INSTALLATION INSTRUCTIONS

Size: px
Start display at page:

Download "INSTALLATION INSTRUCTIONS"

Transcription

1 Tools required for the installation. A. Core Drill 87mm Drill bit B. Tape measure C. Spirit Level D. Marking pen E. Caulking gun F. Cutting Pliers G. Cordless Drill and Philips head bit, 5mm Drill bit. H. Aluminium cutting Drop saw. I. Dust pan and brush J. Soft faced mallet. K. Timber wedges and blocks for supports. L. Quick Grip clamps. Assembly of the balustrades in the factory 1. Cut the posts to length and pair the posts so you end up with a left and right hand post. 2. Label the inside of the post clearly with the Words ( Left Hand Bay 1 and Right Hand Bay 1 ). This will ensure that the bays are going to clip together on site. All bays are labelled as if you were standing outside looking in. 3. Mark out the position of the bottom rail on all of the posts. Use a jig with pre drilled holes to ensure a perfect placement. Drill the holes using a 5mm Drill bit. Please Note: It is important to remember that the bottom of the horizontal rail should not exceed 100mm from the finished floor level to the underside of the lowest point of the horizontal rail. 4. Determine what the length of each bay is and cut the lower horizontal rail to length 5. Minus the width of the glass insert from the lower rail length. 6. Mark out the position of the glass. 7. Line up the lower rail with the pre drill holes and using a 6G x 25 Pan head screw fix the rail to the posts. 8. Screw the under cap to the top of the post. Onsite Installation. 9. Identify the balustrade bays and lay them on the floor on top of timber studs to keep them off the ground. 10. Start at one end of the bay and snap the posts together using a quick grip clamp. 11. Snap on the top hand rail over the glazed under cap. 12. Slide the base covers over the post legs and tape to the lower rail. 13. Lift the balustrade bays up evenly and insert into the clean Core Drill holes. 14. By using a timber block and wedge under the lower rail, level the balustrade horizontally. 15. Two critical measurements must be set, The 1050 from the highest point to the finished floor level reference mark and the 100mm from the floor to the under side of the lower rail.

2 15. Two critical measurements must be set, The 1050 from the highest point to the finished floor level reference mark and the 100mm from the floor to the under side of the lower rail. 16. Use two string lines to align all of the post legs and the tops. 17. Start at one end and insert the timber wedges in and around the legs on the first balustrade post leg. 18. Work your way along the balustrade until the system is level horizontally and vertically. 19. Mix enough grout to fill a few holes at a time 20. Carefully pour in enough grout mixture to half fill the hole. 21. Allow the grout to set for at least 1 2 hours and remove the timber wedges. 22. Continue filling the holes with enough grout to fill the hole just under the finished floor level. 23. Install the Top caps into the balustrade posts. 24. Remove all remaining timber blocks from the lower rails. 25. Install two glass setting blocks per panel where the glass will seat. 26. Insert the glass into the under cap and line the bottom of the glass up with the lower pocket. 27. Centre the glass on the rail and push in the rubber wedge or wet glaze as required. 28. Cut the infill pieces to length. You will need 1 for the under cap and one for the lower rail. 29. Install that infill s either side of the glass and be sure to leave a minimum of a 1mm gap. 30. Repeat the process for both rails. 31. Remove the timber support blocks from the rails. Alternative fixing methods the Solaris Balustrades Direct fixing Concrete base. By using the direct fixing feet supplied by Solaris, fabricators and installers are able to direct fix the posts to a solid concrete base. The Die cast Foot plates are custom made for this role. The foot plates are fitted to the base of Posts and screwed in place with 4-6G x 25mm Stainless Steel CSK screws. Once the foot place is fitted it s then bolted to the concrete base with 4 - M10 Chemical Anchors. IMPORTANT NOTE TO INSTALLERS. Use a spare foot plate to assist you marking the holes out onto the concrete base. At no point should the holes be drilled through the foot plate. Clearly mark out all holes with a blank Foot plate and remove when drilling. Direct fixing Steel or timber By using the direct fixing feet supplied by Solaris, fabricators and installers are able to direct fix the posts to a solid and stable steel or timber base. The Die cast Foot plates are custom made for this role. The foot plates are fitted to the base of Posts and screwed in place with 4 6G x 25mm Stainless Steel CSK screws. Once the foot place is fitted its then bolted to the concrete base with 4 - M10 Chemical Anchors.

3 Concrete Direct concreted posts The posts being inserted directly into the concrete footing must be treated with the use of a rubber based bitumen paint or barrier medium to stop the direct contact of concrete on bare aluminium. All cut surfaces must be treated prior to being inserted. Failure to treat the aluminium can cause corrosion and affect the painted surface of the posts. The post must be embedded as per the fixing details provided. The local shire requirements and standard BCA regulations over write Solaris Balustrade s recommendations where needed and must and must be complied too at all times. Consult your engineer for further rulings and advice on local footing requirements. Core Drill Installing the Posts into Core Drill. 1. Clearly mark out the post centres onto the slab. 2. Core Drill each of the holes a minimum depth of 100mm. 3. Remove the core plug and clean out the remaining dust. 4. Insert all of the aluminium posts into the holes. 5. Start at the end of balustrade run first. With the use of 4 timber wedges centre and level the posts by forcing the timber wedges into the core hole against the post. Once you have established post and stabilised it move back to the last post on the other side of the balustrade run. 6. With the use of 4 timber wedges centre and level the posts by forcing the timber wedges into the core hole against the post. Level and centre the post into final position. 7. Run two separate string lines from the first post to the last post. One at the top and another 100 mm from the bottom of the post off the slab. These stringlines will act as a marker and aid in the placing of the remaining posts. 8. Starting at one end and working back towards the last post also ensures that the glass panels remain the same size. 9. Once all of the posts have been placed, prepare enough grout to fill a couple of holes at a time. 10. Filling the core holes with grout as follows a. Fill half of the core drilled hole only, ensuring that the grout mix runs freely into all of the spaces around the post. a. Continue half filling all of the remaining post holes. b. Allow the grout mix to harden at least for 1 hour after pouring. c. Remove the timber wedges from the core holes. If wedges cannot be removed it can be left in the core hole and trimmed level with the top of the hole after filling. d. Remove the remaining timber wedges. e. Continue filling the remaining core holes with the grout mix no further than the finished floor level. f. Remove the string lines and measure for the glass if not having already done this. Please refer to the glass formula sheet in Section C for deductions and size charts.

