Building small wooden boats in Myanmar 12 ft & 18 ft Multi-purpose boats

Size: px
Start display at page:

Download "Building small wooden boats in Myanmar 12 ft & 18 ft Multi-purpose boats"

Transcription

1 12 ft & 18 ft Multi-purpose boats Immediate Rehabilitation of Subsistence Fisheries Livelihoods in Areas Affected by Cyclone Nargis (OSRO/MYA/805/SWE) Funded by the Government of Sweden

2 Cover photograph: Completed boat of the 12ft and 18ft designs at the boatyard in Kungyangon. FAO/D. Davy

3 12 ft and 18 ft multi-purpose boats by: Daniel Davy FAO Consultant and Kilian Svensson FAO Consultant FOOD AND AGRICULTURE ORGANIZATION OF THE UNITED NATIONS Yangon, 2009

4 The designations employed and the presentation of material in this information product do not imply the expression of any opinion whatsoever on the part of the Food and Agriculture Organization of the United Nations (FAO) concerning the legal or development status of any country, territory, city or area or of its authorities, or concerning the delimitation of its frontiers or boundaries. The mention of specific companies or products of manufacturers, whether or not these have been patented, does not imply that these have been endorsed or recommended by FAO in preference to others of similar nature that are not mentioned. The views expressed in this publication are those of the author(s) and do not necessarily reflects the views of FAO. All rights reserved. Reproduction and dissemination of material in this information product for educational or other non-commercial purposes are authorized without any prior written permission from the copyright holders provided the source is fully acknowledged. Reproduction of material in this information product for resale or other commercial purposes is prohibited without written permission of the copyright holders. Applications for such permission should be addressed to: Chief, Electronic Publishing Policy and Support Branch Communication Division, FAO, Viale delle Terme di Caracalla, Rome, Italy or by to: FAO 2009

5 Preparation of this document This manual has been developed from information collected during a Food and Agriculture Organization (FAO) project on Immediate Rehabilitation of Subsistence Fisheries Livelihoods in Areas Affected by Cyclone Nargis (OSRO/MYA/805/SWE), funded by the Government of Sweden. The manual draws on experience gained during a boatbuilding demonstration project in the village of Kathit Kone, near Kungyangontraining, in Myanmar in 2009, where a number of boats of the 12 ft design and nine of the 18 ft design were built. Daniel Davy, FAO Consultant Naval Architect, was responsible for the final designs, and Kilian Svensson, FAO Consultant Master Boatbuilder, was responsible for organizing and conducting the boatbuilding activities. The preparation of this manual was completed under the technical supervision of Ari Gudmundsson, Fishery Industry Officer (Vessels), Fisheries and Aquaculture Department and with the support of Emergency Operations and Rehabilitation Division, Technical Cooperation Department, FAO, Rome, Italy. iii

6 Abstract This step-by-step manual contains information on the construction of small multi-purpose boats typical of those found in the Ayeyarwaddy Delta in Myanmar. Its purpose is to give organizations access to detailed information on boatbuilding, which will allow the production of small boats appropriate to the Delta. The manual is also intended to assist organizations in their understanding of the boatbuilding process and to provide guidelines on good practice. It should assist in the review of contracts and quality control in boatbuilding. The manual provides information on two boat designs: 12 ft and 18 ft boats. It also gives the scantlings and material requirements as well as the guidelines for selecting and using timber for the boat construction. The largest part of the manual describes how to build the boats step-by-step. Finally, the manual contains boatbuilding guidelines for wooden boats of less than 7 m in length and operating at speeds of less than 12 knots. iv

7 CONTENTS 1. INTRODUCTION DESIGNS SCANTLINGS MATERIAL REQUIREMENTS GUIDELINES FOR SELECTING AND USING TIMBER STEP-BY-STEP CONSTRUCTION METHOD EDGE NAILING OF PLANKS ADDITIONAL INFORMATION BOATBUILDING GUIDELINES v

8

9 1. INTRODUCTION This manual contains information on the construction of small multi-purpose boats typical of those found in the Ayeyarwaddy Delta in Myanmar. Its purpose is to give organizations access to detailed information on boatbuilding, which will allow the production of small boats appropriate to the Delta. It is also intended to assist organizations in their understanding of the boatbuilding process and to provide guidelines on good practice. It should assist in the review of contracts and quality control in boatbuilding. 2. DESIGNS Information on two designs 12 ft and 18 ft boats is presented. The boats are simple wooden canoes of flat-bottomed construction, typical of the small multi-purpose boats found in the Ayeyarwaddy Delta. The 12 ft design is intended to be propelled by paddles and the 18 ft design may be propelled by paddles, oars or long tail motor. (Note: No information is given on the installation of motors.) There are many local variations in boat design in the Delta. These mainly concern traditional preferences and features to suit local environmental conditions and fishing methods. When this manual is used by an experienced boatbuilder from the Delta, it will be possible to vary the given designs slightly to achieve the desired result. The main details of the designs are given below. 12 ft Boat Type of boat Propulsion Length Beam Depth Bauk Tu multi-purpose boat from Delta Paddles 12 ft 6 in (3 810 mm) measured along length of top plank 32.5in (830 mm) measured across widest point 11 in (280 mm) measured from top of keel at mid-section 18ft Boat Type of boat Propulsion Length Beam Depth Gault Chun multi-purpose boat from the Delta Oars and paddle 18 ft (5 480 mm) measured along length of top plank 4 ft (1 225 mm) measured across widest point 19 in (480 mm) measured from top of keel at mid-section 1

10 12 ft Bauk Tu 2

11 18 ft Gault Chun 3

12 3. SCANTLINGS 12-ft Bauk Tu Typical Frame Section 18-ft Gault Chun Typical Frame Section 4

13 4. MATERIAL REQUIREMENTS 12ft Bauk Tu Materials list Item Length (min) Width Thickness No. of pieces Timber (mm) (mm) (mm) A Lower side plank B Upper side plank C Transom D Keel E Inner bottom plank F Outer bottom plank G Covering board (side) H Stem I Clamp J Frames K Floors L Floorboards Floorboard transverses M Decks N Transverses O Mast supports Fastenings* Joint Length Thickness No. of pieces (mm) (mm) Nail Planks to frames Nail Keel to frames Nail Bottom plank to side plank Nail Clamp to plank P Nail Frame to frame Nail Rail cap Nail Plank to plank * Note: All fastenings should be hot-dipped galvanized. 5

14 18ft Gault Chun Materials list Length (min) Width Thickness No. of pieces Timber (mm) (mm) (mm) i i i A Lower side plank B Upper side plank C Stringer D Transom min. 1 E Keel F Inner bottom plank G Outer bottom plank H Covering board (side) I Stem J Inwale K Rail cap L Frames M Floors N Floorboards N Floorboards N Floorboard transverses P Decks Q Transverses S Oar supports T Mast supports Fastenings* Joint Length Thickness No. of pieces (mm) (mm) (mm) R Bolt + (nut & washer to suit) Frame to frame Nail Planks to frames Nail Keel to frames Nail Stringer to frame Nail Bottom plank to side plank Nail Inwale to frame Nail Frame to frame Nail Rail cap Nail Plank to plank * Note: All fastenings should be hot-dipped galvanised. 6

15 5. GUIDELINES FOR SELECTING AND USING TIMBER Wood specification * Boat builder s preferred wood ** Alternative 1 Alternative 2 Thin Gan (Hopea Odorata Roxb) Specific gravity 0.68 (medium) Durability very good Shrinkage small Seasoning easy Ka Nyin (Dipterocarpus spp.) Specific gravity 0.75 (medium) Durability moderate Shrinkage considerable Seasoning moderately easy Pyin Ma (Lagerstroemia speciosa) Specific gravity 0.53 (light) Durability good Shrinkage moderate Seasoning slowly Length If possible, it is recommended that boards be a minimum of 20 ft (6.1 m) long. Consideration should be given to the quantity of boats to be built in each size when ordering timber. If a board is not suitable for the larger boat due to damaged or split ends, it may be suitable for the smaller boat. Sapwood Seasoning Storage Sapwood, the outer and often lighter coloured part of the log, should never be used in boatbuilding. It is normally easy to distinguish this part of a board. Seasoning is required for all boards. Boats should not be built with freshly sawn timber because shrinking and warping (bending) will occur. A minimum of four weeks during dry weather and more during the wet season are recommended for seasoning. It is recommended that the seasoning be as long as practical. Freshly sawn boards should be selected and carefully stacked immediately after sawing. The ends should be painted to avoid splitting. The layers of planks should be separated by transverse battens of equal thickness (1 x 2 ), spaced no more the 90 cm (3 ft) apart. The battens at the ends should be as close to the board ends as possible. * All timber should be legally cut and from sustainably managed sources with appropriate government clearances. The situation regarding timber supply is constantly changing and guidance on suitable species may be updated in the future. ** Thin Gan is facing a high risk of extinction in the wild in the medium-term future and is a reserved species in Myanmar for which government permission is needed before cutting. Alternatives should therefore be considered. 7

