1 HUSSEY GAY BELL SAVANNAH, GEORGIA ADDENDUM NO. 3 TO THE CONTRACT DOCUMENTS AND TECHNICAL SPECIFICATIONS FOR 2.4 MGD CHAPIN WASTEWATER TREATMENT PLANT FOR TOWN OF CHAPIN, SOUTH CAROLINA AUGUST All Bidders and other interested parties are hereby notified of the following additions and/or revisions to the Plans and Specifications of the referenced project. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED ON THE BID PROPOSAL. *************************************************************************** PLANS 1. Please replace Sheet G5.6 with Revised G5.6 Addendum No. 3 Revisions Please see attached MD1.1 for clarity in reference to Question No Please add Yard Hydrant Detail 4. Please add Inside Drop Manhole Detail

2 PROJECT CLARIFICATIONS 1. DIGESTER DECANT PIPING: Drawing M6.0 is showing the piping layout for the Digester. Where section A cuts through the Digester, where the stairs are shown, we see Decant ( TYP ) called out and three pipe drawn in light weight lines. Looking at section view A on M6.1, we see the Decant piping on the outside of the Digester. Looking back at the plan view layout, we do not see a line extending away from the Digester. Also looking at the yard piping drawings G7.1 and G7.2, these drawings do not show the 8 line. Please review and clarify the Decant line piping. The plan view on M6.1 is accurate. The Town desires to have three independent decant outlets for the digester. Each outlet is set at a different height. Each decant outlet pipe has a plug valve for isolation for the main header. Each decant outlet pipe is offset both vertical and horizontally to allow for operation of the plug valve. The digester decant will need to be conveyed to MH#5. Please connect the decant line to the digester drain line after the plug valve using (1) 8x8 wye, (1) 8 45 bed and approximately 200 LF of 8 PVC pipe. 2. DIGESTER DECANT PIPING: Drawing M6.1 is showing the Decant piping on the outside of the Digester. Looking at the elevation view, we see the callout for (3) 8 PV with handwheel and SS chain operators. These are shown along the line of the vertical pipe going down into the ground. The way they are drawn, with light weight lines, it appears that they are behind the vertical pipe. There is also a callout for an 8 TEE ( TYP.). Looking above the elevation view, we see the plan view layout. This view is showing three plug valves in the pipe that comes out of the side of the Digester, before the pipe turn and extend over to the vertical decant pipe. We need some clarification on the quantity of valves to be provided at this location. The piping drawn appears to be showing six ( 6 ) plug valves. Please review and clarify the plug valves in the decant piping. Only (3) 8 plug valves are required. The three additional valves shown in Decant Details, A/M6.0 should not be visible in this section. 3. DIGESTER DECANT PIPING: Drawing M6.1 is showing the Decant piping on the outside of the Digester. We see the pipe penetrating the Digester tank wall. There is no indication for the type of penetration that is desired. Can wall sleeves and link seals be used at this location? Do you want wall pipe to be provided? Please review and clarify the penetrations in the Digester wall. Please use link seals with 304 stainless steel hardware at the three (3) 8 decant outlet connections. 4. RAS / WAS PUMP PAD: Drawing M10.0 is showing the layout for the three RAS / WAS pumps. We noticed that the discharge piping is drawn with a flanged 90 bend fitting above the pumps and then a valve is drawn. Then there is either a

3 flanged 90 bend fitting or a flanged tee fitting. Looking in the section B, the discharge piping has a callout at the valve stating 12 check valve and 12 plug valve. We take it that you have intended for the symbol for the plug to represent a plug valve and a check valve. Since this would mean that approximately another 12 has to be added to the discharge piping. We are wondering how that will affect the concrete pad the pumps and piping where they are installed. Does the pad need to be widened? Please review and clarify this pump pad and the piping. Please revise the pad width from 10 to 14 to accommodate the additional length from the valves. 5. SEPTAGE RECEIVING STATION: Drawing M1.3 is showing the Septage Receiving Station. We see a pipe between the Hauler Connection unit and the Septage Receiving unit in section A A. The note indicates that the contractor is to provide the pipe. There is no indication as to what material to use for the pipe. It appears to be drawn with possibly welded joints. Is the pipe to be PVC or maybe stainless steel? Please review and clarify the pipe between the two units. The piping is to be ductile iron or 304 stainless steel. 6. AERATION BASIN DIMENSIONS: Drawing M2.0 is showing the layout of the Aeration Basin. The plan view layout is indicating that it is drawn to a 1 /16 scale. Looking on the left side of the layout we see a dimension indicated, where the Section A / M2.1 symbol is located. This dimension is 8 1. Looking at the two surface aerators No - 1A and 1B, we see a dimension given between the two units. This dimension is We believe that these are in error. We have scaled the 8 Force Main pipe on the Aeration Basin. The branch line for the two plug valves, V201 and V202, scales to be 12 0 in the plan view. Looking in the section view E / M2.1, we scaled this same pipe and it measures 6 0. Please review and clarify the drawing scale references. The plan view scale is incorrect on M2.0. It should be 1/8 =1. 7. The geotech report states the bar screen area have existing fill material removed and replaced with structural fill. Should this over excavation/undercut work be included in the bid? If it is, what limits is this to be performed and are there any utilities in this area that may be in conflict with this over excavation. Please include the over excavation and structural fill required per the Geotech Report under Section I, Item 1. Headworks. The quantity of over excavation to include in the bid proposal is 200 CY. Over excavation is not anticipated to present any additional utility conflicts in the headworks area. 8. Is blasting allowed? No. 9. Bid form Can the bid form be revised to include all base bid equipment and list

4 alternate deducts in lieu of writing in all prices? This may be troublesome for last minute changes. No. 10. What constitutes a good faith effort for the MBE requirement? MBE Requirements will not apply to this project. 11. Who is responsible for the gravel driveway access to TMS shown on plan sheet G3.0? The Contractor is responsible for installation of the gravel driveway as part of this project. 12. Is the contractor or the town responsible for the maintenance plan for Holly Oak Lane? The Contractor will be responsible for maintaining Holly Oak Lane during construction. 13. Please clarify where the second screen is to be installed per Only one is shown on drawing M1.0. Please remove all references to the second screen in Section The Contractor is responsible for installing the existing MN Water Screen owned by the Town. A manual bar rack is to be installed as the second screen. 14. Please confirm an office is not required to be provided for the owner s on-site representative. An office is not required for the Owner s representative. 15. Please confirm the owner will provide all water, power, and chemicals for testing at no cost. The Contractor is responsible for any temporary power and water service required for construction, construction trailer and testing. Water service is provided thru the Cityof Columbia. 16. The response to question 14 on Addendum 2 was cut off. Please repost the Answer. Number 14 on Addendum No. 2 Specification Section The measurement and payment calls for unit price work to cover authorized changes in scope of lump sum work in Section I and II.

