- B1 - B2

Size: px
Start display at page:

Download "- B1 - B2"

Transcription

1 - B1 Park@Sol - B2 Mounting instructions Example B1 1-row vehicle arrangement (max. depth 6.0 m) Example B2 2-row vehicle arrangement (max. depth 13.5 m) Schletter GmbH Gewerbegebiet an der B15 Alustraße Kirchdorf/Haag i. OB Germany Tel.: / 42

2 CONTENTS PAGE 1 General 3 2 Foundation (Cast-in-place foundation / Precast foundation) Detail Overview Carport - Exploded view 10 4 Component assembly Module mounting 18 6 Cable mounting (optional) 19 7 Sheet metal mounting Mounting of adjustable guttering with integrated ice-breaker Profi le overview for carport systems - Presentation of all components Mechanical drawings and torques / tightening torques Tolerances Lightning protection and potential equalization Warnings 42 Dear Sir, Madam, we would like to thank you for choosing a Schletter product. 2 / 42 Schletter GmbH Gewerbegebiet an der B15 Alustraße Kirchdorf/Haag i. OB Germany Tel:

3 1 General Our Carport systems are modular in structure and can be customized to fulfi l the demands of any individual customer parking-area project. Confi guration of the module arrangement, spatial cut of the parking area etc. takes place according to customer requirements and is drawn up in compliance with local boundary conditions (ground conditions, wind loads, snow loads), Optimal economic effi ciency is thus achieved while complying with all structural requirements. Schletter GmbH Gewerbegebiet an der B15 Alustraße Kirchdorf/Haag i. OB Germany Tel.: / 42

4 Planning Project-specifi c overview diagrams and parts lists will be generated prior to delivery of the system. These drawings display the measurements and positions of the individual components and of their respective connectors. Park@Sol - B1 and B2 Structural design B1 (example) Structural design B2 (example) 2) Foundation The choice of foundation design is dependent upon customer requirements and particularly upon the size of the plant. The laying of the cast-in-place foundation can generally be performed, cost-effi ciently, by local civil engineers and with the use of standard machinery. For larger installations, a more economical alternative can generally be found in deploying the drilling procedure for deep foundations. Cast in place concrete The economical solution for small carport plants Micro foundation The unrivaled solution for large carport plants 4 / 42 Schletter GmbH Gewerbegebiet an der B15 Alustraße Kirchdorf/Haag i. OB Germany Tel:

5 Cast-in-place foundation The foundation is essentially made up of the base plate and the base pedestal. Important to note is that the base-plate should always be laid below the frost line. The base pedestal also serves as impact protection. According to building regulations this must not exceed a height of 60cms above the ground line. Detailed information relating to the laying of foundations can be found in the reinforcement plans and in the overview diagrams. The design calculation for the foundations is found in the structural analysis on Page 12. Sizing dimensions given here must be met in every case in order to guarantee structural safety of the carport. Reinforcement plans are created at receipt of order and according to structural regulations. Scope of delivery on the part of Schletter for cast-in-place foundations: Two armature pieces, comprising: 6 nuts M16 2 thread rods M16 L= 290mm 1 U-Profi le 1 spacer for thread rods Mounting dimensions for the armatures are found in the reinforcement plan. Note: Cast-in-place foundations are laid by the customer and are not delivered by Schletter! Terminology 1 2 1) Purlin 2) Girder 3) Strut 4) Strut base 5) Foundation Schletter GmbH Gewerbegebiet an der B15 Alustraße Kirchdorf/Haag i. OB Germany Tel.: / 42

6 Example foundation: Dimensions and the position of the anchor for the carport are found in the detailed foundation plan. The anchor must be thoroughly encased in concrete. Tolerances for the cast-in-place foundation (customerside) ± 5 mm. Ground level Example plan of reinforcement (service provided by Schletter): 6 / 42 Schletter GmbH Gewerbegebiet an der B15 Alustraße Kirchdorf/Haag i. OB Germany Tel:

7 Precast foundation for construction with micro-piles In contrast to the cast-in-place foundations to be laid by the customer, special precast foundations and injection piles are deployed when preparing foundations with micro-piles. This type of foundation ensures rapid mounting of the structure and an economical foundation-laying procedure. The length and dimensions of the micro-piles are calculated using the parameters documented during the geological survey. Scope of delivery on the part of Schletter: Structural analysis of the micro-piles according to parameters from the geological survey Precast foundation for variants: System B1 (Base width = 1540mm), B2 (Base width = 1850mm), B3 (Base width 1850 = mm) Micro-piles 40/20 Drill bits Grouting mortar Cement mortar Laying of precast foundations Optional: Geological survey performed by in-house geologists Laying of foundations with micro-piles (c.f. precast foundation above the excavation depth, underground): Preparation of a geological survey by dynamic probing and prospecting Structural analysis of the micro-piles Measurement of the drilling points according to Schletter guidelines (customer responsibility) Preparation of the base points by cutting or milling the asphalt layer and later backfi lling with a load-bearing layer of gravel (customer responsibility) Laying of micro-piles in accordance with statistical guidelines Laying and casting of the precast foundation Note: Span distances between the thread rods in System B1 vary due to the deployment of two different foundation shoes. See 9 Profi le overview for carport systems / foundation consoles The length and dimensions of the micropiles are calculated using the parameters documented during the geological survey. Base width Schletter GmbH Gewerbegebiet an der B15 Alustraße Kirchdorf/Haag i. OB Germany Tel.: / 42

8 Precast foundation above excavation depth, subsoil To avoid the risk of damage due to ground frost, the foundation must be cast again after laying. Leveling course Grit dimensions: 0-8mm / 0-5cm thickness Load-bearing gravel layer Materials for leveling course to be provided by customer Excavation of approx.10mm around foundation In paved car parks, the paving is removed from the area reserved for the foundations. In asphalted car parks, the asphalt is cut out or milled, as it presents too low a pressure stability, particularly at high temperatures. In both cases, the opening between surface and foundation is retrospectively fi lled with grit. 8 / 42 Schletter GmbH Gewerbegebiet an der B15 Alustraße Kirchdorf/Haag i. OB Germany Tel:

9 Setting of the foundations Distance between girders Distance between upper edge foundation and upper edge carport paving Ensure precise longitudinal alignment! Note: To ensure smooth mounting of the carport, the anchors must be aligned in one row. The permitted tolerance here is +-5mm Fastening anchors for pouring into castin-place foundations on customer side (included in delivery of the carport set) Schletter GmbH Gewerbegebiet an der B15 Alustraße Kirchdorf/Haag i. OB Germany Tel.: / 42

10 3 Overview and installation of the carport components The following steps and respective item numbers correspond to the item numbers indicated in the drawing below. lower module-bearing profi le diagonal measurements upper module-bearing profi le OBJECT DESCRIPTION Precast foundation Strut - QHP Strut base Purlin Shading sheet Module middle clamp Module end clamp Girder CP Spacer CP Eaves guttering 10 / 42 Schletter GmbH Gewerbegebiet an der B15 Alustraße Kirchdorf/Haag i. OB Germany Tel:

11 4 Component assembly Girder mounting (Pos. 8) The girder components are delivered pre-assembled. The size of the pre-assembled mounting claw must be checked after delivery and prior to installation start and may need to be adjusted. The exact clearance for the mounting claw can be found in the production drawing for the girder components. Note: The mounting claw must be installed to precise dimensions! If, in the case of a horizontal module arrangement, the spacing between purlins is not respected, the profiles will not fit pre-determined module dimensions, or, in the case of a vertical module arrangement, the clamping range defined by the module manufacturer cannot be maintained. Overview diagram girder assembly / parts lists for girder assembly OBJECT QUANTITY COMPONENT NO DESCRIPTION KlickIn click component M10 Mounting claw 40 mm Girder C1 Hexagon head screw DIN 933 M10x25 Square head screw DIN 557 M10 LENGTH Schletter GmbH Gewerbegebiet an der B15 Alustraße Kirchdorf/Haag i. OB Germany Tel.: / 42

12 Mounting of struts with the girder assembly group (Pos. 2) Arrange struts within the girder assembly group Connect struts to the girder assembly with screws (see parts list and overview drawings Girder Assembly group S11, items: 9,11,14) and tighten with a torque of 135 Nm (tightening torque 135 Nm = screw VA M16 A2/A4). If an alternative screw size is required for structural reasons, the corresponding tightening torque must be identifi ed and can be found on page 30. Connect in the girder assembly supports and connectors with M16 screws. Pre-assembled girder- and strut assembly 12 / 42 Schletter GmbH Gewerbegebiet an der B15 Alustraße Kirchdorf/Haag i. OB Germany Tel:

