1 PARTIAL DISCHARGE MEASUREMENT ON ROTATING MACHINES Engr. IÑIGO V. ESCOPETE, JR. ITC Level 2 Certified Thermographer PHIL-NCB NDT-UT Level 2
2 Partial Discharge testing is a Condition Based Maintenance tool for motor and generator stator windings. It is the only on-line electrical test that correctly identifies and warns of pending stator winding failure mechanism such s loose windings, contamination, thermal deterioration, poor manufacture, problems due to load cycling, and more. The test can be applied to any stator winding 3kV to 26kV. CIGRE studies indicate that approximately 56% of all generator failures attributed to stator winding insulation
3 WHAT IS PARTIAL DISCHARGE? A partial discharge (PD) is a localized electrical discharge that only partially bridge the insulation between conductors.
4 PD occurs if electrical stress exceeds electrical breakdown point of gas Voltage builds across a gas-filled void.
5 Neglecting Partial Discharge (PD) activity can lead to further degradation of the insulation system, resulting in possible complete discharge. PD is measured in AMPLITUDE (mv, nc) and Repetition Rate (PPS)
6 Why Test for Partial Discharge? RMEAC - REGISTERED MASTER ELECTRICIAN AFFAIRS COMMITTEE
7 Failure mechanism of Power Generators CIGRE Study Committee SC11,EG11.02,2002
8 Many different types of materials in a generator. These material heat and cool at different speed. Gaps will form between the different materials as the generator gets hot and cold. More fluctuating load = more heating/cooling = more gaps. More gaps = more PD
9 PD Related Failure RMEAC - REGISTERED MASTER ELECTRICIAN AFFAIRS COMMITTEE
10 Thermal Cycling Effect RMEAC - REGISTERED MASTER ELECTRICIAN AFFAIRS COMMITTEE
11 Slot Vibration Discharge RMEAC - REGISTERED MASTER ELECTRICIAN AFFAIRS COMMITTEE
12 Slot Vibration Discharges RMEAC - REGISTERED MASTER ELECTRICIAN AFFAIRS COMMITTEE
13 Bar to Bar PD RMEAC - REGISTERED MASTER ELECTRICIAN AFFAIRS COMMITTEE
14 Contamination RMEAC - REGISTERED MASTER ELECTRICIAN AFFAIRS COMMITTEE
15 Typical Rotating Machine PD Monitoring Layout
16 PD Detection Sensor for Motors and Generators Epoxy-Mica Capacitors(EMCs) 80 pf Directly connected to HV bus on the terminals 80pF creates a High Pass Filter with a 40 MHz cut-off frequency
17 Bus Coupler Installation RMEAC - REGISTERED MASTER ELECTRICIAN AFFAIRS COMMITTEE
18 Bus Coupler Installation RMEAC - REGISTERED MASTER ELECTRICIAN AFFAIRS COMMITTEE
19 Directional Time-of-Arrival (PD Detection)
20 Directional Time-of-Arrival (Noise Separation)
21 Pulse Shape Noise Discrimination
22 Periodic On-Line PD Testing RMEAC - REGISTERED MASTER ELECTRICIAN AFFAIRS COMMITTEE
23 Benefits of On-Line Monitoring Monitor under normal machine operation all the time. Get maximum PD readings and prior warning of impending failure in time. Facilitate remote monitoring and reduce man-hours with periodic testing (using portable instrument) Capable o connection to plant control system.
24 Basic Interpretation of PD Testing Results Instrumentation provides: Pulse Magnitude Analysis Graph Pulse Phase Angle Analysis Graph Instrumentation also produces summary indicators: Qm for Peak PD magnitude and NQN for total PD activity.
25 Magnitude Analysis Graph Qm the peak magnitude in mv at 10-pulse per second Measure of void size: Qm Void NQN the representation of area beneath the curve Measure of total PD activity, total amount of deterioration monitored
26 PD Results: PD Trend RMEAC - REGISTERED MASTER ELECTRICIAN AFFAIRS COMMITTEE
27 PD Results: Phase Resolved Partial Discharge
28 PD Results: PRPD Polar RMEAC - REGISTERED MASTER ELECTRICIAN AFFAIRS COMMITTEE
29 PD Results: PRPD 3D RMEAC - REGISTERED MASTER ELECTRICIAN AFFAIRS COMMITTEE
30 PD Results: Pulse Height Distribution
31 AC Phase Position of PD RMEAC - REGISTERED MASTER ELECTRICIAN AFFAIRS COMMITTEE
32 PD Pulse Polarity RMEAC - REGISTERED MASTER ELECTRICIAN AFFAIRS COMMITTEE
33 No Polarity Predominance RMEAC - REGISTERED MASTER ELECTRICIAN AFFAIRS COMMITTEE
34 Positive polarity predominance
35 Negative polarity predominance
36 Three Basic Method for Interpretation Compare graphs from identical machine (stator with highest PD is most deteriorated) Compare test result from a machine to a similar machines. Trend PD over time (2 times increase per year is significant rate of deterioration)
37 Trend PD Over Time Trending of Data Most powerful, reliable means of interpreting data. If Qm low and constant trend, winding in good condition. Collect data over the years, if Qm increases slowly, winding is stable. Trending can also determine if repairs effective.