4 Installing the glass panels into a Solaris Balustrade system. There are two methods of installing glass. Glazed in front or glazed from on top. Method 1. Glass panels inserted from the front. 1. The Spigots are inserted into the top of the post and screwed into place from either side of the underside of the caps shoulder using the 6G x 12mm CSK self-tapping screw. Failure to use the correct screw will result in glass breakages. 2. Place the selected handrail onto the spigots and centre the handrail so it seats onto the spigot shoulder. Ensure all end caps and joiners are in place prior to final screwing off the handrail from underneath through the 8 holes in the spigot body. End caps are squeezed in with a small bead of clear silicone behind the head as a means of sealing off any opening where water may find its way in. A 6G x 12mm CSK self-tapping screw can be used from underneath to lock the end cap in place. IMPORTANT NOTE TO INSTALLERS. All joins in handrails must be made directly above the spigot by using the correct joiner available in the components list. This is inserted and silicone into the hand rail opening. The handrails are the screwed in place from underneath by using 8-6G x 25 CSK Stainless Steel self-tapping screws. 3. Continue by inserting the glass panel into the Left hand side post. Line up the right hand side with the opening in the opposite post. The glass should clear the post by 3mm if cut correctly. 4. The glass panel is then centred and rested on two timber blocks laid on the floor. 5. Slowly lift the glass panel evenly up until it touches the underside of the post spigot. 6. Support the glass in this position by holding it in place or by the use of timber blocks. 7. Push in the rubber PVC wedge on either side of the glass into the gap. ( Wet glaze if required ) 8. Trim the rubber to length no longer than the glass bottom edge. 9. Measure and cut the infill pieces to fit below the glass. ( Gap from glass to floor 6mm ) 10. Insert the Resilient Nylon Glass saddle. 11. Insert the saddle and infill piece into the post pocket and tap into place with a soft faced mallet. The infill is inserted with the nylon saddle in the end under the glass. 12. Remove the timber blocks supporting the glass. Method 2. Glass panels inserted from the top prior to installing the handrails. This method can be used if there has been an issue with the panels being cut large, lack of glazing space, or difficultly inserting the glass into the post or the glazing posts have not been correctly installed. 1. Measure and cut the infill pieces to fit below the glass. ( Gap from glass to floor 6mm ) 2. Insert the Resilient Nylon Glass saddle. 3. Insert the saddle and infill piece into the post pocket and tap into place with a soft faced mallet.

5 4. Place timber support blocks (75 x 35) on the floor next to each post. 5. Slide the glass in slowly from above the posts. Insert and slowly lower the glass panel until it rests on the timber blocks and centre the glass. 6. Support the glass in this position by holding it in place or by the use of timber blocks. 7. Push in the rubber PVC wedge on either side of the glass into the gap. (Wet glaze if required, glass should remain supported for 24 hours at least) 8. Trim the rubber to length no longer than the glass bottom edge. 9. Measure and cut the infill pieces to fit above the glass. (Gap from glass to underside of cap 6mm) 10. Insert the Resilient Nylon Glass saddle. 11. Insert the saddle and infill piece into the post pocket and tap into place with a soft faced mallet. 12. The Spigots are inserted into the top of the post and screwed into place from either side of the underside of the caps shoulder using the 6G x 12mm CSK self-tapping screw. Failure to use the correct screw will result in glass breakages. 13. Place the selected handrail onto the spigots and centre the handrail so it seats onto the spigot shoulder. Ensure all end caps and joiners are in place prior to final screwing off the handrail from underneath through the 8 holes in the spigot body. End caps are squeezed in with a small bead of clear silicone behind the head as a means of sealing off any opening where water may find its way in. A 6G x 12mm CSK self-tapping screw can be used from underneath to lock the cap in place. IMPORTANT NOTE TO INSTALLERS. All joins should be made directly above the spigot by using the correct joiner. This is inserted and silicone into the hand rail opening. The handrails are the screwed in place from underneath by using 8-6G x 25 CSK Stainless Steel self-tapping screws. 14. Removed the timber blocks supporting the glass. Direct fixing Concrete base. By using the direct fixing base plates supplied by Solaris, fabricators and installers are able to direct fix the posts to a solid concrete base. The Die cast Base Plates are custom made for this role. The foot plates are fitted to the base of Posts and screwed in place with 4 x 6G x 25mm Stainless Steel CSK screws from underneath the base plate. Once the foot place is fitted it s then bolted to the concrete base with 4 x M10 Chemical Anchors. IMPORTANT NOTE FOR INSTALLERS. Use a spare base plate to assist you marking the holes out onto the concrete base. At no point should the holes be drilled through the base plate being installed. Clearly mark out all holes with a blank base plate and remove when drilling. Once the holes are drilled out, clean thoroughly and install the assemblies.

6 Direct fixing Steel or timber base. By using the direct fixing base plates supplied by Solaris, fabricators and installers are able to direct fix the posts to a solid steel or timber base. The Die cast Base Plates are custom made for this role. The base plates are fitted to the base of Posts and screwed in place with 4-6G x 25mm Stainless Steel CSK screws from underneath the base plate. Once the base plate is fitted it s then bolted to the base structure using the listed bolts. IMPORTANT NOTE FOR INSTALLERS. Use a spare base plate to assist you marking the holes out onto the concrete base. At no point should the holes be drilled through the base plate being installed. Clearly mark out all holes with a blank base plate and remove when drilling. Once the holes are drilled out, clean thoroughly and install the assemblies. Concrete Fixing instruction The posts being inserted directly into the concrete footing must be treated with the use of a rubber based bitumen paint or barrier medium to stop the direct contact of concrete on bare aluminium. All cut surfaces must be treated prior to being inserted. Failure to treat the aluminium can cause corrosion and affect the painted surface of the posts. The post must be embedded as per the fixing details provided. The local shire requirements and standard BCA regulations over write Solaris Balustrade s recommendations where needed and must and must be complied too at all times.

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS Tools required for the installation. A. Core Drill 87mm Drill bit B. Tape measure C. Spirit Level D. Marking pen E. Caulking gun F. Cutting Pliers G. Cordless Drill and Philips head bit, 5mm Drill bit.