16 6. STEP-BY-STEP CONSTRUCTION METHOD 1 12 ft & 18 ft The floors The shape of the boat is generated from the floor timbers and the natural curve of the lower side planks (see step 12). 12 ft The dimensions of the necessary floor timbers are shown in step 2 and their positions are given in step 8. The timber required is: 38 mm x 75 mm. 18 ft The dimensions of necessary floor timbers are shown in step 3 and their positions are given in step 9. The timber required is: 38 mm x 100 mm. These shapes can be drawn onto paper for use as full-size templates or drawn directly onto the timber to be cut ft Floor dimensions Dimensions of floor timbers are as follows: Note: The dimensions for floors at other frame positions may be determined once stem and transom are fitted (see step 19). 8

17 3 18 ft Floor dimensions Dimensions of floor timbers are as follows: Note: The dimensions for floors at other frame positions may be determined once stem and transom are fitted (see step 19). 9

18 4 12 ft & 18 ft Mark out floors Draw the shape of the floors on the timber. 12 ft The timber required is: 38 mm x 75 mm. 18 ft The timber required is: 38 mm x 100 mm ft & 18 ft Cut floors Cut the floor timbers to the required sizes. Shape the bottom of the floor with the required curve. 12 ft The bottom curve is: zero. 18 ft The bottom curve is: up to 23 mm (see step 3) ft & 18 ft Prepare lower side planks Cut two planks to the same size and shape to ensure symmetry of the boat; this is done by clamping the planks together while working. 12 ft The timber required is: 180 mm x 16 mm x mm. 18 ft The timber required is: 220 mm x 19 mm x mm. 10

19 7 12 ft & 18 ft Mark lower side planks The positions of the frames and the angles of the ends of the planks are marked on the prepared planks. The required dimensions are given in steps 8 and 9. Note: The forward (stem) end of the planks should be cut to the correct angle, whereas the aft end (transom) is not cut yet. This is left long to be cut later; the additional length should be about 150 mm, to suit local preferences ft Lower side plank dimensions The lower side plank is marked out to the following dimensions: 11

20 9 18ft Lower side plank dimensions The lower side plank is marked out to the following dimensions: ft Install floor at frame 4 18 ft Install floor at frame 5 Align the floor to the line marked on plank. Pre-drill two nail holes (see step D in Section 6.1) and fasten the planks to each end of the floor. Note: The floor is fitted aft of the marked line (see step 11). 12 ft & 18 ft The fastenings required are: 2 mm x 50 mm nails for each frame. 12

21 11 12 ft Install floor at frame 5 18 ft Install floor at frame 6 Repeat step 10. Note: The floor should be fitted in front of the marked line. In general, the floors in the forward part of the boat are fitted in front of the marked line and those in the aft part behind the marked line ft & 18 ft Set up lower side planks Place the assembly of planks and floors the right way up on the build frames. See how the angle of the floors defines the curve in the bottom of the boat as the ends are brought together. Note: This curve may be adjusted a little to suit local preference. If significant change is required, the lower side planks will need shaping at the ends ft & 18 ft Prepare stem 12 ft The timber required is: 100 mm x 75 mm x 600 mm. 18 ft The timber required is: 125 mm x 100 mm x 950 mm. 13

22 14 12 ft & 18 ft Shape stem The stem has the following dimensions: 12 ft The dimensions are: A = 490 mm, B = 25 mm, C = 600 mm. 18 ft The dimensions are: A = 750 mm, B = 90 mm C = 950 mm. Note: The rebate is cut to suit the planking thickness and angle ft & 18 ft Assemble stem & lower side planks The stem is offered up to the lower side planks. A rope may be used to draw the ends of the planks together. Note: The angle of the stem is set by the angle of the cut at the end of the lower side plank (see note 7) ft & 18 ft Fit stem A clamp should be used to ensure a good fit and to hold the planks in place. Pre-drill the nail holes (see step D in section 6.1) and fasten the stem to one plank and then to the other. 12 ft & 18 ft The fastenings required are: 2 x 50 mm nails for each plank. Note: Take care not to split plank ends when fastening. 14

23 17 12 ft & 18 ft Mark & cut transom 12 ft Transom dimensions 12 ft The timber required is: 250 mm x 32 mm x 600 mm. 18 ft The timber required is: 320 mm x 40 mm x 900 mm. 18 ft Transom dimensions ft & 18 ft Fit transom A clamp should be used to hold the planks in place. Predrill the nail holes (see step D in section 6.1) and fasten the transom to one plank and then the other. 12 ft & 18 ft The fastenings required are: 2 mm x 50 mm nails for each plank. Notes: 1) The angle of the transom is set by the angle marked on the lower side planks (see steps 8 & 9). 2) Take care not to split the plank ends. 3) The ends of the planks are left long to be cut later. 15

24 19 12 ft & 18 ft Fit remaining floors The remaining floors can now be cut to size by taking measurements at the boat. The timber required is given in step 1. See step 10, 11 and 20 for installation procedures. Note: The floors in the forward part of the boat are fitted in front of the marked line and those in the aft part, behind the marked line ft & 18 ft Bevel floor ends The ends of the floors should be bevelled to suit the curve in the plank ft Mark plank overlap Carefully mark a line 19 mm below the top edge of the plank. This line is to give the overlap between the lower and upper side planks. 16

25 22 12 ft & 18 ft Prepare frames Cut lengths of timber to make the frames. 12 ft The timber required is: 50 mm x 38 mm x 350 mm. 18 ft The timber required is: 62 mm x 38 mm x 600 mm ft & 18 ft Frame details The frames have a notch cut to suit the upper side plank. The notch is the depth of the thickness of the top plank and extends to the marked line for the plank overlap (see step 21) ft Fit frames Fit the frames aligning the notch with the line marked on the plank. Frames are slightly over length & will be cut later (see step 48). The fastenings required are: 50 mm nails. Pre-drill the nail holes (see step D in section 6.1). Note: A temporary keelson may be fitted at this stage to ensure that the structure remains rigid & straight. 17

26 25 12 ft & 18 ft Frame details Note the following frame details: 1) The frames are not bevelled but fitted aligned with the planking. 2) The frames are halved where they lap the floors. 3) The frames in the forward part of the boat are fitted in front of the floors and those in the aft part behind the floors ft Fit frames The fastenings required for the frame to floor joint are: 1 mm x 75 mm x 8 mm bolt or 2 mm x 50 mm nails. Pre-drill the nail holes (see step D in section 6.1). Note: Where bolts are used, it is recommended that nails are used as temporary fastenings when assembling the frames ft & 18 ft Framing complete Note: Temporary transverses should be fitted at this stage, to ensure structure remains rigid & straight. 18

27 28 18 ft Cut bilge stringer Offer up the timber for the bilge stringer, and mark and cut the correct angle at the stem. The timber required is: 90 mm x 32 mm x mm ft Install bilge stringer Starting at the stem fit the bilge stringer. The fastenings required are: 2 mm x 50 mm nails for each plank. Pre-drill the nail holes (see step D in section 6.1) ft Install bilge stringer Working back from the stem and making use of a clamp where required, continue fastening the stringer to the frames. When complete, the lower plank and stringer should be edge-fastened (see section 6.1). The plank overlap should be marked on the top edge of the stringer (see step 21). See step 21 for marking edge of stringer. 19

28 31 12 ft & 18 ft Mark & cut out stern cover boards The cover boards are designed to suit local preferences. The timber required is the same thickness as the hull planking ft & 18 ft Mark & cut out bow cover boards The cover boards are designed to suit local preferences. The timber required is the same thickness as the hull planking ft & 18 ft Fit bow & stern cover boards Fasten the cover boards to the stem (or transom) and edgefasten to the upper edge of the lower plank (or stringer.) For edge fastening and pre-drilling, see section 6.1. Note: The inside face of the cover boards should be flush with the lower side plank (or stringer.) 20