38 Summary: Stator windings are subject to a variety of failure mechanism. These failure mechanism create problem areas. Partial Discharge occur in these problem ares and are symptoms of these failure mechanism. Stator windings can be monitored on-line through partial discharge testing.
39 Thank you for listening. Questions?
IRIS POWER PDTracII. Continuous On-line Partial Discharge Monitoring for Motors, Generators, Dry Type Transformers, and Air-Insulated Switchgear.
IRIS POWER PDTracII Continuous On-line Partial Discharge Monitoring for Motors, Generators, Dry Type Transformers, and Air-Insulated Switchgear. We have not found another test method that produces as much
More informationCHAPTER 5 CONCEPT OF PD SIGNAL AND PRPD PATTERN
75 CHAPTER 5 CONCEPT OF PD SIGNAL AND PRPD PATTERN 5.1 INTRODUCTION Partial Discharge (PD) detection is an important tool for monitoring insulation conditions in high voltage (HV) devices in power systems.
More informationIRIS POWER TGA-B. Periodic Online Partial Discharge Monitoring Instrument for Turbine Generators and Motors
IRIS POWER TGA-B Periodic Online Partial Discharge Monitoring Instrument for Turbine Generators and Motors We have not found another test method that produces as much decision support data for generator
More informationIRIS POWER PDTracII. Continuous On-line Partial Discharge Monitoring for Motors, Generators, Dry Type Transformers, and Air-Insulated Switchgear.
IRIS POWER PDTracII Continuous On-line Partial Discharge Monitoring for Motors, Generators, Dry Type Transformers, and Air-Insulated Switchgear. We have not found another test method that produces as much
More informationPartial Discharge Theory, Modeling and Applications To Electrical Machines
Partial Discharge Theory, Modeling and Applications To Electrical Machines V. Vahidinasab, A. Mosallanejad, A. Gholami Department of Electrical Engineering Iran University of Science and Technology (IUST)
More informationPARTIAL DISCHARGE MEASUREMENT
PARTIAL DISCHARGE MEASUREMENT Partial Discharges are small electrical sparks which occur predominantly at insulation imperfection. It is the phenomenon which occurs in the insulation on application of
More informationCharacteristics of Insulation Diagnosis and Failure in Gas Turbine Generator Stator Windings
J Electr Eng Technol Vol. 9, No. 1: 280-285, 2014 http://dx.doi.org/10.5370/jeet.2014.9.1.280 ISSN(Print) 1975-0102 ISSN(Online) 2093-7423 Characteristics of Insulation Diagnosis and Failure in Gas Turbine
More informationCONTINUOUS ON-LINE SYSTEM FOR PARTIAL DISCHARGE MONITORING FOR HA1 AT CHE ROBEŞTI
U.P.B. Sci. Bull., Series D, Vol. 77, Iss. 4, 2015 ISSN 1454-2358 CONTINUOUS ON-LINE SYSTEM FOR PARTIAL DISCHARGE MONITORING FOR HA1 AT CHE ROBEŞTI Laurenţiu-Florian ION 1, Apolodor GHEORGHIU 2 A proper
More informationA1-209 EXPERIENCES IN IDENTIFICATION OF PARTIAL DISCHARGE PATTERNS IN LARGE HYDROGENERATORS
21, rue d'artois, F-75008 Paris http://www.cigre.org A1-209 Session 2004 CIGRÉ EXPERIENCES IN IDENTIFICATION OF PARTIAL DISCHARGE PATTERNS IN LARGE HYDROGENERATORS CARLOS AZUAJE* WILLIAM TORRES C.V.G.
