Doble Solutions for Partial Discharge. Greg Topjian Solutions Manager

Size: px
Start display at page:

Download "Doble Solutions for Partial Discharge. Greg Topjian Solutions Manager"

Transcription

1 Doble Solutions for Partial Discharge Greg Topjian Solutions Manager

2 Why do we need to conduct PD measurements PD a major cause of early failure for HV insulation.

3 Partial Discharge PD is a symptom of degradation. Once present it dominates as it s own inherent stress degradation mechanism Its an early waning signal and precursor to complete insulation failure and breakdown PD diagnostics can be used to trend changes in the level and severity of insulation degradation Early detection of PD is critical in the prevention of in catastrophic failures

4 What Does PD Depend On? Electrical field stress Environment conditions - Temp and humidity Load or current Mechanical vibration Important to have early stage of detection for PD PD diagnostics: Used to trend changes in level and severity of the degradation of equipment installation

5 Partial Discharge Causes of PD in insulation system: Voids in epoxy resins, polymers, paper Bubbles in liquids/oils Metal deposits, irregularities such as protrusions, contaminants Electrodes and insulation surfaces and interfaces Can arise through: Poor design and manufacture Damage of equipment e.g. Transport damage Poor installation processes poor workmanship General ageing or deterioration of materials

6 Why is Testing and Monitoring for PD Important?

7 Why is Testing and Monitoring for PD Important?

8 Why is Testing and Monitoring for PD Important?

9 Why Is testing and monitoring for PD Important? 9

10 Doble s 4-Phased PD Products Phase 2 PD-Smart Testing Phase 1 Survey Instrument (PDS 100 and DFA) 100) Phase 3 LDA6 Acoustic Locator (Transformers Only) Phase 4 Permanent Monitoring (Guard-Family)

11 PD Alignment with Doble Services Four phases: Services wrapped into Phase 2-4 Phase 1: Surveying Phase 2: Testing on- or off-line Phase 3: Investigative methods Phase 4: Permanent monitoring Phase 5: Doble Service Agreement (DSA)

12 PD-Smart Combine System Includes electrical and UHF capabilities combined into one unit that will test PD on: Transformers Rotating machines (RM) MV/HV cables GIS And MORE!

13 PD-Guard Monitoring System Key features: Advanced signal processing Interference suppressions Analysis software Continuously monitors your critical assets Most important: Automatic alarm system based on changes in activity rates rather than maximum values; this avoids false alarms due to one-time outliers An important part of a thorough conditionbased maintenance program

14 Activity Rate Changes Monitoring changes in activity rates rather than maximum values avoids false alarms. 14

15 PD Key Markets Testing Rotating Machines (Motors & Generators)

16 PD of Rotating Machines

17 Rotating Machines Testing/Monitoring Periodic testing with PD-Smart + Sensor + Connection Box Permanent monitoring with PD-Guard

18 System Components Permanent PD testing with PD-Smart on machines

19 System Components Permanent PD monitoring on machines Motor or Generator Bus Work A B System Components PD-Guard 3-4 PDDC-24 or PDDC-17 Calibrator Doble PD Support + Neutral Inductive Sensor Pulse Disturbance Gate PD-Guard C Fiber Optic LAN Coupling Capacitors & Installation Kits Calibrator PD Evaluation Server Analysis Software

20 IEC60270: Frequency is important! Doble Lemke uses 2nF coupler, whilst other suppliers using 80pF, 200pF coupler A coupler with a capacitance of 80F,200pF sees only the first part of the winding. Deeper Discharges / Slot Discharges will maybe not detected Coupler with 80pF, 200pF are not conform to the international standard as the measuring frequency is much higher as specified in the standard

21 PD Pulse vs. Location in RM Many generators have high frequency (HF) couplers installed with a strong high pass behavior, hampering PD measurement. HF couplers exhibit good performance for measuring PD close to it that is at the line end of the winding. They are worse than low frequency (LF) couplers for detecting PD in the middle and neutral end of the winding.

22 BC-Matching Unit (HF-Expander) PD-Measurement according to the standard of IEC60270 with a HF coupler + + High Frequency Coupler BC-Matching Unit PD-Smart

23 PD Key Markets Transformer Testing

24 Reasons for Testing and Monitoring to Avoid

25 UHF PD-Smart Testing Pulse Generator LDC-7/UHF

26 UHF PD-Guard Monitoring Doble TransformerGuard Computer(s) for Remote Control & Analysis UHF Plate Sensors (Mounted in Hatch) LAN / WAN / Internet PD Monitoring Server Software Ethernet Hub Interfaces: ActiveX Control DCOM-Interface M MODBUS Fiber optic LAN PD-Guard/UHF UHF Drain Valve Sensors

27 PD Measurement on Transformers Tank Valve Connector

28 Sensor Application Measuring Impedance PD Measuring Impedance for Bushing Tap Installation

29 Doble Acoustic PD Locator: LDA-6 For Transformers Only Multi-channel acoustic transient recorder 4 or 8 acoustical channel External triggering channel Intuitive PD location software Piezo-electric acoustic sensors & magnetic clamps

30 Comments Acoustics Acoustics are a valid technique for locating PD but it s the wrong approach for detecting PD due to low sensitivity of the AE method and the fact that PD imbedded in the winding will not produce acoustic pressure waves detectable on the tank wall. So no Acoustic Signal does not mean no PD and detection via HF-CT on the star point end will only work for strong PD

31 Comments Acoustics (Cont d) Some companies have convinced many Clients in our Region that Acoustic Measurements is detection of PD which is fundamentally wrong We obtain greater location accuracy using UHF triggering. Biggest Market for Location is probably service work

32 Acoustic PD Locator: LDA-6 1 Sensor 1 Sensor 2 Sensor 3 Sensor 4

33 Online Monitoring

34 PD Key Markets Cable Testing (on Site)

35 Terminations & Joints 1. Incorrect installation / poor workmanship 2. Manufacturing issues poor QA

36 The Problems Termination Aging Joint Weak Spot There is a wide range of possible problems in cable installations Apart from physical damage external defects in joints and terminations is the dominant cause of failure In addition some type and vintage of cables developed water treeing for various reasons but often related to outer sheath /jacket damage All of these problems may result in reduced life expectancy and premature failure of the cable

