PENSTOCK CONDITION ASSESSMENT
|
|
- Henry O’Connor’
- 6 years ago
- Views:
Transcription
1 Northwest Hydro Association May 17, 2012 Technical Seminar PENSTOCK CONDITION ASSESSMENT Thomas L. Kahl, P.E. Kleinschmidt
2 TOPICS Concerns Types of Penstock Failure Modes Steel and Wood Stave Failure Mode Inspection Techniques Penstock Safety Program Recommended Methodology Example Program
3 Concerns Safe, Reliable, and Economical Pestock Performance FERC s Primary Concerns 1. The ability to shut down in the event of a leak or failure is critical. (Penstocks can be physically large structures with a lot of potential hazards difficult to detect.) 2. Inadequate inspection.
4 TOPIC 2 FAILURE MODES 1.Internal Pressure Rupture 2.General Buckling 3.Local Buckling 4.Inadequate Support
5 Failure Mode 1 Internal Pressure Rupture Add photo EPP-8
6 Failure initiated in heat affected zone of 1937 vintage longitudinal weld seam.
7
8 Galvanic corrosion at 1953 vintage surge tank longitudinal weld seam.
9 Random pitting pattern in 1939 vintage penstock (Evaluate per ASME B31G-2009)
10 Overall Shell Corrosion (typically occurs in moist environments)
11 Wood Stave Penstocks Internal pressure transferred from staves to steel bands.
12 An example of exterior stave wood decay. The ruptured wood at the metal Kelsey butt joint is called brooming.
13 Steel band corrosion
14 Slippage at shoes can release bands
15 Seam failure due to gravity dead weight pulling apart circumferential seam with deteriorated rivet heads.
16 Failure Mode 2 General Buckling
17 2006 collapse of 1995 vintage penstock when ice plug in vent induced vacuum due to external pressure.
18 General buckling caused by uncontrolled release at rupture. Replacement included additional air vacuum valves
19 Blocked vent induced collapse Note classic crack from corner.
20 Pipe collapsed when decayed top wood stave fell.
21 Failure Mode 3 Local Buckling Zick stress deformation at horn of saddle.
22 Local overhead dents in buried pipe probably caused by concentrated loads.
23 Relatively rare shear buckling of very thin (D/t= 614) large diameter steel penstock.
24 Failure Mode 4 Inadequate Support
25 Deteriorated saddles
26 Cracked concrete saddle.
27 . Loss of support at tipped saddle
28 Slope Instability
29 Surge tanks require very stable foundations to prevent tipping.
30 Cracked foundation and buckled anchor bolt gusset.
31 Surge tank anchor bolt corrosion reduces seismic overturning resistance.
32 TOPIC 3 FAILURE MODE INSPECTION TECHNIQUES Shell Thickness and dimensions. Concentrate on shell Connections Supports New ASCE MOP 79 expected to be published Aug 2012 Corrosion at Steel to Concrete Interfaces
33 Types of Inspection Cursory Inspection: Purpose is to note any observable change in condition Typically performed by operation or maintenance personnel weekly, monthly, or quarterly. Changes in condition noted for further investigation Comprehensive Inspection/Evaluation Purpose is to review the condition, safety, and risk of the existing penstock Performed by engineers who understand the design basis and actual condition of penstock If deficiencies are noted they can be resolved by repair, rehabilitation or replacement.
34 Basic Tools
35 Check rivets for loss of material and tightness.
36
37 TOPIC 4 - Penstock Safety Program Methodology Steps: 1. Establish Baseline Conditions 2. Establish an inspection, monitoring, and documentation plan 3. Implement a documented maintenance and repair program 4. Periodic comprehensive independent condition assessments
38 Penstock Safety Program Effective Program Should Be: Reliably Able to Detect Problems Readily Understood Convenient and Usable by Operating & Maintenance Personnel Cost Effective
39 Ketchikan Alaska Public Utilities (KPU) Penstock Safety Program Ketchikan Lakes Project (4.2 MW) No : concrete: 1,800 : 54 D: 46 head No : ductile iron: 1,800 : 54 D: 46 head No. 3, 4, 5: 1957 steel: 350 : 36 D: 250 head Beaver Falls Project (8.3 MW) No : steel: 342 : 36 D: 321 head No : steel: 3,610 : 42 D: 760 head No : steel: 4,170 : 28 D: 660 head
40 Ketchikan Lakes Beaver Falls
41 Step 1 Establish Baseline Condition Comprehensive System Description Define Design Criteria Define Hazards and Risks Summarize Physical Condition
42 Step 2 Site Specific Inspection, Monitoring, and Documentation Different Portions of a penstock will have different critical components Shell Thickness & Pitting Assessment Concentrate in high humid tunnels and in contact with concrete and soil Vacuum valve testing and inspection Document supports condition Critical to have repeatable observation locations. Inspection checklist can be useful to maintain consistency and completeness.