13 Mounting of the strut base with support (Pos. 3) Attach the strut bases to the struts and secure with screws. Care must be taken that the support bases and struts are mutually compatible (see drawing item 3). Using hoisting equipment (with slip if required), lift the assembled component group, comprising girder assembly, struts and support bases, and lower onto the fastening anchor of the pre-aligned and spaced precast- or cast-in-place concrete foundations. Once the assembly is in place, secure the threaded anchor rods with a base claw and M16 nuts and tighten with the stipulated torque of 135 Nm (for M16). The torque of the base claw at the sides of the strut base must also be verifi ed and the claw tightened if necessary. Please refer to the drawing Strut Base Assembly and to the image Prepared Concrete Foundation Note: To safeguard against possible tilting of this assembly, the lower and upper module-bearing profi le must be mounted and fastened with a mounting claw, please also refer to pages 10 and 11. Position strut base onto supports Secure with M16 screws, spring washers, base claws and nuts (see schematic below) Height of strut base is adjustable with base claw Strut base assembly OBJECT QUANTITY COMPONENT NO DESCRIPTION Strut base 100 Park@Sol Rubber Park@Sol Base claw Park@Sol Hexagon head screw DIN 931 M16x160 Nut M16 self-locking DIN982 Schletter GmbH Gewerbegebiet an der B15 Alustraße Kirchdorf/Haag i. OB Germany Tel.: / 42

14 Strut 100x100 carport customized Item no.: Strut 120x120 carport customized Item no.: Lift assembly using hoisting equipment and slip Position assembly on foundation 14 / 42 Schletter GmbH Gewerbegebiet an der B15 Alustraße Kirchdorf/Haag i. OB Germany Tel:

15 Secure and tighten screws and M16 nuts with a torque wrench Schletter GmbH Gewerbegebiet an der B15 Alustraße Kirchdorf/Haag i. OB Germany Tel.: / 42

16 Installation of the module-bearing profile (Pos. 4) Once all supports are mounted and aligned, the module beams are mounted as per the drawing and aligned at right angles. Please ensure that the module beams are installed with the correct cantilever. A rail mounting is compulsory in a horizontal arrangement. The mounting claws* are factory assembled and the distances must therefore be checked after transport and adjusted if necessary. Once all load-bearing profiles have been mounted with dimensional accuracy, the diagonal measurements (see page 10) must be checked and aligned. The module beams must be mounted at right angles to the support. Note: To safeguard against possible tilting of this assembly, the lower and upper module-bearing profi le must be mounted and fastened with a mounting claw, please also refer to pages 10 and 11. * Arrange and secure the purlin using the pre-assembled mounting claw and screws M10x25. The exact dimensions can be found in the production drawings for the girder assembly. Insertion connector detail Mounting the connector: 1. Slide in the profi le connector 2. Connect the second profi le 3. Secure the connector on both sides with the supplied self-drilling screws (5.5 x 25 mm) 16 / 42 Schletter GmbH Gewerbegebiet an der B15 Alustraße Kirchdorf/Haag i. OB Germany Tel:

17 1. Insert the connector 2. Side fastening with self drilling screws (x2 / purlin) Note: Spacing between purlins must be precisely maintained, particularly in the case of horizontal, linear supports. This applies not only at the struts, but also namely between the struts and also in areas where the purlins are self-supporting! In the event that the module is mounted after installation of the trapezoidal sheets, e.g. due to limited availability, then the purlin spacing must be carefully observed as this can no longer be adjusted once the trapezoidal sheets are in place. Schletter GmbH Gewerbegebiet an der B15 Alustraße Kirchdorf/Haag i. OB Germany Tel.: / 42

18 5 Module Mounting (Pos. 6 & 7) Depending on the design, there are several types of module fastening systems, e.g. normal clamp fastening, fastening with Klick clamps (partic. for unframed modules), module clamps of type Rapid 2+ through to the OptiBond fastening system. The clamping range and the type of module clamp to be used is at the discretion of the customer and is to be agreed with the module manufacturer. The module is to be installed under stress-free conditions Modules are to be mounted as per the drawing, using the supplied module clamps. Preload of the screws can be found in the Screw and Detail plan on page 30. Image 1 - Example Klick system Image 2 - Example Screw system Note: Please refer to our assembly instructions. These are available to you on our website I400129DE Laminate mounting - general recommendations I400130DE Module mounting - general recommendations 18 / 42 Schletter GmbH Gewerbegebiet an der B15 Alustraße Kirchdorf/Haag i. OB Germany Tel:

19 6 Cable mounting (optional) In the majority of installations, cables are fastened with simple cable ties. These become brittle very quickly, however, particularly in hotter climates, with the result that the cables may then droop from the profi les after only two years. This can lead to water damage in the plugs and loose connections due to wind impact on the cables. For effective cable mounting, we supply cable ducts which can be fastened to our profi les with little time and effort. Naturally we can provide edge protection pieces for the profi le ends. Plastic edge protection closed Item no.: closed left Item no.: closed right Plastic edge protection open Item no.: open left Item no.: open right Proklip2000-P Cable Clip Item no.: Schletter GmbH Gewerbegebiet an der B15 Alustraße Kirchdorf/Haag i. OB Germany Tel.: / 42

20 7 Trapezoidal sheet mounting - Sofit Panel Overview of individual components Facing with Sofi t Panels is possible with Schletter Carports. Positioning of individual components is initially defi ned in technical drawings (see Point 2). When placing the order, please ensure that the length of the panels is identical to the length of the girder. Optional: End batten Vergeboard Sofi t panel Shading sheet Technical overview plan Panel arrangement and critical dimensions for mounting are outlined in the overview drawing. Example general layout drawing 20 / 42 Schletter GmbH Gewerbegebiet an der B15 Alustraße Kirchdorf/Haag i. OB Germany Tel:

21 Mounting the components 1. Position the first panels The distance between the girder and panel should be between 55 mm and max. 210 mm! The recommended spacing values can be taken from the technical drawing! A Mount the exterior panels with the open seam facing outwards (see Fig. A) Center distances between girders and / or between girders and purlin ends. The fi rst Sofi t panel is mounted between the girders with the open seam to the opposite girder! (See Fig. B) B Bolt Sofi t panel to the purlin with Zebra pias (or equivalent) screwdriver The fi rst panels to be positioned against the girders must be bolted at both sides. 2. Position the remaining panels Guide the second panel, angled slightly, into the seam of the fi rst panel then press the upwards against the purlin Schletter GmbH Gewerbegebiet an der B15 Alustraße Kirchdorf/Haag i. OB Germany Tel.: / 42

22 The adjustment tolerance is 2 mm. Slight misalignments can be corrected here, in the event that the girders do not run exactly parallel to one another! Panel dimensions: 5.5 mm 13.0 mm mm mm Bolt the panel to the purlin at the open side Mount further panels by following steps outlined in Point 2 3. Mounting the shading sheet Lean the shading sheet in to the girder and press upwards against the purlin. Bolt to the purlin with the Zebra pias from inside the seam (see Fig. C) C 22 / 42 Schletter GmbH Gewerbegebiet an der B15 Alustraße Kirchdorf/Haag i. OB Germany Tel:

23 4. Mounting the vergeboard sheet (optional) A distance of 5-10 mm must be maintained between vergeboard and the front edge of the purlin! 5-10 mm 5. Mounting the end batten (optional) The end batten must be mounted with the seam facing downwards! Mount the end batten onto the front of the Sofi t panel and bolt in place with the Zebra pias screwdriver Projection of between 80mm to 120mm Girder Trapezoidal sheeting Eaves guttering Schletter GmbH Gewerbegebiet an der B15 Alustraße Kirchdorf/Haag i. OB Germany Tel.: / 42

24 8 Mounting of adjustable guttering with integrated ice-breaker (Pos. 10) The following defi nition refers to a two-piece guttering system which allows for mounting without guttering supports (guttering brackets). This guttering system was designed specifically for the mounting of trapezoidal sheeting It is important to have a prior overview of the guttering system. The exact dimensions and quantity of guttering pieces can be found in the production drawing. Guttering systems are custom produced for each individual project. Cutting on the construction site is, therefore, not required. Each supplied gutter unit (upper and lower parts) fits the span between two carport support structures. Note: To avoid a back-fl ow of running water, sections must be cut from the lower trough. Please refer to Point (2) Mounting of lower trough, to incorporate pitch. Adjustable roof guttering Please note: Fundamentally, the carport represents a building. If clean drainage is required by the customer, as with a standard building, then ground compensation and the laying of foundations must be carried out with the utmost of precision or a proper drainage system cannot be guaranteed. To compensate for small areas of unevenness and to adjust the gradient from roof gutter to downspout, a two-piece adjustable roof guttering system is required (see image). In B1: Vertical water-head Downspout holder with square clamps Design B1 (single row arrangement) In B2: Water-head Type 10 degrees Downspout holder with square clamps Design B2 (dual row arrangement) 24 / 42 Schletter GmbH Gewerbegebiet an der B15 Alustraße Kirchdorf/Haag i. OB Germany Tel:

