

More information

w w w. h d o n l i n e s h o p. d e TIMKEN BEARING CONVERSION TOOL GENERAL INSTALLATION -J04672 REV Kit Number Models

w w w. h d o n l i n e s h o p. d e TIMKEN BEARING CONVERSION TOOL GENERAL INSTALLATION -J04672 REV Kit Number Models -J067 REV. 008-07- GENERAL Kit Number 8-08 Models TIMKEN BEARING CONVERSION TOOL For model fitment information, see the P&A Retail Catalog or the Parts and Accessories section of www.harley-davidson.com

More information

Installation/Care/Use Manual Soft Sides Freeze Resistant Fountain

Installation/Care/Use Manual Soft Sides Freeze Resistant Fountain Installation/Care/Use Manual Soft Sides Freeze Resistant Fountain EDFP217FPC Installer To assure you install this model easily and correctly, PLEASE READ THESE SIMPLE INSTRUCTIONS BEFORE STARTING THE INSTALLATION.

More information

Pocket Door Kit PD1 / PD2 Installation Instructions. Kit Contents.

Pocket Door Kit PD1 / PD2 Installation Instructions. Kit Contents. Pocket Door Kit PD1 / PD2 Installation Instructions Kit Contents. 1, Create Rough Opening In Stud Wall Construct rough opening ensuring all sides are square and level. Rough opening should be; Height =

More information

HOUSE PARTS PACKED IN HOUSE BOX PARTS IN PLASTIC BAG (HARDWARE) PARTS IN SMALL PLASTIC BAG (FLOOR CLIPS) PARTS PACKED IN BUNDLE

HOUSE PARTS PACKED IN HOUSE BOX PARTS IN PLASTIC BAG (HARDWARE) PARTS IN SMALL PLASTIC BAG (FLOOR CLIPS) PARTS PACKED IN BUNDLE Check parts against this list before starting assembly. Refer to illustrations on pages 6 and 7 to view house parts. If any shortages are found, refer to Packing Slip for claim instructions. Item 3 5 6

More information

PFT CABLE GYM INSTRUCTION MANUAL

PFT CABLE GYM INSTRUCTION MANUAL PFT CABLE GYM INSTRUCTION MANUAL QUESTION? As a quality home gym supplier we are committed to your complete satisfaction. If you have questions, or find missing or damaged parts, we will guarantee your

More information

MIL-STD B (SH) UPDATE

MIL-STD B (SH) UPDATE MIL-STD-2042-5B (SH) UPDATE Method 5A1 Insert Equipment and materials (to be added to table 5A1-I) Pliers 3.2.2.2 Cable and fiber preparation for Fiber Systems International backshells. Step 1: Ensure

More information

ROLL-A-GLIDE INSULATED ROLLER DOOR

ROLL-A-GLIDE INSULATED ROLLER DOOR ROLL-A-GLIDE INSULATED ROLLER DOOR Installation Instructions 1. Motor 13. Brush / Wear Strips 2. Axle Assembly 14. Curtain Assembly 3. Rigid Link Collars 15. Door Laths 4. Octagonal Plug End 16. Locking

More information

SECTION 9.0 MAINTENANCE

SECTION 9.0 MAINTENANCE SECTION 9.0 MAINTENANCE SECTION 9.1 GENERAL MAINTENANCE CLEANLINESS IS THE KEY TO THE PERFECT STO-AWAY KEEP DIRT, MUD, AND SALT FROM BUILDING UP ON YOUR STO-AWAY If you have a pressure washer, use it to

More information

OPERATOR S MANUAL MAINTENANCE MANUAL PARTS LIST TURFCO. 60 Inch Seeder. Product Number Starting Serial Number H00801 PATENT PENDING

OPERATOR S MANUAL MAINTENANCE MANUAL PARTS LIST TURFCO. 60 Inch Seeder. Product Number Starting Serial Number H00801 PATENT PENDING 0 Inch Seeder OPERATOR S MANUAL MAINTENANCE MANUAL PARTS LIST TURFCO 0 Inch Seeder Product Number 0 Starting Serial Number H000 PATENT PENDING Manual Number DANGER - IF INCORRECTLY USED THIS MACHINE CAN

More information

Model No: TC10. Parts Information: Tyre Changer - Automatic

Model No: TC10. Parts Information: Tyre Changer - Automatic Page 1 of 11 1 TC10.01 BODY 2 TC10.02 COLUMN 3 TC10.03 HORIZONTAL ARM ASS'Y 4 TC10.04 WASHER 5 TC10.05 RUBBER FOOT 6 TC10.06 COVER 7 TC10.07 SCREW M14x42 8 TC10.08 PRESS COVER 9 TC10.09 STOP-UP 10 TC10.10

