NORTH AMERICA ONLY GENERAL INFORMATION SCRAP SHEDDING ON DIES
|
|
- Bennett Dixon
- 5 years ago
- Views:
Transcription
1 GENERAL INFORMATION SCRAP SHEDDING ON DIES 1. CAST S FOR NOISE REDUCTION SEE W-DX5-58M PAGE 5. ALL S, ARE TO BE DESIGNED WITH A PREFERRED SHEDDING ANGLE OF 30 DEGREES, REACHING TO THE EDGE OF THE DIE. WHEN SCRAP SHEDDING ANGLE IS LESS THEN 30 DEGREES. MAKE S OUT OF RIGTEX MATERIAL.. THE MINIMUM SHEDDING ANGLE IS TO BE AND REVIEWED WITH PRODUCTION PLANT AND SIGNED OFF. CHUTES TO BE MADE OF SHEET STEEL. THICKNESS 2.5 mm ±0.6 IF SCRAP CANNOT BE SHED TO REACH THE EDGE OF THE HOLE IN THE FLOOR AND BE DIRECTED AT CENTER HEIGHT OF HOPPER DOOR WITH A MINIMUM SHED DING ANGLE OF DEGREES. IT IS TO BE REMOVED IN EXCEPTIONAL CASES BY BELT CONVEYORS. SEE W-DX5-58M PAGE 3. EXTENSION CHUTES, ARE TO REACH THE EDGE OF THE BOLSTER. HINGED S ARE TO BE USED TO CARRY SCRAP TO REACH THE EDGE OF THE HOLE IN THE FLOOR AND BE DIRECTED AT CENTER HEIGHT OF HOPPER DOOR WHEN APPLICABLE SEE W-DX5-58M PAGES 15 THRU 18. HINGED S ARE PART OF DIE DESIGN. 2. SCRAP AT SIDES OF PART IS TO BE SHED TO REAR OF PRESS WHEREVER POSSIBLE. 3. SCRAP AT FRONT OF PRESS IS TO BE SHED TO MIDDLE PORTION OF SCRAP HOPPER, SO THAT THE RIGHT AND LEFT HAND SIDES CAN BE KEPT CLOSED FOR THE SAFETY OF THE PRESS SHOP PERSONNEL. SEE WDX2-4M PAGE 4. IF NECESSARY, THE SCRAP AT FRONT MAY BE CUT TO SHORTER PIECES THAN THE OTHERS. 4. NO GAPS ARE ALLOWED BETWEEN THE S AND THE CUTTING STEELS. THE GAP MUST BE LESS THAN METAL THICKNESS OF THE PART. HEELS AND CAST WALLS TO AVOID STACKING OF SCRAP (TO SUIT CONTOUR) SEE W-DX5-58M PAGE SIDE WALLS OF CHUTES ARE TO HAVE A MINIMUM HEIGHT OF 100 mm. FOR SAFE SHEDDING. SEE W-DX5-58M PAGE FIXING POINTS OF CHUTES ARE TO BE ACCESSIBLE AND ARE TO BE STABLE. 7. S OVER PARTS LIKE AIR CYLINDERS, JUNCTION BOXES, ETC. ARE TO BE REMOVABLE WITH DIE IN PRESS. PROVIDE INFORMATION PLATE WDX LISTING HIDDEN DETAILS. 8. S MUST MEET SOUND DEADENING REQUIREMENTS SEE W-DX5-58M PAGES 15 AND S NEAR HEELS ARE TO BE DESIGNED SO THAT THE SCRAP CANNOT JUMP INTO HEELS. PROVIDE SHEET METAL DEFLECTORS WHEN REQUIRED. 10. ALL CHUTES COVERING PRESS BOLTS ARE TO HAVE A MINIMUM OF 110mm SEE W-DX5-58M PAGE IF THE SCRAP IS EXPECTED TO STAY ON THE SCRAP CUTTER, SPRING PINS IN THE UPPER DIE HAVE TO BE PROVIDED TO FACILITATE SHEDDING. SEE WDX5-58M PAGE 4 AND WDX5-56M PAGE ALL PIERCE SLUGS TO BE CLEARED BY STRAIGHT PATH CHUTES WHERE POSSIBLE. 13. PROVIDE LATCH TO ASSIST SHEDDING OF SCRAP THAT IS WEDGED BETWEEN TWO SCRAP CUTTERS. 1
2 SCRAP SHEDDING ASSEMBLY SKETCH 1 LATCH TO ASSIST SCRAP SHEDDING WHERE NECESSARY C FULCRUM LINE OF SCRAP DO NOT PAINT INSIDE OF S (NOTE TO APPEAR ON DESIGN) PLAN VIEW LOWER DIE AREA OF SCRAP THAT TENDS TO REST ON SCRAP CUTTERS. C SEE PAGE 3 AREA OF SCRAP THAT TENDS TO PULL SCRAP OFF OF SCRAP CUTTERS. WEIGHT OF SCRAP WILL CAUSE IT TO DROP AND SHED. 2
3 SCRAP SHEDDING ASSEMBLY PROVIDE SUFFICIENT HEIGHT ON SCRAP CUTTERS FOR GOOD SCRAP DISPOSAL MAIN CHUTES ON DIE SET. CHUTE EXTENSIONS MUST REACH EDGE OF HOLE IN FLOOR AND BE DIRECTED AT CENTER HEIGHT OF HOPPER DOOR. BOLSTER SHED PATH MUST CLEAR EDGE OF BOLSTER SKETCH C-C (FROM PAGE 2) HOLE IN FLOOR HOPPER DOOR SOUND DEADENER 100 MIN. 3
4 SCRAP SHEDDING ASSEMBLY PROVIDE SUFFICIENT HEIGHT ON CUTTING SECTIONS FOR GOOD SCRAP DISPOSAL. FIT CHUTE AROUND CORNERS 30 ANGLE FOR S. MAKE S ONE PIECE WHEN PRACTICAL. USE SPRING PLUNGERS IN PUNCH WHERE SCRAP WILL NOT FALL BY GRAVITY OR TO ASSIST SHEDDING OF SCRAP. SEE W-DX5-56M PAGE 15 VIEW IN DIRECTION OF ARROW 5
5 S GUIDE TO DETERMINING WIDTH OF S WIDTH OF SCRAP SCRAP WIDTH OF WIDTH OF WIDTH OF FLOW OF SCRAP SCRAP A SCRAP B WIDTH OF WIDTH OF WIDTH OF WHEN "A" IS OVER 50% LARGER THAN "B" WIDTH OF WHEN "A" IS LESS THAN 50% LARGER THAN "B" WHEN SCRAP HAS A TENDENCY TO ROTATE, DESIGN WITH mm ON EACH SIDE OF THE SCRAP. MEASURE ACROSS ITS WIDEST POINTS TO ASSURE THAT IT WILL NOT HANG UP IN THE CHUTE. 10