25 Roof guttering - Overview diagram OBJECT DESCRIPTION Roof gutter fi eld 1 Roof gutter fi eld 2 Roof gutter end piece Roof gutter 100x150 Run-off 10 Downspout 1 100mm Downspout 100mm Arc Downspout 2 100mm Downspout 2 100mm Downspout 100mm clamp M10 Roof gutter joint Rubber seal joint Schletter GmbH Gewerbegebiet an der B15 Alustraße Kirchdorf/Haag i. OB Germany Tel.: / 42

26 Span of carport frame Ejot screw Gutter top Gutter trough Connector Water-head Girder PV Module Girder Gutter top Connector Gutter trough Support / Strut 3mm gradient per running meter i.e. 15mm height difference over 5m Water-head Support / Strut 26 / 42 Schletter GmbH Gewerbegebiet an der B15 Alustraße Kirchdorf/Haag i. OB Germany Tel:

27 1. Positioning and screwing of the gutter top Each supplied guttering unit (upper and lower parts) fi ts the span between two carport support structures (midpoint to midpoint). Snap a chalk line to position and mark the gutter top on the trapezoidal sheet (pre-mounted with 80mm- 120mm projection). Note: The dimensions from the lower edge of the purlin to the guttering upper edge must be checked and projected, using a chalk line on the standing rib, along the full length of the eaves. Deploying this method on both sides of the roof ensures that the guttering follows a straight course across the entire carport. The upper sections can now be laid, end-to-end in the pre-marked positions and secured with the drilling screws provided (EJOT mm). Note: Please ensure that gutter top is screwed to the trapezoidal sheeting at each standing rib (see also Trapezoidal Sheet mounting). Ejot screw Gutter top PV module Purlin Purlin Trapezoidal sheet Girder Projection trapezoidal sheet at least 10cms Schletter GmbH Gewerbegebiet an der B15 Alustraße Kirchdorf/Haag i. OB Germany Tel.: / 42

28 2. Mounting of gutter trough to incorporate pitch (Diagrams 4 to 7) Prior to installing the gutter trough, it is important to establish which strut should incorporate the rain water head and downspout to channel away water. The designated gutter trough must be notched at this point. Note: To avoid a back-fl ow of water, sections must be cut into the respective gutter trough of length 200mm and breadth 120mm. These notches are to be made on-site using plate shears (see diagram Cut Sections in Gutter Trough). Cutting out the relevant sections for the rain water run-off prior to mounting the guttering has proved to require less time and effort than carrying out this activity retrospectively. Bend the sharp edges of the cut sections carefully downwards at right-angles using specially designed pliers (fl anging pliers, combi-pliers) This ensures smooth run-off of water. upper section adjustable solution 10.2 lower section 28 / 42 Schletter GmbH Gewerbegebiet an der B15 Alustraße Kirchdorf/Haag i. OB Germany Tel:

29 Cut a notch of approx. 10cm into the trough at the point where the water head is to be placed and bend the cut edges downwards to avoid a back-fl ow of water along the under side. Beginning at the highest point of the eaves, the lower guttering sections are slid inside the inner fl ap of the gutter top and are secured using drilling screws (EJOT 5.5*25 mm) at distances of 50cm to the welding point of the guttering. To accommodate for the longitudinal expansion of materials, guttering troughs must be mounted at distances (welding distances) of approx. 3cms one from the next. To ensure optimal drainage of water, it is important to incorporate a gradient when mounting the trough. The gradient should not exceed 3mm/running meter and must be verified using a digital spirit level. The pitched gutter trough is then secured with a drilling screw (similarly with a distance of 50cm to the welding point). Note: To ensure unobstructed drainage, the highest point of the gutter trough is always positioned on the opposite side to the downspout (drainage point). 3. Mounting the water head (Diagrams 8.10 and 11) The water head box is pushed up through the joint of the previously cut gutter trough and is fastened with two drilling screws. It is not necessary to seal the water head. The following steps must however be taken: Once in place, fold out the sides of the box a little. The side (with no fold) is pushed upwards into the trough and inside the metal flap of the inner gutter top. The second side of the box - with the fold - is pushed upwards until the fold locks over the edge of the lower trough. The water-head is now secured with two drilling screws on the side without the fold. Girder PV module Water-head Type: Vertical Drain Water-head Type: 10 degrees Water-head is slotted inside the inner metal flap of the gutter top Schletter GmbH Gewerbegebiet an der B15 Alustraße Kirchdorf/Haag i. OB Germany Tel.: / 42

30 Sealing of water head is not necessary Slot the water-head upwards onto the gutter trough Bend back the sides slightly Hang the water-head from the folded side fi rst Slide the connector into the fl ap of the gutter top; fi nally, secure the connector from the outside with an Ejot screw. 30 / 42 Schletter GmbH Gewerbegebiet an der B15 Alustraße Kirchdorf/Haag i. OB Germany Tel:

31 4. Mounting of the connectors (diagrams 6 and 7) When mounting the guttering connectors, the two sides must be bent outwards slightly, as with the waterhead assembly. First the side (with no fold) is pushed upwards into the trough and inside the metal fl ap of the inner gutter top. The side (with fold) is then pushed upwards until the connector locks. The connector is now fastened with two drilling screws on the side without the fold. The gutter troughs must not be notched for the mounting of connectors. Note: In contrast to the water-heads, it is imperative that connectors be sealed to the guttering. The two procedures used by Schletter for the sealing of roof guttering are outlined in the following: Apply 2-sided bitumen sealing membrane to the inner side. Delivered strips: 25*33cms Push up connector from below onto the gutter trough Bend back the sides slightly Hang the connector from the folded side fi rst Slide the connector into the inner fl ap of the gutter top; fi nally, secure the connector from outside with two Ejot screws Schletter GmbH Gewerbegebiet an der B15 Alustraße Kirchdorf/Haag i. OB Germany Tel.: / 42

32 Sealing with SikaBond T1 (building regulation approval) SikaBond - T1 is an elastic single-component glue with a polyurethane base, which hardens to an elastomer with humidity. Application To achieve perfect adhesion of the connector to the roof guttering, it is imperative that all surfaces be dry, free of oil and grease and from loose particles or dust. For an optimal bond, the connectors and guttering components must be pre-treated with a cleaning agent and with a primer. Please use: Cleaning agent: Sika Haftreiniger-1, Primer: Sika Primer- 3N Apply SikaBond to the connectors using a triangular nozzle (10 x8 mm) in stripes of thickness 4mm. Then slide the connectors onto the gutter trough and fasten with two drilling screws. Care must be taken that the time between appliance of the sealant and the mounting of the component does not exceed 2 minutes, to avoid the build-up of a skin around the sealant. A quality mounting could therefore not be achieved due to a less than optimal impermeability. As described in Point 4 : Mounting of the connectors, the connectors are then slid on from below and are fastened with two drilling screws. Processing conditions / Technical data Subsurface temperature: +5 C min./ +35 C max. Subsurface quality: Dry, grease and oil-free Melting point: The subsurface temperature must be +3 above the melting point. Recommended working temperature: +15 C Heat resistance from -40 to +80 Sealant with Ceresit- BT21 (no technical approval): Ceresit is a self-adhesive, tear-resistant, 2-ply cross-laminated polyethylene fi lm with a plastic, bitumen,- rubber-adhesive sealant, which, when applied correctly, guarantees simple but effective impermeability of the guttering joints. Application: To achieve perfect adhesion of the connector to the roof guttering, it is imperative that the subsurface and the connection points of the gutter trough be dry, free of oil and grease and from loose particles or dust. A preparatory application of primer is not necessary when deploying this method of sealing, Sealing membranes are supplied in the required lengths of 30 cm. Remove the backing paper while simultaneously applying the sealing membrane to the entire exterior surface of the cleaned joint of the trough. 32 / 42 Schletter GmbH Gewerbegebiet an der B15 Alustraße Kirchdorf/Haag i. OB Germany Tel:

33 While doing so, the following points should be observed: Lift backing paper at the reel end and peel away slowly and evenly. Position and affi x the membrane with the adhesive side to the trough surface. Progressively peel away the backing paper and affi x the entire strip, then smooth down the membrane fi rmly, using, for example, a pressure roller (rubber roller). Note: To ensure the impermeability of the bitumen membrane, affi x the membrane across the entire surface while smoothing away any air bubbles. As described in Point 4 : Mounting of the Connectors, the connectors are then slid on to the trough and are fastened with two drilling screws. Processing conditions / Technical data Working temperature: -5 C to + 30 C Subsurface quality: Dry, grease and oil-free Heat resistance: > 70 C Thickness: 1.5mm Storage: BT 21 sealing membrane must be transported and stored upright and protected, until required, from pressure, heat and humidity. In summer temperatures of +25 C, store in a cool place as the plastic adhesive layer reacts to heat and becomes soft - particularly in direct sunlight. In cold conditions, store until required at a temperature of at least +10 C. 5. Mounting of the end pieces End-pieces are sealed at production and are delivered pre-assembled. 6. Screwing in the roof guttering components The pre-assembled guttering lower and upper parts, can now be completely screwed together, at a distance of 50cms apart. To this end, the gutter trough is screwed to the gutter top through the interior metal fl ap. The gutter tops are to be screwed together at every standing rib of the trapezoidal sheeting. The supplied drilling screws EJOT 5.5 x 25 (mm) are to be used for screwing in the guttering end pieces. Schletter GmbH Gewerbegebiet an der B15 Alustraße Kirchdorf/Haag i. OB Germany Tel.: / 42