29 34 12 ft & 18 ft Prepare upper side planks Cut a pair of planks to the same size and shape to ensure symmetry of the boat. This is done by clamping the planks together when working. The lower, outer edge of these planks is planed off by about 1/3 of the thickness (see illustration). 12 ft The timber required is: 160 mm x 16 mm x mm. 18 ft The timber required is: 200 mm x 19 mm x mm. Note: The length of the planks is determined at the boat. Also, the aft end of the plank is left over long and will be cut later (see step 47). The additional length should be about 150 mm, to suit local preferences ft & 18 ft Fit upper side planks The upper side planks are bent into place; several pair of hands will be required for this step. Note: These planks do not touch the stem or transom (see step 37). 21

30 36 12 ft & 18 ft Fit upper side planks Note how the plank fits inside the lower plank (or stringer) into the notches in the frames. A clamp may be required to assist in this process. The fastenings required are: 2 mm x 50 mm nails for each frame. Pre-drill the nail holes (see step D in section 6.1) ft & 18 ft Upper side plank ends The upper side planks fit inside the bow and stern cover boards. Note: The upper side planks are cut in order not to touch the stem or transom. There is a 10 to 15 mm gap ft & 18 ft Turn boat over Turn the boat over on the built frames. 22

31 39 12 ft & 18 ft Prepare bottom Before fitting the keel, there are several steps to complete: 1) Cut frame ends and transom to length (level with bottom). 2) Bevel bottom edge of lower side planks; this should be level with the bottom of the floors. 40 Fit keel 12 ft The timber required is: 75 mm x 25 mm x mm & the fastenings required are: 2 mm x 50 mm nails for each floor. 18 ft The timber required is: 100 mm x 32 mm x mm & the fastenings required are 2 mm x 62 mm nails for each floor. Note: The keel may be tapered to 70 mm wide at the ends; this will assist the planks forming the curved bottom. 41 Bottom planks Offer up planking and cut approximately to length. 12 ft The timber required is: 2 pieces 125 mm x 16 mm x mm & 2 pieces 125 mm x 16 mm x mm. 18 ft The timber required is: 2 pieces 150 mm x 19 mm x mm & 2 pieces 150 mm x 19 mm x mm. 23

32 42 12 ft & 18 ft Fit bottom planks Mark frame positions on planks; once marked, the bottom planks can be fitted. A clamp will be required to keep the plank edges tightly together. The fastenings required are: 2 mm x 50 mm nails for each floor. Pre-drill the nail holes (see step D in section 6.1) ft & 18 ft Edge nail planks Once fitted, the bottom planks can be edge fastened (see section 6.1) ft & 18 ft Cut edge of bottom planks The outboard edge of the bottom planks can be trimmed and then made smoother with a plane. Note: The bottom planks should extend beyond the side planks by about 6 mm to assist in puttying the bottom seam. 24

33 45 12 ft & 18 ft Fasten edges The bottom planks need to be fastened to the side planks along the edges. The holes should be pre-drilled, and care should be taken not to split the planks ft & 18 ft Fasten edges At the ends of the bottom planks, the edges need to be fastened to the adjacent plank. The holes should be pre-drilled, and care should be taken not to split the planks (see step D in section 6.1) ft & 18 ft Ends of planks The aft ends of the side planks can be cut and shaped. The shape is designed to suit local preferences. 25

34 48 Mark the frames Turn the boat over. Cut the frame tops in line with the upper side plank. Note: The frame tops will require further trimming once the inwales are fitted (see step 51). The frames need to be marked to suit the inwale that is to be fitted. 12 ft The timber required is: 50 mm x 19 mm x mm. 18 ft The timber required is: 62 mm x 19 mm x mm. 49 Cut the frames Once marked, the frame tops can be cut to the correct dimensions. 12 ft Once the frame top is removed, the inwale is placed against the inner face of the hull plank. 18 ft The frame top is notched to receive the stringer. 50 Fit the inwales 12 ft The fastenings required are: 2 mm x 38 mm nails for each frame. 18 ft The fastenings required are: 50 mm nails for each frame. Pre-drill the nail holes (see step D in section 6.1). 26

35 51 18 ft Cut the frame tops It is recommended that: 1) the frame tops are cut so that they do not touch the under-side of the gunwale caps, which are fitted later (see step 55); 2) the frame tops and the edges of the planking and the stringer are treated (see step 61) ft Mark the rail cap The rail cap will have to be fitted in 3 or more sections to accommodate the curve of the gunwale. Here, a board is offered up so that it can be marked with the required curve on its underside. The rail cap is cut from ¾ (19 mm) timber ft Cut the rail cap The rail cap is cut to the marked lines. 27

36 54 18 ft Dry fit the rail cap Check the sections of rail cap by offering them up to the boat ft Fit the rail cap Mark and cut scarf joints in the ends of the sections of gunwale cap; fasten the rail cap to the top of the hull plank and the gunwale stringer. The rail cap is fastened to the hull plank and stringer with 38-mm nails spaced at 125 mm to 150 mm. Pre-drill the nail holes (see step D in section 6.1) ft & 18ft Trim stringers and hull for decks Where the forward and aft decks are to be fitted, the edge of the stringers and hull plank need to be trimmed so that they are horizontal. 28

37 57 12 ft & 18 ft Fit the bow and stern decks Short decks or seats are fitted at the ends of the boat. The decks are designed to suit local preferences. 12 ft The timber required is: 16 mm thick. 18 ft The timber required is: 19 mm thick ft & 18 ft Finish details Final shaping and finishing of details should be completed. These details are designed to suit local preferences and may include: the shaping of styling pieces in bow and stern; the final details of the stem and transom ft & 18 ft Finished boat The boat is now ready for puttying and timber treatment. 29

38 60 12 ft & 18 ft Putty seams Putty is made up to a traditional recipe using a natural powder (see right) and oil, either cooking or diesel. The putty is rolled into lengths and worked into the seams. Note: This process will need to be regularly repeated to keep the boat watertight ft & 18 ft Treat timber A timber treatment is made to a traditional recipe using diesel and engine oil. The mixture is applied all over the boat inside and out. Note: 1) This process will need to be regularly repeated to keep the boat in good condition. 2) This treatment is potentially harmful to the environment and humans ft & 18 ft Finished boat The boat is now ready for the final details. 30

39 63 12 ft & 18 ft Final fastenings A few days after the completion of the boat, the planks will have dried a little, and movement and shrinkage will have taken place. At this point, it is necessary to put the final fastenings in. These are required where the top plank overlaps the lower plank (or stringer) ft & 18 ft Final fastenings Two equally spaced fastenings are required between each frame. 12 ft The fastenings required are: 38-mm nails. 18 ft The fastenings required are: 50-mm nails. Pre-drill the nail holes (see step D in section 6.1) ft & 18 ft Final details Final details are designed to suit local preferences. In some areas, it is necessary to fit transverse frames in the bow and stern; these are used for various purposes, including securing the boat. 31

40 66 12 ft & 18 ft Final details Final details are designed to suit local preferences. Other details will include: Floorboards. See Section 4 for material requirements. These should be easily removable and in general not fitted in the middle frame space of the boat because this is used for bailing water. Paddles/oars. These need to be built to suit the user s requirements. Oars will need slots in the side of the boat and support posts ft & 18 ft Mast support A mast support may be added to suit local preferences. This will typically consist of: 1) a transverse of 75 mm x 38 mm, fixed to a frame between the top of the lower side plank and the top of the upper side plank; 2) a block or transverse fixed to the keel below this. Both parts have a hole for the mast of about 40 mm to 50 mm. The mast support should be fitted at frame 7 on the 12 ft design and frame 9 on the 18 ft design. 32

41 68 12 ft & 18 ft Launch After launch, the boats are likely to leak initially. This is normal since it takes a little time for the planking to swell up now that it is in the water. If the problem is serious, more putty may need to be applied in the seams below the water. At this stage, before the boats are in regular use, it is very important to ensure that they don t dry out in the sun, since this will cause shrinkage of the timber. It is best to keep the boats in a shaded area or in the water until they are handed over to the users. Alternatively, they can be filled with leaves or wood shavings, which may be kept wet. 33