6 CAST FOR NOISE REDUCTION CAST LEDGE UP TO 30 DEGREES, WHEN SCRAP SHEDDING ANGLE IS LESS THE 30 DEGREES, FABRICATE OUT OF RIGTEX MATERIAL. 30 IS CAST AS PART OF DIE SHOE. CHUTE EXTENSIONS MUST REACH EDGE OF HOLE IN FLOOR AND BE DIRECTED AT CENTER HEIGHT OF HOPPER DOOR. BOLSTER RUBBER PADS FOR NOISE ABATEMENT. CEMENT TO CLEAN SURFACE. SEE W-DX5-58M PAGE 17. PARTIAL SECTION OF TRIM DIE 15
7 REQUIREMENTS FOR NOISE REDUCTION CAST LEDGE UP TO 30 SEE W-DX5-58M PAGE MIN. CHUTE EXTENSIONS MUST REACH EDGE OF HOLE IN FLOOR AND BE DIRECTED AT CENTER HEIGHT OF HOPPER DOOR. BOLSTER FOR LARGE PIECES OF SCRAP IN LINE DIES ONLY FOR SMALL PIECES OF SCRAP AND PIERCED SLUGS SEE W-DX5-54M PAGE 20 CHUTE EXTENSIONS MUST REACH EDGE OF HOLE IN FLOOR AND BE DIRECTED AT CENTER HEIGHT OF HOPPER DOOR. FOR MORE INFORMATION ON SCRAP SHEDDING SEE W-DX9-2M PAGE 5. HOPPER DOOR BOLSTER TRANSFER PRESS DIES HOLE IN FLOOR SHED PATH MUST CLEAR EDGE OF BOLSTER AND CARRIAGE 16
8 NOTES: HINGED APPLICATION SINGLE FOLD CHUTES REQUIRED FOR SMALL PIECES OF SCRAP AND ALL PIERCED SLUGS PROVIDE SIDES TO ALL HINGED S. DIMENSIONS MARKED WITH ( ) ARE TO APPEAR IN THE DIE DESIGN AND ARE REQUIRED TO ASSEMBLE HINGED S. DESIGN TO SHOW SCRAP DEFLECTION METHOD AS PART OF THE TOOL DESIGN. FOR NOISE REDUCTION CAST LEDGE UP TO 30 SEE W-DX5-58M PAGE 15. THE SIDES OF ALL FOLDING SCRAPE CHUTES ARE TO BE PAINTED ALERT ORANGE M-134 OR RAL ALL HINGED S TO BE 2.5mm ±0.6 THICK. GRAVITY LATCH APPLICATION SEE W-DX5-58M SOUND DEADENER PAGES 30 AND 31 PART NUMBER M /16" X 3" WIDE ADHESIVE 3M #K5090 AVAILABLE FROM F.B. WRIGHT CO. (313) STORED POSITION MIN. SOUND DEADENER NOT REQUIRED FOR DIES RUNNING IN ENCLOSED PRESS LINES. MAIN CHUTE CHUTE EXTENSIONS MUST REACH EDGE OF HOLE IN FLOOR AND BE DIRECTED AT CENTER HEIGHT OF HOPPER DOOR. **SOUND DEADENER SPECIFY "SIZE IN STOCK LIST. 30 PREFERRED MIN. ARC AT END OF HINGED CHUTE MUST CLEAR THE MAIN CHUTE. MIN. BOLSTER RUBBER PADS FOR NOISE ABATEMENT. CEMENT TO CLEAN SURFACE. SEE W-DX5-60M PAGE 37. HINGE BRACKET SEE W-DX5-60M PAGE 37. TO C OF DIE 17
9 HINGED APPLICATION DOUBLE FOLD CHUTES S ARE TO BE PLACED SO THEY WILL NOT BE CONTACTED BY THE CRANE CABLES WHEN THE DIE OR THE LOWER DIE SHOE IS LIFTED. FOR NOISE REDUCTION CAST LEDGE UP TO 30 SEE W-DX5-58M PAGE 15. STORED POSITION OF THE CHUTE MUST BE WITHIN THE CONFINES OF THE DIE SHOE. GRAVITY LATCH APPLICATION SEE W-DX5-58M PAGES 30 AND 31 STORAGE PIN CHUTE EXTENSIONS MUST REACH EDGE OF HOLE IN FLOOR AND BE DIRECTED AT CENTER HEIGHT OF HOPPER DOOR. PIN GUIDE SEE W-DX5-60M PAGE 33 (WELD AT SETUP TIME) HOPPER DOOR STORAGE PIN SEE W-DX5-60M PAGE 33 FOR HINGES SEE W-DX5-60M PAGE 33. HINGE BRACKET SEE W-DX5-60M PAGE 37 HOLE IN FLOOR SHED PATH MUST CLEAR EDGE OF BOLSTER AND CARRIAGE 18
10 UNDER SHELF AND FOR CHUTE EXTENSIONS SKETCH 5 A WHEN CONDITIONS DICTATE THAT THE S MUST RUN UNDER THE SCRAP CUTTER PADS, THE FOLLOWING STANDARD WILL PREVAIL. B B SECTION B-B PLAN OF DIE 100 MIN. WHEN BINDER SCRAP IS FLAT. A MIN. 82 MIN. PROVIDE MINIMUM AS SHOWN. OTHERWISE LOCATE FASTENING SLOT AWAY FROM S. VIEW "Z" EXTEND CHUTES FLUSH WITH THE EDGE OF DIE. 30 CHUTE EXTENSION SEE W-DX5-58M PAGE 1 SECTION A-A BOTTOM OF SHELF TO HAVE SAME ANGLE AS MINIMUM 50 PREFERRED 110 ATTACHING AREA SEE VIEW "Z" BOLSTER OR BED 75 APPROX. MIN. PREFERRED METHOD BOLSTER OR BED 19
11 S FIXING (ATTACHING) ALL S BRACKETS TO BE MADE OF AISI-1020 HOT ROLL STEEL. mm CHAMFER 6 CHAMFER MAKE CHAMFER 6MM NOT MM REASON: MM INTERFERES WITH CHUTE AS SHOWN