43 Step 3: Documented Inspection, Maintenance, and Repair KPU already used computerized Express Maintenance program. Only minor modification needed to existing procedures to more reliably document all records for future trending analyses.
44 Step 4: Periodic Comprehensive Condition Review Either external or internal staff independent evaluation/audit. Frequency 5 to 15 years and after special events (e.g. earthquake).
45 Important to Expect the Unexpected
46 Questions / Comments Thomas L. Kahl, P.E. Kleinschmidt Associates Tom.Kahl@Kleinschmidtusa.com (207) , Ext 280
MOCCASIN THIRD PENSTOCK ADDITION: INCREASING POWER BY REDUCING HEADLOSSES
MOCCASIN THIRD PENSTOCK ADDITION: INCREASING POWER BY REDUCING HEADLOSSES By Matthew Gass, Hetch Hetchy Water and Power, Moccasin, California, USA; Mark A. Hammer and David P. Thompson, Harza Engineering
More informationREHABILITATION OF A STEEL PENSTOCK
ABSTRACT One of the 29 hydroelectric stations owned and operated by the Tennessee Valley Authority (TVA) is a two-unit plant with vertical Francis turbines. The water passageways for these units consist
More informationINTEGRITY MANAGEMENT PROGRAMS FOR AGING INFRASTRUCTURES IN HYDROELECTRIC GENERATING STATIONS
INTEGRITY MANAGEMENT PROGRAMS FOR AGING INFRASTRUCTURES IN HYDROELECTRIC GENERATING STATIONS Jagannath Hiremagalur *, Charles Ahlgren &, Steve J. White *, and Richard A. Mattson * & Chief Dam Safety Engineer,
More informationOptical 3D Laser scan for Penstock Corrosion Damage Assessment for Hydropower Plant
More info about this article: http://www.ndt.net/?id=21233 Optical 3D Laser scan for Penstock Corrosion Damage Assessment for Hydropower Plant G. Kishore kumar and M. Janardhana Materials Technology Division,
More informationTitle of Innovation: In-Line Inspection for Water Pipelines
Title of Innovation: In-Line Inspection for Water Pipelines Nominee(s) Margaret Hannaford, P.E., Division Manager, Hetch-Hetchy Water and Power Division of the San Francisco Public Utilities Commission
More informationConstruction of Steel Penstocks using HT100 at Kannagawa Hydropower Plant
Construction of Steel Penstocks using HT100 at Kannagawa Hydropower Plant Ken-ichiro AOKI 1 and Masayuki MINAMI 1 1 Tokyo Electric Power Company, Japan Introduction Tokyo Electric Power Company s Kannagawa
More informationThe Essentials of Pipeline Integrity Management
TRAINING METHODOLOGY This interactive training workshop includes the following training methodologies : Lectures Video Discussion of case histories and hands on calculations WHO SHOULD ATTEND The course
More informationSECTION III SUBMITTALS AND APPROVALS
SECTION III SUBMITTALS AND APPROVALS In order to expedite the approval process of new water distribution system and sanitary sewer collection system extensions, the Hilton Head No. 1 Public Service District
More informationEVALUATION OF INTEGRITY OF AGED PENSTOCK SUPPORTING STRUCTURE IN HYDROELECTRIC GENERATING STATIONS
EVALUATION OF INTEGRITY OF AGED PENSTOCK SUPPORTING STRUCTURE IN HYDROELECTRIC GENERATING STATIONS More info about this article: http://www.ndt.net/?id=22314 Abstract Janardhana.M*, Kishore kumar. G* and
More informationDetermining Remaining Strength of Corroded Pipelines. Houston Section April 10, 2012
Determining Remaining Strength of Corroded Pipelines Houston Section April 10, 2012 Who is DCP Midstream? Formerly Duke Energy Field Services the Company was renamed on January 1, 2007 to align with DCP
More informationChapter VI Vessel Supports
Chapter VI Vessel Supports 1 2 Vessel Supports Vessel support is to a. Support the weight of the container b. Fix the container position c. Keep the container in operation. Classified by the type of vessels:
More informationNEW APPROACH TO THE PIPE TO GUSSET PLATE CONNECTION
NEW APPROACH TO THE PIPE TO GUSSET PLATE CONNECTION Prepared by Liftech Consultants Inc. Quality Assurance Review for Liftech Consultants Inc. Author: Kenton Lee Structural Engineer Editor: Erik Soderberg
More informationModule 4 Design for Assembly IIT BOMBAY
Module 4 Design for Assembly Lecture 8 Case Studies - IV Instructional objectives The objective of this lecture is to exhibit how real components are designed in industry following some of the principles