5 Is this to mean the contractor is to include all rock excavation in the base bid and only authorize changes to scope will make the rock pay item accessible? Section III Unit Price Pay Items: Sidewalk: The Owner will pay the Contractor per linear foot of 5 sidewalk installed at the unit price provided in the contract. Rock removal: The quantity of rock in the bid proposal has been estimated using the Geotechnical Report and the proposed construction plans. The Owner will pay the Contractor per cubic yard for the removal and disposal of rock encountered during construction. 17. Please confirm if all Ductile iron piping is to be restrained with Flex-Ring/Lok-Ring or Gripper Gaskets. All ductile iron pipe is to be restrained. 18. EFFLUENT LINE CHECK VALVE VAULT: Drawing M9.0 is showing the detail of the check valve vault. The effluent pipe is going through the precast vault walls. The pipe needs flanges to connect to the gate valves. Since this is a yard pipe in a vault, we were wondering if a Uni-flange or a Megaflange could be used at this location to facilitate the installation. See specification section , Flange adapters are not shown in the detail. Please review and advise. A Uni-flange or megaflange is acceptable. 19. FLANGE BOLT SETS: We were wondering about flanged pipe joints in valve vaults. Do you want the carbon steel bolts described in the ductile iron specification section? Are galvanized or stainless steel bolts and nuts required in valve vaults? Please review and clarify the flange bolt and nuts in valve vaults. Standard hardware is acceptable for valve vault applications. 20. CHLORINE CONTACT CHAMBER DRAIN LINES: Drawing G7.2 is showing the two 8 drain lines coming out from the Chlorine Contact Chamber structure. We note the two callouts on the east side of the structure for an 8 90 and an 8 PV. Also there is the callout for the 8 tee and an 8 PV. Looking at the enlarged layout of the structure on sheet M4.0, the two drain lines coming out from the structure do not have the indication of PV, plug valves, in the lines. There are mud valves inside the structure to control the draining of the basins. Please review and clarify the two 8 PV outside the structure. The drain lines for the Chlorine Contact Chamber are shown correctly on M4.0. Please provide two (2) mud valves as shown on M4.0 (Valve #401 and #402). No plug valves are required at this structure.

6 21. DRAIN LINES IN THE YARD: Do the PVC SDR 26 drain lines have to be restrained? We are assuming that they will have gasketed SDR 26, PVC fittings. There are MJ fittings where the drain lines transition from ductile iron pipe to SDR 26 PVC pipe. We are listing MJ gland accessory sets with transition gaskets to PVC sewer pipe. Pleases review and clarify. PVC yard drain piping does not need to be restrained. Drain piping under structures will be restrained joint ductile iron pipe and fittings. Transition kids will be required. 22. DIGESTER DRAIN LINE: Drawing G7.2 is showing the digester and the 8 drain line going to manhole number 5. The callout inside the digester indicates, 57 LF of 8 D.I. P, ( SDR 26 ). The SDR 26 reference should be for PVC sewer pipe. The drain line under the digester is ductile iron piped as shown on drawing M6.0. Sheet G7.2 does not show a plug valve in the drain line. Drawing M6.0 does show a plug valve in the drain line. This valve does not appear in the valve schedule. Since the drain line is so short going to manhole # 5, can it continue as ductile iron which would facilitate the installation of the MJ plug valve? Please review and clarify the digester drain line. The drain line is shown correctly on M6.0 and will need to include the plug valve. Please note that the digester decant is also going to connect to this line per clarification in this addendum with a 8 wye. The entire length of drain line should be 8 DIP from the digester to MH # DIGESTER DRAIN LINE: Drawings M6.0 and 6.1, show the 8 drain line coming out from under the digester tank. We do not see an elevation indicated on these sheets. We do notice the invert elevations indicated at manhole no 5. The south west line invert is indicated to be Is this the elevation of the pipe under the digester tank? Please review and clarify the drain line elevation under the digester tank. The 8 drain line will need to extend from the center of the digester with a minimum 0.40 % slope to MH #5. The center line of the 8 90 bend on the drain line at the center of the digester should be This invert at the digester would result in an approximately invert of at MH#5 and still require an inside drop. 24. DROP MANHOLE: Drawing M6.0 is showing manhole no 5. There are two callouts at the manhole for inside drop on the W west and SW south west lines. We looked in the drawing and did not find a detail of a drop manhole. We did find the standard manhole on sheet MD1.0, but it did not show any piping inside the manhole. Drawing G7.2 is also showing manhole no 5 but does not indicate any drop requirements. Please review and clarify the drop manhole piping required. Inside drop piping is required. Please see attached detail.

7 25. SANITARY SEWERAGE CLEANOUT: Specification section , 2.1, C, - Cleanouts lists item numbers 5, 6 & 7. Item 5 appears to be describing a 26 diameter manhole ring and cover. Items 6 appears to be describing a precast concrete manhole components. Item 7 seems to be describing the base of the manhole. Please review and clarify the requirements for the sewer cleanouts. Also provide a detail of a sewer line cleanout. The clean out detail we did find was showing what appears to be MJ pipe and fittings. There is a clean out detail on MD1.1 which should be used for plant drain piping. There are clean out details on PB2.1 which pertain to the admin building. 26. PW PLANT WATER PIPE LINE: Drawing G7.2 is showing the 6 PW Plant Waterline extending around the plant site. We have not found any indication on the plan sheet as to what pipe material to use for this water line. The specifications in section , A & C are describing ductile iron pipe and AWWA C900, class 150 PVC pipe. Please review and advise as to which pipe to use for the buried PW Plant Water line around the plant site. Plant water piping that is above ground was clarified in Addendum No. 2 Buried plant water piping can be either ductile iron pipe of C900 PVC, purple color. Plant water piping under paved traffic areas must be ductile iron pipe. 27. PW PLANT WATER PIPE LINE: Drawing G7.2 is showing the 6 PW Plant Waterline extending around the plant site. We note that the various fittings in the line are designated to be RJ, restrained joint. We need to know if the pipe also should be restrained. Please review and clarify the restraint of the pipe runs. All plant water piping should be restrained. 28. PW PLANT WATER PIPE LINE: Drawing G7.2 is showing the 6 PW Plant Water line extending around the plant site. If the PW water line is to be PVC, does it need to be colored purple? Yes. 29. PW PLANT WATER PIPE LINE: Drawing G7.2 is showing the 6 PW Plant Waterline extending around the plant site. What is the minimum depth of bury for the PW water line? Minimum depth of bury is PW PLANT WATER HOSE BIBBS: The Utility Piping Plan is showing hose bibb stations around the plant site, with a reference of HB. There is no detail referenced or indicated. We found some details on sheet MD1.1 for Wash Hose

8 Station and Hose Bibbs. The printing of the wording in the details is distorted and hard to read. Please reissue this sheet with the wording clearly shown. We also need to know what piping material to use for the vertical risers up to the hose bibbs. Is the pipe PVC or is it to be copper pipe? Please review and clarify. Please see MD1.1 attached. 31. EFFLUENT FORCE MAIN : Drawing G6.1 is showing the 12 PVC Effluent Force Main extending away from the Effluent Pump Station to the connection point with the existing pipe. The callout for pipe is 12 PVC C900 Force Main, RJ. Looking in the specifications for the class of pipe, we looked in section Sanitary Sewer, which states in paragraph 1.1, Summary, A, 2, Force Main. We looked down in paragraph 2.1, Materials, A - Pipe and fittings, we did not find a listing for C900 PVC pipe. The only listing for C900 PVC pipe is in section Water Distribution. Please review and clarify the C900 PVC pipe to be provided for the Effluent Force Main line. Effluent force main shall be 12 RJ C900 DR 18 (Class 150). Green color is required. 32. Specification Section Laboratory Fume Hoods. 2.2 Manufactures. We would like to request5 that Mott Manufacturing be included as an acceptable manufacturer for Chemical Fume hoods. Mott is not approved as an acceptable manufacturer for chemical fume hoods. 33. Specification Section Laboratory Casework 2.3.A Manufacturers we would like to request approval of Mott Manufacturing for this section as well. Usually the hoods and lab casework is provided by the same company for coordination purposes. Mott is not approved as an acceptable manufacturer of lab casework Specification Section Laboratory Fume Hoods 2.6.A Work surfaces. Typically a fume hood, worktop is 1.25 thick at the outer edge and dished or recessed to 1 thick. Please advise if 1 thick or 1.25 thick is required. Per Spec A, the work surface is 1 thick with ½ raised edges at sides and rear. 35. Specification Section Laboratory Fume Hoods 2.7.A fume hood base cabinets. Base cabinets beneath fume hoods take a lot of abuse. Would the Architect entertain changing material type to Galvanized Steel as an extra layer of protection against corrosion in this area. The cabinets would also be painted to match hood per SEFA standards. Provide base cabinet as specified in Section

