Vertical Control via GPS vs. Tide Gauges: A Pilot Study

Size: px
Start display at page:

Download "Vertical Control via GPS vs. Tide Gauges: A Pilot Study"

Transcription

1 Vertical Control via GPS vs. Tide Gauges: A Pilot Study Rebecca Quintal, John Shannon Byrne, John Kiernan, Evan Robertson, Walter Simmons, Gary Davis, Paul Donaldson, Deborah Smith, Jason Infantino and Jeff Parker Science Applications International Corporation 221 Third Street Newport, RI USA Abstract Under contract to the National Oceanic and Atmospheric Administration (NOAA) Office of Coast Survey, the Marine Science and Technology Division of Science Applications International Corporation (SAIC) is performing a debris mapping survey using 200% side-scan sonar coverage with resulting vertical beam echo sounder coverage, south of Terrebonne Bay Louisiana. Water depths in the survey area range from approximately seven feet (near shore) to 25 feet (off shore, three-mile limit). The primary purpose of the survey is to provide survey data suitable for item detection and debris mapping in the wake of Hurricanes Katrina and Rita, and subsequent to funding, Hurricanes Ike and Gustav, which moved through the area. A secondary purpose of the survey is providing modern, accurate hydrographic survey data for updating the nautical charts. SAIC has deployed two shallow draft boats equipped with SAIC s ISS-2000 data acquisition and navigation system, a vertical beam echo sounder and a side-scan sonar. One vessel will also employ a multibeam echo sounder for item investigations. Both survey platforms are equipped with inertial navigation systems. Vertical control is established using an SAIC-installed tide station at Caillou Bay ( ), and NOAA tide stations at Grand Isle, La. ( ); Port Fourchon, La. ( ); and LAWMA, La. ( ). SAIC s ISS-2000 system as well as the Position and Orientation System for Marine Vessels (POS/MV) are recording raw L1 and L2 Global Positioning System observables within portions of the survey area. These data will be used to compute echo sounder ellipsoidal height, which is then used to correct soundings to the specified mean lower low water (MLLW) vertical datum for comparison with the traditional method of correcting soundings using zoning of water level measurements from shore-based tide stations. The raw L1 and L2 GPS observables acquired on the survey platforms are post-processed using precise point positioning (PPP) techniques. PPP post-processing operates independently of any user-established shore base stations. Rather than relying on user-established shore stations for kinematic corrections, PPP techniques make use of GPS satellite clock corrections and satellite orbit corrections that are freely available via the Internet within 24 hours. Use of GPS-based techniques for vertical control requires analysis to properly define the separation (SEP) from the ellipsoid to the desired vertical datum. The SEP value can change significantly over the spatial extents of the survey area. An integrated survey system, configured with current state-of-the-art equipment for the echo sounder, motion sensor, and sound speed profiling sensor, can meet International Hydrographic Organization (IHO) Order 1 survey requirements using a PPP-based GPS trajectory when the separation uncertainty is suitably known. This paper provides a description of the methods adopted for comparison between the vertical control established from the tide gauges and the vertical control established using GPS PPP techniques. Based on the preliminary results from this pilot study, the potential merits of using a 1

2 GPS-based vertical control solution, that operates independently of user-established shore base stations, are presented and discussed. 1 INTRODUCTION On August 29, 2005, Hurricane Katrina struck the Louisiana and Mississippi gulf coasts, causing catastrophic damage and depositing tons of debris into the surrounding water bodies, creating hazards to vessel navigation and causing adverse effects to the local commercial fishing industry. In September of 2006, the National Oceanic and Atmospheric Administration (NOAA) started surveying the coastal waters to locate marine debris. These data are being used to assist in the removal of the debris to re-establish safe navigation and commercial fishing and to update the nautical charts throughout the affected area 1. Under contract to NOAA, Science Applications International Corporation s (SAIC s) Marine Science and Technology Division was tasked to survey 161 square nautical miles offshore of Terrebonne Bay, Louisiana (Figure 1), with the primary purpose to provide data suitable for item detection and debris-mapping in the wake of Hurricanes Katrina and Rita. A secondary purpose of the survey is providing modern, accurate hydrographic survey data for updating the nautical charts. The survey specifications required 200% side-scan coverage and single-beam echo sounder data of the three sheets to the inshore limit of eight feet. In addition, a Reson (Reson A/S) 8101 multibeam echo sounder will be employed for item investigations on each sheet at the end of the survey. As part of the survey, a tide station was to be installed to aid in vertical control. SAIC chose to deploy two vessels to complete the Terrebonne Bay surveys, but planned to stagger the vessels starting with one in operation in October 2008 and the second coming online in January SAIC planned for a field office at the Louisiana Universities Marine Consortium s (LUMCON) DeFelice Marine Center in Cocodrie, La. Figure 1. SAIC Survey Area of Terrebonne Bay, La., Showing Sheets A, B and C. 2

3 Fortunately, the SAIC team was able to begin survey operations on schedule with the installation of the tide gauge occurring in early October and survey operations beginning on October 21, 2008, despite two hurricanes impacting the Cocodrie, La., area. Hurricane Gustav made landfall on September 1, 2008, near Cocodrie, La., causing severe wind damage and flooding (Figure 2). Gustav was followed by Hurricane Ike, which made landfall on September 13, 2008, in Galveston, Texas, and caused storm surge in the Cocodrie, La., which was still recovering from Gustav. Perhaps it was fortuitous that the debris mapping survey did not begin until after these hurricanes potentially deposited more debris in the Terrebonne Bay area. Figure 2. Photograph of Cocodrie, La., Around September 17, (Photo courtesy Tim Osborn, NOAA) Recent software enhancements to SAIC s data acquisition software, ISS-2000, added the capability to both collect raw L1 and L2 Global Positioning System (GPS) observable data. At the same time, SAIC s post-processing software, SABER, was enhanced to apply the corrected position and ellipsoidal height data to the Generic Sensor Format (GSF) bathymetry data files. The ellipsoidal height data serves as vertical control as opposed to traditional tidal zoning vertical control. Other correctors that are required with tide vertical controlled data are heave, draft, settlement and squat. The raw L1 and L2 GPS observables acquired on the survey platforms are post-processed using GPS precise point positioning (PPP) techniques. PPP post-processing operates independently of any user-established shore base stations. Rather than relying on user-established shore stations for kinematic corrections, PPP techniques make use of GPS satellite clock corrections and satellite orbit corrections that are freely available via the Internet within 24 hours of realtime. Positioning accuracies with PPP techniques of better than 20 cm in the horizontal and 30 cm in the vertical have been demonstrated using commercial GPS processing software packages 2. The Terrebonne Bay area surveys provided a logical scenario to perform a pilot study of the PPP technology for hydrographic surveys. The survey area is remote and not easily accessible for establishing and maintaining shore stations if real-time kinematic (RTK) positioning were to be used. Also, since a tide station was installed for this survey, a cost/benefit analysis of the two methods for vertical control may be performed once the survey is complete and final comparison results have been analyzed. 3

4 2 SYSTEMS Mobilization for the survey commenced in early October 2008, with the installation of a tide station at Caillou Bay, La. ( ). The station was installed on a Texas Gas Transmission, LLC platform (Figure 3) and comprises two Design Analysis H350XL digital bubbler gauges, a tide staff, and Geosynchronous Operational Environmental Satellite (GOES) satellite telemetry link provided by John Oswald & Associates. Figure 3. Tide Station at Caillou Bay, La. ( ). SAIC Photograph SAIC is employing two vessels to conduct the survey. The Sea Beneath is a 32-foot aluminum work boat with twin 500hp outboard motors (Figure 4). The vessel is owned and operated by EMC, Inc., in Greenwood, Miss. The Lacey Marie is a 42-foot Lafitte Skiff work boat with a two-foot draft and is diesel powered (Figure 5). The vessel is owned and operated by Campo Marine in Shell Beach, La., and under charter to SAIC via a sub-contract with Lowe Engineers, LLC, of Atlanta, Ga. Figure 4. Sea Beneath. SAIC Photograph 4