42 6.1 EDGE NAILING OF PLANKS A Mark nail positions When edge fastening, planks slots need to be cut for the nails. Mark these out carefully to ensure that the nails are in the correct positions. Two nails are used between each frame, and the slot is cut between two lines; the first is 1 x the plank thickness from the edge and the second is about 2.5 x the plank thickness from the edge. B Cut nail slots Using a sharp V-shape chisel, cut the nail slots in the marked positions. The depth of the slot at the line closer to the plank edge should be just sufficient to accommodate the nail head. C Finished nail slots The finished nail slots should be neat and regularly spaced. 34

43 D Pre-drill holes To ensure that planks do not split, pre-drill the nail holes in the plank edge. The drill should be one size or 1 mm smaller than the nail. Note: In general, it is good to pre-drill nail holes in all locations, but it is particularly important to do so where the nails are close to the edge or end of the timber. E Insert nails Insert the nails into the predrilled holes. F Nailing Use a punch to drive the nails fully into the slots. Care should be taken not to split the planks. Note: In general, it is good to countersink nail holes by at least 3 mm in all locations. When not edge nailing, this can be done with a drill the same size as the nail head. 35

44 6.2 ADDITIONAL INFORMATION G Protection of joints To ensure that water does not settle between components and cause rot, it is desirable to protect the enclosed surfaces. This may be done with the timber treatment (see step 61) or by painting with primer. An alternative is to use a thick and flexible compound called mastic. This can be done cheaply by using the locally available components shown in the photograph. H Protection of joints The paint or mastic should be applied to the surface to be jointed before fastening. Note: Where pre-drilling is required, this should be done before applying the paint or mastic. I Protection of joints A completed joint. Note: The paint or mastic should squeeze out of the joint once assembled. 36

45 7. BOATBUILDING GUIDELINES 7.1 Introduction The guidelines are applicable to boats less than 7 m in length and operating at speeds of less than 12 knots. It is possible that some boat types may be outside the scope of these guidelines or not practically able to meet all sections. However, the intention is to provide useful information to organizations and authorities involved in building small boats. 7.2 Timber Timber should be well seasoned with a moisture content of 15 to 20 percent, of good quality and free from splits, sap wood and significant knots. The timber should be selected from available species known to have a locally proven record in boatbuilding with good resistance to rot. Keel and underwater planking should preferably have some resistance to marine borers. 7.3 Planking Hull planking should be from continuous lengths where possible. The width of planks should be kept as small as practical, preferably less than eight times the plank thickness. Planks should have two fastenings at each frame; wide planks should have three fastenings at each frame. Hull planking should be of a thickness which is suitable for the size of boat and the frame spacing. And in general planking of 15 mm or less should not be used. Planks should be fitted tight together; the gap between planks should be less than 1 mm. The seams between planks may be caulked with an organic material such as oakum and then filled with flexible waterproof filler. Joints in planks may be made by one of the following methods: on a frame; between frames using butt blocks on the inside of the planking; or by a scarf joint spanning two frames. 37

46 7.4 Frames Frames should be sawn from timber where the grain follows the shape of the frame. It is preferable for the bottom frames or floors to be bolted to the keel, and washers should be used under the head of the bolt and the nut. All frame components, especially the end grain, should be primed before assembly. 7.5 Keel and other components The keel should preferably be in one length. If necessary, the keel may be joined with a scarph of length (L) 5 x keel height (M) with end notches of depth (H) 0.2 x keel height. The scarph should be bolted together. The width of the stem should be the same as the keel. The landing of the planking on the stem should preferably have a length of 12 x the diameter of planking fastenings to avoid splitting the end of planks. Inwales and stringers should run continuously from stem to transom, and where possible, be of a single length of timber; where joints are required, the illustration below shows the requirements. On larger boats, it is good practice for the bilge stringer to be bolted in place. 38

47 The transom should be constructed in the same manner as the hull. It is preferable for the transom to be connected to the keel with a knee bolted in place. It is preferable to use a knee at the keel to stem joint. For boats of less than 6 m in length, it is recommended that the knee extends at least 150 mm along each joint and be bolted in place. All components should be primed before assembly. 7.6 Deck Deck planking should be of the same thickness as the hull sides. 7.7 Fastenings Hot-dipped galvanized nails and bolts should be used throughout the boat; alternatively, stainless steel grade AISI 316 fastenings may be used except for planks under the waterline. Electroplated fastenings are not recommended. Bolts should preferably have a hexagonal head and nut fitted with large washers. The minimum bolt size used should be 6 mm. The bolts in the keel assembly should be at least 8 mm in diameter. To avoid splitting timber, the minimum distances to the end and edge of timber parts should be as follows: Bolt diameter Minimum end distance Minimum edge distance Up to 8 mm 60 mm 35 mm 10 mm 70 mm 40 mm Planks should be fastened to the frames with nails of round or square section of the following dimensions. Planking thickness (mm) Minimum nail diameter (mm) Minimum nail length (mm) Nails should have a head of diameter of at least 2 x the nail diameter and should be countersunk 3-5 mm, and the head covered with waterproof, flexible compound. 39

Building small wooden boats in Myanmar

Building small wooden boats in Myanmar 60 12 ft & 18 ft Putty seams Putty is made up to a traditional recipe using a natural powder (see right) and oil, either cooking or diesel. The putty is rolled into lengths and worked into the seams. Note:

More information

Building small wooden boats in Myanmar

Building small wooden boats in Myanmar 39 12 ft & 18 ft Prepare bottom Before fitting the keel, there are several steps to complete: 1) Cut frame ends and transom to length (level with bottom). 2) Bevel bottom edge of lower side planks; this

More information

Building small wooden boats in Myanmar

Building small wooden boats in Myanmar 19 12 ft & 18 ft Fit remaining floors The remaining floors can now be cut to size by taking measurements at the boat. The timber required is given in step 1. See step 10, 11 and 20 for installation procedures.

More information

Step 21. The second and third planks are fitted and fastened to the boat.

Step 21. The second and third planks are fitted and fastened to the boat. Step 21. The second and third planks are fitted and fastened to the boat. 22 A step-by-step guide to building a traditional double-ended timber fishing craft of Khmer (Cambodian) design Step 22. The planks

More information

NZQA Expiring unit standard version 2 Page 1 of 5. Demonstrate knowledge of traditional wooden boatbuilding

NZQA Expiring unit standard version 2 Page 1 of 5. Demonstrate knowledge of traditional wooden boatbuilding Page 1 of 5 Title Demonstrate knowledge of traditional wooden boatbuilding Level 3 Credits 10 Purpose People credited with this unit standard are able to: describe the design evolution and development

More information

AN IMPROVED DESIGN FOR AMATEUR BUILDERS.. TAKES SAIL OR MOTOR

AN IMPROVED DESIGN FOR AMATEUR BUILDERS.. TAKES SAIL OR MOTOR BUILDING A General H ERE is a rowboat that is in a class by itself the final development of a long line of forerunners. This graceful little V-bottom craft is 13 ft. long, carries from four to six passengers,

More information

RAP PUBLICATION 2013/07

RAP PUBLICATION 2013/07 RAP PUBLICATION 2013/07 A step-by-step guide to building a traditional double-ended timber fishing craft of Khmer (Cambodian) design by Mike Savins THE FOOD AND AGRICULTURE ORGANIZATION OF THE UNITED NATIONS

More information

Photo Essay Building a. Key Largo. Carolina Dory. Plans for this boat may be found at:

Photo Essay Building a. Key Largo. Carolina Dory. Plans for this boat may be found at: Photo Essay Building a Key Largo Carolina Dory Plans for this boat may be found at: http://spirainternational.com/ Photo Essay Building a Key Largo Carolina Dory The Carolina Dory is a specialized type

More information

A Skin-on-Frame Pram. Designed by Dana Munkelt. Drawings by Andrew Walters. Duckworks Boatbuilder's Supply duckworksbbs.com

A Skin-on-Frame Pram. Designed by Dana Munkelt. Drawings by Andrew Walters. Duckworks Boatbuilder's Supply duckworksbbs.com A Skin-on-Frame Pram Designed by Dana Munkelt Drawings by Andrew Walters Duckworks Boatbuilder's Supply duckworksbbs.com "" is a small skin-on-frame (SOF) pram design with a twist; a solid plywood floor.