9 36. In an effort to provide the Town of Chapin an accurate and cost beneficial bid we request Section I Lump Sum Pay Item in the Bid Proposal be changed to one Lump Sum number encompassing all items currently included in Section I. After the bid the lowest 2-3 contractors could be required to provide a breakout similar to the current Section I. The current bid form is at the request of the Town of Chapin and shall be used. 37. Provide list of equipment that needs to be included in Section II No. 7 of the bid Proposal. The balance of all other major equipment required for a complete and operable plant (not included in Section II No. 1 through 6). 38. Advise if under slab piping needs to be encased in concrete. All piping under structures must be encased in concrete. Piping under slabs such as driveways, housekeeping pads or building floors does not need to be encased in concrete. 39. Provide the required Bid Bond form for the proposal as required in the Invitation to Bid. Please use a Surety Company s Standard Bid Bond form. 40. Spec Section Paragraph 2.03C states The handrailing shall be in conformance with the handrail specifications found within this set of bid documents. We cannot locate any handrail specification in the TOC or within the specifications. Please provide a handrail specification or revise the secondary clarifier specification to include handrail spec language. Please see Addendum No. 2 which includes Specification Section Aluminum Pipe and Tube Railings. 41. EFFLUENT PUMP STATION FORCE MAIN: Drawing G6.1 is showing the 12 PVC C900 force main extending out to the existing PVC Effluent Line at Holy Oak Lane. Looking on sheet G7.1 - Process Piping Plan, we see the Effluent Pump Station Force Main also shown. Sheet G7.1 has a note that indicates to install a 12 RJ plug and abandon in place old plant effluent line. Sheet G6.1 does not have this note. It indicates to cut and tie to existing effluent line. Is the plug to be installed? Please clarify. Please install the RJ plug per sheet G7.1. The effluent line from the old plant any be utilized at a later date by the Town. 42. VALVE SCHEDULE: Valve tag number V001 is listed twice, for the 2 gate valves with the 2 square nut operators. These are the first two valves at the top of the schedule.

10 Correct the second valve tag number to #V002 for 2 water to eye wash at chemical tanks. 43. DRAIN PIPING YARD : Addendum No 2, item no 56, response states that all drain piping that is not under a slab can be C900, SDR 26. Our understanding of pressure rated PVC pipe with a class of SDR 26, is PR160, D2241, bell joint pipe, which has a steel pipe outside diameter. PVC pipe that is made per AWWA C900 standards has a ductile iron pipe outside diameter. We are assuming that you want to have the steel pipe size drain pipe. We want to know what type of fitting do you want to have with the SDR 26 PVC pipe? There are a few fittings shown on the yard piping plan. Please clarify that you want the SDR 26 steel pipe size drain pipe and what fittings to use with the pipe. Drain piping that is not under the slab can be ASTM F 794 per Section , 2.1A Please provide a detail for the concrete paving at the Headworks. Please see Revised Sheet G5.6 dated Addendum No. 3 Revisions In our last list of questions, item 4, asked about the PVC drain pipe materials. In addendum No 2, you had indicated that the drain pipe not under a slab can be C900, SDR 26. Our initial understanding of the drain line notation or callout on Sheet G7.2, 8 PVC SDR 26 let us to believe that the yard drain pipe would be PVC sewer pipe, with a class rating of SDR 26. The yard drain lines also include the 4 sanitary drain line coming from the Administration Building. This is a heavy wall sewer pipe and fitting system. Specification section Sanitary Sewerage, does not list the C900, SDR 26, pipe material. This is making us wonder if it should be considered for use in a gravity flow line. Please clarify if the SDR 26 sewer pipe and fittings are acceptable for the yard drain lines. 46. On Sheet M8.0, the section view of the Plant Drain Lift Station calls for the wetwell interior to be coated per Should this be per Spec Section ? This is correct. Please coat per Section End of Addendum #3

June 10, 2014 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA

June 10, 2014 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA June 10, 2014 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA ADDENDUM NO. 5 BID NO. Y14-792 PH IFB EAST SERVICE AREA POTABLE WATER AND RECLAIMED WATER STORAGE AND REPUMP FACILITY BID OPENING: June

More information

SAUSALITO-MARIN CITY SANITARY DISTRICT MISCELLANEOUS UPGRADES PROJECT. Addendum No. 2

SAUSALITO-MARIN CITY SANITARY DISTRICT MISCELLANEOUS UPGRADES PROJECT. Addendum No. 2 SAUSALITO-MARIN CITY SANITARY DISTRICT MISCELLANEOUS UPGRADES PROJECT Addendum No. 2 The following shall modify the Contract Documents. The work shall be accomplished in accordance with such modifications.

More information

ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO.

ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO. ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO. PS 061 SEVEN SPRINGS WASTEWATER TREATMENT FACILITY IMPROVEMENTS PASCO COUNTY,

More information

NEWTON COUNTY WATER AND SEWERAGE AUTHORITY RESIDENTIAL, COMMERCIAL, INSTITUTIONAL AND INDUSTRIAL SUBDIVISIONS CONSTRUCTION PLANS CHECK LIST

NEWTON COUNTY WATER AND SEWERAGE AUTHORITY RESIDENTIAL, COMMERCIAL, INSTITUTIONAL AND INDUSTRIAL SUBDIVISIONS CONSTRUCTION PLANS CHECK LIST NEWTON COUNTY WATER AND SEWERAGE AUTHORITY RESIDENTIAL, COMMERCIAL, INSTITUTIONAL AND INDUSTRIAL SUBDIVISIONS CONSTRUCTION PLANS CHECK LIST Project Name Checked By Date Designer Check List marks to be

More information

This addendum forms a part of the Contract Documents dated: August 10, 2012.