More informationManaging Metallic Pipe
Managing Metallic Pipe Metallic Pipe Overview Buried infrastructure is the backbone of our modern society. It connects communities, empowers our economy and enables everyday life. While there are many
More informationParticulate Control O&M Training. APC/PCUG Conference July 12-16, 2009 The Woodlands, TX
Particulate Control O&M Training APC/PCUG Conference July 12-16, 2009 The Woodlands, TX WPCA Particulate Training Seminar July 11, 2009 ESP Power Supply Choices Slide No 1 Precipitator Power Supplies Conventional
More informationSUMMARY SHEETS OF BAR COUPLER CONNECTIONS
APPENDIX A SUMMARY SHEETS OF BAR COUPLER CONNECTIONS NCHRP 12 88 Connection Evaluations Appendix A A 1 APPENDIX A SUMMARY SHEETS OF BAR COUPLER CONNECTIONS NCHRP 12 88 Connection Evaluations Appendix
More informationMAKING REMAINING LIFE PREDICTIONS FOR POWER CABLES USING RELIABILITY ANALYSES
MAKING REMAINING LIFE PREDICTIONS FOR POWER CABLES USING RELIABILITY ANALYSES Jey K. JEYAPALAN, Dr. Jeyapalan & Associates, (USA), jkjeyapalan@earthlink.net ABSTRACT Most underground cable owners would
More informationWOODEN BUILDINGS 6.1 INTRODUCTION 6.2 TYPICAL DAMAGE AND FAILURE OF WOODEN BUILDINGS. Chapter 6
Chapter 6 WOODEN BUILDINGS 6.1 INTRODUCTION Wood has higher strength per unit weight and is, therefore, very suitable for earthquake resistant construction. But heavy cladding walls could impose high lateral
More informationNVIC March 1968 NAVIGATIONS AND VESSEL INSPECTION CIRCULAR NO Tensile Fasteners
UNITED STATES COAST GUARD COMMANDANT (MMT-4) U.S. COAST GUARD WASHINGTON, DC 20591 NVIC 3-68 21 March 1968 NAVIGATIONS AND VESSEL INSPECTION CIRCULAR NO. 3-68 Subj: Tensile Fasteners 1. Purpose. The purpose
More informationASSEMBLY, INSTALLATION AND OPERATION MANUAL
ASSEMBLY, INSTALLATION AND OPERATION MANUAL - 1-312 SOUTH HWY. 73, PO BOX 398 FALLS CITY, NE 68355-0398 800-500-9777 PO Box 398 Falls City, NE 68355 800-500-9777 Version Date 03/07/2007 P/N 94000100 Revision
More informationPipeline Inspection Technologies Demonstration Report Final
University of Nebraska - Lincoln DigitalCommons@University of Nebraska - Lincoln United States Department of Transportation -- Publications & Papers U.S. Department of Transportation 26 Pipeline Inspection
More informationMETAL FABRICATION SECTION 8: METAL FABRICATION SCOPE MATERIAL.
METAL FABRICATION SCOPE This specification applies to all metal intended to be rubber lined. Metals furnished must conform to this specification with respect to suitability for rubber lining or covering.
More informationInsertion Transducer On-line Install Instruction
LOGO Insertion Transducer On-line Install Instruction Shanghai Dynameters Co., Ltd www.dynameters.com Insertion Transducer Installation Manual Installation steps 1. Locate Installing point 2. Weld mounting
More informationTool 3-1 A2 Bushing 6 Check if the bushing supports (angle iron) are properly welded with the upper part of the structure pipes. welded bushing suppor
Rope Pump MANUFACTURING checklist for quality control A Welding General 1 Check if welding jigs are used for welding of the main parts (wheel, structure frame and bushings) 2 Check if the pump parts are
More informationOperating, Servicing, and Safety Manual Model # 100 Standard Hydraulic Tubing Notcher Model #100-U Heavy Duty Hydraulic Tubing Notcher
Operating, Servicing, and Safety Manual Model # 100 Standard Hydraulic Tubing Notcher Model #100-U Heavy Duty Hydraulic Tubing Notcher Model # 100 Standard Model #100-U Heavy Duty CAUTION: Read and Understand
More informationWire and pipe drawing
Wire and pipe drawing Overview Wire drawing application deformations, drawing speeds and forces equipmentm dies and die materials Tube drawing tube drawing processes Strain and drawing force Drawing tools
More informationInitiating Cracks in PCC Pavements. Malcolm K. Lim, PE
Initiating Cracks in PCC Pavements by Malcolm K. Lim, PE Technology Transfer Concrete Consortium (TTCC) and National Concrete Consortium (NCC) Fall 2009, St Louis, MO Better Performance Through Innovative
More information.1 Materials and installation for steel piping, valves and fittings for hydronic systems in building services piping..2 Related Sections.