34 7. Mounting of downspout and arcs Mount the square clamp set on the supports (see diagram 10.3, Pos. 2, 3, 4). Pre-assemble the guttering downspout and arc as per the detailed diagram and position the water-head boxes. Parallel mounting of the downspout onto the carport supports is achieved by adjusting the distance of the thread rods on the square clamps (image 10.3, Pos. 3) OBJECT DESCRIPTION Strut Square clamp-set Thread rod Downspout clamp M10 Downspout Downspout Arc 34 / 42 Schletter GmbH Gewerbegebiet an der B15 Alustraße Kirchdorf/Haag i. OB Germany Tel:

35 9 Profile overview of the carport system - All components Foundation consoles Strut base 120 mm pre-fabricated component Strut base 100 mm pre-fabricated component Strut base 120 mm cast-in-place concrete Strut base 100 mm cast-in-place concrete OBJECT NUMBER COMPONENT NO DESCRIPTION Strut base 100 Park@Sol Rubber Park@Sol Base claw Park@Sol Hexagon head screw DIN 931 M16x160 Nut M16 self-locking DIN982 Struts Strut 100x100 carport customized Item no.: Strut 120x120 carport customized Item no.: Schletter GmbH Gewerbegebiet an der B15 Alustraße Kirchdorf/Haag i. OB Germany Tel.: / 42

36 Girder OBJECT QUANTITY COMPONENT NO DESCRIPTION KlickIn click component M10 Mounting claw 40 mm Girder C1 Hexagon head screw DIN 933 M10x25 Square head screw DIN 557 M10 LENGTH 36 / 42 Schletter GmbH Gewerbegebiet an der B15 Alustraße Kirchdorf/Haag i. OB Germany Tel:

37 Module clamps End clamp Middle clamp KP-locking device - exterior KP-locking device - interior KP module clamp Module rubber KP-module clamp 2 x KP-locking device - interior KP-Module rubber 2 x Glass panel End clamp ECO8 set Item no.: Glass panel Middle clamp ECO8 set Item no Glass panel End clamp ECO7 set Item no Glass panel Middle clamp ECO7 set Item no.: End clamp Rapid2+ XXmm (30-50) Item no Item no Middle clamp Rapid mm Item no Middle clamp Rapid mm Item no End clamp Rapid mm Item no Earthing middle clamp Rapid mm mont Item no End clamp Rapid mm Item no Earthing middle clamp Rapid mm mont Item no Module anchor OptiBond 30mm Item no Module anchor OptiBond 30mm rubber mounted Item no Module anchor OptiBond 50mm Item no Module anchor OptiBond 50mm rubber mounted Item no Module anchor OptiBond 80mm Item no Module anchor OptiBond 80mm rubber mounted Item no Please note: Item numbers are subject to change in the event of technical modifications or new developments. Schletter GmbH Gewerbegebiet an der B15 Alustraße Kirchdorf/Haag i. OB Germany Tel.: / 42

38 Purlins Click purlin KP 0 interior Item no.: Click purlin KP 0 exterior Item no.: Click purlin KP 1 interior Item no.: Click purlin KP 1 exterior Item no.: Click purlin KP 1.5 interior Item no.: Click purlin KP 1.5 exterior Item no.: Click purlin KP 2 interior Item no.: Click purlin KP 2 exterior Item no.: Module-bearing profi le S 0 Item no.: Module-bearing profi le S 1 exterior Item no.: Module-bearing profi le S 1 interior Item no.: Module-bearing profile S 1.5 Item no.: Module-bearing profi le S 2 Item no.: Module-bearing profi le S 3 Item no.: Module-bearing profi le S 4 Item no.: / 42 Schletter GmbH Gewerbegebiet an der B15 Alustraße Kirchdorf/Haag i. OB Germany Tel:

39 10 Design and torque / tightening torque OBJECT NUMBER COMPONENT NO DESCRIPTION Strut base 120 Park@Sol Base claw Park@Sol Hexagon head screw DIN 931 M16x180 Nut M16 self-locking DIN982 Rubber Park@Sol OBJECT NUMBER COMPONENT NO DESCRIPTION Strut base 120 Park@Sol Base claw Park@Sol U-profi le Park@Sol 60x30x400mm Thread rod M16x290mm Hexagon head screw DIN 931 M16x180 Nut M16 self-locking DIN982 Hexagon nut M16 DIN934 Rubber Park@Sol Schletter GmbH Gewerbegebiet an der B15 Alustraße Kirchdorf/Haag i. OB Germany Tel.: / 42

40 A tightening torque of strength category 6.8 is to be used with high-grade steel screws (V2A, V4A). 40 / 42 Schletter GmbH Gewerbegebiet an der B15 Alustraße Kirchdorf/Haag i. OB Germany Tel:

41 11 Tolerances Schletter mounting racks for carport systems are specifi cally dimensioned to accommodate local wind and snow loads. In the interest of economic effi ciency, the maximum capacity potential of individual components is generally exploited. The racks must therefore be mounted with the utmost precision. Please note that the structural safety of each individual project is subject to verifi cation; the mounting dimensions must therefore be precisely observed. For the compilation of clean documentation and for technical approval, we recommend that the following mounting tolerances be observed: Span between fi elds Linear projection of purlins Lower girder connection Upper girder connection Base connection Module engagement length into the clamp Mounting of trapezoidal sheeting ± 50 mm ± 30 mm ± 20 mm ± 20 mm ± 20 mm 2 mm When mounting trapezoidal sheeting, perpendicularity is of primary importance! Span between fi elds cantilever lower girder connection upper girder connection socket connection lower/upper girder connection module engagement depth into the clamp Schletter GmbH Gewerbegebiet an der B15 Alustraße Kirchdorf/Haag i. OB Germany Tel.: / 42

42 12 Lightning protection and potential equalization - important notes Lightning protection is not mandatory but is recommended by Schletter Anodization or powder-coating of the rack's interior connections does not negatively impact the load-bearing capacity with regard to lightning protection! Fundamentally, in the case of anodized or powder-coating carports, all conductive components of the carport assembly, which could come into contact with live components, are to be incorporated into the potential equalization. We recommend that all individual module-bearing profi les lying one below the other be connected electrically then, subsequently, that each resulting module block be connected with low impedance to the earthing system. Similarly, all supports, clamps, etc. used for cable routing, or which come into contact with live components must be earthed. Overall responsibility for the earthing procedures and for the inspection of protective measures prior to operation lies with the designated electrical engineering company. 13 Warning Risk of falling! The risk of falling is always present when working on the roof. Stepping onto a module can result in slipping. Compliance with legally defined accident prevention procedures is mandatory when working on the roof. According to the procedures for the prevention of accidents, a safety harness or protective platform must be used. Do not step on the solar modules. Risk of injury! There is a risk of injuring others if objects fall from the roof. Apparatus must be secured with a safety line to a stable point, to prevent objects from sliding off. The danger area on the ground must be sealed off to protect passers-by from potential injury from falling objects. Warning! Risk of breakage! PV modules can be damaged if stepped upon. Do not step on the PV modules. Risk of electric shock! Electric cables and solar plant components carry a permanent electrical voltage with light incidence. Touching conductive components can result in electric shock. All operations with electrical equipment must be carried out exclusively by qualifi ed experts. Schletter GmbH, 2012, I400160GB, V4 42 / 42 Schletter GmbH Gewerbegebiet an der B15 Alustraße Kirchdorf/Haag i. OB Germany Tel:

System FS Duo Mounting Instruction. 1 General 2. 2 Pile driving 3. 3 Mounting the individual assembly groups 4. 4 Torque specifications 7

System FS Duo Mounting Instruction. 1 General 2. 2 Pile driving 3. 3 Mounting the individual assembly groups 4. 4 Torque specifications 7 System FS Duo Mounting instructions CONTENTS Page 1 General 2 2 Pile driving 3 3 Mounting the individual assembly groups 4 4 Torque specifications 7 5 Module mounting 8 6 Tolerances 8 1 / 8 1 General 1.1

More information

System FS Uno Mounting Instruction. 1 General 2. 2 Pile driving 3. 3 Mounting the individual assembly groups 4. 4 Torque specifications 6

