PD ANALYSIS OF GAS INSULATED MEDIUM VOLTAGE SWITCHGEAR DURING FACTORY ASSEMBLY AND SITE COMMISSIONING

Size: px
Start display at page:

Download "PD ANALYSIS OF GAS INSULATED MEDIUM VOLTAGE SWITCHGEAR DURING FACTORY ASSEMBLY AND SITE COMMISSIONING"

Transcription

1 C I R E D 18 th International Conference on Electricity Distribution Turin, 6-9 June 2005 PD ANALYSIS OF GAS INSULATED MEDIUM VOLTAGE SWITCHGEAR DURING FACTORY ASSEMBLY AND SITE COMMISSIONING Andreas F.X. WELSCH*, Siegfried A. RUHLAND* *AREVA Sachsenwerk GmbH - Germany andreas.welsch@areva-td.com siegfried.ruhland@areva-td.com INTRODUCTION The Partial Discharge (PD) measurement of medium voltage (MV) gas insulated switchgear as a routine test is according to the standard IEC [1] a subject to agreement between manufacturer and user. However, more and more manufacturers of MV gas insulated switchgears are going to introduce this measurement as a factory test for quality assurance to qualify the proper insulation of the switchgear. Furthermore in the last years the user of MV gas insulated switchgears stated more and more the requirement for PD measurements after erection at site. The main reason is, that despite the current situation of high cost pressure the user has to maintain the reliability of the electricity distribution systems. The important role of medium voltage switchgear to guarantee a high service quality especially in HV-substations led to an increased application of gas insulated switchgears in the last 20 years. Due to the hermetical sealed design gas insulated switchgears have a lot of advantages and show a high reliability. To achieve or even exceed the expected lifetime of 30 years a proper insulating system is of great importance. PD measurements give an indication of the degradation of the insulation. Low PD values at the factory ensure that the switchgear has left the factory not defective. Low PD values after erection on site confirm, that no damages have occurred during the shipment and the installation of the switchgear. For a common understanding of the test results the test items should be specified between manufacturer and user. In the standard IEC the measuring procedure is defined in Annex B, however, the test arrangement, the maximum permissible limit value of the PD quantity and the establishment of the PD reading is always an issue of discussion between manufacturer and user. DESCRIPTION OF PD TEST Types of test The PD measurement is applied at all stages of the life cycle of the switchgear. During the development the focus lays on the evaluation of the design of the switchgear and the final type test confirms the proper design. The routine test of components, especially of insulating cast resin parts, shall show that the casting process was faultless and no serious defects like voids, conducting particles or separation of metallic inserts had remained inside. In the factory of the GIS manufacturer the routine PD test ensures that the used metallic parts have no detectable failures like sharp edges or anomalies at electrode surfaces and ensure the correct assembly of the single panels. However, if damages could occur during the shipment and the installation of the switchgear was not properly carried out, the PD test at site prior to commissioning is of great importance. The detection of insulation changes by means of online PD measurement during the service may help to increase the service life of the switchgear [4]. Test circuits and procedures The possible test circuits to measure the apparent charge described in IEC [1] consist of single-phase and three-phase arrangements. However, the only practicable method for MV gas insulated switchgear is the single phase testing. This test method can be used at the factory as well as at site. For measuring the partial discharge quantities, each phase shall be connected to the test voltage source successively, the other two phases and all the parts earthed in service being earthed. Thereby a sufficient sensitivity for the detection of defects from phase to phase and from phase to ground is reached [5]. According to the standard the neutral point treatment (with or without solidly earthed neutral) determines the test voltage. Most of the MV networks use resonat grounding of the neutral point (Petersen coil). In any case the MV GIS have to be designed and tested for a phase to ground PD test voltage of U r and in fact the users don t differentiate. Therefore the following test procedure is become customary: First, the applied power-frequency voltage is raised to a pre-stress value of 1,3 U r and maintained at this value for 10 s. Partial discharges occurring during this period are disregarded. The voltage is then decreased without interruption to 1,1 U r and maintained at this value a specified time, usually 60 s (no time limit is mentioned in the standard [1]). In this time period the partial discharge quantity has to be determined. To ensure a proper insulation system of MV gas insulated switchgear a permissible PD value below 20 pc at the test voltage of 1,1 U r is acceptable. In case of connected voltage transformers (VTs) the permissible PD value can t be lower CIRED2005 Session No 1

2 C I R E D 18 th International Conference on Electricity Distribution Turin, 6-9 June 2005 than that according to the IEC standard of VTs thus 50 pc. For additional information the PD inception and extinction voltages can be recorded, but always with respect to the actual background noise level. Normally the extinction voltage is the voltage when the PD disappears in the background noise. In some sites the background noise level can be very low (e.g. in metal housings lower than 1 pc) and the extinction voltage can decrease to very low values. Therefore the sole fixing of a permissible voltage level (acceptance criterion) for the PD inception and extinction voltages makes no sense. More practicable is the fixing of a second voltage level below the test voltage connected with a second permissible PD value, e.g. at U r / 3 lower than 5 pc. It is well known that PD values lower than 5 pc have a negligible impact on MV GIS. Requirements on test equipment The most usual method for detecting PD in MV gas insulated switchgear utilises a coupling capacitor (C C ) that is place in parallel with the test object. The PD signals are measured via a coupling device (CD) connected between test object and ground, see figure 1. The extraction of the test voltage signal out of the measuring impedance is of great advantage, as it saves an additional voltage divider. Regulator Figure 1 Transformer 100 kv Test object AKV CD Usual test set up for MV switchgear The test voltage source should be a 100-kV-transformer as an isolated vessel type (weight, size). The transformer has to be PD free up to 60 kv and its power supply should be filtered. The entire needed equipment described is easily transportable and can be used at factory as well as at site, figure 3. For recording and analysis of the PD impulses a computerised measuring equipment, see figure 2 is of great advantage. Three important measuring possibilities can be realised: - A meter for the weighted apparent charge according to IEC [2] - An oscilloscope to display the single PD pulses in relation to the phase - A graph of the phase resolved PD pattern Additionally, certain device functions for the suppression of external PD disturbances, like windowing and gating should be available to reach a sufficient background noise level. ROUTINE TESTS AT FACTORY According to the standard [1], PD measurements as a routine test on assemblies or subassemblies should be made with the switching devices of the concerning primary parts in the closed position. Only in some exceptional cases, where the C c PD Measurement Voltage Measurement deterioration of the insulation by PD is conceivable, e.g. disconnectors or stand-by incoming feeder (energised in open position), an additional PD measurement could be performed with the device in open position. The PD test on parts of the switchgear panel, which are already tested at the supplier like cast resin voltage transformer (VT), is not necessary. Therefore the VTs remain switched off during the test. If the user requires the test, it has to be considered that at power frequency the VT cannot be loaded with the test voltage. Above a design dependant voltage the iron core goes in saturation and an admissible high current flow, which can damage the VT windings. Normally applied voltages at power frequency above 1.0 U r are not permissible. To be sure the VT supplier should be inquired. For an advanced PD analysis a digital PD measuring system with the ability of phase resolved PD pattern was introduced at the factory test areas, see figure 2. To ensure a sufficient background noise level, which in most of the factories heavily is affected by spurious crane movements, the gating method has proved of value. For that purpose the antenna input is directly connected to the metallic fence of the test area. Figure 2 For a normal PD measurement the oscilloscope function is sufficient for the testing staff and the people witnessing, if the measured charge and the applied voltage is displayed simultaneously. To avoid confusion it is important that in this function mode the weighted IEC value [2] and not the peak value is displayed. In the case of PD values, which exceed the maximum limit quantities, immediately the phase Digital PD measuring system resolved PD pattern could at routine test area be recorded and for a PD analysis considered. The best way is to record PD pattern at the fixed test voltage. At the inception or extinction voltages the PD activity is stochastic which leads to large variations of the patterns. For analysis the found PD pattern is compared with a catalogue of possible PD pattern. With this the testing staff can initiate first measures without consultation with the laboratory. If the failure cannot be cleared and investigations in the laboratory are necessary, the PD pattern recorded in the routine test areas is the guideline for the search for the defect. LOCALISATION OF DEFECTS If the PD measurement shows an admissible insulation defect the source of PD has to be localised. Switching operations leads to a first rough localisation of the parts concerned. A more detailed localisation can be performed by means of modern digital PD measuring systems with voltage indication. CIRED2005 Session No 1