More information

Building instructions ARTEMIS Sailing Canoe Day Five Version 1.0 Brian Pearson & Dr. Axel Schmid Day Five. Assembly of Planks and Frames

Building instructions ARTEMIS Sailing Canoe Day Five Version 1.0 Brian Pearson & Dr. Axel Schmid Day Five. Assembly of Planks and Frames Building instructions ARTEMIS Sailing Canoe Version 1.0 Brian Pearson & Dr. Axel Schmid 2016 Assembly of Planks and Frames Steps: Assembling hull plansk with wire Install frames Align and check keel rocker

More information

Penobscot 14 Building Log

Penobscot 14 Building Log Penobscot 14 Building Log Date July 26, 2004 Duration Activity plane jig boards July 27, 2004 July 28, 2004 cut jig boards cut frame boards, assemble jig July 29, 2004 6.75 hr assemble jig August 2, 2004

More information

Chapter Six. Getting started inboard. Installing the false deck

Chapter Six. Getting started inboard. Installing the false deck A close look at the thinning down of the bulkhead extensions. They are just 1/16 thick after fairing them. Chapter Six Getting started inboard This next step is one of the last remaining messy tasks to

More information

Illustrated Guide to Building a Spira International Ply on Frame Boat

Illustrated Guide to Building a Spira International Ply on Frame Boat Illustrated Guide to Building a Spira International Ply on Frame Boat Spira International, Inc. Huntington Beach, California Copyright, 2008 All Rights Expressly Reserved Building a Spira International

More information

You start assembling the boat by piacing the buiiding board on two sawhorses as in Fig. 3. The lines marked on the building

You start assembling the boat by piacing the buiiding board on two sawhorses as in Fig. 3. The lines marked on the building ERE'S just what prospective builders of small sailboats have been looking for, as you will see from a glance at the facsimiles on the left, which reproduce excerpts from letters written by enthusiastic

More information

Balustrade Systems / Installation Instructions

Balustrade Systems / Installation Instructions A. PARTS AND SUPPLIES NEEDED FOR INSTALLATION Hardware included for each 10 section of rail: 2 3 x 1-1/2 L-brackets 4 1-3/4 x 3/16 Blue hex-head screws for anchoring the L-brackets to the newel cap, column

More information

Kentucky 4H Wood Science Plans Notebook. Plans Level 3

Kentucky 4H Wood Science Plans Notebook. Plans Level 3 Kentucky 4H Wood Science Plans Notebook Plans Level 3 MATERIALS: 2 pieces wood 3/4 x 10 x 4 1 piece wood 3/4 x 12 x 4 2 pieces wood 3/4 x 3 x 2 5 1/2" 2 pieces wood 3/4 x 3 x 1 8 1 piece wood 2 x 4 x

More information

PoorBoy Skiff. A 10-11ft 6in skiff for outboard motoring By Steven Lewis

PoorBoy Skiff. A 10-11ft 6in skiff for outboard motoring By Steven Lewis PoorBoy Skiff. A 10-11ft 6in skiff for outboard motoring By Steven Lewis PoorBoy is about the simplest small motorboat you will come across. It consists of 2-2 1/4 sheets of plywood (1-1 1/4 sheets x3/8

More information

woodworkersjournal.com MATERIAL LIST

woodworkersjournal.com MATERIAL LIST MATERIAL LIST T x W x L 1 Legs (2) 1 1 2" x 3 1 2" x 36 7 16" 2 End Uprights (2) 1 1 2" x 3 1 2" x 32 1 2" 3 Stringers (4) 1 1 2" x 3 1 2" x 42" 4 Top Cladding, Long (2) 3/4" x 7 1 4" x 65 3 4" 5 Side

More information

Chapter 17 - Porch Trim

Chapter 17 - Porch Trim Chapter 17 - Porch Trim Contents Chapter 17 - Porch Trim... 17-1 Timing & Prerequisites... 17-2 Trim on Porch Beams (Volunteer)... 17-4 Smart Trim on the Bottom of the Beam... 17-4 Smart Trim on the Inside

More information

Installing your SHOE KEEL

Installing your SHOE KEEL Installing your SHOE KEEL The shoe keel is there solely to protect the bottom of the hull. On a windy day, it will offer some resistance to a side or quartering wind and will help to avoid being blown

More information

Building Instructions Diva cabin boat

Building Instructions Diva cabin boat Building Instructions Diva cabin boat Order no. 3093/00 aero-naut Modellbau Stuttgarterstr. 18-22 D-72766 Reutlingen / Germany http://www.aero-naut.com 1 For pictured building instructions please see the

More information

Installation Guide. Capped Cellular PVC Fencing. Table of Contents. Storage and Handling Tools Needed Fence Layout and Locating Posts

Installation Guide. Capped Cellular PVC Fencing. Table of Contents. Storage and Handling Tools Needed Fence Layout and Locating Posts Capped Cellular PVC Fencing Installation Guide Table of Contents Storage and Handling Tools Needed Fence Layout and Locating Posts Installation instructions 4 x 4 Over Sleeve Post - 3.5 Rail Privacy Shadowbox

More information

San Felipe: Step by Step Pack 3

San Felipe: Step by Step Pack 3 Pack 3 Your parts Bulwarks Gun port covers x 2 Tools and equipment Wood glue Sandpaper Brushes Wood stain Hammer Pin pusher/nails Razor saw a Remove the longer bulwark and test-fit it in place at the bow

More information

Above are the offsets for the plywood panels.

Above are the offsets for the plywood panels. DinkyDink Plans Bottom Panel Half Station X Y X2 Y2 1 1/4 3/4 0 11 5/16 2 4 9/16 4 12 9/16 3 11 11/16 1/4 11 7/16 14 1/2 4 18 5/8 1/16 18 5/8 15 11/16 5 25 3/4 0 25 3/4 16 5/16 6 32 13/16 0 32 13/16 16

More information

LOG CABIN 70 ASSEMBLY INSTRUCTIONS

LOG CABIN 70 ASSEMBLY INSTRUCTIONS LOG CABIN 70 ASSEMBLY INSTRUCTIONS 400 mm x 400 mm Canopy 500 mm Veranda depth 500 mm Wall thickness 45 mm Nordic region spruce wall logs 45 mm x 35 mm Dimensions of base 3900 mm x 5400 mm including terrace

More information

Contents. Study Plans. 2 Introduction. 4 List of Materials. 5 Glue, Resin and Fixings. 6 Tools. 7 Construction Sequence

Contents. Study Plans. 2 Introduction. 4 List of Materials. 5 Glue, Resin and Fixings. 6 Tools. 7 Construction Sequence Volare Study Plans Contents 2 Introduction 4 List of Materials 5 Glue, Resin and Fixings 6 Tools 7 Construction Sequence Study Plans The study plans consist of an abridged version of the first 7 pages

More information

16ft Polytunnel Assembly Instructions

16ft Polytunnel Assembly Instructions CONTENTS Section Page 1. FOUNDATION TUBES: Option A Ground Anchor Plates 3 2. FOUNDATION TUBES: Option B Concreted Foundation Tubes 5 3. STEEL FRAME ASSEMBLY & INSTALLATION 6 4. CROP BARS 8 5. TIMBER END

More information

LOG CABIN 40 ASSEMBLY INSTRUCTIONS

LOG CABIN 40 ASSEMBLY INSTRUCTIONS LOG CABIN 40 ASSEMBLY INSTRUCTIONS 4000 mm x 300 mm Canopy 350 mm Veranda depth 500 mm Wall thickness 34 mm Nordic region spruce wall logs 34 mm x 35 mm Dimensions of base 3800 mm x 4500 mm including terrace

More information

Dura-Lock Roof System

Dura-Lock Roof System DLR-14 Dura-Lock Roof System Assembly and Installation Instructions Read the instructions before starting the job. They explain the steps required to produce a finished product that will meet factory specifications.

More information

HALFPIPE PLANS. Includes plans for a 4' Inline Skate Halfpipe, 3' Skateboard Halfpipe and a Grinding Rail

HALFPIPE PLANS. Includes plans for a 4' Inline Skate Halfpipe, 3' Skateboard Halfpipe and a Grinding Rail HALFPIPE PLANS Includes plans for a 4' Inline Skate Halfpipe, 3' Skateboard Halfpipe and a Grinding Rail Materials List and Directions 7 4 x 8 x 3 /4" Exterior Plywood (sanded one side) 8 4 x 8 x 3 /8"

More information

Chapter 23. Garage Construction

Chapter 23. Garage Construction Chapter 23. Garage Construction 23.1 ESTABLISHING CHALK LINES 23.2 MEASURING AND CUTTING WALL PLATES 23.3 MARKING WINDOW & DOOR LOCATIONS ON EXTERIOR WALL PLATES 23.4 MARKING STUDS ON EXTERIOR WALL PLATES

More information

How to Build Good Decks..

