INSTALLATION INSTRUCTIONS

Save this PDF as:
 WORD  PNG  TXT  JPG

Size: px
Start display at page:

Download "INSTALLATION INSTRUCTIONS"

Transcription

1 Tools required for the installation. A. Core Drill 87mm Drill bit B. Tape measure C. Spirit Level D. Marking pen E. Caulking gun F. Cutting Pliers G. Cordless Drill and Philips head bit, 5mm Drill bit. H. Aluminium cutting Drop saw. I. Dust pan and brush J. Soft faced mallet. K. Timber wedges and blocks for supports. L. Quick Grip clamps. Assembly of the balustrades in the factory 1. Cut the posts to length and pair the posts so you end up with a left and right hand post. 2. Label the inside of the post clearly with the Words ( Left Hand Bay 1 and Right Hand Bay 1 ). This will ensure that the bays are going to clip together on site. All bays are labelled as if you were standing outside looking in. 3. Mark out the position of the bottom rail on all of the posts. Use a jig with pre drilled holes to ensure a perfect placement. Drill the holes using a 5mm Drill bit. Please Note: It is important to remember that the bottom of the horizontal rail should not exceed 100mm from the finished floor level to the underside of the lowest point of the horizontal rail. 4. Determine what the length of each bay is and cut the lower horizontal rail to length 5. Minus the width of the glass insert from the lower rail length. 6. Mark out the position of the glass. 7. Line up the lower rail with the pre drill holes and using a 6G x 25 Pan head screw fix the rail to the posts. 8. Screw the under cap to the top of the post. Onsite Installation. 9. Identify the balustrade bays and lay them on the floor on top of timber studs to keep them off the ground. 10. Start at one end of the bay and snap the posts together using a quick grip clamp. 11. Snap on the top hand rail over the glazed under cap. 12. Slide the base covers over the post legs and tape to the lower rail. 13. Lift the balustrade bays up evenly and insert into the clean Core Drill holes. 14. By using a timber block and wedge under the lower rail, level the balustrade horizontally. 15. Two critical measurements must be set, The 1050 from the highest point to the finished floor level reference mark and the 100mm from the floor to the under side of the lower rail.

2 15. Two critical measurements must be set, The 1050 from the highest point to the finished floor level reference mark and the 100mm from the floor to the under side of the lower rail. 16. Use two string lines to align all of the post legs and the tops. 17. Start at one end and insert the timber wedges in and around the legs on the first balustrade post leg. 18. Work your way along the balustrade until the system is level horizontally and vertically. 19. Mix enough grout to fill a few holes at a time 20. Carefully pour in enough grout mixture to half fill the hole. 21. Allow the grout to set for at least 1 2 hours and remove the timber wedges. 22. Continue filling the holes with enough grout to fill the hole just under the finished floor level. 23. Install the Top caps into the balustrade posts. 24. Remove all remaining timber blocks from the lower rails. 25. Install two glass setting blocks per panel where the glass will seat. 26. Insert the glass into the under cap and line the bottom of the glass up with the lower pocket. 27. Centre the glass on the rail and push in the rubber wedge or wet glaze as required. 28. Cut the infill pieces to length. You will need 1 for the under cap and one for the lower rail. 29. Install that infill s either side of the glass and be sure to leave a minimum of a 1mm gap. 30. Repeat the process for both rails. 31. Remove the timber support blocks from the rails. Alternative fixing methods the Solaris Balustrades Direct fixing Concrete base. By using the direct fixing feet supplied by Solaris, fabricators and installers are able to direct fix the posts to a solid concrete base. The Die cast Foot plates are custom made for this role. The foot plates are fitted to the base of Posts and screwed in place with 4-6G x 25mm Stainless Steel CSK screws. Once the foot place is fitted it s then bolted to the concrete base with 4 - M10 Chemical Anchors. IMPORTANT NOTE TO INSTALLERS. Use a spare foot plate to assist you marking the holes out onto the concrete base. At no point should the holes be drilled through the foot plate. Clearly mark out all holes with a blank Foot plate and remove when drilling. Direct fixing Steel or timber By using the direct fixing feet supplied by Solaris, fabricators and installers are able to direct fix the posts to a solid and stable steel or timber base. The Die cast Foot plates are custom made for this role. The foot plates are fitted to the base of Posts and screwed in place with 4 6G x 25mm Stainless Steel CSK screws. Once the foot place is fitted its then bolted to the concrete base with 4 - M10 Chemical Anchors.

3 Concrete Direct concreted posts The posts being inserted directly into the concrete footing must be treated with the use of a rubber based bitumen paint or barrier medium to stop the direct contact of concrete on bare aluminium. All cut surfaces must be treated prior to being inserted. Failure to treat the aluminium can cause corrosion and affect the painted surface of the posts. The post must be embedded as per the fixing details provided. The local shire requirements and standard BCA regulations over write Solaris Balustrade s recommendations where needed and must and must be complied too at all times. Consult your engineer for further rulings and advice on local footing requirements. Core Drill Installing the Posts into Core Drill. 1. Clearly mark out the post centres onto the slab. 2. Core Drill each of the holes a minimum depth of 100mm. 3. Remove the core plug and clean out the remaining dust. 4. Insert all of the aluminium posts into the holes. 5. Start at the end of balustrade run first. With the use of 4 timber wedges centre and level the posts by forcing the timber wedges into the core hole against the post. Once you have established post and stabilised it move back to the last post on the other side of the balustrade run. 6. With the use of 4 timber wedges centre and level the posts by forcing the timber wedges into the core hole against the post. Level and centre the post into final position. 7. Run two separate string lines from the first post to the last post. One at the top and another 100 mm from the bottom of the post off the slab. These stringlines will act as a marker and aid in the placing of the remaining posts. 8. Starting at one end and working back towards the last post also ensures that the glass panels remain the same size. 9. Once all of the posts have been placed, prepare enough grout to fill a couple of holes at a time. 10. Filling the core holes with grout as follows a. Fill half of the core drilled hole only, ensuring that the grout mix runs freely into all of the spaces around the post. a. Continue half filling all of the remaining post holes. b. Allow the grout mix to harden at least for 1 hour after pouring. c. Remove the timber wedges from the core holes. If wedges cannot be removed it can be left in the core hole and trimmed level with the top of the hole after filling. d. Remove the remaining timber wedges. e. Continue filling the remaining core holes with the grout mix no further than the finished floor level. f. Remove the string lines and measure for the glass if not having already done this. Please refer to the glass formula sheet in Section C for deductions and size charts.