3 C I R E D 18 th International Conference on Electricity Distribution Turin, 6-9 June 2005 These systems can store over a certain period of time the parameters amplitude, phase position and time of every single impulse. After the recording the PD analysis is done off-line. The analysis tool can generate interesting 3D diagrams like pulse number over phase and charge, charge over phase and time or charge over phase and voltage. However, it was found that the phase resolved PD pattern (figure 3 a) is the most suitable one for a fast PD analysis at factory and at site. Additional information can be delivered by the diagram charge over voltage (figure 3 b), out of which the inception and the extinction voltage can be also determined. a) b) Figure 4 PD analysis of a loose bolt on a live part: a) in SF 6, b) in air a) b) a) Figure 5 PD analysis of a sharp tip on a live part: a) in SF 6, b) in air In both cases can be stated, that the PD values in air are much higher than in gas. b) Figure 3 PD analysis of a cast resin spacer a) phase resolved PD pattern, b) charge over voltage (red up) These diagrams are normally sufficient to find out the type of PD source. Together with the known design of the MV GIS in most of the cases the PD producing part can be identified. If not, there are unconventional methods, which support the localisation of PD source, like ultra sonic detection or the recording of ultra violet light emission, which are well known at air insulated equipment. For this type of localisation the gas insulated switchgear has to be opened. Then an ultra sonic detector (microphone), which can normally detect PD down to 30 pc, is used to determine precisely the PD source. In some cases, e.g. loosen bolt or sharp edges, it was found, that a similar PD pattern could be reproduced in air, figures 4 and 5. This is important, because in air corona discharges could be initiated at other parts. Therefore the PD pattern recorded in air has to be comparable to the PD pattern recorded in gas to ensure the right PD source is detected. It is remarkably that for the loosen bolt the inception voltage in air is the same like in gas and lays at 10 kv. For the sharp tip the inception voltage decreases from 18 kv in gas to 14 kv in air (- 20 %). If the concerned area is too complicated or too compact, there is no other way, as part for part has to be removed until the PD disappears. Here it is important likewise, that at each step the recorded PD pattern is compared with the pattern in gas. SITE TESTS AFTER COMMISSIONING In general primary MV GIS are shipped at site in preassembled modules. These modules are subjected to the above-described routine tests in the factory, but it is almost impossible to perform the partial discharge routine test at the complete assembled switchgear. The size of such assemblies can be from a width of some meters to some tens of meters. According to IEC no partial discharge measurements neither in the factory nor at site are required. However from time to time customers are asking for this type of test after the assembly work at site. As the PD test is subject of agreement between manufacturer and user the test procedure and the acceptance criterions have to be agreed before the test. The environment of the test has to be taken into account when criterions are fixed. When speaking about environment both parties should have the physics in mind: - At site there is no shielded laboratory. - The background noise level is heavily affected by electromagnetic noise. - This noise can be of permanent nature (radio transmitters) or random (cell phones). - Partial discharges from other equipment in the switchyard may be interpreted as PD from the test object. - The free space around the switchgear is limited (see figure 6). The biggest difficulty is to judge on the expected background noise level. The accepted PD level at test voltage should be at least 2 times higher than the expected background noise level. Otherwise is almost impossible to make a clear distinction between PD and noise. After successful commissioning of the switchgear the test equipment has to be completed in the switchgear room. CIRED2005 Session No 1

4 C I R E D 18 th International Conference on Electricity Distribution Turin, 6-9 June 2005 Figure 6 Site test of a 36 kv gas insulated switchgear Before running the acceptance test the representatives of the manufacturer and the end user have to be sure, that the test equipment itself is free of any discharges. This should be verified by increasing the voltage to at least 1.3 times the test voltage. The same procedure should be applied when the test cables are connected. Most the problems during site tests are caused by improperly connected high voltage cables. Once it is secured, that the connections and the test equipment are free of any disturbing discharges the applied test procedure is identical to the test procedure during the routine test in the factory. When the test is performed it is very important, that all PD impulses are recorded. Especially all impulses, which occur after switching on the test circuit without the presence of high voltage, are of importance. These impulses are an indicator for the background noise, which is picked up by the overall test arrangement. When the test voltage is reached it should be kept for the specified time. During this time period the reading of the PD-meter takes place (figure 7). Figure 7 Computerised PD measuring device for on site measurements (left - voltage regulator) According to the definitions of IEC a partial discharge occurs during every cycle of the voltage. That means pulses occurring randomly during the specified reading time have to be neglected and should not be considered as PD coming from the object under test. This point leads to the biggest discussions at site almost because of the poor preparation/knowledge of some people witnessing. A partial discharge measurement cannot be compared with a measurement of the resistance of the main circuit, where a reading can be reproduced at almost any time. To measure a partial discharge means to integrate the current of some 10-9 Amperes and to calculate the apparent charge of some Coulombs. Further is has to be considered that the overall uncertainty of such measurements is in the range of some tens of percents and are highly dependant on the bandwidth and the quality of the PD-detector. Another important factor of influence is the ratio of the coupling capacitor to the capacitance of the main circuit. It has to be considered that the sensitivity of the PD measurement is limited due to electrical length (total capacitance) of the main circuit tested. IEC gives sufficient indications how to avoid such problems, but unfortunately most of the content is not properly known. The measurement will be done normally on all parts of the switchgear, which were not tested in the factory. This means the bus bar and bus bar joints are subjected to the test voltage. All other parts of the switchgear modules, like circuit breaker compartments are already tested. The test results of this test sections should be taken into account when the overall PDlevel of the switchgear is determined. As the measurement of PD-impulses is a single impulse measurement, no superposition of impulses takes place. That means 20 pc in one panel and another 20 pc in a second panel will not result in 40 pc for the measurement of the panels, when they are tested together. The above experiences shall not have the character of a school, but should sensate all people who are specifying PD tests at site and who are witnessing these tests. IDENTIFIED CHARACTERISTIC DEFECTS Defects in gas During the assembly small impurities, like conducting particles can get into the GIS compartment. Free particles as well as fixed particles at spacers can drastically reduce the ac breakdown voltage of the gas insulation [3]. Floating components, like not bonded shields or loosen bolts (see figure 4) cause generally high PD intensities, which are normally high enough to decompose SF 6 in huge amounts. The PD pattern is very characteristic with the small gap after the voltage maximum and the occurrence of PD values only in a certain range. In case of sharp protrusions or tips (see figure 5) the PD intensities are small, however, the lightning impulse breakdown voltage is seriously reduced. So all described defects in gas can be serious and should be located. Defects at interface areas Defects at interface areas like surfaces of spacers and cable joints cause high PD intensities up to several hundreds of pc. These creeping discharges can only start at high electrical stress. Contamination or air bubbles can cause continuous discharges along the surface or joint and these the burning of the organic material. The result is an electrical tree and the breakdown of the insulation along the creeping track. Figure 8 illustrates the PD pattern of a creeping discharge on the surface of an insulating spacer. The PD pattern is symmetrically in both half waves. PD occurs before and after CIRED2005 Session No 1

5 C I R E D 18 th International Conference on Electricity Distribution Turin, 6-9 June 2005 the voltage maximum with the highest values short before. The PD pattern of a defect in a dummy plug (see figure 9) shows only PD impulses in the positive half wave of the voltage, but the shape is very similar to that of figure 8. Figure 11 PD pattern of a separation between the insert and the cast resin at the grounded side of a 36-kV-spacer Figure 8 Figure 9 PD pattern of creeping discharge at the surface of a spacer PD pattern of discharges in the joint between silicon rubber of a dummy plug and the cast resin cable socket Defects inside insulating parts PD values higher than 20 pc could cause the deterioration of solid insulations in the course of time. If the PD intensity is increasing, it may lead to the same development of damage like creeping defects. Figure 10 shows the very characteristic PD pattern of a longitudinal void, which lays in parallel to the electric field lines, of a 52-kV-spacer. The PD magnitudes are direct proportional to the instantaneous value of the voltage starting with the passing through of voltage. The PD pattern is identical in both half waves and has a small variance along the slope. In the PD pattern of a separation between an insert and the cast resin of an insulating spacer a linear slope of the PD values is indicated also, see figure 11. However, the variance along the slope is much higher and the characteristic is more diffuse. The clarification of this failure mode was difficult. Only when at a second spacer the inserts were pulled out by a mechanical appliance for 0.6 mm a similar PD pattern could be generated. This shape was surprisingly very close to that of figure 11. CONCLUSION If factory or site tests of MV GIS are witnessed, it is of great importance that the test procedure and the acceptance criterions have to be agreed before the test. The agreement should include the test arrangement, the maximum permissible limits at which test voltage and the establishment of the PD reading. It was presented some practicable fixings. If admissible failures have to be localized inside the GIS compartment digital and computerized measuring systems are very helpful. Especially the phase resolved PD pattern has proved of value. The presented failures including free potential effects in gas, defects of interface areas and voids in insulating parts show surprisingly characteristic shapes of the PD pattern. These allow the classification to types of PD sources and support the identification of the part concerned. ACKNOWLEDGEMENTS The authors wish to acknowledge the support of Mr. Werner Graf, who made the PD measurements in the laboratory. REFERENCES [1] IEC , 2002, "AC metal-enclosed switchgear and controlgear for rated voltages above 1 kv and up to and including 52 kv " [2] IEC 60270, 2000, "Partial Discharge Measurements [3] I.A. Metwally, 2004, "Status review on partial discharge measurements techniques in gas-insulated switchgear/lines ", Electr. Power Syst. Research. vol. 69, [4] J.S. Pearson, O. Farish, B.F. Hampton, M.D. Judd, D. Templeton, B.W. Pryor, I.M. Welch, 1995, "Partial discharge diagnostics for gas insulated substations", IEEE Trans. Dielectr. Electr. Insulat. 2 DEI. vol. 5, Figure 10 PD pattern of a longitudinal void of a 52-kV-spacer [5] H.D. Schlemper, R. Kurrer, K. Feser, 1993, "Sensitivity of on-site partial discharge detection in GIS", Proceedings 8 th International Symposium on High Voltage Engineering, ISH, paper CIRED2005 Session No 1