37 Cable Termination: PD-Smart/Guard PD-Smart: + For Periodic Online testing PD-Guard UHF Sensors + HFCT + Connection box For Online monitoring

38 PD-Smart Cable Termination HFCT

39 Cable Termination: PD-Smart/Guard

40 PD Key Markets Switchgear Testing (MV & GIS)

41 MV Switchgear Monitoring In MV switchgear often high humidity leading to surface tracking, material defects and incorrect assembly are responsible for PD activity

42 Gas Insulated Switchgear (GIS) On-line PD Smart -UHF LDS6-UHF Schematic diagram of the PD-UHF-Monitoring-Setup at GIS by using UHF-Spacer-Sensor or internal sensor PD sensor: spacer type frequency range: 100 MHz 1200 MHz Internal UHF sensor integrated in GIS

43 Doble s PD Product Offerings Phase 2 PD-Smart Testing Phase 1 Survey Instrument (PDS 100 and DFA) 100) Phase 3 LDA6 Acoustic Locator (Transformers Only) Phase 4 Permanent Monitoring (Guard-Family)

44 Questions? Contact: Greg Topjian Solutions Manager

THE POWER OF LIFE. WinTech Partial Discharge based Predictive Intelligence of insulation system to eliminate power failure risk.

THE POWER OF LIFE. WinTech Partial Discharge based Predictive Intelligence of insulation system to eliminate power failure risk. THE POWER OF LIFE WinTech Partial Discharge based Predictive Intelligence of insulation system to eliminate power failure risk. Mr. Neal Yang Pro.E.E. Engineer About Us The flaw of dielectric material

More information

TECHIMP Technologies & Services for Diagnostics and Monitoring of High Voltage Assets

TECHIMP Technologies & Services for Diagnostics and Monitoring of High Voltage Assets TECHIMP Technologies & Services for Diagnostics and Monitoring of High Voltage Assets Who we are TECHIMP is one of the leading providers of Condition Assessment Services Data Acquisition and Test Equipment

More information

The University of New South Wales. School of Electrical Engineering and Telecommunications. High Voltage Systems ELEC9712. Appendix Partial Discharge

The University of New South Wales. School of Electrical Engineering and Telecommunications. High Voltage Systems ELEC9712. Appendix Partial Discharge The University of New South Wales School of Electrical Engineering and Telecommunications High Voltage Systems ELEC9712 Appendix Partial Discharge Content Introduction Quantities measured Test circuits

More information

Africa Utility Week Focus Day Substation Condition Monitoring Benefits of Ultrasound

Africa Utility Week Focus Day Substation Condition Monitoring Benefits of Ultrasound Africa Utility Week Focus Day 2014 Substation Condition Monitoring Benefits of Ultrasound Agenda Review - Substation Condition Monitoring Electrical discharge Types and origin In switchgear Results/consequences

More information

PD Solutions. On-Line PD Measurement Devices

PD Solutions. On-Line PD Measurement Devices On-Line PD Measurement Devices 1. Longshot Device (see Figure 1) The measurement system applied is based around the wideband (0-400 MHz) HVPD- Longshot partial discharge test unit which utilizes a high-speed

More information

TECHIMP Power Transformer Monitoring

TECHIMP Power Transformer Monitoring TECHIMP Power Transformer Monitoring Kontakt: Martin Hesse Techimp Germany GmbH i.g. E-Mail: mhesse@techimp.com Tel.: +49 5724 391 007 Mobil: +49 170 2364 735 PD Monitoring of Power Transformers Power

More information

PD Diagnostic Applications and TechImp solutions

PD Diagnostic Applications and TechImp solutions PD Diagnostic Applications and TechImp solutions Condition Assessment Solutions for Electrical Systems. PD based innovative tools for the Condition Based Maintenance. MD-04.05.004 - rev. 00-29/08/2006

More information

Why partial discharge testing makes good sense

Why partial discharge testing makes good sense Why partial discharge testing makes good sense PD measurement and analysis have proven to be reliable for detecting defects in the insulation system of electrical assets before major damage or a breakdown

More information

PARTIAL DISCHARGE MEASUREMENT ON ROTATING MACHINES

PARTIAL DISCHARGE MEASUREMENT ON ROTATING MACHINES PARTIAL DISCHARGE MEASUREMENT ON ROTATING MACHINES Engr. IÑIGO V. ESCOPETE, JR. ITC Level 2 Certified Thermographer PHIL-NCB NDT-UT Level 2 Partial Discharge testing is a Condition Based Maintenance tool

More information

OMICRON Seminar on Partial Discharge Diagnostics on HV Assets. January 30, 2018 Beirut, Lebanon

OMICRON Seminar on Partial Discharge Diagnostics on HV Assets. January 30, 2018 Beirut, Lebanon OMICRON Seminar on Partial Discharge Diagnostics on HV Assets January 30, 2018 Beirut, Lebanon Substation Asset Testing and Diagnosis LOW ACCURACY LEVEL HIGH Take better maintenance decisions through accurate

More information

Condition Assessment of High Voltage Insulation in Power System Equipment. R.E. James and Q. Su. The Institution of Engineering and Technology

Condition Assessment of High Voltage Insulation in Power System Equipment. R.E. James and Q. Su. The Institution of Engineering and Technology Condition Assessment of High Voltage Insulation in Power System Equipment R.E. James and Q. Su The Institution of Engineering and Technology Contents Preface xi 1 Introduction 1 1.1 Interconnection of

More information

MONTRANO. Continuous monitoring system for power transformers

MONTRANO. Continuous monitoring system for power transformers MONTRANO Continuous monitoring system for power transformers Condition monitoring to extend transformer life Knowing the dielectric condition of insulation is vital Dielectric flashover of insulation in

More information

IRIS POWER PDTracII. Continuous On-line Partial Discharge Monitoring for Motors, Generators, Dry Type Transformers, and Air-Insulated Switchgear.