More informationPD Solutions. On-Line PD Measurement Devices
On-Line PD Measurement Devices 1. Longshot Device (see Figure 1) The measurement system applied is based around the wideband (0-400 MHz) HVPD- Longshot partial discharge test unit which utilizes a high-speed
More informationDoble Solutions for Partial Discharge. Greg Topjian Solutions Manager
Doble Solutions for Partial Discharge Greg Topjian Solutions Manager 617-393-3129 gtopjian@doble.com Why do we need to conduct PD measurements PD a major cause of early failure for HV insulation. Partial
More informationStator Winding Partial Discharge Activity for Air- Cooled Generators
Stator Winding Partial Discharge Activity for Air- Cooled Generators Vicki Warren Qualitrol - Iris Power Toronto, Ontario Canada vwarren@qualitrolcorp.com Abstract Partial discharge (PD) activity has long
More informationWhy partial discharge testing makes good sense
Why partial discharge testing makes good sense PD measurement and analysis have proven to be reliable for detecting defects in the insulation system of electrical assets before major damage or a breakdown
More informationPORTABLE PARTIAL DISCHARGE MONITORING INSTRUMENT
PORTBLE PRTIL ISCHRGE MONITORING INSTRUMENT Periodic Online Monitoring of Partial ischarges on motors, generators, switchgear, isolated phase bus and dry type transformers. MOTORS TURBO GENERTORS HYRO
More informationRelative Ability of UHF Antenna and VHF Capacitor Methods to Detect Partial Discharge in Turbine Generator Stator Windings
IEEE Transactions on Dielectrics and Electrical Insulation Vol. 22, No. 6; December 215 369 Relative Ability of UHF Antenna and VHF Capacitor Methods to Detect Partial Discharge in Turbine Generator Stator
More informationAnalysis of Partial Discharge Patterns for Generator Stator Windings
American Journal of Electrical Power and Energy Systems 2015; 4(2): 17-22 Published online March 11,2015 (http://www.sciencepublishinggroup.com/j/epes) doi: 10.11648/j.epes.20150402.11 ISSN: 2326-912X
More informationDielectric response and partial discharge measurements on stator insulation at varied low frequency. Nathaniel Taylor
Dielectric response and partial discharge measurements on stator insulation at varied low frequency Nathaniel Taylor Rotating Electrical Machines : The Stator and its Windings turbo-generator motor hydro-generator
More informationTECHIMP Technologies & Services for Diagnostics and Monitoring of High Voltage Assets
TECHIMP Technologies & Services for Diagnostics and Monitoring of High Voltage Assets Who we are TECHIMP is one of the leading providers of Condition Assessment Services Data Acquisition and Test Equipment
More informationKnowledge Is Power SM Apparatus Maintenance and Power Management for Energy Delivery. Application of EMI Diagnostics to Hydro Generators
Knowledge Is Power SM Apparatus Maintenance and Power Management for Energy Delivery Application of EMI Diagnostics to Hydro Generators James Timperley Doble Global Power Services Columbus, Ohio jtimperley@doble.com
More informationII. TRADITIONAL APPROACH OF PD MEASUREMENTS
Advantages of Continuous Monitoring of Partial Discharges in Rotating Equipment and Switchgear Claude Kane Cutler Hammer Predictive Diagnostics 5421 Feltl Road, Suite 190 Minnetonka, MN 55343 Phone: 952-912-1358
More informationAnalysis of Off-Line and On-Line Partial Discharge in High Voltage Motor Stator Windings
J Electr Eng Technol.2015; 10(3): 1086-1092 http://dx.doi.org/10.5370/jeet.2015.10.3.1086 ISSN(Print) 1975-0102 ISSN(Online) 2093-7423 Analysis of Off-Line and On-Line Partial Discharge in High Voltage
More informationObjective Methods to Interpret Partial-Discharge Data on Rotating-Machine Stator Windings
Objective Methods to Interpret Partial-Discharge Data on Rotating-Machine Stator Windings Greg C. Stone, Fellow, IEEE, and Vicki Warren, Member, IEEE From IEEE Transactions on Industry Applications Vol.
More informationPartial Discharge Patterns in High Voltage Insulation
22 IEEE International Conference on Power and Energy (PECon), 2-5 December 22, Kota Kinabalu Sabah, Malaysia Partial Discharge Patterns in High Voltage Insulation Hazlee Illias, Teo Soon Yuan, Ab Halim
More informationAfrica Utility Week Focus Day Substation Condition Monitoring Benefits of Ultrasound
Africa Utility Week Focus Day 2014 Substation Condition Monitoring Benefits of Ultrasound Agenda Review - Substation Condition Monitoring Electrical discharge Types and origin In switchgear Results/consequences
More informationEXPERIENCE WITH ON-LINE PARTIAL DISCHARGE MEASUREMENT IN HIGH VOLTAGE INVERTER FED MOTORS
EXPERIENCE WITH ON-LINE PARTIAL DISCHARGE MEASUREMENT IN HIGH VOLTAGE INVERTER FED MOTORS Copyright Material IEEE Paper No. PCIC-2016-46 G.C. Stone H.G. Sedding C. Chan Fellow, IEEE Senior Member, IEEE
More informationBasics of Partial Discharge. Prepared for 2015 Phenix RSM Meeting January 2015
Basics of Partial Discharge Prepared for 2015 Phenix RSM Meeting January 2015 Definitions and History Standard Definitions Fundamentally, what is a Partial Discharge An electric discharge which only partially
More informationThe University of New South Wales. School of Electrical Engineering and Telecommunications. High Voltage Systems ELEC9712. Appendix Partial Discharge
The University of New South Wales School of Electrical Engineering and Telecommunications High Voltage Systems ELEC9712 Appendix Partial Discharge Content Introduction Quantities measured Test circuits
More informationPartial discharge diagnostics on very long and branched cable circuits
11 Nordic Insulation Symposium Stockholm, June 11-13, 2001 Partial discharge diagnostics on very long and branched cable circuits Nico van Schaik, E. Fred Steennis, Wim Boone and Dick M. van Aartrijk KEMA
More informationA NOVEL APPROACH TO PARTIAL DISCHARGE MONITORING
A NOVEL APPROACH TO PARTIAL DISCHARGE MONITORING Dr. Simon Higgins Sustainability Division Eskom SOC Ltd (South Africa) Mr. André Tétreault Tests & Diagnostics Division VibroSystM, Inc. (Canada) ABSTRACT
More informationAdvancements in online partial discharge monitoring and assessment of MV through EHV Substation assets
Advancements in online partial discharge monitoring and assessment of MV through EHV Substation assets Abstract: For decades it has been recognized that partial discharge assessment is an excellent method
More informationTHE POWER OF LIFE. WinTech Partial Discharge based Predictive Intelligence of insulation system to eliminate power failure risk.