6 PARTIAL DISCHARGE DIAGNOSTICS FOR LOCALISATION OF DEFECT PARTS IN GAS INSULATED MEDIUM VOLTAGE SWITCHGEAR Andreas F.X.Welsch 1*, Rainer Haller 2 1 University of Applied Sciences, Faculty of Electrical and Information Technology, Seybothstr. 2, Regensburg, Germany 2 University of West Bohemia, Department of Power and Environmental Engineering, Univerzitni 26, Pilsen, Czech Republik * Andreas.Welsch@e-technik.fh-regensburg.de Abstract: The Partial Discharge Analysis of Medium Voltage Gas Insulated Switchgear (MVGIS) becomes ever more important for improving the quality at all stages of switchgear life cycle. Problems exist in the guarantee of high sensitivity measurements in the range of few pc and, above all, to interpret and to locate pd generating defects. In such cases it is helpful to compare the measured pd-pattern with pd-data from well known defects. Consequently, this paper presents characteristic PD sources in MV GIS and the concerning PD pattern to build up a database. The presented failures include most of the parts in a MV GIS which can be concerned. These are e.g. sharp metal parts or loose screws with discharges in gases (air and SF 6 ). The main part of the paper are failures in or at interfaces with insulating materials like surface discharges. For some effects the reproducibly, the voltage dependence and the changes over time of the PD pattern was investigated. The presented failures show surprisingly characteristic shapes of the PD pattern, which allow the classification to types of PD sources. This method strongly supports the identification of the part concerned inside the MV GIS and is very helpful in the daily work of a factory test bay. 1 INTRODUCTION Partial discharge (PD) analysis becomes an increasingly important tool for improvement of the quality of Medium Voltage Gas Insulated Switchgear (MV GIS) [1]. The use of pd-measurements facilitates the detection of insulation defects or technological damage both during the manufacturing process and after assembling. Not only the identification of the defects, but their interpretation and location are ever more important. In modern pd-measuring systems this problem can be solved by using a reference data base, in which the pd-pattern of well known defects, sometimes added with so-called "fingerprints" [2, 3] are stored. With such a diagnostic tool, the measured data may be compared with reference data in order to provide a recommendation concerning the interpretation of defects. The main problem in this case is, that the reference data base does not include the pd-data typical to the specific product, so the given recommendation may not be exact or possibly even wrong. One of the most important objectives of the manufacturer is to include within the reference database of his diagnostic tool, the pd-pattern of typical product specific defects. In this paper some pd-patterns of MV GIS typical defects will be discussed. 2 TEST ARRANGEMENT AND PRO- CEDURE The most usual method for detecting PD in MV GIS utilises a coupling capacitor (C C ) that is placed in parallel with the test object, a standardized pd-testcircuit [2]. The PD signals are measured via a measuring impedance (MI) connected between test object and ground, see figure 1. The extraction of the test voltage signal out of the measuring impedance is of great advantage, as it saves an additional voltage divider. The pd signals were measured by a modern computer based pd measuring system according IEC [2]. The measuring sensitivity was less than 1 pc, at this special suppressing methods, available by the system, were be used [3]. Regulator Transformer 100 kv Test object C c MI A KV PD Measurement Voltage Measurement Fig.1: PD- test circuit with PD- measuring system [3] 3 SITE TEST AFTER COMMISSIONING In general primary MV GIS are shipped at site in pre-assembled modules. These modules are subjected to the routine tests in the factory, but it is almost impossible to perform the partial discharge routine test at the complete assembled switch gear. The size of such assemblies can be from a width of some meters to some tens of meters. According to IEC [4] no PD measurements neither in the factory nor at site are required. However sometimes customers are asking for this type of test after the assembly work at site.

7 In 2003 an MV GIS for 36 kv was delivered to a Canadian utility. The substation consists of 15 panels and was mounted in a metal clad container, where a background noise level lower than 1 pc is achieved, fig. 2 left. The customer wished a PD test after commissioning on site, whereby a 20 pc limit at 1,1 U r was agreed. The PD test was carried out with a conventional measuring system with a pd meter. During the test at various panels and at the bus bar strongly varying PDs occurred, which reached values up to 100 pc. Additionally, time delay effects were observed, where after some minutes or after repeated voltage application PDs were initiated. Due to this PD behaviour and the used measuring system a localisation of the PD sources was impossible. Because of the pressure to go in service and the acceptable PD values it was decided to switch on the substation and to retest it, when one half of the substation could be shut down. In April 2005 an expert team got the possibility to investigate the first half during the second half is in service and vice versa. Various spare parts were delivered to the site to have the chance to exchange possibly concerned parts. The cables of one half were pulled and the sockets were sealed with dummy plugs. Fig. 3: PD-pattern for MV GIS under test (U test ~ 1.3 U i ) and interpretation by diagnose-tool 4.1. Plastic bolt on HV This defect was a very nasty one, because a time delay effect occurred, where only after some minutes or after repeated voltage application the PD was initiated. The phase resolved PD pattern is in both half waves of the voltage identically, fig. 4. Several parts were exchanged by machined plastic bolts with good results. Fig. 2 At site test of a 36 kv MV GIS in a container left front side, right measuring equipment at the rear side 4 RESULTS OF SITE TEST The measurements at site were started during a test procedure of the assembled MV GIS (see fig. 2 right). The interpretation by using the implemented diagnostic tool showed, that the recommendation about the defect is not practical, fig. 3. Too many different defects are offered (e.g. surface discharges, void discharges and even machine bar insulation discharges). This shows again the problems and the necessity of having a specific MV GIS database for PD sources. To find out the different PD sources, obviously there were several sources, the one half of the MV GIS was sectionalized step by step, possibly concerned parts were removed and verified by a subsequent PD test. The following parts were localized and exchanged. Fig. 4 Plastic bolt of a driving rod on HV with small voids inside, resulted during the die-casting process 4.2. Cast resin spacer This cast resin spacer is used as a fixing post of a copper bar. The PD pattern could be reproduced in air due to the PD injection voltage of 29 kv, which was lower than the corona voltage in air. The spacer was exactly identified, because in this air configuration only this spacer is mounted. The PD pattern is asymmetrically and has the higher values in the negative half wave of the voltage, which indicates a defect near the HV side [5]. On the CT images two voids could be seen, fig 5.

8 5 EXPERIMENTAL WORK In the following times a data base with known PD pattern was built up. Special samples were manufactured. Two samples contain a void with a cylindrical shape. For other two samples the insert was pulled out some tenth of mm. The gas contained in the voids is atmospheric air. The prepared test objects, representative for typical MV GIS defects, are given in tab.1, where two types of defects were investigated: "elementary" (code a-d) and "specific" (code e-f). Tab. 1: PD test objects Fig. 5 Cast resin spacer with two voids at HV side 4.3. Vacuum bottle This defect generated a very characteristic PD pattern with only a small stripe at the maximum of the positive half wave. The PD values increase with the time over some tens of seconds, like a loading effect. At the cut ceramic of the vacuum bottle it can be seen metallic vapour (free potential). Obviously generates a too strong current conditioning process during the manufacturing or the switching of high currents during the service metallic vapour, which condense on the inner surface of the ceramic. However, this failure in vacuum is not critically. a b c void into dielectric (cast resin spacer with 2 bolts on both sides) (void near hvelectrode) (void near earth - electrode) separation between an insert and the cast resin (cast resin spacer with 2 bolts on both sides) (void on hvelectrode) d (void on earth - electrode) e dielectric spacer with potentialfree insert f loose screw with potential-free washer Fig. 6 Vacuum bottle with metallic vapour at the inner side

9 6 RESULTS AND DISCUSSION 6.1. Void into dielectric As expected, the discharges occur in a small limited region near (du/dt) max, in which the discharge- region (about the phase) will be smaller, if the voltage is increased (see fig. 7). This behaviour can t be explained only by different phase angle of inception voltage at increased voltage, therefore, the discharges in the void have an significant influence on the dischargeinception. However, hysteresis-effects didn t occur. Small effects of polarity can be measured, if the void is arranged near the hv-electrode. This effect is caused by the non symmetrical distribution of electrical field over the spacer (fig.8 a-c). If the measuring time is longer, the characteristic PD pattern does not change, but the number of discharges and their dispersion are increased (fig. 9). a) void near hv- electrode b) void near earth- electrode a) PD pattern for U U e, c) electrical field strength distribution (typical) left with electrode, right without electrode Fig. 8: PD pattern for different arrangements of void and typical distribution of electrical field b) charge over voltage (red up) Fig.7: Void into dielectric (void near hv- electrode) Fig. 9: PD pattern after 60 min 6.2. Separation between insert and cast resin A quite another PD pattern will be obtained, if the voids are closed to one of the electrodes (fig. 10, see also tab.1- c,d). This can be caused, for instance, by a

