Piazzola Pergola Awning Manufacturing and installation guide
|
|
- Ursula Townsend
- 5 years ago
- Views:
Transcription
1 Piazzola Pergola Awning Manufacturing and installation guide Date Changes Page
2 General information Maximum and minimum width Width Projection 150 to 349 cm 350 to 500 cm From 200 to 250 cm X From 251 to 600 cm X X Maximum fabric surface 30 m² per awning section (acrylic fabric, Tibelly). To confection the fabric, a wide side hem of 10 cm should be used at both fabric sides. The front profile will start to bend at a free span of 4 m or more. This has no effect on the functionality of the system. You can opt for an arched front profile or a coupled system with two shorter front profiles. Fabric winding method: Bottomwise. Reference item ±10 70 Projection Length side guide Oversize side guide max. 1m Passage height "A" Awning height to reference item 23,3 Cut sizes Control by ASA motor Fabric roller -57 mm -61 mm Bottom cover Top cover Wall cover Upper front profile Lower front profile Side guide Water gutter Post Support beam Support beam (fabric support) Fabric -21 mm -22 mm -0 mm -176 mm -175 mm Projection 270 mm Control by Somfy motor Length side guide + 36 mm (when using part nbr ) Standing height + length A -10 mm (when using part nbr ) Standing height + length A + length below ground level -154 mm -10 mm -155 mm 2 Piazzola Pergola Awning Version 1.01
3 General information Motor diagram For a single unit use 40 Nm. For a double unit (2 linked units) use 80 Nm. Notes Place an extra support beam to support the fabric upward a projection of 3.50 m. When using the Piazzola, in case of rain (short light rainfall) we always recommend (a) support beam(s) supporting the fabric and apply a lock set. The Piazzola should then be placed at a minimum angle of 17 degrees. For a better drainage one can choose to place rings in the fabric. Overview of drawings In the undermentioned overview two drawings are visible with important sizes. Angle connection in mm 75 37,5 37, ,5 75 Side view wall mounting in mm 9 233, ,9 73, ,3 Version 1.01 Piazzola Pergola Awning 3
4 1. Cut the length material into the correct size (see table cut sizes). 2. On the operating side, drill a hole of 11 mm in the bottom cover for lead-through of the motor cable. Fit a tulle in this hole. 12. Place the motor into the control side of the steel tube, and insert the bearing plug on the bearing side. Cord length per side: 2x the projection plus 1.5 times the width plus 1 m. 3. Around the centre point of the length, drill a hole of 6.5 mm along the drill line in the groove of the bottom cover for placement of the top cover support. Note: No wall bracket can be placed here. 4. Slide the mounting plate with sockethead screws in the same groove. Turn 1 socket-head screw through the hole of 6.5 mm. Tighten the other socket-head screws. 13. Make 4 windings of cord on the cord pulley and ensure that the cord runs neatly. TIP: Apply double sided tape in the cord pulley before winding the cord. The first 4 windings will then be fixed in place and will remain so during transport. 14. Assemble the top cover supports (bearing side and control side) as shown on the figure. 5. Slide the wall brackets into the bottom cover. Place the outside brackets at 10 mm from the outside of the bottom cover. 6. A third bracket is required if the width > approx m. It should be placed more or less in the middle. 7. Using screws, fasten all wall brackets to the bottom and backside. 8. Pull the plastic insert strip into the bottom cover. 15. Use screws to fasten both top cover supports to the bottom cover. 16. Place the cord pulleys opposite the wheels on the top cover supports and fix these into place. 9. Slide the two PVC inserts into the fabric. 10. Wind up the fabric on the fabric roller. 11. Fit the cord pulleys. 4 Piazzola Pergola Awning Version 1.01
5 17. Hook the cover support into the bottom cover and place it alongside the socket-head screw that is projecting through the cover. 28. Drill 6.5 mm holes in the left and right side guide for fastening to the top cover supports. 6,5 18. Hook the top cover into the bottom cover and use screws to fasten it to the ends of the top cover supports. 19. Attach the cord tensioners at 50 cm from the centre on the sloping side of the lower front profile. Note: Cord tensioners come in left and right versions. 20. Slide the central pulley into the opening in the lower front profile. 21. Slide the front profile onto the fabric. 22. Fasten the guide blocks onto the lower front profile using screws Slide the mounting plate of the fabric support into the side guide, place it in the required position, and use it to fasten the support. 30. Slide the mounting plate of the top hinge into the side guide. Fasten the top hinge at the required position of the side guide. Leave space for the nut on the outside. 31. Insert the guide plate into the top of the side guide and slide into place. Use a rubber hammer to tap firm. Note: If the lock set is used, it can be mounted now (see number 66) The support consists of two posts with hinge and footplate connected to a support beam. 24. Drill two holes into the post as shown in the figure (page 3 angle connection). 25. Use a machine screwing tap M8 to tap a thread in the post and support beam. Provide sufficient lubrication. Minimum tap 25 mm. 26. Screw the socket-head bolt M8x50 on both sides of the support beam. Let it oversize for ±15 mm. Insert the socket-head bolts through the holes in the post and tighten them. 27. Screw the bottom hinge at the top of the post and the baseplate at the bottom. 32. Take the water gutter sections and drill holes of 5 mm at intervals of ± 60 cm along the drill line. 33. Screw a cover plate against the front of the water gutter. 34. Hook the water gutter sections into the side guide, keeping the cover plate on the front even with the front of the side guide, and screw into place. #25 # Fasten the mounting plate to the wall at a distance that is equal to the length of the awning, measured on the outside (when using a wall cover, deduct the thickness of the endplate of the wall cover = 6 mm). Version 1.01 Piazzola Pergola Awning 5
