REPAIR OF NE KRSKO STEAM GENERATOR TUBES BY SLEEVING METHOD

Size: px
Start display at page:

Download "REPAIR OF NE KRSKO STEAM GENERATOR TUBES BY SLEEVING METHOD"

Transcription

1 HR REPAIR OF NE KRSKO STEAM GENERATOR TUBES BY SLEEVING METHOD Prepared by: Kresimir Gudek, Drago Pete Krsko Nuclear Power Plant, Vrbina 12, 8270 Krsko, Slovenia ABSTRACT In order to decrease the percentage of plugged tubes, i.e. to avoid exceeding of plugging margin in the future, NE KrSko introduced in 1993 Sleeving as the repair method of degraded steam generator (SG) tubes. TIG welded sleeves developed by ABB CE to span defects in roll transition zone or just above the tubesheet (RTZ sleeve) and around tube support plates (TSP sleeve) have been installed during 1993 and In this document both type of TIG welded sleeves are presented including design, installation and examination. Plant specific qualification process and experience from both sleeving campaigns are presented too. At the end there is described new developed ABB Reactor weldless type of sleeve (PLUSS sleeve) which is selected by NE Kr ko as a preferable sleeving option that could replace plugging. 149

2 1.0 INTRODUCTION The operation of Pressurized Water Reactor (P WR) steam generators results in some instances with localized corrosive attack on the inside (primary side) or outside (secondary side) of the steam generator tubing. Such corrosive attack interfere to tube wall integrity in two ways - like reduction of tube wall or cracking. Based on applicable codes and regulations, degradation up to 40% of wall thickness (plugging or repair criteria) does not require any corrective action because SG tubing has been designed with considerable margin between the actual wall thickness and the wall thickness required to meet structural requirements but exceeding this value tube has to be repaired or plugged. Shortly after start up (since 1985), NE KrSko was faced with degradation processes in SG tubing inspectioned by Eddy Current (ECT). Up to year 1993 NE Kr ko used to perform only plugging on tubes exceeding plugging criteria because steam generators have been designed with plugging margin of 18% (percentage of tubes which could be plugged without decreasing of power). Approaching to the plugging margin NE Kr ko maintenance staff started to think about sleeving like relatively new repair method instead of plugging to keep plant operability on 100% of power. At NE Krsko steam generators the most of tube defects are placed at the top of the tube sheet area (TTS) and at the tube support plates (TSP) intersections, both on the "hot leg" side. Some service companies developed sleeves for the tube repairs in these locations. Fig. 1 shows a NPP Kr ko SG's structure (Westinghouse D-4 model, with tubing 3/4" OD x 0.043", ALLOY 600 MA). From technical point of view, sleeve is part of tube with outside diameter very close to the inner tube diameter inserted into the parent tube with a minimal gap. Sleeve spans defect between two joints - welded or mechanically expanded or in combination of these two ways. Both joints have to assure leak-tightness to prevent reactor coolant leakage from primary to secondary side in steam generator. At that time (1993) industry was offering several types of sleeves which could be divided into the two main groups based on technology: welded and mechanically expanded sleeve. There are two types of welded sleeves and they are related to the welding processes used for joint: TIG and LASER. Also, for weldless types there are several technics used: explosion, hydraulic and rolling expansion. Evaluating techniques and sleeve types, industry and plants experience and references NPP KrSko has chosen for the first campaign TIG welded sleeve designed by ABB CE. 150

3 W>UW Accra fbtt OWlWMol tuat Suy R»< Figure 1 Steam Generator W Model D

4 2.0 DESIGN OF TIG WELDED SLEEVES ABB CE has developed and designed two different welded sleeves: RTZ (roll transition zone) sleeve for spaning defects in top of the tube sheet and TSP (tube support plate) sleeve for defects placed at tube support plate intersections. Alloy 690 was selected for sleeve material due to increased corrosion resistance and perfect welding properties. 2.1 RTZ Sleeve RTZ sleeve design is shown of Fig. 2 bellow. Hydraulically expanded region at upper part of sleeve assure contact with the tube necessary for welding using TIG process. Lower sleeve joint is achieved using hard rolling combined with friction and sealing by carbide layer called microlock. Tube Figure RTZ Welded Sleeve

5 2.2 TSP Sleeve Fig. 3 shows TSP sleeve with expended regions above and below tube support plate. Leak tight joint is achieved by welds..tube,weld Tube Support 3.0 INSTALLATION Figure 3 TSP Welded Sleeve 3.1 RTZ Sleeve Process starts with cleaning of tubes in region where sleeve will be installed. Cleaning is performed by steel brushes and stream of air. Verification of cleanliness is done by visual examination using endoscope. After sleeve insertion in to the position follows expansion of upper joint with very preciselly controlled hydraulic equipment. TIG welding process without filler material is used to weld upper joint. In case of rejected weld it is possible to make rewelding. Upper weld is examined by NDE. Finally, lower joint is done by mechanical rolling same as at installation of mechanical removable ABB plug. Post weld heat treatment is option. Basically, if sleeve is installed for longer period heat treatment is necessary but for shorter time of operation sleeve is fully safe without this step which consumes significant time on critical path of an outage. 153

6 RTZ sleeve can be installed in about 90% of tubes. Tubes on periphery is difficult to sleeve because of channel head geometry and tools capability. Installation process which is very complicated requires nearly 100 specialists and supporting workers (jumpers) during 24 hours work, and 20 tons of remote controlled equipment as manipulators, lighting, air-conditions, computers, cameras, different tools etc. Steam generators have to be drained and dried on primary and secondary side. Both atmospheres have to be strictly controlled because success of welding depend on inside humidity conditions. 3.2 TSP sleeve TSP sleeving process differs from RTZ sleeving process because both joints (upper and lower) are welded. Because of this, NDE and heat treatment take longer time and production rate of TSP sleeve installation is approximately 20% less than RTZ sleeves installation. Today, development of tools enables TSP welded sleeving up to the 5-th tube support plate and sleeves can be installed in 95% tubes. 4.0 EXAMINATION The critical moment after installation is NDE. Three methods are used for sleeve welds examination. Visual testing is performed by remote controlled endoscope. Experience learned us that this method provides the most reliable informations about weld quality in conjunction with other NDE methods. Data recorded on video tape can be very useful to make easier ECT, especially to distinguish surface indications, like roughness, from defects to be plugged. During both sleeving campaigns NE Kr ko performed pressure test (water standing test) because this very simple method is capable to detect leakers missed by NDE (case in both campaigns). To check sleeve to tube weld fusion and completeness ultrasonic testing (UT) is applied using immersion technique. Final decision about weld acceptance is based on ECT which establishes baseline data. Today, for this method are developed very sensitive probes which are capable to detect very small defects. 5.0 QUALIFICATION Sleeve to tube assembly and functional integrity has to be maintained in normal conditions during operation as well as in accidental conditions. ASME B & PV code defines comprehensive and extensive testing program for material and design to proove sleeving like safe repair method. Laboratory testing program is consists of tests like cleaning, expansion, welding, different leakage tests performed on full-scale loop test setup, than fatigue, collapse, corrosion, axial load test, NDE etc. 154

