2014 Bentley Systems, Incorporated. Industry Futures Dean Bowman, PE Bentley Fellow Bentley Systems
|
|
- Dortha Mitchell
- 5 years ago
- Views:
Transcription
1 2014 Bentley Systems, Incorporated Industry Futures Dean Bowman, PE Bentley Fellow Bentley Systems
2 Capital Project Lifecycle Built Environment Inspection Design Operations & Maintenance Drawings Redline As-builts Bentley Systems, Incorporated
3 Information Mobility Enabler Built Environment Inspection Design Operations & Maintenance Redline As-builts Bentley Systems, Incorporated
4 Information Mobility Built Environment Inspection Design Operations & Maintenance Bentley Systems, Incorporated
5 Design to to O&M Sample Data Flow Contractor Instructions Installing underdrains around stations to Model Component Select pipe Length Pipe Size Begin Station Begin Offset End Station End Offset Alignment Begin Elevation End Elevation Start Structure End Structure Slope Material Manning s Flow Bentley Systems, Incorporated Steps Trench Bedding Lay Pipe Backfill Inspection Checklist Ensure excavation width no greater than specified Ensure unsuitable material removed and replaced Check minimum bedding thickness Has the bedding material been compacted to standards? Has the contractor installed the culvert components to the horizontal & vertical tolerances specified? Has the backfill been placed and compacted uniformly in layers? Has the side and overlay zone been compacted to the specified requirements? Inspection Data (Pay Items) Field Collect Geotextile ( ) Aggregate Volume ( ) Field Collect Date Length ( ) Begin Station Begin Offset End Station End Offset Alignment Field Verify Pipe Size Pass Through Begin Elevation End Elevation
6 Design to to O&M Sample Data Flow Contractor Instructions Installing underdrains around stations to Model Component Select pipe Length Pipe Size Begin Station Begin Offset End Station End Offset Alignment Begin Elevation End Elevation Start Structure End Structure Slope Material Manning s Flow Bentley Systems, Incorporated Steps Trench Bedding Lay Pipe Backfill Inspection Checklist Ensure excavation width no greater than specified Ensure unsuitable material removed and replaced Check minimum bedding thickness Has the bedding material been compacted to standards? Has the contractor installed the culvert components to the horizontal & vertical tolerances specified? Has the backfill been placed and compacted uniformly in layers? Has the side and overlay zone been compacted to the specified requirements? Inspection Data (Pay Items) Field Collect Geotextile ( ) Aggregate Volume ( ) Field Collect Date Length ( ) Begin Station Begin Offset End Station End Offset Alignment Field Verify Pipe Size Pass Through Begin Elevation End Elevation Date Asset Mgt Begin Station Begin Offset End Station End Offset Alignment Pipe Size Begin Elevation End Elevation
7 Bentley Systems, Incorporated
8 Bentley Systems, Incorporated
9 Bentley Systems, Incorporated
10 Benefits Built Environment Inspection Design Automated (ETL) asset management databases population Operations & Maintenance Bentley Systems, Incorporated
11 Benefits Built Environment Inspection Design Database Interrogations: Audits Litigation search General queries Data mining and analytics Operations & Maintenance Bentley Systems, Incorporated
12 Benefits Audits Field Inspections Recorded Manually typed into non-graphic system Audit Jan 2014: 2115 guardrail Install Guardrail: 10-Jan-14: LT 13-Jan-14: RT 14-Jan-14: RT 15-Jan-14: RT Bentley Systems, Incorporated
13 Benefits Audits Server Server Audit Query Jan 2014: 2115 guardrail Desktop Client Query by element(s) work task(s) inspector(s) date range Audit Results Work Task = Install Guardrail: 13-Jan-14: RT 10-Jan-14: LT 14-Jan-14: RT 15-Jan-14: RT Bentley Systems, Incorporated
14 Benefits Graphical referencing Checklist & linked docs Optional RTK GPS measurements, drone earthwork, RFID, etc. Built Environment Inspection Design Increased time inspectors in field Mitigate inspector inexperience Better inspection quality Better contractor accountability Operations & Maintenance Bentley Systems, Incorporated
15 Benefits Built Environment Inspection Design Enables Advanced Work Packaging Operations & Maintenance Bentley Systems, Incorporated