This addendum forms a part of the Contract Documents dated: August 10, 2012. Addendum # 1 Date Issued: August 28, 2012 Issued By: Project: Owner: Renker Eich Parks Architects 1609 Dr. Martin Luther King Street North St. Petersburg, Florida 33704 Ph# (727) 821-2986 Fax # (727) 896-4911

More information

SECTION MANHOLES

SECTION MANHOLES SECTION 02601 MANHOLES PART 1 GENERAL 1.01 SCOPE OF WORK A. WORK required under this section consists of all materials, accessories, equipment, tools, and labor required to install precast concrete standard

More information

ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030 ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO. 2018-008-COM.00030 To: Prospective Bidders of Record Date: January 8, 2019 The following changes, additions, revisions, and/or deletions

More information

Engineering and Construction Services Division Construction Drawings for Sewers and Watermains. T No. Revision T No. Revision Remarks All T drawings

Engineering and Construction Services Division Construction Drawings for Sewers and Watermains. T No. Revision T No. Revision Remarks All T drawings Engineering and Construction Services Division Construction Drawings for Sewers and Watermains Revision No. 8 April All T drawings New title block for each drawing is now standardized. Revision numbers

More information

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION 4.0. INTRODUCTION PART 4 STANDARD DRAWINGS FOR CONSTRUCTION In this document, Ivins City adopts the most recent edition (currently 2007), including all amendments, of the APWA Utah Chapter s Manual of

More information

MANHOLES PART I: GENERAL. A. Precast Concrete Manholes

MANHOLES PART I: GENERAL. A. Precast Concrete Manholes MANHOLES PART I: GENERAL A. Precast Concrete Manholes 1) Manholes shall be made of precast concrete sections of which the top section shall be eccentric or flat slab top. The bottom section shall be a

More information

PALM COAST WASTEWATER TREATMENT PLANT NO. 2

PALM COAST WASTEWATER TREATMENT PLANT NO. 2 ITB-CD-CME--0 ADDENDUM NO. PALM COAST WASTEWATER TREATMENT PLANT NO. ISSUE DATE: December 0, 0 BID DATE: January 0, 0 SUBJECT: Statements, Questions and Answers INTENT: This addendum is issued prior to

More information

September 21, Mannik Smith Group 1771 North Dixie Highway Monroe, Michigan RE: LA Fitness City File No.: CVLP

September 21, Mannik Smith Group 1771 North Dixie Highway Monroe, Michigan RE: LA Fitness City File No.: CVLP CITY OF ANN ARBOR, MICHIGAN Public Services Area / Engineering 301 E. Huron Street, P.O. Box 8647 Ann Arbor, Michigan 48107 Phone (734) 794-6410 Fax (734) 994-1744 Web: www.a2gov.org Printed on recycled

More information

SECTION III STANDARD DRAWINGS ROYSE CITY GENERAL CONSTRUCTION NOTES & DETAILS

SECTION III STANDARD DRAWINGS ROYSE CITY GENERAL CONSTRUCTION NOTES & DETAILS 9. STANDARD DETAILS SECTION III STANDARD DRAWINGS ROYSE CITY GENERAL CONSTRUCTION NOTES & DETAILS j:\clerical\royse city\1-4086 general services\168-tech const standards review\tcss manual\2018 tcss manual\sec-9a

More information

Grease Interceptor Design Checklist

Grease Interceptor Design Checklist CHECKLIST C2 Revised 5/2/2016 Grease Interceptor Design Checklist Public Works DISCLAIMER - This checklist is provided to Consulting Engineers for the express purpose of assisting them in compiling private

More information

REGIONAL TRANSIT AUTHORITY PUBLIC NOTICE. IFB Rail Expansion (Streetcar) Rampart Street. Addendum IV

REGIONAL TRANSIT AUTHORITY PUBLIC NOTICE. IFB Rail Expansion (Streetcar) Rampart Street. Addendum IV REGIONAL TRANSIT AUTHORITY PUBLIC NOTICE IFB 2014-014 Rail Expansion (Streetcar) Rampart Street Addendum IV Acknowledge receipt of this addendum in the bid submission. This addendum is a part of the Contract

More information

INSTALLATION INSTRUCTIONS. March 2016 FOR FURTHER QUESTIONS, PLEASE CALL

INSTALLATION INSTRUCTIONS. March 2016 FOR FURTHER QUESTIONS, PLEASE CALL March 2016 INSTALLATION INSTRUCTIONS FOR FURTHER QUESTIONS, PLEASE CALL 775 440 2025 JENSEN WATER RESOURCES 521 Dunn Circle, Sparks, NV 89431 JensenPumps.com Figure 1: This illustration shows a complete

More information

Pipe Product Catalog Table of Contents

Pipe Product Catalog Table of Contents Pipe Product Catalog Table of Contents Section A: Drawing #: Page Description A1 Reinforced Concrete Pipe A3 Storm Manhole Sizing Chart (48" - 96") A3.1 Storm Manhole Sizing Chart (108" - 144") A4 48"

More information

UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1

UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1 UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1 ENGINEERING STANDARDS FOR UTILITY AND STREET CONSTRUCTION PLANS MARCH 2014 CONSTRUCTION PLAN SHEET FORMAT REQUIREMENTS REPRODUCIBLE MYLAR 1.

More information

CHARLES COUNTY GOVERNMENT ITB NO ST. MARK S PUMP STATION UPGRADE

CHARLES COUNTY GOVERNMENT ITB NO ST. MARK S PUMP STATION UPGRADE CHARLES COUNTY GOVERNMENT Department of Fiscal and Administrative Services Purchasing Division Telephone: 301-645-0656 August 30, 2016 ITB NO. 17-07 ST. MARK S PUMP STATION UPGRADE ADDENDUM NUMBER THREE

More information

Oil-Water Separator Design Checklist

Oil-Water Separator Design Checklist CHECKLIST C3 Revised 5/2/2016 Oil-Water Separator Design Checklist DISCLAIMER - This checklist is provided to Consulting Engineers for the express purpose of assisting them in compiling private oil-water

More information

Appendix C Construction Details

Appendix C Construction Details 7172 Kennedy Road Warrenton, Virginia 20187 Appendix C Construction Details November 2017 TABLE OF CONTENTS THRUST BLOCKS Anchorage for 11 1/4 o, 22 1/2 o & 45 o Upper Vertical Bends... AV 01 Buttresses

More information

Existing and proposed contours at 1-foot intervals. The fill and/or excavation quantities in cubic yards.

Existing and proposed contours at 1-foot intervals. The fill and/or excavation quantities in cubic yards. PLAN REQUIREMENTS The plans for street design shall conform to the requirements of Sections 3 and 4. The following requirements shall also be shown on the plans where applicable. Road and Storm Plans:

More information

RECORD DRAWINGS REVISED TO CONFORM TO CONSTRUCTION RECORDS PROVIDED BY CONTRACTOR GMG BY DATE 11/13 CRS NO.

RECORD DRAWINGS REVISED TO CONFORM TO CONSTRUCTION RECORDS PROVIDED BY CONTRACTOR GMG BY DATE 11/13 CRS NO. CELL: (715) 803-8009 MABOSI@WISCONSINPUBLICSERVICE.COM CELL: (715) 573-7806 CHVIRCKS@WISCONSINPUBLICSERVICE.COM CALVIN.KLADE@FTR.COM DGAU@KRONENWETTER.COM SCOTT OLSEN (715) 302-1348 S REVISED TO CONFORM

More information

MEDIUM DUTY CAST IRON SLIDE GATES SERIES 20-10C

MEDIUM DUTY CAST IRON SLIDE GATES SERIES 20-10C MEDIUM DUTY CAST IRON SLIDE GATES SERIES 20-10C Revised October 2007 Armtec reserves the right to alter designs. General The Armtec Sluice Gate is a quality and highly economical gate for a variety of

More information

ALUMINUM PIPE GUIDERAIL 01/01/

ALUMINUM PIPE GUIDERAIL 01/01/ NOTES PIPE RAILING & POSTS: Structural Tube, Pipe and Bar shall be in accordance with ASTM B22 or ASTM B429, Alloy 606-T6. End Rail 90 bends and corner bends with maximum 4-0" post spacing, may be Alloy

More information

MSD STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY

MSD STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY MSD M etr o p olitan S e w e r Di s t r ict STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY 40203-1911 STANDARD DRAWINGS DIVISION

More information

STEEL PIPE GUIDERAIL 01/01/

STEEL PIPE GUIDERAIL 01/01/ NOTES PIPE RAILING & POSTS: Pipe Rails and s shall be in accordance with ASTM A5 Grade B for standard weight pipe and ASTM A500 Grade B, C or D or ASTM A50 for structural tube. Bars for handrail supports

More information

CITY OF TOMBALL. Section FIRE HYDRANTS 1.01 SECTION INCLUDES. A. Fire hydrants. B. Adjustment of fire hydrants and gate valves.