7 6.0 EXPERIENCE FROM OUTAGES '93 AND '96 To perform successful sleeving campaign plant staff for steam generators maintenance have to be perfectly informed about sleeving processes through specific training program prepared by contractors to get necessary knowledge and experience. This job has to be well prepared from plant side. That means that for each tube which is sleeving candidate some measures and checking have to be performed. The most important restriction is sludge height. Welding performance in sludge area is very difficult and usually results with rejected joints. Therefore, eddy current sludge measurement will realise tubes with minimum 12 mm sludge level below positions of future weld joints. In addition to all restrictions of technique it is not recommended to sleeve first two rows because in next inspections it will be very difficult to examine those tubes with ECT. Calculation showed that sleeving campaign is the most cost benefit for number of over 200 tubes. It is not good decision to install more than one sleeve in one tube. Expenses per saved tube are much higher and in next outages, parent tube between two sleeves will be very difficult to inspect. In both campaigns NE KrSko decided to return also some plugged tubes into operation. These tubes have been deplugged on the"hot leg" side and examined on full length. Tubes with only one indication were added on sleeving list and directed for deplugging on "cold leg" side. In tubes with more indications plugs have been installed on "hot leg" side back. Deplugging tubes just on one side decreases cost and time. Taking into considerations all mentioned restrictions and experience sleeving campaign can be optimized. 7.0 ABB WELDLESS SLEEVE (PLUSS SLEEVE) Last two years NPP Krsko has been in very close contact with ABB Reactor during developing of new sleeve type without welding. An idea is to make joint between tube and sleeve performing just expansions. Concept of new pressure boundary created between sleeve and tube is based on different yield strengths of materials. Sleeve material (ALLOY 800) has lower yield strenght. The elasticity of the tube is much higher, but its real spring back effect is blocked by the plastically expanded sleeve resulting in a contact pressure between tube and sleeve. This contact pressure provides all codes and regulations requirements at ambient temperature as well as at load parameters and accidental conditions. With 6 expansion zones below and 6 above TSP, or 6 expansions above and hard rolling below TTS, joints are assured. Such configuration is capable to fulfill all requirements. Fig. 6 shows PLUSS Sleeve design. 155

8 N Stem Figure 4 Pluss Sleeve 8.0 SUMMARY Good experiences with installed welded sleeves since 1993 is confirmed by fact that up to last inspection no one indication is found in sleeve region. Next target is to keep plant operating on full power till year 2000 when steam generators will be replaced. Krslco plant is just passing through PLUSS sleeving licencing process waiting for positive decision from URSJV*. With new sleeve plant will get possibilities to save tubes degraded also up to 10-th TSP as well as drastically reduce cost and time for outage. This sleeve is perfect solution for short tenri repair, because this method does need welding, heat treatment, extensive NDE and it is close to expenses to mechanical plugging. While RTZ PLUSS sleeves are already in operation in Belgium and Korean plants, NE Krslco will be first one which will install TSP PLUSS sleeves. * Slovenian Nuclear Authorities References: ABB CE ABB Reactor ABB Reactor "Reports on Testing and Qualification of the Sleeving Process" "SG Tube Repair for W Designed Plants with 3/4" Alloy 600 Tubes Using PLUSS Sleeves, GBRA B "Scope of Products, Steam Generator Services" 156

D DAVID PUBLISHING. Eddy Current Test for Detection of Foreign Material using Rotating Probe. 2. Theory. 1. Introduction

D DAVID PUBLISHING. Eddy Current Test for Detection of Foreign Material using Rotating Probe. 2. Theory. 1. Introduction Journal of Mechanics Engineering and Automation 6 (2016) 379-383 doi: 10.17265/2159-5275/2016.07.009 D DAVID PUBLISHING Eddy Current Test for Detection of Foreign Material using Rotating Probe Houng Kun

More information

Overview of V.C. Summer Hot Leg Loop A Nozzle to Pipe Dissimilar Metal Weld

Overview of V.C. Summer Hot Leg Loop A Nozzle to Pipe Dissimilar Metal Weld Overview of V.C. Summer Hot Leg Loop A Nozzle to Pipe Dissimilar Metal Weld Steven R. Doctor NDE Measurement Systems Group PNNL, Richland, WA SMiRT-16 Conference August 2001 Outline 1. Background on V.C.

More information

New generation of welding and inspection systems

New generation of welding and inspection systems New generation of welding and inspection systems Throughout the pipeline industry, and particularly in offshore and spool base production, welding requirements are shifting toward higher quality, greater

More information

Application of Ultrasonic Guided Wave to Heat Exchanger Tubes Inspection

Application of Ultrasonic Guided Wave to Heat Exchanger Tubes Inspection 17th World Conference on Nondestructive Testing, 25-28 Oct 2008, Shanghai, China Application of Ultrasonic Guided Wave to Heat Exchanger Tubes Inspection Ik-Keun PARK 1,a, Yong-Kwon KIM 2,b, Sae-Jun PARK

More information

EDDY CURRENT TECHNOLOGY FOR HEAT EXCHANGER AND STEAM GENERATOR TUBE INSPECTION

EDDY CURRENT TECHNOLOGY FOR HEAT EXCHANGER AND STEAM GENERATOR TUBE INSPECTION EDDY CUENT TECHNOLOGY FO HEAT EXCHANGE AND STEAM GENEATO TUBE INSPECTION L. Obrutsky, B. Lepine, J. Lu,. Cassidy and J. Carter Atomic Energy of Canada Limited, Chalk iver Laboratories, Chalk iver, Ontario,

More information

INFLUENCE OF SIGNAL-TO-NOISE RATIO ON EDDY CURRENT SIGNALS OF CRACKS IN STEAM GENERATOR TUBES

INFLUENCE OF SIGNAL-TO-NOISE RATIO ON EDDY CURRENT SIGNALS OF CRACKS IN STEAM GENERATOR TUBES http://dx.doi.org/10.5516/net.09.2014.055 INFLUENCE OF SIGNAL-TO-NOISE RATIO ON EDDY CURRENT SIGNALS OF CRACKS IN STEAM GENERATOR TUBES DO HAENG HUR 1*, MYUNG SIK CHOI 1, HEE-SANG SHIM 1, DEOK HYUN LEE