5 Figure 5. Lacey Marie. SAIC Photograph Both vessels are configured with SAIC s ISS-2000 real-time survey system, which consists of a dual processor computer with Microsoft Corporation s Windows XP operating system running SAIC s ISS-2000 software. This software provides survey planning and control in addition to data acquisition and logging for single beam, multibeam and navigation data. The system includes: Applanix Corporation POS/MV 320 Position and Orientation System with a Trimble ProBeacon differential receiver Trimble 4000 GPS receiver with a differential receiver Sea-Bird Electronics, Inc., Model SBE conductivity, temperature, depth (CTD) profiler L-3 Communications/Klein Associates Inc. (Klein), 3000 side-scan sonar (bow-mounted) Odom Echotrac CV vertical-beam echo sounder with a pole-mounted 200-kHz transducer 3 DATA ACQUISITION The task order with NOAA provided preliminary water-level zoning based on NOAA tide stations in Port Fourchon, La. ( ), and LAWMA, La. ( ). In addition, SAIC was required to install a tide station at Caillou Bay, La. ( ), and operate it for the duration of the survey. Subsequent to the start of survey operations, SAIC s ISS-2000 system and the POS/MV system were configured to record raw L1 and L2 GPS observables within portions of the survey area to test the use of GPS PPP techniques for determining water-level correctors. The data presented in this paper were collected on H11784 (Sheet B) over six days (Figure 6). The data fall within one modified NOAA-provided tide zone for the Port Fourchon station (zone CGM749) and include four cross lines. 5

6 Figure 6. Track Lines of Data Used for This Paper (yellow lines), with Port Fourchon, La. ( ), and Caillou Bay, La. ( ), Tide Zoning (red polygons). SAIC graphic 4 DATA PROCESSING The following sections provide details on the specific processing steps performed on the raw GPS-observable data and the bathymetry data to support GPS-based vertical control and traditional tidal control. Figure 7 is a processing flow chart that aids in the understanding of the processes detailed below. The steps colored in black are steps performed on both the tidal vertical control dataset and the GPS-based vertical control dataset. The green steps are for the GPS-based vertical control processing pipeline, while the blue steps are for the tidal verticalcontrol processing pipeline. 6

7 GSF Bathymetry Files Navigation Processing Apply Delayed Heave POS/MV Data File Clock Orbit Corrections Edit and QC Separation Definition Water Level Measurements Merge XYZ Navigation Tide Benchmark Data EGM2008 Model Apply Tidal Corrections GPS Based Vertical Control Uncertainty Attribution Uncertainty Attribution Surface Generation Surface Generation Surface Differencing Figure 7. Flow Chart for Processing Steps. 4.1 VERTICAL CONTROL PROCESSING As part of the task order, SAIC is to compute the datum at the SAIC-installed Caillou Bay station by comparison with the NOAA control station Grand Isle, La. ( ). The determination of final water-level correctors is also an SAIC responsibility. SAIC modified the NOAA-provided preliminary tide zones to cover the receding shoreline on the north because the contracted inshore limit crossed into the zones intended for surveys north of the islands. Once the survey began, it quickly became apparent that the zoning from the LAWMA station was not adequate and would not provide the data needed to determine whether we had reached the inshore limit of the survey. Figure 8 illustrates this problem. At 18:30 UTC on October 27, 2008, there is a meter difference between the observed data and the WGM413 zoned data. This two-foot (0.565 meter) uncertainty in the water level could equate to a displacement of soundings horizontally by 2000 feet (610 meters) or more in this very flat bottom. 7

8 Caillou Bay WGM Tidal Height - Meters :00 1:54 3:48 5:42 7:36 9:30 11:24 13:18 15:12 17:06 19:00 20:54 22:48 0:42 2:36 4:30 6:24 8:18 10:12 12:06 14:00 15:54 17:48 19:42 21:36 23:30 Time October 26-27, 2008 Figure 8. Caillou Bay Record Compared to Zone WGM413 on LAWMA. SAIC graphic Because of the numerous shape and height differences between the LAWMA-zoned water levels and those observed at Caillou Bay, SAIC elected to prepare preliminary zones based on the observed water levels at Caillou Bay. At the same time, SAIC modified the western bounds of zone CGM749 (Port Fourchon) to match the new CAI### (Caillou Bay) zones. Where acquisition of the L1 and L2 data is accomplished for the Terrebonne Bay surveys, SAIC may use the GPS PPP solution to aid in development and improvement of the final water level zoning from the tide stations. For purposes of this paper, the observed tides based on the modified CGM749 zone on the NOAA Port Fourchon station are being used for tidal corrections. Future comparisons will be made against the Caillou Bay tide data, where applicable. 4.2 NAVIGATION PROCESSING SAIC chose to use the NovAtel, Inc., Waypoint Products Group GrafNav GPS post-processing software for the PPP navigation processing. GrafNav operates on the raw GPS observables and utilizes the precise clock and orbit corrections to develop the PPP trajectory. It is necessary to ensure a sufficiently high sampling rate of the PPP trajectory to resolve all of the motion of the platform. The required sampling rate of the trajectory has a one-for-one mapping to the sampling rate of the raw GPS observables. This is in part due to the fact that GrafNav does not make use of the high rate POS/MV inertial measurement unit (IMU) data. For the small boats utilized on this project, a 10 Hz sampling rate of the raw GPS observables is used. The following are the high-level processing steps: 8

9 1. Extract the primary L1 and L2 GPS data stream records from the ISS-2000 or POS/MV raw data files using SAIC s SABER. This creates a GrafNav compatible Global Navigation Satellite System (GNSS) file. 2. Using GrafNav, convert the raw GNSS file to a binary GPB (*.gpb) file and an ASCII EPP (*.epp) file. The GPB has the GPS measurement data and the EPP stores the ephemeris data. Both are GrafNav s custom formats. 3. Load the GPB file into the current GrafNav project. 4. Download the GPS raw service data, the Precise Ephemeris File (*.sp3) and Precise Clock (*.clk) data files from the Internet. The Download Service Data automatically retrieves the data from the appropriate ftp servers. 5. Using the four files above, create a PPP solution using Multi-Pass (forward, reverse, and forward again) process to converge on the PPP solution. 6. Export the time, date, latitude, longitude, ellipsoidal height, and the standard deviations to an ASCII file. 4.3 SEPARATION DEFINITION The PPP data provide the ellipsoidal height of the vessel s reference point; however, the distance (or separation) between the ellipsoid and the chart datum must be determined and applied to use the GPS (PPP) data for vertical control. The ellipsoidal height of the primary bench mark at the Caillou Bay station was determined by GPS observations during SAIC s station installation. Preliminary datum determination established the height of the benchmark above the mean lower low water (MLLW) datum. Combining these two values yielded the separation (SEP) from the ellipsoid to MLLW at the Caillou Bay station. NOAA published data for the Grand Isle station provided the ellipsoidal height of the primary benchmark, and that mark s height above the MLLW datum at the station. Combining these two values yielded the SEP from the ellipsoid to MLLW at the Grand Isle station. With Grand Isle beyond the east end of the project and Caillou Bay at the west end, SAIC had the means to calculate the SEP values across the survey area. A worldwide Earth Gravitational Model (EGM2008), which provides the WGS-84 to geoid undulation has been published by the National Geospatial-Intelligence Agency 3. This model is available at two resolutions: 1 by 1-minute and 2.5 by 2.5-minute resolution. At both the Caillou Bay and Grand Isle tide station the 2.5 x 2.5-minute EGM2008 model undulation height was subtracted from the SEP to MLLW for that position. These difference values were then interpolated across the survey area and added to the EGM2008 height at specific points to determine the SEP to MLLW as shown in Table 1 and Figure 9. The EGM2008 model was used as a tool for interpolating the SEP to MLLW across the survey area. 9

10 Latitude (N) Longitude (W) Table 1. Preliminary SEP Values Used SEP SEP Uncertainty Latitude (N) Longitude (W) SEP SEP Uncertainty Figure 9 shows the color-coded EGM2008 WGS-84 to geoid separation with overlays of preliminary tide zoning (red), survey bounds (blue) and SEP to MLLW values (blue) as determined by SAIC. Flags indicate the three tide stations in the area. 10

11 Caillou Bay SAIC Grand Isle NOAA Port Fourchon NOAA Figure 9. EGM2008 Predicted WGS-84 to GEOID Undulation in Survey Area, Values Are SEP to MLLW. SAIC graphic 4.4 MERGING PROCESSED NAVIGATION The PPP navigation files contain updated latitude, longitude and height values. As the assumption that the PPP latitude and longitude are more accurate than the Differential Global Positioning System positions collected during acquisition, the position for each ping is updated along with adding in the height value when the PPP navigation is merged with the GSF bathymetry files. In order to make a direct comparison between the vertical control of the PPP processed files and the traditionally processed tidal files, the positions need to be the same in both datasets. Once all other corrections and processing have been performed, the PPP data are merged into to the bathymetry files using SAIC s SABER version 4.3. The positions for each ping are updated and a new field within the GSF files is populated with the GPS height corrector (the height above the ellipsoid). At this point, the depths for each beam have not been recalculated. That process comes after the next step in the process flow. After merging the navigation data, copies of the files are made so that they may be processed in parallel pipelines for GPS and tidal vertical control. As mentioned above, there are several updates to the GSF format to accommodate GPS vertical control. A new version of GSF will be issued in the April/May 2009 timeframe. Two of these modifications are the addition of new ping record fields and a new ping flag. The new ping record fields in the GSF file are SEP: Separation value the distance between the ellipsoid and the chart datum Height: Ellipsoidal height the height above the ellipsoid GPS Tide Corrector: GPS vertical correction value applied to each ping. This value also includes the correction for heave. 11