IRIS POWER PDTracII. Continuous On-line Partial Discharge Monitoring for Motors, Generators, Dry Type Transformers, and Air-Insulated Switchgear. IRIS POWER PDTracII Continuous On-line Partial Discharge Monitoring for Motors, Generators, Dry Type Transformers, and Air-Insulated Switchgear. We have not found another test method that produces as much

More information

IRIS POWER PDTracII. Continuous On-line Partial Discharge Monitoring for Motors, Generators, Dry Type Transformers, and Air-Insulated Switchgear.

IRIS POWER PDTracII. Continuous On-line Partial Discharge Monitoring for Motors, Generators, Dry Type Transformers, and Air-Insulated Switchgear. IRIS POWER PDTracII Continuous On-line Partial Discharge Monitoring for Motors, Generators, Dry Type Transformers, and Air-Insulated Switchgear. We have not found another test method that produces as much

More information

IRIS POWER TGA-B. Periodic Online Partial Discharge Monitoring Instrument for Turbine Generators and Motors

IRIS POWER TGA-B. Periodic Online Partial Discharge Monitoring Instrument for Turbine Generators and Motors IRIS POWER TGA-B Periodic Online Partial Discharge Monitoring Instrument for Turbine Generators and Motors We have not found another test method that produces as much decision support data for generator

More information

International Journal of Advance Engineering and Research Development. Comparison of Partial Discharge Detection Techniques of Transformer

International Journal of Advance Engineering and Research Development. Comparison of Partial Discharge Detection Techniques of Transformer Scientific Journal of Impact Factor(SJIF): 3.134 International Journal of Advance Engineering and Research Development Volume 2,Issue 7, July -2015 e-issn(o): 2348-4470 p-issn(p): 2348-6406 Comparison

More information

- Continuous real-time measurement and PD trend analysis; not multiplexed data collection.

- Continuous real-time measurement and PD trend analysis; not multiplexed data collection. QTMS The transformer monitor shall provide data integration platform, cooling supervision & monitoring. User configurable without need of a technician, a 100% configurable to specific customer requirement.

More information

Specialists in HV and MV test and diagnostics. Testing in Substations

Specialists in HV and MV test and diagnostics. Testing in Substations Specialists in HV and MV test and diagnostics Testing in Substations Testing in Substations Testing in Substations At 4fores we specialize in the diagnosis and measurement of all types of existing technologies

More information

PARTIAL DISCHARGE MEASUREMENT

PARTIAL DISCHARGE MEASUREMENT PARTIAL DISCHARGE MEASUREMENT Partial Discharges are small electrical sparks which occur predominantly at insulation imperfection. It is the phenomenon which occurs in the insulation on application of

More information

PARTIAL DISCHARGE DETECTION - AN OVERVIEW

PARTIAL DISCHARGE DETECTION - AN OVERVIEW PARTIAL DISCHARGE DETECTION - AN OVERVIEW 1 MR. N. J. PATEL, 2 PROF. K. K. DUDANI, 3 PROF. A. K. JOSHI 1 M.E. [Power System] P.G. Student, Department of Electrical Engineering, L. E. College of Engineering,

More information

The importance of partial discharge testing throughout the development and operation of power transformers

The importance of partial discharge testing throughout the development and operation of power transformers The importance of partial discharge testing throughout the development and operation of power transformers Ulrike Broniecki OMICRON Energy Solutions GmbH, Berlin Power transformers are exposed to intense

More information

Partial Discharge Measurement and Monitoring on High Voltage XLPE Cables

Partial Discharge Measurement and Monitoring on High Voltage XLPE Cables 21, rue d Artois, F-75008 PARIS AUCKLAND 2013 http : //www.cigre.org Partial Discharge Measurement and Monitoring on High Voltage XLPE Cables Michael Krüger, Rene Hummel, Stefan Böhler, OMICRON Austria

More information

PD Testing Considerations for MV Plant Cables

PD Testing Considerations for MV Plant Cables PD Testing Considerations for MV Plant Cables Cable Testing Philosophy Damage Mistake Aging Repair Manufacturing Transportation Installation Operation Power frequency 50/60 Hz Power frequency 50/60 Hz

More information

Advancements in online partial discharge monitoring and assessment of MV through EHV Substation assets

Advancements in online partial discharge monitoring and assessment of MV through EHV Substation assets Advancements in online partial discharge monitoring and assessment of MV through EHV Substation assets Abstract: For decades it has been recognized that partial discharge assessment is an excellent method

More information

IN ELECTRICAL ENGINEERING - I C M E T CRAIOVA

IN ELECTRICAL ENGINEERING - I C M E T CRAIOVA Taking into account that power transformer is the major item of equipment in power systems, its correct operation is vital to system operation. It is well known that transformer failures are sometimes

More information

PORTABLE PARTIAL DISCHARGE MONITORING INSTRUMENT

PORTABLE PARTIAL DISCHARGE MONITORING INSTRUMENT PORTBLE PRTIL ISCHRGE MONITORING INSTRUMENT Periodic Online Monitoring of Partial ischarges on motors, generators, switchgear, isolated phase bus and dry type transformers. MOTORS TURBO GENERTORS HYRO

More information

Autotransformer Condition Monitoring Systems

Autotransformer Condition Monitoring Systems Autotransformer Condition Monitoring Systems The Bidders shall offer separately the following systems of par.1 Integrated Condition Monitoring System and par.2 UHF PD Monitoring System. Two systems following

More information

UHF PD-DIAGNOSIS AT HIGH VOLTAGE CABLE TERMINATIONS INTERNATIONAL CASE STUDIES

UHF PD-DIAGNOSIS AT HIGH VOLTAGE CABLE TERMINATIONS INTERNATIONAL CASE STUDIES UHF PD-DIAGNOSIS AT HIGH VOLTAGE CABLE TERMINATIONS INTERNATIONAL CASE STUDIES D. Götz*, H.T. Putter* *Megger Germany INTRODUCTION High voltage termintions are essential components in high voltage cable