System FS Uno Mounting Instruction. 1 General 2. 2 Pile driving 3. 3 Mounting the individual assembly groups 4. 4 Torque specifications 6 System FS Uno Mounting instructions CONTENTS Page 1 General 2 2 Pile driving 3 3 Mounting the individual assembly groups 4 4 Torque specifications 6 5 Module mounting 6 6 Tolerances 7 1 / 7 1 General 1.1

More information

FS Uno mounting instructions. 2 Pile driving (Ramming) 5. 6 Components list Torque specifications 15

FS Uno mounting instructions. 2 Pile driving (Ramming) 5. 6 Components list Torque specifications 15 FS Uno System Mounting instructions CONTTS Page 1 General - Safety, planning and tools 2 2 Pile driving (Ramming) 5 3 Rack overview - Components and fasteners 6 4 Mounting of the individual assembly groups

More information

MANUAL MOUNTING SYSTEM FOR CORRUGATED ROOF

MANUAL MOUNTING SYSTEM FOR CORRUGATED ROOF MANUAL MOUNTING SYSTEM FOR CORRUGATED ROOF EN mounting system for corrugated roof for solar panels in portait setup (cross-system) ESDEC BV 2015 TABLE OF CONTENT 1. Introduction 1 2. General installation

More information

INSTALLATION INSTRUCTIONS TRI-ROOF. energy for a better world

INSTALLATION INSTRUCTIONS TRI-ROOF. energy for a better world energy for a better world INSTALLATION INSTRUCTIONS TRI-ROOF The flexible roof integration system Compatible for framed module types* Simple exchange of modules Replaces existing roofing Special profiles

More information

MANUAL MOUNTING SYSTEM FOR BITUMEN / EPDM

MANUAL MOUNTING SYSTEM FOR BITUMEN / EPDM MANUAL MOUNTING SYSTEM FOR BITUMEN / EPDM EN mounting system for insulated pitched roof Bitumen / EPDM for solar panels landscape setup ESDEC BV 2015 TABLE OF CONTENT 1. Introduction 1 2. General installation

More information

YUKON PATIO COVER INSTALLATION INSTRUCTIONS

YUKON PATIO COVER INSTALLATION INSTRUCTIONS YUKON PATIO COVER INSTALLATION INSTRUCTIONS Before You Begin: Consult your local building department for any required permits You may be required to obtain a building permit for this structure. Contact

More information

Installation instructions. Novotegra for Corrugated Fibre Cement / Sandwich Roofs

Installation instructions. Novotegra for Corrugated Fibre Cement / Sandwich Roofs Installation instructions Novotegra for Corrugated Fibre Cement / Sandwich Roofs I CONTENTS 1 General information... 0 2 Novotegra: mounting system planning... 1 2.1 Solar-Planit software... 1 2.1.1 General

More information

CSS Central Mount System

CSS Central Mount System CSS-20 Installation Manual CSS-20 Safety Notifications Below are the installation instructions for the CSS-20-2 Long Span Beam Mounting System. Please read these safety notifications prior to beginning

More information

Installation Instructions

Installation Instructions Installation Instructions SOLC 220 SOLC 220 PAG SOLC 220 PAE SOLC 220 BAG SOLC 220 BAE Flat plate collector Basic kit Frankfurt tile Extension kit Frankfurt tile Basic kit plain tile Extension kit plain

More information

Installation Guide Simplicity Alfresco. V1.9 Lu070318

Installation Guide Simplicity Alfresco. V1.9 Lu070318 0333 305 5272 www.canoports.co.uk Installation Guide Simplicity Alfresco V1.9 Lu070318 Tools Required Below is a list of tools that you will require to install your the Simplicity Alfresco System. Cordless

More information

ShorePort PWC Lift Instructions " x 138" Sandstone ShorePort " x 138" White ShorePort " x 138" Tan ShorePort

ShorePort PWC Lift Instructions  x 138 Sandstone ShorePort  x 138 White ShorePort  x 138 Tan ShorePort ShorePort PWC Lift Instructions 00-8" x 8" Sandstone ShorePort 009-8" x 8" White ShorePort 090-8" x 8" Tan ShorePort....... - PUT SAFETY FIRST To avoid the risk of personal injury or death, study and fully

More information

Assembly instructions

Assembly instructions Commission: Order no.: Rondo Pavilion PR Ø3.9 Technical changes reserved Assembly instructions As at: 05.011 Sliding door Dear Garden lover, we congratulate you on the purchase of a quality product from

More information

STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS

STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS 1290363 Revision 1 12/16 Page 1 Weather Shield Mfg., Inc. NOTICE CAUTION! Failure to install and maintain our product according to these instructions

More information

Installation Manual for The Asphalt/Bitumen Shingle Roof Hook System

Installation Manual for The Asphalt/Bitumen Shingle Roof Hook System Installation Manual for The Asphalt/Bitumen Shingle Roof Hook System (F-IMG-1534-SolNV) Installation of Asphalt/Bitumen Shingle Roof Hook System Installing Rail / Purlin System Installing Cross Rail System

More information

Greenhouse Assembly Instructions

Greenhouse Assembly Instructions Greenhouse Assembly Instructions Our Help Line provides support and advice to customers of Summer Garden Buildings after ordering. For advice before you buy you can phone us free 7 days a week on 0800

More information

GABLE ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL

GABLE ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL GABLE ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL Table of Contents Introduction 2 Components 3 Step 1a Marking out the Perimeter of the Carport with Footing only 3 Step 2a Footing Set-Out for Concrete

More information

Alpha + On-Roof System Installation manual

Alpha + On-Roof System Installation manual 810-0116 Alpha + On-Roof System Installation manual Content Alpha + A stroke of genius with a plus 1 Introduction 2 1.1 Short Description 2 1.2 About These Instructions 2 1.3 Warnings 3 1.4 Safety 3 2

More information

compile system INSTALLATION GUIDE Updated January 2019

compile system INSTALLATION GUIDE Updated January 2019 INSTALLATION GUIDE Updated January 09 compile system Table of Contents Panels 0 Quick Connect Clips 0 Lock Clips 0 Panel Trims 0 Privacy Glass 0 Post Base Covers 04 Electrical 04 Power Distribution Harness

More information

Mounting instructions SZ210 Full-frame pedestal with screw-on tube with placement hinge, for type SCHATTELLO

Mounting instructions SZ210 Full-frame pedestal with screw-on tube with placement hinge, for type SCHATTELLO This height will be made to order. Mounting instructions SZ210 Full-frame pedestal with screw-on tube with placement hinge, for type SCHATTELLO The following instructions include all information necessary

More information

Hatchback Wing Riser Kit

Hatchback Wing Riser Kit Hatchback Wing Riser Kit 2015-06-11 Thank you for purchasing this PERRIN product for your car! Installation of this product should only be performed by persons experienced with installation of aftermarket

More information

Installation Guide Contemporary Alfresco V1.3 LU

Installation Guide Contemporary Alfresco V1.3 LU Installation Guide Contemporary Alfresco V1.3 LU 010818 Tools Required Below is a list of tools that you will require to install you're the Contemporary Alfresco System. Cordless Drill Mastic Gun Spirit

More information

Mounting systems for solar technology

Mounting systems for solar technology Mounting systems for solar technology ASSEMBLY INSTRUCTIONS Roof Fastener System CrossHook 2G GB Table of contents TABLE OF CONTENTS THE COMPANY SAFETY REGULATIONS MATERIALS REQUIRED TOOLS REQUIRED ASSEMBLY

More information

Service installation of hardtop Installing hardtop

Service installation of hardtop Installing hardtop Service installation of hardtop Installing hardtop â Lower side windows as far as they will go. â Retract (if necessary unscrew) radio aerial. â Switch off ignition. â If necessary, remove wind deflector.

More information

MM540 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

MM540 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS MM50 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS Please read this entire manual before you begin. Do not unpack any contents until you verify all requirements on PAGE.

More information

Rayport G Eco Dealer Kit

Rayport G Eco Dealer Kit Rayport G Eco Dealer Kit Installation Guide www.aetenergy.com Supporting a Cleaner, Greener Tomorrow 1. Table of Contents 1. Table of Contents P2 2. Installer Notes P3 3. Parts List P4-7 4. Tool List P8

More information

On-roof system Alpha + Product catalogue

On-roof system Alpha + Product catalogue On-roof system Alpha + Product catalogue Contents ALPHA +... 3 1. ALPHA + BASE RAILS... 4 2. ALPHA + SPLICES... 5 3. ALPHA + TELESCOPING END PIECES... 6 4. ALPHA + INTER-MODULE CLAMPS AND MODULE END CLAMPS...

More information

Installation manual. novotegra for tiled roofs

Installation manual. novotegra for tiled roofs Installation manual novotegra for tiled roofs I TABLE OF CONTENTS 1 Information... 1 2 Installation system maintenance... 3 3 novotegra for tiled roofs... 3 4 System components, tools and work equipment...