THE POWER OF LIFE WinTech Partial Discharge based Predictive Intelligence of insulation system to eliminate power failure risk. Mr. Neal Yang Pro.E.E. Engineer About Us The flaw of dielectric material
More informationPARTIAL DISCHARGE MEASUREMENTS ON GENERATORS USING A NOISE GATING SYSTEM
Abstract PARTIAL DISCHARGE MEASUREMENTS ON GENERATORS USING A NOISE GATING SYSTEM Q. SU Department of Electrical & Computer Systems Engineering Monash University, Clayton VIC 3168 Email: qi.su@eng.monash.edu.au
More informationTHE PROPAGATION OF PARTIAL DISCHARGE PULSES IN A HIGH VOLTAGE CABLE
THE PROPAGATION OF PARTIAL DISCHARGE PULSES IN A HIGH VOLTAGE CABLE Z.Liu, B.T.Phung, T.R.Blackburn and R.E.James School of Electrical Engineering and Telecommuniications University of New South Wales
More informationNETWORK INNOVATION COMPETITION ANGLE-DC PROJECT HOLISTIC CIRCUIT CONDITION MONITORING SYSTEM REPORT
NETWORK INNOVATION COMPETITION PROJECT HOLISTIC CIRCUIT CONDITION MONITORING SYSTEM REPORT NOVEMBER 17 Version: 1.0 Authored by: Andrew Moon Engineering Consultant and Project Manager Kevin Smith Lead
More informationInvesti ations Into the Use of Temperature Detectors as # tator Winding Partial Discharge Detectors
Conference Record of the 2006 IEEE International Symposium on Electrical Insulation Investi ations Into the Use of Temperature Detectors as # tator Winding Partial Discharge Detectors S.R. Campbell, G.C.
More informationA1-207 STUDY AND DEVELOPMENT OF ON-LINE MONITORING SYSTEM FOR A KEPCO PUMPED STORAGE GENERATOR/MOTOR HEE-DONG KIM, YOUNG-HO JU
2, rue d'rtois, F-8 Paris http://www.cigre.org -2 Session 2 CIGRÉ STUDY ND DEELOPMENT OF ON-LINE MONITORING SYSTEM FOR KEPCO PUMPED STORGE GENERTOR/MOTOR HEE-DONG KIM, YOUNG-HO JU KEPRI YONG-JU KIM KERI
More informationThe Generators and Electric Motor Monitoring and Diagnostics Systems
The Generators and Electric Motor Monitoring and Diagnostics Systems MDR and PGU-DM 1 The «MDR» - Motor Diagnostics Relay the Universal System for Insulation Monitoring in Electric Machines PD-Monitor
More informationGENERATOR TESTING APPLICATION GUIDE. reliable. precision.