More information

On-Site Partial Discharge Monitoring using the differential LEMKE PROBE LDP-5 and its accessories

On-Site Partial Discharge Monitoring using the differential LEMKE PROBE LDP-5 and its accessories Workshop 2000, lexandria, Virginia, 13 & 14 September 2000 paper No.: 8 On-Site Partial Discharge Monitoring using the differential LEMKE PROE and its accessories Dirk Russwurm, HV Technologies, Inc. bstract

More information

Testing and PD Diagnosis of MV Cable Systems with DAC Voltage Educational Session May St Pete Beach, Fl

Testing and PD Diagnosis of MV Cable Systems with DAC Voltage Educational Session May St Pete Beach, Fl Testing and PD Diagnosis of MV Cable Systems with DAC Voltage Educational Session May 26 2011 St Pete Beach, Fl HDW ELECTRONICS, INC. THE BEST IN CABLE FAULT LOCATING TECHNOLOGY by Henning Oetjen Frank

More information

New Techniques for the Monitoring of Transformer Condition

New Techniques for the Monitoring of Transformer Condition New Techniques for the Monitoring of Transformer Condition Thomas Prevost OMICRON electronics USA IEEE T&D Conference Chicago, Illinois April 17, 2014 Agenda Monitoring Expectations & Needs Bushing Monitoring

More information

PARTIAL DISCHARGE MEASUREMENTS ON GENERATORS USING A NOISE GATING SYSTEM

PARTIAL DISCHARGE MEASUREMENTS ON GENERATORS USING A NOISE GATING SYSTEM Abstract PARTIAL DISCHARGE MEASUREMENTS ON GENERATORS USING A NOISE GATING SYSTEM Q. SU Department of Electrical & Computer Systems Engineering Monash University, Clayton VIC 3168 Email: qi.su@eng.monash.edu.au

More information

Diagnostic testing of cast resin transformers

Diagnostic testing of cast resin transformers Paper of the Month Diagnostic testing of cast resin transformers Author Michael Krüger, OMICRON, Austria michael.krueger@omiconenergy.com Christoph Engelen, OMICRON, Austria christoph.engelen@omicronenergy.com

More information

IMPORTANCE OF ACCURATE MEASUREMENTS DURING THE LIFE CYCLE OF UTILITIES

IMPORTANCE OF ACCURATE MEASUREMENTS DURING THE LIFE CYCLE OF UTILITIES IMPORTANCE OF ACCURATE MEASUREMENTS DURING THE LIFE CYCLE OF UTILITIES Thomas Steiner HIGHVOLT Prüftechnik Dresden GmbH Lifecycle of utilities time schedule utilities Tests during life cycle of utilities

More information

PERMANENT ON-LINE MONITORING OF MV POWER CABLES BASED ON PARTIAL DISCHARGE DETECTION AND LOCALISATION AN UPDATE

PERMANENT ON-LINE MONITORING OF MV POWER CABLES BASED ON PARTIAL DISCHARGE DETECTION AND LOCALISATION AN UPDATE PERMANENT ON-LINE MONITORING OF MV POWER CABLES BASED ON PARTIAL DISCHARGE DETECTION AND LOCALISATION AN UPDATE Fred STEENNIS, KEMA, (the Netherlands), fred.steennis@kema.com Peter VAN DER WIELEN, KEMA,

More information

NEW MV CABLE ACCESSORY WITH EMBEDDED SENSOR TO CHECK PARTIAL DISCHARGE ACTIVITY

NEW MV CABLE ACCESSORY WITH EMBEDDED SENSOR TO CHECK PARTIAL DISCHARGE ACTIVITY NEW MV CABLE ACCESSORY WITH EMBEDDED SENSOR TO CHECK PARTIAL DISCHARGE ACTIVITY Lorenzo PERETTO Luigi FODDAI Simone ORRU Luigi PUDDU Altea Switzerland ENEL Italy ENEL Italy REPL Italy lperetto@alteasolutions.com

More information

Hands-On Transformer Testing and Maintenance

Hands-On Transformer Testing and Maintenance Hands-On Course Description This Hands-On course will teach you how to prioritize your transformer maintenance strategy, stretch your maintenance budget and at the same time maximize the life and condition

More information

Dielectric response and partial discharge measurements on stator insulation at varied low frequency. Nathaniel Taylor

Dielectric response and partial discharge measurements on stator insulation at varied low frequency. Nathaniel Taylor Dielectric response and partial discharge measurements on stator insulation at varied low frequency Nathaniel Taylor Rotating Electrical Machines : The Stator and its Windings turbo-generator motor hydro-generator

More information

Maintenance & Diagnosis Strategies. for. High Voltage Substations

Maintenance & Diagnosis Strategies. for. High Voltage Substations Maintenance & Diagnosis Strategies for High Voltage Substations 1/ 52 Robin Fischer, 28 April 2004 Diagnosis of Substation Equipment Power Transformers Instrument Transformers Switch-Gears Breakers Coils

More information

TECHNICAL SPECIFICATION

TECHNICAL SPECIFICATION TECHNICAL SPECIFICATION IEC/TS 61934 Edition 2.0 2011-04 colour inside Electrical insulating materials and systems Electrical measurement of partial discharges (PD) under short rise time and repetitive

More information

The Generators and Electric Motor Monitoring and Diagnostics Systems

The Generators and Electric Motor Monitoring and Diagnostics Systems The Generators and Electric Motor Monitoring and Diagnostics Systems MDR and PGU-DM 1 The «MDR» - Motor Diagnostics Relay the Universal System for Insulation Monitoring in Electric Machines PD-Monitor

More information

Knowledge Is Power SM Apparatus Maintenance and Power Management for Energy Delivery. Application of EMI Diagnostics to Hydro Generators

Knowledge Is Power SM Apparatus Maintenance and Power Management for Energy Delivery. Application of EMI Diagnostics to Hydro Generators Knowledge Is Power SM Apparatus Maintenance and Power Management for Energy Delivery Application of EMI Diagnostics to Hydro Generators James Timperley Doble Global Power Services Columbus, Ohio jtimperley@doble.com

More information

Partial discharge diagnostics on very long and branched cable circuits

Partial discharge diagnostics on very long and branched cable circuits 11 Nordic Insulation Symposium Stockholm, June 11-13, 2001 Partial discharge diagnostics on very long and branched cable circuits Nico van Schaik, E. Fred Steennis, Wim Boone and Dick M. van Aartrijk KEMA

More information

CHAPTER 5 CONCEPT OF PD SIGNAL AND PRPD PATTERN

CHAPTER 5 CONCEPT OF PD SIGNAL AND PRPD PATTERN 75 CHAPTER 5 CONCEPT OF PD SIGNAL AND PRPD PATTERN 5.1 INTRODUCTION Partial Discharge (PD) detection is an important tool for monitoring insulation conditions in high voltage (HV) devices in power systems.