More information

QB78 CO 2 Pellet Rifle

QB78 CO 2 Pellet Rifle QB78 CO 2 Pellet Rifle Maintenance Instructions Text and photos by George Fox Lang The Chinese QB78 pellet rifle is one of the nicest and most popular CO 2 rifles ever produced. Here are the long-wanted

More information

DYNATRAC BALL JOINT REBUILD INSTRUCTIONS V5.0

DYNATRAC BALL JOINT REBUILD INSTRUCTIONS V5.0 DYNATRAC PRODUCTS 2007-2018 JEEP JK HEAVY DUTY BALL JOINT JP44-2X3050-C DYNATRAC BALL JOINT REBUILD INSTRUCTIONS V5.0 WARNING: Improper use or installation of this product can cause major failures that

More information

Tooling Approving Report

Tooling Approving Report Project Name: Part Name: Tool Name: Tool source: Tool Steel: Resin: Project Number: Part Number: Tool Number: Customer: No of Cavities: Machine Size: CAVITY What is the customer required core hardness?

More information

JARVIS. Model Brisket Scissor EQUIPMENT... TABLE OF

JARVIS. Model Brisket Scissor EQUIPMENT... TABLE OF Model 423-17 Brisket Scissor EQUIPMENT SELECTION... Ordering No. TABLE OF CONTENTS... Page Model 423--17... 4037003 Air Filter / Regulator / Lubricator 3022003 Air Hose Assembly... 3059018 Balancer...

More information

CLASSIC 300D Kubota PARTS LIST FOR RETURN TO MAIN INDEX

CLASSIC 300D Kubota PARTS LIST FOR RETURN TO MAIN INDEX Illustration of Sub Assemblies Illustration of Sub Assemblies Illustration of Sub Assemblies Illustration of Sub Assemblies P-498 P-498 RETURN TO MAIN INDEX PARTS LIST FOR CLASSIC 300D Kubota P-498-A P-498-A

More information

Clearview Railing System Installation Instructions

Clearview Railing System Installation Instructions Clearview Railing System Installation Instructions Disclaimer: AGS Stainless, Inc. has its Clearview Railing Systems designed by a professional engineer to meet the requirements of the latest national

More information

NORWAY. Norwegian Industrial Property Office (12) APPLICATION (19) NO (21) (13) A1. (51) Int Cl.

NORWAY. Norwegian Industrial Property Office (12) APPLICATION (19) NO (21) (13) A1. (51) Int Cl. (12) APPLICATION (19) NO (21) 11782 (13) A1 NORWAY (1) Int Cl. E21B 43/00 (06.01) E21B 43/01 (06.01) E21B 43/12 (06.01) Norwegian Industrial Property Office (21) Application nr 11782 (86) Int.application.day

More information

BBF Series Blower Base Frame Assembly Instructions Rev.: BFA-9105

BBF Series Blower Base Frame Assembly Instructions Rev.: BFA-9105 BBF Series Blower Base Frame Assembly Instructions Rev.: BFA-9105 These assembly instructions are to be used as a general reference guide to facilitate assembly. Please consult the blower, bushing, sheave,

More information

OWNERS MANUAL. Model No LB. POLY PRO SPIKER/SPREADER. CAUTION: Read Rules for Safe Operation and Instructions Carefully

OWNERS MANUAL. Model No LB. POLY PRO SPIKER/SPREADER. CAUTION: Read Rules for Safe Operation and Instructions Carefully OWNERS MANUAL Model No. -0301 CAUTION: Read Rules for Safe Operation and Instructions Carefully 17 LB. POLY PRO SPIKER/SPREADER Safety Assembly Operation Maintenance Parts PRINTED IN U.S.A. FORM NO. 78

More information

Tech Unit No: Approved By: Quality Engineer Date: Lock-Set Packer

Tech Unit No: Approved By: Quality Engineer Date: Lock-Set Packer Tech Unit No: 0802340000 Revision: A Approved By: Quality Engineer Date: 11-5-2014 Lock-Set Packer Description: The MAP Model Lock-Set Retrievable Casing Packer is a general purpose packer for production,

More information

D300K 3+3 SE KUBOTA PARTS LIST FOR RETURN TO MAIN INDEX

D300K 3+3 SE KUBOTA PARTS LIST FOR RETURN TO MAIN INDEX Illustration of Sub Assemblies Illustration of Sub Assemblies Illustration of Sub Assemblies Illustration of Sub Assemblies P-737 P-737 RETURN TO MAIN INDEX PARTS LIST FOR P-737-A P-737-A ILLUSTRATION

More information

Assembly Instructions Nevins Phone Booth

Assembly Instructions Nevins Phone Booth Assembly Instructions Nevins Phone Booth Included Hardware Tools Required supplied by installer Drill & Bit Socket Wrench Bolt A - (16) 1/4-20 x 1-1/2 hex head Bolt B - (20) 1/4-20 x 2-1/4 phillips head