12 A new ping flag has been defined for GPS-based vertical control. This ping flag is mutually exclusive with conventional tide flags for any given ping, but may change from one ping to the next within a file. Post-Processing Kinematic (PPK) and PPP are defined as positioning modes for the HV Nav Error record, and Mean Sea Level is added as a vertical datum intended for deep water (greater than 200 meters) work where a low water datum is not available. 4.5 APPLYING TIDES/GPSZ DATA For the copy of the GSF files that are to be processed using tidal data, the water level files are applied to the bathymetry files. Any predicted tidal corrections that may have been applied during acquisition are removed and then the new observed tidal corrections are applied to the files. The SAIC SABER software automatically sets a flag for each ping to indicate the type of tide correction that has been applied (predicted, observed preliminary or observed verified). Based on this ping flag, the SAIC SABER software will ignore any fields that are populated for GPS vertical control (such as the new ellipsoidal height corrector field) and will instead use the fields such as heave, draft, tide corrector, depth corrector (settlement and squat) to calculate the depth value for each beam. For the copy of the GSF files that are to be processed using the PPP data, the SEP value is required. The user has the choice of applying a single SEP value, using the EGM2008 modeled values or providing a text file that contains the SEP values determined by the user. When the user chooses to apply PPP data instead of tidal data, the SAIC SABER software will set a flag for each ping indicating that GPS vertical control is being used for this ping. Therefore, when the depth for each beam is calculated, the software will remove the corrections for tides, heave, draft, and settlement and squat, and will then add in the ellipsoidal height corrector and SEP value to calculate the final depth value for each beam. For both processing pipelines, uncertainty attribution is applied to the data next. 4.6 UNCERTAINTY ATTRIBUTION The Total Propagated Uncertainty (TPU) model incorporated within SAIC SABER has been updated to support GPS-based vertical control. The uncertainty model uses the ping flag that is applied to determine the uncertainty parameters that should be used in the horizontal and vertical uncertainty attribution for each beam. If the ping flag indicates that tidal corrections are applied to the ping, then the program will ignore the uncertainty fields pertaining to GPS corrections. If the ping flag indicates that GPS-based vertical control corrections are applied to the ping, then the program will ignore the uncertainty fields pertaining to tidal corrections (zoning uncertainty and gauge measurement uncertainty). The SAIC SABER TPU model includes two new fields for GPS vertical control. A user-defined SEP uncertainty value and a new vertical uncertainty value for the positioning system. When vertical control is established based on GPS, the dynamically updated vertical uncertainty from the positioning system is combined with the estimated SEP uncertainty and this value is combined with the sonar contributions to the model to provide the final uncertainty. It is important to note that whenever a new navigation source is applied, the dynamically changing 12

13 horizontal and vertical uncertainty values are correspondingly updated. When using GPS-based vertical control, the component uncertainties associated with conventional tides, settlement and squat, static draft, and loading draft are all bypassed. If the vertical uncertainty from the positioning system is stored in the GSF file, then the values stored in the GSF file are used by the TPU model; if they do not exist in the GSF file, then the model uses the fixed value defined by the user. Once the uncertainty attribution is complete, combined uncertainty bathymetry estimator (CUBE) grids are generated for each dataset (PPP and tides) and the resulting surfaces can then be compared. 5 RESULTS CUBE grids were generated at one-meter resolution for both the GPS-based vertical control dataset and the tidal vertical control dataset. The minimum and maximum CUBE depths were 1.20 meters and 8.92 meters, respectively for the GPS vertical controlled data and 1.20 meters and 8.67 meters, respectively, for the tide vertical controlled data. Various comparisons were made between gridded crossings data. The first junction analysis was performed by subtracting the entire one-meter GPS CUBE surface from the one-meter tide CUBE surface. Comparisons of these crossing data showed that 97.25% of comparisons were within 15 centimeters, and 99.46% of comparisons were within 20 centimeters (Table 2). A comparison was performed on the tidal mainscheme lines versus the four tidal cross lines by subtracting the cross line grid from the mainscheme grid. Comparison of these crossing data showed that 87.61% of comparisons were within 15 centimeters, and 97.01% of comparisons were within 20 centimeters (Table 3). Almost all the differences are positive, which indicates a possible issue with the water level corrector determination. A similar comparison was performed on the GPS mainscheme lines versus the four GPS cross lines. These data showed that 98.29% of comparisons were within 15 centimeters, and 99.15% of comparisons were within 20 centimeters (Table 4). While there are limited crossings in these datasets, the results show an appreciable improvement with the GPS vertical control data. Table 2. GPS Vertical Control Versus Tidal Vertical Control Junction Analysis Results Depth All Positive Negative Zero Difference Range (cm) Count Percent Count Percent Count Percent Count Percent % % % % % % % % % % % % % % % % % % % % % % % % % % % % Totals % % % % 13

14 Table 3. Tidal Vertical Control Main to Cross Junction Analysis Results Depth All Positive Negative Zero Difference Range (cm) Count Percent Count Percent Count Percent Count Percent % % % % % % % % % % % % % % % % Totals % % % % Table 4. GPS Vertical Control Main to Cross Junction Analysis Results Depth All Positive Negative Zero Difference Range (cm) Count Percent Count Percent Count Percent Count Percent % % % % % % % % % % % % % % % % Totals % % % % All of the data used for this paper falls within one Port Fourchon tide zone; therefore, we were not able to analyze tide zone boundaries. However, we did evaluate the cross line data on the eastern (Figure 10, Figure 11 and Table 5) and western (Figure 12, Figure 13 and Table 6) ends of tide zone CGM749. These comparisons indicate that the single CGM749 zone may not be adequate to define the water level correctors for this area. For the eastern cross line there is a larger difference between tide-corrected main and cross lines than at the western cross line. In addition, the GPS height-controlled crossings show much better agreement at both the east and west cross lines. 14

15 Figure 10. Tidal Eastern Cross Line and Northern Three Mainscheme Lines Figure 11. GPS Eastern Cross Line and Northern Three Mainscheme Lines Table 5. Water Level Values Applied at Three Crossings for Eastern Cross Line Line File Day Tide Time Ping Eastern Cross Line 088.d11 29-Mar :53:09-22:53: Northernmost Mainscheme Line 080.d03 21-Mar :38: Next Mainscheme South 079.d09 20-Mar :10: Second Mainscheme South 079.d08 20-Mar :56:

16 Figure 12. Tidal Western Cross Line and Northern Three Mainscheme Lines Figure 13. GPS Western Cross Line and Northern Three Mainscheme Lines Table 6. Water Level Values Applied at Three Crossings for Western Cross Line Line File Day Tide Time Ping Western Cross Line 088.d08 29-Mar :27:03-20:27: Northernmost Mainscheme Line 079.d08 20-Mar :32: Next Mainscheme South 078.d12 19-Mar :10: Second Mainscheme South 088.d09 29-Mar :22: Tables 7, 8, and 9 show that there is good agreement between the GPS vertical control and the tidal vertical control near the center of the CGM749 zone, but that there appears to be an offset at the east and west ends of the test area. In the middle of the tide zone, the percentage of positive to negative comparisons is more equally distributed. However, there is a larger percentage of negative comparisons on either end of the zone. Because the GPS CUBE surface was subtracted from the tide CUBE surface, this means that there are more cells that have deeper depths in the GPS dataset. An example of this is shown in Figure 14. This figure shows the final depths of the tide and GPS-based vertical control from file 088.d09, which is the rightmost mainscheme 16

17 line shown in Figure 10 and Figure 11 (eastern side of the tide zone). The GPS PPP trajectory data will prove useful for updating the tide zoning in this survey area for the zones based on both the Port Fourchon and Caillou Bay tide gauges. Table 7. GPS Vertical Control Versus Tidal Vertical Control Junction Analysis East Depth All Positive Negative Zero Difference Range (cm) Count Percent Count Percent Count Percent Count Percent % % % % % % % % % % % % % Totals % % % % Table 8. GPS Vertical Control Versus Tidal Vertical Control Junction Analysis Middle Depth All Positive Negative Zero Difference Range (cm) Count Percent Count Percent Count Percent Count Percent % % % % % % % % % % % % % Totals % % % Table 9. GPS Vertical Control Versus Tidal Vertical Control Junction Analysis West Depth All Positive Negative Zero Difference Range (cm) Count Percent Count Percent Count Percent Count Percent % % % % % % % % % % % % % Totals % % % % 17