More information

IN HOUSE CALIBRATION OF PD DETECTOR SYSTEM FOR FIELD TEST RESULT RELIABILITY

IN HOUSE CALIBRATION OF PD DETECTOR SYSTEM FOR FIELD TEST RESULT RELIABILITY IN HOUSE CALIBRATION OF PD DETECTOR SYSTEM FOR FIELD TEST RESULT RELIABILITY Avinash Raj 1, Chandan Kumar Chakrabarty 1, Rafidah Ismail 1 and Basri Abdul Ghani 2 1 College of Engineering, University Tenaga

More information

Partial Discharge Theory, Modeling and Applications To Electrical Machines

Partial Discharge Theory, Modeling and Applications To Electrical Machines Partial Discharge Theory, Modeling and Applications To Electrical Machines V. Vahidinasab, A. Mosallanejad, A. Gholami Department of Electrical Engineering Iran University of Science and Technology (IUST)

More information

PD ANALYSIS OF GAS INSULATED MEDIUM VOLTAGE SWITCHGEAR DURING FACTORY ASSEMBLY AND SITE COMMISSIONING

PD ANALYSIS OF GAS INSULATED MEDIUM VOLTAGE SWITCHGEAR DURING FACTORY ASSEMBLY AND SITE COMMISSIONING PD ANALYSIS OF GAS INSULATED MEDIUM VOLTAGE SWITCHGEAR DURING FACTORY ASSEMBLY AND SITE COMMISSIONING Andreas F.X. WELSCH*, Siegfried A. RUHLAND* *AREVA Sachsenwerk GmbH - Germany andreas.welsch@areva-td.com

More information

Onsite Mobile AC High Voltage Test System

Onsite Mobile AC High Voltage Test System TSGMF(T) series Onsite Mobile AC High Voltage Test System Onsite mobile AC high voltage test systems are used for withstand voltage testing, partial discharge measurement, tan delta measurement to instrument

More information

Partial Discharge (PD) techniques for measuring the condition of ageing HV/MV switchgear

Partial Discharge (PD) techniques for measuring the condition of ageing HV/MV switchgear 3100 words with case studies (US) Partial Discharge (PD) techniques for measuring the condition of ageing HV/MV switchgear By Neil Davies, Director, EA Technology International Throughout the world, the

More information

Partial Discharge Monitoring and Diagnosis of Power Generator

Partial Discharge Monitoring and Diagnosis of Power Generator Partial Discharge Monitoring and Diagnosis of Power Generator Gao Wensheng Institute of High Voltage & insulation tech. Electrical Eng. Dept., Tsinghua University Wsgao@tsinghua.edu.cn Currently preventive

More information

PD Monitoring of MV/HV Power Cables December 2016

PD Monitoring of MV/HV Power Cables December 2016 PD Monitoring of MV/HV Power Cables December 216 Malcolm Seltzer-Grant m.seltzer-grant@hvpd.co.uk Introduction to HVPD Our global presence Introduction to HVPD Ltd HVPD are experts in the growing industry

More information

EFFECT OF INTEGRATION ERROR ON PARTIAL DISCHARGE MEASUREMENTS ON CAST RESIN TRANSFORMERS. C. Ceretta, R. Gobbo, G. Pesavento

EFFECT OF INTEGRATION ERROR ON PARTIAL DISCHARGE MEASUREMENTS ON CAST RESIN TRANSFORMERS. C. Ceretta, R. Gobbo, G. Pesavento Sept. 22-24, 28, Florence, Italy EFFECT OF INTEGRATION ERROR ON PARTIAL DISCHARGE MEASUREMENTS ON CAST RESIN TRANSFORMERS C. Ceretta, R. Gobbo, G. Pesavento Dept. of Electrical Engineering University of

More information

II. TRADITIONAL APPROACH OF PD MEASUREMENTS

II. TRADITIONAL APPROACH OF PD MEASUREMENTS Advantages of Continuous Monitoring of Partial Discharges in Rotating Equipment and Switchgear Claude Kane Cutler Hammer Predictive Diagnostics 5421 Feltl Road, Suite 190 Minnetonka, MN 55343 Phone: 952-912-1358

More information

HZJF-9007 Fully Functional Partial Discharge Inspector USER MANUAL. Huazheng Electric Manufacturing(Baoding) Co.,Ltd

HZJF-9007 Fully Functional Partial Discharge Inspector USER MANUAL. Huazheng Electric Manufacturing(Baoding) Co.,Ltd HZJF-9007 Fully Functional Partial Discharge Inspector USER MANUAL Huazheng Electric Manufacturing(Baoding) Co.,Ltd Safety Terms and Symbols This manual may contain the terms: Warning! Indicate the conditions

More information

Power Factor Insulation Diagnosis: Demystifying Standard Practices

Power Factor Insulation Diagnosis: Demystifying Standard Practices Power Factor Insulation Diagnosis: Demystifying Standard Practices Dinesh Chhajer, PE 4271 Bronze Way, Dallas Tx Phone: (214) 330 3238 Email: dinesh.chhajer@megger.com ABSTRACT Power Factor (PF) testing

More information

THE EVOLUTION OF NON-INTRUSIVE PARTIAL DISCHARGE TESTING OF MV SWITCHGEAR

THE EVOLUTION OF NON-INTRUSIVE PARTIAL DISCHARGE TESTING OF MV SWITCHGEAR THE EVOLUTION OF NON-INTRUSIVE PARTIAL DISCHARGE TESTING OF MV SWITCHGEAR Neil DAVIES and Chris LOWSLEY EA Technology Ltd. - United Kingdom Neil.Davies@eatechnology.com INRODUCTION The trend for extending

More information

SAMPLE. Determining the health of your power transformer begins with Transformer Clinic s SAMPLE testing programs.

