INSTALLATION INSTRUCTIONS TRI-ROOF. energy for a better world

Size: px
Start display at page:

Download "INSTALLATION INSTRUCTIONS TRI-ROOF. energy for a better world"

Transcription

1 energy for a better world INSTALLATION INSTRUCTIONS TRI-ROOF The flexible roof integration system Compatible for framed module types* Simple exchange of modules Replaces existing roofing Special profiles for maximum impermeability Closed module surface for aesthetically attractive PV systems Certificated for wind and snow loads Tested for statics *from the TRITEC range

2

3 Table of Contents The Basics System 4 Notes 4 Load effect 4 Statics 5 Roof condition 5 TRI-DESIGN Dimensioning Software 5 Installation: Introduction Tools 6 Installation procedure 6 Installation Measuring the module field 7 Laying of the Perform 7 Installation of the vertical UP-I profiles 8 Fixation of the bottom edge plates to the first row of SafeClicks 9 Insertion of the horizontal retainers TR-H and TS profiles 10 Installation of the slats for the top connection plates 11 Installation of the lateral end plates and roof ridge plates 11 Laying of cables and insertion of modules 14 Annex: Use of the TS bending tool 16

4 4_The Basics THE BASICS System The TRI-ROOF Mounting System is a flexible roof integration system, allowing almost any photovoltaic system to be integrated into existing roofs or roofs to be constructed simply, safely and aesthetically attractively. The system is compatible with all framed module types from the TRITEC range. The installed system replaces the existing roofing. The later replacement of system modules poses no problem. The special profiles of the system enable maximum impermeability, and the closed module surface meets even the greatest demands for aesthetically attractive PV systems. Störfix Notes For the installation of the TRI-ROOF system only products from the range of the TRI-ROOF mounting system must be used. Using third-party components can affect the system s stability and result in significant damage. The system must only be installed by trained and competent personnel. We do not accept liability for damages caused by the use of third-party components or incorrect installation. In order to prevent damages due to condensation water drain, ice from forming,and storm rains a sub-roof provided on site is required for every TRI-ROOF system. These installation instructions describe the correct installation of the TRI-ROOF roof integration system. However, in some situations we recommend to consult an expert on special roof features (e.g. a roofer or carpenter). Required screw torques: SafeClick 20 Nm M10 threaded joints truss head, hammer head and hexagonal screws: 30 Nm M8 threaded joints: 20 Nm Load effect In addition to their own weight, the system components and sub-structures experience mainly wind forces and snow loads. Therefore, each system must be calculated and designed considering its requirements and external influences as well as DIN 1055* (Effects on supporting structures). The exposure to wind loads is mainly dependent on the wind zone (according to DIN *), the building s height, the shape and inclination of the roof and the system s position. Weight loads caused by snow depend on the snow zone (according to DIN *), the shape and inclination of the roof and the system s position. The wind and snow load zones, on which the system s design is based, can be determined for any location. * European standard: EN

5 The Basics_5 Statics In all cases, the statics of the roof must be checked by authorised experts. In particular, it must be examined whether the roof can bear the additional load created by the solar system. Since the load acceptance and the load effect of photovoltaic systems are affected by many factors, the statics must be calculated for every individual roof. Roof condition The current condition of the roof must be such that renovation will not be necessary for at least 20 years. When in doubt, we recommend to have the roof checked by an expert. To achieve the optimal draining of rain water, a minimum roof inclination of 10 degrees is required. When using the edge plates for tiles, the minimum required roof inclination is 15. The TRI-ROOF mounting system is optimised for plane surfaces. If a roof is uneven due to age or other reasons, we recommend to consult an expert. Make sure that aeration and ventilation of the roof exists or will be built in. TRI-DESIGN Dimensioning Software The TRI-DESIGN dimensioning software calculates and designs the TRI-ROOF mounting system according to the standards of DIN 1055 *. The relevant directives are DIN * for wind loads and DIN * for snow and ice loads, which affect the photovoltaic system and its substructure. The software calculates all sizes and distances relevant for the installation. In addition, the dimensioning software allows us to design the system optimally for the individual roof and thus to select the best version of the mounting system. Under the warranty terms and conditions, all TRI-ROOF systems must have been dimensioned using the TRI-DESIGN dimensioning software.

6 6_Installation: Introduction INSTALLATION: INTRODUCTION Tools Cordless screwdriver Drill 3.3 mm Rivet gun Open-ended spanner 15 mm Open-ended spanner 17 mm (for installation on steel beams) TS edging tool (see annex) Allen key 3 mm Allen key 5 mm Metal shears Installation procedure The roof integration system TRI-ROOF is installed in eight steps: 1. Measuring of the module field 2. Laying of the Perform 3. Installation of the SafeClicks and vertical UP-I profiles 4. Fixation of the bottom edge plates to the first row of SafeClicks 5. Insertion of the horizontal retainers TR-H and TS profiles 6. Installation of the slats for the top connection plates 7. Installation of the lateral end plates and roof ridge plates 8. Laying of cables and insertion of modules

7 Installation_7 INSTALLATION Measuring the module field The size of the module field is determined by the number of modules to be installed. The exact size of the field can be gathered from the TRI-DESIGN dimensioning. After measuring the module field on the roof, the existing roofing if any is removed. Laying of the Perform The perform is laid over the roofing adjacent to the bottom of the module field. The material must overlap the roofing by a minimum of 10 cm. The perform is glued to the roofing using Perform adhesive. To install the Perform between module field and tiles, a supporting board must be installed from the bottom edge of the module field and the connecting edge of the tiles. In some cases it is recommended to install a tiling batten at the top edge of the perform, in order to affix it easily and cleanly. To achieve the optimum impermeability of the bottom edge of the system, the Perform must extend to at least 100 mm beneath the system. The roofing adjacent to the system must also be covered for at least 100 mm.

8 8_Installation Installation of the vertical UP-I profiles In the case of systems of low depth without UP-I joints, the SafeClicks can be pre-installed on the ground or in the workshop. The installation of the Safe- Clicks is described in the section Fixation of the bottom edge plates to the first row of SafeClicks. Based on the dimensioning of the system, the UP-I profiles are installed at the calculated places. Using a plumb line, the profiles are oriented in such a way that they are at the same height horizontally and at a right angle to the bottom edge vertically. It is recommended to check the correct right angle by measuring the diagonal. To ensure greater precision, we recommend to use a gauge to adjust the horizontal distance between two profiles exactly. The following rules of thumb allow the determination of distances between profiles: End field clearance: Module laying width (in mm) 254 mm Central field clearance: Module laying width (in mm) 168 mm If due to the depth of the module field, several UP-I profiles must be mounted on top of each other, they will be pushed into each other and glued together with TRI-ROOF special adhesive for ridge plates and form-fittingly connected in the centre by means of flat connectors, sliding nuts M10 and hexagonal screws M10 x 25 A2. If a SafeClick is located on the rail joint, the flat connector can also be connected to the lateral or lower groove of the UP-I profile by means of hammer head bolts and self-locking nuts with serrated bearing surface. Depending on the roof, there are different methods of fixation. For example, the fixation depends on the roof s sub-structure and the number of fixation points is dependent on the static conditions. The following methods of fixation are used for the respective roof constructions. The respective installation of the fixation aids is described below. Tiling battens: Steel roof beams: Universal profile retainer TR-U and button-head screw 5.0 x 30 A2 Z adapter TR-Z Wood roof beams: Universal profile retainer TR-U and flat-head screw 8.0 x 80