More information

Installation Guide Simplicity Alfresco. V1.9 Lu070318

Installation Guide Simplicity Alfresco. V1.9 Lu070318 0333 305 5272 www.canoports.co.uk Installation Guide Simplicity Alfresco V1.9 Lu070318 Tools Required Below is a list of tools that you will require to install your the Simplicity Alfresco System. Cordless

More information

Installation Guide Contemporary Alfresco V1.3 LU

Installation Guide Contemporary Alfresco V1.3 LU Installation Guide Contemporary Alfresco V1.3 LU 010818 Tools Required Below is a list of tools that you will require to install you're the Contemporary Alfresco System. Cordless Drill Mastic Gun Spirit

More information

4-lite Patio Door. Installation Instructions

4-lite Patio Door. Installation Instructions 4-lite Patio Door Installation Instructions IMPORTANT: Read the instructions and familiarize yourself with the door parts and pieces before beginning assembly and installation. Note: Only the 5-0 x 6-8

More information

DIY GLASS BALUSTRADE AND POOL FENCING THE CHOICE IS SIMPLE

DIY GLASS BALUSTRADE AND POOL FENCING THE CHOICE IS SIMPLE DIY GLASS BALUSTRADE AND POOL FENCING THE CHOICE IS SIMPLE SAFE STYLISH AND AFFORDABLE FOR DIY GLASS FENCE SOLUTIONS THE CHOICE IS SIMPLE Bring your outdoor areas to life with clear views and clean lines.

More information

Method of Build 1. General

Method of Build 1. General Method of Build 1 General GLAZED ELEVATIONS Viso Double Glazed in glazed form differs from many other systems as the vertical joints can have Viso dry joints or the unique HIDDEN mullion post between glazed

More information

3-LITE PATIO DOOR INSTALLATION INSTRUCTIONS

3-LITE PATIO DOOR INSTALLATION INSTRUCTIONS 3-LITE PATIO DOOR INSTALLATION INSTRUCTIONS IMPORTANT: Read the instructions and familiarize yourself with the door parts and pieces before beginning assembly and installation. TOOLS NEEDED: Tape Measure

More information

37.5 M6. If the basin chain hole is not used, please cover it with the screw and nut supplied.

37.5 M6. If the basin chain hole is not used, please cover it with the screw and nut supplied. BASIN WASTE FLIP TOP SLOTTED CHROME 20003000018 WASTE SHELL SILICONE WASHER BASIN When fitting the waste, ensure the slotted side faces the overflow channel. SILICONE WASHER * FIXING NUT (OPTION 1) 37.5

More information

Installation Guide Simplicity 16. V2.9 Lu171117

Installation Guide Simplicity 16. V2.9 Lu171117 0845 869 6006 www.canoports.co.uk Installation Guide Simplicity 16 V2.9 Lu171117 Tools Required Below is a list of tools that you will require to install the Simplicity 16 Canopy or Carport. Cordless Drill

More information

AFCO-Rail Post INSTALLATION INSTRUCTIONS AFCO-RAIL POST

AFCO-Rail Post INSTALLATION INSTRUCTIONS AFCO-RAIL POST AFCO-Rail Post INSTALLATION INSTRUCTIONS TOOLS REQUIRED: Drill Bits (for the appropriate fastener) Drill (with adjustable clutch, recommended) Level String Line Tape Measure Tools to install fasteners

More information

SLIDING DOOR for CORNER installation ONLY - this door closes to side panel -

SLIDING DOOR for CORNER installation ONLY - this door closes to side panel - by KUDOS INSTALLATION INSTRUCTIONS SLIDING DOOR for CORNER installation ONLY - this door closes to side panel - Please read these instructions throughout before installing as incorrect fitting will invalidate

More information

Tools you will need for this install

Tools you will need for this install Arizona Corporate Office 2801 W. Indian School Rd Phoenix, AZ 85017 800-255-1901 PH 602-447-8208 FAX Florida 8100-1 Westside Industrial Dr Jacksonville, FL 32219 855-695-8899 PH 904-786-9025 FAX Illinois

More information

ALLORA SWING PANEL INSTALLATION INSTRUCTIONS

ALLORA SWING PANEL INSTALLATION INSTRUCTIONS ALLORA SWING PANEL INSTALLATION INSTRUCTIONS Before Installation Please check that your Allora Swing Panel is undamaged SEQUENCE OF INSTALLATION These instructions are also available from the Athena website:

More information

Installation Guide Simplicity 6. v3.5 lu171117

Installation Guide Simplicity 6. v3.5 lu171117 0845 869 6006 www.canoports.co.uk Installation Guide Simplicity 6 v3.5 lu171117 Tools Required Below is a list of tools that you will require to install the Simplicity 6 Canopy or Carport. Cordless Drill

More information

Curium 19H Installation Instructions & Parts List

Curium 19H Installation Instructions & Parts List Curium 19H Installation Instructions & Parts List Illustration Curium 19H Right Hand Page 1 of 15 01/07/2016 Revision 2.1 IMPORTANT This shower screen / enclosure must be installed by suitably qualified

More information

PORCH-LOC INSTALLATION INSTRUCTIONS

PORCH-LOC INSTALLATION INSTRUCTIONS PORCH-LOC INSTALLATION INSTRUCTIONS 2017 HB&G Building Products, Inc. Porch-Loc Installation Instructions NOTE: DISCARD THE INSTALLATION INSTRUCTIONS AND HARDWARE THAT CAME IN YOUR PERMAPOST PACKAGING

More information

Dura-Lock Roof System

Dura-Lock Roof System DLR-14 Dura-Lock Roof System Assembly and Installation Instructions Read the instructions before starting the job. They explain the steps required to produce a finished product that will meet factory specifications.

More information

Quick Fit Installation Guide Retractable Screen - Double Door

Quick Fit Installation Guide Retractable Screen - Double Door Quick Fit Installation Guide Retractable Screen - Double Door 1 REMOVE KIT PARTS FROM SHIPPING TUBE 2 Slide bolts 2 Rail receiver Clips 15 Mounting screws 1 Housing end cap screw 2 Handles 1 Housing end

More information

Installation Guide. Step-by-Step Guide

Installation Guide. Step-by-Step Guide Installation Guide Step-by-Step Guide Thank you for choosing one of our quality products. We are the industry leaders in designer panel fencing. This product will provide you with years of trouble free

More information

Cardo DOOR & RETURN SHOWER ENCLOSURE INSTALLATION PLEASE READ THESE INSTRUCTIONS CAREFULLY.