More information

FABA. Installation Instructions. Conductor Bar System. Publication #FABA-03 3/1/04 Part Number: Copyright 2004 Electromotive Systems

FABA. Installation Instructions. Conductor Bar System. Publication #FABA-03 3/1/04 Part Number: Copyright 2004 Electromotive Systems FABA Conductor Bar System Installation Instructions Publication #FABA-03 3/1/04 Part Number: 005-1062 Copyright 2004 Electromotive Systems 1S 100 Z Installation Instructions Contents: Basic Diagram - -

More information

Piazzola Pergola Awning Manufacturing and installation guide

Piazzola Pergola Awning Manufacturing and installation guide Piazzola Pergola Awning Manufacturing and installation guide Date Changes Page General information Maximum and minimum width Width Projection 150 to 349 cm 350 to 500 cm From 200 to 250 cm X From 251 to

More information

Edgerail Aluminum Bridge Railing System Specification & Installation Instructions

Edgerail Aluminum Bridge Railing System Specification & Installation Instructions Edgerail System Specification & Installation Instructions Hill & Smith, Inc 1000 Buckeye Park Road Columbus, Ohio 43207 Tel: 614-340-6294 Fax: 614-340-6296 www.hillandsmith.com Section A System Specification

More information

A Shell construction

A Shell construction A Shell construction A 4/2012 Content 1 BASE AND WALL ANCHORING 1.1 Base with mortar bed 1.2 Base with sill plate 1.3 Base with raised sill plate 1.4 Concrete base (mortar bed) 1.5 Concrete base (sill

More information

Fixed Wall Arm. Installation Guide. Part number Rev E 2012 PolyVision Corporation All rights reserved

Fixed Wall Arm. Installation Guide. Part number Rev E 2012 PolyVision Corporation All rights reserved Fixed Wall Arm Installation Guide Part number 2002003-001 Rev E 2012 PolyVision Corporation All rights reserved Table of contents Important Safety Instructions... 3 Overview... 4 Important considerations...

More information

MOUNTING INSTRUCTIONS CONCRETE PURLIN BRACKET

MOUNTING INSTRUCTIONS CONCRETE PURLIN BRACKET CONCRETE PURLIN BRACKET VERSION MARCH 2015 GENERAL INSTRUCTIONS Safety: Systems may only be installed and operated by properly trained and technically suitable people (i.e. MCS accredited installers).

More information

Gardman Lean-to Greenhouse Assembly Instructions

Gardman Lean-to Greenhouse Assembly Instructions Page 1 Gardman Lean-to Greenhouse Assembly Instructions Our Help Line provides support and advice to customers of Summer Garden Buildings after ordering. For advice before you buy you can phone us free

More information

MM340 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

MM340 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS MM30 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS Please read this entire manual before you begin. Do not unpack any contents until you verify all requirements on PAGE.

More information

Hydraulic Clamp Carrier. Installation & Operation Manual

Hydraulic Clamp Carrier. Installation & Operation Manual Hydraulic Clamp Carrier Installation & Operation Manual Hydraulic Clamp Carrier Installation & Operation Manual Quick Machinery Company 8272 Peninsula Drive Kelseyville, CA 95451 phone: (707) 272-6719

More information

DUTCH GABLE CARPORT RECOMMENDED INSTRUCTION MANUAL

DUTCH GABLE CARPORT RECOMMENDED INSTRUCTION MANUAL DUTCH GABLE CARPORT RECOMMENDED INSTRUCTION MANUAL Table of Contents Introduction 2 Components 3 Step 1a Marking out the Perimeter of the Carport with Footing only 4 Step 2a Footing Set-Out for Concrete

More information

TITAN INDUSTRIAL RACK 6-FOOT TALL / 4-SHELF

TITAN INDUSTRIAL RACK 6-FOOT TALL / 4-SHELF TITAN INDUSTRIAL RACK 6-FOOT TALL / 4-SHELF DXST10000 IMPORTANT: Please read this manual carefully before assembling this storage rack and save it for reference INSTRUCTION MANUAL 3 TABLE OF CONTENTS

More information

INSTALLATION GUIDE DECKING.

INSTALLATION GUIDE DECKING. INSTALLATION GUIDE DECKING www.ttp-online.de/resysta CONTENT LATEST TEST RESULT Classification C, DIN 51097: Features, made by, best skid-resistance properties and is eminently suitable for wet barefoot

More information

GROWING BETTER THROUGH DESIGN. 6ft Lean-To LEAN-TO. Assembly Instructions 04/02

GROWING BETTER THROUGH DESIGN. 6ft Lean-To LEAN-TO. Assembly Instructions 04/02 GROWING BETTER THROUGH DESIGN 6ft Lean-To LEAN-TO Assembly Instructions 04/02 6ft Lean-To Greenhouse Base Plan Introduction/Tools/Contents / / Contents This is a copy of our Lean-To greenhouse base plan.

More information

Installation and Assembly - Universal Articulating Swivel Double-Arm for 42" - 60" Plasma Screens

Installation and Assembly - Universal Articulating Swivel Double-Arm for 42 - 60 Plasma Screens Installation and Assembly - Universal Articulating Swivel Double-Arm for 42" - 60" Plasma Screens Models: PLAV 70-UNL, PLAV 70-UNL-S PLAV 70-UNLP, PLAV 70-UNLP-S R This product is UL Listed. It must be

More information

AWNING SYSTEM INSTALLATION INSTRUCTIONS ALL VERTICAL WALLS

AWNING SYSTEM INSTALLATION INSTRUCTIONS ALL VERTICAL WALLS INSTALLATION MANUAL AWNING SYSTEM INSTALLATION INSTRUCTIONS ALL VERTICAL WALLS TABLE OF CONTENTS Table of Contents... 3 Components... 4 System Components... 6 Attachment Components... 7 Module Compatibility...

More information

Series 1500 Aluminum Door Canopy

Series 1500 Aluminum Door Canopy Series 500 Aluminum Door Canopy with Sidewings It is our recommendation that you read instructions carefully prior to assembly and installation. Series 500 with Sidewings mounting bar (A) top trim (B)

More information

Service Information. In case of questions or reclamations please fill out the information below, so that you have access to it when needed.

Service Information. In case of questions or reclamations please fill out the information below, so that you have access to it when needed. Installation Manual Service Information In case of questions or reclamations please fill out the information below, so that you have access to it when needed. Umbrella Type/Size: Serial number: 3 Umbrella

More information

Video Wall Installation Instructions 2W X 3H, 3W X 3H

Video Wall Installation Instructions 2W X 3H, 3W X 3H Video Wall Installation Instructions 2W X 3H, 3W X 3H www.microndisplaysolutions.com Table of Contents Important Safety Instructions... 3 Configuration... 4 Package Contents, included and optional items...

More information

Repair manual. Fifth-wheel coupling JSK 38/50

Repair manual. Fifth-wheel coupling JSK 38/50 Repair manual Fifth-wheel coupling JSK 38/5 ZDE 199 3 12 E 6/212 1 Foreword Table of contents Page Fifth wheel couplings are connecting parts that must comply with very high safety requirements and must

More information

CURVED ROOF ASSEMBLY INSTRUCTIONS ATTACHED VERANDAH. Your supplementary guide to building an ATTACHED CURVED ROOF VERANDAH or PATIO BEFORE YOU START

CURVED ROOF ASSEMBLY INSTRUCTIONS ATTACHED VERANDAH. Your supplementary guide to building an ATTACHED CURVED ROOF VERANDAH or PATIO BEFORE YOU START ROOF ATTACHED VERANDAH ASSEMBLY INSTRUCTIONS Your supplementary guide to building an ATTACHED ROOF VERANDAH or PATIO This set of instructions should be used in conjunction with the Stratco instruction

More information

Installation instructions AZ120 (Anchor foot with placement hinge, to be embedded: type Albatros)

Installation instructions AZ120 (Anchor foot with placement hinge, to be embedded: type Albatros) Installation instructions AZ120 (Anchor foot with placement hinge, to be embedded: type Albatros) The following instructions include all information necessary for the installation and operation of this

More information

S5 - Window. Outside view. Inside view

S5 - Window. Outside view. Inside view S5 - Window Outside view Inside view Dometic Seitz GmbH 1 S5-Window.doc Exterior frame End cap Sealing rubber between exterior frame and wall (Foam rubber) Frame hinge strip Seal between exterior frame

More information

3.2.3 Rear Door Window and Quarter Window Carrier Assembly

3.2.3 Rear Door Window and Quarter Window Carrier Assembly Tighten all bolts. Tighten bolts marked -1- and -2- in specified sequence. Tightening torque: 8 Nm Remaining bolts can be tightened in any sequence. Insert door window -3- through window recess without