SAMPLE. Determining the health of your power transformer begins with Transformer Clinic s SAMPLE testing programs. Keep Powering On SAMPLE Determining the health of your power transformer begins with Transformer Clinic s SAMPLE testing programs. Overheating, arcing, partial discharge, and other active or slow-evolving

More information

Investigation of PD Detection on XLPE Cables

Investigation of PD Detection on XLPE Cables Investigation of PD Detection on XLPE Cables Hio Nam O, T.R. Blackburn and B.T. Phung School of Electrical Engineering and Telecommunications The University New South Wales, Australia Abstract- The insulation

More information

CONTINUOUS ON-LINE SYSTEM FOR PARTIAL DISCHARGE MONITORING FOR HA1 AT CHE ROBEŞTI

CONTINUOUS ON-LINE SYSTEM FOR PARTIAL DISCHARGE MONITORING FOR HA1 AT CHE ROBEŞTI U.P.B. Sci. Bull., Series D, Vol. 77, Iss. 4, 2015 ISSN 1454-2358 CONTINUOUS ON-LINE SYSTEM FOR PARTIAL DISCHARGE MONITORING FOR HA1 AT CHE ROBEŞTI Laurenţiu-Florian ION 1, Apolodor GHEORGHIU 2 A proper

More information

Substation Preventive Maintenance

Substation Preventive Maintenance Substation Preventive Maintenance PROVINCIAL ELECTRICITY AUTHORITY 1 Presentation Contents 1) A kind of substation 2) Electrical equipment details of AIS substation 3) Electrical equipment details of GIS

More information

SGMF(T) series. Onsite Mobile AC High Voltage Test System. Applications:

SGMF(T) series. Onsite Mobile AC High Voltage Test System. Applications: SGMF(T) series Onsite Mobile AC High Voltage Test System On-site AC high voltage test systems are used for voltage withstanding test, partial discharge measurement, tan delta measurement on those instrument

More information

PRODUCT PORTFOLIO TEST AND MEASURING SYSTEMS

PRODUCT PORTFOLIO TEST AND MEASURING SYSTEMS PRODUCT PORTFOLIO TEST AND MEASURING SYSTEMS n Quality made in Germany n Standardized and customized solutions n Turn key projects, all from one hand 0.1-1/1 Product Portfolio Test and Measuring Systems

More information

On-line Partial Discharge Assessment and Monitoring of MV to EHV Cables

On-line Partial Discharge Assessment and Monitoring of MV to EHV Cables On-line Partial Discharge Assessment and Monitoring of MV to EHV Cables William Higinbotham, Neil Davies and Victor Chan EA Technology LLC, New Jersey; USA, EA Technology Pty Ltd, Brisbane Australia; EA

More information

USING DAMPED AC VOLTAGES

USING DAMPED AC VOLTAGES MODERN & TESTING DIAGNOSIS OF POWER CABLES USING DAMPED AC VOLTAGES BY EDWARD GULSKI AND ROGIER JONGEN, Onsite HV Solutions ag, Switzerland AND RALPH PATTERSON, Power Products & Solutions LLC, United States

More information

700 Series AC Dielectric Test Sets

700 Series AC Dielectric Test Sets 700 Series AC Dielectric Test Sets AC Test Systems HAEFELY HIPOTRONICS standard line of AC Test Systems is designed to perform high voltage AC tests on electrical apparatus in accordance with IEC60, IEEE

More information

THE PROPAGATION OF PARTIAL DISCHARGE PULSES IN A HIGH VOLTAGE CABLE

THE PROPAGATION OF PARTIAL DISCHARGE PULSES IN A HIGH VOLTAGE CABLE THE PROPAGATION OF PARTIAL DISCHARGE PULSES IN A HIGH VOLTAGE CABLE Z.Liu, B.T.Phung, T.R.Blackburn and R.E.James School of Electrical Engineering and Telecommuniications University of New South Wales

More information

Fault Detection in Transformer Using Frequency (Sweep) Response Analysis

Fault Detection in Transformer Using Frequency (Sweep) Response Analysis Fault Detection in Transformer Using Frequency (Sweep) Response Analysis Miss. Kajal R. Pachbhai PG Student at Ballarpur Institute of Technology, Ballarpur-442701 India kajalpachbhai86@gmail.com Mr. Sagar

More information

Testing of 400 kv GIS

Testing of 400 kv GIS Testing of 400 kv GIS Robert le Roux, Dermot Dorgan, Brian Perry ESB International - Ireland Paper 028 1 Introduction The 400 kv transmission is designed for critical periods of low loading. Due to critical

More information

Advanced Test Equipment Rentals ATEC (2832) CP RC. Resonance circuit for GIS testing

Advanced Test Equipment Rentals ATEC (2832) CP RC. Resonance circuit for GIS testing Established 1981 Advanced Test Equipment Rentals www.atecorp.com 800-404-ATEC (2832) CP RC Resonance circuit for GIS testing A new approach to testing gas-insulated switchgear Testing gas-insulated switchgear

More information

NETWORK INNOVATION COMPETITION ANGLE-DC PROJECT HOLISTIC CIRCUIT CONDITION MONITORING SYSTEM REPORT

NETWORK INNOVATION COMPETITION ANGLE-DC PROJECT HOLISTIC CIRCUIT CONDITION MONITORING SYSTEM REPORT NETWORK INNOVATION COMPETITION PROJECT HOLISTIC CIRCUIT CONDITION MONITORING SYSTEM REPORT NOVEMBER 17 Version: 1.0 Authored by: Andrew Moon Engineering Consultant and Project Manager Kevin Smith Lead