18 File 088.d09 Depth Comparison Tidal Vertical Control GPS PPP Vertical Control Depth - Meters Time of Day - Seconds Figure 14. File 088.d09 Depth Comparison Between Tidal and GPS PPP Vertical Control. With water depths in this test dataset between one meter and nine meters, the allowable International Hydrographic Organization (IHO) Order 1 vertical uncertainty is between 0.50 and 0.51 meters. The junction analysis results of both the tidal vertical control and GPS-based vertical control datasets had 100% of the comparisons at 25 centimeters or less. There was a constant average total propagated vertical uncertainty for all of the soundings that contribute to a give node for the tide CUBE grid of 0.30 meters. The minimum and maximum average total propagated vertical uncertainty for all of the soundings that contribute to a given node for the GPS data was 0.14 and 0.23 meters, respectively. 6 SUMMARY At the time of this writing, it is not possible to draw strong conclusions about the benefits of the GPS-based approach to vertical control versus the traditional tidal approach; however, preliminary results show a significant improvement in junction analysis results by using GPS vertical control. An added benefit to the survey is that the GPS PPP trajectory data will be used to aid in updating the current tide zoning for the survey area based on the NOAA Port Fourchon gauge and the SAIC-installed Caillou Bay gauge. Analysis of the trajectory data will continue throughout the remainder of the survey for all three sheets. 7 REFERENCES 1 Gulf of Mexico Marine Debris Project, NOAA Website 2 Russell, D.C., Wong, R. and Toor, P., Real-time Tidal Observation Using High-accuracy GPS Positioning. Proc Hydro 2007 Conference, Cairns, November Earth Gravitational Model 2008 (EGM2008), NGA Website 18

Lake Borgne, Louisiana Debris Mapping

Lake Borgne, Louisiana Debris Mapping Lake Borgne, Louisiana Debris Mapping Abstract Gary R. Davis, Paul L. Donaldson, Walter Simmons, Rebecca Quintal Science Applications International Corporation 221 Third Street Newport, RI 02840 USA Under

More information

Overview of Recent Tidal Projects in the United States

Overview of Recent Tidal Projects in the United States 1 st Tides and Water Levels Working Group Meeting Overview of Recent Tidal Projects in the United States Stephen Gill National Oceanic and Atmospheric Administration, National Ocean Service Center for

More information

VDatum and SBET to Improve Accuracy of NOAA s High-Resolution Bathymetry

VDatum and SBET to Improve Accuracy of NOAA s High-Resolution Bathymetry VDatum and SBET to Improve Accuracy of NOAA s High-Resolution Bathymetry US HYDRO 2007 Extended Abstract Author: Crescent H. Moegling CoAuthor: Steve Brodet Moegling HYDRO 2007 1 Introduction NOAA s Hydrographic

More information

Handling Interferometric Data: Streamlining the Processing Flow

Handling Interferometric Data: Streamlining the Processing Flow Handling Interferometric Data: Streamlining the Processing Flow Paper 5 at Hydro8, 4 th November 2008 Tom Hiller, Advanced Products Manager, GeoAcoustics Ltd. WORLD CLASS through people, technology and

More information

NATIONAL VDATUM -- THE IMPLEMENTATION OF A NATIONAL VERTICAL DATUM TRANSFORMATION DATABASE

NATIONAL VDATUM -- THE IMPLEMENTATION OF A NATIONAL VERTICAL DATUM TRANSFORMATION DATABASE NATIONAL VDATUM -- THE IMPLEMENTATION OF A NATIONAL VERTICAL DATUM TRANSFORMATION DATABASE Bruce Parker, Dennis Milbert, Kurt Hess, and Stephen Gill National Ocean Service, NOAA The National Ocean Service

More information

Old House Channel Bathymetric and Side Scan Survey

Old House Channel Bathymetric and Side Scan Survey FIELD RESEARCH FACILITY DUCK, NC Old House Channel Bathymetric and Side Scan Survey COASTAL AND HYDRAULICS LABORATORY FIELD DATA COLLECTION AND ANALYSIS BRANCH Michael Forte December 2009 View looking

More information

Appendix A Lower Columbia River Chart Datum Modeling

Appendix A Lower Columbia River Chart Datum Modeling Appendix A Lower Columbia River Chart Datum Modeling David Evans and Associates, Inc. David Evans and Associates, Inc. 2801 SE Columbia Way, Ste. 130 Vancouver, WA 98661 (360) 314-3200 1.0 Vertical Datum

More information

GPS STATIC-PPP POSITIONING ACCURACY VARIATION WITH OBSERVATION RECORDING INTERVAL FOR HYDROGRAPHIC APPLICATIONS (ASWAN, EGYPT)

GPS STATIC-PPP POSITIONING ACCURACY VARIATION WITH OBSERVATION RECORDING INTERVAL FOR HYDROGRAPHIC APPLICATIONS (ASWAN, EGYPT) GPS STATIC-PPP POSITIONING ACCURACY VARIATION WITH OBSERVATION RECORDING INTERVAL FOR HYDROGRAPHIC APPLICATIONS (ASWAN, EGYPT) Ashraf Farah Associate Professor,College of Engineering, Aswan University,

More information

LT Matthew Forney, NOAA Navigation Manager Alaska Region Bering Strait MaritimeSymposium. Office of Coast Survey

LT Matthew Forney, NOAA Navigation Manager Alaska Region Bering Strait MaritimeSymposium. Office of Coast Survey NOAA LT Matthew Forney, NOAA Navigation Manager Alaska Region Bering Strait MaritimeSymposium Who is Coast Survey? First science agency of the U.S. Formed in 1807 Responsible for surveying 3.4 million

More information

INTEGRATING BATHYMETRY, TOPOGRAPHY, AND SHORELINE, AND THE IMPORTANCE OF VERTICAL DATUMS

INTEGRATING BATHYMETRY, TOPOGRAPHY, AND SHORELINE, AND THE IMPORTANCE OF VERTICAL DATUMS INTEGRATING BATHYMETRY, TOPOGRAPHY, AND SHORELINE, AND THE IMPORTANCE OF VERTICAL DATUMS Bruce Parker, Dennis Milbert, Kurt Hess, and Stephen Gill National Ocean Service, NOAA 1315 East-West Highway Silver

More information

POSITION & ORIENTATION SYSTEMS FOR MARINE VESSELS

POSITION & ORIENTATION SYSTEMS FOR MARINE VESSELS POSITION & ORIENTATION SYSTEMS FOR MARINE VESSELS Applanix POS MV is the marine-survey industry s most accurate, robust, and reliable position and orientation solution available today. Representing the

More information

Defense and Maritime Solutions

Defense and Maritime Solutions Defense and Maritime Solutions Automatic Contact Detection in Side-Scan Sonar Data Rebecca T. Quintal Data Processing Center Manager John Shannon Byrne Software Manager Deborah M. Smith Lead Hydrographer

More information

Figure 1. Overview of Critical and Emerging Critical Areas along Columbia River

Figure 1. Overview of Critical and Emerging Critical Areas along Columbia River GPS Derived Water Levels for Large Scale Hydrographic Surveys: Implementation of a Separation Model of the Columbia River Datum, A Case Study Crescent H. Moegling 1, Jon L. Dasler 2, Jason C. Creech 3,

More information

Overview of Tides and Water Levels

Overview of Tides and Water Levels Overview of Tides and Water Levels www.tidesandcurrents.noaa.gov New Orleans, Baton Rouge, Lafayette, LA March 2009 Gerald Hovis, NOAA - National Ocean Service William Sweet, NOAA - National Ocean Service

More information

Utilizing A GNSS Network Solution for Utility Applications

Utilizing A GNSS Network Solution for Utility Applications Utilizing A GNSS Network Solution for Utility Applications David Newcomer, PE, PLS GPServ, Inc. newcomer@ (407) 601-5816 AGENDA Types and accuracies of data collection o Autonomous o Meter + o Sub-meter