Cardo DOOR & RETURN SHOWER ENCLOSURE INSTALLATION PLEASE READ THESE INSTRUCTIONS CAREFULLY. Cardo DOOR & RETURN SHOWER ENCLOSURE INSTALLATION PLEASE READ THESE INSTRUCTIONS CAREFULLY. IT IS RECOMMENDED TO USE A TRAINED SHOWER INSTALLER FOR THIS SHOWER TO OBTAIN THE BEST INSTALLATION. D Square

More information

a.k.a. casegoods instructions

a.k.a. casegoods instructions a.k.a. casegoods instructions a a.k.a. workwall installation IMPORTANT NOTES Failure to install product according to installation instruction will result in loss of warranty. Tools required for assembly

More information

Installation - Sub Cills

Installation - Sub Cills Installation - Sub Cills Fitting of Subcill Drainage paths through the sub-cill can be seen on the illustration alongside so care must be taken to ensure they are not obstructed and that screw fixings

More information

I n s t a l l a t i o n I n s t r u c t i o n s S E N T I N E L S E R I E S 1 50 SLIDING GLASS DOORS

I n s t a l l a t i o n I n s t r u c t i o n s S E N T I N E L S E R I E S 1 50 SLIDING GLASS DOORS I n s t a l l a t i o n I n s t r u c t i o n s S E N T I N E L S E R I E S 1 50 SLIDING GLASS DOORS Page 2-9: Installation Instructions, Figures 1, 2, & 3 Page 10-12: Figures A-1, A-2, & A-3: Installation

More information

Step-by-Step Installation Instructions for

Step-by-Step Installation Instructions for Step-by-Step Installation Instructions for Customer helpline number: 01604 633607 8892_Step_By_Step_900_Quad_V5.indd 1 1/9/10 18:01:22 Before Starting: Please read and understand these instructions. Not

More information

Gallium 03 Installation Instructions & Parts List

Gallium 03 Installation Instructions & Parts List Gallium 03 Installation Instructions & Parts List Illustration Gallium 03, H1 Handle Left Hand: Open Out 04/05/2016 Revision 1.1 Page 1 of 19 IMPORTANT This shower screen / enclosure must be installed

More information

Method of Build 1. Fire. Sound

Method of Build 1. Fire. Sound Method of Build 1 General Viso Fire & Acoustic in the solid form differs from most other systems as it can be erected using 12.5mm & 15.0mm boards within the same Aluminium framework. Also hidden fix board

More information

INSTALLATION GUIDE. Flat Roof Homesheds TM. Onto Concrete BEFORE YOU START TOOLS REQUIRED

INSTALLATION GUIDE. Flat Roof Homesheds TM. Onto Concrete BEFORE YOU START TOOLS REQUIRED INSTALLATION GUIDE Flat Roof Homesheds TM Onto Concrete BEFORE YOU START It is important to check your Local Government Authority requirements before the installation of your new Stratco Flat Roof Homeshed.

More information

Step-by-Step Installation Instructions for

Step-by-Step Installation Instructions for Step-by-Step Installation Instructions for Version 5-06/11 Before Starting: Please read and understand these instructions. Not following these instructions will invalidate your warranty (although this

More information

Curium 19.4H Installation Instructions & Parts List

Curium 19.4H Installation Instructions & Parts List Curium 19.4H Installation Instructions & Parts List Illustration Curium 19.4H Right Hand Page 1 of 21 30/06/2016 Revision 1.0 IMPORTANT This shower screen / enclosure must be installed by suitably qualified

More information

ALL SEASON PATIO COVER

ALL SEASON PATIO COVER ALL SEASON PATIO COVER 61 Where the All Season Patio Cover is to be attached to the home, create a level line showing where the top of the mounting rail is to be located. Install each section with the

More information

GROWING BETTER THROUGH DESIGN. 6ft Lean-To LEAN-TO. Assembly Instructions 04/02

GROWING BETTER THROUGH DESIGN. 6ft Lean-To LEAN-TO. Assembly Instructions 04/02 GROWING BETTER THROUGH DESIGN 6ft Lean-To LEAN-TO Assembly Instructions 04/02 6ft Lean-To Greenhouse Base Plan Introduction/Tools/Contents / / Contents This is a copy of our Lean-To greenhouse base plan.

More information

W L. Standard Sizes: 2.125m underside of gutters m total height m roof m roof m roof.

W L. Standard Sizes: 2.125m underside of gutters m total height m roof m roof m roof. H Standard Sizes: H 2.125m underside of gutters. 2.280m total height. L L 5.450m roof. 6.050m roof. 7.250m roof. W W 3.000m roof/2.640m between posts. 3.600m roof/3.240m between posts. 5.400m roof/5.040m

More information

Oxford Stalls Installation Instructions

Oxford Stalls Installation Instructions Oxford Stalls Installation Instructions RAMM Horse Fencing and Stalls 13150 Airport Hwy. Swanton, OH 43558-9615 1-800-434-8456 Rev. 8/15/17 Before You Start Typical stall sizes are 10 x 10, 12 x 12 or

More information

INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5233

INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5233 INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5233 QCI5233 Rev 0 Page 1 Certified 06/20/2016 INSTALLATION NOTES: Unpack your unit carefully and inspect for freight damage. Lay

More information

Pergola Installation Instructions

Pergola Installation Instructions Pergola Installation Instructions TOOLS REQUIRED HAMMER DRILL 1/2 MASONRY BIT PENCIL DRILL 3/16 DRILL BIT LEVEL SQUARE LADDER WRATCHET & SOCKETS RUBBER MALLET 2 TAPE MEASURE Column/Post Placement Table

More information

The following instructions will guide you through the installation of your new vinyl railing.