6 36. Hook the wall brackets into the mounting plate and fasten the socketplate screws on the bottom side. 43. Tighten the nuts on the side of the wall bracket. 37. Pull out the front profile by 30 cm. 38. Feed the cord along the wheels of the guide blocks into the front profile. 39. Slide the side guide over the wheels of the guide blocks and over the leg of the top cover support. 44. Hook the springs on the left and right into the screw eyes of the guide blocks. 45. Place the pulley on the other side of the spring. 46. Slide the central pulley towards the centre of the bottom front profile. 47. Lead the cord through the side guide and lay it over the top of the wheels in the end bearing. Ensure that the cord is not crossed in the side guide. 48. Lead the cord as shown in the figure below. Pull out each spring to a maximum of 60% of its own length. 40. Attach the side guide to the legs of the top cover supports. 41. Place the two hinges at the desired positions above one another, and connect these. 42. Measure the Piazzola diagonally and ensure that the system is perfectly perpendicular. When using concrete pads, place the posts at exactly the same height. When using the baseplate, fasten it to the ground. 49. Tension the springs lightly. 50. Check that the cord runs well over all the wheels of the pulleys. 51. Further tension the springs by pulling the cord in the cord tensioners. 52. Allow the fabric to run out to its full length. 53. Determine at which point of the side guide the springs are least tensioned. This is the point where the awning will sag. 54. Then mark the position of the front profile in relation to the side guide. 55. Stop the front profile at the marked point while drawing in. 56. Tension the springs in such a way that the fabric is (sufficiently) tight. For this, pull the cord in the cord tensioners. 57. Let the awning run in and out a couple of times to check correct functioning 58. Straighten the top cover by turning the sockethead screw at the back of the bottom cover. 59. Attach the wall cover and wall cover end plates to one another. 60. Pull the plastic insert strip into the gulley of the wall cover and fasten the end plates using screws. 61. Place the wall cover on the top cover and position the end plates even against the wall. 6 Piazzola Pergola Awning Version 1.01
7 62. Determine the position of the holes and drill these in the wall cover and wall. 63. Attach the wall cover to the wall and the end plates to the mounting plate (bottom slot end plate). 64. Hook the cover extension into the top cover. 65. Drill holes in the cover extension and the side guides. 66. Attach them to one another using screws. 67. The lock set can only be used with an ASA ETR-A or a Somfy Orea motor. Place the lock set at least 110 mm from the end of the side guide. At this place no top hinge can be mounted. The plastic stopper has to be screwed on the front profile, as shown at the drawing. Note: At this place no top hinge can be mounted Version 1.01 Piazzola Pergola Awning 7
8 Piazzola Pergola Awning Pergola Awning Piazzola Exploded-view Version 1.01
9 Hexagon nut M8 stainless Flat washer without shamfer M8 stainless A Lock set Piazzola Neopren strip 10x2mm selfadhesive Reinforcement corner set Piazzola Cover reinforcement corner Piazzola Hexagon socket set screw M6x10 stainless Mounting plate Piazzola Cord tensionner, left Self drilling pancil. screw with Philips Head ST4,2x Cord tensionner, right Countersunk plate screw with Philips Head ST4,2x45 stainless / 185 Spring 25mm, length 350mm / 570mm Guide block Piazzola left Screw eye with nut M Stainless pulley for cord 2,5mm with synth. runner Guide block Piazzola right Central pulley for cord 2,5mm Alu upper front profile Summerlight Alu lower front profile Summerlight Flat washer without shamfer DIN A M6 stainless Hexagon bolt M6x20 stainless Guide plate Piazzola left Cylinder hexagon screw M6x16 stainless Side guide Piazzola Hinge Piazzola upside Cylinder hexagon screw M6x20 stainless Guide plate Piazzola right Clamping plate Piazzola stainless Bearing block set Piazzola, Cubola, Summerlight End plate for end bearing Piazzola Plate screw with countersunk Philips Head 3,5x16 mm Cover plate gutter Piazzola Gutter side guide Piazzola Pancil. Plate screw with Philips Head ST4,2x Synth. sealing strip Cover plate for wall cover Piazzola Wall cover Piazzola Support set intermediate support beam Piazzola Support beam Piazzola (fabric support) Support beam Piazzola Lower hinge Piazzola Adjustment hexagon screw M8x50mm Cylinder hexagon screw M8x70 stainless Cylinder hexagon screw M8x30 stainless Socket head bolt M8x30 countersunk Philips Head Base plate Piazzola Post Piazzola Fabric Drilling screw 4,2x13 DIN 7504 stainless A Adaptor ASA / Somfy Friction ring ASA / Somfy Steel tube Synth. cord pulley tube Synth. Washer 16mm Countersunk plate screw with Philips Head ST4,2x32 stainless Synth. bearing bung 85 with axle ASA / Somfy motor Bristle for top cover Alu motor support ASA / Somfy Synth. bearing block complete Cover support Piazzola Top cover support Piazzola left complete Top cover support Piazzola right complete Wall bracket Piazzola Mounting plate Gota 140mm Top cover Piazzola Bottom cover Piazzola 1 No. Part number Description Nbr. Parts list Version 1.01 Piazzola Pergola Awning 9
Manufacturing and installation instruction. Solidare Verso. Pergola awning (bottom mounted)
Manufacturing and installation instruction Solidare Verso Pergola awning (bottom mounted) Solidare Verso pergola awning 11-05-2017 * * A T T E N T I O N * * AVZ accepts no liability for any errors in this
More informationSolidScreen XL. Version 1.05 Sun Protection AVZ 6P.1
Version 1.05 Sun Protection AVZ P.1 P.2 Sun Protection AVZ Versie 1.05 4453 470-000 End fix bracket Screen 150 square without spindle, left Mill finish 4453 472-000 Idem, right Mill finish 4453 470-008
More informationGlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas)
List of Contents Quantity Description 12 #10 x 1 ½ Flat Head Phillips Screw (see pg. 2) 2 #10 x ½ Pan Head Phillips Screw (see pg. 2) 8 ¼ x 2 ½ Lag Bolt (see pg. 2) 7 ¼ 20 x 5 / 8 Hex Head Bolt (see pg.