More information

Basics of Partial Discharge. Prepared for 2015 Phenix RSM Meeting January 2015

Basics of Partial Discharge. Prepared for 2015 Phenix RSM Meeting January 2015 Basics of Partial Discharge Prepared for 2015 Phenix RSM Meeting January 2015 Definitions and History Standard Definitions Fundamentally, what is a Partial Discharge An electric discharge which only partially

More information

PULSE-SEQUENCE ANALYSIS OF PARTIAL DISCHARGES IN POWER TRANSFORMERS

PULSE-SEQUENCE ANALYSIS OF PARTIAL DISCHARGES IN POWER TRANSFORMERS PULSE-SEQUENCE ANALYSIS OF PARTIAL DISCHARGES IN POWER TRANSFORMERS Anne Pfeffer 1*, Stefan Tenbohlen 1 and Stefan Kornhuber 2 1 Institute of Power Transmission and High Voltage Technology, Pfaffenwaldring

More information

Further Experience in the Use of Existing RTDs in Windings of Motors and Generators for the Measurement of Partial Discharges

Further Experience in the Use of Existing RTDs in Windings of Motors and Generators for the Measurement of Partial Discharges Further Experience in the Use of Existing RDs in Windings of Motors and Generators for the Measurement of Partial Discharges Claude Kane Eaton Electrical Predicative Diagnostics 5421 Feltl Road Suite 190

More information

ICC PES Spring 2011 Meeting, Educational Session Luigi Testa, Alfred Mendelsohn

ICC PES Spring 2011 Meeting, Educational Session Luigi Testa, Alfred Mendelsohn The use of pulse shape in PD testing of cable systems using VLF ICC PES Spring 2011 Meeting, Educational Session Luigi Testa, Alfred Mendelsohn 1 Introduction Hipot VLF testing of power cable systems is

More information

Type 297, High-Voltage Mica Capacitors Corona-free Mica Coupling Capacitors for Medium-Voltage PDA s

Type 297, High-Voltage Mica Capacitors Corona-free Mica Coupling Capacitors for Medium-Voltage PDA s Designed for Partial Discharge Analyzers (PDA s) monitoring rotating machinery or other medium-voltage equipment from 1 to 35 kvac RMS at power-line frequencies of 10 Hz to 1 khz, Mica Capacitor Type 297

More information

High Voltage Diagnostics Sarl 4, Rue de Lac CH 1897 Le Bouveret Switzerland

High Voltage Diagnostics Sarl 4, Rue de Lac CH 1897 Le Bouveret Switzerland High Voltage Diagnostics Sarl 4, Rue de Lac CH 1897 Le Bouveret Switzerland Company HV Diagnostics Sarl is a Swiss based company in the field of high voltage test equipment for cable testing and diagnosis.

More information

ONLINE OFFLINE B Y WIL L IAM H IG INBOT H AM,

ONLINE OFFLINE B Y WIL L IAM H IG INBOT H AM, ONLINE OFFLINE VERSUS FEATURE PARTIAL DISCHARGE TESTING FOR CABLE ASSESSMENT B Y WIL L IAM H IG INBOT H AM, EA Technology, LLC Medium voltage cables have three distinct phases to their lifecycle: (1) new

More information

Digital Fault Recorder Deployment at HVDC Converter Stations

Digital Fault Recorder Deployment at HVDC Converter Stations Digital Fault Recorder Deployment at HVDC Converter Stations On line continuous monitoring at HVDC Converter Stations is an important asset in determining overall system performance and an essential diagnostic

More information

Measurement Of Partial Discharge (PD) In High Voltage Power Equipment

Measurement Of Partial Discharge (PD) In High Voltage Power Equipment First International Conference on Emerging Trends in Engineering, Management and Scineces December 28-3, 214 (ICETEMS-214)Peshawar,Pakistan Measurement Of Partial Discharge (PD) In High Voltage Power Equipment

More information

Comparison of capacitive and inductive sensors designed for partial discharges measurements in electrical power apparatus

Comparison of capacitive and inductive sensors designed for partial discharges measurements in electrical power apparatus Comparison of capacitive and inductive sensors designed for partial discharges measurements in electrical power apparatus Michał Kunicki 1,* 1 Opole University of Technology, ul. Prószkowska 76, 45-758

More information

VLF. DAC tandelta. Partial Discharge. Experience the world of Megger electrical testing

VLF. DAC tandelta. Partial Discharge. Experience the world of Megger electrical testing Cable Testing & Diagnostics Solutions for Medium Voltage Networks (1 kv - 36 kv) VLF Partial Discharge DC DAC tandelta Cable Testing Cable Diagnostics? There are two main applications for cable testing:

More information

Relative Ability of UHF Antenna and VHF Capacitor Methods to Detect Partial Discharge in Turbine Generator Stator Windings

Relative Ability of UHF Antenna and VHF Capacitor Methods to Detect Partial Discharge in Turbine Generator Stator Windings IEEE Transactions on Dielectrics and Electrical Insulation Vol. 22, No. 6; December 215 369 Relative Ability of UHF Antenna and VHF Capacitor Methods to Detect Partial Discharge in Turbine Generator Stator

More information

7. INSPECTION AND TEST PROCEDURES

7. INSPECTION AND TEST PROCEDURES 7.1 Switchgear and Switchboard Assemblies A. Visual and Mechanical Inspection 1. Compare equipment nameplate data with drawings and specifications. 2. Inspect physical and mechanical condition. 3. Inspect

More information

ENLIGHTENING TECHNOLOGY. Advanced testing & monitoring solutions

ENLIGHTENING TECHNOLOGY. Advanced testing & monitoring solutions ENLIGHTENING TECHNOLOGY Advanced testing & monitoring solutions ALTANOVA GROUP ALTANOVA GROUP 2 WHO WE ARE WHO WE ARE 3 ALTANOVA: ADVANCED TESTING & MONITORING SOLUTIONS ALTANOVA is a leading company in

More information

VARIABLE FREQUENCY RESONANT TEST SYSTEM

VARIABLE FREQUENCY RESONANT TEST SYSTEM VARIABLE FREQUENCY RESONANT TEST SYSTEM 400kV,1200kVA Tank Type Reactor for Outdoor Cable Test Field 650kV, 5850kVA, Cylinder Type Reactors for Onsite Testing of GIS and Cable PHENIX Variable Frequency

More information

ABB Power Products Service

ABB Power Products Service Raben Naidoo, Technology days, May 21-22th, 2014, Cape Town, South Africa, Enhanced availability of transformers via transformer remote monitoring - TEC ABB Power Products Service Why a session on availability?