4 Installing the glass panels into a Solaris Balustrade system. There are two methods of installing glass. Glazed in front or glazed from on top. Method 1. Glass panels inserted from the front. 1. The Spigots are inserted into the top of the post and screwed into place from either side of the underside of the caps shoulder using the 6G x 12mm CSK self-tapping screw. Failure to use the correct screw will result in glass breakages. 2. Place the selected handrail onto the spigots and centre the handrail so it seats onto the spigot shoulder. Ensure all end caps and joiners are in place prior to final screwing off the handrail from underneath through the 8 holes in the spigot body. End caps are squeezed in with a small bead of clear silicone behind the head as a means of sealing off any opening where water may find its way in. A 6G x 12mm CSK self-tapping screw can be used from underneath to lock the end cap in place. IMPORTANT NOTE TO INSTALLERS. All joins in handrails must be made directly above the spigot by using the correct joiner available in the components list. This is inserted and silicone into the hand rail opening. The handrails are the screwed in place from underneath by using 8-6G x 25 CSK Stainless Steel self-tapping screws. 3. Continue by inserting the glass panel into the Left hand side post. Line up the right hand side with the opening in the opposite post. The glass should clear the post by 3mm if cut correctly. 4. The glass panel is then centred and rested on two timber blocks laid on the floor. 5. Slowly lift the glass panel evenly up until it touches the underside of the post spigot. 6. Support the glass in this position by holding it in place or by the use of timber blocks. 7. Push in the rubber PVC wedge on either side of the glass into the gap. ( Wet glaze if required ) 8. Trim the rubber to length no longer than the glass bottom edge. 9. Measure and cut the infill pieces to fit below the glass. ( Gap from glass to floor 6mm ) 10. Insert the Resilient Nylon Glass saddle. 11. Insert the saddle and infill piece into the post pocket and tap into place with a soft faced mallet. The infill is inserted with the nylon saddle in the end under the glass. 12. Remove the timber blocks supporting the glass. Method 2. Glass panels inserted from the top prior to installing the handrails. This method can be used if there has been an issue with the panels being cut large, lack of glazing space, or difficultly inserting the glass into the post or the glazing posts have not been correctly installed. 1. Measure and cut the infill pieces to fit below the glass. ( Gap from glass to floor 6mm ) 2. Insert the Resilient Nylon Glass saddle. 3. Insert the saddle and infill piece into the post pocket and tap into place with a soft faced mallet.

5 4. Place timber support blocks (75 x 35) on the floor next to each post. 5. Slide the glass in slowly from above the posts. Insert and slowly lower the glass panel until it rests on the timber blocks and centre the glass. 6. Support the glass in this position by holding it in place or by the use of timber blocks. 7. Push in the rubber PVC wedge on either side of the glass into the gap. (Wet glaze if required, glass should remain supported for 24 hours at least) 8. Trim the rubber to length no longer than the glass bottom edge. 9. Measure and cut the infill pieces to fit above the glass. (Gap from glass to underside of cap 6mm) 10. Insert the Resilient Nylon Glass saddle. 11. Insert the saddle and infill piece into the post pocket and tap into place with a soft faced mallet. 12. The Spigots are inserted into the top of the post and screwed into place from either side of the underside of the caps shoulder using the 6G x 12mm CSK self-tapping screw. Failure to use the correct screw will result in glass breakages. 13. Place the selected handrail onto the spigots and centre the handrail so it seats onto the spigot shoulder. Ensure all end caps and joiners are in place prior to final screwing off the handrail from underneath through the 8 holes in the spigot body. End caps are squeezed in with a small bead of clear silicone behind the head as a means of sealing off any opening where water may find its way in. A 6G x 12mm CSK self-tapping screw can be used from underneath to lock the cap in place. IMPORTANT NOTE TO INSTALLERS. All joins should be made directly above the spigot by using the correct joiner. This is inserted and silicone into the hand rail opening. The handrails are the screwed in place from underneath by using 8-6G x 25 CSK Stainless Steel self-tapping screws. 14. Removed the timber blocks supporting the glass. Direct fixing Concrete base. By using the direct fixing base plates supplied by Solaris, fabricators and installers are able to direct fix the posts to a solid concrete base. The Die cast Base Plates are custom made for this role. The foot plates are fitted to the base of Posts and screwed in place with 4 x 6G x 25mm Stainless Steel CSK screws from underneath the base plate. Once the foot place is fitted it s then bolted to the concrete base with 4 x M10 Chemical Anchors. IMPORTANT NOTE FOR INSTALLERS. Use a spare base plate to assist you marking the holes out onto the concrete base. At no point should the holes be drilled through the base plate being installed. Clearly mark out all holes with a blank base plate and remove when drilling. Once the holes are drilled out, clean thoroughly and install the assemblies.

6 Direct fixing Steel or timber base. By using the direct fixing base plates supplied by Solaris, fabricators and installers are able to direct fix the posts to a solid steel or timber base. The Die cast Base Plates are custom made for this role. The base plates are fitted to the base of Posts and screwed in place with 4-6G x 25mm Stainless Steel CSK screws from underneath the base plate. Once the base plate is fitted it s then bolted to the base structure using the listed bolts. IMPORTANT NOTE FOR INSTALLERS. Use a spare base plate to assist you marking the holes out onto the concrete base. At no point should the holes be drilled through the base plate being installed. Clearly mark out all holes with a blank base plate and remove when drilling. Once the holes are drilled out, clean thoroughly and install the assemblies. Concrete Fixing instruction The posts being inserted directly into the concrete footing must be treated with the use of a rubber based bitumen paint or barrier medium to stop the direct contact of concrete on bare aluminium. All cut surfaces must be treated prior to being inserted. Failure to treat the aluminium can cause corrosion and affect the painted surface of the posts. The post must be embedded as per the fixing details provided. The local shire requirements and standard BCA regulations over write Solaris Balustrade s recommendations where needed and must and must be complied too at all times.