CITY OF TOMBALL. Section FIRE HYDRANTS 1.01 SECTION INCLUDES. A. Fire hydrants. B. Adjustment of fire hydrants and gate valves. Section 02520 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Fire hydrants. B. Adjustment of fire hydrants and gate valves. 1.02 MEASUREMENT AND PAYMENT A. Unit Prices. 1. Payment is on a unit price basis

More information

CS3 represents manufacturers of products for use in the municipal waterworks industry.

CS3 represents manufacturers of products for use in the municipal waterworks industry. Brian Drexel & Rob Grier WWW.CS3WATERWORKS.COM Established in 2000, CS3 Waterworks is a Florida Based company with offices in Orange Springs Florida and Savannah Georgia. CS3 represents manufacturers of

More information

STANDARD CATCH BASIN GUTTER LINE CB INLET FRAME & GRATE, GROUTED TO GRADE RINGS AS REQ'D CONCRETE CURB FINISHED GRADE ASPHALT MAX 50 MIN

STANDARD CATCH BASIN GUTTER LINE CB INLET FRAME & GRATE, GROUTED TO GRADE RINGS AS REQ'D CONCRETE CURB FINISHED GRADE ASPHALT MAX 50 MIN CB INLET FRAME & GRATE, GROUTED TO GRADE RINGS AS REQ'D ASPHALT 20 GUTTER LINE CONCRETE CURB FINISHED GRADE PRECAST GRADE RINGS, 2 50 100 MAX PRECAST CB LID GROUT ALL AROUND CB LEAD, INSIDE & OUTSIDE OF

More information

SECTION III SUBMITTALS AND APPROVALS

SECTION III SUBMITTALS AND APPROVALS SECTION III SUBMITTALS AND APPROVALS In order to expedite the approval process of new water distribution system and sanitary sewer collection system extensions, the Hilton Head No. 1 Public Service District

More information

CITY OF MUSKEGO DRAFTING STANDARDS

CITY OF MUSKEGO DRAFTING STANDARDS CITY OF MUSKEGO DRAFTING STANDARDS GENERAL - These standards apply to all plans. 1. Plans must be prepared on sheets measuring 36 inch across and 22 inch to 24 inch high unless otherwise specified under

More information

Valley Road Main Replacement

Valley Road Main Replacement Bonding Provided Construction Co., Construction, Construction, 5% 5% 5% 5% 5% 5% 5% acknowledged 2 - Bidder Acknowledges Receipt of Addendums there was only 1 Affadivit of Preferential Bidders Status not

More information

ADDENDUM NO. 02 July 31, 2012

ADDENDUM NO. 02 July 31, 2012 Post Point Wastewater Treatment Plant Improvements Owner: Engineer: GC/CM: City of Bellingham Carollo Engineers Mortenson Construction ADDENDUM NO. 02 July 31, 2012 THIS ADDENDUM MUST BE ACKNOWLEDGED ON

More information

BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006

BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006 Project Name: BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006 Phase: Unit: # Lots: Development Type (residential, commercial, industrial, etc.) Braselton Project No.

More information

ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS

ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS ADDENDUM NO. TWO To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS Prepared By: ARCHITECT Bhide & Hall Architects, P.A. 1329-C Kingsley

More information

ROUTES: 65 SECTIONS: miles in length. THE FOLLOWING ITEMS AND APPROXIMATE QUANTITIES ARE INVOLVED:

ROUTES: 65 SECTIONS: miles in length. THE FOLLOWING ITEMS AND APPROXIMATE QUANTITIES ARE INVOLVED: ARKANSAS DEPARTMENT OF TRANSPORTATION CA0801 HWY. 110 - CLINTON (WIDENING) (S) FEDERAL AID PROJECT ACNHPP-0071(31) THE PURPOSE OF THIS PROJECT IS TO WIDEN HIGHWAY 65 IN VAN BUREN COUNTY. THIS PROJECT CONSISTS

More information

VILLAGE OF VILLA PARK CENTRAL BOULEVARD IMPROVEMENTS LOCATION MAP (NOT TO SCALE) CORTESI AVE. MYRTLE AVE. CENTRAL BLVD.

VILLAGE OF VILLA PARK CENTRAL BOULEVARD IMPROVEMENTS LOCATION MAP (NOT TO SCALE) CORTESI AVE. MYRTLE AVE. CENTRAL BLVD. Q:\VillaPark_IL\11283000 Astor-Myrtle Sewer Separation Preliminary Design\D.4 CAD\Sheets\North\1. Cover.dwg INDEX OF SHEETS 1 COVER 2 GENERAL NOTES 3 SUMMARY OF QUANTITIES 4 ALIGNMENT 5-9 DRAINAGE AND

More information

UPDATE LOG FOR STANDARD DRAWINGS Item(s) Changed 6/1/18 STANDARD DRAWINGS

UPDATE LOG FOR STANDARD DRAWINGS Item(s) Changed 6/1/18 STANDARD DRAWINGS Date 6/1/18 STANDARD DRAWINGS UPDATE LOG FOR STANDARD DRAWINGS Item(s) Changed WATER STANDARD DRAWINGS Title Drawing Number Current Date Fire Hydrant and Appurtenance Locations, Improved Streets with Curb

More information

ACSA PLAN REVIEW CHECKLIST (Guideline Only) (4) Standard water and sewer general plan notes (attached).

ACSA PLAN REVIEW CHECKLIST (Guideline Only) (4) Standard water and sewer general plan notes (attached). ACSA PLAN REVIEW CHECKLIST (Guideline Only) Revised: December 3, 2015 General (1) Proper Title (2) Vicinity map on first sheet. (3) Date and latest plan revision. (4) Standard water and sewer general plan

More information

A. Radius elbows with a construction radius of 1.5 the duct width are preferred to square elbows.

A. Radius elbows with a construction radius of 1.5 the duct width are preferred to square elbows. SECTION 233100 DUCTWORK 1.0 Acoustical duct lining in any part of the duct system is prohibited. All ductwork requiring insulation shall be externally insulated (Refer to the Sheet Metal Ductwork Insulation

More information

The Manitoba Water Services Board SECTION Standard Construction Specifications September 2013 Page 1 of 8

The Manitoba Water Services Board SECTION Standard Construction Specifications September 2013 Page 1 of 8 September 2013 Page 1 of 8 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the construction of air release chambers, flushout chambers, valve chambers, meter chambers

More information

Introduction. Classifications of piping: Industrial. Residential (i.e., plumbing) Carries liquids and gases used in the manufacture of products

Introduction. Classifications of piping: Industrial. Residential (i.e., plumbing) Carries liquids and gases used in the manufacture of products Plumbing Plans Introduction Classifications of piping: Industrial Carries liquids and gases used in the manufacture of products Residential (i.e., plumbing) Carries fresh water, gas, liquid, solid waste

More information

ADDENDUM #1. April 29, 2009

ADDENDUM #1. April 29, 2009 April 29, 2009 Re: HACC, Central Pennsylvania s Community College Midtown 1 CCTA Phase 2 Solicitation # 09-17 From: Eastern pcm, LLC Construction Manager HACC 212 Locust Street, Suite 604 Harrisburg, PA

More information

MH Table of Contents Standard Title/Scope Page Table of Contents SCE Public

MH Table of Contents Standard Title/Scope Page Table of Contents SCE Public MH Table of Contents Standard Title/Scope MH 300 MH 310 MH 318 MH 320 MH 325 MH 330 MH 335 MH 340 MH 350 Manholes Requirements MH 300.1 Manholes Requirements...........................................