How to Build Good Decks.. How to Build Good Decks.. Worldwide Sleeping Company, Inc Cary, North Carolina Decking Overview.. Decking Overview.. more Decking Joist.... Joist Hanger Ledger Lag Screw House Wall Decking House Floor

More information

Playaway Swiss Cottage Assembly Instructions

Playaway Swiss Cottage Assembly Instructions Playaway Swiss Cottage Assembly Instructions English SS288C IMPORTANT SAFETY INFORMATION Adult assembly is required. Checks and maintenance needs to be carried out on the main parts (fixings etc.) at regular

More information

Tools Required. Bench Hardware. Bench Parts. Planter Hardware. Planter Parts. BENCH/PLANTER INSTALLATION GUIDELINES for

Tools Required. Bench Hardware. Bench Parts. Planter Hardware. Planter Parts. BENCH/PLANTER INSTALLATION GUIDELINES for Arbor Collection / Harvest Collection / Terra Collection Page 1 Please read all instructions completely before starting any part of the installation. Each AZEK and Kit comes complete with all hardware,

More information

ADULT. Adirondack / Muskoka Chair Plans

ADULT. Adirondack / Muskoka Chair Plans ADULT Adirondack / Muskoka Chair Plans Materials List 3/4" x 9 1/2" (1.9cm x 24.1cm) redwood, cedar or pine boards. Six, 8' (2.44m) boards should make one chair depending on knots and layout. You can also

More information

HOW TO INSTALL ELITE PANELED WAINSCOTING Using X-Rails with Either Raised, Flat or Beaded Panels

HOW TO INSTALL ELITE PANELED WAINSCOTING Using X-Rails with Either Raised, Flat or Beaded Panels HOW TO INSTALL ELITE PANELED WAINSCOTING Using X-Rails with Either Raised, Flat or Beaded Panels 1. First, remove the cover plates from all electrical outlets. All baseboards should also be removed; the

More information

Cabonyx Installation Manual

Cabonyx Installation Manual Cabonyx Installation Manual Content Deck-Nyx and Plan-Nyx Installation Page 1 Flooring Products Page 1 Accessories Page 1 Installation Tools Page 2 Preparing Sub-structure Page 2 Installation Page 4 Cautions

More information

Photo Essay: How to Build a. Seneca. Pacific Power Dory. Plans for this boat may be found at:

Photo Essay: How to Build a. Seneca. Pacific Power Dory. Plans for this boat may be found at: Photo Essay: How to Build a Seneca Pacific Power Dory Plans for this boat may be found at: http://www.spirainternational.com/ To begin building the Seneca, or any Spira International framed boat, a strongback

More information

DUTCH GABLE FREESTANDING CARPORT

DUTCH GABLE FREESTANDING CARPORT DUTCH GABLE FREESTANDING CARPORT STRATCO OUTBACK ASSEMBLY INSTRUCTIONS. Your complete guide to building a FREESTANDING Outback DUTCH GABLE CARPORT BEFORE YOU START Carefully read these instructions. If

More information

ATLANTIS RAIL Contact Information

ATLANTIS RAIL Contact Information ATLANTIS RAIL Contact Information Customer Service (800) 541-6829 (508) 732-9191 Spectrum System Installation Instructions Atlantis Rail s Spectrum System is an easy to install, universal cable railing

More information

ROOF FRAMING INFORMATION BATTEN INSTALLATION CORONA SHAKE INSTALLATION ACCESSORY INSTALLATION ESTIMATING DATA GENERAL INFORMATION

ROOF FRAMING INFORMATION BATTEN INSTALLATION CORONA SHAKE INSTALLATION ACCESSORY INSTALLATION ESTIMATING DATA GENERAL INFORMATION ROOF FRAMING INFORMATION BATTEN INSTALLATION CORONA SHAKE INSTALLATION ACCESSORY INSTALLATION ESTIMATING DATA GENERAL INFORMATION ROOF FRAMING INFORMATION It is the responsibility or roofers, building

More information

Copyright 2008 Robert Conroy

Copyright 2008 Robert Conroy Copyright 2008 Robert Conroy 24 Diameter Dome This is a precision structure. One must use precise jigs in its fabrication. The measurement tolerances are 1/32", while the overall tolerances are 1/16".

More information

FUSELAGE CONSTRUCTION

FUSELAGE CONSTRUCTION FUSELAGE CONSTRUCTION Note: prior to building and gluing on the work surface use protective covering on your building surface. (wax paper or clear wrap) Fit the laser cut Fuselage Front and Fuselage Rear

More information

INS A KSCR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE. 1. Unpacking the KSCR Splicing the KSCR (If Required)...

INS A KSCR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE. 1. Unpacking the KSCR Splicing the KSCR (If Required)... INS-88.500-0A KSCR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE 1. Unpacking the KSCR... 2 2. Splicing the KSCR (If Required)... 4 3. Assemble Curb and Rail Corners... 5 4. Install Cross Bracing (If Required)...

More information

Potting Store Assembly Instructions

Potting Store Assembly Instructions Before assembly We recommend that time is taken to read the instructions before starting assembly, then follow the easy step by step guide. The instruction sheet is only a guide to the assembly. Certain

More information

DIY CHILD S STOOL. Instructions

DIY CHILD S STOOL. Instructions DIY CHILD S STOOL Children have their own special world. And having the right furniture is part of that world. We have designed an easy-to-assemble child's stool that you can paint in a selection of bright

More information

Shingle Installation Guide

Shingle Installation Guide Installation Guide Roof Framing Information Installation Installation Accessory Installation Estimating Data General Information Roof Framing Information It is the responsibility or roofers, building contractors

More information

Building the Wee Lassie Canoe. A Michigan Woodworkers Guild Presentation by Bob Mills

Building the Wee Lassie Canoe. A Michigan Woodworkers Guild Presentation by Bob Mills Building the Wee Lassie Canoe A Michigan Woodworkers Guild Presentation by Bob Mills So you want to build a boat, eh? Ok, how about this for starters? Carved by Livio De Marchi, Woodcarver Extraordinaire

More information

Contents. Introduction. List of Materials. Glue, Resin and Fixings. Tools. Construction Sequence. Study Plans Sheet 3. Andrew Walters April 2012

Contents. Introduction. List of Materials. Glue, Resin and Fixings. Tools. Construction Sequence. Study Plans Sheet 3. Andrew Walters April 2012 Mia Study Plans Contents C Andrew Walters April 2012 2 Introduction. 4 List of Materials. 5 Glue, Resin and Fixings. 6 Tools. 7 Construction Sequence. 10 Study Plans Sheet 1. 11 Study Plans Sheet 2. 12

More information

COMPOSITE SIDING INSTALLATION GUIDE

COMPOSITE SIDING INSTALLATION GUIDE CENTURY HOME LIVING COMPOSITE SIDING INSTALLATION GUIDE Read all instructions prior to installing any siding product. Failure to install and finish this product in accordance with all local building codes,

More information

GARDEN SHED BRIGHTOLN

GARDEN SHED BRIGHTOLN ASSEMBLY INSTRUCTIONS GARDEN SHED BRIGHTOLN Dimensions: 10x10 (1 1/8") IMPORTANT Before beginning the assembly of your garden shed, please read the instructions carefully and follow them closely. By doing

More information

SAN FELIPE: Step by Step Pack 2

SAN FELIPE: Step by Step Pack 2 Pack 2 Your parts Stern reinforcement Bulkheads The poop deck Bulkhead planks Planks Tools and equipment Knife Pencil Wood glue Sandpaper File a Using leftover 5 x 5-mm wooden strips, measure and cut beams

More information

Stratco Sanctuary INSTALLATION BEFORE YOU START TOOLS REQUIRED GUIDE

Stratco Sanctuary INSTALLATION BEFORE YOU START TOOLS REQUIRED GUIDE INSTALLATION GUIDE Stratco Sanctuary Verandahs, Patios and Carports BEFORE YOU START It is important to check with your Local Government Authority prior to the installation of your new Stratco Sanctuary