The following instructions will guide you through the installation of your new vinyl railing. Installation Guide St. James Vinyl T-Rail Tools Required Protective eye glasses 3/8 x 3 Concrete Anchors/Fasteners (for Tape measure concrete installations) Variable speed drill/screwdriver Philips Driver

More information

Sliding Glass Door Assembly and Installation Guide

Sliding Glass Door Assembly and Installation Guide Sliding Glass Door Assembly and Installation Guide Index Door System Components and Hardware The following components are needed to complete the installation of your Sliding Patio Door unit. Check all

More information

Allora ALCOVE ENCLOSURE INSTALLATION BEFORE INSTALLATION CHECK THAT YOUR ALLORA SHOWER ENCLOSURE SYSTEM IS UNDAMAGED

Allora ALCOVE ENCLOSURE INSTALLATION BEFORE INSTALLATION CHECK THAT YOUR ALLORA SHOWER ENCLOSURE SYSTEM IS UNDAMAGED Allora ALCOVE ENCLOSURE INSTALLATION BEFORE INSTALLATION CHECK THAT YOUR ALLORA SHOWER ENCLOSURE SYSTEM IS UNDAMAGED ALCOVE SHOWER Your shower can be installed to open Left hand or Right hand by rotating

More information

Frameless Glass Balustrade Systems

Frameless Glass Balustrade Systems Frameless Glass Balustrade Systems Frameless Glass Balustrade Systems i fg1 - systems Spigot Fixed Glass with Toprail OPTIONS B Toprail & Accessories A Glass Panel C Spigot Posts i fg2 - systems Spigot

More information

ENGINEERING STRENGTH INSTAL L AT I O N M A NUAL OUR STRENGTH IS OUR STRENGTH

ENGINEERING STRENGTH INSTAL L AT I O N M A NUAL OUR STRENGTH IS OUR STRENGTH ENGINEERING STRENGTH INSTAL L AT I O N M A NUAL OUR STRENGTH IS OUR STRENGTH RAFTER PREPERATION RAFTER PREPARATION A FRAME PREPERATION AND ASSEMBLY A FRAME PREPARATION AND ASSEMBLY... Open boxes, remove

More information

INSTALLATION GUIDE. 1. Overview. 2. Measuring. 3. Tools & fixings you will need B C. Opening Width. Opening Height

INSTALLATION GUIDE. 1. Overview. 2. Measuring. 3. Tools & fixings you will need B C. Opening Width. Opening Height INSTALLATION GUIDE Please take a few minutes to read through this guide before getting started. 1. Overview A Typical Sliding Wardrobe Door Layout A Frame - Top Liner (optional) B Top Track C Frame - Strike

More information

TREX TRANSCEND RAILING

TREX TRANSCEND RAILING RAILING NOTES:» RAILINGS ARE DESIGNED TO BE INSTALLED OVER THE DECKING FRAME OR ON INSIDE OF RIM JOIST. NOTCHING OF PRESSURE-TREATED POSTS OR POSTS INSTALLED ON OUTSIDE OF RIM JOIST IS NOT ALLOWED.» All

More information

Installation Instructions Models: SESD180, DESD180, MESD180 1/4" Semi-Frameless Door and 3/8" In-Line Panel

Installation Instructions Models: SESD180, DESD180, MESD180 1/4 Semi-Frameless Door and 3/8 In-Line Panel Models: SESD180, DESD180, MESD180 Scan this Barcode for Parts Bag BP.3143.NLT Thank you for purchasing this outstanding product! This booklet will help you install your units safely and successfully. IMPORTANT:

More information

Balustrade Systems / Installation Instructions

Balustrade Systems / Installation Instructions A. PARTS AND SUPPLIES NEEDED FOR INSTALLATION Hardware included for each 10 section of rail: 2 3 x 1-1/2 L-brackets 4 1-3/4 x 3/16 Blue hex-head screws for anchoring the L-brackets to the newel cap, column

More information

The following instructions will guide you through the installation of your new vinyl railing stair kit.

The following instructions will guide you through the installation of your new vinyl railing stair kit. Installation Guide Vinyl Standard Stair Railing Tools Required Protective eye glasses Tape measure Variable speed drill/screwdriver Rotary hammer or hammer drill and masonry percussion bit recommended

More information

Laminate Cabinet Installation Instructions

Laminate Cabinet Installation Instructions Laminate Cabinet Installation Instructions www.easygaragestorage.com/installation How To Use These Instructions Thank you for your purchase! Please read each step of this manual thoroughly to ensure proper

More information

INSTALLATION GUIDE. Outback. Flat Attached BEFORE YOU START ADDITIONAL MATERIALS TOOLS REQUIRED. VERAnDAHS PATIOS CARPORTS

INSTALLATION GUIDE. Outback. Flat Attached BEFORE YOU START ADDITIONAL MATERIALS TOOLS REQUIRED. VERAnDAHS PATIOS CARPORTS INSTALLATION GUIDE Outback VERAnDAHS PATIOS CARPORTS Flat Attached BEFORE YOU START It is important to check your Local Government Authority requirements before the installation of your new Stratco Outback

More information

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE Set A Set B P7001 Standard Kit FITTING INSTRUCTIONS For use with 44mm thick doors only For Single and Double doors IF INSTALLING A TOUCH LATCH, PLEASE READ THE CORRESPONDING FITTING INSTRUCTIONS FIRST

More information

Horizontal Cable Systems

Horizontal Cable Systems ALUMINUM RAILING INSTALLATION INSTRUCTIONS v2012 orizontal Cable Systems 1) Check Contents Of Packages: Verify that all parts have arrived and that they match the packing list. 1A) Coastal applications:

More information

IMPORTANT -- SPECIAL INSTALLATION INSTRUCTIONS

IMPORTANT -- SPECIAL INSTALLATION INSTRUCTIONS IMPORTANT -- SPECIAL INSTALLATION INSTRUCTIONS ** READ ALL INSTALLATION INSTRUCTIONS BEFORE STARTING!** If at any point, you have questions, call 1-800-851-0865...(The manufacturer will not be responsible

More information

ATLANTIS RAIL Contact Information

ATLANTIS RAIL Contact Information ATLANTIS RAIL Contact Information Customer Service (800) 541-6829 (508) 732-9191 Spectrum System Installation Instructions Atlantis Rail s Spectrum System is an easy to install, universal cable railing

More information

InStallatIon InStruCtIonS for vinyl 2-lIte PatIo door assembled

InStallatIon InStruCtIonS for vinyl 2-lIte PatIo door assembled InStallatIon InStruCtIonS for vinyl -lite PatIo door assembled tools & materials you Will need: Measuring Tape Pencil Shims Square Hammer or Mallet Level Drill & Drill bits: 6", 8", 5 6", 7 6" Utility