More informationInstallation Guide Simplicity Alfresco. V1.9 Lu070318
0333 305 5272 www.canoports.co.uk Installation Guide Simplicity Alfresco V1.9 Lu070318 Tools Required Below is a list of tools that you will require to install your the Simplicity Alfresco System. Cordless
More informationGROWING BETTER THROUGH DESIGN. 6ft Lean-To LEAN-TO. Assembly Instructions 04/02
GROWING BETTER THROUGH DESIGN 6ft Lean-To LEAN-TO Assembly Instructions 04/02 6ft Lean-To Greenhouse Base Plan Introduction/Tools/Contents / / Contents This is a copy of our Lean-To greenhouse base plan.
More informationGlideRite Retractable Cover System For Hot Spot Spas (SE & SLX only)
List of Contents Quantity Description 12 #10 x 1 ½ Flat Head Phillips Screw (see pg. 2) 2 #10 x ½ Pan Head Phillips Screw (see pg. 2) 8 ¼ x 2 ½ Lag Bolt (see pg. 2) 7 ¼ 20 x 5 / 8 Hex Head Bolt (see pg.
More information400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS
12/11/07 PAGE 1 OF 12 400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS Thank you for purchasing our product! *Please read these instructions
More informationInstallation Guide Contemporary Alfresco V1.3 LU
Installation Guide Contemporary Alfresco V1.3 LU 010818 Tools Required Below is a list of tools that you will require to install you're the Contemporary Alfresco System. Cordless Drill Mastic Gun Spirit
More informationAX1001. Smith/Functional training Combo-free weight ASSEMBLY INSTRUCTIONS
AX1001 Smith/Functional training Combo-free weight ASSEMBLY INSTRUCTIONS EXPLODED DIAGRAM 83 84 84 85/86 87 87 88 89 90 91 62 64 64 64 64 64 64 65 65 65 65 66 66 65 66 66 65 63 63 66 67 68 55 66 66 70
More informationset of safety brace steel cable draw-up gate kpl
0324101 7108020 8208100 Order-nr. Description Number 0324101 safety brace steel cable draw-up gate 2 7108020 hexagon-head tap bolt M8x20 galv. 2 8208100 hexagon nut M8 galv. 2 set of safety brace steel
More informationCHICKEN COOP & CHICKEN RUN. Tools required for assembly (not included)
CHICKEN COOP & CHICKEN RUN ASSEMBLY MANUAL SKU# 6839 Tools required for assembly (not included) Distributed by: TRACTOR SUPPLY COMPANY 0 VIRGINIA WAY, BRENTWOOD, TN 3707 For customer support, call: -888-376-960
More informationDeck Mount Installation with Bench
Deck Mount Installation with Bench 1. Mark track with square. 2. Cut tracks with saw. 3. Drill ¼ hole (if needed.) 4. Countersink track. 5. Countersink all track 6. File all track ends. ends. 7. Lay out
More informationTELESCOPIC GATE MANUFACTURING AND INSTALLATION MANUAL.
TELESCOPIC GATE MANUFACTURING AND INSTALLATION MANUAL. Telescopic gates have been manufactured for many years essentially in the same way they are largely today. In recent years hardware suppliers have
More informationAWNING / PATIO COVER INSTALLATION INSTRUCTIONS
AWNING / PATIO COVER INSTALLATION INSTRUCTIONS Before You Begin Read the installation instructions thoroughly before beginning the installation procedure. Perspective In the Awning Instructions, Back means
More informationDublin Stalls Installation Instructions
Dublin Stalls Installation Instructions RAMM Horse Fencing and Stalls 13150 Airport Hwy. Swanton, OH 43558-9615 1-800-434-8456 Rev. 9/13/17 Part Identification Round Track Bracket (4) (Not Painted) Round
More informationClearview Railing System Installation Instructions
Clearview Railing System Installation Instructions Disclaimer: AGS Stainless, Inc. has its Clearview Railing Systems designed by a professional engineer to meet the requirements of the latest national
More informationaluminium profile system
aluminium profile system 63 AME System aluminium profiles overview series profiles introduction 80x80 x80 x80/180 x Aluminium profiles are provided with longitudinal grooves which can be used in conjunction
More informationASSEMBLY INSTRUCTIONS FOR 9000 DOOR