More information

6625 WEST WILSHIRE BLVD. OKLAHOMA CITY, OK (405) FAX (405)

6625 WEST WILSHIRE BLVD. OKLAHOMA CITY, OK (405) FAX (405) INSTALLATION INSTRUCTIONS FOR BEDSIDE INNER REPAIR PANELS 67-72 GM FLEETSIDES This instruction illustrates the removal and replacement of the often rusted and damaged lower inner flanges on the 1967-1972

More information

Building Instructions ARTEMIS Sailing Canoe Day Six Version 1.0 Brian Pearson & Dr. Axel Schmid Day Six. Align and Glue Planks

Building Instructions ARTEMIS Sailing Canoe Day Six Version 1.0 Brian Pearson & Dr. Axel Schmid Day Six. Align and Glue Planks Version 1.0 Brian Pearson & Dr. Axel Schmid 2016 Align and Glue Planks Steps: Align boat, check dimensions Join planks provisionally Pull wires Glue the outside planks Tools and Materials: Epoxy putty

More information

COMPLIMENTARY WOODWORKING PLAN

COMPLIMENTARY WOODWORKING PLAN COMPLIMENTARY WOODWORKING PLAN ORIENTAL GARDEN ARBOR PLAN This downloadable plan is copyrighted. Please do not share or redistribute this plan in any way. It has been paid for on your behalf by JET Tools,

More information

DECKING INSTALLATION GUIDE

DECKING INSTALLATION GUIDE STAIR TREAD INSTALLATION GUIDE Step 7: Install the Remaining Treads Repeat steps 2 to 6 for the remaining stair treads. Step 8: Install the Fascia 1. Measure the riser height. 2. Rip the fascia to the

More information

PANELTEK ENGINEERED SIDING/PANELLING INSTRUCTIONS

PANELTEK ENGINEERED SIDING/PANELLING INSTRUCTIONS PANELTEK ENGINEERED SIDING/PANELLING INSTRUCTIONS This product can be used for interior and exterior installations. Much of this guide refers to exterior installation, however, many of the construction

More information

3Insert the second rod no. 4

3Insert the second rod no. 4 Yamato: Step-by-step 37 The stern block and searchlight control towers a b c d e f Recommended tools and materials Wood glue Sandpaper (no. 800 grain) Metal file Putty Craft knife For metal: Super Glue

More information

Balustrade System Installation - Cambridge & Huntington

Balustrade System Installation - Cambridge & Huntington A. PARTS AND SUPPLIES NEEDED FOR INSTALLATION Hardware included for each 10 section of rail: 2 3 x 1-1/2 L-brackets 4 1-3/4 x 3/16 Blue hex-head screws for anchoring the L-brackets to the newel cap, column

More information

INSTALLATION GUIDE. 5" Balustrade System

INSTALLATION GUIDE. 5 Balustrade System 5" Balustrade System PARTS LIST ITEM QTY A PORCH POST INSTALLATION KIT (PPK6) (SEE STEP 3C) 5 1/2" x 5 1/2" Trim Collar 2 2" Wide x 1 1/2" x 2" Angle Bracket 4 MATERIALS NEEDED INSTALLATION GUIDE #14 x

More information

installation care & maintenance instructions lifecycledecking.com 25-year limited residential warranty 20-year limited commercial warranty

installation care & maintenance instructions lifecycledecking.com 25-year limited residential warranty 20-year limited commercial warranty installation care & maintenance instructions lifecycledecking.com 25-year limited residential warranty 20-year limited commercial warranty Installation Instructions As with any building project, use proper

More information

Ulltraclad Aluminium Cladding. Contents. 1.0 General Information Design Information Installation Information 7. 4.

Ulltraclad Aluminium Cladding. Contents. 1.0 General Information Design Information Installation Information 7. 4. Ulltraclad Aluminium Cladding Contents 1.0 General Information 2 2.0 Design Information 4 3.0 Installation Information 7 4.0 Maintenance 10 5.0 Health & Safety 10 1 1.0 General Information 1.1 Introduction

More information

Bluenose II Part 3. Dia. 1: Plank layout on stern post

Bluenose II Part 3. Dia. 1: Plank layout on stern post The Final Planking The race is nearly won now. Just 6 more planks and we re through. Instead of placing another batten, we re going to place a full-width plank all along the edge of the keel. This plank

More information

Delfini. 19x6 Console Semi Flat Hull. Study Plans

Delfini. 19x6 Console Semi Flat Hull. Study Plans Delfini 19x6 Console Semi Flat Hull Study Plans Contents 3 Introduction 4 Specification 6 List of Materials 7 Glue, Resin and Fixings 8 Tools 9 Construction Sequence 2 Introduction This is the 19' x 6'

More information

How To Build An. External Closed Staircase

How To Build An. External Closed Staircase How To Build An External Closed Staircase How To Build An External Staircase FOREWORD How to build a staircase explains the basic principles behind the construction and installation of external closed

More information

Installation of Balustrade Systems

Installation of Balustrade Systems Installation of Balustrade Systems IMPORTANT: Be sure to mark the center point of each newel post's location prior to installation to insure proper spacing. All product interfaces must use PL Premium Adhesive

More information

Corner Potting Store Assembly Instructions

Corner Potting Store Assembly Instructions Corner Potting Store Assembly Instructions English SS225E Before assembly We recommend that time is taken to read the instructions before starting assembly, then follow the easy step by step guide. The

More information

INSTALLATION, STORAGE AND WALL CONSTRUCTION DETAILS

INSTALLATION, STORAGE AND WALL CONSTRUCTION DETAILS www.capecodsiding.com INSTALLATION, STORAGE AND WALL CONSTRUCTION DETAILS IMPORTANT READ THE FOLLOWING INSTRUCTIONS CAREFULLY BEFORE INSTALLING YOUR WOOD SIDING. FAILURE TO STRICTLY FOLLOW THESE INSTALLATION,

More information

10X12 Arched Breeze Pergola Assembly Manual Outdoor Living Today

10X12 Arched Breeze Pergola Assembly Manual Outdoor Living Today 10X12 Arched Breeze Pergola Assembly Manual Outdoor Living Today ITEM# BZ1012ARCH Revision 2 March 25th/2015 Note: Post Mounting Hardware is NOT included in this kit. Please confirm with your local building

More information

Installation Manual for Thermo Panel

Installation Manual for Thermo Panel Installation Manual for Thermo Panel 1 About Thermo Panel is a building wrap, insulation, air and water barrier, mold inhibitor and cold bridge eliminator all-in-one. Delivering an R-value of up to 5 on

More information

Pristine Precise Perfection

Pristine Precise Perfection Pristine Precise Perfection EB TY Premium Hidden Deck Fastening System For Premium Timber Deck Applications Stainless Steel Reinforced EB- GUIDE EB-TY Premium Hidden Deck-Fastening System Optimise Your

More information

Steel Reinforced Joining Thank you for choosing Andersen. Please leave this guide with building owner.

Steel Reinforced Joining Thank you for choosing Andersen. Please leave this guide with building owner. Steel Reinforced Joining (Horizontal/Vertical) for Andersen 400 Series Woodwright & Tilt-Wash Double-Hung, Picture, and Transom Windows and 400 Series Double-Hung Half Circle and Flexiframe Specialty Windows

More information

2x2 Baluster Railings FPO REDWOOD. Naturally beautiful Easy to use Practical and economical Durable and stable Resistant to decay and insects

2x2 Baluster Railings FPO REDWOOD. Naturally beautiful Easy to use Practical and economical Durable and stable Resistant to decay and insects B U I L D I T W I T H REDWOOD 2x2 Baluster Railings FPO R E D W O O D Naturally beautiful Easy to use Practical and economical Durable and stable Resistant to decay and insects 2x2 Baluster Railings RAILING

More information

Sawn Baluster Sizing and Installation Guide

Sawn Baluster Sizing and Installation Guide Sawn Baluster Sizing and Installation Guide Welcome to the Durabrac sizing and installation guide for Sawn Balusters. This guide has been prepared to answer any questions you may have about our Sawn Balusters

More information

12ft Ultra Polytunnel Assembly Instructions

12ft Ultra Polytunnel Assembly Instructions CONTENTS Section Page 1. FOUNDATION TUBES: Option A Hammered-In Foundation Tubes 3 2. FOUNDATION TUBES: Option B Ground Anchor Plates 4 3. FOUNDATION TUBES: Option C Concreted Foundation Tubes 5 4. STEEL

More information

The image above is intended to give you an idea of what the dovecote will look like when finished.