9 Installation_9 Fixation using universal profile retainer TR-U and button-head screw 5.0 x 30 A2 The universal profile retainers are fixed to the battens using the button-head screws 5.0 x 30 A2, according to the static data on number and distance. In addition, a hammer-head screw M10 x 20 A2 with self-locking nut with serrated bearing M10 A4 is installed above the universal profile retainers, in order to prevent sliding of the UP-I profiles. Fixation using Z adapter TR-Z The Z adapters are inserted into the rear side of the UP-I profiles using hammer-head screws M10 x 20 A2 and self-locking nut with serrated bearing M10 A4, and pushed to the T profiles as far as they will go and tightened. Then the hexagon-head screw M10 x 25 A2 is screwed into the thread of the Z adapter, in order to make the connection fully restraint and pressure-resistant. In the case of deep module fields (>12 m), only the hexagon-head screws close to the roof ridge are firmly tightened. The bottom screws should only be tightened finger-tight to allow the heat expansion of the UP-I profiles. Fixation using universal profile retainer TR-U and flat-head screw 8.0 x 80 The universal profile retainers are fixed to the wood roof beams using flathead screws 8.0 x 80, according to the static data on number and distance of fixation points. In addition, a hammer-head screw M10 x 20 A2 with self-locking nut with serrated bearing M10 A4 is installed above the universal profile retainers, in order to prevent sliding of the UP-I profiles. Fixation of the bottom edge plates to the first row of SafeClicks The edge plates are installed at the bottom of and flush with the UP-I profiles. They are fixed to the UP-I profiles using the SafeClicks. To achieve a continuous bottom edge of the module field, the plates must overlap and be riveted. It is important that the edge plates overlap by a minimum of 10 cm each. To install the SafeClicks, it is also recommended to use a gauge. Starting with the lower SafeClicks, the SafeClicks are installed at the specified distance (module insertion length minus 57.5 mm). They are inserted into the profile from the top and fixed in the relevant place using an Allen key. SafeClicks can also be installed before the installation on the ground or in the workshop.

10 10_Installation Insertion of the horizontal retainers TR-H and TS profiles The water-bearing TR-H carrier profiles are directly installed on the UP-I profiles using the TR-C Clips. The profiles are clamped above the already installed SafeClicks using the clips. Since two TR-H profiles are always fixed with a TR-C clip in the module field, it is recommended to click in the clip into the profile only after the second profile has been inserted. To ensure the best possible drain-off of rain water under the hoizontal module joints, the horizontal TR-H carrier profiles must be installed so that they converge at an angle. The angle is achieved by attaching the TR-C clips alternatively at the top stop angle or the second bar of the T-H carrier profiles. Determination of the RH groove length in end fields: Module insertion width minus 155 mm Special case of only one vertical module line: Module insertion width minus 241 mm Determination of the TRH groove length in centre fields: Module insertion width minus 69 mm When all TR-H profiles have been installed, the TS profiles are clicked into the SafeClicks. For a firm connection between the SafeClicks and TS profiles it is sufficient to insert the profile into the grooves of the SafeClicks and press it down until it clicks into place. To ensure the safe installation of the modules on the roof, the correct orientation of the TS profiles is essential. The profiles must be clicked into place in such a way that the longer flange of the module retainer points towards the bottom edge of the roof, and the shorter towards the roof ridge. Depending on the width of the module field, it might be necessary to extend the TS profiles. To link two TS profiles, the insertion profile connector must be installed between the two profiles. With the setscrew oriented towards the bottom, the TS-C connector is pushed into an installed TS profile until it is flush with the TS profile. Subsequently, the next TS profile is installed with a 3 mm space to the one before; the TS-C connector is pushed into the new TS profile up to its centre marking and then unilaterally connected with a setscrew. With this type of connection, the TS profiles are able to expand or contract relatively stress-free in hot or cold conditions. The modular loads will be transmitted nonetheless.

11 Installation_11 Installation of the slats for the top connection plates Blanking plates can only be used with standard tiles. In some cases slats must be installed before the roof ridge plates can be mounted. The bottom edge of the roof ridge plates must later be inserted into the TS profile and fixed at the top end using the aluminium brackets. If the fixation by means of aluminium brackets at the top end of the ridge plate is impossible, slats must be installed on the roof to enable the fixation. Installation of the lateral end plates and roof ridge plates The lateral plates are laid flush with the TS profiles and fixed to the roof using the aluminium brackets. The length of the lateral plates is adjusted to the height of the module field by letting the plates overlap. They should overlap by at least 15 cm. The plates are telescoped until the desired length is reached. To achieve optimum drainoff of the water, it is important that the top plate is put on top of the adjoining lower plate, when the plates are positioned on top of each other. The lateral plates are flush with the bottom edge of the bottom outer plates at the bottom end of the module field. The top end of the lateral plates is flush with the top end of the ridge plates. Begin the installation of the ridge plates in one of the two corners of the module field with FL (ridge plate left) or FR (ridge plate right). The bottom end of the ridge plate is inserted into the topmost TS profile. Ridge sheets must be laid such that the sheets are provided with a lateral space of 5 mm.

12 12_Installation After the ridge plates have been laid, they are fastened with aluminium grips on the roof. This is done either on one of the existing roof battens or on the mounting battens installed beforehand. The ridge plates are fastened on the TS profile by means of self-tapping screws 6.3 x 25 A2 DS, at a distance of 50 cm. Four pieces per FM, two pieces per FR and / or FL ridge plate. Important: In the area of the TS insertion profile butt joint, the overlapping area of the ridge sheet must not be screwed together with the following TS profile. Installation of the ridge plates is completed by fastening the joint cover plates on the butt joints formed between the individual plates. To give the system impermeability, the joint cover plates receive two lines of adhesive (TRI-ROOF special adhesive for ridge plates) at their lateral edges and are then bonded together firmly.

13 Installation_13 The butt plates may only be riveted on one side with the ridge plates so that heat expansion is possible in the ridge area. For the riveting of the lateral end plates (AS) they are pushed to the sides of the TS profiles. It is important that the AS angles are inserted under the TR-C clips from bottom to top. Here an overlap of 5 cm is sufficient. Then the AS angles and lateral plates are drilled every 50 cm and riveted together. Finally the connection between ridge plate and lateral plate is sealed using the weather-proof adhesive tape FLEX-DICHT 3D. When all ridge and lateral plates are mounted, they are fixed in place by riveting.