ASSEMBLY INSTRUCTIONS FOR 9000 DOOR SLI Nassau Door A/S Krogagervej 2 DK-5750 Ringe Tlf.: +45 62 62 23 46 Fax: +45 62 62 39 18 E-mail: info@nassau.dk www.nassau.dk MANUAL NO.: 89-22021 / RELEASE 8 CONTENTS
More informationPergola Installation Instructions
Pergola Installation Instructions TOOLS REQUIRED HAMMER DRILL 1/2 MASONRY BIT PENCIL DRILL 3/16 DRILL BIT LEVEL SQUARE LADDER WRATCHET & SOCKETS RUBBER MALLET 2 TAPE MEASURE Column/Post Placement Table
More informationMAG-CONV Basic, 48, 48R & Midline Front Mount
Parts Required: Tools Used: Mag Wheels Brakes Brake Rods Mounting Bracket Anti Tippers 7/16" Wrench Screw Driver Rubber Mallet 5/8 Wrench 5mm Allen Wrench Step Execution Figures 1 Remove front 5" total
More informationThank you for purchasing out product! *Please read these instructions and follow them step by step. *
Page 1 of 7 AD17 AA DS 4 X 16 T12 Thank you for purchasing out product! *Please read these instructions and follow them step by step. * STEP 1. Slide two support posts (REF. # 24) into the two outside
More informationSPARE PARTS LIST MODEL NO. LB1200F PAGE 1 ITEM PART NO. DESCRIPTION QTY NOTE
PAGE 1 001 JM21000018 HEX.SOCKET HEAD SCREW M5X12 4 002 JM21000019 SPRING WASHER 5 4 003 JM21000020 FLAT WASHER 5 4 004 JM21000021 UP COVER COMPLETE 1 005 JM21000025 MICRO SWITCH FIX PANEL A 1 006 JM21000026
More informationGota cassette. Version 1.10 Sun Protection AVZ 3G.1
Version 1.10 Sun Protection AVZ G.1 G.2 Sun Protection AVZ Version 1.10 Part number Description Paint finish Length in m 1 4211 772-090 Alu wall bracket 140 mm Mill finish 4211 772-008 Idem RAL 705 light
More informationPRS X-Axis E-Chain Installation For Tools with a 12 Z-Axis
888-680-4466 ShopBotTools.com PRS X-Axis E-Chain Installation For Tools with a 12 Z-Axis This kit is compatible with PRS Shopbots that have an X-axis cutting area of 96 to 144. It is not immediately compatible
More informationVINYL CLASSIC FREESTANDING PERGOLA ASSEMBLY INSTRUCTIONS
P a g e 1 VINYL CLASSIC FREESTANDING PERGOLA ASSEMBLY INSTRUCTIONS Shown: 8' x 12' Vinyl Classic Pergola with 12" Top and Main Runner Spacing The design of this pergola is based on all posts being installed
More informationPORTA-DOCK, INC. AP17 APD DS 4 X 16 T12 AW17 CPD DS 4 X 16 T12
Page 1 of 7 PORTA-DOCK, INC. AP17 APD DS 4 X 16 T12 AW17 CPD DS 4 X 16 T12 *For Beige Decking Add the Letter B to Model* Thank you for purchasing out product! *Please read these instructions and follow
More informationSTANDARD GRAVITY BOX TARP INSTALLATION
OPERATORS MANUAL Rev. 9.9.2016 STANDARD GRAVITY BOX TARP INSTALLATION J. & M. Mfg. Co., Inc. 284 Railroad Street - P.O. Box 547 Fort Recovery, OH 45846 Ph: (419) 375-2376 Fax: (419) 375-2708 www.jm-inc.com
More informationCONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013
U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS TOOL LIST Required Tools: - Reciprocating Saw with Metal Cutting Blade - Drill - 7/16 Drill Bit for Metal Drilling -
More informationA59 APD & A86 CPD 5'X 16' SW ALUMINUM PORTA-DOCK
Page 1 of 5 PORTA-DOCK, INC. A59 APD & A86 CPD 5'X 16' SW ALUMINUM PORTA-DOCK *For Beige Decking Add the Letter B to model* Thank you for purchasing our product! *Please read these instructions and follow
More informationV4 Premium Kit. Prusa i3 Build Guide
V4 Premium Kit Prusa i3 Build Guide Hi! Congratulations on your purchase of the DIYElectronics.co.za Prusa I3 kit, the best South African 3D Printer Kit! Hopefully this should serve as complete guide to
More informationASSEMBLY AND ADJUSTMENT
EPPA MONITOR ARM EPPA Rev A 10/17 Model EPPA-XXX ASSEMBLY AND ADJUSTMENT EPPA MONITOR ARM PARTS AND TOOLS PLEASE REVIEW these instructions before beginning the assembly and adjustment procedures. Check
More informationTable and Furniture Base Fittings Plinth Adjusting Fittings
Adjusting screw with M8 or M thread Rigid, for glide inserts, steel thread Finish/Colour: Black, thread galvanized Version: With acceptance Ø30 mm Thread M8 650.22.381 M 650.22.382 Packing: 1 or 0 pcs.