Issued 2006/08/01 Section 15183 Hydronic Systems: Steel Page 1 of 6 PART 1 GENERAL 1.1 SUMMARY.1 Section Includes..1 Materials and installation for steel piping, valves and fittings for hydronic systems
More informationEMAT Application on Incoloy furnace Tubing Ramamohan Reddy M (ASNT Level III UT, PCN Level III UT,PAUT&TOFD)
EMAT Application on Incoloy furnace Tubing By Ramamohan Reddy M (ASNT Level III UT, PCN Level III UT,PAUT&TOFD) Outlines 1. Introduction EMAT 2. EMAT- Ultrasound waves 3. EMAT-Surface waves 4. EMAT-Guided
More informationorthwest Corrosion Engineering
January 27, 2015 N orthwest Corrosion Engineering Mr. William Davis, P.E. City of Bremerton 3027 Olympus Drive Bremerton, WA 98310 10995 Warfield Road, Sedro-Woolley, WA 98284 Phone: (360) 826-4570 Fax:
More informationRattling Brook Hydro Plant Refurbishment. Table of Contents. 1.0 Introduction Background Electrical Works...7
Table of Contents Page 1.0 Introduction...1 2.0 Background...2 3.0 Civil Works...3 3.1 Penstock...3 3.1.1 Optimum Penstock Diameter...4 3.1.2 Penstock Replacement Options...4 3.2 Surge Tank...5 3.3 Civil
More informationTECHNICAL MANUAL. TERADOWEL and ULTRADOWEL. Reliable Dowel System for Floor Joints
TECHNICAL MANUAL TERADOWEL and ULTRADOWEL Reliable Dowel System for Floor Joints Version: PEIKKO GROUP 11/2018 TERADOWEL and ULTRADOWEL Reliable Dowel System for Floor Joints Dowels manufactured from high
More informationBasic Measurements for Pipe Inspections
Basic Measurements for Pipe Inspections Period 7 Basic Corrosion Course 2017 February 21-23, 2017 Mark Anderson-MTS 1 DOT 192.459 External corrosion control: Examination of buried pipeline when exposed.
More information12'W x 10'H RoundTop Frame Assembly Please read and understand instructions completely before assembly.
12'W x 10'H RoundTop Frame Assembly Please read and understand instructions completely before assembly. Layout out frame parts as shown and match up items with quantity to make sure no parts are missing.
More informationCH # 8. Two rectangular metal pieces, the aim is to join them
CH # 8 Screws, Fasteners, and the Design of Non-permanent Joints Department of Mechanical Engineering King Saud University Two rectangular metal pieces, the aim is to join them How this can be done? Function
More informationThis specification describes the minimum requirements for piping systems for the following service:
SPEC-3004 1/7 1.0 APPLICATION This specification describes the minimum requirements for piping systems for the following service: Service Water Design Conditions Operating Conditions 10 PSIG @ 33 o F to
More informationSubsea Pipeline IMR. PT Hallin Marine June 18 th, 2014!