14 14_Installation After installation of the ridge and lateral plates, they are covered with collar sealing strips. These collar sealing strips prevent moisture from penetrating the roof via the lateral and ridge plates in case of heavy rain or snow. By means of the TS edging tool, the TS-profiles must now each be edgetrimmed to the left and right of a SafeClick located in the middle of the rail. This measure will limit subsequent creeping of the rails due to heat and cold. Laying of cables and insertion of modules All cables must be run under the profiles and not over the UP-I profiles and TR-H carrier profiles. In addition, the strain relief and good attachment of all cables are significant. To connect the cables to the UP-I profiles, a cross cable clip block is used. This is attached to the side of the profile and fixes the cables by means of a cable tie. When the string cables have been laid, the modules can be inserted and connected. For the easy cabling of modules they are put on the top TS profile and then connected.

15 Installation_15 Installation of the TRI-ROOF spacers (TR-D): The dimensioning specifies the installation of the spacers. Spacers are easy to mount if there is already a module to the left or right of the specified place. It can then be inserted with a 90 turn into the centre duct of the UP-I rail, and the next modules can be inserted and wired up to the next following TR-D. The final insertion of the modules is carried out in three steps: Insertion of the module into the top TS profile Depositing the module on the bottom TS profile Insertion of the module into the bottom profile The modules are held by the force of gravity in the TS profiles and are securely fixed in place without screws or rivets. A 2 mm space must be kept between the modules so that they can expand tension-free. If necessary, filler pieces are installed after laying of the modules and the TR-D spacers. The filler pieces are inserted in the still open places exactly like the modules; after that, the filler piece is riveted with two TRI-ROOF rivets to the lateral angle AS.

16 16_Annex Annex: Use of the TS bending tool The TS profiles must each be edge-bent per profile left and right of a SafeClick located in the centre of the TS rail. This measure will limit the movement of profiles as a result of temperature changes. 1. Fix TS profile in place Push bending tool into the lower leg of the TS profile. Turn the bending tool by 8 10 cm toward the bottom. Pull out the bending tool again and repeat the same steps on the left side of the SafeClick.

17 Annex_17 2. Subsequently loosen SafeClick Push bending tool from the top over the flat spring of the SafeClick. Turn the bending tool toward the bottom all the way to the stop. Push TS profile toward the top and remove.

18 The General Terms and Conditions and Guarantee Conditions of TRITEC apply. Made in Switzerland Version 3.1 Subject to technical changes. Artikel-Nr

INSTALLATION INSTRUCTIONS TRI-VENT. energy for a better world

INSTALLATION INSTRUCTIONS TRI-VENT. energy for a better world energy for a better world INSTALLATION INSTRUCTIONS TRI-VENT The photovoltaic mounting system for trapezoidal sheet roofs Quick and easy installation Riveting instead of glueing Securing without screws

More information

Mounting systems for solar technology

Mounting systems for solar technology Mounting systems for solar technology ASSEMBLY INSTRUCTIONS Crosshook 3S CrossHook 4S GB Table of contents TABLE OF CONTENTS THE COMPANY SAFETY REGULATIONS MATERIALS REQUIRED TOOLS REQUIRED ASSEMBLY 2

More information

Mounting systems for solar technology

Mounting systems for solar technology Mounting systems for solar technology ASSEMBLY INSTRUCTIONS Roof Fastener System CrossHook 2G GB Table of contents TABLE OF CONTENTS THE COMPANY SAFETY REGULATIONS MATERIALS REQUIRED TOOLS REQUIRED ASSEMBLY

More information

MANUAL MOUNTING SYSTEM FOR CORRUGATED ROOF

MANUAL MOUNTING SYSTEM FOR CORRUGATED ROOF MANUAL MOUNTING SYSTEM FOR CORRUGATED ROOF EN mounting system for corrugated roof for solar panels in portait setup (cross-system) ESDEC BV 2015 TABLE OF CONTENT 1. Introduction 1 2. General installation

More information

SecuAnch Roof Anchor System

SecuAnch Roof Anchor System Height Safety Products Email: marketing@fallprotec.com SecuAnch Roof Anchor System 1 Presentation The SecuAnch lifeline is designed to be permanently installed on buildings and other structures where maintenance

More information

WPS crew Doors Installation instructions

WPS crew Doors Installation instructions WPS-132-133 crew Doors Installation instructions ORDER OF INSTALLATION FOR A COMPLETE ENCLOSURE OF A CREW WPS (Weather Protection System) IS AS FOLLOWS: 1. Heater 2. Rear Thresholds - Right Hand & Left

More information

GROWING BETTER THROUGH DESIGN. 6ft Lean-To LEAN-TO. Assembly Instructions 04/02

GROWING BETTER THROUGH DESIGN. 6ft Lean-To LEAN-TO. Assembly Instructions 04/02 GROWING BETTER THROUGH DESIGN 6ft Lean-To LEAN-TO Assembly Instructions 04/02 6ft Lean-To Greenhouse Base Plan Introduction/Tools/Contents / / Contents This is a copy of our Lean-To greenhouse base plan.

More information

Installation instructions. Novotegra for Corrugated Fibre Cement / Sandwich Roofs

Installation instructions. Novotegra for Corrugated Fibre Cement / Sandwich Roofs Installation instructions Novotegra for Corrugated Fibre Cement / Sandwich Roofs I CONTENTS 1 General information... 0 2 Novotegra: mounting system planning... 1 2.1 Solar-Planit software... 1 2.1.1 General

More information

Alpha + On-Roof System Installation manual

Alpha + On-Roof System Installation manual 810-0116 Alpha + On-Roof System Installation manual Content Alpha + A stroke of genius with a plus 1 Introduction 2 1.1 Short Description 2 1.2 About These Instructions 2 1.3 Warnings 3 1.4 Safety 3 2

More information

Assembly Instructions 10 X 10 Aluminum Roof Support

Assembly Instructions 10 X 10 Aluminum Roof Support Assembly Instructions 10 X 10 Aluminum Roof Support Aluminum Roof Support Bolt Package 16-5/16 X 2 ¼ SS Bolt 24-5/16 X 1 SS Bolt 40-5/16 SS Nylon Lock Nuts 16-5/16 SS Flat Washers 28-4 ½ Wood Screws 36-1

More information

Manufacturing and installation instruction. Solidare Verso. Pergola awning (bottom mounted)

Manufacturing and installation instruction. Solidare Verso. Pergola awning (bottom mounted) Manufacturing and installation instruction Solidare Verso Pergola awning (bottom mounted) Solidare Verso pergola awning 11-05-2017 * * A T T E N T I O N * * AVZ accepts no liability for any errors in this

More information

REC Series Rack Installation Guide

REC Series Rack Installation Guide REC Series Rack Installation Guide 1 REC Series Rack Installation Guide TABLE OF CONTENTS SECTION SAFETY WARNINGS 1 600 WIDE EXPLODED VIEW 2 800 WIDE EXPLODED VIEW 3 SWITCHING DOOR HANDING 4 STABILIZING