More informationS48-L12-SC AND G48-L12-GC STEEL PORTA-DOCK S82 SC 6 X 12 PLATFORM AND G82 GC 6 X 12 PLATFORM
PAGE 1 OF 6 PORTA-DOCK, INC. S48-L12-SC AND G48-L12-GC STEEL PORTA-DOCK S82 SC 6 X 12 PLATFORM AND G82 GC 6 X 12 PLATFORM Thank you for purchasing our product! *Please read these instructions and follow
More informationTaurean Sectional Garage Door INSTALLATION INSTRUCTIONS
BEFORE YOU BEGIN MAKE SURE THESE INSTRUCTIONS ARE READ AND UNDERSTOOD COMPLETELY. THESE INSTRUCTIONS ARE INTENDED FOR PROFESSIONAL GARAGE DOOR INSTALLERS. ALL REFERENCES ARE TAKEN FROM THE INSIDE LOOKING
More informationAssembly Instructions 10 X 10 Aluminum Roof Support
Assembly Instructions 10 X 10 Aluminum Roof Support Aluminum Roof Support Bolt Package 16-5/16 X 2 ¼ SS Bolt 24-5/16 X 1 SS Bolt 40-5/16 SS Nylon Lock Nuts 16-5/16 SS Flat Washers 28-4 ½ Wood Screws 36-1
More informationDepending on the size you ordered you will have either 5 Foot sections which will build the 10 Foot frame or 6 Foot sections which will build the 12
XL Quilting Frame 1 Depending on the size you ordered you will have either 5 Foot sections which will build the 10 Foot frame or 6 Foot sections which will build the 12 Foot frame Printed 2 June 2014 Updated
More informationINSTALLATION INSTRUCTION RRU DOUBLE LIGHT POLE MOUNT
INSTALLATION INSTRUCTION RRU Double Light Pole Mount for installation of two RRU units on mast, towers or other vertical structures. CUE DEE YOUR INNOVATIVE PARTNER 1 CONTENTS 1. PRODUCT COVERED IN THIS
More informationF i t t i n g t h e N e w L a n d i n g G e a r t o Y o u r S k y J i b V 1
F i t t i n g t h e N e w L a n d i n g G e a r t o Y o u r S k y J i b V 1 1 P a r t s L i s t : S t a n d a r d L a n d i n g G e a r U p g r a d e Product Code Parts + Spares Product Code Parts + Spares
More informationTitan Series Awning Assembly and Installation Instructions
Titan Series Awning Assembly and Installation Instructions Be sure to use safety glasses when assembling and installing the awning. Some metal parts may have sharp edges. Use work gloves to handle them.
More informationCRP700 Benchtop Basic CNC Machine Assembly Instructions. Updated 10/24/2014 SHEET 1 of 24
CRP700 Benchtop Basic CNC Machine Assembly Instructions Updated 0//0 SHEET of NOTE: This piece of extrusion is mounted wide side up Quick Tip: Lay extrusion on table as shown for easy assembly BASE ASSEMBLY:.
More information1: profile cross section. FD- profile. for sidewalls + backwalls. eaves profile. curved roof profile. Z - profile (alongside frame) L 60 x 60
1: profile cross section FD- profile for sidewalls + backwalls eaves profile curved roof profile Z - profile (alongside frame) L 60 x 60 for backwall Image 2: 1.) Insert feet from below in square tubes
More informationSpring Loaded All Season Roll-Up Doors
Spring Loaded All Season Roll-Up Doors STAND-OFF MOUNTING METHOD INSTALLATION INSTRUCTIONS READ THIS FIRST Carefully examine the crate(s) for damage before opening. If the carton is damaged, immediately
More informationENG. Installation instruction. Thermalift 42 TOF, TOR K085129
ENG Installation instruction Thermalift 2 TOF, TOR K08129 0706 EC-DECLARATION OF producer We hereby declare that the following described product, with regard to its conception and construction and in the
More information3 D Printer Enclosure Assembly Instructions
3 D Printer Enclosure Assembly Instructions Tools Required: 2.5 mm Allen wrench (included) Phillips screwdriver Adjustable Wrench Parts Included: Plexiglas Back with fan and filters installed (29.5 x 35.5
More informationPO BOX 130 CLEAR LAKE, MN
WWW.WALKSONWATER.COM PO BOX 130 CLEAR LAKE, MN 55319 320-743-3333 PARTS LIST FOR 30115# VERTICAL BOAT LIFT 2-Back Leg Uprights 1 right, 1 left (BL) 1-Front Leg Upright (FL) 1-Winch Leg Upright (WU) 2-Bottom
More informationPrivacy Wall Glass Selections - Polished Edge Slider Door
Privacy Wall Glass Selections - Polished Edge Slider Door 3/6" HEX BIT PUTTY KNIFE #2 ACR BIT SUCTION CUP HOLDERS DOOR LEAF: Satin Tempered Clear Tempered LOCTITE 425 SIDE LIGHT ETCHED GLASS STYLES: Satin
More informationTITAN2-EDGE Public Access Computer Station Dual Track
TITAN2-EDGE Public Access Computer Station Dual Track TITAN2-EDGE Rev A 6/17 Model TITAN2-EDGE ASSEMBLY AND ADJUSTMENT TITAN2-EDGE PARTS AND TOOLS PLEASE REVIEW these instructions before beginning the
More information~11. ~~m. c' Type. W~m IIIIIIIII IIIIIIIII. Tel: (01935) CG 5/9. S. See requirements. BETWEEN BRICKWORK
Fitting instructions for c' Type Frame arrangement enin ~~m Width BEHIND BRICKWORK IMPORTANT For electric operation use system 'c' operator. S. See requirements. ~11 BriCkwoJ":ening IIIIIIIII BETWEEN BRICKWORK
More informationAssembly instructions. 6x4. Model GH1354A. 6x6. Model GH1357A. 6x8. Model GH1360A. 6x10. Walk-in Greenhouse. Model GH1363A
ssembly instructions x Model GH x Model GH7 x8 Model GH0 x0 Model GH Walk-in Greenhouse Statement ear Customer! May we congratulate you on your new Greenhouse. We feel sure that by following the detailed
More informationNot including the type of fabric used (clear pvc or shade mesh), there are three main types of side screen.