More information

EGYPTIAN HYDROGRAPHIC DEPARTMENT THE EGYPTIAN HYDROGRAPHIC FRAMEWORK

EGYPTIAN HYDROGRAPHIC DEPARTMENT THE EGYPTIAN HYDROGRAPHIC FRAMEWORK gvt THE EGYPTIAN HYDROGRAPHIC FRAMEWORK The roles of a national Hydrographic Service can be summarized in collecting georeferenced data through systematic surveys at sea and along the coast related to:

More information

APPLICATIONS OF KINEMATIC GPS AT SHOM

APPLICATIONS OF KINEMATIC GPS AT SHOM International Hydrographic Review, Monaco, LXXVI(1), March 1999 APPLICATIONS OF KINEMATIC GPS AT SHOM by Michel EVEN 1 Abstract The GPS in kinematic mode has now been in use at SHOM for several years in

More information

08/10/2013. Marine Positioning Systems Surface and Underwater Positioning. egm502 seafloor mapping

08/10/2013. Marine Positioning Systems Surface and Underwater Positioning. egm502 seafloor mapping egm502 seafloor mapping lecture 8 navigation and positioning Marine Positioning Systems Surface and Underwater Positioning All observations at sea need to be related to a geographical position. To precisely

More information

KONGSBERG seafloor-mapping echosounders

KONGSBERG seafloor-mapping echosounders KONGSBERG seafloor-mapping echosounders Berit Horvei WORLD CLASS through people, technology and dedication AGENDA Historical overview EM series Multibeam echosounder and Subbottom profiler Topside software.

More information

21st International Conference of The Coastal Society

21st International Conference of The Coastal Society 21st International Conference of The Coastal Society DEVELOPMENT OF A VERTICAL DATUM TRANSFORMATION TOOL AND A BATHYMETRIC/TOPOGRAPHIC DIGITAL ELEVATION MODEL FOR SOUTHERN CALIFORNIA Edward P. Myers, NOAA/NOS

More information

Technical Notes FOR MARINE MAPPING APPLICATIONS. Leading the way with increased reliability.

Technical Notes FOR MARINE MAPPING APPLICATIONS. Leading the way with increased reliability. FOR MARINE MAPPING APPLICATIONS Technical Notes Leading the way with increased reliability. Industry-leading post-processing software designed to maximize the accuracy potential of your POS MV (Position

More information

Application of GPS heights to Bay of Fundy multibeam data

Application of GPS heights to Bay of Fundy multibeam data GEOLOGICAL SURVEY OF CANADA OPEN FILE 6658 Application of GPS heights to Bay of Fundy multibeam data David W. Dodd 2010 GEOLOGICAL SURVEY OF CANADA OPEN FILE 6658 Application of GPS heights to Bay of Fundy

More information

Research Vessel Technical Enhancement Committee (RVTEC) November 2009 Meeting ISS - Integrated Survey Systems

Research Vessel Technical Enhancement Committee (RVTEC) November 2009 Meeting ISS - Integrated Survey Systems Research Vessel Technical Enhancement Committee (RVTEC) November 2009 Meeting ISS - Integrated Survey Systems John Kiernan, P.E. SAIC - Marine Science and Technology Division ISS-2000 Integrated Survey

More information

GNSS & Coordinate Systems

GNSS & Coordinate Systems GNSS & Coordinate Systems Matthew McAdam, Marcelo Santos University of New Brunswick, Department of Geodesy and Geomatics Engineering, Fredericton, NB May 29, 2012 Santos, 2004 msantos@unb.ca 1 GNSS GNSS

More information

CALTRANS BATHYMETRIC SURVEY VICINITY OF YERBA BUENA ISLAND AND OAKLAND MOLE ALONG SFOBB SAN FRANCISCO BAY

CALTRANS BATHYMETRIC SURVEY VICINITY OF YERBA BUENA ISLAND AND OAKLAND MOLE ALONG SFOBB SAN FRANCISCO BAY FUGRO PELAGOS, INC. CALTRANS BATHYMETRIC SURVEY VICINITY OF YERBA BUENA ISLAND AND OAKLAND MOLE ALONG SFOBB SAN FRANCISCO BAY CALTRANS CONTRACT 59A0053 Survey Period: February 25 th March 1 st, 2013 Report

More information

NOAA s National Ocean Service / Office of Coast Survey

NOAA s National Ocean Service / Office of Coast Survey Coast Survey OCS 1807 2007 Maintains over 1000 nautical charts & 9 Coast Pilots Surveys over 3.4M SNM of oceans and lakes Conducts research and development in hydrography Thomas Jefferson Founder of The

More information

Tidal Datum Determination and VDatum Evaluation with a GNSS Buoy

Tidal Datum Determination and VDatum Evaluation with a GNSS Buoy Tidal Datum Determination and VDatum Evaluation with a GNSS Buoy Ben Hocker, David Evans and Associates, Inc. Nathan Wardwell, JOA Surveys, LLC BIOGRAPHY Ben Hocker is a Lead Hydrographer at David Evans

More information

Windstorm Simulation & Modeling Project

Windstorm Simulation & Modeling Project Windstorm Simulation & Modeling Project Manatee County Digital Elevation Models Preliminary Report Prepared for: The Manatee County Public Safety Department 1112 Manatee Avenue West, Suite 525 Bradenton,

More information

National Height Modernization: Cost comparison of conducting a vertical survey by leveling versus by GPS in western North Carolina

National Height Modernization: Cost comparison of conducting a vertical survey by leveling versus by GPS in western North Carolina Introduction: National Height Modernization: Cost comparison of conducting a vertical survey by leveling versus by GPS in western North Carolina The North Carolina Geodetic Survey (NCGS) conducted a National

More information

Ian Church 1, Steven Brucker 1, Dr. John Hughes Clarke 1, Susan Haigh 1, Jason Bartlett 2 and Tim Janzen 2

Ian Church 1, Steven Brucker 1, Dr. John Hughes Clarke 1, Susan Haigh 1, Jason Bartlett 2 and Tim Janzen 2 Developing Strategies to Facilitate using Post Processed GPS and Tidal Models Ian Church 1, Steven Brucker 1, Dr. John Hughes Clarke 1, Susan Haigh 1, Jason Bartlett 2 and Tim Janzen 2 1: Dept. Geodesy

More information

Joining New Zealand Land and Sea Vertical Datums (JLAS) Graeme Blick Group Manager Positioning and Resilience

Joining New Zealand Land and Sea Vertical Datums (JLAS) Graeme Blick Group Manager Positioning and Resilience Presented at the FIG Congress 2018, May 6-11, 2018 in Istanbul, Turkey Joining New Zealand Land and Sea Vertical Datums (JLAS) Graeme Blick Group Manager Positioning and Resilience Mapping NZ 2025 What

More information

Inertial Navigation System

Inertial Navigation System Apogee Series ULTIMATE ACCURACY MEMS Inertial Navigation System INS MRU AHRS ITAR Free 0.005 RMS Motion Sensing & Georeferencing APOGEE SERIES makes high accuracy affordable for all surveying companies.

More information

A Report On Tide Gauges In Singapore. 1 The Republic of Singapore is an island city-state situated at the southern tip of

A Report On Tide Gauges In Singapore. 1 The Republic of Singapore is an island city-state situated at the southern tip of A Report On Tide Gauges In Singapore Introduction 1 The Republic of Singapore is an island city-state situated at the southern tip of Peninsula Malaysia, approximately 1 north of the equator. It consists

More information

Fugro Marinestar Improvements

Fugro Marinestar Improvements Fugro Marinestar Improvements Hans Visser Fugro Intersite B.V. Improvements in Marinestar Positioning Hydro 2016 Warnemünde, 10 November 2016 Overview of presentation The Marinestar GNSS Networks The supplied

More information

Advances in GNSS Technology and it s Application to Tidal Derivation

Advances in GNSS Technology and it s Application to Tidal Derivation Advances in GNSS Technology and it s Application to Tidal Derivation Tim Painter Chief Surveyor Fugro Survey Africa Pty Ltd John Vint Survey and Starfix Product Manager Fugro Survey AS, Norway Scope of

More information

Determining Accurate Elevations: Datums & Tools, Today & Tomorrow

Determining Accurate Elevations: Datums & Tools, Today & Tomorrow Determining Accurate Elevations: Datums & Tools, Today & Tomorrow Association of State Floodplain Managers Annual Meeting Grand Rapids, MI Christine Gallagher June 21, 2016 Overview NGS Mission Important

More information

Chapter 6 GPS Relative Positioning Determination Concepts

Chapter 6 GPS Relative Positioning Determination Concepts Chapter 6 GPS Relative Positioning Determination Concepts 6-1. General Absolute positioning, as discussed earlier, will not provide the accuracies needed for most USACE control projects due to existing