12 HINGE BRACKET APPLICATION HINGED S ARE ONLY TO BE PROVIDED FOR THE PRIMARY STRAIGHT SIDE TRANSFER OR COIL FEED PRESS. SEE W-DX5-58M PAGE 18 FOR DIE CONDITION NOT REQUIRING A HINGED S. HINGED S ARE TO BE REMOVED BEFORE TURNING OVER THE DIE SHOE AMD IF NECESSARY FOR DIE MAINTENANCE. X X 3 STEEL ANGLE REINFORCEMENT RIB REQUIRED FOR S WIDER THAN 1000mm. LOCATE NEAR HINGE AREA. 10mm I.D. FLAT WASHER Ø10 X 65 LG. DOWEL HINGE BRACKET SEE W-DX5-60M PAGE WELD AT ASSEMBLY DIE FASTENING BOLT AREAS MUST BE ACCESSIBLE WHEN THE HINGED SCRAP CHUTE IS IN THE STORED POSITION. 26
13 GRAVITY LATCH "L" SHAPE APPLICATION USE TO ATTACH BRACKET TO SIDE OF DIE WALL "T" BRACKET SEE W-DX5-80M PAGE GRAVITY LATCH "L" SHAPE SEE W-DX5-80M PAGE 27 HINGE BRACKET SEE W-DX5-60M PAGE 37 30
14 GRAVITY LATCH "L" SHAPE APPLICATION BRACKET ATTACHED TO SIDE OF RIB "L" BRACKET SEE W-DX5-80M PAGE GRAVITY LATCH STRAIGHT SEE W-DX5-80M PAGE 27 31
NORTH AMERICA ONLY PIPE SLUG CHUTE DETAILS ALL DIMENSIONS IN INCHES
"B" B. C. PIPE SLUG CHUTE DETAILS ALL DIMENSIONS IN INCHES PVC - DWV PIPE FITTINGS FOR "X" SOC. HD. SCREW (N) HOLES "D" "C" "A" O.D. ALTER IF CONSTRAINED BY SPACE LIMITATION. (2) MIN. FASTENING HOLES REQUIRED.
More informationEUROPE ONLY NUMERICAL INDEX DESIGN REQUIREMENTS FOR OBI DIES AND OBI BLANK DIES
NUMERICAL INDEX UNIT PAGE ITEM SUBJECT 42M 5 1 GENERAL INFORMATION 5 1.1 START OF DESIGN 5 1.2 CONSTRUCTION OF DIES 5 1.3 DIE FIXING 5 1.4 SHUT HEIGHT 6 1.5 MATERIAL 6 1.6 GUIDING UPPER-LOWER DIE 6 1.7
More information3 BRACKET TO GUIDE ATTACHMENT. RIGHT END Figure 1. EXTENDED BRACKET (for doors taller than 8-8 ) SERIES 650. RIGHT END COTTER PIN Figure 6
2 DOOR ARRANGEMENT. A Lay door on a clean floor inside of building and in front of opening (see Figure 1). NOTE: Door can be damaged if laid on unclean surface. B Distribute parts bags, guides, stops and
More informationOxford Stalls Installation Instructions
Oxford Stalls Installation Instructions RAMM Horse Fencing and Stalls 13150 Airport Hwy. Swanton, OH 43558-9615 1-800-434-8456 Rev. 8/15/17 Before You Start Typical stall sizes are 10 x 10, 12 x 12 or
More informationMETAL BENDER OPERATING & MAINTENANCE INSTRUCTIONS Model Nos: CCB1 & CCB2 Part Nos: & CCB2 CCB1
METAL BENDER Model Nos: CCB1 & CCB2 Part Nos: 7630073 & 7630074 CCB2 CCB1 OPERATING & MAINTENANCE INSTRUCTIONS 1206 1 The Compact Bender allows you to economically make a variety of bends in flat, square,
More informationED1300/1300F SERIES CONCEALED VERTICAL ROD DEVICE INSTALLATION INSTRUCTIONS
ED1300/1300F SERIES CONCEALED VERTICAL ROD DEVICE INSTALLATION INSTRUCTIONS Ver.2 1300 SERIES CONCEALED VERTICAL ROD DEVICE Top Strike Latch Screws Strike Screws Release Plunger Top Latch Plunger Screws
More informationShay Cab - Floor & Roof
Shay Cab - Floor & Roof Nelson Riedel Nelson@NelsonsLocomotive.com Initial: 1/20/04 Last Revised: 06/06/2004 Cab Floor: A cab floor was made at the same time as the tender floor. I was unhappy with some
More informationINSTALLATION INSTRUCTIONS KK-K9-C12-K CHEVY IMPALA
INSTALLATION INSTRUCTIONS KK-K9-C12-K 2000-2005 CHEVY IMPALA READ ALL INSTRUCTIONS PRIOR TO INSTALLATION TOOLS REQUIRED: Power Drill Drill bits1/4 and 5/32 7/l6 wrench and socket 15,18 and\or 19mm socket
More informationProfiform 200 Profiform 320. Operating manual
Profiform 200 Profiform 320 Operating manual Profiform 200 / Profiform 320 Operating manual Page 1 Table of contents 1. General information Page 2 2. Profile of the Profiform sheet metal working machines
More informationInstallation Instructions for Vista Air Vertically Folding Walls
Installation Instructions for Vista Air Vertically Folding Walls Use these instructions in conjunction with your shop drawings to see the specifics that are particular to the model you are installing.