installation Outrigger side screens are installed as a single stage job when the screens are fitted to a existing structure. However, two stages may be necessary if, for whatever reason, reliable measurements
More informationHOUSE PARTS PACKED IN HOUSE BOX PARTS IN PLASTIC BAG (HARDWARE) PARTS IN SMALL PLASTIC BAG (FLOOR CLIPS) PARTS PACKED IN BUNDLE
Check parts against this list before starting assembly. Refer to illustrations on pages 6 and 7 to view house parts. If any shortages are found, refer to Packing Slip for claim instructions. Item 3 5 6
More informationFRONT BUMPER INSTALLATION INSTRUCTIONS Toyota 4Runner
Aluminess Products Inc 9402 Wheatlands Ct. #A Santee, CA 92071 619-449-9930 FRONT BUMPER INSTALLATION INSTRUCTIONS 2003-2009 Toyota 4Runner Please read before beginning Stainless steel hardware may bind
More informationAssembly instructions
Commission: Order no.: Rondo Pavilion PR Ø3.9 Technical changes reserved Assembly instructions As at: 05.011 Sliding door Dear Garden lover, we congratulate you on the purchase of a quality product from
More informationNEWS Part. N /0 MINITEC NEWS
NEWS 2009 Part. N 95.0423/0 MINITEC NEWS 2009 1 TABLE OF CONTENT INTRODUCTION CONTENTS 3 END CAP Z WITH HAMMER TAPS 3 END CAP 45X45 VA 4 ANGLE 25 GD-Z 4 ANGLE 45X90 GD-Z 5 ANGLE 90 GD-Z 5 HINGE 19 S 6
More informationInstallation Instruction
Tools Needed for Assembly Stud finder (for wood stud wall) Pencil Mark Electric drill Wood Stud Wall Installation Step 1. Locate the Wood Studs Installation Instruction Drill bit (for wood stud wall) Masonry
More informationModel PLM5113N PETROL LAWN MOWER
Strana 1 / 2 Strana 2 / 2 Strana 1 / 4 001 671006065 "BLADE TIGHTEN BOLT 3/8""24" 1 002 671010730 LID SHAPE WASHER 1 003 DA00000973 BLADE 510MM 1 004 671015252 BLADE SUPPORT 1 005 DA00000535 FLAT KEY 1
More informationAssembly Instructions
Unite Panel System Hinge Door July 2016 #12 x / slotted hex washer head bolt Figure 1 threshold bracket frame Detail F threshold bracket threshold bracket (installed) #12 x / slotted hex washer head bolt
More informationMotorized or Crank Operated Fortress Zipper Track Shade with Housing and Side Track Installation Instructions
Motorized or Crank Operated Fortress Zipper Track Shade with Housing and Side Track Installation Instructions Tools Needed Drill 3/8 Metal Drill Bit ¼ Masonry Drill Bit Measuring Tape Pencil 4 Level Phillips
More informationABM International, Inc. Navigator Assembly Manual
ABM International, Inc. 1 1.0: Parts List Tablet (Qty. 1) Tablet mount (Qty. 1) NOTE: Mount may appear and operate different then image below Control Box (Qty. 1) Motor Power Supply (Qty. 1) 2 X-axis motor
More informationNOTE: Top section pole (Q) is packed INSIDE bottom section pole (S)
Form 0905-0 Instructions and Parts List TM- Mini Castle (modified) MARTIN SAFETY SYSTEM NOTES: () A complete system is packed in two boxes post box and house box. House box contains hardware for both post
More informationDowntown Rack. Custom logo option available
Custom logo option available Downtown Rack The Downtown Rack uses thick, square-tube construction that can t be cut with a pipe cutter. The extended width of the Downtown Rack makes for easy bike parking
More informationTHANK YOU FOR PURCHASING FROM HERITAGE PATIOS
Installation Guide THANK YOU FOR PURCHASING FROM HERITAGE PATIOS Your purchase is engineered by nearly a half century of commercial and residential product design proudly manufactured in the USA from responsibly
More informationInstallation Instructions
Supafold Slide Aside System Three Fold Room Divider Installation Instructions Distinctive Doors Ltd Supafold Slide Aside Internal Folding System IMPORTANT: Before proceeding with the installation, and
More informationFord Pick Up Rear leaf Spring Kit Installation Instructions
1948-1956 Ford Pick Up Rear leaf Spring Kit Installation Instructions 1-800-984-6259 www.totalcostinvolved.com Parts 48 inch leaf (2) springs (4) U-bolts 3/8-24 x l 1/4bolts (16) & nuts (2) 1/2-20 x 4
More informationBIFOLD FUTON FRAME TRINITY ARM. Seat Rails and Slats x 1. *Note: Use 4pc of 100mm Bolts and 4pc of 60mm Bolts to attach the arms to the Stretchers.
1A Parts in this box. 2pc with extra holes 2pc with extra holes & plastic stoppers Arms x 2 Back Rails and Slats x 1 Full Size: Slat Supports x 6 3pc are longer for the Back deck Back Side Rails x 2 Seat
More informationLCD LIFT Flat Panel Display System Installation Manual. Table of Contents
LCD LIFT Flat Panel Display System Installation Manual Table of Contents Page Installation Overview... 2 Trim Ring Installation... 3 LCD Lift Installation....4 Actuator Switch Installation.5 Top Plate
More informationASSEMBLY INSTRUCTIONS
GARDEN SHED 6X5ft B/C 9400988362649 GARDEN SHED 6X7ft B/C 9400988362656 GARDEN SHED 6X9ft B/C 9400988362663 GARDEN SHED 6X1 B/C 9400988362670 111 ft ASSEMBLY INSTRUCTIONS Product specifications may change
More informationAssembly Instructions
18' W x 10' H or 12' H Peak Style Frame Assembly Assembly Instructions Before you start: 2+ individuals recommended for assembly, approximate time 3 hours. Recommended tools: Power Drill, Safety Glasses,
More informationSwerve Rack CUSTOM RACKS AVAILABLE
CUSTOM RACKS AVAILABLE Swerve Rack The design of the Swerve mirrors the bike frame, thus providing superior bike support while making it easy to secure both the bike frame and wheel with a standard u-lock.