More information

Seafloor Mapping Using Interferometric Sonars: Advances in Technology and Techniques

Seafloor Mapping Using Interferometric Sonars: Advances in Technology and Techniques Seafloor Mapping Using Interferometric Sonars: Advances in Technology and Techniques Tom Hiller, Advanced Products Manager, GeoAcoustics Ltd. WORLD CLASS through people, technology and dedication Brest,

More information

BATHYMETRIC DATA AND NAUTICAL CHART DATUMS

BATHYMETRIC DATA AND NAUTICAL CHART DATUMS Distr. LIMITED ECA/NRD/CART.9/USA.2 October 1996 Original: ENGLISH Ninth United Nations Regional Cartographic Conference for Africa Addis Ababa, Ethiopia 11-15 November 1996 A GLOBAL APPROACH TO UPDATE

More information

Precise Point Positioning (PPP) using

Precise Point Positioning (PPP) using Precise Point Positioning (PPP) using Product Technical Notes // May 2009 OnPOZ is a product line of Effigis. EZSurv is a registered trademark of Effigis. All other trademarks are registered or recognized

More information

Beach monitoring with GPS William F Price Department of Civil Engineering, University of Brighton, BRIGHTON, BN1 4GJ, UK

Beach monitoring with GPS William F Price Department of Civil Engineering, University of Brighton, BRIGHTON, BN1 4GJ, UK Beach monitoring with GPS William F Price Department of Civil Engineering, University of Brighton, BRIGHTON, BN1 4GJ, UK Abstract In common with many other countries that have an extended coastline, sea

More information

Presented at the FIG Congress 2018, May 6-11, 2018 in Istanbul, Turkey

Presented at the FIG Congress 2018, May 6-11, 2018 in Istanbul, Turkey Presented at the FIG Congress 2018, May 6-11, 2018 in Istanbul, Turkey 2 Improving Hydrographic PPP by Height Constraining Ashraf Abdallah (Egypt) Volker Schwieger, (Germany) ashraf.abdallah@aswu.edu.eg

More information

The Los Alamos Dual Band Lightning Array: A new tool for mapping VLF and VHF lightning in the Gulf of Mexico

The Los Alamos Dual Band Lightning Array: A new tool for mapping VLF and VHF lightning in the Gulf of Mexico The Los Alamos Dual Band Lightning Array: A new tool for mapping VLF and VHF lightning in the Gulf of Mexico Can we probe D-region disturbances using lightning? Christopher A. Jeffery (cjeffery@lanl.gov)

More information

HYDROGRAPHIC SURVEY STANDARDS AND DELIVERABLES

HYDROGRAPHIC SURVEY STANDARDS AND DELIVERABLES TABLE OF CONTENTS 1. HYDROGRAPHIC SURVEY METHODOLOGY... 3 2. HYDROGRAPHIC SURVEY REFERENCE STANDARDS... 3 3. HYDROGRAPHIC SURVEY CRITERIA... 3 3.1 HYDROGRAPHIC SURVEYS OVER NON GAZETTED NAVIGABLE WATERS*:...

More information

Introduction to Datums James R. Clynch February 2006

Introduction to Datums James R. Clynch February 2006 Introduction to Datums James R. Clynch February 2006 I. What Are Datums in Geodesy and Mapping? A datum is the traditional answer to the practical problem of making an accurate map. If you do not have

More information

MAINTENANCE DREDGING, PORT OF ALASKA HYDROGRAPHIC SURVEY PRE_ _POA ANCHORAGE, ALASKA V-101 SHEET IDENTIFICATION.

MAINTENANCE DREDGING, PORT OF ALASKA HYDROGRAPHIC SURVEY PRE_ _POA ANCHORAGE, ALASKA V-101 SHEET IDENTIFICATION. _FINAL.DWG /7/08 0:07 AM " = 00' 0-8 W9KB8C000 ANCEXP 7 May 08 /07/8 CONTRACT NO. W9KB-8-C-000 Engineers V-0 _FINAL.DWG /7/08 0:07 AM " = 00' 0-8 W9KB8C000 ANCEXP 7 May 08 /07/8 CONTRACT NO. W9KB-8-C-000

More information

Paper for a communication at the U.S. Hydro 2003

Paper for a communication at the U.S. Hydro 2003 Paper for a communication at the U.S. Hydro 2003 A Student Initiated Hydrographic Survey in a Riverine Environment, The Pearl River 2002 Field Project Experience David Dodd, Stephan Howden, David Wells,

More information

Geodesy, Geographic Datums & Coordinate Systems

Geodesy, Geographic Datums & Coordinate Systems Geodesy, Geographic Datums & Coordinate Systems What is the shape of the earth? Why is it relevant for GIS? 1/23/2018 2-1 From Conceptual to Pragmatic Dividing a sphere into a stack of pancakes (latitude)

More information

Multibeam Echosounder Metadata and Quality Statistics

Multibeam Echosounder Metadata and Quality Statistics Multibeam Echosounder Metadata and Quality Statistics Dave Mann, Survey Support Manager, Gardline Geosurvey Gardline MBES Systems Sea Explorer EM1002 RV Triton EM1002(S) Ocean Seeker EM1002(S) Ocean Endeavour

More information

FieldGenius Technical Notes GPS Terminology

FieldGenius Technical Notes GPS Terminology FieldGenius Technical Notes GPS Terminology Almanac A set of Keplerian orbital parameters which allow the satellite positions to be predicted into the future. Ambiguity An integer value of the number of

More information

Benefits and Impacts to Nautical Charting by Adopting a New Reference Frame. Dr. Neil Weston Office of Coast Survey, NOAA

Benefits and Impacts to Nautical Charting by Adopting a New Reference Frame. Dr. Neil Weston Office of Coast Survey, NOAA Benefits and Impacts to Nautical Charting by Adopting a New Reference Frame Dr. Neil Weston Office of Coast Survey, NOAA Motivation for this study NOAA s National Geodetic Survey New geometric reference

More information

hydro8 Precise Point Positioning, the new DGPS: The C-Nav Experience Edwin Danson FRICS FInstCES FRAS Business strategy consultant

hydro8 Precise Point Positioning, the new DGPS: The C-Nav Experience Edwin Danson FRICS FInstCES FRAS Business strategy consultant hydro8 Precise Point Positioning, the new DGPS: The C-Nav Experience Edwin Danson FRICS FInstCES FRAS Business strategy consultant C-Nav Worldwide Precise Point Positioning with In-built Autonomy for Assurance

More information

NJDEP GPS Data Collection Standards for GIS Data Development

NJDEP GPS Data Collection Standards for GIS Data Development NJDEP GPS Data Collection Standards for GIS Data Development Bureau of Geographic Information Systems Office of Information Resource Management April 24 th, 2017 Table of Contents 1.0 Introduction... 3

More information

Fugro commence new Airborne Lidar Bathymetry trials

Fugro commence new Airborne Lidar Bathymetry trials Fugro commence new Airborne Lidar Bathymetry trials Laurent Pronier 20 May 2011 Marrakech, Morocco, 18-22 May 2011 Contents Menu LADS Technology - History LADS Mk I (RAN LADS I) LADS Mk II RAN LADS II

More information

DEVICE CONFIGURATION INSTRUCTIONS

DEVICE CONFIGURATION INSTRUCTIONS WinFrog Device Group: Device Name/Model: Device Manufacturer: Device Data String(s) Output to WinFrog: WinFrog Data String(s) Output to Device: WinFrog Data Item(s) and their RAW record: GPS POS/MV (NMEA)

More information

Survey Operations Pipeline Inspection

Survey Operations Pipeline Inspection Survey Operations Pipeline Inspection HydroFest 16 th April 20 Kevin Donald Agenda Why Inspect? Definition of a Pipeline Types of Survey Positioning Data Processing The Future Conclusions Page 2 Why Inspect?

More information

MONITORING SEA LEVEL USING GPS

MONITORING SEA LEVEL USING GPS 38 MONITORING SEA LEVEL USING GPS Hasanuddin Z. Abidin* Abstract GPS (Global Positioning System) is a passive, all-weather satellite-based navigation and positioning system, which is designed to provide

More information

Evaluation of GPS-Based Attitude Parameters Applied to Bathymetric Measurements

Evaluation of GPS-Based Attitude Parameters Applied to Bathymetric Measurements Article ID: Evaluation of GPS-Based Attitude Parameters Applied to Bathymetric Measurements Chang Chia-chyang, Lee Hsing-wei Department of Surveying and Mapping Engineering, Chung Cheng Institute of Technology

More information

POS MV Position and Attitude sensors. Applications. > > High reliability in all dynamic conditions. > > Immunity to GNSS outages

POS MV Position and Attitude sensors. Applications. > > High reliability in all dynamic conditions. > > Immunity to GNSS outages 45 27 39.384 N 9 07 30.145 E POS MV Position and Attitude sensors Applanix technology and support gives you the advantage: lower costs of deployment, faster times to completion, and improved quality of

More information

VERTICAL DATUM TRANSFORMATIONS FOR KINEMATIC GPS HYDROGRAPHIC SURVEYS. Kurt W. Hess, Dennis G. Milbert, Stephen K. Gill, and Daniel R.