PT Hallin Marine June 18 th, 2014! Introduction Issues and Risks Inspection, Maintenance & Repair Case Study Conclusions and Recommendations 2 Introduction Subsea Pipeline IMR q Obtain data to assess the
More informationPipeline & Specialty Services (P&SS)
Pipeline & Specialty Services (P&SS) A Pipeline Inspection Case Study: Design Improvements on a New Generation UT In-line Inspection Crack Tool Mark Slaughter Global Product Line Manager Pipeline & Specialty
More informationPipeline Technology Conference 2010
THRESHOLDS, ACCURACIES AND RESOLUTION: QUANTITATIVE MEASUREMENT AND ITS ADVANTAGES FOR METAL LOSS INSPECTION A. Barbian, M. Beller, A. Hugger, C. Jäger, A. Pfanger NDT Systems & Services Stutensee, Germany
More informationFinite Element Analysis per ASME B31.3
Brief Discussion: Split-Body 12in Butterfly valve, Ph: 520-265-3657 Page 1 of 13 Finite Element Analysis per ASME B31.3 Prepared by: Michael Rodgers, P.Eng. Date: July 16, 2010 Page 2 of 13 Section Headings:
More informationIMPORTANCE & PROCESS OF RLA STUDIES IN ASSESSMENT OF NEED FOR R&M - A CASE STUDY. CPRI, Bengaluru
IMPORTANCE & PROCESS OF RLA STUDIES IN ASSESSMENT OF NEED FOR R&M - A CASE STUDY CPRI, Bengaluru What is RLA? RLA is a technique to examine systematically and monitor the plant, during and after service
More information50948-RHN Putney. 06 January This document includes: Aluminium strip/ sheet coverings/ flashings 1. Code Section Revision Dated
50948-RHN Putney 06 January 2018 This document includes: Code Section Revision Dated H72 Aluminium strip/ sheet coverings/ flashings 1 Table of Contents Title H72 Aluminium strip/ sheet coverings/ flashings
More informationCALCULATION & DRAFTING STANDARDS MANUAL PROCEDURE: C&D 525 Interior Ladder Standard REV 0.0 7/19/04
BROWN MINNEAPOLIS TANK PAGE 1 OF 5 PURPOSE: Create, explain, and establish an interior ladder design standard, which will govern a BMT, supplied and/or installed typical interior ladder for welded steel
More informationProduct design: Structural systems
Product design: Structural systems Tension and compression The arch bridge and the aerial ropeway in the panels below were designed to resist specific loads and forces. The arch has to resist the load
More informationATTACHMENT H TACOMA HYDROELECTRIC PROJECT DESCRIPTION OF PROJECT FEATURES
ATTACHMENT H TACOMA HYDROELECTRIC PROJECT DESCRIPTION OF PROJECT FEATURES The Tacoma Hydroelectric Project is located about 20 miles north of Durango, Colorado, on a high intermountain plateau west of
More informationERECTION & CONSTRUCTION
ERECTION & CONSTRUCTION High Strength Structural Bolting Author: Clark Hyland Affiliation: Steel Construction New Zealand Inc. Date: 24 th August 2007 Ref.: Key Words High Strength Bolts; Property Class
More informationApplication of SLOFEC and Laser Technology for Testing of Buried Pipes
19 th World Conference on Non-Destructive Testing 2016 Application of SLOFEC and Laser Technology for Testing of Buried Pipes Gerhard SCHEER 1 1 TMT - Test Maschinen Technik GmbH, Schwarmstedt, Germany
More informationAVK PENSTOCK SOLUTIONS PENSTOCK SOLUTIONS
AVK PENSTOCK SOLUTIONS PENSTOCK SOLUTIONS AVK PENSTOCK RANGE AVK UK is part of the globally renowned AVK group who are based in over 85 countries and are known as one of the leading innovators and manufacturers
More informationSECTION METAL FABRICATIONS
SECTION 05100 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for metal fabrications, including minimum requirements for fabricator, and galvanizing. 1.02 REFERENCE STANDARDS A. ASTM
More informationAn FEA-Based Acoustic Fatigue Analysis Methodology
An FEA-Based Acoustic Fatigue Analysis Methodology Timothy C. Allison, Ph.D. Lawrence J. Goland, P.E. Southwest Research Institute San Antonio, TX ANSYS Regional Conference: Engineering the System August
More informationREPAIR OF NE KRSKO STEAM GENERATOR TUBES BY SLEEVING METHOD
HR9800122 REPAIR OF NE KRSKO STEAM GENERATOR TUBES BY SLEEVING METHOD Prepared by: Kresimir Gudek, Drago Pete Krsko Nuclear Power Plant, Vrbina 12, 8270 Krsko, Slovenia ABSTRACT In order to decrease the
More informationThis specification describes the minimum requirements for piping systems for the following service:
SPEC-3501 1/ 1.0 APPLICATION This specification describes the minimum requirements for piping systems for the following service: Instrument Air Design Conditions 150 PSIG @ 180 F Operating Conditions 125
More informationThis specification describes the minimum requirements for piping systems for the following service:
201/01/13 1/ 1.0 APPLICATION This specification describes the minimum requirements for piping systems for the following service: Service Air Design Conditions Operating Conditions Blast Air (see Note 1)
More informationAssmann Corporation of America TANK INSTALLATION AND USE GUIDELINES FOR BULK STORAGE TANKS
Assmann Corporation of America TANK INSTALLATION AND USE GUIDELINES FOR BULK STORAGE TANKS General Information Assmann polyethylene storage tanks are manufactured to give you the toughest, most reliable
More informationStandard Details Index NWTP Improvements and MF System Installation
Detail Standard Details Index NWTP Improvements and MF System Installation Marco Island, Florida Description 0315-001 PLASTIC WATERSTOP 0315-003 HYDROPHILIC/GROOVE WATERSTOP 0315-011 WATERSTOP JOINT 0315-154
More informationGlulam Connection Details
T E C H N I C A L N O T E Glulam Connection Details Note: This version is superseded by a more current edition. Check the current edition for updated design and application recommendations. ENGINEERED
More informationConductor Integrity Management & Solutions
Conductor Integrity Management & Solutions Delivering safe, reliable, cost effective solutions to the North Sea. Contents 1. Late Life Asset Management 2. Conductors 3. Loadings 4. Internals 5. External
More informationPage 1 of 12 Second Revision No. 5-NFPA 12-2014 [ Section No. 2.3.4 ] 2.3.4 ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C 700, West Conshohocken, PA 19428-2959. ASTM A53, Standard
More informationSWAY BRACE PIPE ATTACHMENT FIG. 010
Function: Designed for bracing pipe against sway and seismic disturbance. The pipe attachment component of a sway brace system used in conjunction with a PHD Manufacturing structural attachment fitting,
More information6o ft (18.3 m) Southwest Windpower, Inc West Route 66 Flagstaff, Arizona USA Phone: Fax:
6o ft (18.3 m) sectional MONOPOLE TOWER INSTALLATION MANUAL Southwest Windpower, Inc. 1801 West Route 66 Flagstaff, Arizona 86001 USA Phone: 928.779.9463 Fax: 928.779.1485 www.skystreamenergy.com 3-CMLT-1390-01
More informationDESIGN OF MACHINE MEMBERS-I
Code No: R31035 R10 Set No: 1 JNT University Kakinada III B.Tech. I Semester Regular/Supplementary Examinations, Dec - 2014/Jan -2015 DESIGN OF MACHINE MEMBERS-I (Mechanical Engineering) Time: 3 Hours
More informationWood structures Copyright G G Schierle, press Esc to end, for next, for previous slide 1
Wood structures Copyright G G Schierle, 2001-02 press Esc to end, for next, for previous slide 1 Wood Types: Balloon framing (rare) Platform framing Heavy timber framing Advantages: The only renewable
More informationMW&S STANDARD PROCEDURE
FILE 1 of 6 SCOPE AND NATURE To provide for a uniform system of adjusting both jointed and welded rail for the prevention of buckling track where the rail was laid outside the preferred rail temperature
More informationDesign of Machine Elements I Prof. G. Chakraborty Department of Mechanical Engineering Indian Institute of Technology Kharagpur
Design of Machine Elements I Prof. G. Chakraborty Department of Mechanical Engineering Indian Institute of Technology Kharagpur Lecture - 22 Rivet Joints Dear student, welcome to the video lectures on
More informationJVI Vector Connector
The JVI Vector Connector User Guidelines 1 of 11 INTRODUCTION JVI designed the Vector Connector for use as shear and alignment connections between precast concrete elements such as double-tee flanges,
More informationREINFORCEMENT DESIGN FOR METAL BUILDING SYSTEMS
REINFORCEMENT DESIGN FOR METAL BUILDING SYSTEMS By Donald L. Johnson, P.E. RETROFIT PROJECTS CAN BE NECESSARY FOR ANY NUMBER OF REASONS, though change in use is one of the most common. Change of use can
More informationSECTION DEWATERING TANKAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS
SECTION 31 23 19 - DEWATERING TANKAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
More information5/16" Flange nut. Bolt Keeper Plate (8" Sq. SYS.) (3) 1/2" x 3" Hex head connector zinc plated bolt w/ washers and nut. Anchor 3" sq. 7 Ga.