More information

Garage Door Frame Retro-Fit Clad Installation Instructions

Garage Door Frame Retro-Fit Clad Installation Instructions Garage Door Frame Retro-Fit Clad Installation Instructions Patent # US 7,111,433 B2, CA 2,415,545, Other Patents Pending Tools required Screw driver (screw gun), hammer, pry bar, tape measure, compound

More information

OUTBACK FLAT ATTACHED VERANDAH PATIO CARPORT - INSTALLATION GUIDE BEFORE YOU START TOOLS REQUIRED ADDITIONAL MATERIALS

OUTBACK FLAT ATTACHED VERANDAH PATIO CARPORT - INSTALLATION GUIDE BEFORE YOU START TOOLS REQUIRED ADDITIONAL MATERIALS BEFORE YOU START It is important to check your Local Government Authority requirements before the installation of your new Stratco Outback Flat Verandah. It is the builder s responsibility to ensure any

More information

INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5232

INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5232 INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5232 QCI5232 Rev 0 Page 1 Certified 06/20/2016 INSTALLATION NOTES: Unpack your unit carefully and inspect for freight damage. Lay

More information

Bumper Sign INSTALLATION INSTRUCTIONS

Bumper Sign INSTALLATION INSTRUCTIONS Bumper Sign INSTALLATION INSTRUCTIONS BUMPERSIGN TOOL CHECKLIST SDS MAX Rotary Hammer Drill Marker/Pencil SDS MAX 1 Carbide Drill Bit Tape Measure Torque Wrench with ½ Drive Power Source Vacuum ½ Drive

More information

Installation Guide Important:

Installation Guide Important: Installation Guide Important: Please Read carefully through this installation guide prior to starting the setting out of your new fence. Setting out the wall accurately and correctly will be the difference

More information

Installation Instructions

Installation Instructions Arizona Corporate Office 2801 W. Indian School Rd Phoenix, AZ 85017 800 255 1901 PH 602 447 8208 FAX Florida 8100 1 Westside Industrial Dr Jacksonville, FL 32219 855 695 8899 PH 904 786 9025 FAX Illinois

More information

IMPORTANT -- SPECIAL INSTALLATION INSTRUCTIONS

IMPORTANT -- SPECIAL INSTALLATION INSTRUCTIONS IMPORTANT -- SPECIAL INSTALLATION INSTRUCTIONS ** READ ALL INSTALLATION INSTRUCTIONS BEFORE STARTING!** If at any point, you have questions, call 1-800-851-0865...(The manufacturer will not be responsible

More information

Wall Profiles 2 Pozi Screwdriver. Wall Profile Covers 4 Sealant. Large Panel and Thin Panel Assemblies Sealant Gun

Wall Profiles 2 Pozi Screwdriver. Wall Profile Covers 4 Sealant. Large Panel and Thin Panel Assemblies Sealant Gun Decem Sliding Door (Corner Fitting) Instruction Manual DXT Important Information Toughened glass is completely safe for use in our shower enclosures and bath screens; providing our products are installed

More information

MODERN PERGOLA INSTALLATION GUIDE. When only the best will do.

MODERN PERGOLA INSTALLATION GUIDE. When only the best will do. MODERN PERGOLA INSTALLATION GUIDE When only the best will do. TOOLS LIST Drill(s) 3/8" Magnetic Driver (s) 12" Drill Extension #2 Square Drive bit for Drill or Driver Level Tape Measure Hammer Drill if

More information

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE Set A Set B PFD30 SG Fire Door Kit FITTING INSTRUCTIONS For use with 44mm thick doors only For Single and Double doors SUGGESTED TOOLS DRILL G-CLAMP TAPE MEASURE (Image for reference only) HACKSAW POCKET

More information

Dubnium 11 Installation Instructions & Parts List

Dubnium 11 Installation Instructions & Parts List Dubnium 11 Installation Instructions & Parts List Illustration Dubnium, H1 Handle Right Hand: Open Out Page 1 of 25 IMPORTANT This shower screen / enclosure must be installed by suitably qualified individuals.

More information

DekPro Prestige Aluminum Rail System Level Railing Installation Instructions

DekPro Prestige Aluminum Rail System Level Railing Installation Instructions ing Installation Guide Please read all instructions completely before starting any installation of DekPro Prestige Railing Systems. SAFETY: Always be safe and follow all instructions when using power tools

More information

Series Sloped glazed Curtain wall. Installation Instructions

Series Sloped glazed Curtain wall. Installation Instructions Series 5600 Sloped glazed Curtain wall Installation Instructions Part NO. Y308 February 2013 SECTION TABLE OF CONTENTS PAGE I. General Notes & Guidelines. 3-4 II. Gutter and Mullion Assembly.. 5 III. End

More information

Installation Instructions for Vista Air Vertically Folding Walls

Installation Instructions for Vista Air Vertically Folding Walls Installation Instructions for Vista Air Vertically Folding Walls Use these instructions in conjunction with your shop drawings to see the specifics that are particular to the model you are installing.

More information

SERIES 3070-T MULTI-SLIDE ASSEMBLY & INSTALLATION INSTRUCTIONS

SERIES 3070-T MULTI-SLIDE ASSEMBLY & INSTALLATION INSTRUCTIONS Table of Contents I. Care and Maintenance...2 II. Tools / Material & Sealant Requirements...2 III. Assembly and Installation...2 IV. Glazing Assembly...3 V. Panel Assembly...3 1. X Panel...3 2. O Panel...4

More information

FUSION JULIETTE BALCONIES FITTING INSTRUCTIONS

FUSION JULIETTE BALCONIES FITTING INSTRUCTIONS FUSION JULIETTE BALCONIES FITTING INSTRUCTIONS The Richard Burbidge FUSION Juliette Balcony System comprises a combination of timber and aluminium rails, glass infill panels and brackets designed for use

More information

Installation Guidelines

Installation Guidelines Page 1 Tools You ll Need 4 ft. Carpenter s level Chalk line (to mark U channel locations) Cordless drill/nut driver Caulking gun Chop saw with a metal cutting blade on it (required to make accurate and