More informationSpring Loaded SCREEN-PRO. All Season Roll-Up Doors IN-JAMB MOUNTING METHOD INSTALLATION INSTRUCTIONS READ THIS FIRST
Spring Loaded SCREEN-PRO All Season Roll-Up Doors IN-JAMB MOUNTING METHOD INSTALLATION INSTRUCTIONS READ THIS FIRST Carefully examine the crate(s) for damage before opening. If the carton is damaged, immediately
More informationTOOLS REQUIRED FOR ASSEMBLY. Rubber Mallet or Plastic Tip Hammer PARTS REQUIRED FOR ASSEMBLY OF SINGLE ENTRY STARTER.
TOOLS REQUIRED FOR ASSEMBLY Rubber Mallet or Plastic Tip Hammer Top Cover Support PARTS REQUIRED FOR ASSEMBLY OF SINGLE ENTRY STARTER Back Stop Divider Closed 'L' Upright Slotted Reinforcement Support
More informationCode Product Qty 1 Top Vertex 3 2 Hot End Housing 1 3 Bottom Vertex 3 4 Print Platform Lock 3 5 End Stop Holder 3 6 Filament Feeder Motor Bracket 1 7
List of Parts Code Product Qty 1 680mm Extrusion 3 2 Power Supply 1 3 240mm Extrusion 9 4 42mm Nema 17 Stepper Motor 3 5 Slider-Hotend Connecting Rod 6 6 48mm Nema 17 Stepper Motor 1 7 Linear Rail with
More informationGreenhouse Assembly Instructions
Greenhouse Assembly Instructions Our Help Line provides support and advice to customers of Summer Garden Buildings after ordering. For advice before you buy you can phone us free 7 days a week on 0800
More informationW6 series greenhouse
W series greenhouse ssembly instructions Model W0 Model W07 Model W0 Model W Model W Walk-in Greenhouse Statement Dear Customer! May we congratulate you on your new Greenhouse. We feel sure that by following
More information3.2.3 Rear Door Window and Quarter Window Carrier Assembly
Tighten all bolts. Tighten bolts marked -1- and -2- in specified sequence. Tightening torque: 8 Nm Remaining bolts can be tightened in any sequence. Insert door window -3- through window recess without
More informationNEW. Perfect Fit Roller Blind System Measuring, assembly & fitting instructions
NEW Perfect Fit Roller Blind System Measuring, assembly & fitting instructions Perfect Fit Roller Blind System Measuring, assembly & fitting instructions Clearance & seals Seal Check clearance around the
More informationHubble GOTO Installation Instruction (1.3, 04/30/2014)
Hubble GOTO Installation Instruction (1.3, 04/30/2014) 1. Preparation... 1 1.1 Tools required... 1 1.2 AZ GOTO Drive Parts List...1 1.3 ALT GOTO Drive Parts List... 1 2. The Azimuth motor drive installation...2
More informationSectional Door Installation Instructions
Sectional Door Installation Instructions 1. Check opening height and door size. a. 25-30mm overlap on each side and >10mm at top. b. At least 150mm side room required 2. Check headroom clearance, standard
More informationInstallation Instructions - Model V4JSD 1
Installation Instructions - Model V4JSD 1 Support Assemblies: Parts list: (Note see enclosed cut sheet for quantities and dimensional information) A vertical structural member (1 ½ x 1 ½ modular frame)
More informationCURVED ROOF ASSEMBLY INSTRUCTIONS ATTACHED VERANDAH. Your supplementary guide to building an ATTACHED CURVED ROOF VERANDAH or PATIO BEFORE YOU START
ROOF ATTACHED VERANDAH ASSEMBLY INSTRUCTIONS Your supplementary guide to building an ATTACHED ROOF VERANDAH or PATIO This set of instructions should be used in conjunction with the Stratco instruction
More informationCRP700 Benchtop Basic CNC Machine Assembly Instructions. Updated 9/11/2014 SHEET 1 of 25
CRP700 Benchtop Basic CNC Machine Assembly Instructions Updated 9//0 SHEET of NOTE: This piece of extrusion is mounted wide side up Quick Tip: Lay extrusion on table as shown for easy assembly BASE ASSEMBLY:.
More informationRoll In W/L Dock PAGE 1
Roll In W/L Dock PAGE 1 1 2 3/8 X 1 CARRIAGE BOLT SS 3/8 FLANGE NUT BRASS 3 4 1/2-13 X 1.25 SQ BOLT SS 1/2 SQ NUT BRASS 5 3/8-16 X 2.5" BOLT SS PAGE 2 6 7 BRACE BRKT SINGLE AXLE TUBE 8 9 3" AXLE WASHER
More informationThe Phoenix. Professional Quilting Frame. Copyright January 1, 2016 Jim M. Bagley, GraceWood, Inc (Reproduction Prohibited) Version 2.