16 Advanced Work Packaging Maturity & Project Performance Project performance Maturity Bentley Systems, Incorporated
17 Information Mobility Software Architecture Federated but linked Built Environment Inspection Design Operations & Maintenance Bentley Systems, Incorporated
18 Benefits Summary Built Environment Inspection Design Information Mobility Summary Enables Advanced Work Packaging More effective field operations Better agency reports Better position for audits and litigation Automated population of asset management databases Operations & Maintenance Bentley Systems, Incorporated
19 Bentley Systems, Incorporated
Resurfacing and Overlay Made Easy with New Overlay Tools in Roadway Designer
Resurfacing and Overlay Made Easy with New Overlay Tools in Roadway Designer Joe Waxmonsky, Bentley Civil 2 WWW.BENTLEY.COM Why Overlay? Why Overlay? Accommodate wedging / leveling Milling Widening Crown
More informationEXCAVATION AND BACKFILL
Standard Specification 2565.3, 2451, and 1805 A basic understanding of specifications is needed to properly replace the disturbed soil and restore the condition of the excavated area. The size of the disturbed
More informationStormTrap Guide Specification. StormTrap 2 SingleTrap on Aggregate Foundation Groundwater BELOW Invert Revised 11/30/17
StormTrap Guide Specification StormTrap 2 SingleTrap on Aggregate Foundation Groundwater BELOW Invert Revised 11/30/17 This product guide specification is written according to the Construction Specifications
More informationIntegrated Life Cycle Management for Design, Modeling, and Operation of Stormwater Drainage Systems
Integrated Life Cycle Management for Design, Modeling, and Operation of Stormwater Drainage Systems Robert Mankowski, P.E. Vice President, Water Infrastructure Asset Performance 1 WWW.BENTLEY.COM 2017
More informationStormTrap Guide Specification. StormTrap SingleTrap on Pad Foundation Groundwater BELOW Invert Revised 11/21/18
StormTrap Guide Specification StormTrap SingleTrap on Pad Foundation Groundwater BELOW Invert Revised 11/21/18 This product guide specification is written according to the Construction Specifications Institute
More informationWork Type Definition and Submittal Requirements Work Type: Subsurface Utility Engineering (SUE)
MUST be qualified under Minnesota Department of Transportation Prequalification Program - Work Type 15.1 Subsurface Utility Engineering The first section, Work Type Definition, provides a detailed explanation
More informationB-PERMIT PLAN CHECK MANUAL
B-PERMIT PLAN CHECK MANUAL 5. SEWER PLANS Sewer Plans are usually submitted in conjunction with Street Plans to meet the requirements of conditions imposed on a Planning or Zoning action. In some cases
More informationGuidelines and Checklist For SAWS Sanitary Sewer. Developmental Engineering Division
Guidelines and Checklist For SAWS Sanitary Sewer Developmental Engineering Division INITIAL CONSIDERATIONS UTILITY SERVICE AGREEMENT Utility Service Agreement A Utility Service Agreement (USA) will be
More informationLooking into the Future Bentley Systems, Incorporated
OPTRAM Looking into the Future Universal Truisms of Rail Too much of: Not Enough of: Infrastructure Problems Maintenance Budget 2 WWW.BENTLEY.COM Highest Priority Issues How Do You: 1) Know where to work
More informationWashington County Road Engineering Plan Submittal/Review Checklist
Washington County Road Engineering Plan Submittal/Review Checklist Washington County Land Use Case File Number: Parcel(s): Developer/Owner Name(s): Developer/Owner E-mail(s): The following elements should
More informationGCG ASSOCIATES, INC. February 8, Mr. Nathaniel Strosberg, Town Planner 101 Main Street Town of Ashland Ashland, MA 01721
GCG ASSOCIATES, INC. CIVIL ENGINEERING AND LAND SURVEYING 84 Main Street Wilmington, Massachusetts 01887 Phone: (978) 657-9714 Fax: (978) 657-7915 February 8, 2016 Mr. Nathaniel Strosberg, Town Planner
More informationB422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422
B422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422 422.1 GENERAL The work under these tender items consists of the fabrication and installation in open cut of precast reinforced
More informationTYPICAL SECTIONS TYPICAL NO. 1 (MAINLINE) STA TO STA STA TO STA ROUNDING DETAIL TYPICAL NO.