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS www.marwincompany.com Kit Number Door Height Rough Opening Height KD200BB68 80 84 ½ KD200BB70 84 88 ½ KD200BB80 96 100 ½ INSTALLATION INSTRUCTIONS 200BB SERIES KD POCKET DOOR FRAME FOR 2 X 4 STUD WALLS

More information

MUELLER GAS. DH-5/EH-5 Drilling. Reliable Connections. DH-5 Drilling Machine General Information 2. EH-5 Drilling Machine General Information 3

MUELLER GAS. DH-5/EH-5 Drilling. Reliable Connections. DH-5 Drilling Machine General Information 2. EH-5 Drilling Machine General Information 3 operating Instructions manual MUELLER GAS TAble of contents PAGE DH-5 Drilling Machine General Information 2 DH-5/EH-5 Drilling EH-5 Drilling Machine General Information 3 Operating Instructions 4-5 DH-5

More information

BETTIS SERVICE INSTRUCTIONS FOR MODELS G01 THROUGH G10 SERIES HYDRAULIC SPRING RETURN ACTUATORS WITH M11 HYDRAULIC OVERRIDE

BETTIS SERVICE INSTRUCTIONS FOR MODELS G01 THROUGH G10 SERIES HYDRAULIC SPRING RETURN ACTUATORS WITH M11 HYDRAULIC OVERRIDE ENGLISH LANUAGE BETTIS SERVICE INSTRUCTIONS FOR MODELS G01 THROUGH G10 SERIES HYDRAULIC SPRING RETURN ACTUATORS WITH M11 HYDRAULIC OVERRIDE PART NUMBER: 127072E REVISION: A DATE: December 2001 Page 1 of

More information

JANUARY 2002 ARMADILLO

JANUARY 2002 ARMADILLO JANUARY 2002 ARMADILLO Drillable End Plate Kit NOMENCLATURE End Plate Assembly Kit End Plate Assembly (Two - Section Shown) Sealant Roll Emery Cloth Application Procedure Cue Card Sealant Strips Cable

More information

Stargrip series 3000 Mechanical Joint Wedge Action Restraint for Ductile Iron Pipe

Stargrip series 3000 Mechanical Joint Wedge Action Restraint for Ductile Iron Pipe Stargrip series 3000 Mechanical Joint Wedge Action Restraint for Ductile Iron Pipe INFORMATION The Stargrip Mechanical Joint Restraint System is a unique product with a proven design that provides an exceptional

More information

15,000 psi 20,000 psi. BigBore IIe HPHT SUBSEA WELLHEAD SYSTEMS

15,000 psi 20,000 psi. BigBore IIe HPHT SUBSEA WELLHEAD SYSTEMS 15,000 psi 20,000 psi BigBore IIe HPHT SUBSEA WELLHEAD SYSTEMS DXe Gasket Profile DXe Locking Profile BigBore IIe SUBSEA WELLHEAD SYSTEM Mud Stick 18 ¾" BigBore IIe Wellhead Housing The BigBore IIe Subsea

More information

PRE-ENGINEERED HORSE STALL SYSTEMS SDFD SLIDING DOOR c/w FOLD-DOWN GRILL. & Assembly. Installation Instructions

PRE-ENGINEERED HORSE STALL SYSTEMS SDFD SLIDING DOOR c/w FOLD-DOWN GRILL. & Assembly. Installation Instructions PRE-ENGINEERED HORSE STALL SYSTEMS 4800 SDFD SLIDING DOOR c/w FOLD-DOWN GRILL & Assembly Installation Instructions 4800 SDFD Sliding Door c/w Fold-Down Grill Components - 1 3 /4" x 2" x 88" channels (2)

More information

535-Manual. Main Components. Pipe and Bolt Threading Machine. Printed in U.S.A. Ridge Tool Company/Elyria, Ohio, U.S.A.

535-Manual. Main Components. Pipe and Bolt Threading Machine. Printed in U.S.A. Ridge Tool Company/Elyria, Ohio, U.S.A. Pipe and Bolt Threading Machine -Manual Main Components 0 Screw, Button Head /" - 0 x /" () Washer, Flat /" ()" Top Cover 0 0 Cutter Assembly Stop Pin 0 Pin Reamer Assembly Carriage Assembly 0 Stop Screw

More information

HDL(M)6 Nut/Screw Assembly

HDL(M)6 Nut/Screw Assembly HDL(M)6 Nut/Screw Assembly Remove, repair, and reassemble the nut and screw assembly in your HDL series double lock vise. In these instructions when we refer to the front of the vise or nut/screw assembly,

More information