More information

VarioSole SE. Installation instructions

VarioSole SE. Installation instructions VarioSole SE Installation instructions INTRODUTION Product Information VarioSole is a universal, easy to install system for the mounting of framed PV modules on pitched roofs with a roof pitch between

More information

TITGEMEYER Tf1673GB(0517)1. GETO City Body Kit with a self-supporting base and without a base Assembly Instructions

TITGEMEYER Tf1673GB(0517)1. GETO City Body Kit with a self-supporting base and without a base Assembly Instructions TITGEMEYER Tf1673GB(0517)1 with a self-supporting base and without a base All rights reserved. The technical data quoted in this catalogue, performance descrip - tions, recommendations and instructions

More information

Roof fastener. Perfectly thought out for every roof

Roof fastener. Perfectly thought out for every roof Roof fastener Perfectly thought out for every roof 1 Welcome to the world of clever solutions Solutions for every roof In our production areas we produce all needed components for the sub construction

More information

E N G L I S H GARDEN SHED. Assembly Instructions. Suitable for Models WITH VARYING DEPTHS

E N G L I S H GARDEN SHED. Assembly Instructions. Suitable for Models WITH VARYING DEPTHS GARDEN SHED Assembly Instructions Suitable for Models 6' Wide 8' Wide 0' Wide WITH VARYING DEPTHS GI0003 November 0 INSTALLATION ADVICE It's Not That Difficult! The construction of your shed isn't as complicated

More information

MANUAL MOUNTING SYSTEM FOR BITUMEN / EPDM

MANUAL MOUNTING SYSTEM FOR BITUMEN / EPDM MANUAL MOUNTING SYSTEM FOR BITUMEN / EPDM EN mounting system for insulated pitched roof Bitumen / EPDM for solar panels landscape setup ESDEC BV 2015 TABLE OF CONTENT 1. Introduction 1 2. General installation

More information

Installation manual. novotegra for tiled roofs

Installation manual. novotegra for tiled roofs Installation manual novotegra for tiled roofs I TABLE OF CONTENTS 1 Information... 1 2 Installation system maintenance... 3 3 novotegra for tiled roofs... 3 4 System components, tools and work equipment...

More information

ALUMINIUM SOLAR MOUNTING SYSTEM. Components catalogue FOR ALL TYPES OF ROOFS AND SITES

ALUMINIUM SOLAR MOUNTING SYSTEM. Components catalogue FOR ALL TYPES OF ROOFS AND SITES Components catalogue MOUNTING RAILS CARRIERS FOR RAILS FASTENERS BOLTS AND NUTS CLIPS FLAT ROOFS STRUCTURES FREE FIELD SYSTEMS COMPLEX ROOFS SYSTEMS ALUMINIUM SOLAR MOUNTING SYSTEM FOR ALL TYPES OF ROOFS

More information

UPDATED REV.5 BLACK WIDOW. Detailed installation manual. Patent pending P/N: BW-S, BW-B, BW-F.

UPDATED REV.5 BLACK WIDOW. Detailed installation manual. Patent pending P/N: BW-S, BW-B, BW-F. PAGE-1 UPDATED 2-3-2015 REV.5 BLACK WIDOW Detailed installation manual PAGE-2 UPDATED 2-3-2015 SpiderRax, Inc. REVISION PAGE Installation Manual For BW-S, BW-B,BW-F DATE PAGES REASON OLD LEVEL NEW LEVEL

More information

FABA. Installation Instructions. Conductor Bar System. Publication #FABA-03 3/1/04 Part Number: Copyright 2004 Electromotive Systems

FABA. Installation Instructions. Conductor Bar System. Publication #FABA-03 3/1/04 Part Number: Copyright 2004 Electromotive Systems FABA Conductor Bar System Installation Instructions Publication #FABA-03 3/1/04 Part Number: 005-1062 Copyright 2004 Electromotive Systems 1S 100 Z Installation Instructions Contents: Basic Diagram - -

More information

AWNING / PATIO COVER INSTALLATION INSTRUCTIONS

AWNING / PATIO COVER INSTALLATION INSTRUCTIONS AWNING / PATIO COVER INSTALLATION INSTRUCTIONS Before You Begin Read the installation instructions thoroughly before beginning the installation procedure. Perspective In the Awning Instructions, Back means

More information

orientation Conergy SunTop Instructions for professional installation

orientation Conergy SunTop Instructions for professional installation On-roof Framed modules Portrait orientation Landscape Three-tab Shingle Plain tile Slate Double Roman tile Metal roof Material warranty orientation Conergy SunTop Instructions for professional installation

More information

CSS Central Mount System

CSS Central Mount System CSS-20 Installation Manual CSS-20 Safety Notifications Below are the installation instructions for the CSS-20-2 Long Span Beam Mounting System. Please read these safety notifications prior to beginning

More information

Installation Guide Simplicity Alfresco. V1.9 Lu070318

Installation Guide Simplicity Alfresco. V1.9 Lu070318 0333 305 5272 www.canoports.co.uk Installation Guide Simplicity Alfresco V1.9 Lu070318 Tools Required Below is a list of tools that you will require to install your the Simplicity Alfresco System. Cordless

More information

Assembly Instructions 10 X 10 Aluminum Frame Building

Assembly Instructions 10 X 10 Aluminum Frame Building Assembly Instructions 10 X 10 Aluminum Frame Building 27 97 9 8 47 36 74 52 10 10 X 10 Square Building W/ Dome Includes: The Steel Entry Door with a Dead Bolt Lock assembly and Aluminum Door Frame. Metal

More information

LAWN AND GARDEN GREENHOUSE

LAWN AND GARDEN GREENHOUSE MODELS# OG0AL8-BKE OGAL-8 OGrow Walk-in ' x 8' LAWN AND GARDEN GREENHOUSE With Heavy Duty Aluminium Frame MANUAL VERSION # Grow r! e h t e g To Let's Thank you for purchasing the OGROW greenhouse Follow

More information

BLACK WIDOW COMPOSITE

BLACK WIDOW COMPOSITE PAGE-1 UPDATED 3-6-2015 REV.1 BLACK WIDOW COMPOSITE Detailed installation manual PAGE-2 UPDATED 3-6-2015 SpiderRax, Inc. REVISION PAGE Installation Manual For BWC-S, BWC-B,BWC-F DATE PAGES REASON OLD LEVEL

More information

Notes. Modifications and constructional corrections arising particularly from technological development excepted.

Notes. Modifications and constructional corrections arising particularly from technological development excepted. Notes Our service staff and application en gineers will be pleased to offer you their assistance to answer your questions or to work out in cooperation with you specific solutions with the aid of our own

More information

AWNING SYSTEM INSTALLATION INSTRUCTIONS ALL VERTICAL WALLS

AWNING SYSTEM INSTALLATION INSTRUCTIONS ALL VERTICAL WALLS INSTALLATION MANUAL AWNING SYSTEM INSTALLATION INSTRUCTIONS ALL VERTICAL WALLS TABLE OF CONTENTS Table of Contents... 3 Components... 4 System Components... 6 Attachment Components... 7 Module Compatibility...