More information

Display Shelving Installation Instructions

Display Shelving Installation Instructions Display Shelving Installation Instructions Top Rail (R-T) Back (BE) (R-C) Splicer Rail (R-S) 78 H to 120 H only Uprite (U) Uprite End Trim (UET) Shelf Back (BE) Base End Trim (BET) (R-C) 96 H to 120 H

More information

Level Railing. Installation Guide. v2.5 W W W. S O L U T I O N S A L U M I N U M. C O M

Level Railing. Installation Guide. v2.5 W W W. S O L U T I O N S A L U M I N U M. C O M Level Railing Installation Guide Top Rail Bottom Rail Aluminum Baluster 2x Bottom Bracket 1x Rail Support #909915 Kit Includes: 1 - Top Rail (with Baluster Connectors installed) 1 - Bottom Rail (with Baluster

More information

XL JOINERY LTD LA PORTE VISTA MODULAR 3 ASSEMBLY INSTRUCTIONS

XL JOINERY LTD LA PORTE VISTA MODULAR 3 ASSEMBLY INSTRUCTIONS XL JOINERY LTD LA PORTE VISTA MODULAR 3 2090mm High x 4687mm Wide ASSEMBLY INSTRUCTIONS READ AND UNDERSTAND THESE INSTRUCTIONS FULLY PRIOR TO STARTING INSTALLATION. IT IS STRONGLY RECOMMENDED THAT A COMPETENT

More information

OXYGEN INSTALLATION. Revision date

OXYGEN INSTALLATION. Revision date 12345 1 Hardware List 12345 Flat head wood screw #9 x 7/8 long with #2 Phillips drive, silver Used to attach surfaces and end panels Hex set screw ½-13 x 2 long with 1/4 hex drive, black Used on Legs Hex

More information

Deck Mount Installation with Bench

Deck Mount Installation with Bench Deck Mount Installation with Bench 1. Mark track with square. 2. Cut tracks with saw. 3. Drill ¼ hole (if needed.) 4. Countersink track. 5. Countersink all track 6. File all track ends. ends. 7. Lay out

More information

600mm 3 drawer base cabinet

600mm 3 drawer base cabinet Follow these instructions to build and attach your cabinet. Things you need to know ase cabinets come with different positions for attaching your. If you are choosing the rebated back option make sure

More information

INSTALLATION INSTRUCTIONS Aluminum Railing System

INSTALLATION INSTRUCTIONS Aluminum Railing System INSTALLATION INSTRUCTIONS FASCIA MOUNT SURFACE MOUNT OFFSET BASE SURFACE MOUNT STANDARD BASE CORE MOUNT Ø3" [Ø76 mm] 3 2 1 " [89 mm] 1 4 1 " [32 mm] 2 8 7 " [73 mm] 200 SERIES 300 SERIES 3 3 4 " [95 mm]

More information

CAUTION. It is the responsibility of the INSTALLER to ensure that the installation complies with council and or local authority bylaws.

CAUTION. It is the responsibility of the INSTALLER to ensure that the installation complies with council and or local authority bylaws. INSTALLATION GUIDE SAPPHIRE ROUND CORNER SLIDING SHOWER CAUTION It is the responsibility of the INSTALLER to ensure that the installation complies with council and or local authority bylaws. Instructions,

More information

12 Wide Evolution Cedar Partition Assembly Instructions

12 Wide Evolution Cedar Partition Assembly Instructions 06/13 12 Wide Evolution Cedar Partition Assembly Instructions Contents: Introduction Base Preparation Side Assembly Glazing Door Installation Frame Finishing Section - 1 2 3 4 5 Page 3 4 5-6 7 8-9 10-14

More information

Installation Instructions for. Before You Begin TOOLS REQUIRED

Installation Instructions for. Before You Begin TOOLS REQUIRED Composite Railing System STEP-BY-STEP Installation Instructions for Spectrum Composite Railing Virtually maintenance free 20-year warranty EverNew Spectrum Railing system is designed to work with a number

More information

INSTALLATION INSTRUCTIONS. Thermal Entrances AA 250/AA 425 THERMAL DOOR WITH TRIFAB 601/601T FRAMING

INSTALLATION INSTRUCTIONS. Thermal Entrances AA 250/AA 425 THERMAL DOOR WITH TRIFAB 601/601T FRAMING JANUARY, 2014 1 INSTALLATION Thermal Entrances AA 250/AA 425 THERMAL DOOR WITH TRIFAB 601/601T FRAMING INSTRUCTIONS 2 FRAME ASSEMBLY JANUARY, 2014 601442 SHEAR BLOCK BALL BEARING NRP BUTT (FACTORY APPLIED

More information

Steel Solutions USA 602 E. Walnut Street Watseka, IL p: (888) f: (815)

Steel Solutions USA 602 E. Walnut Street Watseka, IL p: (888) f: (815) Steel Solutions USA 602 E. Walnut Street Watseka, IL 60970 p: (888) 875-5004 f: (815) 432-3364 sales@steelsolutionsusa.com Published February 2011 2011 Steel Solutions USA. All rights reserved. version

More information

4-SIDED NAVAJO SHELTER ARIZONA MODEL INSTALLATION INSTRUCTIONS

4-SIDED NAVAJO SHELTER ARIZONA MODEL INSTALLATION INSTRUCTIONS 4-SIDED NAVAJO SHELTER ARIZONA MODEL INSTALLATION INSTRUCTIONS Recommended Tools: Before You Begin: Saftey Glasses, Tape Measure, Carpenters Level, Framing Square, Hex Head Nut Drivers, Chalk Line, Elec.