4-lite Patio Door. Installation Instructions

4-lite Patio Door. Installation Instructions 4-lite Patio Door Installation Instructions IMPORTANT: Read the instructions and familiarize yourself with the door parts and pieces before beginning assembly and installation. Note: Only the 5-0 x 6-8

More information

AFCO-Rail Post INSTALLATION INSTRUCTIONS AFCO-RAIL POST

AFCO-Rail Post INSTALLATION INSTRUCTIONS AFCO-RAIL POST AFCO-Rail Post INSTALLATION INSTRUCTIONS TOOLS REQUIRED: Drill Bits (for the appropriate fastener) Drill (with adjustable clutch, recommended) Level String Line Tape Measure Tools to install fasteners

More information

Method of Build 1. General

Method of Build 1. General Method of Build 1 General GLAZED ELEVATIONS Viso Double Glazed in glazed form differs from many other systems as the vertical joints can have Viso dry joints or the unique HIDDEN mullion post between glazed

More information

Installation Guide. Step-by-Step Guide

Installation Guide. Step-by-Step Guide Installation Guide Step-by-Step Guide Thank you for choosing one of our quality products. We are the industry leaders in designer panel fencing. This product will provide you with years of trouble free

More information

INSTALLATION GUIDE. Flat Roof Homesheds TM. Onto Concrete BEFORE YOU START TOOLS REQUIRED

INSTALLATION GUIDE. Flat Roof Homesheds TM. Onto Concrete BEFORE YOU START TOOLS REQUIRED INSTALLATION GUIDE Flat Roof Homesheds TM Onto Concrete BEFORE YOU START It is important to check your Local Government Authority requirements before the installation of your new Stratco Flat Roof Homeshed.

More information

a.k.a. casegoods instructions

a.k.a. casegoods instructions a.k.a. casegoods instructions a a.k.a. workwall installation IMPORTANT NOTES Failure to install product according to installation instruction will result in loss of warranty. Tools required for assembly

More information

INSTALLATION GUIDE. Outback. Flat Attached BEFORE YOU START ADDITIONAL MATERIALS TOOLS REQUIRED. VERAnDAHS PATIOS CARPORTS

INSTALLATION GUIDE. Outback. Flat Attached BEFORE YOU START ADDITIONAL MATERIALS TOOLS REQUIRED. VERAnDAHS PATIOS CARPORTS INSTALLATION GUIDE Outback VERAnDAHS PATIOS CARPORTS Flat Attached BEFORE YOU START It is important to check your Local Government Authority requirements before the installation of your new Stratco Outback

More information

ENGINEERING STRENGTH INSTAL L AT I O N M A NUAL OUR STRENGTH IS OUR STRENGTH

ENGINEERING STRENGTH INSTAL L AT I O N M A NUAL OUR STRENGTH IS OUR STRENGTH ENGINEERING STRENGTH INSTAL L AT I O N M A NUAL OUR STRENGTH IS OUR STRENGTH RAFTER PREPERATION RAFTER PREPARATION A FRAME PREPERATION AND ASSEMBLY A FRAME PREPARATION AND ASSEMBLY... Open boxes, remove

More information

Step-by-Step Installation Instructions for

Step-by-Step Installation Instructions for Step-by-Step Installation Instructions for Customer helpline number: 01604 633607 8892_Step_By_Step_900_Quad_V5.indd 1 1/9/10 18:01:22 Before Starting: Please read and understand these instructions. Not

More information

ALL SEASON PATIO COVER

ALL SEASON PATIO COVER ALL SEASON PATIO COVER 61 Where the All Season Patio Cover is to be attached to the home, create a level line showing where the top of the mounting rail is to be located. Install each section with the

More information

TrendWall Floor-To-Ceiling Panels Installation Instruction

TrendWall Floor-To-Ceiling Panels Installation Instruction TrendWall Floor-To-Ceiling Panels Installation Instruction TrendWall Components Covered by this Instruction: Crown (and accessories) Floor Plate Solid Panel Filler Panel Wall Channel Door Section Pilaster

More information

Installation Guide Important:

Installation Guide Important: Installation Guide Important: Please Read carefully through this installation guide prior to starting the setting out of your new fence. Setting out the wall accurately and correctly will be the difference

More information

Level Railing. Installation Guide. v2.5 W W W. S O L U T I O N S A L U M I N U M. C O M

Level Railing. Installation Guide. v2.5 W W W. S O L U T I O N S A L U M I N U M. C O M Level Railing Installation Guide Top Rail Bottom Rail Aluminum Baluster 2x Bottom Bracket 1x Rail Support #909915 Kit Includes: 1 - Top Rail (with Baluster Connectors installed) 1 - Bottom Rail (with Baluster

More information

INSTALLATION INSTRUCTIONS GUIDE

INSTALLATION INSTRUCTIONS GUIDE CERTAINTEED RAILING AND DECKING INSTALLATION INSTRUCTIONS GUIDE Kingston Vinyl Railing and Vinyl Decking CONTENTS Important Information Before You Begin...3 Helpful Hints, Tips, Fire Information and Tools

More information

Horizontal Cable Systems

Horizontal Cable Systems ALUMINUM RAILING INSTALLATION INSTRUCTIONS v2012 orizontal Cable Systems 1) Check Contents Of Packages: Verify that all parts have arrived and that they match the packing list. 1A) Coastal applications:

More information

LEGENDS RETRACTABLE DOOR SCREENS

LEGENDS RETRACTABLE DOOR SCREENS LEGENDS RETRACTABLE DOOR SCREENS MAGNETIC LATCHING DESIGN SYSTEM 42 I N S T A L L A T I O N I N S T R U C T I O N S 1 MOUNTING OPTIONS Recess : Mount the Screen Cassette using Recess Mounting Clips Recess

More information

Installation Instructions

Installation Instructions File #2013-640A Installation Instructions for DesignRail Aluminum Rail Kits with CableRail Cable Infill - LEVEL RAILING 36-42 high railing for residential applications between wood or non-ferrous metal

More information

SERIES 3070-T MULTI-SLIDE ASSEMBLY & INSTALLATION INSTRUCTIONS

SERIES 3070-T MULTI-SLIDE ASSEMBLY & INSTALLATION INSTRUCTIONS Table of Contents I. Care and Maintenance...2 II. Tools / Material & Sealant Requirements...2 III. Assembly and Installation...2 IV. Glazing Assembly...3 V. Panel Assembly...3 1. X Panel...3 2. O Panel...4

More information

Installation Instructions for Vista Air Vertically Folding Walls

Installation Instructions for Vista Air Vertically Folding Walls Installation Instructions for Vista Air Vertically Folding Walls Use these instructions in conjunction with your shop drawings to see the specifics that are particular to the model you are installing.