More informationWPS crew Doors Installation instructions
WPS-132-133 crew Doors Installation instructions ORDER OF INSTALLATION FOR A COMPLETE ENCLOSURE OF A CREW WPS (Weather Protection System) IS AS FOLLOWS: 1. Heater 2. Rear Thresholds - Right Hand & Left
More informationMelamine Plastic Laminate. Toilet Partition Installation Manual
Melamine Plastic Laminate Toilet Partition Installation Manual PHONE: FAX: 1-866-317-2786 ATTENTION DO NOT MIX FASTENER PACKS EACH FASTENER PACK HAS THE NECESSARY BOLTS, BARRELS AND SCREWS TO INSTALL THE
More informationTOOL LIST FOR TAILGATE HIDDEN LATCH & LINK ASSY FOR FORD FLARESIDE TRUCKS
TOOL LIST FOR TAILGATE HIDDEN LATCH & LINK ASSY FOR 53-87 FORD FLARESIDE TRUCKS Vise Grip Clamps C-clamps Sharpie Marker Ball Peen Hammer Center Punch 3/8 or 1/2 Drill 5/32, 7/32, 9/32, and 3/8 Drill Bits
More informationAssembly Instructions 10 X 10 Aluminum Frame Building
Assembly Instructions 10 X 10 Aluminum Frame Building 27 97 9 8 47 36 74 52 10 10 X 10 Square Building W/ Dome Includes: The Steel Entry Door with a Dead Bolt Lock assembly and Aluminum Door Frame. Metal
More informationS H E D A S S E M B L Y I N S T R U C T I O N S
T I T A N R A N G E S H E D A S S E M B L Y I N S T R U C T I O N S 8 X 10 ft Approx = 2550 x 3140 cm COMPONENT LIST Component illustrations are given as a visual guide only and are not in proportion PART
More informationFord Pick Up Rear leaf Spring Kit Installation Instructions
1948-1956 Ford Pick Up Rear leaf Spring Kit Installation Instructions 1-800-984-6259 www.totalcostinvolved.com Parts 48 inch leaf (2) springs (4) U-bolts 3/8-24 x l 1/4bolts (16) & nuts (2) 1/2-20 x 4
More informationSutton Screened in Awning / Porch
Sutton Screened in Awning / Porch Sections: Project Overview Roof Work Cedar Framing Canopy Frame Screen Frames Misc. Sheet 1 - - - Index Sheet 2 - - - Project Summary Sheet 3 - - - Roof Work overview
More informationFor installation assistance, contact SARGENT at DOORS SHOWN HERE SWING IN FOR ILLUSTRATION PURPOSES ONLY.
SARGENT Installation Instructions for LP8600 x LR8600 & 12-LP8600 x 12-LR8600 Series Low Profile Panic and Fire Exit Devices on Double Egress & Double Doors or LS8600 & 12-LS8600 Low Profile Exit Device
More informationHD installation guide
JANUS INTERNATIONAL 1 866 562 2580 www.janusintl.c o m 1950 1950HD installation guide RIGHT DRIVE END SHOWN LH OPPOSITE LEFT TENSION END SHOWN RH OPPOSITE PUSH-UP OPERATION 1950 1950HD SHOWN A rolling
More informationDublin Stalls Installation Instructions
Dublin Stalls Installation Instructions RAMM Horse Fencing and Stalls 13150 Airport Hwy. Swanton, OH 43558-9615 1-800-434-8456 Rev. 9/13/17 Part Identification Round Track Bracket (4) (Not Painted) Round
More informationINSTALLING YOUR NEW SPRING LIFT ARM KIT
INSTALLING YOUR NEW SPRING LIFT ARM KIT 1. Measure the distance that the roof is to be raised. [If your lift system is completely non-functional, you will need to calculate or estimate this distance as
More information33/3527A. Devices covered by these instructions: 33/3527A-F (Fire) Surface Vertical Rod Exit Device
*911403-00* 911403-00 Surface Vertical Rod Exit Device 33/3527A Installation Instructions Devices covered by these instructions: 33/3527A Surface Vertical Rod Exit Device 33/3527A-F (Fire) Surface Vertical
More informationINSTALLATION MANUAL. All Recessed Wall-Mount Modules Front-Loading, Rear-Loading, Parcel-Only, Collection Box, Trash/Recycling Bin
INSTALLATION MANUAL All Recessed Wall-Mount Modules Front-Loading, Rear-Loading, Parcel-Only, Collection Box, Trash/Recycling Bin TABLE OF CONTENTS GENERAL INFORMATION AND ADVISORIES 3 USPS INSTALLATION
More informationK9 KIT INSTALLATION INSTRUCTIONS CROWN VIC with Fire Suppression System Model KK-K9-F7-K-FS
K9 KIT INSTALLATION INSTRUCTIONS 2005-2011 CROWN VIC with Fire Suppression System Model KK-K9-F7-K-FS TOOLS REQUIRED: Power Drill (Cordless preferable) Drill Bit Set Standard Wrench and Socket Set Metric
More informationPRE-ENGINEERED HORSE STALL SYSTEMS SDFD SLIDING DOOR c/w FOLD-DOWN GRILL. & Assembly. Installation Instructions
PRE-ENGINEERED HORSE STALL SYSTEMS 4800 SDFD SLIDING DOOR c/w FOLD-DOWN GRILL & Assembly Installation Instructions 4800 SDFD Sliding Door c/w Fold-Down Grill Components - 1 3 /4" x 2" x 88" channels (2)
More informationtable of contents Sliding Door Accessories Page Latches & Snuggers Stay Rollers Brackets & Stops
table of contents Square Track & Accessories Pages 4-7 Square Track Options Page 4 Light Duty Track Page 4 Square Track Brackets Page 5 Square Track Accessories Page 5 Square Track Trolleys Page 6-7 Offset
More informationRouter Table-Mate. Everything you'd want in a router table for just $50.