10 damage on the surface of the electrode or by a mechanical cave on the border electrode- dielectric. Fig. 12: PD pattern of potential free insert a) separation on HV electrode b) separation on earth electrode Fig. 10: PD pattern of separation of insert In comparison with the former discussed void- intodielectric, the magnitude and dispersion of chargevalues are significantly larger, even the occurring- range is not so remarkable ("clouds"). If the void- closed- toelectrode has positive polarity, than higher magnitudes can be measured, polarity- and hysteresis-effects are significantly obtained (fig. 11). The PD pattern shows no polarity effects. The region of PD is typical for a surface discharge pattern. This means from (du/dt) max up to the voltage maximum. The dispersion of charge values is relatively high at small magnitude. The pd- conditions are practically independent of polarisation and the range of discharges spreads from the zero voltage point through to the voltage maximum with a relatively wide distribution in charge values but small absolute values. Occurrences of hysteresis were not observed Loose screw with washer With this type of defect no polarity effects are measured (see fig. 13), where the range of the PD is from the (du/dt) max up to the voltage maximum occur. The measured dispersion of magnitude charges in air is remarkable lower in comparison to SF 6, but as with the behaviour of point to plane, the charge values are higher in air. a) In air Fig. 11: Voltage- up- and- down- characteristic (red up) 6.3. Spacer with "potential- free" insert Also the PD pattern of a spacer with a "potential free" insert (e.g. caused by damages during assembling) was to be measured (see table 1, e), as shown in fig.12. b) In SF 6 Fig. 13: PD pattern of a loose screw with washer

11 7 CONCLUSION Finally, it should be noticed that with assistance of the presented experimental results and the formerly described PD measurements unambiguous diagnostics are possible. It concerns damage to the high voltage side of an electrode support bolt, which could be verified following its dismantling. If admissible failures have to be localized inside the GIS compartment digital and computerized measuring systems are very helpful. Especially the phase resolved PD pattern has proved of value. The presented failures including free potential effects in gas, defects of interface areas and voids in insulating parts show surprisingly characteristic shapes of the PD pattern. These allow the classification to types of PD sources and support the identification of the part concerned. 8 REFERENCES [1] A. Welsch; S. Ruhland.: PD analysis of gas insulated medium voltage switchgear during factory assembly and site commissioning. In Proc. CIRED th International Conference on Electricity Distribution, Turin, paper 0564 [2] IEC 60270, 2000, "Partial Discharge Measurements [3] Technical description of PD measuring system (LDIC 2004) [4] IEC , 2002, "AC metal-enclosed switchgear and controlgear for rated voltages above 1 kv and up to and including 52 kv " [5] D. Guo, A. Nesbitt, D.M. Hepburn, C. Zhou, B.G. Stewart, X. Zhou and F. Baumann: Time varying characteristics of ϕ-q-n patterns from natural voids in resin. In Proc. CIRED th International Conference on Electricity Distribution, Turin, paper 0516

PD ANALYSIS OF GAS INSULATED MEDIUM VOLTAGE SWITCHGEAR DURING FACTORY ASSEMBLY AND SITE COMMISSIONING

PD ANALYSIS OF GAS INSULATED MEDIUM VOLTAGE SWITCHGEAR DURING FACTORY ASSEMBLY AND SITE COMMISSIONING PD ANALYSIS OF GAS INSULATED MEDIUM VOLTAGE SWITCHGEAR DURING FACTORY ASSEMBLY AND SITE COMMISSIONING Andreas F.X. WELSCH*, Siegfried A. RUHLAND* *AREVA Sachsenwerk GmbH - Germany andreas.welsch@areva-td.com

More information

The University of New South Wales. School of Electrical Engineering and Telecommunications. High Voltage Systems ELEC9712. Appendix Partial Discharge

The University of New South Wales. School of Electrical Engineering and Telecommunications. High Voltage Systems ELEC9712. Appendix Partial Discharge The University of New South Wales School of Electrical Engineering and Telecommunications High Voltage Systems ELEC9712 Appendix Partial Discharge Content Introduction Quantities measured Test circuits

More information

Testing of 400 kv GIS

Testing of 400 kv GIS Testing of 400 kv GIS Robert le Roux, Dermot Dorgan, Brian Perry ESB International - Ireland Paper 028 1 Introduction The 400 kv transmission is designed for critical periods of low loading. Due to critical

More information

EFFECT OF INTEGRATION ERROR ON PARTIAL DISCHARGE MEASUREMENTS ON CAST RESIN TRANSFORMERS. C. Ceretta, R. Gobbo, G. Pesavento

EFFECT OF INTEGRATION ERROR ON PARTIAL DISCHARGE MEASUREMENTS ON CAST RESIN TRANSFORMERS. C. Ceretta, R. Gobbo, G. Pesavento Sept. 22-24, 28, Florence, Italy EFFECT OF INTEGRATION ERROR ON PARTIAL DISCHARGE MEASUREMENTS ON CAST RESIN TRANSFORMERS C. Ceretta, R. Gobbo, G. Pesavento Dept. of Electrical Engineering University of

More information

Why partial discharge testing makes good sense

Why partial discharge testing makes good sense Why partial discharge testing makes good sense PD measurement and analysis have proven to be reliable for detecting defects in the insulation system of electrical assets before major damage or a breakdown

More information

THE POWER OF LIFE. WinTech Partial Discharge based Predictive Intelligence of insulation system to eliminate power failure risk.

THE POWER OF LIFE. WinTech Partial Discharge based Predictive Intelligence of insulation system to eliminate power failure risk. THE POWER OF LIFE WinTech Partial Discharge based Predictive Intelligence of insulation system to eliminate power failure risk. Mr. Neal Yang Pro.E.E. Engineer About Us The flaw of dielectric material

More information

PD Solutions. On-Line PD Measurement Devices

PD Solutions. On-Line PD Measurement Devices On-Line PD Measurement Devices 1. Longshot Device (see Figure 1) The measurement system applied is based around the wideband (0-400 MHz) HVPD- Longshot partial discharge test unit which utilizes a high-speed

More information

10. DISTURBANCE VOLTAGE WITHSTAND CAPABILITY

10. DISTURBANCE VOLTAGE WITHSTAND CAPABILITY 9. INTRODUCTION Control Cabling The protection and control equipment in power plants and substations is influenced by various of environmental conditions. One of the most significant environmental factor

More information

Basics of Partial Discharge. Prepared for 2015 Phenix RSM Meeting January 2015

Basics of Partial Discharge. Prepared for 2015 Phenix RSM Meeting January 2015 Basics of Partial Discharge Prepared for 2015 Phenix RSM Meeting January 2015 Definitions and History Standard Definitions Fundamentally, what is a Partial Discharge An electric discharge which only partially

More information

EI HIGH VOLTAGE INSULATION TESTING POLICY

EI HIGH VOLTAGE INSULATION TESTING POLICY Network(s): Summary: ENGINEERING INSTRUCTION EI 09-0001 HIGH VOLTAGE INSULATION TESTING POLICY EPN, LPN, SPN This engineering instruction details the policy for the on-site insulation testing of new and

More information

Power Frequency Withstand Voltage On-site testing of 400 kv GIS

Power Frequency Withstand Voltage On-site testing of 400 kv GIS Power Frequency Withstand Voltage On-site testing of 400 kv GIS D. Anaraki Ardakani, A. Omidkhoda, M. Solati High Voltage Engineering Center ACECR Tehran, Iran Da_ardakani@yahoo.com Paper Reference Number:

More information

Partial discharge diagnostics on very long and branched cable circuits

Partial discharge diagnostics on very long and branched cable circuits 11 Nordic Insulation Symposium Stockholm, June 11-13, 2001 Partial discharge diagnostics on very long and branched cable circuits Nico van Schaik, E. Fred Steennis, Wim Boone and Dick M. van Aartrijk KEMA

More information

International Journal of Advance Engineering and Research Development. Comparison of Partial Discharge Detection Techniques of Transformer

International Journal of Advance Engineering and Research Development. Comparison of Partial Discharge Detection Techniques of Transformer Scientific Journal of Impact Factor(SJIF): 3.134 International Journal of Advance Engineering and Research Development Volume 2,Issue 7, July -2015 e-issn(o): 2348-4470 p-issn(p): 2348-6406 Comparison

More information

Partial Discharge Detection of High Voltage Switchgear Using a Ultra High Frequency Sensor

Partial Discharge Detection of High Voltage Switchgear Using a Ultra High Frequency Sensor TRANSACTIONS ON ELECTRICAL AND ELECTRONIC MATERIALS Vol. 14, No. 4, pp. 211-215, August 25, 2013 Regular Paper pissn: 1229-7607 eissn: 2092-7592 DOI: http://dx.doi.org/10.4313/teem.2013.14.4.211 Partial