2 1/2" x 2 1/2" x 10 Ga. 6" 5" 4" Variable Slipbase (8" Sq. SYS.) 5/16 Corner Bolt W/ nut 5/16" Flange nut Stub Insert (8" Sq. SYS.) Bolt Keeper Plate (8" Sq. SYS.) (3) 1/2" x 3" Hex head connector zinc
More informationFPSO Operation and Maintenance
An Intensive 5 Day Training Course FPSO Operation and Maintenance (Floating Production Storage and Offloading) This course is Designed, Developed, and will be Delivered under iso Quality Standards FPSO
More informationMueller Gas Products. Mueller H17800 Curb Stop Tee No Blo Curb Stop Tee Weld x Weld 1440 PSI
Mueller Gas Products Distributed by: Mountain States Pipe and Supply Colorado Springs, Colorado 80903 1 800 777 7173 Mueller H17800 Curb Stop Tee No Blo Curb Stop Tee Weld x Weld 1440 PSI MUELLER NO-BLO
More informationNID Regional Water Supply Project Technical Memorandum
NID Regional Water Supply Project Technical Memorandum Cross River Penstock Predesign January 2011 Prepared for Nevada Irrigation District City of Lincoln Prepared by Stantec Consulting Services Inc. 3875
More informationSight glass window Sight flow indicator
SIGHT GLASS Sight glass components allow operators to safely observe processes inside tanks, pipes, reactors and vessels. When it comes to selecting a sight glass, a wide variety of factors should be considered
More informationEvaluation of In-Pavement Light Fixture Designs and Performance
Evaluation of In-Pavement Light Fixture Designs and Performance Presented to: IES ALC Fall Technology Meeting By: Joseph Breen Date: Background In-Pavement Light Fixture Assemblies Utilize a Circle of
More informationOperators Manual: Diamond Rock Saw Excavator Attachment Austramac Flashcut Series
Operators Manual: Diamond Rock Saw Excavator Attachment Austramac Flashcut Series! WARNING! Inappropriate use of rock saw may cause serious injury or death. Operators must read this manual before use and
More informationFitness-For-Service, Remaining Life Assessment & Repair of apressure Equipment & Piping
An Intensive 5 Day Training Course Fitness-For-Service, Remaining Life Assessment & Repair of apressure Equipment & Piping (API-579/ASME FFS-1 & PCC-2 Standards) 08-12 Jul 2019, Kuala Lumpur 01-NOV-18
More informationWESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868)
WESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868) THREE-PHASE SUBSURFACE UNDERGROUND COMMERCIAL DISTRIBUTION (UCD) TRANSFORMER NOTE: This "Guide" summarizes the opinions, recommendations, and practices
More informationRequirement for Holes - Holes for Hanging
Requirement for Holes - Holes for Hanging In order for items to progress through the series of pretreatment and galvanizing baths at our facility, they must be suspended in a suitable manner to ensure
More informationSECTION 39 - MANHOLES TABLE OF CONTENTS
SECTION 39 - MANHOLES TABLE OF CONTENTS Section Page 39-1 GENERAL... 39.1 39-2 PRECAST CONCRETE MANHOLES... 39.1 39-2.01 Precast Concrete Sewer Manholes... 39.1 39-2.02 Precast Concrete Storm Drain Manholes...
More informationNational Craft Assessment and Certification Program S P E C I F I C A T I O N S
National Craft Assessment and Certification Program S P E C I F I C A T I O N S BOILERMAKER PRESSURE VESSEL V2 BLMK34_02 October 2014 Focus Statement A journey level boilermaker is skilled in all aspects
More informationHeat Exchanger & Boiler Tube Inspection Techniques
Overview For the in-service inspection of ferromagnetic, non-ferromagnetic and fin-fan tubes, the following advanced techniques offer high defect detection capabilities and accurate defect analysis: Multiple
More informationNew Product Release: October 2014 Boone Racks
New Product Release: October 2014 Boone Racks Double Fido Fountain Mounting: Surface NOTE: THESE ROUGH-IN DIMENSIONS MAY VARY ½: (13 mm) PLUS OR MINUS NOTE: All dimensions subject to manufacturing variance
More informationGUIDELINES FOR HINGED AND BOLTED MANWAY ASSEMBLY
GUIDELINES FOR HINGED AND BOLTED MANWAY ASSEMBLY Assembly Instructions for the Flammable Liquid Industry Published by: Renewable Fuels Association Authored by: Watco Compliance Services, VSP Technologies,
More informationNote: Do not bury sulphur dioxide lines Use stainless steel pipe and fittings only where specified on project drawings.
1/7 1.0 APPLICATION This specification describes the minimum requirements for piping systems for the following service: Liquid and High Pressure Gaseous Dry Sulphur Dioxide (Less than 100 ppm of water)
More informationFig. (8.1) types of riveted joints
8 Riveted Joints 8. Introduction Riveting was the standard method of joining plates and structural parts before welding began to replace it with increasing rapidity. are widely used in many engineering
More informationThe MUELLER method of making a main to service connection using the MUELLER E-5 Small Drilling Machine. Hand or power. kpa/34.
MUELLER SMALL DRILLING MACHINES 2.1 Shaded area indicates change Rev. 9-09 MUELLER Co. manufactures several different small drilling machines for drilling holes from 7/16" to 2" in all types of pipe. Machines
More information10 Ton Pull Back Ram
10 Ton Pull Back Ram Model 97207 Set up And Operating Instructions Diagrams within this manual may not be drawn proportionally. Due to continuing improvements, actual product may differ slightly from the
More informationStake-less earth / ground testing
APPLICATION NOTE Stake-less earth / ground testing NEW DET14C and DET24C CLAMPS GETTING-AROUND ANY CHALLENGE What is stake-less testing? How does it work? Where and how can it be used? What are the potential
More informationSection COUPLINGS AND COUPLING ADAPTERS. This Section covers couplings and coupling adapters for ductile iron and steel pipe.