More information

On-roof system Alpha + Product catalogue

On-roof system Alpha + Product catalogue On-roof system Alpha + Product catalogue Contents ALPHA +... 3 1. ALPHA + BASE RAILS... 4 2. ALPHA + SPLICES... 5 3. ALPHA + TELESCOPING END PIECES... 6 4. ALPHA + INTER-MODULE CLAMPS AND MODULE END CLAMPS...

More information

1 of 2 3/3/2017 4:49 PM

1 of 2 3/3/2017 4:49 PM 1 of 2 3/3/2017 4:49 PM Front Door Window, Assembly Overview 1 - Window guide - Inserted on flange 2 - Door 3 - Inner window recess seal - Inserted on flange 4 - Bolt - 20 Nm 5 - Carrier assembly - Window

More information

10 Octagon Cedar Gazebo Assembly Instructions

10 Octagon Cedar Gazebo Assembly Instructions 10 Octagon Cedar Gazebo Assembly Instructions Toll Free: 866.768.8465 Hours: 9-5 Monday-Friday EST www.homeplacestructures.com Package ships as shown revised 06/22/09 10 Cedar Gazebo Assembly Instructions

More information

Installation Instructions - Model V4JSD 1

Installation Instructions - Model V4JSD 1 Installation Instructions - Model V4JSD 1 Support Assemblies: Parts list: (Note see enclosed cut sheet for quantities and dimensional information) A vertical structural member (1 ½ x 1 ½ modular frame)

More information

SILVERBACK INSTALLATION MANUAL

SILVERBACK INSTALLATION MANUAL SILVERBACK INSTALLATION MANUAL S-SERIES SOLAR RACKS T OLL FREE 877-765-2759 WWW.SILVERBACKSOLAR.COM Introduction... 2 The Silverback Solar Racking System... 2 This manual... 2 Application... 2 System Overview...

More information

INS A KSCR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE. 1. Unpacking the KSCR Splicing the KSCR (If Required)...

INS A KSCR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE. 1. Unpacking the KSCR Splicing the KSCR (If Required)... INS-88.500-0A KSCR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE 1. Unpacking the KSCR... 2 2. Splicing the KSCR (If Required)... 4 3. Assemble Curb and Rail Corners... 5 4. Install Cross Bracing (If Required)...

More information

3.2.3 Rear Door Window and Quarter Window Carrier Assembly

3.2.3 Rear Door Window and Quarter Window Carrier Assembly Tighten all bolts. Tighten bolts marked -1- and -2- in specified sequence. Tightening torque: 8 Nm Remaining bolts can be tightened in any sequence. Insert door window -3- through window recess without

More information

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE Set A Set B PFD30 Fire Door Kit FITTING INSTRUCTIONS For use with 44mm thick doors only For Single and Double doors IF INSTALLING A TOUCH LATCH, PLEASE READ THE CORRESPONDING FITTING INSTRUCTIONS FIRST

More information

MOUNTING INSTRUCTIONS CONCRETE PURLIN BRACKET

MOUNTING INSTRUCTIONS CONCRETE PURLIN BRACKET CONCRETE PURLIN BRACKET VERSION MARCH 2015 GENERAL INSTRUCTIONS Safety: Systems may only be installed and operated by properly trained and technically suitable people (i.e. MCS accredited installers).

More information

Insolroll Clutch Operated Shades Installation Instructions Installation Instructions

Insolroll Clutch Operated Shades Installation Instructions Installation Instructions All clutch operated shades are shipped fully assembled and ready for installation. Mounting screws are not provided. Screws for chain guide installation to meet the child safety standards are provided.

More information

Assembly Instructions

Assembly Instructions 10' and 12' Octagon Cedar Gazebo Assembly Instructions Toll Free: 866.768.8465 Hours: 9-5 Monday-Friday EST www.homeplacestructures.com Package ships as shown revised 06/20/09 Cedar Gazebo Assembly Instructions

More information

USER S MANUAL. Horizontal inclinometer system Model TES-AN-25H

USER S MANUAL. Horizontal inclinometer system Model TES-AN-25H USER S MANUAL Horizontal inclinometer system Model TES-AN-25H Doc. # WI 6002.82 Rev. 01 Printed May 2011 System description & method statement for installing ABS casing (Model TES-AN-25H horizontal inclinometer

More information

IMPORTANT!!! ASSEMBLY ASSEMBLY INSTRUCTIONS. (Internal Dimensions)

IMPORTANT!!! ASSEMBLY ASSEMBLY INSTRUCTIONS. (Internal Dimensions) ASSEMBLY ASSEMBLY INSTRUCTIONS (Internal Dimensions) Ent Spec Edition Ltr v-0- Overall dimensions including base: 7. L x 9 W x 0 H cms 97.5" L x 7" W x 8.7" H IMPORTANT!!! Please read these instructions

More information

Greenhouse Assembly Instructions

Greenhouse Assembly Instructions Greenhouse Assembly Instructions Our Help Line provides support and advice to customers of Summer Garden Buildings after ordering. For advice before you buy you can phone us free 7 days a week on 0800

More information

Gardman Lean-to Greenhouse Assembly Instructions

Gardman Lean-to Greenhouse Assembly Instructions Page 1 Gardman Lean-to Greenhouse Assembly Instructions Our Help Line provides support and advice to customers of Summer Garden Buildings after ordering. For advice before you buy you can phone us free

More information

Simotec. 13.i

Simotec. 13.i Products: Framo 80 13.0 Products: Framo 80 13.1 Products: Structural Elements 100/120 13.2 Products: Pipe Shoes 13.3 Framo 80: Beam Section and Screw 13.4 Framo 80: Cantilever Bracket and End Support STA

More information

Piazzola Pergola Awning Manufacturing and installation guide

Piazzola Pergola Awning Manufacturing and installation guide Piazzola Pergola Awning Manufacturing and installation guide Date Changes Page General information Maximum and minimum width Width Projection 150 to 349 cm 350 to 500 cm From 200 to 250 cm X From 251 to

More information

NX8 SERIES 6-1/4 HANDRAIL W/ VINYL HANDGRIP

NX8 SERIES 6-1/4 HANDRAIL W/ VINYL HANDGRIP 6-1/4 HANDRAIL W/ VINYL HANDGRIP TYPICAL ASSEMBLY 5 2 BUTT JOINT 12 10 9 1 8 11 6 3 7 4 BUTT JOINT COMPONENT LIST 1 LEFT RETURN 7 UPPER IMPACT ABSORBER 2 RIGHT RETURN 8 LOWER IMPACT ABSORBER 3 OUTSIDE