More information

30th European Conference on Acoustic Emission Testing & 7th International Conference on Acoustic Emission University of Granada, 12-15 September 2012 www.ndt.net/ewgae-icae2012/ Qualification of the acoustic

More information

Simulation Model for SG Eddy Current SG Inspection

Simulation Model for SG Eddy Current SG Inspection Simulation Model for SG Eddy Current SG Inspection Saptarshi Mukherji, Anton Efremov, Pavel Roy, Portia Banerjee, Anders Rosell, L.Udpa Michigan State University & Rick Williams, Nathan Driessen, James

More information

Technical Manual. ETP-CLASSIC incl type R. Content

Technical Manual. ETP-CLASSIC incl type R. Content Technical Manual ETP-CLASSIC incl type R Content Technical parts description...2 Mounting/dismantling tips...4 Design suggestions...7 Tolerances...13 Central bolt...15 Torsional stiffness...16 Screw pitch

More information

Practical Bolting and Gasketing for the Non Standard-Flanged Joint

Practical Bolting and Gasketing for the Non Standard-Flanged Joint Practical Bolting and Gasketing for the Non Standard-Flanged Joint Points of Discussion Introduction Joint Analysis Existing Flange Data Machining Procedure Bolting Radial Shear Available Gasket Styles

More information

Eddy Current Signal Analysis Techniques for Assessing Degradation of Support Plate Structures in Nuclear Steam Generators

Eddy Current Signal Analysis Techniques for Assessing Degradation of Support Plate Structures in Nuclear Steam Generators ECNDT 2006 - Th.3.1.2 Eddy Current Signal Analysis Techniques for Assessing Degradation of Support Plate Structures in Nuclear Steam Generators Laura OBRUTSKY, Robert CASSIDY, Miguel CAZAL, Ken SEDMAN,

More information

R&D of Multi-Frequency ECT Algorithms for FBR SG Tubes

R&D of Multi-Frequency ECT Algorithms for FBR SG Tubes E-Journal of Advanced Maintenance Vol.9- (7) - Japan Society of Maintenology R&D of Multi-Frequency ECT Algorithms for FBR SG Tubes Ovidiu MIHALACHE, Toshihiko YAMAGUCHI, Takuma SHIRAHAMA and Masashi UEDA

More information

LCSF Low Clearance Split Frame

LCSF Low Clearance Split Frame Designed For Portability And Limited Clearance Full Range 2in - 48in for Pipe and Tube Optional Bridge Slide for Heavy Wall Pipe EXTERNALLY MOUNTED PORTABLE PIPE CUTTING AND BEVELING SYSTEM E.H. Wachs

More information

LASER-BASED NDT OF TITANIUM AIRCRAFT ENGINE COMPONENTS J. Doyle Jr and M. J. Brinkman Laser Techniques Company, LLC, Bellevue, USA

LASER-BASED NDT OF TITANIUM AIRCRAFT ENGINE COMPONENTS J. Doyle Jr and M. J. Brinkman Laser Techniques Company, LLC, Bellevue, USA LASER-BASED NDT OF TITANIUM AIRCRAFT ENGINE COMPONENTS J. Doyle Jr and M. J. Brinkman Laser Techniques Company, LLC, Bellevue, USA Abstract: Assuring the integrity of high-energy rotating parts in aircraft

More information

Modelling III ABSTRACT

Modelling III ABSTRACT Modelling III Hybrid FE-VIM Model of Eddy Current Inspection of Steam Generator Tubes in the Vicinity of Tube Support Plates S. Paillard, A. Skarlatos, G. Pichenot, CEA LIST, France G. Cattiaux, T. Sollier,

More information

Module 4 Design for Assembly IIT BOMBAY

Module 4 Design for Assembly IIT BOMBAY Module 4 Design for Assembly Lecture 8 Case Studies - IV Instructional objectives The objective of this lecture is to exhibit how real components are designed in industry following some of the principles

More information

Pipeline & Specialty Services (P&SS)

Pipeline & Specialty Services (P&SS) Pipeline & Specialty Services (P&SS) A Pipeline Inspection Case Study: Design Improvements on a New Generation UT In-line Inspection Crack Tool Mark Slaughter Global Product Line Manager Pipeline & Specialty

More information

PIPING NOMENCLATURE. Header Branch connection Valve Flange Expansion joint Expansion loop Pipe support Reducer Elbow

PIPING NOMENCLATURE. Header Branch connection Valve Flange Expansion joint Expansion loop Pipe support Reducer Elbow PIPING COMPONENTS Piping components are mechanical elements suitable for joining or assembly into pressure-tight fluid containing piping systems. Components include pipe, tubing, fittings, flanges, gaskets,

More information

Introduction INTRODUCTION DISCOVER THE NEXT GENERATION IN EDGE WELDED METAL BELLOWS

Introduction INTRODUCTION DISCOVER THE NEXT GENERATION IN EDGE WELDED METAL BELLOWS 2 INTRODUCTION Introduction DISCOVER THE NEXT GENERATION IN EDGE WELDED METAL BELLOWS BellowsTech, an MW Industries company, is a premier US manufacturer of high quality, dependable edge welded bellows

More information

Dec The Twisted Tube Heat Exchanger AlfaTwist. Examples of deliveries. Siljan Allards AB.

Dec The Twisted Tube Heat Exchanger AlfaTwist. Examples of deliveries. Siljan Allards AB. Dec 2007 The Twisted Tube Heat Exchanger AlfaTwist Examples of deliveries Siljan Allards AB www.siljanallards.com Siljan Allards is one of Sweden's largest manufacturers of stainless process equipment.