Router Table-Mate Everything you'd want in a router table for just $50. Commercially made router tables are everywhere these days. Some of them come with more gizmos and gadgets than a 59 Edsel. By the
More information129 KITCHEN BASE CABINET 480
129 KITCHEN BASE CABINET 480 There are two sorts of kitchen cabinets: base cabinets, which sit on the floor, and wall cabinets. Base cabinets provide both storage space and work surfaces. They often house
More informationImportant Notice. CAUTION: Use proper lifting equipment and correct procedures to avoid injury.
Integrity. Partnership. Quality. SELF-STORAGE DOOR INSTALLATION INSTRUCTIONS SERIES 690 Important Notice In the following text, the word: Warning: Indicates that serious injury or death can result from
More informationK9 KIT INSTALLATION INSTRUCTIONS CROWN VIC KK-K9-F7-K
K9 KIT INSTALLATION INSTRUCTIONS 1998-2011 CROWN VIC KK-K9-F7-K TOOLS REQUIRED: Power Drill (Cordless preferable) Drill Bit Set Standard Wrench and Socket Set Metric Socket Set Screwdriver Set Torx Bit
More informationinstallation guide
JANUS INTERNATIONAL 1 866 562 2580 w w w. j a n u s i n t l. c o m 2000 2500 3000 installation guide RIGHT DRIVE END SHOWN LH OPPOSITE LEFT TENSION END SHOWN RH OPPOSITE PUSH-UP OPERATION 2000 2500 3000
More informationINSTALLATION, OPERATION & MAINTENANCE INSTRUCTIONS
CLAMP MOUNT SKIRTING SYSTEM CLAMP MOUNT/ DURA-SEAL / TRACKEEPER / VACU-SKIRT INSTALLATION, OPERATION & MAINTENANCE INSTRUCTIONS Check us out at www.asgco.com Customer Service 800-344-4000 800-394-2358
More informationSheet Metal Brake Plans for a 6' Sheet Metal Brake
Sheet Metal Brake Plans for a 6' Sheet Metal Brake,1752'8&7,21 Thank you for purchasing the sheet metal brake plans. The plans include a complete list of material needed and easy to follow steps to build
More information** Do Not Contact the Store ** For Assistance, including missing or broken parts, Call Customer Service at:
3/01/2007 VISIT THE LITIME WEB SITE: WWW.LITIME.COM ** Do Not Contact the Store ** For Assistance, including missing or broken parts, Call Customer Service at: 1 (800) 225-3865 Double Shed Doors for Back
More informationC. Samples for Initial Selection: Manufacturer's color charts showing the full range of colors available.
SECTION 105113 - METAL LOCKERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationTOOL DESIGN - MANUFACTURING DESIGN SPECIFICATIONS FOR TOOLING AND EQUIPMENT SECTION H - DIE DESIGN TABLE OF CONTENTS. H.1 General...
TABLE OF CONTENTS H.1 General...Page 2 H.2 General Die Layout...Page 2 H.3 General Die Features...Page 2 H.4 Specific Die Type Features...Page 5 H.5 Special Punches and Die Bushings...Page 6 H.6 Wire E.D.M...Page
More informationInstallation of the JD 900 Series Flex Grain Platform Auger Trough Liner Kit
www.polyskid.com P. O. Drawer 349, Monticello, GA. 31064 Phone: 800-542-7659 Fax: 706-468-2881 E-Mail: polytech@polyskid.com Installation of the JD 900 Series Flex Grain Platform Auger Trough Liner Kit
More informationSegmented Transfer Plate Installation Instructions
Segmented Transfer Plate Installation Instructions Parts Included in Transfer Plate Kit: Transfer Plate Support Bar (1) Center Segment Right End Segment (1) Left End Segment (1) Mounting Bracket Assemblies
More informationUnit4 31. UnitS 39. Unit 6 47
Preface..................... xi About the Author......... xiii Acknowledgments... xiv Unit 1 1 Bases for Interpreting Drawings........ I Visible Lines............. 3 Lettering on Drawings... 3 Sketching...
More information40 & 50 Foot PS-1 Box Car Assembly Instructions
40 & 50 Foot PS-1 Box Car Instructions Push the #2100 coupler/stirrup assembly onto the ends of the metal floor. Slide them into the slots and slightly lift the ends (wings), then press firmly on the front
More informationFOR PROFESSIONAL GARAGE DOOR INSTALLERS
Composite Garage Doors Installation Instructions FOR PROFESSIONAL GARAGE DOOR INSTALLERS Tools required Screwdriver Claw Hammer Locking Pliers Power Drill Level with a 3/32" Drill Bit Utility Knife 9/16",
More informationImportant Notice. caution: Use proper lifting equipment and correct procedures to avoid injury.