GENERATOR TESTING APPLICATION GUIDE www.haefely-hipotronics.com reliable. precision. 2 GENERATOR TESTING CONTENTS Product Line Overview 3 AC Hipot Testing 4 Partial Discharge Measurement 5 DC Hipot Testing
More informationDiagnostic testing of cast resin transformers
Paper of the Month Diagnostic testing of cast resin transformers Author Michael Krüger, OMICRON, Austria michael.krueger@omiconenergy.com Christoph Engelen, OMICRON, Austria christoph.engelen@omicronenergy.com
More informationTECHIMP Power Transformer Monitoring
TECHIMP Power Transformer Monitoring Kontakt: Martin Hesse Techimp Germany GmbH i.g. E-Mail: mhesse@techimp.com Tel.: +49 5724 391 007 Mobil: +49 170 2364 735 PD Monitoring of Power Transformers Power
More informationXu Xiao Ming, AP Services, March 2010 Machine services Life expectance analysis program (LEAP)
Xu Xiao Ming, AP Services, March 2010 Machine services Life expectance analysis program (LEAP) April 12, 2010 Slide 1 Content MV Machine Winding Insulation Stress LEAP Methodology LEAP Standard LEAP from
More informationIN HOUSE CALIBRATION OF PD DETECTOR SYSTEM FOR FIELD TEST RESULT RELIABILITY
IN HOUSE CALIBRATION OF PD DETECTOR SYSTEM FOR FIELD TEST RESULT RELIABILITY Avinash Raj 1, Chandan Kumar Chakrabarty 1, Rafidah Ismail 1 and Basri Abdul Ghani 2 1 College of Engineering, University Tenaga
More informationMeasurement Of Partial Discharge (PD) In High Voltage Power Equipment
First International Conference on Emerging Trends in Engineering, Management and Scineces December 28-3, 214 (ICETEMS-214)Peshawar,Pakistan Measurement Of Partial Discharge (PD) In High Voltage Power Equipment
More informationPERMANENT ON-LINE MONITORING OF MV POWER CABLES BASED ON PARTIAL DISCHARGE DETECTION AND LOCALISATION AN UPDATE
PERMANENT ON-LINE MONITORING OF MV POWER CABLES BASED ON PARTIAL DISCHARGE DETECTION AND LOCALISATION AN UPDATE Fred STEENNIS, KEMA, (the Netherlands), fred.steennis@kema.com Peter VAN DER WIELEN, KEMA,
More informationHVDC Transmission. Michael Muhr. Institute of High Voltage Engineering and System Performance Graz University of Technology Austria P A S S I O N
S C I E N C E P A S S I O N T E C H N O L O G Y HVDC Transmission Michael Muhr Graz University of Technology Austria www.tugraz.at 1 Definition HV High Voltage AC Voltage > 60kV 220kV DC Voltage > 60kV
More informationRamp Testing in Identifying and Preventing Insulation Failure
FEATURE Megger Ramp Testing in Identifying and Preventing Insulation Failure By Jeff Jowett THE TESTING OF ELECTRICAL INSULATION has Simply taking a spot resistance reading with a megohmmeter seen the
More informationPARTIAL discharge testing has been used for nearly
Importance of Bandwidth in PD Measurement in Operating Motors and Generators by Greg Stone Iris Power Engineering, Etobicoke, ON, Canada IEEE Transactions on Dielectrics and Electrical Insulation, Vol.
More informationThe importance of partial discharge testing throughout the development and operation of power transformers
The importance of partial discharge testing throughout the development and operation of power transformers Ulrike Broniecki OMICRON Energy Solutions GmbH, Berlin Power transformers are exposed to intense
More informationHands-On Transformer Testing and Maintenance
Hands-On Course Description This Hands-On course will teach you how to prioritize your transformer maintenance strategy, stretch your maintenance budget and at the same time maximize the life and condition
More informationPartial Discharge, Survey or Monitor?
July 2014 Partial Discharge, Survey or Monitor? 24-7 Partial Discharge monitoring is the ultimate tool for finding insulation weaknesses before they fail. Introduction It s well established that Partial
More informationThe Synthesis and Analysis of Partial Discharges from Stator Winding Insulation of Hydro Generators
ANALELE UNIVERSITĂłII EFTIMIE MURGU REŞIłA ANUL XIV, NR. 1, 2007, ISSN 1453-7397 Mihaela Răduca, Ana-Maria Pittner, Eugen Răduca, Iancu Tătucu The Synthesis and Analysis of Partial Discharges from Stator
More informationType 297, High-Voltage Mica Capacitors Corona-free Mica Coupling Capacitors for Medium-Voltage PDA s
Designed for Partial Discharge Analyzers (PDA s) monitoring rotating machinery or other medium-voltage equipment from 1 to 35 kvac RMS at power-line frequencies of 10 Hz to 1 khz, Mica Capacitor Type 297
More informationSpecialists in HV and MV test and diagnostics. Testing in Substations
Specialists in HV and MV test and diagnostics Testing in Substations Testing in Substations Testing in Substations At 4fores we specialize in the diagnosis and measurement of all types of existing technologies