More information

STOP. V00029AC Rev. 04 READ ALL OF THE FOLLOWING INSTRUCTIONS BEFORE REMOVING CABINET FROM SKID TOOL LIST. NET-ACCESS S-Type Network Cabinets

STOP. V00029AC Rev. 04 READ ALL OF THE FOLLOWING INSTRUCTIONS BEFORE REMOVING CABINET FROM SKID TOOL LIST. NET-ACCESS S-Type Network Cabinets Rev. 04 STOP READ ALL OF THE FOLLOWING INSTRUCTIONS BEFORE REMOVING CABINET FROM SKID NET-ACCESS S-Type Network Cabinets -Phillips screwdriver -Flatblade screwdriver -22mm socket wrench -15mm socket wrench

More information

Assembly Instructions

Assembly Instructions InTandem Table System November 20 InTandem Table System - Worksurface #4 x/" 4 wood screw power beam Tools Provided T-0 Extended Torx Driver T-25 Torx Driver Additional Tools Required Soft protective

More information

SUPREME WALL GARDEN ASSEMBLY INSTRUCTIONS 24/08/16 www.hallsgreenhouses.com Please refer to website for the most up to date instructions. SAFETY WARNING 1. Always wear protective glasses, shoes, gloves

More information

IF INSTALLING ANY OF THE PORTMAN SELF CLOSING SYSTEMS, PLEASE READ THE CORRESPONDING FITTING INSTRUCTIONS SUPPLIED WITH THE CLOSING SYSTEM FIRST

IF INSTALLING ANY OF THE PORTMAN SELF CLOSING SYSTEMS, PLEASE READ THE CORRESPONDING FITTING INSTRUCTIONS SUPPLIED WITH THE CLOSING SYSTEM FIRST Set A Set B PFD60 Fire Door Kit FITTING INSTRUCTIONS IF INSTALLING ANY OF THE PORTMAN SELF CLOSING SYSTEMS, PLEASE READ THE CORRESPONDING FITTING INSTRUCTIONS SUPPLIED WITH THE CLOSING SYSTEM FIRST SUGGESTED

More information

No. 412, 414, 416 Operations Manual

No. 412, 414, 416 Operations Manual No. 412, 414, 416 Operations Manual CARE: Occasional oiling of moving parts with machine oil will ease operation and extend the life of the brake. Occasionally check and tighten the lower beam bracket

More information

CONSTRUCTION GUIDE 27ft Wide and 30ft Wide SHEEP HOUSE

CONSTRUCTION GUIDE 27ft Wide and 30ft Wide SHEEP HOUSE The Outside, Inside CONSTRUCTION GUIDE 27ft Wide and 30ft Wide SHEEP HOUSE Thank you for purchasing a Premier Sheep House. Please take the time to carefully read through this Construction Guide before

More information

METHOD STATEMENT FOR THE CONSTRUCTION OF LIGHTWEIGHT HALLS

METHOD STATEMENT FOR THE CONSTRUCTION OF LIGHTWEIGHT HALLS METHOD STATEMENT FOR THE CONSTRUCTION OF LIGHTWEIGHT HALLS General The exact position of the structure has to be established. Please note that the difference in height must not exceed 1.5% in longitudinal

More information

LAWN AND GARDEN GREENHOUSE

LAWN AND GARDEN GREENHOUSE MODEL# OGAL-66 OGrow Walk-in 6' x ' LAWN AND GARDEN GREENHOUSE With Heavy Duty Aluminium Frame Let'sGrow Together! Thank you for purchasing the OGROW greenhouse Follow the assembly and safety instructions

More information

INS A KSR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE. 1. Verify Curb Installation Required Installation Tools...

INS A KSR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE. 1. Verify Curb Installation Required Installation Tools... INS-88.300-0A KSR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE 1. Verify Curb Installation... 2 2. Required Installation Tools... 2 3. Unpacking the KSR... 3 4. Attach KSR Bottom Rail to Curb... 5 5. Attach

More information

TOOLS REQUIRED: HARDWARE INCLUDED: 13MM FLAT WRENCH FOR LEVELING THE STRUCTURE RATCHET WITH 5MM HEX BIT FOR CORNER SCREWS ON TOP TRAVERSE BEAMS

TOOLS REQUIRED: HARDWARE INCLUDED: 13MM FLAT WRENCH FOR LEVELING THE STRUCTURE RATCHET WITH 5MM HEX BIT FOR CORNER SCREWS ON TOP TRAVERSE BEAMS 1 TOOLS REQUIRED: RATCHET WITH 5MM HEX BIT FOR CORNER SCREWS ON TOP TRAVERSE BEAMS 13MM FLAT WRENCH FOR LEVELING THE STRUCTURE RUBBER MALLET FOR INSERTING PANELS 8MM HEX BIT WITH EXTENSION FOR HEX BOLT

More information

GARAGE DOOR WITH TORSION SPRING

GARAGE DOOR WITH TORSION SPRING GARAGE DOOR WITH TORSION SPRING DIMENSIONS 9 WIDTH X 7 HEIGHT (2.74m x 2.13m) IMPORTANT SAFETY INSTRUCTIONS WARNING: Read all instructions and warnings before use. Failure to follow all instructions may

More information

PEDESTAL INSTALLATION. Guidelines for installing adjustable height pedestals

PEDESTAL INSTALLATION. Guidelines for installing adjustable height pedestals BASIC REQUIREMENTS Irrespective of the type of pavers or tiles that will be installed over pedestals, the following basic requirement must be met. Decks must be designed not to exceed the load capacity

More information

RLT500 - Rhino Track Leg Kit

RLT500 - Rhino Track Leg Kit RLT500 - Rhino Track Leg Kit Important: Please read these instructions carefully prior to installation. Please refer to your fitting instruction to ensure that the roof racks are installed in the correct

More information

Installation manual for sloped roof assembly system. Jurchen Technology GmbH Prinz-Ludwig-Straße Helmstadt

Installation manual for sloped roof assembly system. Jurchen Technology GmbH Prinz-Ludwig-Straße Helmstadt Installation manual for sloped Jurchen Technology GmbH Prinz-Ludwig-Straße 5 9764 Helmstadt Index. Security note.... Hazard note.... Planning and installation notes.... Installation notes... 4. Outline

More information

Bracket guide. LK Pipe Pole. LK Radiator fixture Uni

Bracket guide. LK Pipe Pole. LK Radiator fixture Uni Bracket guide LK Radiator fixture Uni LK Radiator fixture Uni c/c 40 (Article no. 481 43 92) LK Radiator fixture Uni c/c 50 (Article no. 481 44 03) LK Pipe Pole (Article no. 481 43 91, 481 43 90) Used

More information

compile system INSTALLATION GUIDE Updated January 2019

compile system INSTALLATION GUIDE Updated January 2019 INSTALLATION GUIDE Updated January 09 compile system Table of Contents Panels 0 Quick Connect Clips 0 Lock Clips 0 Panel Trims 0 Privacy Glass 0 Post Base Covers 04 Electrical 04 Power Distribution Harness