More information

SECTION PRECAST CONCRETE SECTIONAL MANHOLES

SECTION PRECAST CONCRETE SECTIONAL MANHOLES SECTION 02545 PRECAST CONCRETE SECTIONAL MANHOLES PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. Precast reinforced concrete cylindrical sectional manholes, complete with openings, inserts, hardware,

More information

Plan Review and Standards

Plan Review and Standards Plan Review and Standards Minnesota Rules, part 4720.0010, states that prior to the installation, alteration, or extension of any water supply infrastructure, plans and specifications must be submitted

More information

This specification describes the minimum requirements for service water piping systems (ie: cooling water, process water, etc.), located on surface.

This specification describes the minimum requirements for service water piping systems (ie: cooling water, process water, etc.), located on surface. SPEC-3500 1/9 1.0 PURPOSE This specification describes the minimum requirements for service water piping systems (ie: cooling water, process water, etc.), located on surface. Note: This specification does

More information

1.1 GENERAL RECORD DRAWING REQUIREMENTS

1.1 GENERAL RECORD DRAWING REQUIREMENTS Page 1 of 5 VILLAGE OF ROMEOVILLE RECORD DRAWINGS CHECKLIST PART I GENERAL Record drawings are required to provide a means of schematic verification that the intent of the approved engineering design has

More information

STANDARD BID ITEM NUMBERS

STANDARD BID ITEM NUMBERS 10701 TRAFFIC CONTROL LUMP SUM 10702 Traffic Control for Storm Sewer Installation LUMP SUM 10703 Traffic Control for Water Main Installation LUMP SUM 10704 Traffic Control for Sanitary Sewer Installation

More information

Stargrip series 3000 Mechanical Joint Wedge Action Restraint for Ductile Iron Pipe

Stargrip series 3000 Mechanical Joint Wedge Action Restraint for Ductile Iron Pipe Stargrip series 3000 Mechanical Joint Wedge Action Restraint for Ductile Iron Pipe INFORMATION The Stargrip Mechanical Joint Restraint System is a unique product with a proven design that provides an exceptional

More information

CITY OF PITTSBURG ENGINEERING DEPARTMENT CONTRACT NO A WATER TREATEMENT PLANT CAPITAL IMPROVEMENTS PHASE 1A ADDENDUM #1 FENCE AND DITCH AUGUST

CITY OF PITTSBURG ENGINEERING DEPARTMENT CONTRACT NO A WATER TREATEMENT PLANT CAPITAL IMPROVEMENTS PHASE 1A ADDENDUM #1 FENCE AND DITCH AUGUST CITY OF PITTSBURG ENGINEERING DEPARTMENT CONTRACT NO. 2012-16A WATER TREATEMENT PLANT CAPITAL IMPROVEMENTS PHASE 1A ADDENDUM #1 FENCE AND DITCH AUGUST 2014 CHAIN LINK FENCE SPECIFICATIONS Chain link fence,

More information

Section COUPLINGS AND COUPLING ADAPTERS. This Section covers couplings and coupling adapters for ductile iron and steel pipe.

Section COUPLINGS AND COUPLING ADAPTERS. This Section covers couplings and coupling adapters for ductile iron and steel pipe. PART 1 GENERAL 1.01 SUMMARY Section 15155 This Section covers couplings and coupling adapters for ductile iron and steel pipe. 1.02 MEASUREMENT AND PAYMENT A. No separate payment for Work performed under

More information

DIVISION APPROVED MATERIAL LIST AND STANDARD DETAILS

DIVISION APPROVED MATERIAL LIST AND STANDARD DETAILS DIVISION 400 - APPROVED MATERIAL LIST AND STANDARD DETAILS Section 403 - STANDARD DETAILS TABLE OF CONTENTS DIVISION 400, Section 403 - STANDARD DETAILS SECTION DETAIL NOS. Application Table 403-1 I. Concrete

More information

3. DESIGN SPECIFICATIONS

3. DESIGN SPECIFICATIONS Schedule H to Bylaw 7452, Subdivision Bylaw Page 10 3. DESIGN SPECIFICATIONS 3.1 General 3.1.1 The Design Specifications apply to the design of sanitary sewers, storm drains, waterworks, roadways, and

More information

SECTION 095 SPECIFICATIONS DETAIL DRAWINGS. Index of Detail Drawings

SECTION 095 SPECIFICATIONS DETAIL DRAWINGS. Index of Detail Drawings SECTION 095 SPECIFICATIONS DETAIL DRAWINGS Index of Detail Drawings Flat Top Manhole... 095-1 Splash Drop Manhole and Regular Drop Manhole... 095-2 Special Detail Splash Drop Manhole and Special Detail

More information

Basic Plan Set Requirements

Basic Plan Set Requirements Attachment Three Basic Plan Set Requirements DRAWING CATEGORY & CONTENT 35% 65%, 95% and Stamped GENERAL Cover Sheet & Sheet Inde General Legend & Vicinity Map Abbreviations & General Notes Scope of Work

More information

Pipe Restraints and Adapter Flanges. Section U. For PVC, Ductile Iron and Steel Pipe. 09/2017 Web Revision

Pipe Restraints and Adapter Flanges. Section U. For PVC, Ductile Iron and Steel Pipe. 09/2017 Web Revision DQS Inc. THE FORD METER BOX COMPANY, INC. CERTIFIED TO ISO 9001:2015 10004466 Section U 09/2017 Web Revision 11-29-17 Restraints and Adapter Flanges For PVC, Ductile Iron and Steel Contents Applications

More information

WATER & SEWER CONSTRUCTION SITE PLAN DESIGN SUMMARY COMMERCIAL & RESIDENTIAL

WATER & SEWER CONSTRUCTION SITE PLAN DESIGN SUMMARY COMMERCIAL & RESIDENTIAL WATER & SEWER CONSTRUCTION SITE PLAN DESIGN SUMMARY COMMERCIAL & RESIDENTIAL This summary is not all inclusive of the requirements set forth by the York County Planning & Development Services, York County

More information

CITY OF VISTA STANDARD DRAWINGS

CITY OF VISTA STANDARD DRAWINGS CITY OF VISTA STANDARD DRAWINGS May, 2015 THIS SHEET INTENTIONALLY LEFT BLANK TABLE OF CONTENTS MODIFICATIONS Modifications to San Diego Regional Standard Drawings DRAINAGE STRUCTURES DRN 01 Corrugated