Integrity. Partnership. Quality. COMMERCIAL DOOR INSTALLATION INSTRUCTIONS SERIES 1900, 1950, 2000, 2250, 2500, 2750 Important Notice In the following text, the word: Warning: Indicates that serious injury
More informationP.O. Box 8400 Green Bay, WI (920)
P.O. Box 8400 Green Bay, WI 54308-8400 (920) 468-2165 Change Notice No. 112 Implemented By: KI-Pembroke Notification By: Scott Vissers Date: 03/15/10 Component Product Title: Series XXI Lateral Filing
More informationVACUSEAL MODEL 300 & 400
VACUSEAL MODEL 300 & 400 G L HOT TUB PRODUCTS 2 Toelles Road, Suite 13 Wallingford, CT 06492 860-469-2580 www.hottubproducts.com J G F H H K E D C I A P B 10 9 8 7 6 5 4 3 2 1 0 0 1 Figure 1 2 3 4 SPAS
More informationIntroduction to Manufacturing Processes
Introduction to Manufacturing Processes Products and Manufacturing Product Creation Cycle Design Material Selection Process Selection Manufacture Inspection Feedback Typical product cost breakdown Manufacturing
More information3. Barrier elements. Barrier posts. Stainles steel
3. Urban Equipment Building Equipment Stainles steel e 3.1 Tubular hoops 216-223 3.2 Access barriers 224-227 3.3 Height restriction barriers 228-231 3.4 Protective railing 232-237 3.5 City fence 238-240
More informationDIE SPECIFICATION SHEET #1 TITLE BLOCK
PRINTED COPY IS DIE SPECIFICATION # TITLE BLOCK PUNCH & DIE TO NOTCH, PIERCE & CUTOFF PART NAME FRAME- BODYSIDE WINDOW L.H. (INNER) PART MATERIAL: MSB-MIA0-B PART THICKNESS: 0.7 OPER MODEL NO. 0 YEAR 999
More informationGENERAL ISOMETRIC LAYOUT
EXISTING OR PROPOSED WIPER WALL SUPPORT STRUCTURE GATE LID CARBATHAN HG 0 WEB GRAY LOWER PAN GRATING ALUMINUM WIPER WALL CARBATHANE HG, 90 GRAY STRUCTURAL SPECIFICATIONS:. FLOODGATE MATERIAL TO BE ALUMINUM
More informationFORM TP m a y /ju n e 2010
TEST CODE 01335020 FORM TP 2010089 m a y /ju n e 2010 CARIBBEAN EXAMINATIONS COUNCIL SECONDARY EDUCATION CERTIFICATE EXAMINATION MECHANICAL ENGINEERING TECHNOLOGY Paper 02 - Technical Proficiency 2 j hours
More informationHow To Measure Your Finished Opening
3000 Series Bifold Doors How To Measure Your Finished Opening MEASURE FROM RIGHT TO LEFT 2 PLACES (WIDTH) MEASURE FROM TOP TO BOTTOM 2 PLACES (HEIGHT) Tools Required for Assembly: Tools Needed: Phillips
More informationTable of Contents IMPORTANT
Plastic Laminate Restroom Partitions Floor-raced Series 500 For Standard Height Doors and Panels Only Table of ontents Pre- Information...2 Layout Dimensions for rackets...3 Mounting rackets to Wall...4
More informationTech Sheet. T4 Interior conversion kit how to - fitting instructions. 1. Rear seat belts. 2.
Page 1 of 8 T4 Interior conversion kit how to - fitting instructions Thank you for purchasing our T4 interior conversion kit. This kit will enable you to convert any SWB left hand loading door T4 into
More informationLinear Hook- on Worksurfaces
Linear Hook- on Worksurfaces Linear Hook-On Worksurfaces come in three depths and seven lengths. Different worksurfaces have different reqirements for installation that are outlined below. 27 inch deep
More informationInstallation Manual for Metal Emperor Lockers
P a g e 1 Table of Contents Page General Notes and Tools Required 2-3 Assemble Shelves with Coat Hooks/Coat Rods 4 Fastening Chart 5 Knock Down Locker Assembly (Banks of Three) 6-12 Appendix A: Dress End
More informationMurphy Door DIY Flush-Mount Bookshelf & Hardware Installation Manual
Murphy Door DIY Flush-Mount Bookshelf & Hardware Installation Manual The Murphy Door Flush-Mount Bookshelf was designed to install in the space normally occupied by a door. It is NOT designed to install
More informationWARNING Indicates a hazardous situation which, if not avoided, could result in death or serious injury. WARNING. Ranger XP Door Kit
REVISION 04 November, 20 2018 Ranger XP Door Kit Prior to installation, please verify if a revised version of this instruction sheet is available on Knowledge Center. The following symbols may be used
More information* * 98/9950WDC. Fire-Rated Devices include these. additional components. 1-Point Latch (LBL)
*24739468* 24739468 98/9950WDC Installation Instructions 1-Point Latch (LBL) Fire-Rated Devices include these additional components Metal Edge Wrap required for 60 and 90-minute applications 2-Point Latch
More information11 6 Round Building Assembly Instructions
11 6 Round Building Assembly Instructions 11 6 Round Building Hardware List 1. Pro Rib Brite White 36 Wide X 68 Long (Siding Steel) 11 2. Top Wall Wheel Ring 3 3. Base Ring 3 4. 1 ½ X 68 Aluminum Tubes
More informationFrameless Inline Door With Return QCI5263
INSTALLATION INSTRUCTIONS Frameless Inline Door With Return QCI5263 WALL MOUNT HINGES FRAMELESS DOOR / PANEL / RETURN PANEL QCI5263 REV. 0 Page 1 Certified 06/17/2016 Parts List with wall mount hinges
More informationME 25 ENGLAND. Tel +44 (0) Web 1 Blatchford Road, Horsham, West Sussex RH13 5QR
ENG ME 25 Automatic edge bander me 25 THE INNOVATIVE AUTOMATIC EDGE BANDING MACHINE FOR CRAFT JOINER S SHOPS Stable, steady, with constantly maintained adjustments, thanks to the stainless steel single-block
More information*D-1030* 1 PARTS CHECK 8 REVERSING INSTRUCTIONS F-XX-C & XX-C D Customer Service. Installation Instructions. Exit Devices
*D-1030* D-1030 F-XX-C & XX-C Exit Devices Installation Instructions 8 REVERSING INSTRUCTIONS TO REVERSE THE HANDING OF A (F)XX-C DEVICE NOTE: TO REVERSE TRIM, REFER TO SEPARATE INSTALLATION SHEETS. 1
More informationTool and Die Maker Level 3