More information

FUSION JULIETTE BALCONIES FITTING INSTRUCTIONS

FUSION JULIETTE BALCONIES FITTING INSTRUCTIONS FUSION JULIETTE BALCONIES FITTING INSTRUCTIONS The Richard Burbidge FUSION Juliette Balcony System comprises a combination of timber and aluminium rails, glass infill panels and brackets designed for use

More information

SteelChief Installation Instructions for pre-assembled panel form sheds GABLE ROOF

SteelChief Installation Instructions for pre-assembled panel form sheds GABLE ROOF SteelChief Installation Instructions for pre-assembled panel form sheds GABLE ROOF Please read fully before commencing work...any queries will be promptly answered, contact theboss@steelchief.com.aui MPORTANT

More information

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE Set A Set B PFD30 SG Fire Door Kit FITTING INSTRUCTIONS For use with 44mm thick doors only For Single and Double doors SUGGESTED TOOLS DRILL G-CLAMP TAPE MEASURE (Image for reference only) HACKSAW POCKET

More information

XL JOINERY LTD LA PORTE VISTA MODULAR 3 ASSEMBLY INSTRUCTIONS

XL JOINERY LTD LA PORTE VISTA MODULAR 3 ASSEMBLY INSTRUCTIONS XL JOINERY LTD LA PORTE VISTA MODULAR 3 2090mm High x 4687mm Wide ASSEMBLY INSTRUCTIONS READ AND UNDERSTAND THESE INSTRUCTIONS FULLY PRIOR TO STARTING INSTALLATION. IT IS STRONGLY RECOMMENDED THAT A COMPETENT

More information

Installation Instructions

Installation Instructions Arizona Corporate Office 2801 W. Indian School Rd Phoenix, AZ 85017 800 255 1901 PH 602 447 8208 FAX Florida 8100 1 Westside Industrial Dr Jacksonville, FL 32219 855 695 8899 PH 904 786 9025 FAX Illinois

More information

Display Shelving Installation Instructions

Display Shelving Installation Instructions Display Shelving Installation Instructions Top Rail (R-T) Back (BE) (R-C) Splicer Rail (R-S) 78 H to 120 H only Uprite (U) Uprite End Trim (UET) Shelf Back (BE) Base End Trim (BET) (R-C) 96 H to 120 H

More information

Series 1100 Aluminum Door Canopy

Series 1100 Aluminum Door Canopy Series 00 Aluminum Door Canopy with Support Arms It is our recommendation that you read instructions carefully prior to assembly and installation. Series 00 with Support Arms MOUNTING BAR (A) TOP TRIM

More information

Table of Content. Sayl Disassembly for Recycling

Table of Content. Sayl Disassembly for Recycling Y Sayl Disassembly for Recycling Table of Content 1. Work Chair Disassembly... 2 2. Side Chair Disassembly...17 3. Work Stool Footring Disassembly... 22 1 Y Sayl Disassembly for Recycling Work Chair Disassembly

More information

Pocket Door Kit PD1 / PD2 Installation Instructions. Kit Contents.

Pocket Door Kit PD1 / PD2 Installation Instructions. Kit Contents. Pocket Door Kit PD1 / PD2 Installation Instructions Kit Contents. 1, Create Rough Opening In Stud Wall Construct rough opening ensuring all sides are square and level. Rough opening should be; Height =

More information

HANDRAIL HEIGHT PER LOCAL CODE AUTHORITY

HANDRAIL HEIGHT PER LOCAL CODE AUTHORITY WITH OPTIONAL S.S. S PLEASE READ PLEASE READ THESE INSTRUCTIONS THOROUGHLY PRIOR TO BEGINNING THE INSTALLATION! THIS INSTRUCTION SHEET IS INTENDED TO PROVIDE A SPECIFIC GUIDE TO FOLLOW FOR THE INSTALLATION

More information

INSTALLATION INSTRUCTIONS Aluminum Railing System

INSTALLATION INSTRUCTIONS Aluminum Railing System INSTALLATION INSTRUCTIONS FASCIA MOUNT SURFACE MOUNT OFFSET BASE SURFACE MOUNT STANDARD BASE CORE MOUNT Ø3" [Ø76 mm] 3 2 1 " [89 mm] 1 4 1 " [32 mm] 2 8 7 " [73 mm] 200 SERIES 300 SERIES 3 3 4 " [95 mm]

More information

Spiral Slide

Spiral Slide IMPORTANT Page 1 PLEASE READ THESE INSTRUCTIONS BEFORE COMMENCING ASSEMBLY. All equipment must be installed in accordance with these instructions. Check your shipment against Bill of Lading and Parts list.

More information

INOVO 2-LITE SLIDING PATIO DOOR

INOVO 2-LITE SLIDING PATIO DOOR INOVO 2-LITE SLIDING PATIO DOOR ASSEMBLY AND INSTALLATION INSTRUCTIONS IMPORTANT: READ THE INSTRUCTIONS AND FAMILIARIZE YOURSELF WITH THE DOOR PARTS AND PIECES BEFORE BEGINNING ASSEMBLY AND INSTALLATION.

More information

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE Set A Set B PFD30 Fire Door Kit FITTING INSTRUCTIONS For use with 44mm thick doors only For Single and Double doors IF INSTALLING A TOUCH LATCH, PLEASE READ THE CORRESPONDING FITTING INSTRUCTIONS FIRST

More information

INSTALLATION MANUAL STOREFRONT DOORS

INSTALLATION MANUAL STOREFRONT DOORS INSTALLATION MANUAL STOREFRONT DOORS www.aluflam-usa.com SYSTEM DESCRIPTION - Extruded and filled aluminum framing, tested and approved by UL - 3-3/8 frame depth - Clear, fire-rated safety glazing - Door

More information

Downtown Rack. Custom logo option available

Downtown Rack. Custom logo option available Custom logo option available Downtown Rack The Downtown Rack uses thick, square-tube construction that can t be cut with a pipe cutter. The extended width of the Downtown Rack makes for easy bike parking

More information

CURVED ROOF ASSEMBLY INSTRUCTIONS ATTACHED VERANDAH. Your supplementary guide to building an ATTACHED CURVED ROOF VERANDAH or PATIO BEFORE YOU START

CURVED ROOF ASSEMBLY INSTRUCTIONS ATTACHED VERANDAH. Your supplementary guide to building an ATTACHED CURVED ROOF VERANDAH or PATIO BEFORE YOU START ROOF ATTACHED VERANDAH ASSEMBLY INSTRUCTIONS Your supplementary guide to building an ATTACHED ROOF VERANDAH or PATIO This set of instructions should be used in conjunction with the Stratco instruction

More information

Centre-fold Door. Installation Instructions. Please note: Images shown are for illustration purposes only

Centre-fold Door. Installation Instructions. Please note: Images shown are for illustration purposes only Centre-fold Door Installation Instructions Please note: Images shown are for illustration purposes only Please read these instructions in full before installing. The enclosure can be installed to give

More information

SERIES 360. Single Hung Windows. NOTE: Read instructions completely before attempting any installation.