More information

Substation Preventive Maintenance

Substation Preventive Maintenance Substation Preventive Maintenance PROVINCIAL ELECTRICITY AUTHORITY 1 Presentation Contents 1) A kind of substation 2) Electrical equipment details of AIS substation 3) Electrical equipment details of GIS

More information

ECP HV INSULATION TESTING

ECP HV INSULATION TESTING Document Number: ECP 11-0006 Network(s): Summary: All ENGINEERING COMMISSIONING PROCEDURE ECP 11-0006 HV INSULATION TESTING This standard details the policy for the on-site insulation testing of new and

More information

Specialists in HV and MV test and diagnostics. Testing in Substations

Specialists in HV and MV test and diagnostics. Testing in Substations Specialists in HV and MV test and diagnostics Testing in Substations Testing in Substations Testing in Substations At 4fores we specialize in the diagnosis and measurement of all types of existing technologies

More information

Partial Discharge Patterns in High Voltage Insulation

Partial Discharge Patterns in High Voltage Insulation 22 IEEE International Conference on Power and Energy (PECon), 2-5 December 22, Kota Kinabalu Sabah, Malaysia Partial Discharge Patterns in High Voltage Insulation Hazlee Illias, Teo Soon Yuan, Ab Halim

More information

PULSE-SEQUENCE ANALYSIS OF PARTIAL DISCHARGES IN POWER TRANSFORMERS

PULSE-SEQUENCE ANALYSIS OF PARTIAL DISCHARGES IN POWER TRANSFORMERS PULSE-SEQUENCE ANALYSIS OF PARTIAL DISCHARGES IN POWER TRANSFORMERS Anne Pfeffer 1*, Stefan Tenbohlen 1 and Stefan Kornhuber 2 1 Institute of Power Transmission and High Voltage Technology, Pfaffenwaldring

More information

PD Testing Considerations for MV Plant Cables

PD Testing Considerations for MV Plant Cables PD Testing Considerations for MV Plant Cables Cable Testing Philosophy Damage Mistake Aging Repair Manufacturing Transportation Installation Operation Power frequency 50/60 Hz Power frequency 50/60 Hz

More information

Abstract. 1 Introduction

Abstract. 1 Introduction Using optical couplers to monitor the condition of electricity infrastructure S.G. Swingler, L. Hao, P.L. Lewin and D.J. Swaffield The Tony Davies High Voltage Laboratory, University of Southampton, Southampton

More information

NEW MV CABLE ACCESSORY WITH EMBEDDED SENSOR TO CHECK PARTIAL DISCHARGE ACTIVITY

NEW MV CABLE ACCESSORY WITH EMBEDDED SENSOR TO CHECK PARTIAL DISCHARGE ACTIVITY NEW MV CABLE ACCESSORY WITH EMBEDDED SENSOR TO CHECK PARTIAL DISCHARGE ACTIVITY Lorenzo PERETTO Luigi FODDAI Simone ORRU Luigi PUDDU Altea Switzerland ENEL Italy ENEL Italy REPL Italy lperetto@alteasolutions.com

More information

ECP HV INSULATION TESTING

ECP HV INSULATION TESTING Document Number: ECP 11-0006 Network(s): Summary: ENGINEERING COMMISSIONING PROCEDURE EPN, LPN, SPN ECP 11-0006 HV INSULATION TESTING This standard details the policy for the on-site insulation testing

More information

GIS Instrument Transformers: EMC Conformity Tests for a Reliable Operation in an Upgraded Substation

GIS Instrument Transformers: EMC Conformity Tests for a Reliable Operation in an Upgraded Substation GIS Instrument Transformers: EMC Conformity Tests for a Reliable Operation in an Upgraded Substation W. Buesch 1) G. Palmieri M.Miesch J. Marmonier O. Chuniaud ALSTOM LTD 1) ALSTOM LTD High Voltage Equipment

More information

Advancements in online partial discharge monitoring and assessment of MV through EHV Substation assets

Advancements in online partial discharge monitoring and assessment of MV through EHV Substation assets Advancements in online partial discharge monitoring and assessment of MV through EHV Substation assets Abstract: For decades it has been recognized that partial discharge assessment is an excellent method

More information

CHAPTER 5 CONCEPT OF PD SIGNAL AND PRPD PATTERN

CHAPTER 5 CONCEPT OF PD SIGNAL AND PRPD PATTERN 75 CHAPTER 5 CONCEPT OF PD SIGNAL AND PRPD PATTERN 5.1 INTRODUCTION Partial Discharge (PD) detection is an important tool for monitoring insulation conditions in high voltage (HV) devices in power systems.

More information

Africa Utility Week Focus Day Substation Condition Monitoring Benefits of Ultrasound

Africa Utility Week Focus Day Substation Condition Monitoring Benefits of Ultrasound Africa Utility Week Focus Day 2014 Substation Condition Monitoring Benefits of Ultrasound Agenda Review - Substation Condition Monitoring Electrical discharge Types and origin In switchgear Results/consequences

More information

TECHNICAL DESCRIPTION TD-77A/3 170 KV COMPACT GAS INSULATED INTEGRATED SUBSTATION MODULES

TECHNICAL DESCRIPTION TD-77A/3 170 KV COMPACT GAS INSULATED INTEGRATED SUBSTATION MODULES INDEPENDENT POWER TRANSMISSION OPERATOR S.A. TNPRD/ SUBSTATION SPECIFICATION & EQUIPMENT SECTION October 2014 TECHNICAL DESCRIPTION 170 KV COMPACT GAS INSULATED INTEGRATED SUBSTATION MODULES I. SCOPE This

More information

Partial Discharge Measurement and Monitoring on High Voltage XLPE Cables

Partial Discharge Measurement and Monitoring on High Voltage XLPE Cables 21, rue d Artois, F-75008 PARIS AUCKLAND 2013 http : //www.cigre.org Partial Discharge Measurement and Monitoring on High Voltage XLPE Cables Michael Krüger, Rene Hummel, Stefan Böhler, OMICRON Austria

More information

Doble Solutions for Partial Discharge. Greg Topjian Solutions Manager

Doble Solutions for Partial Discharge. Greg Topjian Solutions Manager Doble Solutions for Partial Discharge Greg Topjian Solutions Manager 617-393-3129 gtopjian@doble.com Why do we need to conduct PD measurements PD a major cause of early failure for HV insulation. Partial

More information

Diagnostic testing of cast resin transformers

Diagnostic testing of cast resin transformers Paper of the Month Diagnostic testing of cast resin transformers Author Michael Krüger, OMICRON, Austria michael.krueger@omiconenergy.com Christoph Engelen, OMICRON, Austria christoph.engelen@omicronenergy.com

More information

A Review Comprehension: Guideline for Testing of HV, EHV and UHV Substation Equipment

A Review Comprehension: Guideline for Testing of HV, EHV and UHV Substation Equipment International Research Journal of Engineering and Technology (IRJET) eissn: 23 0056 Volume: 04 Issue: 02 Feb 2017 www.irjet.net pissn: 072 A Review Comprehension: Guideline for Testing of HV, EHV and UHV

More information

Condition Assessment of High Voltage Insulation in Power System Equipment. R.E. James and Q. Su. The Institution of Engineering and Technology

Condition Assessment of High Voltage Insulation in Power System Equipment. R.E. James and Q. Su. The Institution of Engineering and Technology Condition Assessment of High Voltage Insulation in Power System Equipment R.E. James and Q. Su The Institution of Engineering and Technology Contents Preface xi 1 Introduction 1 1.1 Interconnection of

More information

Gas-Insulated Metal-Clad Switchgears Express-Diagnostics Method on Partial Discharge Characteristics

Gas-Insulated Metal-Clad Switchgears Express-Diagnostics Method on Partial Discharge Characteristics Gas-Insulated Metal-Clad Switchgears Express-Diagnostics Method on Partial Discharge Characteristics ALEXANDRA KHALYASMAA 1, STANISLAV EROSHENKO 1, EGOR MARYSHKO 2, ALEXANDR OVSIANNIKOV 2 1 Ural Federal

More information

HV AC TESTING OF SUPER-LONG CABLES

HV AC TESTING OF SUPER-LONG CABLES HV AC TESTING OF SUPER-LONG CABLES Stefan SCHIERIG, (Germany), schierig@highvolt.de Peter COORS, (Germany), coors@highvolt.de Wolfgang HAUSCHILD, IEC, CIGRE, (Germany), hauschild@highvolt.de ABSTRACT The

More information

Measurement Of Partial Discharge (PD) In High Voltage Power Equipment

Measurement Of Partial Discharge (PD) In High Voltage Power Equipment First International Conference on Emerging Trends in Engineering, Management and Scineces December 28-3, 214 (ICETEMS-214)Peshawar,Pakistan Measurement Of Partial Discharge (PD) In High Voltage Power Equipment