The Phoenix Professional Quilting Frame Copyright January 1, 2016 Jim M. Bagley, GraceWood, Inc (Reproduction Prohibited) Version 2.1 1 The Phoenix Professional Quilting Frame Parts List Box 1...3 Box
More informationEDGE2 DUAL MONITOR ARM
EDGE2 DUAL MONITOR ARM EDGE2 Rev A 2/17 Model EDGE2-SLV Model EDGE2-BLK Model EDGE2-WHT ASSEMBLY AND ADJUSTMENT EDGE2 DUAL MONITOR ARM PARTS AND TOOLS PLEASE REVIEW these instructions before beginning
More informationInstall Instructions. NewAge Steel Welded Tall Locker
Kit Contains Full Width Adjustable Steel Shelves (4) Height-Adjustable Steel Leveling Legs (4) Aluminum Door Trim (2) 2.5 x ¼ Cabinet Mounting Lag Bolts (4) Large Zinc Plated Mounting Washers (4) 5/8 x
More informationParts list continues on Page 2 HOUSE PARTS PACKED IN HOUSE BOX PARTS IN SMALL PLASTIC BAG (HARDWARE) POST PARTS PACKED IN THIS BOX (LARGE PLASTIC BAG)
Form 05-07 Instructions and Parts List MSS- Martin Safety System NOTES: () A complete system is packed in two boxes post box and house box. House box contains hardware for both post and house assembly.
More informationThis manual will aid in the assembly of the FireBall V90 and FireBall X90. The assembly of both machines will be identical, unless specified.
This manual will aid in the assembly of the FireBall V90 and FireBall X90. The assembly of both machines will be identical, unless specified. Step #1 Lay all parts out to verify quantities. (2) 2 x 25-1/4
More informationLange Crank Hoist-a-top Assembly Instructions
Lange Crank Hoist-a-top Assembly Instructions Installation Time: 1-4 Hours depending on skill level Tools Required: Cordless Drill Level Stud Finder Ratcheting wrench 9/16 socket or wrench 11/16 socket
More informationAssembly Instructions 10 X 10 Aluminum Frame Building
Assembly Instructions 10 X 10 Aluminum Frame Building 27 97 9 8 47 36 74 52 10 10 X 10 Square Building W/ Dome Includes: The Steel Entry Door with a Dead Bolt Lock assembly and Aluminum Door Frame. Metal
More informationOWNERS MANUAL MODEL F660 HIP SLED
OWNERS MANUAL MODEL F HIP SLED QUESTION? As a quality home gym supplier we are committed to your complete satisfaction. If you have questions, or find missing or damaged parts, we will guarantee your complete
More informationBY ALIEN TECHNOLOGIES CORP
BY ALIEN TECHNOLOGIES CORP Assembly Instructions TopLift Pros YOU MAY ALSO REVIEW OUR ASSEMBLY VIDEO, PLAY AND PAUSE AT YOUR CONVENIENCE. JUST VISIT US AT WWW.TOPLIFTPROS.COM AND GO TO Customer Support
More informationASSEMBLY AND ADJUSTMENT
EDGE MONITOR ARM EDGE Rev A 2/17 Model EDGE-SLV Model EDGE-BLK Model EDGE-WHT ASSEMBLY AND ADJUSTMENT EDGE MONITOR ARM PARTS AND TOOLS PLEASE REVIEW these instructions before beginning the assembly and
More informationS H E D A S S E M B L Y I N S T R U C T I O N S
T I T A N R A N G E S H E D A S S E M B L Y I N S T R U C T I O N S 8 X 10 ft Approx = 2550 x 3140 cm COMPONENT LIST Component illustrations are given as a visual guide only and are not in proportion PART
More informationKossel Rev B Build Guide V1.0
Kossel Rev B Build Guide V1.0 1 Table of Contents: Step 1: BASE ASSEMBLY Gathering parts: Building the Corners and Base: Step 2: UPPER ASSEMBLY Building Upper: Step 3: VERTICAL RAIL INSTALLATION Building
More informationInstallation Instructions for Vista Air Vertically Folding Walls
Installation Instructions for Vista Air Vertically Folding Walls Use these instructions in conjunction with your shop drawings to see the specifics that are particular to the model you are installing.
More informationTERRACE / TERRACE CONCEPT Retractable Classic Roof / Double Rail System Step by Step Assembly Instructions
TERRACE / TERRACE CONCEPT Retractable Classic Roof / Double Rail System Step by Step Assembly Instructions Before You Begin These installation instructions will lead you through the process of installing
More informationInstallation manual. Roller door RV55 - RV77
Installation manual Roller door RV55 - RV77 Installation manual Roller door Content Package 1 1. Armor 2. Cap with axle 3. Guides 4. Suspension springs 5. Covers 6. Control a. Electrical: switch + plug
More informationBARLOW TYRIE quality since Ref: x 3m - 12 x 10 Pavilion with Cabrio Folding Roof Step by Step Assembly Instructions
Pavilions 3.66 x 4.5m - Step 12 x by 15 Step Pavilion Assembly Shelter Instructions with Double Rail Beams Ref: 9011215 3.66 x 3m - 12 x 10 Pavilion with Cabrio Folding Roof Step by Step Assembly Instructions
More informationClamping devices 521
Clamping devices 521 522 Product overview Clamping devices Adjustable straps K0001 Hook clamps K0012 Goose-neck straps with long slot K0002 Page 526 Hook Clamps with collar K0013 Page 535 Equipped clamps
More informationThanks for shopping with Improvements! 8 ft. Retractable Window Awning Item # (Fits windows/doors from 73 to 96 wide)
Thanks for shopping with Improvements! 8 ft. Retractable Window Awning Item #511412 (Fits windows/doors from 73 to 96 wide) Note: Read these instructions carefully before assembling. Find a clean, smooth
More information