More informationPD Testing Considerations for MV Plant Cables
PD Testing Considerations for MV Plant Cables Cable Testing Philosophy Damage Mistake Aging Repair Manufacturing Transportation Installation Operation Power frequency 50/60 Hz Power frequency 50/60 Hz
More informationNew Techniques for the Monitoring of Transformer Condition
New Techniques for the Monitoring of Transformer Condition Thomas Prevost OMICRON electronics USA IEEE T&D Conference Chicago, Illinois April 17, 2014 Agenda Monitoring Expectations & Needs Bushing Monitoring
More informationBring sense of Peace and Security to your equipment with Eaton Partial Discharge diagnostics capabilities
Bring sense of Peace and Security to your equipment with Eaton Partial Discharge diagnostics capabilities Monitor insulation condition, predict and prevent insulation problem before they will harm your
More informationInsulation State On-Line Monitoring and Running Management of Large Generator
Energy and Power Engineering, 2010, 2, 203-207 doi:10.4236/epe.2010.23030 Published Online August 2010 (http://www.scirp.org/journal/epe) Insulation State On-Line Monitoring and Running Management of Large
More informationRTD as a Valuable Tool in Partial Discharge Measurements on Rotating Machines
RTD as a Valuable Tool in Partial Discharge Measurements on Rotating Machines Z. Berler, I. Blokhintsev, A. Golubev, G. Paoletti, A. Romashkov Cutler Hammer Predictive Diagnostics Abstract: This paper
More informationOMICRON Seminar on Partial Discharge Diagnostics on HV Assets. January 30, 2018 Beirut, Lebanon
OMICRON Seminar on Partial Discharge Diagnostics on HV Assets January 30, 2018 Beirut, Lebanon Substation Asset Testing and Diagnosis LOW ACCURACY LEVEL HIGH Take better maintenance decisions through accurate
More informationThe R Portable Device for Partial Discharge Measurement and Analysis in High Voltage Equipment Insulation
The R2200 - Portable Device for Partial Discharge Measurement and Analysis in High Voltage Equipment Insulation DIMRUS Ltd. www.dimrus.ru 1 The R2200 Device is for Effective Partial Discharge (PD) Measurement
More informationElectrical Equipment Condition Assessment
Feature Electrical Equipment Condition Assessment Using On-Line Solid Insulation Sampling Importance of Electrical Insulation Electrical insulation plays a vital role in the design and operation of all
More informationFor Medium Voltage Motors, Generators, Switchgear, Bus Duct and Cable Terminations
InsulGard Product Focus Maximize Your Uptime For Medium Voltage Motors, Generators, Switchgear, Bus uct and Cable erminations InsulGard 1. InsulGard (Front) 2. InsulGard (Back) Why InsulGard?...Economics
More informationSimulation Model of Partial Discharge in Power Equipment
Simulation Model of Partial Discharge in Power Equipment Pragati Sharma 1, Arti Bhanddakkar 2 1 Research Scholar, Shri Ram Institute of Technology, Jabalpur, India 2 H.O.D. of Electrical Engineering Department,
More information1.1 STRESSES ACTING ON POWER EQUIPMENT
Chapter 1 Dielectric Diagnosis of Stator winding insulation 1.0 INTRODUCTION Electric Power System comprises of a large number of Power equipments like high voltage generators, motors, transformers, bushings,
More informationRECENT DEVELOPMENTS IN IEEE AND IEC STANDARDS FOR OFF-LINE AND ON-LINE PARTIAL DISCHARGE TESTING OF MOTOR AND GENERATOR STATOR WINDINGS
RECENT DEVELOPMENTS IN IEEE AND IEC STANDARDS FOR OFF-LINE AND ON-LINE PARTIAL DISCHARGE TESTING OF MOTOR AND GENERATOR STATOR WINDINGS Copyright Material IEEE Paper No. PCIC-2014-9 G.C. Stone Meredith
More informationInternational Journal of Advance Engineering and Research Development. Comparison of Partial Discharge Detection Techniques of Transformer
Scientific Journal of Impact Factor(SJIF): 3.134 International Journal of Advance Engineering and Research Development Volume 2,Issue 7, July -2015 e-issn(o): 2348-4470 p-issn(p): 2348-6406 Comparison
More informationFurther Experience in the Use of Existing RTDs in Windings of Motors and Generators for the Measurement of Partial Discharges
Further Experience in the Use of Existing RDs in Windings of Motors and Generators for the Measurement of Partial Discharges Claude Kane Eaton Electrical Predicative Diagnostics 5421 Feltl Road Suite 190
More informationApplication of Polarisation Depolarisation Current (PDC) technique on fault and trouble analysis of stator insulation
CIGRE SC A1 & D1 JOINT COLLOQUIUM October 24, 2007 Application of Polarisation Depolarisation Current (PDC) technique on fault and trouble analysis of stator insulation S. A. BHUMIWAT Independent Consultant