More information

PARTIAL DISCHARGE DETECTION - AN OVERVIEW

PARTIAL DISCHARGE DETECTION - AN OVERVIEW PARTIAL DISCHARGE DETECTION - AN OVERVIEW 1 MR. N. J. PATEL, 2 PROF. K. K. DUDANI, 3 PROF. A. K. JOSHI 1 M.E. [Power System] P.G. Student, Department of Electrical Engineering, L. E. College of Engineering,

More information

THE PROPAGATION OF PARTIAL DISCHARGE PULSES IN A HIGH VOLTAGE CABLE

THE PROPAGATION OF PARTIAL DISCHARGE PULSES IN A HIGH VOLTAGE CABLE THE PROPAGATION OF PARTIAL DISCHARGE PULSES IN A HIGH VOLTAGE CABLE Z.Liu, B.T.Phung, T.R.Blackburn and R.E.James School of Electrical Engineering and Telecommuniications University of New South Wales

More information

SENSITIVITY ASPECTS OF ON-LINE PD DIAGNOSIS OF MV POWER CABLES

SENSITIVITY ASPECTS OF ON-LINE PD DIAGNOSIS OF MV POWER CABLES SENSITIVITY ASPECTS OF ON-LINE PD DIAGNOSIS OF MV POWER CABLES Frank WESTER, Edward GULSKI, Johan SMIT, Edwin GROOT*, Mark VAN VLIET* Delft University of Technology The Netherlands * NUON The Netherlands

More information

Electrical Equipment Condition Assessment

Electrical Equipment Condition Assessment Feature Electrical Equipment Condition Assessment Using On-Line Solid Insulation Sampling Importance of Electrical Insulation Electrical insulation plays a vital role in the design and operation of all

More information

Extended analysis versus frequency of partial discharges phenomena, in support of quality assessment of insulating systems

Extended analysis versus frequency of partial discharges phenomena, in support of quality assessment of insulating systems Extended analysis versus frequency of partial discharges phenomena, in support of quality assessment of insulating systems Romeo C. Ciobanu, Cristina Schreiner, Ramona Burlacu, Cristina Bratescu Technical

More information

Partial Discharge Monitoring and Diagnosis of Power Generator

Partial Discharge Monitoring and Diagnosis of Power Generator Partial Discharge Monitoring and Diagnosis of Power Generator Gao Wensheng Institute of High Voltage & insulation tech. Electrical Eng. Dept., Tsinghua University Wsgao@tsinghua.edu.cn Currently preventive

More information

Advanced Test Equipment Rentals ATEC (2832) CP RC. Resonance circuit for GIS testing

Advanced Test Equipment Rentals ATEC (2832) CP RC. Resonance circuit for GIS testing Established 1981 Advanced Test Equipment Rentals www.atecorp.com 800-404-ATEC (2832) CP RC Resonance circuit for GIS testing A new approach to testing gas-insulated switchgear Testing gas-insulated switchgear

More information

MODIFICATION OF THE ARRESTER ARRANGEMENT WHEN CONVERTING THE METHOD OF NEUTRAL TREATMENT

MODIFICATION OF THE ARRESTER ARRANGEMENT WHEN CONVERTING THE METHOD OF NEUTRAL TREATMENT MODIFICATION OF THE ARRESTER ARRANGEMENT WHEN CONVERTING THE METHOD OF NEUTRAL TREATMENT Claus NEUMANN Darmstadt University of Technology Germany claus.neumann@amprion.net Klaus WINTER Swedish Neutral

More information

UHF PD-DIAGNOSIS AT HIGH VOLTAGE CABLE TERMINATIONS INTERNATIONAL CASE STUDIES

UHF PD-DIAGNOSIS AT HIGH VOLTAGE CABLE TERMINATIONS INTERNATIONAL CASE STUDIES UHF PD-DIAGNOSIS AT HIGH VOLTAGE CABLE TERMINATIONS INTERNATIONAL CASE STUDIES D. Götz*, H.T. Putter* *Megger Germany INTRODUCTION High voltage termintions are essential components in high voltage cable

More information

Sources of transient electromagnetic disturbance in medium voltage switchgear

Sources of transient electromagnetic disturbance in medium voltage switchgear Sources of transient electromagnetic disturbance in medium voltage switchgear Dennis Burger, Stefan Tenbohlen, Wolfgang Köhler University of Stuttgart Stuttgart, Germany dennis.burger@ieh.uni-stuttgart.de

More information

PD Diagnostic Applications and TechImp solutions

PD Diagnostic Applications and TechImp solutions PD Diagnostic Applications and TechImp solutions Condition Assessment Solutions for Electrical Systems. PD based innovative tools for the Condition Based Maintenance. MD-04.05.004 - rev. 00-29/08/2006

More information

Cable testing and diagnostics

Cable testing and diagnostics Cable testing and diagnostics To ensure the flow Cost-optimised maintenance through cable diagnostics The sheath and cable testing supports you in assessing whether a cable system is safe and ready to

More information

INVESTIGATION ON THE TECHNOLOGIES FOR DEFECT LOCALIZATION AND CHARACTERIZATION ON MEDIUM VOLTAGE UNDERGROUND LINES

INVESTIGATION ON THE TECHNOLOGIES FOR DEFECT LOCALIZATION AND CHARACTERIZATION ON MEDIUM VOLTAGE UNDERGROUND LINES INVESTIGATION ON THE TECHNOLOGIES FOR DEFECT LOCALIZATION AND CHARACTERIZATION ON MEDIUM VOLTAGE UNDERGROUND LINES Gonzalo MAIZ, Iberdrola Distribución, (Spain), gmaiz@iberdrola.es Armando RODRIGO, Instituto

More information

I -limiter The world s fastest switching device

I -limiter The world s fastest switching device I S -limiter 2 I S -limiter The world s fastest switching device Reduces substation cost Solves short-circuit problems in new substations and substation extensions Optimum solution for interconnection

More information

Simulation Model of Partial Discharge in Power Equipment

Simulation Model of Partial Discharge in Power Equipment Simulation Model of Partial Discharge in Power Equipment Pragati Sharma 1, Arti Bhanddakkar 2 1 Research Scholar, Shri Ram Institute of Technology, Jabalpur, India 2 H.O.D. of Electrical Engineering Department,

More information

HV Module Systems for Testing, Training and Research

HV Module Systems for Testing, Training and Research HV Module Systems for Testing, Training and Research 4.0/3 Application Advantages Principle of HV circuit Smaller high-voltage (HV) test systems are necessary for research, development and quality testing

More information

CVVOZE Power Laboratories (CVVOZEPowerLab)

CVVOZE Power Laboratories (CVVOZEPowerLab) CVVOZE Power Laboratories (CVVOZEPowerLab) BRNO, SEPTEMBER 2016 1 Centre for Research and Utilization of Renewable Energy Centre for Research and Utilization of Renewable Energy (CVVOZE) was established

More information

KEYWORDS On-line diagnostics, cable termination, partial discharge (PD), ultra-high frequency (UHF), sensitivity check.

KEYWORDS On-line diagnostics, cable termination, partial discharge (PD), ultra-high frequency (UHF), sensitivity check. 2, rue d Artois, F-758 PARIS B-2 CIGRE 28 http : //www.cigre.org Application of UHF method for on-line PD diagnostics of cable terminations T. KLEIN Pfisterer Kontaktsysteme GmbH Germany D. DENISSOV, W.

More information

Testing and PD Diagnosis of MV Cable Systems with DAC Voltage Educational Session May St Pete Beach, Fl

Testing and PD Diagnosis of MV Cable Systems with DAC Voltage Educational Session May St Pete Beach, Fl Testing and PD Diagnosis of MV Cable Systems with DAC Voltage Educational Session May 26 2011 St Pete Beach, Fl HDW ELECTRONICS, INC. THE BEST IN CABLE FAULT LOCATING TECHNOLOGY by Henning Oetjen Frank

More information

Investigation of PD Detection on XLPE Cables

Investigation of PD Detection on XLPE Cables Investigation of PD Detection on XLPE Cables Hio Nam O, T.R. Blackburn and B.T. Phung School of Electrical Engineering and Telecommunications The University New South Wales, Australia Abstract- The insulation

More information

Software System for Finding the Incipient Faults in Power Transformers

Software System for Finding the Incipient Faults in Power Transformers Software System for Finding the Incipient Faults in Power Transformers Nikolina Petkova Technical University of Sofia, Department of Theoretical Electrical Engineering, 1156 Sofia, Bulgaria Abstract In

More information

PARTIAL DISCHARGE MEASUREMENTS ON GENERATORS USING A NOISE GATING SYSTEM

PARTIAL DISCHARGE MEASUREMENTS ON GENERATORS USING A NOISE GATING SYSTEM Abstract PARTIAL DISCHARGE MEASUREMENTS ON GENERATORS USING A NOISE GATING SYSTEM Q. SU Department of Electrical & Computer Systems Engineering Monash University, Clayton VIC 3168 Email: qi.su@eng.monash.edu.au