VERTICAL DATUM TRANSFORMATIONS FOR KINEMATIC GPS HYDROGRAPHIC SURVEYS. Kurt W. Hess, Dennis G. Milbert, Stephen K. Gill, and Daniel R. VERTICAL DATUM TRANSFORMATIONS FOR KINEMATIC GPS HYDROGRAPHIC SURVEYS Kurt W. Hess, Dennis G. Milbert, Stephen K. Gill, and Daniel R. Roman National Ocean Service, NOAA ABSTRACT Kinematic Global Positioning

More information

GNSS POST-PROCESSING SOFTWARE

GNSS POST-PROCESSING SOFTWARE GNSS POST-PROCESSING SOFTWARE Product Overview // July 2018 EZSURV POST-PROCESSING SOFTWARE EZSurv software is designed to edit, process and analyze raw GNSS (Global Navigation Satellite System) data to

More information

Applanix Products and Solutions for Hydrographic Survey & Marine Applications Maximize Your Productivity!

Applanix Products and Solutions for Hydrographic Survey & Marine Applications Maximize Your Productivity! Applanix Products and Solutions for Hydrographic Survey & Marine Applications Maximize Your Productivity! Applanix technology and support gives you the advantage: lower costs of deployment, faster times

More information

Inertial Navigation System

Inertial Navigation System Apogee Marine Series ULTIMATE ACCURACY MEMS Inertial Navigation System INS MRU AHRS ITAR Free 0.005 RMS Navigation, Motion & Heave Sensing APOGEE SERIES makes high accuracy affordable for all surveying

More information

New Approach for Tsunami Detection Based on RTK-GNSS Using Network of Ships

New Approach for Tsunami Detection Based on RTK-GNSS Using Network of Ships New Approach for Tsunami Detection Based on RTK-GNSS Using Network of Ships Tokyo University of Marine Science and Technology Ryuta Nakaosone Nobuaki Kubo Background After the Indian Ocean Tsunami on 2004,

More information

THE ELECTRONIC CHART DISPLAY AND INFORMATION SYSTEM (ECDIS) IN CHINA

THE ELECTRONIC CHART DISPLAY AND INFORMATION SYSTEM (ECDIS) IN CHINA International Hydrographic 'Review, Monaco, LXIX(2), September 1992 THE ELECTRONIC CHART DISPLAY AND INFORMATION SYSTEM (ECDIS) IN CHINA by The Research Group on ECDIS 1 Abstract This paper presents a

More information

Active microwave systems (1) Satellite Altimetry

Active microwave systems (1) Satellite Altimetry Remote Sensing: John Wilkin Active microwave systems (1) Satellite Altimetry jwilkin@rutgers.edu IMCS Building Room 214C 732-932-6555 ext 251 Active microwave instruments Scatterometer (scattering from

More information

United States - Canada Hydrographic Commission Halifax, Canada May 16, 2016

United States - Canada Hydrographic Commission Halifax, Canada May 16, 2016 United States - Canada Hydrographic Commission Halifax, Canada May 16, 2016 USCHC39 INF-E NOAA Pilot Study Applying Satellite-Derived Bathymetry to Longboat Pass, Florida Submitted by: The United States

More information

Technical Notes LAND MAPPING APPLICATIONS. Leading the way with increased reliability.

Technical Notes LAND MAPPING APPLICATIONS. Leading the way with increased reliability. LAND MAPPING APPLICATIONS Technical Notes Leading the way with increased reliability. Industry-leading post-processing software designed to maximize the accuracy potential of your POS LV (Position and

More information

Three-dimensional investigation of buried structures with multi-transducer parametric sub-bottom profiler as part of hydrographical applications

Three-dimensional investigation of buried structures with multi-transducer parametric sub-bottom profiler as part of hydrographical applications Three-dimensional investigation of buried structures with multi-transducer parametric sub-bottom profiler as part Jens LOWAG, Germany, Dr. Jens WUNDERLICH, Germany, Peter HUEMBS, Germany Key words: parametric,

More information

GPS Geodetic Reference System WGS 84

GPS Geodetic Reference System WGS 84 GPS Geodetic Reference System WGS 84 International Committee on GNSS Working Group D Saint Petersburg, Russia 16 September 2009 Barbara Wiley National Geospatial-Intelligence Agency United States of America

More information

High Precision Positioning Unit 1: Accuracy, Precision, and Error Student Exercise

High Precision Positioning Unit 1: Accuracy, Precision, and Error Student Exercise High Precision Positioning Unit 1: Accuracy, Precision, and Error Student Exercise Ian Lauer and Ben Crosby (Idaho State University) This assignment follows the Unit 1 introductory presentation and lecture.

More information

Combining low-cost sonar and high-precision GNSS for river and estuarine bathymetry

Combining low-cost sonar and high-precision GNSS for river and estuarine bathymetry Combining low-cost sonar and high-precision GNSS for river and estuarine bathymetry J.A. Gonçalves, J. Pinheiro, L. Bastos, A. Bio Background Bathymetry surveys are essential to provide data to keep navigation

More information

POS MV Position and Attitude sensors. Applications. > > High reliability in all dynamic conditions. > > Immunity to GNSS outages

POS MV Position and Attitude sensors. Applications. > > High reliability in all dynamic conditions. > > Immunity to GNSS outages 45 27 39.384 N 9 07 30.145 E POS MV Position and Attitude sensors Applanix technology and support gives you the advantage: lower costs of deployment, faster times to completion, and improved quality of

More information

Determining Accurate Elevations: Datums & Tools, Today & Tomorrow

Determining Accurate Elevations: Datums & Tools, Today & Tomorrow Determining Accurate Elevations: Datums & Tools, Today & Tomorrow Maryland Association Floodplain and Stormwater Managers Linthicum Heights, MD Christine Gallagher Oct. 20, 2016 Overview NGS Mission Important

More information

ION GNSS 2011 FILLING IN THE GAPS OF RTK WITH REGIONAL PPP

ION GNSS 2011 FILLING IN THE GAPS OF RTK WITH REGIONAL PPP ION GNSS 2011 FILLING IN THE GAPS OF RTK WITH REGIONAL PPP SEPTEMBER 22 th, 2011 ION GNSS 2011. PORTLAND, OREGON, USA SESSION F3: PRECISE POSITIONING AND RTK FOR CIVIL APPLICATION C. García A. Mozo P.

More information

GLMTF November 18, 2014 Presentation

GLMTF November 18, 2014 Presentation GLMTF November 18, 2014 Presentation Michigan Security Network Founded by major corporations, industry leaders and leading universities in 2008 as a non-profit organization (501c6). MiSN mission is to

More information

AUSPOS GPS Processing Report

AUSPOS GPS Processing Report AUSPOS GPS Processing Report February 13, 2012 This document is a report of the GPS data processing undertaken by the AUSPOS Online GPS Processing Service (version: AUSPOS 2.02). The AUSPOS Online GPS

More information

Overview of New Datums NOAA s National Geodetic Survey

Overview of New Datums NOAA s National Geodetic Survey Overview of New Datums NOAA s National Geodetic Survey February 3, 2015 1 NGS s Mission and Role NGS Mission: To define, maintain, and provide access to the National Spatial Reference System to meet our

More information

Appendix E-4 BIWF Marine Geophysical Landfall Survey

Appendix E-4 BIWF Marine Geophysical Landfall Survey Appendix E-4 BIWF Marine Geophysical Landfall Survey 25 July 2012 AECOM 10 Orms Street, Suite 405 Providence, RI 02904 Attn: Mark Gardella SUBJECT: MARINE GEOPHYSICAL SITE INVESTIGATIONS (REPORT NO. 12ES048-WF)

More information

Global Correction Services for GNSS

Global Correction Services for GNSS Global Correction Services for GNSS Hemisphere GNSS Whitepaper September 5, 2015 Overview Since the early days of GPS, new industries emerged while existing industries evolved to use position data in real-time.