More information

GLOSSARY OF TERMS SECTION 8

GLOSSARY OF TERMS SECTION 8 GLOSSARY OF TERMS SECTION 8 Anchor Bolt Angle Base Plate Bay Blocking CCB Centerline Chord Cladding Clip Closure Strip An A-307 steel bolt embedded in the concrete footing to anchor the base plate of the

More information

Simotec. 13.i

Simotec. 13.i Products: Framo 80 13.0 Products: Framo 80 13.1 Products: Structural Elements 100/120 13.2 Products: Pipe Shoes 13.3 Framo 80: Beam Section and Screw 13.4 Framo 80: Cantilever Bracket and End Support STA

More information

SunTrackerTwo Preparation

SunTrackerTwo Preparation TOLL FREE:(888)29-2705 FAX:(941)77-9460 info@eco-smart.com SunTrackerTwo Preparation Cutting Holes and Preparing Curbs T.G.I Or Truss CIRALIGHT INSTALLATION MANUAL Page 1 Cutting Holes and Preparing Curbs

More information

1 Fastening elements Roof hooks 3 Fastening on corrugated roofs 9 Standing seam clamps 11 StandOff 14 FixE / FixT 15

1 Fastening elements Roof hooks 3 Fastening on corrugated roofs 9 Standing seam clamps 11 StandOff 14 FixE / FixT 15 Schletter Solar Mounting Systems Components overview 2011 Contents Page 1 Fastening elements Roof hooks 3 Fastening on corrugated roofs 9 Standing seam clamps 11 StandOff 14 FixE / FixT 15 2 Module clamps

More information

PUSH-PULL-PROPS. and accessories ROBUSTA-GAUKEL GMBH MOUNTING TECHNOLOGY &CO.KG

PUSH-PULL-PROPS. and accessories ROBUSTA-GAUKEL GMBH MOUNTING TECHNOLOGY &CO.KG PUSH-PULL-PROPS and accessories MOUNTING TECHNOLOGY ROBUSTA-GAUKEL GMBH &CO.KG MOUNTING TECHNOLOGY PUSH-PULL-PROPS AND ACCESSORIES INDEX General information...................... 3 Push-pull-prop Type

More information

INSTALLATION INSTRUCTIONS TRI-VENT. energy for a better world

INSTALLATION INSTRUCTIONS TRI-VENT. energy for a better world energy for a better world INSTALLATION INSTRUCTIONS TRI-VENT The photovoltaic mounting system for trapezoidal sheet roofs Quick and easy installation Riveting instead of glueing Securing without screws

More information

TITGEMEYER Tf1663GB(0514)1. GETO Megaport II flush rear doors Assembly Instructions

TITGEMEYER Tf1663GB(0514)1. GETO Megaport II flush rear doors Assembly Instructions TITGEMEYER GETO Megaport II flush rear doors All rights reserved. The technical data quoted in this catalogue, performance descrip - tions, recommendations and instructions e.g. for the installation of

More information

TITAN INDUSTRIAL RACK 4-FOOT TALL / 3-SHELF

TITAN INDUSTRIAL RACK 4-FOOT TALL / 3-SHELF TITAN INDUSTRIAL RACK 4-FOOT TALL / 3-SHELF DXST4500 IMPORTANT: Please read this manual carefully before assembling this storage rack and save it for reference INSTRUCTION MANUAL 3 TABLE OF CONTENTS TECHNICAL

More information

Tree protection systems 2.0

Tree protection systems 2.0 r e z t ü h c s m u Die Ba Tree protection systems 2.0 Installation and assembly instructions 2 General information The installation instructions below are merely a recommendation for how to install the

More information

Series 1100 Aluminum Door Canopy

Series 1100 Aluminum Door Canopy Series 00 Aluminum Door Canopy with Support Arms It is our recommendation that you read instructions carefully prior to assembly and installation. Series 00 with Support Arms MOUNTING BAR (A) TOP TRIM

More information

ROBOT KR 350. Installation, Connection, Exchange. Ro/Me/03/ en. 1of 26

ROBOT KR 350. Installation, Connection, Exchange. Ro/Me/03/ en. 1of 26 ROBOT KR 350 Installation, Connection, Exchange 1of 26 e Copyright KUKA Roboter GmbH This documentation or excerpts therefrom may not be reproduced or disclosed to third parties without the express permission

More information

Installation and Assembly - Universal Articulating Swivel Double-Arm for 42" - 60" Plasma Screens

Installation and Assembly - Universal Articulating Swivel Double-Arm for 42 - 60 Plasma Screens Installation and Assembly - Universal Articulating Swivel Double-Arm for 42" - 60" Plasma Screens Models: PLAV 70-UNL, PLAV 70-UNL-S PLAV 70-UNLP, PLAV 70-UNLP-S R This product is UL Listed. It must be

More information

E N G L I S H GARDEN SHED. Assembly Instructions. Suitable for Models WITH VARYING DEPTHS

E N G L I S H GARDEN SHED. Assembly Instructions. Suitable for Models WITH VARYING DEPTHS GARDEN SHED Assembly Instructions Suitable for Models 6' Wide 8' Wide 0' Wide WITH VARYING DEPTHS GI0003 November 0 INSTALLATION ADVICE It's Not That Difficult! The construction of your shed isn't as complicated

More information

Fifth-wheel coupling JSK 38/50

Fifth-wheel coupling JSK 38/50 Repair manual Fifth-wheel coupling JSK 38/5 ZDE 199 3 12 E 6/25 1 LT SK38C-3 English RevA Foreword Table of contents Page Fifth wheel couplings are connecting parts that must comply with very high safety

More information

INSTALLATION INSTRUCTIONS LS X 12-2 X 7 1/2 FRAME LOAFING SHED

INSTALLATION INSTRUCTIONS LS X 12-2 X 7 1/2 FRAME LOAFING SHED INSTALLATION INSTRUCTIONS LS-12 12 X 12-2 X 7 1/2 FRAME ACTUAL FRAME BASE SIZE: 12 X 12-2 LOAFING SHED Our unique assembly process quickly transforms the individual pieces into a finished structure that

More information

Schletter solar mounting systems Components overview

Schletter solar mounting systems Components overview Schletter solar mounting systems Components overview CONTENT PAGE 1 Fixation elements Roof hooks 3 Corrugated roof fixations 7 Standing seam clamps 9 Standoff 11 FixE / FixT 12 2 Module clamps For framed

More information

Installation Instructions for Vista Air Vertically Folding Walls

Installation Instructions for Vista Air Vertically Folding Walls Installation Instructions for Vista Air Vertically Folding Walls Use these instructions in conjunction with your shop drawings to see the specifics that are particular to the model you are installing.

More information

Installation Manual for Gate Guard

Installation Manual for Gate Guard Installation Manual for Gate Guard Fast Opening Barrier Gate for Emergencies and Contra Flow Innovative safety technology from SGGT of Germany TABLE OF CONTENTS Page Number Preface 3 Introduction 3 System

More information

Dura-Lock Roof System

Dura-Lock Roof System DLR-14 Dura-Lock Roof System Assembly and Installation Instructions Read the instructions before starting the job. They explain the steps required to produce a finished product that will meet factory specifications.

More information

DUTCH GABLE FREESTANDING CARPORT

DUTCH GABLE FREESTANDING CARPORT DUTCH GABLE FREESTANDING CARPORT STRATCO OUTBACK ASSEMBLY INSTRUCTIONS. Your complete guide to building a FREESTANDING Outback DUTCH GABLE CARPORT BEFORE YOU START Carefully read these instructions. If

More information

Panel Guard Installation For Adhesive Attachment

Panel Guard Installation For Adhesive Attachment For Adhesive Attachment 1. Clean roof surface with isopropyl alcohol where snow guard is to be attached-ensure area is completely dry before attaching snow guard 2. Cut tip of adhesive nozzle (Surebond

More information

Removing and Replacing the Y-truck

Removing and Replacing the Y-truck Service Documentation Removing and Replacing the Y-truck To remove and replace the Y-truck you will need the following tools: 4mm Allen wrench 12mm stamped flat wrench #2 Phillips screwdriver (magnetic

More information

Portofino Case2 Installation Guide

Portofino Case2 Installation Guide Portofino Case2 Installation Guide vjun16 (for 17 or 24 mm Surface Wall Profile) DO NOT ASSEMBLE WITHOUT FULLY READING THESE INSTRUCTIONS Page 2 Thank you for purchasing this Portofino Case 2 shower enclosure.

More information

FOR PROFESSIONAL GARAGE DOOR INSTALLERS

FOR PROFESSIONAL GARAGE DOOR INSTALLERS Composite Garage Doors Installation Instructions FOR PROFESSIONAL GARAGE DOOR INSTALLERS Tools required Screwdriver Claw Hammer Locking Pliers Power Drill Level with a 3/32" Drill Bit Utility Knife 9/16",

More information

Be sure any accessory used will fit with the soft upper doors before installing. Not all accessories will be compatible.