SERIES 360. Single Hung Windows. NOTE: Read instructions completely before attempting any installation. Installation Instructions SERIES 360 Single Hung Windows Page 2: Opening Preparation and Wood Buck Installation and Figure 1 Page 3-5: Installation Instructions for Series 360 WINDOWS Page 6: Figure 2:

More information

SLIDING TUB / SHOWER ENCLOSURE WITH STATIONARY 90º PANEL

SLIDING TUB / SHOWER ENCLOSURE WITH STATIONARY 90º PANEL SLIDING TUB / SHOWER ENCLOSURE WITH STATIONARY 0º PANEL This instruction sheet applies to the following units. C, C7, C7, C77, C, C7 This instruction sheet also applies to the following units. VTE / VSE

More information

Shower Screen and Door Kit Instructions

Shower Screen and Door Kit Instructions Shower Screen and Door Kit Instructions Step by step guide everton.com.au IMPORTANT NOTICE IMPORTANT: The glass panels used for Highrove frameless shower screens are made from Grade A Toughened Safety

More information

Your order will be shipped with the supports and rail components packaged inside the ramp package. Each accessory package is labeled.

Your order will be shipped with the supports and rail components packaged inside the ramp package. Each accessory package is labeled. instructions About Your Order. Your order will be shipped with the supports and rail components packaged inside the ramp package. Each accessory package is labeled. Check the Order Before the Carrier leaves!

More information

RENU PANELING SYSTEM Installation Guide PLEASE READ GUIDE COMPLETELY BEFORE ASSEMBLY. Version 1.0 ALL STATED SIZES ARE NOMINAL DIMENSIONS.

RENU PANELING SYSTEM Installation Guide PLEASE READ GUIDE COMPLETELY BEFORE ASSEMBLY. Version 1.0 ALL STATED SIZES ARE NOMINAL DIMENSIONS. RENU PANELING SYSTEM Installation Guide Version 1.0 PLEASE READ GUIDE COMPLETELY BEFORE ASSEMBLY. ALL STATED SIZES ARE NOMINAL DIMENSIONS. Components Trim Track (TT) 1" x 1 3 4" (GER3TTAA): fastens to

More information

Installing your new Bevella Top. L Shaped Countertop with Joints No Finished Ends (Fits Between Four Walls)

Installing your new Bevella Top. L Shaped Countertop with Joints No Finished Ends (Fits Between Four Walls) Installing your new Bevella Top L Shaped Countertop with Joints No Finished Ends (Fits Between Four Walls) Bevella RTI Countertops are engineered and manufactured to the highest quality standards, built

More information

FRAMELESS GLASS FENCING DIY GUIDE

FRAMELESS GLASS FENCING DIY GUIDE FRAMELESS GLASS FENCING SITE MEASURE 1. Planning is the first step of any successful project. 2. We have a large range of sizes to allow for varying site requirements. 3. Simply decide where you would

More information

HANDRAIL HEIGHT PER LOCAL CODE AUTHORITY. 6 3/8" [161.9mm]

HANDRAIL HEIGHT PER LOCAL CODE AUTHORITY. 6 3/8 [161.9mm] PLEASE READ PLEASE READ THESE INSTRUCTIONS THOROUGHLY PRIOR TO BEGINNING THE INSTALLATION! THIS INSTRUCTION SHEET IS INTENDED TO PROVIDE A SPECIFIC GUIDE TO FOLLOW FOR THE INSTALLATION OF THIS. CONTAINED

More information

2x Bottom Bracket. 1x Rail Support STEP 1 STEP 2

2x Bottom Bracket. 1x Rail Support STEP 1 STEP 2 Level Railing Top Rail Bottom Rail Aluminum Baluster 2x Bottom Bracket 1x Rail Support Kit Includes: 1 - Top Rail (with Baluster Connectors installed) 1 - Bottom Rail (with Baluster Connectors installed)

More information

INSTALLATION VIDEOS ONLINE

INSTALLATION VIDEOS ONLINE Railing Installation Guide GLASS PICKET CABLE INSTALLATION VIDEOS ONLINE Videos are broken up into small segments which covers most aspects of glass, picket, and cable railing installations. Cable railing

More information

Installation Guide. Evolve bi-fold. 8. Door restrictor- optional p9. 1. Before you start p2. 9. Adjustment. 2. Measuring and surveying p2

Installation Guide. Evolve bi-fold. 8. Door restrictor- optional p9. 1. Before you start p2. 9. Adjustment. 2. Measuring and surveying p2 Evolve bi-fold Installation Guide 1. Before you start p2 8. Door restrictor- optional p9 2. Measuring and surveying p2 3. Configuration details p4 4. Installation p5 5. Glazing p5 6. Glazing packer details

More information

IMPORTANT - GLASS IS FRAGILE AND CAN SHATTER.

IMPORTANT - GLASS IS FRAGILE AND CAN SHATTER. STEP BY STEP SHOWER SCREEN INSTALLATION GUIDE IMPORTANT - GLASS IS FRAGILE AND CAN SHATTER. 2 PEOPLE ARE IMPORTANT REQUIRED - GLASS FOR GLASS IS FRAGILE PANEL AND INSTALLATION CAN SHATTER. TO AVOID GLASS

More information

Vanity Installation Instructions

Vanity Installation Instructions Vanity Installation Instructions Segments of these instructions will relate to your vanity. Please read these instructions thoroughly and ensure the appropriate instructions are used during the installation

More information

Ready-To-Assemble VersaRail INSTALLATION INSTRUCTIONS

Ready-To-Assemble VersaRail INSTALLATION INSTRUCTIONS FREEDOM-WEB Ready-To-Assemble VersaRail INSTALLATION INSTRUCTIONS Read all instructions prior to installing product. Refer to manufacturers safety instructions when operating any tools. To register your

More information

Installation Instructions

Installation Instructions Installation Instructions Curved Glass Screen Installation Instructions Important Information Please read these instructions carefully before starting installation and keep for future reference. Remove

More information

Retractable Screen Installation Instructions For Vinyl and Aluminum Clad and Wood In-Swing Hinged Doors (See separate instructions for sliding doors)

Retractable Screen Installation Instructions For Vinyl and Aluminum Clad and Wood In-Swing Hinged Doors (See separate instructions for sliding doors) Retractable Screen Installation Instructions For Vinyl and Aluminum Clad and Wood In-Swing Hinged Doors (See separate instructions for sliding doors) IMPORTANT: Please read before you begin. Table of Contents

More information

INFINITE RANGE - CENTRE FOLDING DOOR

INFINITE RANGE - CENTRE FOLDING DOOR INFINITE RANGE - CENTRE FOLDING DOOR CENTRE FOLDING DOOR + 2 SIDE RETURN PANELS (PENINSULA) Please read these instructions before installing, as incorrect fitting will invalidate the guarantee-carry out