More information

Fig. 2 DORMA-Glas Stand/Issue 02/03 Seite/Page 1/7

Fig. 2 DORMA-Glas Stand/Issue 02/03 Seite/Page 1/7 FSW Installation instructions Track rail 75 x 72 mm 1. Ceiling substructure and installation of the track rail (Fig. 1): The track rail must be bolted over its entire length (including the stacking track

More information

MobileTrak5 Installation Instructions

MobileTrak5 Installation Instructions MobileTrak5 Installation Instructions PLEASE OPEN ALL BOXES & CHECK TO MAKE SURE YOU HAVE ALL PIECES REQUIRED READ ALL INSTRUCTIONS BEFORE STARTING Tools Required for Assembly 7/16, 1/2 Wrench Phillips

More information

MX8 SERIES 6-1/4 HANDRAIL W/ VINYL HANDGRIP

MX8 SERIES 6-1/4 HANDRAIL W/ VINYL HANDGRIP 6-1/4 HANDRAIL W/ VINYL HANDGRIP TYPICAL ASSEMBLY 5 2 BUTT JOINT 12 10 9 1 8 11 6 3 7 4 BUTT JOINT COMPONENT LIST 1 LEFT RETURN 7 UPPER IMPACT ABSORBER 2 RIGHT RETURN 8 LOWER IMPACT ABSORBER 3 OUTSIDE

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS TOOLS REQUIRED Rechargeable, variable speed drill 3/8 diameter drill bit 3 Robertson bits #0, #1 and #2 Slot screwdriver Non marring hammer with 1 head Level Caulk or sealant

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS SOLID PHENOLIC TOILET PARTITIONS 1080 DuraLineSeries Class-A Fire Rated Includes Institutional Hardware Option.67 IMPORTANT: Storage and Handling Information on last page. Review

More information

CHICKEN COOP & CHICKEN RUN. Tools required for assembly (not included)

CHICKEN COOP & CHICKEN RUN. Tools required for assembly (not included) CHICKEN COOP & CHICKEN RUN ASSEMBLY MANUAL SKU# 6839 Tools required for assembly (not included) Distributed by: TRACTOR SUPPLY COMPANY 0 VIRGINIA WAY, BRENTWOOD, TN 3707 For customer support, call: -888-376-960

More information

Taurean Sectional Garage Door INSTALLATION INSTRUCTIONS

Taurean Sectional Garage Door INSTALLATION INSTRUCTIONS BEFORE YOU BEGIN MAKE SURE THESE INSTRUCTIONS ARE READ AND UNDERSTOOD COMPLETELY. THESE INSTRUCTIONS ARE INTENDED FOR PROFESSIONAL GARAGE DOOR INSTALLERS. ALL REFERENCES ARE TAKEN FROM THE INSIDE LOOKING

More information

Modular Bi-File Lateral

Modular Bi-File Lateral Modular Bi-File Lateral Installation Instructions 920-563-6362 E-mail: ssc@spacesaver.com Internet: www.spacesaver.com Contents Hardware Identification..................................3 Pre-Installation........................................6

More information

Curtain Wall Installation Guide

Curtain Wall Installation Guide Curtain Wall Installation Guide Curtain Wall Installation Guide 1 IMPORTANT NOTICES! Important Notices & Information Manufacturer s Notes: The building envelope must be correctly prepared with weather

More information

Material Packing Brown Grey Pine Black White

Material Packing Brown Grey Pine Black White RTA Connectors Minifix Zinc alloy For housing: 12 or 18 Bolt hole: Ø 7 or 8, depending on choice of connecting bolt Drilling distance B: Distance from centre of Minifix housing to shelf front edge (24

More information

UNIVERSAL ASSEMBLY INSTRUCTIONS FOR VERSATUBE GARAGE BUILDINGS

UNIVERSAL ASSEMBLY INSTRUCTIONS FOR VERSATUBE GARAGE BUILDINGS UNIVERSAL ASSEMBLY INSTRUCTIONS FOR VERSATUBE GARAGE BUILDINGS SINGLE DOOR GARAGE AVAILABLE IN 12, 20, 24 AND 30 WIDTHS DOUBLE DOOR GARAGE AVAILABLE IN 24 AND 30 WIDTHS Our unique assembly process quickly

More information

PUSH-PULL-PROPS. and accessories ROBUSTA-GAUKEL GMBH MOUNTING TECHNOLOGY &CO.KG

PUSH-PULL-PROPS. and accessories ROBUSTA-GAUKEL GMBH MOUNTING TECHNOLOGY &CO.KG PUSH-PULL-PROPS and accessories MOUNTING TECHNOLOGY ROBUSTA-GAUKEL GMBH &CO.KG MOUNTING TECHNOLOGY PUSH-PULL-PROPS AND ACCESSORIES INDEX General information...................... 3 Push-pull-prop Type

More information

SILVERBACK INSTALLATION MANUAL

SILVERBACK INSTALLATION MANUAL SILVERBACK INSTALLATION MANUAL R-SERIES SOLAR RACKS T OLL FREE 866-766-3727 WWW.ROOFSCREEN.COM Introduction... 2 The Silverback Solar Racking System... 2 This manual... 2 Application... 2 System Overview...

More information

GSE INTEGRATION INSTALLATION MANUAL For photo-voltaic systems partially covering the roof

GSE INTEGRATION INSTALLATION MANUAL For photo-voltaic systems partially covering the roof GSE INTEGRATION INSTALLATION MANUAL For photo-voltaic systems partially covering the roof V 7.5 WWW.GSEINTEGRATION.COM Contents STEP BY STEP Presentation of system p.4 Contents of kit p.5 GSE Integration

More information

HD installation guide

HD installation guide JANUS INTERNATIONAL 1 866 562 2580 www.janusintl.c o m 1950 1950HD installation guide RIGHT DRIVE END SHOWN LH OPPOSITE LEFT TENSION END SHOWN RH OPPOSITE PUSH-UP OPERATION 1950 1950HD SHOWN A rolling

More information

GLOSSARY OF TERMS SECTION 8

GLOSSARY OF TERMS SECTION 8 GLOSSARY OF TERMS SECTION 8 Anchor Bolt Angle Base Plate Bay Blocking CCB Centerline Chord Cladding Clip Closure Strip An A-307 steel bolt embedded in the concrete footing to anchor the base plate of the

More information

INSTALLATION INSTRUCTIONS VENETIAN 84" SLIDING SHOWER DOOR SYSTEM (180º INSTALLATION)

INSTALLATION INSTRUCTIONS VENETIAN 84 SLIDING SHOWER DOOR SYSTEM (180º INSTALLATION) INSTALLATION INSTRUCTIONS VENETIAN 84" SLIDING SHOWER DO SYSTEM (180º INSTALLATION) 28539 Industry Drive, Valencia, CA 91355 Toll Free Phone: (877) 728-3874 Toll Free Fax: (888) 440-9567 Phone: (661) 775-1675