More information

TrendWall Floor-To-Ceiling Panels Installation Instruction

TrendWall Floor-To-Ceiling Panels Installation Instruction TrendWall Floor-To-Ceiling Panels Installation Instruction TrendWall Components Covered by this Instruction: Crown (and accessories) Floor Plate Solid Panel Filler Panel Wall Channel Door Section Pilaster

More information

N35 ALUMINIUM ROLL-UP DOOR INSTALLATION MANUAL

N35 ALUMINIUM ROLL-UP DOOR INSTALLATION MANUAL N35 ALUMINIUM ROLL-UP DOOR INSTALLATION MANUAL DOVER ROLLER SHUTTERS 295 COMMERCE WAY P.O. BOX 420 UPPER SANDUSKY, OH 43351 Dover Roller Shutters wants to THANK YOU for your purchase of the N35 Aluminum

More information

Installation Instructions

Installation Instructions File #2013-640A Installation Instructions for DesignRail Aluminum Rail Kits with CableRail Cable Infill - LEVEL RAILING 36-42 high railing for residential applications between wood or non-ferrous metal

More information

Quick Fit Installation Guide Retractable Screen - Single Door

Quick Fit Installation Guide Retractable Screen - Single Door Quick Fit Installation Guide Retractable Screen - Single Door 1 REMOVE KIT PARTS FROM SHIPPING TUBE 15 Mounting screws 1 Housing end cap screw 2 Handles 1 Housing end cap 1 Bushing 1 Pull bar end cap 2

More information

BEST PRACTICE GUIDE. Socket Bases. Working with Concrete Slabs

BEST PRACTICE GUIDE. Socket Bases. Working with Concrete Slabs Working with Concrete Slabs When working with concrete slabs the barrier protection can be erected in three ways - with socket bases, adjustable slab edge brackets and multi slab clamps. Socket Bases 1

More information

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE Set A Set B PFD30 Fire Door Kit FITTING INSTRUCTIONS For use with 44mm thick doors only For Single and Double doors IF INSTALLING A TOUCH LATCH, PLEASE READ THE CORRESPONDING FITTING INSTRUCTIONS FIRST

More information

Installation Guide. Bi-fold Doors

Installation Guide. Bi-fold Doors Installation Guide Bi-fold Doors Installation Guide Components box 1. 6. 2. 3. 7. 5. 4. 8. Contents 1. Fixing plugs 2. Wedge gasket 3. Bottom trolley 4. Top trolley 5. Magnetic keep (x 2 if door height

More information

CURVED ROOF ASSEMBLY INSTRUCTIONS ATTACHED VERANDAH. Your supplementary guide to building an ATTACHED CURVED ROOF VERANDAH or PATIO BEFORE YOU START

CURVED ROOF ASSEMBLY INSTRUCTIONS ATTACHED VERANDAH. Your supplementary guide to building an ATTACHED CURVED ROOF VERANDAH or PATIO BEFORE YOU START ROOF ATTACHED VERANDAH ASSEMBLY INSTRUCTIONS Your supplementary guide to building an ATTACHED ROOF VERANDAH or PATIO This set of instructions should be used in conjunction with the Stratco instruction

More information

LEGENDS RETRACTABLE DOOR SCREENS

LEGENDS RETRACTABLE DOOR SCREENS LEGENDS RETRACTABLE DOOR SCREENS MAGNETIC LATCHING DESIGN SYSTEM 42 I N S T A L L A T I O N I N S T R U C T I O N S 1 MOUNTING OPTIONS Recess : Mount the Screen Cassette using Recess Mounting Clips Recess

More information

Please read and understand all instructions before beginning. These instructions cover impact and non-impact aluminum French Door 650/750.

Please read and understand all instructions before beginning. These instructions cover impact and non-impact aluminum French Door 650/750. The performance and proper operation of a door is only as good as the installation. By following these instructions, the probability of a good installation greatly increases. Please read and understand

More information

HOW TO INSTALL HORIZONTAL ROD RAILING TREX SIGNATURE STANDARD

HOW TO INSTALL HORIZONTAL ROD RAILING TREX SIGNATURE STANDARD HOW TO INSTALL HORIZONTAL ROD RAILING NOTES:» Adjust drill power to lowest setting that will drive screw. DO NOT OVER TORQUE 6 STAINLESS STEEL STAINLESS FASTENERS.» NEVER use impact tools on 6 Stainless

More information

SERIES: CONFIGURATION: MOUNTING PACKAGE: 1200 Door-Door Frameless, sliding door

SERIES: CONFIGURATION: MOUNTING PACKAGE: 1200 Door-Door Frameless, sliding door SERIES: CONFIGURATION: MOUNTING PACKAGE: 1200 Door-Door Frameless, sliding door RDQCI5022 Rev.0 Page 1 Certified 06/01/2016 Tools: To install your New Shower Enclosure, you may need the following: Pencil

More information

Hinge Door + Side Panel

Hinge Door + Side Panel Hinge Door + Side Panel Instruction Manual KL+ KR Important Information Toughened glass is completely safe for use in our shower enclosures and bath screens; providing our products are installed according

More information

InstallatIon InstructIons for 2-lIte PatIo Door unassembled

InstallatIon InstructIons for 2-lIte PatIo Door unassembled InstallatIon InstructIons for -lite PatIo Door unassembled tools & materials You will need: Measuring Tape Pencil Shims Drill & Drill bits: 6", 8", 5 6", 7 6" Utility Knife High-Performance Premium Silicone

More information

SLIDING TUB / SHOWER ENCLOSURE WITH STATIONARY 90º PANEL

SLIDING TUB / SHOWER ENCLOSURE WITH STATIONARY 90º PANEL SLIDING TUB / SHOWER ENCLOSURE WITH STATIONARY 0º PANEL This instruction sheet applies to the following units. C, C7, C7, C77, C, C7 This instruction sheet also applies to the following units. VTE / VSE

More information

Safety Glasses Safety Gloves Ladders Measuring Tape Spirit Level String Line. Tin-Snips Rivet Gun Caulking Gun Silicone Socket Set

Safety Glasses Safety Gloves Ladders Measuring Tape Spirit Level String Line. Tin-Snips Rivet Gun Caulking Gun Silicone Socket Set BEFORE YOU START Carefully read these instructions and refer to them constantly during each stage of construction. If you do not have all the necessary tools or information, contact Stratco for advice.

More information

Shower Screen and Door Kit Instructions

Shower Screen and Door Kit Instructions Shower Screen and Door Kit Instructions Step by step guide everton.com.au IMPORTANT NOTICE IMPORTANT: The glass panels used for Highrove frameless shower screens are made from Grade A Toughened Safety

More information

Insolroll Clutch Operated Shades Installation Instructions Installation Instructions

Insolroll Clutch Operated Shades Installation Instructions Installation Instructions All clutch operated shades are shipped fully assembled and ready for installation. Mounting screws are not provided. Screws for chain guide installation to meet the child safety standards are provided.

More information