More information

Developments in Electromagnetic Inspection Methods I

Developments in Electromagnetic Inspection Methods I 6th International Conference on NDE in Relation to Structural Integrity for Nuclear and Pressurized Components October 2007, Budapest, Hungary For more papers of this publication click: www.ndt.net/search/docs.php3?mainsource=70

More information

BHARAT HEAVY ELECTRICALS LIMITED

BHARAT HEAVY ELECTRICALS LIMITED FIELD QUALITY PLAN OF BOILER PRESSURE PARTS (Erection & Commissioning) FOR BHEL-JHANSI BHARAT HEAVY ELECTRICALS LIMITED BHEL-JHANSI DOC. NO.: REV. NO. : R00 FIELD QUALITY PLAN OF BOILER PRESSURE PARTS

More information

DIFFICULT TO PIG AND TO INSPECT OFFSHORE PIPES

DIFFICULT TO PIG AND TO INSPECT OFFSHORE PIPES DIFFICULT TO PIG AND TO INSPECT OFFSHORE PIPES K. Reber, Innospection Germany GmbH, Stutensee, Germany S. Hartmann, Innospection Ltd., UK A. Boenisch, Innospection Ltd., UK Introduction When it comes to

More information

MultiScan MS Tube Inspection System. Multi-technology System Eddy Current Magnetic Flux Leakage Remote Field IRIS Ultrasound

MultiScan MS Tube Inspection System. Multi-technology System Eddy Current Magnetic Flux Leakage Remote Field IRIS Ultrasound MultiScan MS 5800 Tube Inspection System Multi-technology System Eddy Current Magnetic Flux Leakage Remote Field IRIS Ultrasound 920-107 MultiScan MS 5800 E Tube Inspection with Eddy Current Condensers

More information

Pipeline Technology Conference 2010

Pipeline Technology Conference 2010 THRESHOLDS, ACCURACIES AND RESOLUTION: QUANTITATIVE MEASUREMENT AND ITS ADVANTAGES FOR METAL LOSS INSPECTION A. Barbian, M. Beller, A. Hugger, C. Jäger, A. Pfanger NDT Systems & Services Stutensee, Germany

More information

MultiScan MS Tube Inspection System. Multi-technology System Eddy Current Magnetic Flux Leakage Remote Field IRIS Ultrasound

MultiScan MS Tube Inspection System. Multi-technology System Eddy Current Magnetic Flux Leakage Remote Field IRIS Ultrasound MultiScan MS 5800 Tube Inspection System 920-107 Multi-technology System Eddy Current Magnetic Flux Leakage Remote Field IRIS Ultrasound MultiScan MS 5800 E Tube Inspection with Eddy Current Condensers

More information

Specifications for EA31002 U Tube Bundle for CDU 3

Specifications for EA31002 U Tube Bundle for CDU 3 Specifications for EA31002 U Tube Bundle for CDU 3 Tube Bundle Specificatio Tube Bundle for Heat Exchanger EA31002A/B/C/D Quantity required : One with Dummy shell Exchanger Type: BEU Horizontal No of U

More information

NEW APPROACH TO THE PIPE TO GUSSET PLATE CONNECTION

NEW APPROACH TO THE PIPE TO GUSSET PLATE CONNECTION NEW APPROACH TO THE PIPE TO GUSSET PLATE CONNECTION Prepared by Liftech Consultants Inc. Quality Assurance Review for Liftech Consultants Inc. Author: Kenton Lee Structural Engineer Editor: Erik Soderberg

More information

IMPROVEMENT OF DETECTION OF SMALL DEFECTS LOCATED NEAR OR FAR FROM WELDS OF MAGNETIC STEAM GENERATOR TUBES USING REMOTE FIELD EDDY CURRENT

IMPROVEMENT OF DETECTION OF SMALL DEFECTS LOCATED NEAR OR FAR FROM WELDS OF MAGNETIC STEAM GENERATOR TUBES USING REMOTE FIELD EDDY CURRENT 12 th A-PCNDT 2006 Asia-Pacific Conference on NDT, 5 th 10 th Nov 2006, Auckland, New Zealand IMPROVEMENT OF DETECTION OF SMALL DEFECTS LOCATED NEAR OR FAR FROM WELDS OF MAGNETIC STEAM GENERATOR TUBES

More information

Assure best processing and product quality with the world s first In-line 3D Measuring Plate Inspection

Assure best processing and product quality with the world s first In-line 3D Measuring Plate Inspection Saving Costs at Inspection, Analysis and Repair of Hot and Cold Heavy Plates Assure best processing and product quality with the world s first In-line 3D Measuring Plate Inspection Aachen,. ISRA VISION

More information

PRIMARY LOOP ACOUSTIC EMISSION PROCEDURE: AN UPGRADED METHOD AND ITS CONSEQUENCES ON THE IN-SERVICE-INSPECTION

PRIMARY LOOP ACOUSTIC EMISSION PROCEDURE: AN UPGRADED METHOD AND ITS CONSEQUENCES ON THE IN-SERVICE-INSPECTION PRIMARY LOOP ACOUSTIC EMISSION PROCEDURE: AN UPGRADED METHOD AND ITS CONSEQUENCES ON THE IN-SERVICE-INSPECTION Laurent Truchetti, Yann Forestier, Marc Beaumont EDF CEIDRE, EDF Nuclear Engineering Division;

More information

U, W, and Y -- MULTIPLE LEG STARBARS, SILICON CARBIDE HEATING ELEMENTS

U, W, and Y -- MULTIPLE LEG STARBARS, SILICON CARBIDE HEATING ELEMENTS U, W, and Y -- MULTIPLE LEG STARBARS, SILICON CARBIDE HEATING ELEMENTS GENERAL DESCRIPTION Made of high density recrystallized silicon carbide, these multiple leg Starbars use the same hot zone and cold

More information

Essex County College - West Essex Campus Addition And Renovations dlb # / SECTION EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING

Essex County College - West Essex Campus Addition And Renovations dlb # / SECTION EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING SECTION 230516 - EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING PART I - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

NDT KONFERANSEN ZENOVIEA VOROSCIUC

NDT KONFERANSEN ZENOVIEA VOROSCIUC NDT KONFERANSEN 2011 ZENOVIEA VOROSCIUC Short about FMC Expectations Requirements New Challenges. New Solutions. 2 FMC Technologies Subsea Eastern ~ 150% growth from 2004-2010 MUSD Revenue Employees ER

More information

BAFFLE BOLT ULTRASONIC INSPECTION NEW DEVELOPMENTS FOR DIFFICULT TO INSPECT BOLT CONFIGURATIONS. P.M. Minogue, WesDyne International, Madison PA, USA

BAFFLE BOLT ULTRASONIC INSPECTION NEW DEVELOPMENTS FOR DIFFICULT TO INSPECT BOLT CONFIGURATIONS. P.M. Minogue, WesDyne International, Madison PA, USA BAFFLE BOLT ULTRASONIC INSPECTION NEW DEVELOPMENTS FOR DIFFICULT TO INSPECT BOLT CONFIGURATIONS P.M. Minogue, WesDyne International, Madison PA, USA INTRODUCTION Implementation of MRP-227 guidelines will

More information

Wire and pipe drawing

Wire and pipe drawing Wire and pipe drawing Overview Wire drawing application deformations, drawing speeds and forces equipmentm dies and die materials Tube drawing tube drawing processes Strain and drawing force Drawing tools

More information

.1 Materials and installation for steel piping, valves and fittings for hydronic systems in building services piping..2 Related Sections.