Level 3 B3 Basic Tool Design Duration: 10 hours 3 hours 7 hours This unit of instruction introduces the Tool and Die Maker Apprentice with the knowledge and skills necessary for basic tool design and apply
More informationASSEMBLY INSTRUCTIONS DIY WALL BED KIT QUEEN BI FOLD DOOR CABINET & MECHANISM. Tools Required For Assembly. 6.5mm Masonry Drill Bit
ASSEMBLY INSTRUCTIONS DIY WALL BED KIT QUEEN BI FOLD DOOR CABINET & MECHANISM Tools Required For Assembly No 2 & No 4 Phillips Head Screwdrivers No 2 Slot Head Screwdriver Hammer Electric Drill (Hammer
More informationPRO Brake Operating Instructions
PRO Brake Operating Instructions Tapco Products Company P R O 9 a n d P R O B r a k e s PRO Brake System PRO Cut Off Gauge Simplifies cutting. PRO Cut-Off Quickly, safely, and easily makes factory quality
More informationWood Duck Nest Box Design & Assembly Directions
Wood Duck Nest Box Design & Assembly Directions Instructions, Illustrations & Photos Courtesy of MWDI and Scott Jasion, Harford County Chapter, Ducks Unlimited Side door opening design for easy mounting
More informationTOOLS REQUIRED Metal Wood Wood and Metal Screws. #16 Drill #12-24 Tap. 1/8 Drill
DEVICES COVERED IN THIS DOCUMENT: 4700S Surface Vertical Rod Device 4700SF Fire Exit Surface Vertical Rod Device TOOLS REQUIRED Metal Wood Wood and Metal Screws Sex Bolts #7 Drill ¼ -20 Tap #16 Drill #12-24
More informationPARTS LIST: Air Control Assembly (1632 Sander)
PARTS LIST: Air Control Assembly (1632 Sander) 1 6293482 Filter... 1 2 6293483 Solenoid Valve... 1 3 6293484 Brake Cylinder... 1 4 6293485 Multi-Hole Connector... 1 5 6293486 Air Valve... 1 6 6293487 Air
More informationMODUL general specifications
hinges general specifications inge-to-door attachment Mounting plate-to-cabinet Press-in Use #6 wood screws Pre-attached dowels, install with lum MINIPRESS lum boring pattern Door-to-cabinet attachment
More informationStainless Steel 95C34 Series
Stainless Steel 95C34 Series Toilet Partition Installation Manual PHONE: FAX: 866-317-2786 ATTENTION DO NOT MIX FASTENER PACKS EACH FASTENER PACK HAS THE NECESSARY BOLTS, BARRELS AND SCREWS TO INSTALL
More informationInstallation *HDWL-INSTR-001* IMPORTANT. Plastic Laminate Restroom Partitions Floor-Mounted with Overhead Brace Series 400
Plastic Laminate Restroom Partitions Floor-Mounted with Overhead race Series 400 For Standard Height Doors and Panels Only Table of ontents Pre- Information...2 Layout Dimensions for rackets...3 Mounting
More informationINSTALLATION GUIDE TOYOTA 4 RUNNER (2013+) REAR BUMPER
INSTALLATION GUIDE TOYOTA 4 RUNNER (2013+) REAR BUMPER CONTENTS CONTENTS Rear Bumper (base or dual arm) Installation...................................... 2 Dual Swing Installation..........................................................
More informationMounting Instructions Item No.: xxx
Mounting Instructions Item No.: 271.92.xxx Wall-Beds 1 General Notes For vertical folding beds Successful and safe installation of Bed-Lift and construction of casework requires a professional skill level
More informationSCI-FAB Product Specifications. Casework Section 1. Part 1 General
SCI-FAB Product Specifications Casework Section 1 Part 1 General 1.1 SCOPE OF WORK Includes all factory fabricated stainless steel casework as required by the project drawings. 1.2 TYPICAL INCLUSIONS A.
More informationInstallation Instructions - Model V4JSD 1
Installation Instructions - Model V4JSD 1 Support Assemblies: Parts list: (Note see enclosed cut sheet for quantities and dimensional information) A vertical structural member (1 ½ x 1 ½ modular frame)
More informationECLIPSE: TV COVER INSTALLATION GUIDE
ECLIPSE: TV COVER INSTALLATION GUIDE 1 Congratulations on purchasing your Eclipse Vanishing TV Mirror! Installing your TV into the Eclipse Mirror is a very simple process following these instructions.
More informationCopyright Black Box Corporation. All rights reserved Park Drive Lawrence, PA Fax
Copyright 2003. Black Box Corporation. All rights reserved. 1000 Park Drive Lawrence, PA 15055-1018 724-746-5500 Fax 724-746-0746 JULY 2003 RM3010A RM315-R2 RM323-R2 RM329 RM451 RM457 RM3020A RM316 RM324-R2
More informationANGLE AND FLAT BAR LINE ABL-74T
ANGLE AND FLAT BAR LINE ABL-74T ABL-74T The ABL-74T is our most economical, entry level machine for punching and shearing angle and flat bar. It has a combination of features requested by our customers.
More informationRH-412 STEEL DOORS INSTALLATION INSTRUCTIONS
RH-412 STEEL DOORS INSTALLATION INSTRUCTIONS By following the steps outlined below, the assembly, installation and adjustment of the steel doors, will be a simple process. Let s start with the Driver Side.
More informationInstallation for Full Size Polaris Ranger Crew Doors
Installation for Full Size Polaris Ranger Crew Doors Order of Installation: Heater Doors Wiper on to Windshield Windshield Top & Back Panel Note: Most of the steps in these instructions need to be repeated
More informationCustom 3-Point Seatbelt Installation Guide for: Corvette
Custom 3-Point Seatbelt Installation Guide for: 1963-67 Corvette Note: The information enclosed in this installation guide is to be used as merely an outline to assist you during the process of installation.
More informationSEATBELT SOLUTIONS, LLC.
Custom 3-Point Seatbelt Installation Guide for: 1963-67 Corvette Note: The information enclosed in this installation guide is to be used as merely an outline to assist you during the process of installation.