More information

This specification describes the minimum requirements for piping systems for the following service:

This specification describes the minimum requirements for piping systems for the following service: 201/11/2 1/9 1.0 APPLICATION This specification describes the minimum requirements for piping systems for the following service: Underground Service Water Note: This specification does not apply to piping

More information

This specification describes the minimum requirements for piping systems for the following service:

This specification describes the minimum requirements for piping systems for the following service: SPEC-3004 1/7 1.0 APPLICATION This specification describes the minimum requirements for piping systems for the following service: Service Water Design Conditions Operating Conditions 10 PSIG @ 33 o F to

More information

TG Glazing Design-Build

TG Glazing Design-Build TG08.1 - Glazing Design-Build Question No. 0040 0041 0042 0043 Submission Date Question 7.14.2011 Is it acceptable to use 304 stainless in lieu of 316 where the material will be painted per 09 97 15? 7.14.2011

More information

This specification describes the minimum requirements for piping systems for the following service:

This specification describes the minimum requirements for piping systems for the following service: 201/01/13 1/ 1.0 APPLICATION This specification describes the minimum requirements for piping systems for the following service: Service Air Design Conditions Operating Conditions Blast Air (see Note 1)

More information

Procurement Department Bid Office Customer Center 1 st Floor, Room W. Church Street Jacksonville, Florida 32202

Procurement Department Bid Office Customer Center 1 st Floor, Room W. Church Street Jacksonville, Florida 32202 Procurement Department Bid Office Customer Center 1 st Floor, Room 002 21 W. Church Street Jacksonville, Florida 32202 May 24, 2017 ADDENDUM NUMBER: Three (3) TITLE: Construction Services for Arlington

More information

SECTION 39 - MANHOLES TABLE OF CONTENTS

SECTION 39 - MANHOLES TABLE OF CONTENTS SECTION 39 - MANHOLES TABLE OF CONTENTS Section Page 39-1 GENERAL... 39.1 39-2 PRECAST CONCRETE MANHOLES... 39.1 39-2.01 Precast Concrete Sewer Manholes... 39.1 39-2.02 Precast Concrete Storm Drain Manholes...

More information

CONSTRUCTION SPECIFICATION FOR MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION

CONSTRUCTION SPECIFICATION FOR MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 407 NOVEMBER 2013 CONSTRUCTION SPECIFICATION FOR MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION TABLE OF CONTENTS 407.01

More information

KC Water Rules and Regulations For Water Main Extensions and Relocations

KC Water Rules and Regulations For Water Main Extensions and Relocations KC Water Rules and Regulations For Water Main Extensions and Relocations MAY 2017 NOTE: Changes from 2016 are highlighted in yellow and appear on Pages 5, 8, 10-11, 13, and 15. Additional changes made

More information

TOWN of LAKESHORE SITE PLAN CHECKLIST

TOWN of LAKESHORE SITE PLAN CHECKLIST TOWN of LAKESHORE SITE PLAN CHECKLIST Last Revised December 17, 2009 Project Name: Project Location: Date Submitted: Name Phone Number E-mail Address Owner: Contractor/ Engineer: ( ) ( ) Applicant: ( )

More information

EMMEGI ARCHITECTURAL FENCING MASTER SPECIFICATION SECTION METAL FENCING, GATES & RAILING SYSTEM PART 1 GENERAL

EMMEGI ARCHITECTURAL FENCING MASTER SPECIFICATION SECTION METAL FENCING, GATES & RAILING SYSTEM PART 1 GENERAL EMMEGI ARCHITECTURAL FENCING MASTER SPECIFICATION SECTION 05720 METAL FENCING, GATES & RAILING SYSTEM PART 1 GENERAL EMMEGI ARCHITECTURAL FENCING is a high quality steel fencing system comprised of a hybrid

More information

Software Services, Section 16748, Add as an attachment to this section Attachment A enclosed with this addendum.

Software Services, Section 16748, Add as an attachment to this section Attachment A enclosed with this addendum. This addendum is hereby made part of the Request for Bid for the above-named project and shall be taken into consideration by all firms preparing a submittal on this project. Acknowledge receipt of this

More information

CITY OF VISTA STANDARD DRAWINGS

CITY OF VISTA STANDARD DRAWINGS CITY OF VISTA STANDARD DRAWINGS May, 2015 THIS SHEET INTENTIONALLY LEFT BLANK TABLE OF CONTENTS MODIFICATIONS Modifications to San Diego Regional Standard Drawings DRAINAGE STRUCTURES DRN 01 Corrugated

More information

2. Remove from the Standard Plate manual: Standard Plate Index, Sheets 1-4 of 4, Numerical Index of Standard Plates (August 31, 2012)

2. Remove from the Standard Plate manual: Standard Plate Index, Sheets 1-4 of 4, Numerical Index of Standard Plates (August 31, 2012) MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management & Technical Support, Design Support Section TRANSMITTAL LETTER NO. (12-04) MANUAL: Standard

More information

CITY OF NEW WESTMINSTER SECTION Westminster Pier Park ADDENDUM NO. 1 Landscape Contract

CITY OF NEW WESTMINSTER SECTION Westminster Pier Park ADDENDUM NO. 1 Landscape Contract ADDENDUM NO. 1 November 10, 2010 This Addendum forms part of the Bid Documents and amends the original Contracting Requirements, Specifications, and Drawings, and clarifies Bidders questions received between

More information

B17. Sewer Site Plans BULLETIN

B17. Sewer Site Plans BULLETIN BULLETIN B17 Revised 5/2/2016 Sewer Site Plans Public Works This bulletin is designed to assist you in submitting the required documentation for sewer site plans to the Pierce County Sewer Division in

More information

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS 101 General 102 Submittal Requirements A. Initial Submittal B. Second Submittal 103 Plan Requirements A. Subdivisions B. Site Plans 104 Approval of

More information

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable

More information

Digitally signed by Anne Prudhel Contact Info: Carollo Engineers, Inc. Date: :06:03-07'00'

Digitally signed by Anne Prudhel Contact Info: Carollo Engineers, Inc. Date: :06:03-07'00' Digitally signed by Anne Prudhel Date: 207.05.9 6:06:03-07'00' Date: 207.05.9 6:42:34-07'00' Date: 207.05.9 6:42:26-07'00' Date: 207.05.9 6:42:5-07'00' Date: 207.05.9 6:42:06-07'00' Date: 207.05.9 6:4:57-07'00'

More information

APPENDIX 1: CONSTRUCTION PLAN CHECKLIST

APPENDIX 1: CONSTRUCTION PLAN CHECKLIST APPENDIX 1: CONSTRUCTION PLAN CHECKLIST October 2017 APPENDIX A APPENDIX 1: CONSTRUCTION PLAN CHECKLIST ALL PLANS Plans on 24-inch by 36-inch paper (Originals shall be transmitted on a CD as an electronic

More information

2. What are the estimated volumes for the Residuum Harvesting See response to Question 1

2. What are the estimated volumes for the Residuum Harvesting See response to Question 1 No. Question Answer 1. What are the approximate earthwork quantities for this job? FBP approximate quantities will be provided via amendment with or before the CADD files. Contractor is still responsible