.1 Materials and installation for steel piping, valves and fittings for hydronic systems in building services piping..2 Related Sections. Issued 2006/08/01 Section 15183 Hydronic Systems: Steel Page 1 of 6 PART 1 GENERAL 1.1 SUMMARY.1 Section Includes..1 Materials and installation for steel piping, valves and fittings for hydronic systems

More information

Selection BASIC LINE BASIC LINE PLUS VARIO LINE SERIES TUBE LINE STEEL LINE

Selection BASIC LINE BASIC LINE PLUS VARIO LINE SERIES TUBE LINE STEEL LINE PLUS 30 for cable carriers Support trays page 304 PLUS Guide channels page 305 RCC Rail Cable Carrier page 309 ECC Emergency Cable Carrier page 30 Strain relief devices page 3 Assembly profile bars page

More information

EDDY CURRENT MEASUREMENT OF REMOTE TUBE POSITIONS IN CANDU REACTORS S.T. Craig, T.W. Krause, B.V. Luloff and J.J. Schankula Atomic Energy of Canada

EDDY CURRENT MEASUREMENT OF REMOTE TUBE POSITIONS IN CANDU REACTORS S.T. Craig, T.W. Krause, B.V. Luloff and J.J. Schankula Atomic Energy of Canada EDDY CURRENT MEASUREMENT OF REMOTE TUBE POSITIONS IN CANDU REACTORS S.T. Craig, T.W. Krause, B.V. Luloff and J.J. Schankula Atomic Energy of Canada Limited, Chalk River, Ontario, Canada Abstract: Regular

More information

Phased Array UT Application For Boiler Tube Inspection in Manufacturing And In-Service Anandamurugan S 1, Siva Sankar Y 2

Phased Array UT Application For Boiler Tube Inspection in Manufacturing And In-Service Anandamurugan S 1, Siva Sankar Y 2 More Info at Open Access Database www.ndt.net/?id=15156 Phased Array UT Application For Boiler Tube Inspection in Manufacturing And In-Service Anandamurugan S 1, Siva Sankar Y 2 1 GE Inspection Technologies,

More information

EC Test of welded Tubes. Edition 3 January 2003

EC Test of welded Tubes. Edition 3 January 2003 EC Test of welded Tubes Edition 3 Technological changes in the welding process are impacting on eddy current testing. In this article we describe new potential applications of eddy current testing in the

More information

6 Tips for Critical Sight Glass Applications

6 Tips for Critical Sight Glass Applications White Paper 6 Tips for Critical Sight Glass Applications Sight glass applications require varying levels of consideration during the design phase. In all applications, sight glasses will be subjected to

More information

Inspection and Test Plan for Water Tube Boiler

Inspection and Test Plan for Water Tube Boiler www.inspectionforindustry.com Inspection and Test Plan for Water Tube Boiler No. AND TEST PLAN REFERENCE DOCUMENT ACCEPTANCE CRITERIA VERIFING DOCUMENT ACTIVITY BY MANUF. TPI CLIENT REMARK 1 PRE MEETING

More information

EDDY CURRENT INSPECTION MODELLING OF THE ELBOW OF A STEAM GENERATOR TUBE WITH THE FINITE ELEMENT SOFTWARE «FLUX»

EDDY CURRENT INSPECTION MODELLING OF THE ELBOW OF A STEAM GENERATOR TUBE WITH THE FINITE ELEMENT SOFTWARE «FLUX» EDDY CURRENT INSPECTION MODELLING OF THE ELBOW OF A STEAM GENERATOR TUBE WITH THE FINITE ELEMENT SOFTWARE «FLUX» Fabrice FOUCHER*, Bastien LAVIE**, Erwan TOUDIC** * EXTENDE, 86 rue de Paris, 91400 ORSAY,

More information

EMAT Application on Incoloy furnace Tubing Ramamohan Reddy M (ASNT Level III UT, PCN Level III UT,PAUT&TOFD)

EMAT Application on Incoloy furnace Tubing Ramamohan Reddy M (ASNT Level III UT, PCN Level III UT,PAUT&TOFD) EMAT Application on Incoloy furnace Tubing By Ramamohan Reddy M (ASNT Level III UT, PCN Level III UT,PAUT&TOFD) Outlines 1. Introduction EMAT 2. EMAT- Ultrasound waves 3. EMAT-Surface waves 4. EMAT-Guided

More information

Pipeline Design & Installation Systems

Pipeline Design & Installation Systems Pipeline Design & Installation Systems Rigid pipeline subsea tie-backs new operational challenges Paul Georgeson Operations Support Manager Wood Group Kenny Agenda - Overview - Materials - Inspection -

More information

SECTION EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING

SECTION EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING SECTION 230516 - EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

INSPECTION AND TEST PLAN

INSPECTION AND TEST PLAN BOILER AND TEST PLAN No. AND TEST PLAN REFERENCE DOCUMENT ACCEPTANCE CRITERIA VERIFING DOCUMENT ACTIVITY BY MANUF. TPI CLIENT REMARK 1 PRE MEETING SPEC. SPEC. MOM H H H Before Manufacturing 2 DWG, DESIGN,

More information

Long Range Ultrasonic Testing - Case Studies

Long Range Ultrasonic Testing - Case Studies More info about this article: http://www.ndt.net/?id=21145 Prawin Kumar Sharan 1, Sheethal S 1, Sri Krishna Chaitanya 1, Hari Kishore Maddi 1 1 Sievert India Pvt. Ltd. (A Bureau Veritas Company), 16 &

More information

Requirements for manufacture of anchors

Requirements for manufacture of anchors W29 (June 2005) Requirements for manufacture of anchors 1. General requirements 1.1 Scope These Rules apply to the materials, manufacture and testing, and certification of anchors, shanks and anchor shackles

More information

TYPE SE and TSE, SILICON CARBIDE SPIRAL HEATING ELEMENTS

TYPE SE and TSE, SILICON CARBIDE SPIRAL HEATING ELEMENTS TYPE SE and TSE, SILICON CARBIDE SPIRAL HEATING ELEMENTS GENERAL DESCRIPTION The spiral Starbars are made of special high-density reaction-bonded silicon carbide. A spiral slot in the hot zone reduces

More information

Electromagnetic Eddy Current Sensors for Evaluation of Sea-Cure and 2205 Duplex Condenser Tubing

Electromagnetic Eddy Current Sensors for Evaluation of Sea-Cure and 2205 Duplex Condenser Tubing 6th European Workshop on Structural Health Monitoring - We.3.B.2 More info about this article: http://www.ndt.net/?id=14151 Electromagnetic Eddy Current Sensors for Evaluation of Sea-Cure and 2205 Duplex

More information

22 Aug J.T. Hong, S.H. Ahn, H.Y. Jeong, C.Y. Joung Neutron Utilization Technology Division, KAERI

22 Aug J.T. Hong, S.H. Ahn, H.Y. Jeong, C.Y. Joung Neutron Utilization Technology Division, KAERI Development of a drilling machine for the instrumentation of thermocouple in a fuel pellet 22 Aug. 2012 J.T. Hong, S.H. Ahn, H.Y. Jeong, C.Y. Joung Neutron Utilization Technology Division, KAERI Contents

More information

User s Manual For CT Model IMB

User s Manual For CT Model IMB User s Manual For CT Model IMB 2 of (13) Contents: A. Introduction... 3 B. Steps on receipt and opening the cases... 3 C. Transportation and handling... 3 D. Unpacking the transformer... 4 E. Storage...