PART 1 GENERAL 1.01 SUMMARY Section 15155 This Section covers couplings and coupling adapters for ductile iron and steel pipe. 1.02 MEASUREMENT AND PAYMENT A. No separate payment for Work performed under
More informationIJSRD - International Journal for Scientific Research & Development Vol. 4, Issue 04, 2016 ISSN (online):
IJSRD - International Journal for Scientific Research & Development Vol. 4, Issue 04, 2016 ISSN (online): 2321-0613 Comparative Study between Precast and Cast In-Situ Structure Under Combination of Dynamic
More information...thoroughly tried and tested!
...thoroughly tried and tested! Tapping and bushing with EWE tools www.ewe-armaturen.de Installation and operating instructions for EWE drilling units 1. Details of product 1.1. Application field EWE tapping
More informationSTP-PT-032 BUCKLING OF CYLINDRICAL, THIN WALL, TRAILER TRUCK TANKS AND ASME SECTION XII
STP-PT-032 BUCKLING OF CYLINDRICAL, THIN WALL, TRAILER TRUCK TANKS AND ASME SECTION XII Date of Issuance: September 1, 2009 This report was prepared as an account of work sponsored by ASME Pressure Technologies
More informationA. Radius elbows with a construction radius of 1.5 the duct width are preferred to square elbows.
SECTION 233100 DUCTWORK 1.0 Acoustical duct lining in any part of the duct system is prohibited. All ductwork requiring insulation shall be externally insulated (Refer to the Sheet Metal Ductwork Insulation
More informationSturdi-Wall Design Manual for SW46, SW66, SW63, SW64, SW60, SW83, SW84, and SW80 Models
Sturdi-Wall Design Manual for SW46, SW66, SW63, SW64, SW60, SW83, SW84, and SW80 Models Project Number ME086-05 by Brent Leatherman, P.E. Timber Tech Engineering, Inc E-Mail: bl@timbertecheng.com January
More information1. ANSI/ASME Standard B , Square and Hex Bolts and Screws, Inch Series
SECTION 31 66 13 HELICAL PILES AND HELICAL ANCHORS PART 1 - GENERAL 1.1 DESCRIPTION A. This work pertains to furnishing and installing Helical Piles and Bracket Assemblies shown in the Contract in accordance
More informationThe MUELLER method of making a main to service connection using the MUELLER E-5 Small Drilling Machine. The main is drilled out under pressure.
MUELLER SMALL DRILLING MACHINES 2.1 Rev. 9-09 MUELLER Co. manufactures several different small drilling machines for drilling holes from 7/16" to 2" in all types of pipe. Machines are available in hand
More informationINVICTA PENSTOCK SOLUTIONS PENSTOCK SOLUTIONS
INVICTA PENSTOCK SOLUTIONS PENSTOCK SOLUTIONS INVICTA PENSTOCK RANGE Invicta is a well established, service driven company offering complete valve, penstock and actuator solutions. Invicta Valves was formed
More informationFluid Sealing Association
Fluid Sealing Association STANDARD FSA-MG-501-02 STANDARD TEST METHOD FOR INWARD BUCKLING OF SPIRAL-WOUND GASKETS 994 Old Eagle School Road, Suite 1019 Wayne, Pennsylvania 19087-1866 Phone: (610) 971-4850
More informationINSUL-FLUE is used to reduce the danger of radiant heat from smoke pipe, flue pipe, gas vents, etc. igniting combustibles.
INSUL-FLUE OWNER S MANUAL (6 inch) High Heat Resistant Thimble and Insulating Sleeve for Smoke Pipe When Passing Through Any Combustible Wall September 1993, Revision A INTRODUCTION CONGRATULATIONS ON
More informationWoven Wire Fence. Fencing for small ruminant prescribed grazing. Job Sheet No. AL382C - 1
Job Sheet No. AL382C - 1 Woven Wire Fence Alabama Fence Job Sheet No. 382C The woven wire fence is suited for the restraint and management of most species and classes of livestock. When constructed in
More informationUser s Manual For CT Model IMB
User s Manual For CT Model IMB 2 of (13) Contents: A. Introduction... 3 B. Steps on receipt and opening the cases... 3 C. Transportation and handling... 3 D. Unpacking the transformer... 4 E. Storage...
More information