More information

PHG 70 TD PD / PHG 80 TD PD

PHG 70 TD PD / PHG 80 TD PD PHG 70 TD PD / PHG 80 TD PD BAUR VLF test and diagnostics system Functions Universal test and diagnostics system flexible, modular, extendable Cutting-edge testing and diagnostics technology: VLF truesinus

More information

OMICRON Seminar on Partial Discharge Diagnostics on HV Assets. January 30, 2018 Beirut, Lebanon

OMICRON Seminar on Partial Discharge Diagnostics on HV Assets. January 30, 2018 Beirut, Lebanon OMICRON Seminar on Partial Discharge Diagnostics on HV Assets January 30, 2018 Beirut, Lebanon Substation Asset Testing and Diagnosis LOW ACCURACY LEVEL HIGH Take better maintenance decisions through accurate

More information

24 th International Conference on Electricity Distribution Glasgow, June Paper 0881 ABSTRACT STATE OF THE ART INTRODUCTION ECOTAP VPD

24 th International Conference on Electricity Distribution Glasgow, June Paper 0881 ABSTRACT STATE OF THE ART INTRODUCTION ECOTAP VPD A NEW GENERATION VOLTAGE REGULATION DISTRIBUTION TRANSFORMER WITH AN ON LOAD TAP CHANGER FOR POWER QUALITY IMPROVEMENT IN THE ELECTRICAL DISTRIBUTION SYSTEMS Sudheer MOKKAPATY Jens WEISS Frank SCHALOW

More information

Alternative Coupling Method for Immunity Testing of Power Grid Protection Equipment

Alternative Coupling Method for Immunity Testing of Power Grid Protection Equipment Alternative Coupling Method for Immunity Testing of Power Grid Protection Equipment Christian Suttner*, Stefan Tenbohlen Institute of Power Transmission and High Voltage Technology (IEH), University of

More information

PARTIAL DISCHARGE MEASUREMENT ANALYSIS ON RING MAIN UNIT

PARTIAL DISCHARGE MEASUREMENT ANALYSIS ON RING MAIN UNIT PARTIAL DISCHARGE MEASUREMENT ANALYSIS ON RING MAIN UNIT Vaibhav Patil 1, Er. Harpreet Singh 2, Er Prashant Rade 3, 1 M Tech scholar, Institute Of Engineering And Technology, Alwar Rajasthan,India. 2 Associate

More information

PERMANENT ON-LINE MONITORING OF MV POWER CABLES BASED ON PARTIAL DISCHARGE DETECTION AND LOCALISATION AN UPDATE

PERMANENT ON-LINE MONITORING OF MV POWER CABLES BASED ON PARTIAL DISCHARGE DETECTION AND LOCALISATION AN UPDATE PERMANENT ON-LINE MONITORING OF MV POWER CABLES BASED ON PARTIAL DISCHARGE DETECTION AND LOCALISATION AN UPDATE Fred STEENNIS, KEMA, (the Netherlands), fred.steennis@kema.com Peter VAN DER WIELEN, KEMA,

More information

ELECTRICAL POWER ENGINEERING

ELECTRICAL POWER ENGINEERING Introduction This trainer has been designed to provide students with a fully comprehensive knowledge in Electrical Power Engineering systems. The trainer is composed of a set of modules for the simulation

More information

USING DAMPED AC VOLTAGES

USING DAMPED AC VOLTAGES MODERN & TESTING DIAGNOSIS OF POWER CABLES USING DAMPED AC VOLTAGES BY EDWARD GULSKI AND ROGIER JONGEN, Onsite HV Solutions ag, Switzerland AND RALPH PATTERSON, Power Products & Solutions LLC, United States

More information

KEVCY 24 RE1; KEVCY 24 RF1 Indoor combined sensor; Indoor voltage sensor

KEVCY 24 RE1; KEVCY 24 RF1 Indoor combined sensor; Indoor voltage sensor Medium Voltage Product KEVCY 24 RE1; KEVCY 24 RF1 Indoor combined sensor; Indoor voltage sensor Parameters for Application Unit Value Rated primary current of application A up to 630 Rated primary voltage

More information

Gas-Insulated Medium-Voltage Switchgear siemens.com/8dab12

Gas-Insulated Medium-Voltage Switchgear siemens.com/8dab12 8DB 12 blue GIS Gas-Insulated Medium-Voltage Switchgear siemens.com/8dab12 Features Gas-insulated switchgear (GIS) type 8D/B has been an integral part of the medium-voltage portfolio at Siemens for more

More information

Shunt Reactors. Global Top Energy, Machinery & Plant Solution Provider

Shunt Reactors. Global Top Energy, Machinery & Plant Solution Provider Shunt Reactors Global Top Energy, Machinery & Plant Solution Provider Our Business Brief introduction of Hyosung Power & Industrial Systems PG While Hyosung is an established name for world-class electrical

More information

Type Test of a 145 kv Termination Type TS 145-II

Type Test of a 145 kv Termination Type TS 145-II Test Report No 2009-125/2 Type Test of a 145 kv Termination Type TS 145-II Client: 3 M Deutschland GmbH Carl-Schurz-Str.1 41453 Neuss Reporter: Dr.-Ing. R. Badent Dr.-Ing. B. Hoferer This report includes

More information

AC CREEPAGE DISCHARGES IN SF 6, CO 2, N 2 AND SF 6 -CO 2 AND SF 6 - N 2 MIXTURES

AC CREEPAGE DISCHARGES IN SF 6, CO 2, N 2 AND SF 6 -CO 2 AND SF 6 - N 2 MIXTURES AC CREEPAGE DISCHARGES IN SF 6, CO 2, N 2 AND SF 6 -CO 2 AND SF 6 - N 2 MIXTURES F. Sadaoui and A. Beroual* Ecole Centrale de Lyon, AMPERE CNRS UMR 5005, 36, Avenue Guy de Collongue, 69134 Ecully, France

More information

POWER TRANSFORMER SPECIFICATION, DESIGN, QUALITY CONTROL AND TESTING 18 MARCH 2009

POWER TRANSFORMER SPECIFICATION, DESIGN, QUALITY CONTROL AND TESTING 18 MARCH 2009 POWER TRANSFORMER SPECIFICATION, DESIGN, QUALITY CONTROL AND TESTING 18 MARCH 2009 Nkosinathi Buthelezi Senior Consultant: Power Transformers and Reactors Presentation Content Standardization of Power

More information

The Application of Partial Discharge Measurement and Location on CGIS

The Application of Partial Discharge Measurement and Location on CGIS International Journal on Electrical Engineering and Informatics Volume 4, Number 3, October 2012 The Application of Partial Discharge Measurement and Location on CGIS Min-Yen Chiu¹, Keng-Wei Liang¹, Chang-Hsing

More information

IEEE Transactions on Power Delivery. 15(2) P.467-P

IEEE Transactions on Power Delivery. 15(2) P.467-P Title Author(s) Citation Detection of wide-band E-M signals emitted from partial discharge occurring in GIS using wavelet transform Kawada, Masatake; Tungkanawanich, Ampol; 河崎, 善一郎 ; 松浦, 虔士 IEEE Transactions

More information

IN HOUSE CALIBRATION OF PD DETECTOR SYSTEM FOR FIELD TEST RESULT RELIABILITY

IN HOUSE CALIBRATION OF PD DETECTOR SYSTEM FOR FIELD TEST RESULT RELIABILITY IN HOUSE CALIBRATION OF PD DETECTOR SYSTEM FOR FIELD TEST RESULT RELIABILITY Avinash Raj 1, Chandan Kumar Chakrabarty 1, Rafidah Ismail 1 and Basri Abdul Ghani 2 1 College of Engineering, University Tenaga

More information

Evaluation and Limitations of Corona Discharge Measurements An Application Point of View

Evaluation and Limitations of Corona Discharge Measurements An Application Point of View Evaluation and Limitations of Corona Discharge Measurements An Application Point of View P. Mraz, P. Treyer, U. Hammer Haefely Hipotronics, Tettex Instruments Division 2016 International Conference on

More information

CHAPTER 2. v-t CHARACTERISTICS FOR STANDARD IMPULSE VOLTAGES

CHAPTER 2. v-t CHARACTERISTICS FOR STANDARD IMPULSE VOLTAGES 23 CHAPTER 2 v-t CHARACTERISTICS FOR STANDARD IMPULSE VOLTAGES 2.1 INTRODUCTION For reliable design of power system, proper insulation coordination among the power system equipment is necessary. Insulation

More information

Practical Experience in On-Line Partial Discharge Measurements of MV Switchgear Systems

Practical Experience in On-Line Partial Discharge Measurements of MV Switchgear Systems Practical Experience in On-Line Partial Discharge Measurements of MV Switchgear Systems Z. Berler, I. Blokhintsev, A. Golubev, G. Paoletti, V. Rashkes, A. Romashkov Cutler-Hammer Predictive Diagnostics