More information

DATA ANALYSIS FOR VALVE LEAK DETECTION OF NUCLEAR POWER PLANT SAFETY CRITICAL COMPONENTS

DATA ANALYSIS FOR VALVE LEAK DETECTION OF NUCLEAR POWER PLANT SAFETY CRITICAL COMPONENTS DATA ANALYSIS FOR VALVE LEAK DETECTION OF NUCLEAR POWER PLANT SAFETY CRITICAL COMPONENTS Jung-Taek Kim, Hyeonmin Kim, Wan Man Park Korea Atomic Energy Research Institute 145 Daedeok-daero, Yuseong-gu,

More information

Application of Guided Wave Technology to Tube Inspection

Application of Guided Wave Technology to Tube Inspection ECNDT 2006 - Th.3.1.5 Application of Guided Wave Technology to Tube Inspection T. VOGT, D. ALLEYNE, B. PAVLAKOVIC, Guided Ultrasonics Limited, Nottingham, United Kingdom 1. Introduction Abstract. The inspection

More information

BALANCE FIELD ELECTROMAGNETIC TECHNIQUE INSPECTION REPORT OF THE 8_INCH_1260_FITTING (HA-2/1200 BLOCK) TESTEX, INC. TESTED: JANUARY 9, 2019

BALANCE FIELD ELECTROMAGNETIC TECHNIQUE INSPECTION REPORT OF THE 8_INCH_1260_FITTING (HA-2/1200 BLOCK) TESTEX, INC. TESTED: JANUARY 9, 2019 STATE OF THE ART PRODUCTS & SERVICES FOR NON-DESTRUCTIVE TESTING BALANCE FIELD ELECTROMAGNETIC TECHNIQUE INSPECTION REPORT OF THE 8_INCH_1260_FITTING (HA-2/1200 BLOCK) AT IN BY TESTEX, INC. TESTED: JANUARY

More information

The Essentials of Pipeline Integrity Management

The Essentials of Pipeline Integrity Management TRAINING METHODOLOGY This interactive training workshop includes the following training methodologies : Lectures Video Discussion of case histories and hands on calculations WHO SHOULD ATTEND The course

More information

Bending. the bend radius is measured to the inner surface of the bent part

Bending. the bend radius is measured to the inner surface of the bent part Bending the bend radius is measured to the inner surface of the bent part there is a plane which separates the tension and compression zones. This plane is called neutral axis. The position of neutral

More information

Ultrasonic Examination Of Tube To Tube Sheet Weld Joints In High Pressure Heat Exchanger For The Urea Process

Ultrasonic Examination Of Tube To Tube Sheet Weld Joints In High Pressure Heat Exchanger For The Urea Process More info about this article: http://www.ndt.net/?id=21124 Ultrasonic Examination Of Tube To Tube Sheet Weld Joints In High Pressure Heat Exchanger For The Urea Process Jigar Prajapati, Subhas Ghosh, Subrata

More information

Title of Innovation: In-Line Inspection for Water Pipelines

Title of Innovation: In-Line Inspection for Water Pipelines Title of Innovation: In-Line Inspection for Water Pipelines Nominee(s) Margaret Hannaford, P.E., Division Manager, Hetch-Hetchy Water and Power Division of the San Francisco Public Utilities Commission

More information

VD3-71 universal eddy current flaw detector application for field inspection of aeronautical engineering

VD3-71 universal eddy current flaw detector application for field inspection of aeronautical engineering VD3-71 universal eddy current flaw detector application for field inspection of aeronautical engineering Introduction. The Document reviewed by http://engineermind.com/ By ahmed@engineermind.com The need

More information

PENSTOCK CONDITION ASSESSMENT

PENSTOCK CONDITION ASSESSMENT Northwest Hydro Association May 17, 2012 Technical Seminar PENSTOCK CONDITION ASSESSMENT Thomas L. Kahl, P.E. Kleinschmidt TOPICS Concerns Types of Penstock Failure Modes Steel and Wood Stave Failure Mode

More information

Developments in Ultrasonic Guided Wave Inspection

Developments in Ultrasonic Guided Wave Inspection Developments in Ultrasonic Guided Wave Inspection Wireless Structural Health Monitoring Technology for Heat Exchanger Shells using Magnetostrictive Sensor Technology N. Muthu, EPRI, USA; G. Light, Southwest

More information

Endoscopic Inspection of Area Array Packages

Endoscopic Inspection of Area Array Packages Endoscopic Inspection of Area Array Packages Meeting Miniaturization Requirements For Defect Detection BY MARCO KAEMPFERT Area array packages such as the family of ball grid array (BGA) components plastic

More information

INVESTIGATION OF IMPACT DAMAGE OF CARBON FIBER- RAINFORCED PLASTIC (CFRP) BY EDDY CURRENT NON- DESTRUCTIVE TESTING

INVESTIGATION OF IMPACT DAMAGE OF CARBON FIBER- RAINFORCED PLASTIC (CFRP) BY EDDY CURRENT NON- DESTRUCTIVE TESTING International Workshop SMART MATERIALS, STRUCTURES & NDT in AEROSPACE Conference NDT in Canada 2011 2-4 November 2011, Montreal, Quebec, Canada INVESTIGATION OF IMPACT DAMAGE OF CARBON FIBER- RAINFORCED

More information

Fluid Sealing Association

Fluid Sealing Association Fluid Sealing Association STANDARD FSA-MG-501-02 STANDARD TEST METHOD FOR INWARD BUCKLING OF SPIRAL-WOUND GASKETS 994 Old Eagle School Road, Suite 1019 Wayne, Pennsylvania 19087-1866 Phone: (610) 971-4850