More information

Symphony II Adaptable Table System

Symphony II Adaptable Table System Symphony II Adaptable Table System 1.00 General 1.01 Conditions 1.02 Scope of work 1. This section covers all materials, equipment, tools and labor for the supply and installation of the laboratory Symphony

More information

February 18, Re: Zephyr Lakes Amenity Center Zephyrhills, Florida

February 18, Re: Zephyr Lakes Amenity Center Zephyrhills, Florida February 18, 2019 Re: Zephyr Lakes Amenity Center Zephyrhills, Florida These are the responses to the RFIs received by 2:00 PM on Monday, February 11, 2019. All items that are not answered in the following

More information

Zoning District: R-1, R-2, and R-4 Applicant: Exeter Rose Farm, LLC, 953 Islington Street #23D Portsmouth, NH 03801

Zoning District: R-1, R-2, and R-4 Applicant: Exeter Rose Farm, LLC, 953 Islington Street #23D Portsmouth, NH 03801 2220.00, Town Planner Town Planning Office, Town of Exeter 10 Front Street Exeter, NH 03833 Re: Exeter Rose Farm Subdivision Design Review Engineering Services Exeter, New Hampshire Site Information: Tax

More information

Training Manual The Installation of Siphonic Pipework

Training Manual The Installation of Siphonic Pipework Training Manual The Installation of Siphonic Pipework The Engineered Rainwater Solution Training Manual: The Installation of Siphonic Pipework o Overview of Principals of Siphonic Drainage o Interpreting

More information

Manholes Table of Contents

Manholes Table of Contents Standard MH 300 Title Manholes Requirements MH 300.1 Manholes Requirements Manholes Table of Contents Underground Structures Standards MH 310 MH 318 MH 320 MH 325 MH 330 MH 335 MH 340 MH 350 Precast Tub-Type

More information

SECTION MANHOLES

SECTION MANHOLES SECTION 33 05 13 MANHOLES PART 1 GENERAL 1.01 SECTION INCLUDES A. CONTRACTOR shall furnish and install precast concrete manhole base, sections, adjusting rings, steps, and manhole ring and cover, complete.

More information

SECTION 2.0 PREPARATION OF MASTER PLANS, CONSTRUCTION PLANS, AND RECORD DRAWINGS

SECTION 2.0 PREPARATION OF MASTER PLANS, CONSTRUCTION PLANS, AND RECORD DRAWINGS SECTION 2.0 PREPARATION OF MASTER PLANS, CONSTRUCTION PLANS, AND RECORD DRAWINGS 2.1 MASTER PLAN 2.1.1 A Master Plan for water, wastewater, and/or reclaimed water is required for all residential or commercial

More information

Essex County College - West Essex Campus Addition And Renovations dlb # / SECTION EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING

Essex County College - West Essex Campus Addition And Renovations dlb # / SECTION EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING SECTION 230516 - EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING PART I - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT ADDENDUM NO. 1

PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT ADDENDUM NO. 1 PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT 3-41-0056-024-2018 ADDENDUM NO. 1 Addendum No. 1 hereby amends the contract documents and drawings for the Scappoose

More information

PART MATERIALS. Section Fencing Materials. Description

PART MATERIALS. Section Fencing Materials. Description PART 03000 - MATERIALS Section 03010 - Fencing Materials Description 03010.00 Scope - This section consists of the test requirements, specifications and tolerances for barbed wire, woven wire and chain

More information

CITY OF REEDLEY NEW DEVELOPMENT PLAN REVIEW CHECK LIST

CITY OF REEDLEY NEW DEVELOPMENT PLAN REVIEW CHECK LIST CITY OF REEDLEY NEW DEVELOPMENT PLAN REVIEW CHECK LIST Tract Number and Subdivision Name: Engineering Firm: Contact Person: Address: City: State: Zip: Phone No. Fax No. Assessor s Parcel Number(s) Tentative

More information

UNIVERSITY OF ROCHESTER DESIGN STANDARDS FEBRUARY 29, 2012

UNIVERSITY OF ROCHESTER DESIGN STANDARDS FEBRUARY 29, 2012 SECTION 01950 - RECORD DRAWINGS & SPACE FLOOR PLANS 1.1 RECORD DRAWINGS MATERIAL AND FORMAT A. Definition 1. Final record drawings, or as-builts, are drawings, which are revised to reflect the changes

More information

SECTION UNDERGROUND POWER DUCT AND SUB-STRUCTURES. A. Section : Trenching, Backfilling, and Compacting

SECTION UNDERGROUND POWER DUCT AND SUB-STRUCTURES. A. Section : Trenching, Backfilling, and Compacting SECTION 33 71 19 UNDERGROUND POWER DUCT AND SUB-STRUCTURES PART 1 GENERAL 1.1 RELATED WORK A. Section 31 23 33: Trenching, Backfilling, and Compacting B. Section 32 01 00: Site Restoration and Rehabilitation

More information

City of Vaughan Engineering Department DESIGN STANDARD DRAWINGS

City of Vaughan Engineering Department DESIGN STANDARD DRAWINGS City of Vaughan Engineering Department DESIGN STANDARD DRAWINGS March 2004 STANDARD DRAWINGS Partners With The Environment March 2004 FORWARD The March 2004 version of the City of Vaughan Design Standard

More information

A representative from Occupational Health is to be involved in the commissioning process to address any Respiratory Protection Program requirements.

A representative from Occupational Health is to be involved in the commissioning process to address any Respiratory Protection Program requirements. SPEC-3017 1/8 1.0 PURPOSE This specification describes the minimum requirements for the installation of breathing air distribution systems (indoor and outdoor) up to the connection to the breathing air

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCESA / NASA UFGS-33 34 13 (April 2008) -------------------------- Preparing Activity: USACE Superseding UFGS-33 34 13 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

Miscellaneous. Demolition

Miscellaneous. Demolition Public Improvements Miscellaneous 1 Mobilization L.S. ** 2 Clearing and Grubbing L.S. *** 3 Structural Concrete Incl. Reinforcing C.Y. $1,325.00 4 6" PVC Sleeves L.F. $26.00 Demolition 5 Remove Asphalt

More information

REQUIREMENTS. for ENGINEERING SERVICES PUBLIC CONSTRUCTION PROJECTS

REQUIREMENTS. for ENGINEERING SERVICES PUBLIC CONSTRUCTION PROJECTS REQUIREMENTS for ENGINEERING SERVICES on PUBLIC CONSTRUCTION PROJECTS April, 2007 David W. Johnson Senior Engineer Design & Construction Requirements for Engineering Services on Public Construction Projects

More information

MAY J. Collins Engineering Associates, LLC San Jose Blvd. Jacksonville, Florida 32223

MAY J. Collins Engineering Associates, LLC San Jose Blvd. Jacksonville, Florida 32223 PROJECT LOCATION: 95 NOCATEE PARKWAY PONTE VEDRA, FL. 38 J. Collins Engineering Associates, LLC 56-3 San Jose Blvd. Jacksonville, Florida 32223 NOT TO SCALE 904-262-42 sm sm ON DRAWING WHERE SECTION OR

More information

9. Pay for the power consumed until the project has been accepted as substantially complete.

9. Pay for the power consumed until the project has been accepted as substantially complete. 9. Pay for the power consumed until the project has been accepted as substantially complete. A4-2. SECTION 01 23 00 ALTERNATES A. Reference Page 2, Paragraph 1.03.: Modification: Add the following paragraph:

More information