More informationIeee Guide For Partial Discharge Testing Of Shielded Power
Ieee Guide For Partial Discharge Testing Of Shielded Power We have made it easy for you to find a PDF Ebooks without any digging. And by having access to our ebooks online or by storing it on your computer,
More informationThe Multi-Technology Approach to Motor Diagnostics
The Multi-Technology Approach to Motor Diagnostics Howard W. Penrose, Ph.D. For: ALL-TEST Pro Old Saybrook, CT Introduction There has been a persistent misconception that there is a magic bullet, in the
More informationUSING DAMPED AC VOLTAGES
MODERN & TESTING DIAGNOSIS OF POWER CABLES USING DAMPED AC VOLTAGES BY EDWARD GULSKI AND ROGIER JONGEN, Onsite HV Solutions ag, Switzerland AND RALPH PATTERSON, Power Products & Solutions LLC, United States
More informationThe Basics of Insulation Testing
The Basics of Insulation Testing Feature by Jim Gregorec IDEAL Industries, Inc. What Is Insulation Testing? In a perfect world, all the electrical current sent along a conductive wire would reach its intended
More informationCHARACTERIZATION OF PARTIAL DISCHARGE PULSES OF POWER GENERATOR
CHARACTERIZATION OF PARTIAL DISCHARGE PULSES OF POWER GENERATOR Yu Ming SCHOOL OF ELECTRICAL & ELECTRONIC ENGINEERING A thesis submitted to the Nanyang Technological University in fulfillment of the requirement
More informationAPPLICATIONS OF ACOUSTIC LOCALIZATION TO ONLINE POWER TRANSFORMERS
APPLICATIONS OF ACOUSTIC LOCALIZATION TO ONLINE POWER TRANSFORMERS David Larochelle NDB Technologies Reasons leading to acoustic testing are different weather it is a manufacturing or field environment
More informationOn-line Partial Discharge Assessment and Monitoring of MV to EHV Cables
On-line Partial Discharge Assessment and Monitoring of MV to EHV Cables William Higinbotham, Neil Davies and Victor Chan EA Technology LLC, New Jersey; USA, EA Technology Pty Ltd, Brisbane Australia; EA
More informationMEDIUM & HIGH VOLTAGE
MEDIUM & HIGH VOLTAGE TESTING EQUIPMENT VOLTAGE WITHSTAND SGM Series Resonant Systems The SGM series are used for generating high AC voltages at a fixed frequency (mainly 50 or 60 Hz) by means of an excited
More informationCondition Assessment of High Voltage Insulation in Power System Equipment. R.E. James and Q. Su. The Institution of Engineering and Technology
Condition Assessment of High Voltage Insulation in Power System Equipment R.E. James and Q. Su The Institution of Engineering and Technology Contents Preface xi 1 Introduction 1 1.1 Interconnection of
More informationReview of Partial Discharge and Dielectric Loss Tests for Hydropower Generator Bars
Review of Partial Discharge and Dielectric Loss Tests for Hydropower Generator Bars Torstein Grav Aakre*, Erling Ildstad*, Sverre Hvidsten** and Arne Nysveen* *NTNU/Department of Electrical Power engineering,
More informationCONDITION MONITORING OF MEDIUM VOLTAGE ELECTRICAL CABLES BY MEANS OF PARTIAL DISCHARGE MEASUREMENTS
136 CONDITION MONITORING OF MEDIUM VOLTAGE ELECTRICAL CABLES BY MEANS OF PARTIAL DISCHARGE MEASUREMENTS H. van Jaarsveldt* and R. Gouws** School of Electrical, Electronic and Computer Engineering, North-West
More informationPARTIAL DISCHARGE LOCATION Selected Topics
PARTIAL DISCHARGE LOCATION Selected Topics M.S. Mashikian IMCORP ICC Meeting - Fall 2000 TOPICS TESTING PHILOSOPHY Excitation Voltage Test Voltage Level METHOD OF REFLECTOMETRY METHOD OF ARRIVAL TIME TESTING
More informationPOWER TRANSFORMER SPECIFICATION, DESIGN, QUALITY CONTROL AND TESTING 18 MARCH 2009
POWER TRANSFORMER SPECIFICATION, DESIGN, QUALITY CONTROL AND TESTING 18 MARCH 2009 Nkosinathi Buthelezi Senior Consultant: Power Transformers and Reactors Presentation Content Standardization of Power
More informationPartial Discharge Characteristics and Insulation Life with Voltage Waveform
Partial Discharge Characteristics and Insulation Life with Voltage Waveform Sanjay Gothwal 1, Kaustubh Dwivedi 2, Priyanka Maheshwari 3 1Asst. Prof., RKDF University, Bhopal, MadhyaPradesh 2Lecturer, University
More informationInsulation resistance testing. A complete solution for every application.
Insulation resistance testing A complete solution for every application. Why perform insulation testing? Safety The most important reason for testing insulation is to ensure public and personal safety.
More informationABB Power Products Service
Raben Naidoo, Technology days, May 21-22th, 2014, Cape Town, South Africa, Enhanced availability of transformers via transformer remote monitoring - TEC ABB Power Products Service Why a session on availability?