More information

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013 U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS TOOL LIST Required Tools: - Reciprocating Saw with Metal Cutting Blade - Drill - 7/16 Drill Bit for Metal Drilling -

More information

Installation Guide 1

Installation Guide 1 1 2 Contents Before you begin Storage & preparation Tools & materials you may need Getting started Sink & cooktop cut-outs Cabinet Joins for 20mm benchtops Joining & installation of 20mm benchtops Joining

More information

DUTCH GABLE FREESTANDING CARPORT

DUTCH GABLE FREESTANDING CARPORT DUTCH GABLE FREESTANDING CARPORT STRATCO OUTBACK ASSEMBLY INSTRUCTIONS. Your complete guide to building a FREESTANDING Outback DUTCH GABLE CARPORT BEFORE YOU START Carefully read these instructions. If

More information

INOVO 4-LITE SLIDING PATIO DOOR ASSEMBLY AND INSTALLATION INSTRUCTIONS

INOVO 4-LITE SLIDING PATIO DOOR ASSEMBLY AND INSTALLATION INSTRUCTIONS INOVO 4-LITE SLIDING PATIO DOOR ASSEMBLY AND INSTALLATION INSTRUCTIONS IMPORTANT: READ THE INSTRUCTIONS AND FAMILIARIZE YOURSELF WITH THE DOOR PARTS AND PIECES BEFORE BEGINNING ASSEMBLY AND INSTALLATION.

More information

SHADOWBOX INSTALLATION FOR: Standard 6 H x 8 W Shadowbox Fence 5 x 5 Routed Posts Dog Ear or Straight-Edge Pickets 1.75 x 3.5 Rail

SHADOWBOX INSTALLATION FOR: Standard 6 H x 8 W Shadowbox Fence 5 x 5 Routed Posts Dog Ear or Straight-Edge Pickets 1.75 x 3.5 Rail SHADOWBOX INSTALLATION FOR: Standard 6 H x 8 W Shadowbox Fence 5 x 5 Routed Posts Dog Ear or Straight-Edge Pickets 1.75 x 3.5 Rail Storage and Handling Fence Preparation and Layout Locate and Set Posts

More information

Ziptrak. Overview. Ziptrak system considerations. Ziptrak Vertical screening ideal for outdoor restaurants, patios, verandas, corporate signage.

Ziptrak. Overview. Ziptrak system considerations. Ziptrak Vertical screening ideal for outdoor restaurants, patios, verandas, corporate signage. Overview Vertical screening ideal for outdoor restaurants, patios, verandas, corporate signage. Operating big window and pergola blinds has been a difficult task for many people. Conventional spring loaded

More information

SAVE THESE INSTRUCTIONS

SAVE THESE INSTRUCTIONS SAVE THESE INSTRUCTIONS DEALER/INSTALLER: GIVE TO HOMEOWNER OCEAN BLUE GRAND ENTRANCE POOL STEPS ASSEMBLY AND INSTALLATION MANUAL ABOVE GROUND FOUR TREAD MODEL Part No. 400700 IN GROUND THREE TREAD MODEL

More information

Thank you for purchasing our product! *Please read these instructions and follow them step by step.*

Thank you for purchasing our product! *Please read these instructions and follow them step by step.* 07/07/08.rev1 PAGE 1 OF 11 601AL VERTICAL 60120VL LIFT W/CHAIN DRIVE WINCH Thank you for purchasing our product! *Please read these instructions and follow them step by step.* Step 1. Separate and group

More information

ULTRA SPACE SAVER SQUARED Installation Instructions

ULTRA SPACE SAVER SQUARED Installation Instructions Installation Instructions The Ultra Space Saver Squared has several steps for installation. Note that the single and double sided setups and parts are different. Make sure you follow the instructions according

More information

6400, 8400 and 9400 Series Sliding Patio Door

6400, 8400 and 9400 Series Sliding Patio Door Contemporary 3 Panel Classic 5 Panel French Panel 6400, 8400 and 9400 Series Sliding Patio Door (O) Fixed Panel Left (X) Operating / Mullion Panel Right (X) Operating / Lock Panel Left (O) Fixed Panel

More information

10x10 Trellis Pergola

10x10 Trellis Pergola 0x0 Trellis Pergola ASSEMBLY GUIDE Ver.-007 Table of Contents PAGE 0x0 Trellis Pergola Introduction & Overview...................................................... Pergola Materials Overview..............................................................

More information

Platinum Swing Panel Installation Instructions

Platinum Swing Panel Installation Instructions Platinum Swing Panel Installation Instructions The Standard Platinum Swing Panel is designed to fit baths with a perimeter lip no taller than 20mm. If installing onto baths without a perimeter lip an optional

More information

Swing Door Installation Manual

Swing Door Installation Manual Manual 20D/35D/50D 20DH/35DH 40M/50M 25FD 35XT 50XT 01-4000-03 2010 YKK AP America Inc. is a subsidiary of YKK Corporation of America. TABLE OF CONTENTS Installation Notes.......................................

More information

HANDRAIL HEIGHT PER LOCAL CODE AUTORITY

HANDRAIL HEIGHT PER LOCAL CODE AUTORITY WOOD END CAPS PLEASE READ PLEASE READ THESE INSTRUCTIONS THOROUGHLY PRIOR TO BEGINNING THE HRWS-6CSLBW INSTALLATION! 3 1/16" [77.7mm] THIS INSTRUCTION SHEET IS INTENDED TO PROVIDE A SPECIFIC GUIDE TO FOLLOW

More information

10x10 Trellis Pergola

10x10 Trellis Pergola 0x0 Trellis Pergola ASSEMBLY GUIDE Ver.0-7 Table of Contents PAGE Introduction & Overview...................................................... Pergola Materials Overview..............................................................

More information

STRATUS SHELTER. Take bike parking to new heights

STRATUS SHELTER. Take bike parking to new heights Take bike parking to new heights The Stratus Shelter is a striking bike shelter option for any transit station, university campus, or multi-family residential building project. It is constructed of American

More information

INSTALLATION INSTRUCTIONS. UNIT No. 160/760 THIN-LINE SHOWER ENCLOSURE

INSTALLATION INSTRUCTIONS. UNIT No. 160/760 THIN-LINE SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS UNIT No. 160/760 THIN-LINE SHOWER ENCLOSURE QCI0011 Rev. 0 Page 1of 10 Certified 10/18/2006 MAINTENANCE: Two primary materials are used to manufacture your new Basco enclosure;

More information

PRIVACY INSTALLATION FOR: Standard 6 H x 8 W Privacy Fence 4 x 4 Post Sleeve & Brackets Dog Ear or Straight-Edge Pickets 1.75 x 3.