More information

Remote Sensing: John Wilkin IMCS Building Room 211C ext 251. Active microwave systems (1) Satellite Altimetry

Remote Sensing: John Wilkin IMCS Building Room 211C ext 251. Active microwave systems (1) Satellite Altimetry Remote Sensing: John Wilkin wilkin@marine.rutgers.edu IMCS Building Room 211C 732-932-6555 ext 251 Active microwave systems (1) Satellite Altimetry Active microwave instruments Scatterometer (scattering

More information

Experiences with Fugro's Real Time GPS/GLONASS Orbit/Clock Decimeter Level Precise Positioning System

Experiences with Fugro's Real Time GPS/GLONASS Orbit/Clock Decimeter Level Precise Positioning System Return to Session Directory DYNAMIC POSITIONING CONFERENCE October 13-14, 2009 Sensors Experiences with Fugro's Real Time GPS/GLONASS Orbit/Clock Decimeter Level Precise Positioning System Ole Ørpen and

More information

Kongsberg Seatex AS Pirsenteret N-7462 Trondheim Norway POSITION 303 VELOCITY 900 HEADING 910 ATTITUDE 413 HEAVE 888

Kongsberg Seatex AS Pirsenteret N-7462 Trondheim Norway POSITION 303 VELOCITY 900 HEADING 910 ATTITUDE 413 HEAVE 888 WinFrog Device Group: Device Name/Model: Device Manufacturer: Device Data String(s) Output to WinFrog: WinFrog Data String(s) Output to Device: WinFrog Data Item(s) and their RAW record: GPS SEAPATH Kongsberg

More information

Recent Developments in NOAA s Real- Time Coastal Observing Systems for Safe and Efficient Maritime Transportation

Recent Developments in NOAA s Real- Time Coastal Observing Systems for Safe and Efficient Maritime Transportation Recent Developments in NOAA s Real- Time Coastal Observing Systems for Safe and Efficient Maritime Transportation Rich Edwing, Director NOAA Center for Operational Oceanographic Products and Services CMTS

More information

SPAN Data Logging for Inertial Explorer

SPAN Data Logging for Inertial Explorer APN-076 ev C SPAN Data Logging for Inertial Explorer Page 1 November 16, 2017 Overview This document provides an overview of the OEM6 and OEM7 SPAN logs used for post-processing in Inertial Explorer (IE)

More information

One Source for Positioning Success

One Source for Positioning Success novatel.com One Source for Positioning Success RTK, PPP, SBAS OR DGNSS. NOVATEL CORRECT OPTIMIZES ALL CORRECTION SOURCES, PUTTING MORE POWER, FLEXIBILITY AND CONTROL IN YOUR HANDS. NovAtel CORRECT is the

More information

Vertical Datum Conversions for Regional Coastal Management

Vertical Datum Conversions for Regional Coastal Management Vertical Datum Conversions for Regional Coastal Management Jennifer M. Wozencraft Joint Airborne Lidar Bathymetry Technical Center of Expertise US Army Engineer District Mobile 109 St. Joseph Street Mobile,

More information

Hydrofest The Hydrographic Society in Scotland

Hydrofest The Hydrographic Society in Scotland Hydrofest 2017 The Hydrographic Society in Scotland POSITIONING SYSTEMS Eddie Milne 1. GNSS Positioning 2. Additional Sensors 3. Alternative Positioning 4. Bringing it altogether GNSS = GPS + Glonass +

More information

Measuring Currents from Aids-to-Navigation Buoys

Measuring Currents from Aids-to-Navigation Buoys Measuring Currents from Aids-to-Navigation Buoys Recent Design Improvements Bob Heitsenrether Kate Bosley, PhD Kasey Hall Overview CO-OPS Background NOAA s Physical Oceanographic Real-time System (PORTS

More information

The Global Positioning System

The Global Positioning System The Global Positioning System 5-1 US GPS Facts of Note DoD navigation system First launch on 22 Feb 1978, fully operational in 1994 ~$15 billion (?) invested to date 24 (+/-) Earth-orbiting satellites

More information

PHOTOGRAMMETRIC RESECTION DIFFERENCES BASED ON LABORATORY vs. OPERATIONAL CALIBRATIONS

PHOTOGRAMMETRIC RESECTION DIFFERENCES BASED ON LABORATORY vs. OPERATIONAL CALIBRATIONS PHOTOGRAMMETRIC RESECTION DIFFERENCES BASED ON LABORATORY vs. OPERATIONAL CALIBRATIONS Dean C. MERCHANT Topo Photo Inc. Columbus, Ohio USA merchant.2@osu.edu KEY WORDS: Photogrammetry, Calibration, GPS,

More information

DEVICE CONFIGURATION INSTRUCTIONS. WinFrog Device Group:

DEVICE CONFIGURATION INSTRUCTIONS. WinFrog Device Group: WinFrog Device Group: Device Name/Model: Device Manufacturer: Device Data String(s) Output to WinFrog: WinFrog Data String(s) Output to Device: WinFrog Data Item(s) and their RAW record: GPS NMEA GPS (Sercel)

More information

An NGS Illustrated Guide to Geodesy for GIS Professionals

An NGS Illustrated Guide to Geodesy for GIS Professionals An NGS Illustrated Guide to Geodesy for GIS Professionals Michael Dennis, RLS, PE michael.dennis@noaa.gov Esri User Conference San Diego Convention Center July 14-18, 2014 San Diego, CA Why should we care

More information

GNSS (GPS) buoy array in the Pacific for natural disaster mitigation. Teruyuki KATO Earthquake Research Institute the University of Tokyo, Japan

GNSS (GPS) buoy array in the Pacific for natural disaster mitigation. Teruyuki KATO Earthquake Research Institute the University of Tokyo, Japan GNSS (GPS) buoy array in the Pacific for natural disaster mitigation Teruyuki KATO Earthquake Research Institute the University of Tokyo, Japan 1 (Modified from Oki & Koketsu, 2011) Historical megaquakes

More information

Tidal Datums & Coastal Profiles. DGGS Coastal Hazards Program - Fairbanks, AK Program Manager: Nicole Kinsman

Tidal Datums & Coastal Profiles. DGGS Coastal Hazards Program - Fairbanks, AK Program Manager: Nicole Kinsman Tidal Datums & Coastal Profiles DGGS Coastal Hazards Program - Fairbanks, AK Program Manager: Nicole Kinsman nicole.kinsman@alaska.gov 907-451-5026 Overview AOOS-funded DGGS Projects: 1) Port Heiden Short-Term

More information

Keywords: GPS/GLONASS, Precise Point Positioning, Kinematic, Hydrography

Keywords: GPS/GLONASS, Precise Point Positioning, Kinematic, Hydrography GPS/GLONASS COMBINED PRECISE POINT POSITIOINING FOR HYDROGRAPHY CASE STUDY (ASWAN, EGYPT) Ashraf Farah Associate Professor,College of Engineering, Aswan University, Egypt, ashraf_farah@aswu.edu.eg ABSTRACT

More information

1 Introduction integrated 3D sonar system for underwater inspection applications

1 Introduction integrated 3D sonar system for underwater inspection applications 1 Introduction The Underwater Inspection System (UIS TM ) is an integrated 3D sonar system for underwater inspection applications, specifically port and harbor construction, maintenance, port expansion,

More information

ELEMENTS OF THE NATIONAL SPATIAL REFERENCE SYSTEM

ELEMENTS OF THE NATIONAL SPATIAL REFERENCE SYSTEM Dave Doyle NGS Chief Geodetic Surveyor dave.doyle@noaa.gov 301-713-3178 ELEMENTS OF THE NATIONAL SPATIAL REFERENCE SYSTEM ESRI SURVEY SUMMIT San Diego, CA June 17, 2007 ftp://ftp.ngs.noaa.gov/dist/daved/esri

More information

GPS Milestones, cont. GPS Milestones. The Global Positioning Sytem, Part 1 10/10/2017. M. Helper, GEO 327G/386G, UT Austin 1. US GPS Facts of Note

GPS Milestones, cont. GPS Milestones. The Global Positioning Sytem, Part 1 10/10/2017. M. Helper, GEO 327G/386G, UT Austin 1. US GPS Facts of Note The Global Positioning System US GPS Facts of Note DoD navigation system First launch on 22 Feb 1978, fully operational in 1994 ~$15 billion (?) invested to date 24 (+/-) Earth-orbiting satellites (SVs)

More information

Kordil Surveying & Engineering Services

Kordil Surveying & Engineering Services Kordil Surveying & Engineering Services About Kordil Kordil Surveying & Engineering Ltd. Co. in short Kordil is an all in one surveying company providing service from Turkey. Hydrography, Oceanography

More information