FILL SECTION TYPICAL NO. 1 (MAINLINE) STA. 2434. TO STA. 244035.16 STA. 244396.83 TO STA. 2449. CUT SECTION ROUNDING DETAIL FILL SECTION TYPICAL NO. 3 (DETOUR) CUT SECTION STA. 242849.86 TO STA. 2453.88
More informationDocuments: Response letter and attachments, Prepared by: AMEC Massachusetts, Inc., Dated February 17, 2016.
GCG ASSOCIATES, INC. CIVIL ENGINEERING AND LAND SURVEYING 84 Main Street Wilmington, Massachusetts 01887 Phone: (978) 657-9714 Fax: (978) 657-7915 February 23, 2016 Mr. Nathaniel Strosberg, Town Planner
More informationAutomated Machine Guidance
Design Manual Chapter 5 - Roadway Design 5H - Automated Machine Guidance 5H-1 Automated Machine Guidance A. Concept Automated machine guidance (AMG) for grading is a process in which grading equipment,
More informationCONSTRUCTION CERTIFICATION PACKAGE
Purpose: The intent of this Construction Certification Package is to ensure that acceptable documentation is maintained during the construction of stormwater management practices (SMPs). For general information
More information2012 PURDUE ROAD SCHOOL Session 56. JW Stanger, P.E. Rieth-Riley Construction Co., Inc.
2012 PURDUE ROAD SCHOOL Session 56 JW Stanger, P.E. Rieth-Riley Construction Co., Inc. GPS Components Base Stations 3D-GPS Rover Pack 3D-GPS Machine Control 3D-millimeter GPS Truck Mounted GPS Using GPS
More informationSymmetrical Parabolic Curve In highway practice, abrupt change in the vertical direction of moving vehicles should be avoided. In order to provide
Symmetrical Parabolic Curve In highway practice, abrupt change in the vertical direction of moving vehicles should be avoided. In order to provide gradual change in its vertical direction, a parabolic
More informationExcellence in Engineering Since 1946
Excellence in Engineering Since 1946 Strand Associates, Inc. ( ) Lessons Learned Out In The Collection System Tom Brankamp, PE OWEA State Collection Systems Committee Specialty Conference May 18, 2016
More informationCONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 MAY 1993 CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS 422.01 SCOPE 422.02 REFERENCES 422.03 DEFINITIONS
More informationCHAPTER 15. Cross Section Sheets. None, except batch processing of an input file.
CHAPTER 15 Cross Section Sheets 15.1 Introduction Objectives Project Manager Menu Bar Application Learn the procedures for laying out cross section sheets. Cross Section Sheets None, except batch processing
More informationCITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST
CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil ing Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST The following checklist consists of the minimum requirements for
More informationCONSULTANT ACCREDITATION SCHEME SEWER DESIGN
CONSULTANT ACCREDITATION SCHEME SEWER DESIGN DRAWING CRITERIA AND CHECKLIST Produced by SA Water Corporation Asset Management Group June 2013 Land Developer Agreements Contact Information Details Sharyn
More information670 10/26/17 SSD: 07/14/16, 09/16/17 Page 1 of 6
SSD: 07/14/16, 09/16/17 Page 1 of 6 S P E C I A L P R O V I S I O N Section MISCELLANEOUS INCIDENTALS Item.822 - GNSS Construction Inspection Equipment Description SAMPLE PROJECT 12345 10/30/17 1.1 Work
More informationCity of Regina Standard Construction Specification SECTION 2999 LISTING OF ROADWAY STANDARD DRAWINGS
City of Regina Standard Construction Specification SECTION 2999 LISTING OF ROADWAY STANDARD DRAWINGS R-1 Alternate Pavement Structures July/10 R-2 Typical Cross Sections for Asphaltic Concrete Pavements
More informationProduct Dimensions (Width x Length x Height) (inches)
Mr. Dennis Hallahan, P.E. Infiltrator Water Technologies 4 Business Park Road P.O. Box 768 Old Saybrook, CT 06475 RE: Product Registration Renewal #2 Notice of Proprietary Distribution Product Listing
More informationTABLE OF CONTENTS 1200 PLAN PREPARATION
1200 PLAN PREPARATION TABLE OF CONTENTS PAGE 1201 General Plan Sheet Information... 12-1 1201.1 Introduction... 12-1 1201.2 Unit of Measure... 12-1 1201.3 Plan Sheet Materials and File Format... 12-1 1201.4
More informationPractice Workbook. Cross Sections: Creating, Annotating, and Volumes. SELECTseries 4 ( ) or newer
Practice Workbook This workbook is designed for use in Live instructor-led training and for OnDemand self study. The explanations and demonstrations are provided by the instructor in the classroom, or
More informationSANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS
SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS All plans for sanitary sewer main extensions, improvements and modifications
More information50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges
50.24 Culverts, Bridges and Culvert Bridges Type, Size and Location (T, S & L) Plans shall be required for all Bridges, Culvert Bridges and Culverts of eight-foot (8') clear span or greater as follows:
More informationFuture of Bentley Plant applications: AutoPLant and OpenPlant
1 WWW.BENTLEY.COM 2013 Bentley Systems, Incorporated Future of Bentley Plant applications: AutoPLant and Magnus Cullberg 2 WWW.BENTLEY.COM 2013 Bentley Systems, Incorporated AutoPLANT Modeler AutoPLANT
More informationAttachment A Construction Inspection Log (Required for initial certification of stormwater treatment facilities)
Rain Garden Soil Amendments meet requirements (if amendments required) Final grades/location/volume conform with construction plans Overflow installed at location/elevation shown on plans Type and thickness
More informationOpenRoads Best Practice - Civil Cells
OpenRoads Best Practice - Civil Cells Presented by: Ian Rosam, Director Civil Product Management, Bentley Systems, Inc. 1 WWW.BENTLEY.COM 2017 Bentley Systems, Incorporated 2017 Bentley Systems, Incorporated
More informationKANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION
Sheet 1 of 5 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION NOTE: This special provision is generally written in the imperative mood. The subject, "the
More informationGeospatial Keynote Nordic Civil konference I Vejle Bentley Systems, Incorporated 2016 Bentley Systems, Incorporated
Geospatial Keynote Nordic Civil konference 07.11.2016 I Vejle 1 WWW.BENTLEY.COM 2016 Bentley Systems, Incorporated 2016 Bentley Systems, Incorporated Introduction Johannes Klick Senior Support Manager
More informationWhat's the Latest with InRoads Storm & Sanitary SS1?
What's the Latest with InRoads Storm & Sanitary SS1? Joe Waxmonsky, Bentley Civil Why implement S&S? To avoid this: 2 WWW.BENTLEY.COM Single-source it 3 WWW.BENTLEY.COM StormCAD reads S&S files! StormCAD
More informationSECTION MANHOLES
SECTION 33 05 13 MANHOLES PART 1 GENERAL 1.01 SECTION INCLUDES A. CONTRACTOR shall furnish and install precast concrete manhole base, sections, adjusting rings, steps, and manhole ring and cover, complete.
More informationOpenBridge Modeler: What is it and how can I use it today?
2015 Bentley Systems, Incorporated OpenBridge Modeler: What is it and how can I use it today? Steve Willoughby, Senior Application Engineer Agenda: Introducing OpenBridge Modeler OpenBridge Modeler Features
More informationCHC MINING DEFORMATION MONITORING SOLUTION
CHC MINING DEFORMATION MONITORING SOLUTION Safety is first in mining. CHC offers solutions designed to improve safety for personnel on the ground and in the cab with 24/7 precision positioning for automatic
More informationSurvey Data and TOPO Checklist
Checklists Survey Data and TOPO Preliminary Plan Field Review Plans o Field Review Erosion Control Right-of-Way and Utility Meeting Plans Final Plan Field Review Plans Methods of Plan Markups Plan-in-Hand
More informationMAINTENANCE HOLES, CATCH BASINS AND DITCH INLETS - MTC FORM 407 INDEX
407-1 - MAINTENANCE HOLES, CATCH BASINS AND DITCH INLETS - MTC FORM 407 INDEX 407-1.1 GENERAL Tender Items Specifications Standard Drawings 407-1.1.1 Frame and Grate Selection 407-1.1.2 Selection of Structure
More informationMaintenance of Traffic sequence of operations including any phasing and detour maps;
All Local-let projects are required to have a Stage 2 submittal to the LPA Manager for review. The only exceptions are 2-lane resurfacing, striping, guardrail, and raised pavement markers, unless otherwise
More informationField Asset Data Collection and Integration with the Enterprise Database
Incorporated Field Asset Data Collection and Integration with the Enterprise Database Marc Kratzschmar & Ian Martin 2011 GIS-T Overview British Columbia asked for help Needed asset data collection application
More informationConstruction Tolerances - The following tolerances apply to cast-in-place structures:
00540.40(b) Construction 00540.40 Tolerances - The following tolerances apply to cast-in-place structures: (a) Foundation Footings: (1) Lateral Alignment: Actual (as cast) location of the center of gravity:
More informationACSA PLAN REVIEW CHECKLIST (Guideline Only) (4) Standard water and sewer general plan notes (attached).