More informationAWMS Inc State Route 41 Northwest, Washington Court House, OH
AWMS Inc. 5029 State Route 41 Northwest, Washington Court House, OH 43160-8740 18 Jul 2010 DRO PROS 2010-A Harbison Drive #213 Vacaville, CA 95687 DRO PROS, You were most helpful when I was looking to
More informationMS HYDRAULIC GUILLOTINE SHEAR
MS-25-10 HYDRAULIC GUILLOTE SHEAR MS-25-10 HYDRAULIC GUILLOTE SHEAR STANDARD Low speed electric motor & low hydraulic working pressure ensures long life. If the remote foot-pedal control is released anywhere
More informationINSTALLATION INSTRUCTIONS RH 412 STEEL DOORS
By following the steps outlined below, the assembly, installation and adjustment of the steel doors, will be a simple process. Let s start with the Driver Side. Note: Having the hood open makes the job
More information`48-`56 Ford Pickup Rear leaf Spring Kit Installation Instructions Tech Line:
`48-`56 Ford Pickup Rear leaf Spring Kit Installation Instructions Tech Line: 1-855-693-1259 www.totalcostinvolved.com CHECK ALL PARTS INCLUDED IN THIS KIT TO THE PARTS LIST BEFORE INSTALLING THE KIT.
More informationSolutions AGRICULTURAL LABORATORY & CLASSROOM FURNITURE. Education to Industry. Solutions for Your Workspace & Storage Needs
AGRICULTURAL LABORATORY & CLASSROOM FURNITURE Education to Industry for Your Workspace & Storage Needs www.ageducationalsolutions.com 864-256-0621 info@ageducationalsolutions.com Workbenches Potting Benches
More informationOXYGEN INSTALLATION. Revision date
12345 1 Hardware List 12345 Flat head wood screw #9 x 7/8 long with #2 Phillips drive, silver Used to attach surfaces and end panels Hex set screw ½-13 x 2 long with 1/4 hex drive, black Used on Legs Hex
More information12. Wings, Flaps, Ailerons and Struts
12. Wings, Flaps, Ailerons and Struts Fit Aileron Hinges Reference: Drawing 20270K2 Photo 12.1 Parts Required: 2007092 Aileron LS 200809N Aileron RS 2001394 Hinge 3/16 A1 (4) 2001694 Hinge Pin (4) PH0059N
More informationSECTIONAL DOORS INSTALLATION GUIDE. (incl. Inspiration Doors) THIS GUIDE IS FOR USE BY EXPERIENCED INSTALLERS OF GARAGE DOORS
SECTIONAL DOORS INSTALLATION GUIDE (incl. Inspiration Doors) THIS GUIDE IS FOR USE BY EXPERIENCED INSTALLERS OF GARAGE DOORS By undertaking the installation of this door, the installer understands the
More informationFeatures of TOOLFAST Clamping Devices and Clamping Elements
PART I CLAMPING DEVICES & CLAMPING ELEMENTS INTRODUCTION In the following pages of this part of catalogue, different types & sizes of clamping devices and clamping elements manufactured by us are illustrated.
More informationHD-CXENVL-FDR Envelope Feeder Assembly and Operations Guide
HD-CXENVL-FDR Envelope Feeder Assembly and Operations Guide Rev. 12-12-16 1 Table of Contents DESCRIPTION OF FUNCTION... 3 Time-out (out of paper) Feature... 3 PREPARING THE HD-CX1600/1700 (C9x1) PRINTER...
More informationCYCL E STAT IO N. High Capacity
CYCL E STAT IO N High Capacity The Dero Cycle Station provides high-capacity, covered bike parking for bicycle commuters. With a high roof and open platform, the Dero Cycle Station allows bike corrals,
More informationBe sure any accessory used will fit with the soft upper doors before installing. Not all accessories will be compatible.
Company Name: Spike Power Sports Vehicle Name: Polaris General 2P Product Description: Soft Upper Doors Part Number: 58-1600 Revision: R01 09/19/2018 Contents: 655 Elm Ridge Ave, Canal Fulton OH, 44614
More informationMulchmaker for gardening buffs
Mulchmaker for gardening buffs By MANLY BANISTER ANY GARDENING BUFF knows the best way to fertilize the garden is with organic material and that the cheapest organic material is homegrown compost. Mulches
More informationPINEHAVEN SHEDS Assembly Instructions FOR LEAN-TO SHEDS
PINEHAVEN SHEDS Assembly Instructions FOR LEAN-TO SHEDS GARDEN PRODUCTS www.pinehavensheds.co.nz 5/16 hex drive bit, By asking about our products at your nearest DIY or gardening store www.pinehavensheds.co.nz
More informationPRO Series Brakes Operating Instructions
PRO Series Brakes Operating Instructions Tapco Products Company PRO Brake System PRO Cut Off Gauge Simplifies cutting. PRO Cut-Off Quickly, safely, and easily makes factory quality cuts in coil stock,
More informationINSTALLATION & OWNER S MANUAL
Rev. O p. 1 of 16 INSTALLATION & OWNER S MANUAL V4213 BALL CAGE KIT INSTALLATION & OWNER S MANUAL The contents of this envelope are the property of the owner. Be sure to leave with the owner when installation
More information33/3547A. Special tools needed: #10-24 tap Drill bits: #25, 5/16, 13/32, 1/2
911404-00 Concealed Vertical Rod Exit Device 33/3547A Installation Instructions Devices covered by these instructions: 33/3547A and 33/3548A Concealed Vertical Rod Exit Device 33/3547A-F and 33/3548A-F
More informationPrecision Steel Car s 100 T Steel Coil Car
Precision Steel Car s 100 T Steel Coil Car Precision Steel Car www.precisionsteelcar.com info@precisionsteelcar.com Paul Vernon: (513) 571-5739 Revised 4/30/2009 Contents of Kit Main Tube Side Frame 2
More informationNext Level Security. This 2-tier locker ships flat to save on freight, comes in galvanized and powder coat finish options, and has a modular design.
T WO - T I E R B IK E LO C K E R Next Level Security We take long-term bicycle storage to new heights with the new Dero Two-Tier Bike Locker. It is easy to load and provides a space-saving solution to
More information