More informationInsulation resistance testing
Insulation resistance testing Application Note Introduction Insulation resistance testers can be used to determine the integrity of windings or cables in motors, transformers, switchgear, and electrical
More informationA COMPARISON OF AC AND DC PARTIAL DISCHARGE ACTIVITY IN POLYMERIC CABLE INSULATION *
Morris, E.A. and Siew, W.H. (2018) A comparison of AC and DC partial discharge activity in polymeric cable insulation. In: 2017 IEEE 21st International Conference on Pulsed Power (PPC). IEEE, Piscataway,
More informationComparison of capacitive and inductive sensors designed for partial discharges measurements in electrical power apparatus
Comparison of capacitive and inductive sensors designed for partial discharges measurements in electrical power apparatus Michał Kunicki 1,* 1 Opole University of Technology, ul. Prószkowska 76, 45-758
More informationPROPAGATION OF PARTIAL DISCHARGE AND NOISE PULSES IN TURBINE GENERATORS
PROPAGATION OF PARTIAL DISCHARGE AND NOISE PULSES IN TURBINE GENERATORS M. Henriksen, Technical University of Denmark, DK-2800 Lyngby, Denmark G.C. Stone, M. Kurtz, Ontario Hydro, 800 Kipling Avenue, Toronto,
More informationSIGNATURE ANALYSIS FOR ON-LINE MOTOR DIAGNOSTICS
Page 1 of 10 2015-PPIC-0187 SIGNATURE ANALYSIS FOR ON-LINE MOTOR DIAGNOSTICS Ian Culbert Senior Member, IEEE Qualitrol-Iris Power 3110 American Drive Mississauga, ON Canada Abstract - Stator current signature
More informationRotary Machine Prognostic Based on Gamma Process
Rotary Machine Prognostic Based on Gamma Process Project Introduction, Current Status and Future Plan Date: May 5, 2017 Ariful Islam M.Sc candidate Reliability, Availability, Maintenability and Safety
More informationPulse Width Modulated Motor Drive Fault Detection Using Electrical Signature Analysis
Pulse Width Modulated Motor Drive Fault Detection Using Electrical Signature Analysis By ALL-TEST Pro, LLC & EMA Inc. Industry s use of Motor Drives for AC motors continues to grow and the Pulse-Width
More informationIMPORTANCE OF INSULATION RESISTANCE
IMPORTANCE OF INSULATION RESISTANCE What is Good Insulation? Every electric wire in your plant whether it s in a motor, generator, cable, switch, transformer, etc., is carefully covered with some form
More informationPATTERN CLASSIFICATION OF PARTIAL DISCHARGE IN LV WINDING OF 1- TRANSFORMER USING PCA
International Journal of Information Technology and Knowledge Management January-June 2011, Volume 4, No. 1, pp. 1-5 PATTERN CLASSIFICATION OF PARTIAL DISCHARGE IN LV WINDING OF 1- TRANSFORMER USING PCA
More informationGenerator Users Group Annual Conference Core testing, low and high flux, tap. Mladen Sasic, IRIS Power
Generator Users Group Annual Conference 2015 Core testing, low and high flux, tap Mladen Sasic, IRIS Power Stator Cores Cores provide low reluctance paths for working magnetic fluxes Support stator winding,
More informationAutotransformer Condition Monitoring Systems
Autotransformer Condition Monitoring Systems The Bidders shall offer separately the following systems of par.1 Integrated Condition Monitoring System and par.2 UHF PD Monitoring System. Two systems following
More informationPartial Discharge Monitoring and Diagnosis of Power Generator
Partial Discharge Monitoring and Diagnosis of Power Generator Gao Wensheng Institute of High Voltage & insulation tech. Electrical Eng. Dept., Tsinghua University Wsgao@tsinghua.edu.cn Currently preventive
More informationPD Diagnostic Applications and TechImp solutions
PD Diagnostic Applications and TechImp solutions Condition Assessment Solutions for Electrical Systems. PD based innovative tools for the Condition Based Maintenance. MD-04.05.004 - rev. 00-29/08/2006
More informationPARTIAL DISCHARGE MEASUREMENT ANALYSIS ON RING MAIN UNIT
PARTIAL DISCHARGE MEASUREMENT ANALYSIS ON RING MAIN UNIT Vaibhav Patil 1, Er. Harpreet Singh 2, Er Prashant Rade 3, 1 M Tech scholar, Institute Of Engineering And Technology, Alwar Rajasthan,India. 2 Associate
More informationField Measurement of Transmission Cable Dissipation Factor
Workshop 2000, Alexandria, Virginia, 13 & 14 September 2000 paper No.: 1 Field Measurement of Transmission Cable Dissipation Factor John H. Cooper, Power Delivery Consultants, Inc. Abstract This presentation
More informationEquipment under Measurement: 6.6kV Alstom AIS Switchgear. Date of Measurement: 10 th August 2017
Case History - 24: Online PD measurement using TEV, Ultrasonic Inductive UHF & HFCT Sensors Equipment under Measurement: 6.6kV Alstom AIS Switchgear Date of Measurement: 10 th August 2017 Sensor Used:
More information