ACSA PLAN REVIEW CHECKLIST (Guideline Only) Revised: December 3, 2015 General (1) Proper Title (2) Vicinity map on first sheet. (3) Date and latest plan revision. (4) Standard water and sewer general plan
More informationMoving to Model-Based Design
Infrastructure Solutions White Paper Moving to Model-Based Design Choosing Between 2D and 3D Do you really have to choose between 2D and 3D? The answer is no, but it is important to know why. Over the
More informationPlan Submittal Checklist for Permit Projects Compliance Required Information. (Answer Yes or Not Applicable (NA)) Yes NA
Note: This Checklist has been created to assist in and maintain a uniform review of Construction Design Documents for projects done under permit with the County. This document has been created by the Permit
More informationEXTERIOR BUILDING, ROOFING, AND SITE IMPROVEMENTS
CONTRACT NUMBER: IFB-8-B006 ARCHITECT / ENGINEER : HURST-ROSCHE, INC. NO. LINOIS 62203 (68) 398-0890 -7 E. RANDLE ST./ N. FRITZ ST. 402 CHERRY ST., 404-406 ST. LOUIS ST. 502-506 DEE ST. 50-505 PLUM ST.
More informationOhio Department of Transportation, VBA Documentation
Contents 1.1 Current Versions... 2 1.2 Overview... 3 1.3 Supporting Files and Standards... 4 1.3.1 ODOT_Drainage.cel... 4 1.3.2 ODOT2013.ddb... 5 1.4 ODOT_StormSewerPlan2013.mvba... 6 1.4.1 Mode: Place
More information1. Land survey Work. 2. Civil and Structural engineering services.
SECTION 01050 FIELD ENGINEERING PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division-1 Specification
More informationPORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT ADDENDUM NO. 1
PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT 3-41-0056-024-2018 ADDENDUM NO. 1 Addendum No. 1 hereby amends the contract documents and drawings for the Scappoose
More information2. What are the estimated volumes for the Residuum Harvesting See response to Question 1
No. Question Answer 1. What are the approximate earthwork quantities for this job? FBP approximate quantities will be provided via amendment with or before the CADD files. Contractor is still responsible
More informationCITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST
CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil ing Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST The following checklist consists of the minimum requirements for preparation
More informationDeep Creek Canyon US Highway 12
Deep Creek Canyon US Highway 12 ABC Techniques in Rural Montana Jim Scoles Morrison-Maierle 1 Location Deep Creek Canyon US Highway 12 Helena National Forest Great Falls Map of mid MT showing Location
More informationBentley Transmittal Services for ProjectWise Users
Bentley Transmittal Services for ProjectWise Users Arnold van der Zijden ProjectWise Consultant Agenda What is a Transmittal? Current Transmittals and Submittal Processes Existing Market Challenges Bentley
More informationSubdivision Application Checklist
City of Portsmouth, New Hampshire Subdivision Application Checklist This subdivision application checklist is a tool designed to assist the applicant in the planning process and for preparing the application
More informationCHAPTER 11. Plan Standards
CHAPTER 11 Plan Standards A. Introduction The city requires uniform public improvement plans for ease of record keeping and understanding. The following standards govern most plan submittals to the city.
More informationSECTION 8: DRAINAGE, SEWER AND WATER SUPPLY NETWORKS
UDNP Standard Specifications SECTION 8: DRAINAGE, SEWER AND WATER SUPPLY NETWORKS 8.01 - Page i UDNP Standard Specifications SECTION 8: DRAINAGE, SEWER AND WATER SUPPLY NETWORKS Table of Contents SECTION
More informationLarge Scale CalArc Pavers for Sand-Set Pedestrian Use Installations
The following specification refers to the Stepstone, Inc. product known as: Large Scale CalArc Pavers for Sand-Set Pedestrian Use Installations Large Scale CalArc Pavers are part of the California Architectural
More informationDevelopments in BIM Infrastructure Design. Barry Blake 3 rd June 2014
Developments in BIM Infrastructure Design Barry Blake 3 rd June 2014 BIM Infrastructure Design BIM Collaboration / Sharing / Design validation / Integrating various elements of design What are we delivering
More informationPractice Workbook. Cross Sections: Creating, Annotating, and Volumes
Practice Workbook This workbook is designed for use in Live instructor-led training and for OnDemand selfstudy. The explanations and demonstrations are provided by the instructor in the classroom, or in
More informationSECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts.