More information

A Review of the Eddy Current Loose Part Signals and STD Tubes for the SG Tubes

A Review of the Eddy Current Loose Part Signals and STD Tubes for the SG Tubes A Review of the Eddy Current Loose Part Signals and STD Tubes for the SG Tubes Kyong-Mahn MIN 1 *, Jung-Am PARK 1, Se-Gon CHO 1, Dong-Jun GO 1, Ki-Dong PARK 1 1. UMI Inc., Daejeon, South Korea * kmmhin@hanmail.net

More information

TESTING OF BURIED PIPES BY SLOFEC TECHNIQUE IN COMBINATION WITH A MOTOR-DRIVEN CRAWLER SYSTEM. W. Kelb, KontrollTechnik, Germany

TESTING OF BURIED PIPES BY SLOFEC TECHNIQUE IN COMBINATION WITH A MOTOR-DRIVEN CRAWLER SYSTEM. W. Kelb, KontrollTechnik, Germany More Info at Open Access Database www.ndt.net/?id=18480 Introduction TESTING OF BURIED PIPES BY SLOFEC TECHNIQUE IN COMBINATION WITH A MOTOR-DRIVEN CRAWLER SYSTEM W. Kelb, KontrollTechnik, Germany In 2001

More information

Heat Exchanger & Boiler Tube Inspection Techniques

Heat Exchanger & Boiler Tube Inspection Techniques Overview For the in-service inspection of ferromagnetic, non-ferromagnetic and fin-fan tubes, the following advanced techniques offer high defect detection capabilities and accurate defect analysis: Multiple

More information

Introduction INTRODUCTION

Introduction INTRODUCTION 2 INTRODUCTION Introduction Discover the Next Generation in Edge Welded Metal Bellows BellowsTech is a premier US manufacturer of high quality, dependable edge welded bellows and assemblies. Engineers

More information

GRAPHICAL INTERFACE FOR EXPERIMENTAL ANALYSIS OF NONDESTRUCTIVE TESTING OF DRILL PIPES

GRAPHICAL INTERFACE FOR EXPERIMENTAL ANALYSIS OF NONDESTRUCTIVE TESTING OF DRILL PIPES GRAPHICAL INTERFACE FOR EXPERIMENTAL ANALYSIS OF NONDESTRUCTIVE TESTING OF DRILL PIPES Stan Ioana-Gabriela, Assistant lecturer, U.P.G. Ploiesti Niculae Georgrta-Claudia, Lecturer Dr., U.P.G. Ploiesti ABSTRACT:In

More information

Reliance SG777 Series Steel Water Gage Valves

Reliance SG777 Series Steel Water Gage Valves Installation, Operation, & Maintenance Instructions R500.SG777 10/16/2016 Reliance SG777 Series Steel Water Gage Valves Note: Design variations in Steel Water Gage Valves necessitate typical illustrations,

More information

Construction of Steel Penstocks using HT100 at Kannagawa Hydropower Plant

Construction of Steel Penstocks using HT100 at Kannagawa Hydropower Plant Construction of Steel Penstocks using HT100 at Kannagawa Hydropower Plant Ken-ichiro AOKI 1 and Masayuki MINAMI 1 1 Tokyo Electric Power Company, Japan Introduction Tokyo Electric Power Company s Kannagawa

More information

Rigid Fluid Lines Tubing Materials Material Identification 7-1

Rigid Fluid Lines Tubing Materials Material Identification 7-1 Aircraft fluid lines are usually made of metal tubing or flexible hose. Metal tubing (also called rigid fluid lines) is used in stationary applications and where long, relatively straight runs are possible.

More information

Assembly instructions

Assembly instructions Assembly instructions Important notes on VOSS assembly instructions In order to ensure maximum performance and functional reliability of VOSS products, the respective assembly instructions, operating conditions

More information

11-1/4 OD at Transition Point. Microcosmic. 4th and Brannan Street Platform Station Project. Elevation. Moto Ohtake 2014

11-1/4 OD at Transition Point. Microcosmic. 4th and Brannan Street Platform Station Project. Elevation. Moto Ohtake 2014 74 480 330 90 72 180 150 60 90 18 11- OD at Transition Point 36 184 74 Microcosmic Elevation 14 1 Moto Ohtake I. GENERAL NOTES: A. SCULPTURE DESIGN CRITERIA 1. CALIFORNIA BUILDING CODE (CBC, 2010 EDITION)

More information

Guided Wave Testing - Maximizing Buried Pipe Corrosion Knowledge from each Excavation

Guided Wave Testing - Maximizing Buried Pipe Corrosion Knowledge from each Excavation Proceedings of the ASME 2012 Pressure Vessels & Piping Conference PVP2012 July 15-19, 2012, Toronto, Ontario, CANADA PVP2012-78561 Guided Wave Testing - Maximizing Buried Pipe Corrosion Knowledge from

More information

SSAB Laser OPTIMIZED FOR YOU AND LASER CUTTING

SSAB Laser OPTIMIZED FOR YOU AND LASER CUTTING SSAB Laser OPTIMIZED FOR YOU AND LASER CUTTING If other steel doesn t behave to perfection, try SSAB Laser. It has guaranteed flatness both before and after cutting. SSAB LASER THE ULTIMATE CHOICE FOR

More information

INTEGRITY MANAGEMENT PROGRAMS FOR AGING INFRASTRUCTURES IN HYDROELECTRIC GENERATING STATIONS

INTEGRITY MANAGEMENT PROGRAMS FOR AGING INFRASTRUCTURES IN HYDROELECTRIC GENERATING STATIONS INTEGRITY MANAGEMENT PROGRAMS FOR AGING INFRASTRUCTURES IN HYDROELECTRIC GENERATING STATIONS Jagannath Hiremagalur *, Charles Ahlgren &, Steve J. White *, and Richard A. Mattson * & Chief Dam Safety Engineer,

More information

Two aging problems were discovered in the mid 90`s: thinning and cracking.