More information

POWER TRANSFORMER SPECIFICATION, DESIGN, QUALITY CONTROL AND TESTING 18 MARCH 2009

POWER TRANSFORMER SPECIFICATION, DESIGN, QUALITY CONTROL AND TESTING 18 MARCH 2009 POWER TRANSFORMER SPECIFICATION, DESIGN, QUALITY CONTROL AND TESTING 18 MARCH 2009 Nkosinathi Buthelezi Senior Consultant: Power Transformers and Reactors Presentation Content Standardization of Power

More information

HV AC TESTING OF SUPER-LONG CABLES

HV AC TESTING OF SUPER-LONG CABLES HV AC TESTING OF SUPER-LONG CABLES Stefan SCHIERIG, (Germany), schierig@highvolt.de Peter COORS, (Germany), coors@highvolt.de Wolfgang HAUSCHILD, IEC, CIGRE, (Germany), hauschild@highvolt.de ABSTRACT The

More information

The Application of Partial Discharge Measurement and Location on CGIS

The Application of Partial Discharge Measurement and Location on CGIS International Journal on Electrical Engineering and Informatics Volume 4, Number 3, October 2012 The Application of Partial Discharge Measurement and Location on CGIS Min-Yen Chiu¹, Keng-Wei Liang¹, Chang-Hsing

More information

EI HIGH VOLTAGE INSULATION TESTING POLICY

EI HIGH VOLTAGE INSULATION TESTING POLICY Network(s): Summary: ENGINEERING INSTRUCTION EI 09-0001 HIGH VOLTAGE INSULATION TESTING POLICY EPN, LPN, SPN This engineering instruction details the policy for the on-site insulation testing of new and

More information

GENERATOR TESTING APPLICATION GUIDE. reliable. precision.

GENERATOR TESTING APPLICATION GUIDE.  reliable. precision. GENERATOR TESTING APPLICATION GUIDE www.haefely-hipotronics.com reliable. precision. 2 GENERATOR TESTING CONTENTS Product Line Overview 3 AC Hipot Testing 4 Partial Discharge Measurement 5 DC Hipot Testing

More information

PARTIAL DISCHARGE MEASUREMENT AS A DIAGNOSTIC TOOL FOR CURRENT TRANSFORMER

PARTIAL DISCHARGE MEASUREMENT AS A DIAGNOSTIC TOOL FOR CURRENT TRANSFORMER PARTIAL DISCHARGE MEASUREMENT AS A DIAGNOSTIC TOOL FOR CURRENT TRANSFORMER N. R. Bhasme 1 and Bhushan Salokhe 2 1 Associate Prof., 2 M.E. Student, Dept. of Electrical Engg., Govt. College of Engineering

More information

MEDIUM & HIGH VOLTAGE

MEDIUM & HIGH VOLTAGE MEDIUM & HIGH VOLTAGE TESTING EQUIPMENT VOLTAGE WITHSTAND SGM Series Resonant Systems The SGM series are used for generating high AC voltages at a fixed frequency (mainly 50 or 60 Hz) by means of an excited

More information

WinTech Partial Discharge Testing and Monitoring Systems

WinTech Partial Discharge Testing and Monitoring Systems WinTech Partial Discharge Testing and Monitoring Systems Predictive maintenance to eliminate power equipment failure risk. WinTech Electric 嘉芳 Claire Huang Global Sales & Marketing +886-289110833#605 +886-972-280-102

More information

MPD 500. Partial Discharge Measuring System for Routine Test Applications

MPD 500. Partial Discharge Measuring System for Routine Test Applications MPD 500 Partial Discharge Measuring System for Routine Test Applications Partial Discharge Measurement The MPD 500 partial discharge measuring system has been specially designed for providing fast and

More information

IDAX 300 Insulation Diagnostic Analyzer. Dielectric Frequency Response Also known as: Frequency Domain Spectroscopy

IDAX 300 Insulation Diagnostic Analyzer. Dielectric Frequency Response Also known as: Frequency Domain Spectroscopy IDAX 300 Insulation Diagnostic Analyzer Dielectric Frequency Response Also known as: Frequency Domain Spectroscopy 1 Frequency Domain Spectroscopy Hi V A Lo Ground C HL Measure at several frequencies Use

More information

Advanced Test Equipment Rentals ATEC (2832)

Advanced Test Equipment Rentals ATEC (2832) Established 1981 Advanced Test Equipment Rentals www.atecorp.com 800-404-ATEC (2832) MPD 500 Partial Discharge Measuring System for Routine Test Applications Partial Discharge Measurement The MPD 500 partial

More information

Assuring the Reliability of Critical Power Cable Systems

Assuring the Reliability of Critical Power Cable Systems Assuring the Reliability of Critical Power Cable Systems Presented by: Benjamin Lanz Manager of Application Engineering IMCORP Power Cable Reliability Consulting & Diagnostics Some of the technologies

More information

Be on guard for effective testing: Introduction

Be on guard for effective testing: Introduction Be on guard for effective testing: Introduction The development of the insulation tester by Evershed and Vignoles is part of our electrical history, with insulation testers produced by Megger Instruments

More information

Monitoring Solutions For Power Transformers, Reactors, Bushings and Instrument Transformers

Monitoring Solutions For Power Transformers, Reactors, Bushings and Instrument Transformers in cooperation with Monitoring Solutions For Power Transformers, Reactors, Bushings and Instrument Transformers BZ-MS/1 pazifik power Complete Transformer Monitoring System (TMS) ZVCM-1001 Bushing Monitoring

More information