PRIVACY INSTALLATION FOR: Standard 6 H x 8 W Privacy Fence 4 x 4 Post Sleeve & Brackets Dog Ear or Straight-Edge Pickets 1.75 x 3. PRIVACY INSTALLATION FOR: Standard 6 H x 8 W Privacy Fence 4 x 4 Post Sleeve & Brackets Dog Ear or Straight-Edge Pickets 1.75 x 3.5 Rail Storage and Handling Fence Preparation and Layout Locate and Set

More information

EASY-IN POOL STEP SYSTEM NE132

EASY-IN POOL STEP SYSTEM NE132 EASY-IN POOL STEP SYSTEM NE132 This instruction manual features multiple guides for the step unit components. 7939 EASY POOL STEP (NE113) FOR USE WITH: EASY-IN POOL STEP (NE126) 6492 PARTS & HARDWARE FOR

More information

WC INSTRUCTION MANUAL 2 PEOPLE REQUIRED SHOWER DOOR KW002

WC INSTRUCTION MANUAL 2 PEOPLE REQUIRED SHOWER DOOR KW002 WC-66-75 INSTRUCTION MANUAL SHOWER DOOR 05.11 2 PEOPLE REQUIRED KW002 IT IS MANDATORY TO HAVE A WALL STUD ON EACH SIDE OF THE SHOWER UNIT TO SECURELY FASTEN THE RAIL TO THE WALLS. GENERAL INSTRUCTIONS

More information

Installation Instructions for. Handrail Component System

Installation Instructions for. Handrail Component System Handrail STEP-BY-STEP Installation Instructions for Handrail Component System Rise in Inches Run in Inches 8 8.5 9 9.5 10 10.5 11 11.5 12 12.5 13 13.5 14 14.5 15 8.5 47 45 43 42 40 39 38 36 35 34 33 32

More information

HANDRAIL HEIGHT PER LOCAL CODE AUTHORITY. 6 3/8" [161.9mm]

HANDRAIL HEIGHT PER LOCAL CODE AUTHORITY. 6 3/8 [161.9mm] P-RSS PLEASE READ PLEASE READ THESE INSTRUCTIONS THOROUGHLY PRIOR TO BEGINNING THE P-RSS INSTALLATION! THIS INSTRUCTION SHEET IS INTENDED TO PROVIDE A SPECIFIC GUIDE TO FOLLOW FOR THE INSTALLATION OF THIS

More information

12. Wings, Flaps, Ailerons and Struts

12. Wings, Flaps, Ailerons and Struts 12. Wings, Flaps, Ailerons and Struts Fit Aileron Hinges Reference: Drawing 20270K2 Photo 12.1 Parts Required: 2007092 Aileron LS 200809N Aileron RS 2001394 Hinge 3/16 A1 (4) 2001694 Hinge Pin (4) PH0059N

More information

The Safe Solution for Stainless Steel Balustrade Systems

The Safe Solution for Stainless Steel Balustrade Systems M E R G I N G S A F E T Y W I T H S T Y L E The Safe Solution for Stainless Steel Balustrade Systems KEE STAINLESS is the most exclusive product in the Kee Safety handrail and balustrade product range.

More information

x2 1/4 (6mm) Floor Anchor

x2 1/4 (6mm) Floor Anchor Main Components x1 Rail x5 Wall Spacer x2 Anti-jump Block x2 Bent Strap x1 Right Stopper x1 Left Stopper x5 5/16 (8mm x 60mm) Carriage Bolt x5 5/16 (8mm x25mm) Anchor x5 5/16 (8mm x 90mm) Wall Screw x2

More information

TRADITIONAL GABLE ATTACHED PATIO AND CARPORT. Your complete guide to building an ATTACHED Outback TRADITIONAL GABLE PATIO or CARPORT

TRADITIONAL GABLE ATTACHED PATIO AND CARPORT. Your complete guide to building an ATTACHED Outback TRADITIONAL GABLE PATIO or CARPORT TRADITIONAL GABLE ATTACHED PATIO AND CARPORT STRATCO OUTBACK ASSEMBLY INSTRUCTIONS. Your complete guide to building an ATTACHED Outback TRADITIONAL GABLE PATIO or CARPORT BEFORE YOU START Carefully read

More information

Post-Paint>Fuselage>Interior>Controls>Fit rudder pedals

Post-Paint>Fuselage>Interior>Controls>Fit rudder pedals Post-Paint>Fuselage>Interior>Controls>Fit rudder pedals Objectives of this task: To fit the rudder pedals and steering links to the aircraft, and fit the rudder cable to the rudder pedals and set the deflection

More information

Installing the Nantucket (100 Series), Manhattan (200 Series), and Charleston (300 Series) Code-Approved Rail Systems

Installing the Nantucket (100 Series), Manhattan (200 Series), and Charleston (300 Series) Code-Approved Rail Systems ENRAIL INSTALL GUIDE Installing the Nantucket (100 Series), Manhattan (200 Series), and Charleston (300 Series) Code-Approved Rail Systems Thank you for choosing Enduris Enrail Code-Approved Railing products.

More information

ASSEMBLY INSTRUCTIONS

ASSEMBLY INSTRUCTIONS Quality Built In ASSEMBLY INSTRUCTIONS MK4A BASE SIZE 4.210mm x 2545mm ASSEMBLY INSTRUCTIONS Tools Required: Drill Drill Bit 3.5mm Drill Bit 6mm (for clear roof panel only) Riveter Hammer Nail Punch Tape

More information

HANDRAIL HEIGHT PER LOCAL CODE AUTHORITY

HANDRAIL HEIGHT PER LOCAL CODE AUTHORITY P-OS PLEASE READ PLEASE READ THESE INSTRUCTIONS THOROUGHLY PRIOR TO BEGINNING THE P-OS INSTALLATION! THIS INSTRUCTION SHEET IS INTENDED TO PROVIDE A SPECIFIC GUIDE TO FOLLOW FOR THE INSTALLATION OF THIS

More information

CXT PRO RAILING INSTALLATION INSTRUCTIONS For Installations Using Aluminum and Glass Balusters Sold Separately

CXT PRO RAILING INSTALLATION INSTRUCTIONS For Installations Using Aluminum and Glass Balusters Sold Separately CXT PRO RAILING INSTALLATION INSTRUCTIONS For Installations Using Aluminum and Glass Balusters Sold Separately CCRR-0171 PFS AA-652 Drill/power screwdriver Assorted drill bits Hammer Miter or circular