Two aging problems were discovered in the mid 90`s: thinning and cracking. FEEDER PIPING NDE CURRENT CAPABILITIES AND FUTURE DIRECTION G. Rousseau 1, K. Chaplin 2, T. Hazelton 3, P. Martin 4, and E. Choi 3 1 Hydro Quebec, Gentilly, Canada ; 2 AECL, Chalk River Laboratories, Canada;

More information

WESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868)

WESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868) WESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868) THREE-PHASE SUBSURFACE UNDERGROUND COMMERCIAL DISTRIBUTION (UCD) TRANSFORMER NOTE: This "Guide" summarizes the opinions, recommendations, and practices

More information

NUCLEAR POWER CORPORATION OF INDIA LIMITED (A Govt. of India Enterprise)

NUCLEAR POWER CORPORATION OF INDIA LIMITED (A Govt. of India Enterprise) NUCLEAR POWER CORPORATION OF INDIA LIMITED (A Govt. of India Enterprise) DIRECTORATE OF QUALITY ASSURANCE NO.: PP-P-2014 REV. NO. 2 TITLE FOR ULTRASONIC EXAMINATION OF STEEL FORGINGS FOR GENERAL PURPOSE

More information

Drawing. Fig. 1 Drawing

Drawing. Fig. 1 Drawing Drawing Drawing is a metalworking process which uses tensile forces to stretch metal. It is broken up into two types: sheet metal drawing and wire, bar, and tube drawing. The specific definition for sheet

More information

Barofor Round System (polyester coated) Panels, Posts, Accessories

Barofor Round System (polyester coated) Panels, Posts, Accessories 1 Scope This Technical Data Sheet specifies the requirements for the Barofor Round System. The complete system exists of: Panels Posts Accessories such as fixation system and posts caps. Panels and posts

More information

REPUTE tube fittings are manufactured to stringent quality control program and internal standards which

REPUTE tube fittings are manufactured to stringent quality control program and internal standards which Introduction: REPUTE tube fittings are manufactured to stringent quality control program and internal standards which assure the highest quality available in the industry. Two ferrule tube fittings are

More information

RISK & RELIABILITY BASED FITNESS FOR SERVICE (FFS) ASSESSMENT FOR SUBSEA PIPELINES By. Ir. Muhd Ashri Mustapha & Dr. Yong BaI.

RISK & RELIABILITY BASED FITNESS FOR SERVICE (FFS) ASSESSMENT FOR SUBSEA PIPELINES By. Ir. Muhd Ashri Mustapha & Dr. Yong BaI. RISK & RELIABILITY BASED FITNESS FOR SERVICE (FFS) ASSESSMENT FOR SUBSEA PIPELINES By Ir. Muhd Ashri Mustapha & Dr. Yong BaI. June 2011 Hannover All rights reserved. No part of this document may be reproduced,

More information

Steam Generator Tubing Inspection

Steam Generator Tubing Inspection 6th International Conference on NDE in Relation to Structural Integrity for Nuclear and Pressurized Components October 27, Budapest, Hungary For more papers of this publication click: www.ndt.net/search/docs.php3?mainsource=7

More information

OPTIFLUX 1000 Technical Datasheet

OPTIFLUX 1000 Technical Datasheet OPTIFLUX 1000 Technical Datasheet Electromagnetic flow sensor in sandwich design Lightweight and compact Excellent price performance ratio Quick and easy to install The documentation is only complete when

More information

Corrosion Steel Inspection under Steel Plate Using Pulsed Eddy Current Testing

Corrosion Steel Inspection under Steel Plate Using Pulsed Eddy Current Testing 4th International Symposium on NDT in Aerospace 2012 - Poster 4 Corrosion Steel Inspection under Steel Plate Using Pulsed Eddy Current Testing D.M. SUH *, K.S. JANG **, J.E. JANG **, D.H. LEE ** * Raynar

More information

High pressure solutions for urea plants

High pressure solutions for urea plants 2 3 Industrial Solutions Process Technologies Uhde High Pressure Technologies GmbH Buschmuehlenstr. 20 58093 Hagen, Germany P: +49 2331 967-0 F: +49 2331 967-370 www.uhde-hpt.com Industrial Solutions High

More information

Wire feeding systems for welding applications

Wire feeding systems for welding applications Wire feeding systems for welding applications The perfect drive package! u precise wire feeding u modern drive concept u fully digitalized process control u detailed monitoring u maximum production reliability

More information

Annexure - V. Specifications, Typical Drawing & Data Sheet for Split TEE (Hot Tapping Material)

Annexure - V. Specifications, Typical Drawing & Data Sheet for Split TEE (Hot Tapping Material) Annexure - V Specifications, Typical Drawing & Data Sheet for Split TEE (Hot Tapping Material) CONTENTS SL NO. DESCRIPTION 1.0 SCOPE 2.0 REFERENCE DOCUMENTS 3.0 MANUFACTURER'S QUALIFICATION 4.0 MATERIALS

More information

III III MI1,

III III MI1, THE AMERICAN SOCIETY OF MECHANICAL ENGINEERS 345 E. 47th St., Now York, N.Y. 10017 The Society shall not be responsible for statements or opinions advanced in papers or discussion at meetings of the Society

More information

Energiforsk Nuclear power concrete structures R&D program

Energiforsk Nuclear power concrete structures R&D program 1 (5) Date October 12, 2015 Program area Nuclear Monika Adsten 08-677 27 35, 070-677 05 40 monika.adsten@energiforsk.se Strategy plan Energiforsk Nuclear power concrete structures R&D program Program period

More information

Fretting Fatigue of Slot-dovetails in Turbo-generator Rotor

Fretting Fatigue of Slot-dovetails in Turbo-generator Rotor Fretting Fatigue of Slot-dovetails in Turbo-generator Rotor (From O&M Issues Discussed in Recent EPRI Meetings) H. Ito Toshiba Corporation 1-1-1, Shibaura, Minato-Ku, Tokyo, 105-8001 Japan Abstract-This

More information

Application of Ultrasonic Guided Waves for Characterization of Defects in Pipeline of Nuclear Power Plants. Younho Cho

Application of Ultrasonic Guided Waves for Characterization of Defects in Pipeline of Nuclear Power Plants. Younho Cho Application of Ultrasonic Guided Waves for Characterization of Defects in Pipeline of Nuclear Power Plants Younho Cho School of Mechanical Engineering, Pusan National University, Korea ABSTRACT State-of-art

More information

Location. Established in 2015 Office location: Klepp Næringspark, Norway.

Location. Established in 2015 Office location: Klepp Næringspark, Norway. Location Established in 2015 Office location: Klepp Næringspark, Norway. Vision to be leader within On-Site machining & Decommissioning segment with a main focus on mature plants, offshore installations,

More information

Innovation and Nuclear : opportunities and difficulties. Jean-Pierre HUTIN (EDF)

Innovation and Nuclear : opportunities and difficulties. Jean-Pierre HUTIN (EDF) Innovation and Nuclear : opportunities and difficulties Jean-Pierre HUTIN (EDF) Three areas for innovation : Component design and construction : innovation versus experience High Performance Calculation

More information

The use of Mechanical Connectors throughout Life of Field

The use of Mechanical Connectors throughout Life of Field The use of Mechanical Connectors throughout Life of Field Andrew Woodward Subsea Sales Engineer andrew.woodward@hydratight.com 1 What I will cover Safety Moment Introduction to Hydratight What are Mechanical

More information