More information

CONTINUOUS ON-LINE MONITORING OF PARTIAL DICHARGES IN HV DISTRIBUTION CABLES

CONTINUOUS ON-LINE MONITORING OF PARTIAL DICHARGES IN HV DISTRIBUTION CABLES CONTINUOUS ON-LINE MONITORING OF PARTIAL DICHARGES IN HV DISTRIBUTION CABLES Hao ZHANG, Transgrid, (Australia), hao.zhang@transgrid.com.au Zhao LIU, University of NSW, (Australia), z.liu@unsw.edu.au Toan

More information

Characteristics of Insulation Diagnosis and Failure in Gas Turbine Generator Stator Windings

Characteristics of Insulation Diagnosis and Failure in Gas Turbine Generator Stator Windings J Electr Eng Technol Vol. 9, No. 1: 280-285, 2014 http://dx.doi.org/10.5370/jeet.2014.9.1.280 ISSN(Print) 1975-0102 ISSN(Online) 2093-7423 Characteristics of Insulation Diagnosis and Failure in Gas Turbine

More information

G. KOEPPL Koeppl Power Experts Switzerland

G. KOEPPL Koeppl Power Experts Switzerland PS3: Substation Design: New Solutions and Experiences Bus-Node Substation A Big Improvement in Short-Circuit and Switching Properties at Reduced Substation Costs G. KOEPPL Koeppl Power Experts Switzerland

More information

A TECHNICAL REVIEW ON CAPACITOR BANK SWITCHING WITH VACUUM CIRCUIT BREAKERS

A TECHNICAL REVIEW ON CAPACITOR BANK SWITCHING WITH VACUUM CIRCUIT BREAKERS A TECHNICAL REVIEW ON CAPACITOR BANK SWITCHING WITH VACUUM CIRCUIT BREAKERS Shashi Kumar 1, Brajesh Kumar Prajapati 2, Vikramjeet Singh 3 1, 2 Students, Electrical Engineering Department Greater Noida

More information

A New Approach for Transformer Bushing Monitoring. Emilio Morales Technical Application Specialist Qualitrol

A New Approach for Transformer Bushing Monitoring. Emilio Morales Technical Application Specialist Qualitrol A New Approach for Transformer Bushing Monitoring Emilio Morales Technical Application Specialist Qualitrol Abstract Transformer bushings are one of the most critical components of a transformer. Up to

More information

The importance of partial discharge testing throughout the development and operation of power transformers

The importance of partial discharge testing throughout the development and operation of power transformers The importance of partial discharge testing throughout the development and operation of power transformers Ulrike Broniecki OMICRON Energy Solutions GmbH, Berlin Power transformers are exposed to intense

More information

Partial Discharge Analysis of a Solid Dielectric Using MATLAB Simulink

Partial Discharge Analysis of a Solid Dielectric Using MATLAB Simulink ISSN (Online) 2321 24 Vol. 4, Issue 6, June 2 Partial Discharge Analysis of a Solid Dielectric Using MATLAB Simulink C Sunil kumar 1, Harisha K S 2, Gouthami N 3, Harshitha V 4, Madhu C Assistant Professor,

More information

High Frequency Voltage Stress. Presented by: Flore Chiang Date: March 30, 2012

High Frequency Voltage Stress. Presented by: Flore Chiang Date: March 30, 2012 High Frequency Voltage Stress Presented by: Flore Chiang Date: March 30, 2012 Now the additional data is available! ground rules: 1. intro to PD. 2. experimental results. 3. comparison with current practice.

More information

ON-LINE PARTIAL DISCHARGE TESTING OF SOME OF THE WORST PERFORMING CIRCUITS ON A UTILITY DISTRIBUTION SYSTEM

ON-LINE PARTIAL DISCHARGE TESTING OF SOME OF THE WORST PERFORMING CIRCUITS ON A UTILITY DISTRIBUTION SYSTEM ON-LINE PARTIAL DISCHARGE TESTING OF SOME OF THE WORST PERFORMING CIRCUITS ON A UTILITY DISTRIBUTION SYSTEM D. Clark¹ R. Mackinlay² M. Seltzer-Grant² S. Goodfellow² Lee Renforth² Jamie McWilliam³ and Roger

More information

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK PO Box 25876 Safat 13119 Kuwait Contact: Mr Atul Madhukar Vaidya Tel: +965 1822600 Fax: +965 24761963 E-Mail: factory@ahleiasg.com Website:

More information

HVDC Transmission. Michael Muhr. Institute of High Voltage Engineering and System Performance Graz University of Technology Austria P A S S I O N

HVDC Transmission. Michael Muhr. Institute of High Voltage Engineering and System Performance Graz University of Technology Austria P A S S I O N S C I E N C E P A S S I O N T E C H N O L O G Y HVDC Transmission Michael Muhr Graz University of Technology Austria www.tugraz.at 1 Definition HV High Voltage AC Voltage > 60kV 220kV DC Voltage > 60kV

More information

7. INSPECTION AND TEST PROCEDURES

7. INSPECTION AND TEST PROCEDURES 7.1 Switchgear and Switchboard Assemblies A. Visual and Mechanical Inspection 1. Compare equipment nameplate data with drawings and specifications. 2. Inspect physical and mechanical condition. 3. Inspect

More information

CONDITION ASSESSMENT OF XLPE MV CABLE JOINTS BY USING AN INSULATION TESTER

CONDITION ASSESSMENT OF XLPE MV CABLE JOINTS BY USING AN INSULATION TESTER CONDITION ASSESSMENT OF XLPE MV CABLE JOINTS BY USING AN INSULATION TESTER Henrik ENOKSEN Espen EBERG Sverre HVIDSTEN SINTEF Energy Research - Norway SINTEF Energy Research - Norway SINTEF Energy Research

More information

Application of Polarisation Depolarisation Current (PDC) technique on fault and trouble analysis of stator insulation

Application of Polarisation Depolarisation Current (PDC) technique on fault and trouble analysis of stator insulation CIGRE SC A1 & D1 JOINT COLLOQUIUM October 24, 2007 Application of Polarisation Depolarisation Current (PDC) technique on fault and trouble analysis of stator insulation S. A. BHUMIWAT Independent Consultant

More information

TMS 580. Transformer Loss Measuring System FEATURES BENEFITS APPLICATIONS

TMS 580. Transformer Loss Measuring System FEATURES BENEFITS APPLICATIONS TMS 580 Transformer Loss Measuring System The measurement of the losses in power transformers is an indispensable quality-verification process. Due to the fact that normally the transformer user puts a

More information

Fault location on power cables. Fault location on power cables

Fault location on power cables. Fault location on power cables Fault location on power cables Fault location on power cables Contents: 1. Introduction 2. Construction of power cables 3. Cable faults 1. Introduction Fault location on communication and power cables

More information

Device Under Test: ALTEA VS- 24-I VS-24-I. 0 24/09/12 First issue A. Peretto L. Peretto 1 24/06/16 All text review E. Scala L. Peretto J. L.

Device Under Test: ALTEA VS- 24-I VS-24-I. 0 24/09/12 First issue A. Peretto L. Peretto 1 24/06/16 All text review E. Scala L. Peretto J. L. /9 TECHNICAL SPECIFICATIONS VOLTAGE LOW-POWER TRANSFORMER VS- Rev. Date Revision Description Prepared by Checked by Approved by 0 24/09/2 First issue A. Peretto L. Peretto 24/06/6 All text review E. Scala

More information

High Voltage Engineering

High Voltage Engineering High Voltage Engineering Course Code: EE 2316 Prof. Dr. Magdi M. El-Saadawi www.saadawi1.net E-mail : saadawi1@gmail.com www.facebook.com/magdi.saadawi 1 Contents Chapter 1 Introduction to High Voltage

More information

Lecture 36 Measurements of High Voltages (cont) (Refer Slide Time: 00:14)

Lecture 36 Measurements of High Voltages (cont) (Refer Slide Time: 00:14) Advances in UHV Transmission and Distribution Prof. B Subba Reddy Department of High Voltage Engg (Electrical Engineering) Indian Institute of Science, Bangalore Lecture 36 Measurements of High Voltages

More information

IEC/CIGRE UHV Symposium Beijing Paper 4.2. Challenges on the measuring and testing techniques for UHV AC and DC equipment

IEC/CIGRE UHV Symposium Beijing Paper 4.2. Challenges on the measuring and testing techniques for UHV AC and DC equipment IEC/CIGRE UHV Symposium Beijing 2007-07-23 Paper 4.2 Challenges on the measuring and testing techniques for UHV AC and DC equipment E. GOCKENBACH 1 ; W. HAUSCHILD 2, S. SCHIERIG 2, M. MUHR 3, W. LICK 3,

More information

Power Quality. Case Study. Conrad Bottu Laborelec January 2008

Power Quality. Case Study. Conrad Bottu Laborelec January 2008 Case Study Electromagnetic compatibility (EMC) study Breakdown of low voltage electronic equipment in a 25 kv substation Conrad Bottu Laborelec January 2008 Power Quality Power Quality 1 Introduction Description

More information

Device Interconnection

Device Interconnection Device Interconnection An important, if less than glamorous, aspect of audio signal handling is the connection of one device to another. Of course, a primary concern is the matching of signal levels and

More information