The image above is intended to give you an idea of what the dovecote will look like when finished. Thank you for buying my book, I hope it is useful and enjoyable in your quest to building your own dovecote. This book will give you step-by step instructions on how to build your own dovecote also included

More information

Connection Solutions for Wood-frame Structures. Copyright Materials. Learning Objectives

Connection Solutions for Wood-frame Structures. Copyright Materials. Learning Objectives Connection Solutions for Wood-frame Structures Presented by: John Buddy Showalter, P.E. Vice President, Technology Transfer The Wood Products Council is a Registered Provider with. Credit(s) earned on

More information

Additional Parts List:

Additional Parts List: THE TIME MACHINE Additional Parts List: In addition to the cast resin parts enclosed in this kit, there should also be a plastic bag containing the following items needed to complete your time machine

More information

5If the protruding part is. 6Place 1 as is shown in the. 7Place what was assembled

5If the protruding part is. 6Place 1 as is shown in the. 7Place what was assembled Yamato: Step-by-step 49 The base of the bridge and strakes a c b d a Base of the bridge b Base of the bridge c Base of the bridge d Strakes x 10 THE BASE OF THE BRIDGE 1Smooth 1 to 3, first using the metal

More information

CXT PRO RAILING INSTALLATION INSTRUCTIONS For Installations Using Aluminum and Glass Balusters Sold Separately

CXT PRO RAILING INSTALLATION INSTRUCTIONS For Installations Using Aluminum and Glass Balusters Sold Separately CXT PRO RAILING INSTALLATION INSTRUCTIONS For Installations Using Aluminum and Glass Balusters Sold Separately CCRR-0171 PFS AA-652 Drill/power screwdriver Assorted drill bits Hammer Miter or circular

More information

eb^sv=qfj_bo UNIVERSITY OF WISCONSIN - STOUT COLLEGE OF SCIENCE TECHNOLOGY ENGINEERING & MATHEMATICS Architectural Technology AEC 233

eb^sv=qfj_bo UNIVERSITY OF WISCONSIN - STOUT COLLEGE OF SCIENCE TECHNOLOGY ENGINEERING & MATHEMATICS Architectural Technology AEC 233 eb^sv=qfj_bo UNIVERSITY OF WISCONSIN - STOUT COLLEGE OF SCIENCE TECHNOLOGY ENGINEERING & MATHEMATICS Architectural Technology AEC 233 Dr. Jason E. Charalambides fkqolar`qflk Heavy timber construction consists

More information

Part 2 Lining off and planking

Part 2 Lining off and planking Part 2 Lining off and planking Lining off the hull for planking Those of you who have built one of my projects in the past probably know how I have always stressed the importance of lining of your hull.

More information

CELLBOARD DECK CLIP FIXING INSTALLATION MANUAL CBWD14525

CELLBOARD DECK CLIP FIXING INSTALLATION MANUAL CBWD14525 CELLBOARD DECK CLIP FIXING INSTALLATION MANUAL CBWD14525 1 BEFORE YOU COMMENCE Please note that: The Product is subject to natural variation* in finish as part of the manufacturing process. The purchaser

More information

by John Correll written February 2015

by John Correll written February 2015 1 Simple Way to Install a Liftable Floorboard or Casting Deck in a Boat (without using a fixed underlying support structure that tends to interfere with access to the compartment) by John Correll written

More information

Shed Assembly Instructions

Shed Assembly Instructions Shed Kit Contents The shed kit includes all the parts needed to assemble your shed except for tools and fasteners such as screws and nails. The various pieces are pre-cut and many are marked to indicate

More information

Restoration of 12½ -Footers

Restoration of 12½ -Footers Restoration of 12½ -Footers Part II by Maynard Bray Photographs by Benjamin Mendlowitz here simply isn't enough space within the pages of WoodenBoat to describe everything Steve Ballentine does to bring

More information

Ask your DIY store or carpenter to cut the required boards to size. Instructions. 1. Cut out the opening for the bottles

Ask your DIY store or carpenter to cut the required boards to size. Instructions. 1. Cut out the opening for the bottles KITCHEN TROLLEY Next time you're whipping up some magic in the kitchen, take advantage of our willing assistant. Fixed on rollers to provide easy mobility, our kitchen trolley can be stationed wherever

More information

How to Install Elite Bayside Beadboard

How to Install Elite Bayside Beadboard How to Install Elite Bayside Beadboard Beadboard will give a room a warm and comfortable feeling. Its beauty lies in its simplicity. It is one of the easiest to install out of all wainscoting, regardless

More information

Eaves Lining Installation Guide

Eaves Lining Installation Guide Eaves Lining Installation Guide feb 13 Design Pine Eaves Lining - Installation Like most building products, Design Pine eaves lining has both advantages and limitations therefore a clear understanding

More information

12ft X 12ft Attached Breeze Pergola Assembly Manual. Outdoor Living Today. (For Both 9 and 12 High Posts) June 1st/2012 Version #4

12ft X 12ft Attached Breeze Pergola Assembly Manual. Outdoor Living Today. (For Both 9 and 12 High Posts) June 1st/2012 Version #4 12ft X 12ft Attached Breeze Pergola Assembly Manual (For Both 9 and 12 High Posts) Outdoor Living Today June 1st/2012 Version #4 Note: Installation of Wall Side Girders (P) and Wall Mount Brackets (M)

More information

Calistoga Spa Surround

Calistoga Spa Surround B U I L D I T W I T H REDWOOD Calistoga Spa Surround R E D W O O D Naturally beautiful Easy to use Practical and economical Durable and stable Resistant to decay and insects Calistoga Spa Surround BUILD

More information

CONSTRUCTION GUIDE 21ft Wide and 24ft Wide SHEEP HOUSE

CONSTRUCTION GUIDE 21ft Wide and 24ft Wide SHEEP HOUSE The Outside, Inside CONSTRUCTION GUIDE 21ft Wide and 24ft Wide SHEEP HOUSE Thank you for purchasing a Premier Sheep House. Please take the time to carefully read through this Construction Guide before

More information

CELLBOARD DECK CLIP FIXING INSTALLATION MANUAL CBWD14525

CELLBOARD DECK CLIP FIXING INSTALLATION MANUAL CBWD14525 CELLBOARD DECK CLIP FIXING INSTALLATION MANUAL CBWD14525 1 BEFORE YOU COMMENCE Please note that: The Product is subject to natural variation* in finish as part of the manufacturing process. The purchaser

More information

I N S TA L L AT I O N & M A I N T E N A N C E G U I D E

I N S TA L L AT I O N & M A I N T E N A N C E G U I D E I N S TA L L AT I O N & M A I N T E N A N C E G U I D E E N V I R O B U I L D. C O M + 4 4 ( 0 ) 2 0 8 0 8 8 4 8 8 8 Version 3.2 EnviroBuild 2018 C O N T E N T S Storage & Handling 03 Tools 04 Calculating

More information

SE5a Wing Panels rev 1.0

SE5a Wing Panels rev 1.0 SE5a Wing Panels rev 1.0 The top and bottom wings are different. They might look the same but the bottom wing has one less rib and some rib spacing difference. This is due to where the wooden interplane

More information

NewTech - CleverDeck Composite Decking Installation Guidelines

NewTech - CleverDeck Composite Decking Installation Guidelines NewTech - CleverDeck Composite Decking Installation Guidelines Composite decking has unique characteristics and requires specific fixing requirements that differ from timber. We strongly recommend that

More information

TENANT IMPROVEMENT 16 FEBRUARY WEST 27TH STREET, 4TH FLOOR 100% CD OWNER/BID ADD 1-03/08/2018

TENANT IMPROVEMENT 16 FEBRUARY WEST 27TH STREET, 4TH FLOOR 100% CD OWNER/BID ADD 1-03/08/2018 SECTION 055000 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

8 x 10 Timber-frame Garden Shed

8 x 10 Timber-frame Garden Shed 8 x 10 Timber-frame Garden Shed Includes: Step-By-Step Instructions, Complete Details & Materials Lists Timber-framing is a traditional building method that uses a simple framework of heavy timber posts

More information

The Wood Products Council is a Registered Provider with. . Credit(s) earned on completion of this program will be

The Wood Products Council is a Registered Provider with. . Credit(s) earned on completion of this program will be Connection Solutions for Wood-frame Structures Presented by: John Buddy Showalter, P.E. Vice President, Technology Transfer The Wood Products Council is a Registered Provider with. Credit(s) earned on

More information