More information

SunTrackerTwo Preparation

SunTrackerTwo Preparation TOLL FREE:(888)29-2705 FAX:(941)77-9460 info@eco-smart.com SunTrackerTwo Preparation Cutting Holes and Preparing Curbs T.G.I Or Truss CIRALIGHT INSTALLATION MANUAL Page 1 Cutting Holes and Preparing Curbs

More information

Step by Step Installation Instructions. Poly Shutters. Customer Service or visit us online at smithandnoble.com

Step by Step Installation Instructions. Poly Shutters. Customer Service or visit us online at smithandnoble.com Step by Step Installation Instructions Poly Shutters Customer Service 800.248.8888 or visit us online at smithandnoble.com Thank you for purchasing from smith+noble. Your new window treatments have been

More information

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013 U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS TOOL LIST Required Tools: - Reciprocating Saw with Metal Cutting Blade - Drill - 7/16 Drill Bit for Metal Drilling -

More information

SolarMount (E)volution

SolarMount (E)volution SolarMount (E)volution SOLARMOUNT (E)VOLUTION: THE BEST JUST GOT BETTER. Engineering, Excellence, and Ease. Performance Engineered for versatility and reduced installation time, SolarMount (E)volution

More information

Thor Audi A4/S4 Skid Plate Installation Instructions

Thor Audi A4/S4 Skid Plate Installation Instructions Thor Audi A4/S4 Skid Plate Installation Instructions Parts List: 1 Aluminum Skid Plate 2 Aluminum Side Wings 10 10mm Flat Washers 3 8mm Flat Washers 3 8mm Speed Clips 2 10x40mm Bolts 3 8x35mm Bolts 2 Rivet-nuts

More information

101B, 210X, ELM, VSTB Installation Manual

101B, 210X, ELM, VSTB Installation Manual 101B, 210X, ELM, VSTB Installation Manual 99-16105-I001 Copyright 2010 by ALL rights reserved. Information in this document is subject to change without notice. Companies, names and data used in examples

More information

RIVETING Rivet types Solid rivets Solid rivets are used less and less. They have been replaced in many cases by welding or bonding.

RIVETING Rivet types Solid rivets Solid rivets are used less and less. They have been replaced in many cases by welding or bonding. 10.1 Rivet types 10.1.1 Solid rivets Solid rivets are used less and less. They have been replaced in many cases by welding or bonding. Because of the large countersinking angle of 140 flat countersunk

More information

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE Set A Set B P7001 Standard Kit FITTING INSTRUCTIONS For use with 44mm thick doors only For Single and Double doors IF INSTALLING A TOUCH LATCH, PLEASE READ THE CORRESPONDING FITTING INSTRUCTIONS FIRST

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS THESE INSTRUCTIONS COVER THE INSTALLATION OF THE FOLLOWING REAR DOORS WITH OUTSIDE CABLES AND MAXIMUM SECURITY LOCK: 3/4" DryFreight 1-1/8" PolarGuard

More information

CONSTRUCTION GUIDE 21ft Wide and 24ft Wide SHEEP HOUSE

CONSTRUCTION GUIDE 21ft Wide and 24ft Wide SHEEP HOUSE The Outside, Inside CONSTRUCTION GUIDE 21ft Wide and 24ft Wide SHEEP HOUSE Thank you for purchasing a Premier Sheep House. Please take the time to carefully read through this Construction Guide before

More information

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE Set A Set B PFD30 SG Fire Door Kit FITTING INSTRUCTIONS For use with 44mm thick doors only For Single and Double doors SUGGESTED TOOLS DRILL G-CLAMP TAPE MEASURE (Image for reference only) HACKSAW POCKET

More information

Variable Pitch Collector Frame

Variable Pitch Collector Frame Variable Pitch Collector Frame INSTALLATION INSTRUCTIONS FOR SOLAR WATER HEATER SYSTEMS This frame must be installed by an authorised person. Please leave this guide with a responsible officer or the householder.

More information

Model 209 Fireback Replacement

Model 209 Fireback Replacement Model 209 Fireback Replacement Please read all the instructions before you begin the procedure. Confirm that you have all the necessary tools and materials. If you have any questions, technical support

More information

Gared Pro-S Portable Backstop

Gared Pro-S Portable Backstop Models: 9616 & 9618 Installation, Operation and Maintenance Instructions Please read all instructions before attempting installation or operation of these units SAVE THESE INSTRUCTIONS FOR FUTURE USE PUBLICATION

More information

GMS FLEX. / Versatile mounting system for open-terrain PV power plants / Adaptable to terrain: Variable module tilt angle and lateral tilt, various

GMS FLEX. / Versatile mounting system for open-terrain PV power plants / Adaptable to terrain: Variable module tilt angle and lateral tilt, various GMS FLEX Adjustable and flexible as the nature / Versatile mounting system for open-terrain PV power plants / Adaptable to terrain: Variable module tilt angle and lateral tilt, various foundation types

More information

RTS518 - Rhino Heavy Duty 2 & 3 Crossbar System Hyundai iload, imax, i800, H-1.

RTS518 - Rhino Heavy Duty 2 & 3 Crossbar System Hyundai iload, imax, i800, H-1. RTS518 - Rhino Heavy Duty 2 & 3 Crossbar System Hyundai iload, imax, i800, H-1. NOTE: Please read these instructions carefully prior to installation. Check the contents of kit before commencing fitment

More information

MPA-9000 Universal Ceiling Projector Mount Kit

MPA-9000 Universal Ceiling Projector Mount Kit I N S T R U C T I O N M A N U A L Universal Ceiling Projector Mount Kit The Universal Ceiling Projector Mount provides a unique, simplified method of ceiling mounting your inverted projector. This low

More information

Installation Guide Contemporary Alfresco V1.3 LU

Installation Guide Contemporary Alfresco V1.3 LU Installation Guide Contemporary Alfresco V1.3 LU 010818 Tools Required Below is a list of tools that you will require to install you're the Contemporary Alfresco System. Cordless Drill Mastic Gun Spirit

More information

6MM ALLEN KEY FOR ROOF CLIPS PHILLIPS HEAD BIT FOR SCREWS FOR DOOR FRAME SPIRIT/LASER LEVEL TO LEVEL THE UNIT

6MM ALLEN KEY FOR ROOF CLIPS PHILLIPS HEAD BIT FOR SCREWS FOR DOOR FRAME SPIRIT/LASER LEVEL TO LEVEL THE UNIT 1 TOOLS REQUIRED: MOVING CART/DOLLY FOR TRANSPORTING PANELS, ROOF, AND POSTS TWO 9 FT. STEP LADDERS FOR INSTALLING ROOF & PANELS MINI REVERSIBLE RATCHET 1/4 DRIVE FOR CORNER SCREWS ON TOP TRAVERSE BEAMS

More information