Be sure any accessory used will fit with the soft upper doors before installing. Not all accessories will be compatible. Company Name: Spike Power Sports Vehicle Name: Polaris General 2P Product Description: Soft Upper Doors Part Number: 58-1600 Revision: R01 09/19/2018 Contents: 655 Elm Ridge Ave, Canal Fulton OH, 44614

More information

INSTALLATION INSTRUCTIONS LS X 12-2 X 7 1/2 FRAME LOAFING SHED

INSTALLATION INSTRUCTIONS LS X 12-2 X 7 1/2 FRAME LOAFING SHED INSTALLATION INSTRUCTIONS LS-30 30 X 12-2 X 7 1/2 FRAME ACTUAL FRAME BASE SIZE: 30 X 12-2 LOAFING SHED Our unique assembly process quickly transforms the individual pieces into a finished structure that

More information

SolarMount (E)volution

SolarMount (E)volution SolarMount (E)volution SOLARMOUNT (E)VOLUTION: THE BEST JUST GOT BETTER. Engineering, Excellence, and Ease. Performance Engineered for versatility and reduced installation time, SolarMount (E)volution

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS Tools required for the installation. A. Core Drill 87mm Drill bit B. Tape measure C. Spirit Level D. Marking pen E. Caulking gun F. Cutting Pliers G. Cordless Drill and Philips head bit, 5mm Drill bit.

More information

BY ALIEN TECHNOLOGIES CORP

BY ALIEN TECHNOLOGIES CORP BY ALIEN TECHNOLOGIES CORP Assembly Instructions TopLift Pros YOU MAY ALSO REVIEW OUR ASSEMBLY VIDEO, PLAY AND PAUSE AT YOUR CONVENIENCE. JUST VISIT US AT WWW.TOPLIFTPROS.COM AND GO TO Customer Support

More information

Solara Adjustable Patio Cover Installation Instructions

Solara Adjustable Patio Cover Installation Instructions Solara Adjustable Patio Cover Installation Instructions We divided the installation instructions in 6 major sections. Reference your project to the drawings below, this way you ll know you are on the right

More information

Assembly instructions Pantograph shutters

Assembly instructions Pantograph shutters Assembly instructions Pantograph shutters Read these instructions, observe the contents and the warning notes prior to assembly. The information is very important for installation and correct use of the

More information

MantelMount. TM1A Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

MantelMount. TM1A Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS MantelMount TMA Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS TM Thank you for choosing the MantelMount television wall mount. Please read this entire manual before

More information

POWER PEAK TM ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation. Version 1, Rev D P/N

POWER PEAK TM ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation. Version 1, Rev D P/N POWER PEAK TM ASSEMBLY ISTRUCTIOS step-by-step assembly and installation Version 1, Rev D P/ 5803028 The Power Peak TM A few words about this product The Power Peak is designed to mount on standard I-Beams

More information

Roof fastener. Perfectly thought out for every roof

Roof fastener. Perfectly thought out for every roof Roof fastener Perfectly thought out for every roof 1 Welcome to the world of clever solutions Solutions for every roof In our production areas we produce all needed components for the sub construction

More information

Installation Guide. Capped Cellular PVC Fencing. Table of Contents. Storage and Handling Tools Needed Fence Layout and Locating Posts

Installation Guide. Capped Cellular PVC Fencing. Table of Contents. Storage and Handling Tools Needed Fence Layout and Locating Posts Capped Cellular PVC Fencing Installation Guide Table of Contents Storage and Handling Tools Needed Fence Layout and Locating Posts Installation instructions 4 x 4 Over Sleeve Post - 3.5 Rail Privacy Shadowbox

More information

Aluminum Frame Type Instruction Manual

Aluminum Frame Type Instruction Manual Aluminum Frame TypeInstruction Manual Thank you for selecting our product. Before starting installation, please read this manual thoroughly to ensure correct installation. Please keep this manual at hand

More information

ASSEMBLY INSTRUCTIONS. Construction type approved Reg. no S819 F ENERGY AND SANITARY SYSTEMS

ASSEMBLY INSTRUCTIONS. Construction type approved Reg. no S819 F ENERGY AND SANITARY SYSTEMS Heliostar 252 S4 and 218 S4 FREE-STANDING INSTALLATION vertical ASSEMBLY INSTRUCTIONS Construction type approved Reg. no. 011-7S819 F ENERGY AND SANITARY SYSTEMS Safety instructions Safety instructions

More information

10x10 Trellis Pergola

10x10 Trellis Pergola 0x0 Trellis Pergola ASSEMBLY GUIDE Ver.0-7 Table of Contents PAGE Introduction & Overview...................................................... Pergola Materials Overview..............................................................

More information

SUPREME WALL GARDEN ASSEMBLY INSTRUCTIONS 24/08/16 www.hallsgreenhouses.com Please refer to website for the most up to date instructions. SAFETY WARNING 1. Always wear protective glasses, shoes, gloves

More information

#4 Phillips Driver Bit 1/8, 4mm, 5.5mm & 8mm (5/16 ) Allen Wrench. Safety Glasses

#4 Phillips Driver Bit 1/8, 4mm, 5.5mm & 8mm (5/16 ) Allen Wrench. Safety Glasses ATLANTIS RAIL Contact Information: Atlantis Rail Systems 70 Armstrong Road 3900 Civic Center Drive Plymouth, MA 02360 North Las Vegas, NV 89030 (800) 541-6829 or (508) 732-9191 (508) 732-9798 www.atlantisrail.com

More information

SteelChief Installation Instructions for pre-assembled panel form sheds GABLE ROOF

SteelChief Installation Instructions for pre-assembled panel form sheds GABLE ROOF SteelChief Installation Instructions for pre-assembled panel form sheds GABLE ROOF Please read fully before commencing work...any queries will be promptly answered, contact theboss@steelchief.com.aui MPORTANT

More information

ALL SEASON PATIO COVER

ALL SEASON PATIO COVER ALL SEASON PATIO COVER 61 Where the All Season Patio Cover is to be attached to the home, create a level line showing where the top of the mounting rail is to be located. Install each section with the

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS SOLID PHENOLIC TOILET PARTITIONS 1080 DuraLineSeries Class-A Fire Rated Includes Institutional Hardware Option.67 IMPORTANT: Storage and Handling Information on last page. Review

More information

GE Monogram. Installation. Instructions. 36" Vent Hood. Model ZV750. Call anywhere in the US and Canada -

GE Monogram. Installation. Instructions. 36 Vent Hood. Model ZV750. Call anywhere in the US and Canada - at :: rangehoods. com GE Monogram Instructions Model ZV750 GE Monogram at:: rangehoods. com is a division of CAUTION WARNING Before you begin Read these instructions completely and carefully. IMPORTANT:

More information

FOLDING DOOR - FOR FACTORY ASSEMBLED JAMBS WITH APPLIED SILL

FOLDING DOOR - FOR FACTORY ASSEMBLED JAMBS WITH APPLIED SILL FOLDING DOOR - FOR FACTORY ASSEMBLED JAMBS WITH APPLIED SILL READ SPECIFIC INSTALLATION INSTRUCTIONS COMPLETELY BEFORE STARTING ANY INSTALLATION Failure to install and maintain our product according to

More information

1200 SERIES 2 PANEL DOOR rev.1 DETAILED INSTALLATION INTRUCTIONS

1200 SERIES 2 PANEL DOOR rev.1 DETAILED INSTALLATION INTRUCTIONS 1200 SERIES 2 PANEL DOOR 10.2013 rev.1 DETAILED INSTALLATION INTRUCTIONS GENERAL: Door elevations shown in these instructions are as viewed from the outside. X denotes the active or moving panel(s). O

More information

Fig. 2 DORMA-Glas Stand/Issue 02/03 Seite/Page 1/7

Fig. 2 DORMA-Glas Stand/Issue 02/03 Seite/Page 1/7 FSW Installation instructions Track rail 75 x 72 mm 1. Ceiling substructure and installation of the track rail (Fig. 1): The track rail must be bolted over its entire length (including the stacking track

More information

Undercut anchor KH AA

Undercut anchor KH AA HS 15 Undercut anchor KH AA Undercut anchor KH AA = 7 = 3 min DIBt 6,0 4,0 1,5 M6x8.5 14 020 820 6,0 4,0 3,0 M6x10 14 020 742 DRILLING Anchor sleeve inc. hexagon bolt with locking ratchet in stainless

More information

INSTALLATION GUIDE SM SOLAR MOUNT PUB15JAN01

INSTALLATION GUIDE SM SOLAR MOUNT PUB15JAN01 MOUNT INSTALLATION GUIDE PUB5JAN0 SM SOLAR Wrenches and Torque Wrench Size Recommended Torque (ft-lbs) /4 Hardware 7/6 *0 3/8 Hardware 9/6 *30 # Hardware 5/6 0 Torques are not designed for use with wood

More information