More information

Heavy Glass Frameless Shower Door With Return Panel

Heavy Glass Frameless Shower Door With Return Panel 202 Anderson Ave., Belvue, KS 66407 Phone: 800-669-9867 Fax: 800-393-6699 www.onyxcollection.com Heavy Glass Frameless Shower Door With Return Panel Full Showers with Return PL92-0118 R S K Parts List

More information

A LUMINIUM. Modular Handrail Installation Guide. Tools and Materials Required. Hardware Included. See WARNING on inside panel

A LUMINIUM. Modular Handrail Installation Guide. Tools and Materials Required. Hardware Included. See WARNING on inside panel A LUMINIUM Handrail Modular Handrail Installation Guide WALL APPLICATION BALUSTRADE APPLICATION see page 3 see page 11 Tools and Materials Required Mitre saw with non-ferrous metal cutting blade Drill

More information

620 Freestyle/Style Swing Door

620 Freestyle/Style Swing Door 620 Freestyle/Style Swing Door (CUH or MG) Style Series Option M HK87 MGNETIC PULL HNDLE KIT 989 MGNETIC DOOR STOP C 083 JM Metal Slide with Magnet H900 PN HED SCREW N Connector Screw J HTG6 PUSH / PULL

More information

R Form No MILLENNIUM GONDOLA / WALLCASE ASSEMBLY

R Form No MILLENNIUM GONDOLA / WALLCASE ASSEMBLY R06-19-06 - Form No.08335-0109 POST THIS WARNING PAGE IN A CONSPICUOUS PLACE, CLEARLY VISIBLE TO ALL STORE PERSONNEL READ BEFORE ASSEMBLING WARNING FOR YOUR SAFETY Install all shelving units according

More information

YES 600 Thermal Clip Storefront System Installation Manual

YES 600 Thermal Clip Storefront System Installation Manual Installation Manual 2004 YKK AP America Inc. is a subsidiary of YKK Corporation of America. TABLE OF CONTENTS Installation Notes........................................ Page ii Frame Types............................................

More information

PL-93. Frameless Door with Panel & Return. 202 Anderson Ave., Belvue, KS Phone: Fax:

PL-93. Frameless Door with Panel & Return. 202 Anderson Ave., Belvue, KS Phone: Fax: 202 Anderson Ave., elvue, KS 66407 Phone: 800-669-9867 Fax: 800-393-6699 www.onyxcollection.com 800-643-1514 www.alumaxshowerdoor.com PL-93 Frameless Door with Panel & Return Full Showers with Return ench

More information

1/4 FRAMELESS SLIDING DOOR FOR TUB OR SHOWER

1/4 FRAMELESS SLIDING DOOR FOR TUB OR SHOWER 1/4 FRAMELESS SLIDING DOOR FOR OR SHOWER INSTALLATION INSTRUCTIONS NEED INSTALLATION HELP? Call 1-800-45-BASCO (452-2726) M onda y - Friday 8 :00 A.M. - 4:30 P.M. Eastern Time MAINTENANCE: Two primary

More information

Semi-Frameless Hinged Door With Panel And Return

Semi-Frameless Hinged Door With Panel And Return 202 Anderson Ave., Belvue, KS 66407 Phone: 800-669-9867 Fax: 800-393-6699 www.onyxcollection.com 800-643-1514 www.alumaxbath.com Semi-Frameless Hinged Door With Panel And Return Full Showers with Return

More information

TRUE TECHNICAL SERVICE MANUAL - ALL MODELS. DOORS/DRAWERS/LIDS

TRUE TECHNICAL SERVICE MANUAL - ALL MODELS.  DOORS/DRAWERS/LIDS DOORS/DRAWERS/LIDS 55 56 NOTES DOORS/DRAWERS/LIDS Swing s 73 74 NOTES INSTALLATION OF A GDM-SWING DOOR Phillips Head Screwdriver (2) - 1/8" Drift Punches (forged) Top Bracket NOTE: It may be necessary

More information

IDP Entry-Fit Steel Door Frames. Installation Instructions K2A and NK2A Series Frames

IDP Entry-Fit Steel Door Frames. Installation Instructions K2A and NK2A Series Frames IDP Entry-Fit Steel Door Frames Installation Instructions K2A and NK2A Series Frames IDP Inc 21300 W. 8 Mile Rd. Southfield, MI 48075 1-877-645-2770 www.idpframes.com email: info@idpframes.com K2A and

More information

12X20 Breeze Pergola Assembly Manual Outdoor Living Today

12X20 Breeze Pergola Assembly Manual Outdoor Living Today 12X20 Breeze Pergola Assembly Manual Outdoor Living Today Revision #10 July 21th, 2015 Note: Post Mounting Hardware is NOT included in this kit. Please confirm with your local building permit office to

More information

Queen Wingback Bed King Wingback Bed

Queen Wingback Bed King Wingback Bed Parts and Hardware List A. Side Rails with Attachment Hooks 2 pcs B. Foot Rail 1 pc C. Head Rail 1 pc D. Center Support Slat 1 pc E. Leg Supports 3 pcs F. Support Slats 4 pcs G. Flat Washers 8 pcs H. Lock

More information

WILDING WALLBEDS INSTALLATION INSTRUCTION Side Mount

WILDING WALLBEDS INSTALLATION INSTRUCTION Side Mount WILDING WALLBEDS INSTALLATION INSTRUCTION Side Mount For Wallbed models: Do-It-Yourself Insturction booklet C92 WARNING! ALL MURPHY/WALLBED SYSTEMS CONTAIN STORED ENERGY. FAILURE TO USE AND FOLLOW THESE

More information

Fig. 2 DORMA-Glas Stand/Issue 02/03 Seite/Page 1/7

Fig. 2 DORMA-Glas Stand/Issue 02/03 Seite/Page 1/7 FSW Installation instructions Track rail 75 x 72 mm 1. Ceiling substructure and installation of the track rail (Fig. 1): The track rail must be bolted over its entire length (including the stacking track

More information

PREMIUM CONCRETE COUNTERTOP MIX INSTALLATION INSTRUCTIONS

PREMIUM CONCRETE COUNTERTOP MIX INSTALLATION INSTRUCTIONS PREMIUM CONCRETE COUNTERTOP MIX INSTALLATION INSTRUCTIONS High Strength Fast Setting Pourable Helpful Items: TCC Materials February 09 Version 2.0 Tools Required: Concrete mixer or ½ drill (600 RPM or

More information