SECTION 58 PRECAST CONCRETE BOX CULVERT 58.1 DESCRIPTION A. General This work consists of furnishing and installing Pre-cast Concrete Box Culverts. B. Related Work Section 51 Section 52 Section 53 Section
More informationBestall Collaborative Limited Planning Environment Construction Management Development
November 18, 2017 Bestall Collaborative Limited Lori Hight, AICP, Senior Planner City Development Department City of Thornton City Hall 9500 Civic Center Drive Thornton, Colorado 80229-4326 RE: River Valley
More informationSubsurface Utility Engineering and 3D Utility Mapping
Subsurface Utility Engineering and 3D Utility Mapping Subsurface Utility Engineering: A branch of engineering practice that involves managing certain risks associated with utility mapping and appropriate
More informationCONVEYANCE PIPELINE AND PUMP STATION
SCOPE OF WORK CONVEYANCE PIPELINE AND PUMP STATION The purpose of this scope of work is to provide engineering services to revise and complete the design of the RUWAP pipeline and 5th Avenue Pump Station
More informationVILLAGE OF VILLA PARK CENTRAL BOULEVARD IMPROVEMENTS LOCATION MAP (NOT TO SCALE) CORTESI AVE. MYRTLE AVE. CENTRAL BLVD.
Q:\VillaPark_IL\11283000 Astor-Myrtle Sewer Separation Preliminary Design\D.4 CAD\Sheets\North\1. Cover.dwg INDEX OF SHEETS 1 COVER 2 GENERAL NOTES 3 SUMMARY OF QUANTITIES 4 ALIGNMENT 5-9 DRAINAGE AND
More informationThe above deliverables are to be provided as a zip file to your ILAWC Engineering Project Manager.
Water Main Construction Projects The requirements and deliverables identified below are those for water main construction projects performed by Developers, Contractors, and Internal Illinois-American Water
More informationSECTION 6A ROADWAY PLAN PREPARATION
SECTION 6A ROADWAY PLAN PREPARATION Table of Contents Page No 6A.1 GENERAL...1 6A.2 PRELIMINARY PLANS...3 6A.2.1 PRELIMINARY PLAN SHEETS...3 6A.2.2 PRELIMINARY PROFILE SHEETS...4 6A.3 PHASE A PLANS...4
More informationSECTION 1085 PRECAST REINFORCED CONCRETE BOX CULVERT
1085.1 1085.2(k) SECTION 1085 PRECAST REINFORCED CONCRETE BOX CULVERT 1085.1 DESCRIPTION This work is the manufacture, storage, delivery, installation, and assembly of precast reinforced concrete box culvert
More information1.1 GENERAL RECORD DRAWING REQUIREMENTS
Page 1 of 5 VILLAGE OF ROMEOVILLE RECORD DRAWINGS CHECKLIST PART I GENERAL Record drawings are required to provide a means of schematic verification that the intent of the approved engineering design has
More informationCustomer Requirements Commercial Secondary Service
Application Installation requirements for commercial services from Tacoma Power overhead or underground facilities. It applies to new construction or upgrades of older services. Electrical service may
More informationDRAFTING STANDARDS 9.00 DRAFTING STANDARDS
DRAFTING STANDARDS 9.00 DRAFTING STANDARDS Final plans shall conform in appearance, format, accuracy, and quality to the standards used in the Springfield Engineering Division. Additional standards shall
More informationSECTION 9.00 AS-BUILT DRAWING REQUIREMENTS SUB-INDEX
SECTION 9.00 AS-BUILT DRAWING REQUIREMENTS SUB-INDEX 9.00 AS-BUILT DRAWING REQUIREMENTS 9.01 As-Built Check List 1 Supp 1 2016 Supp # 2 Aug. 2017 AS-BUILT DRAWING REQUIREMENTS As-Built Review Fee is $200.00
More informationBuilding Information Modelling HMG Strategic Overview. Mark Bew
Building Information Modelling HMG Strategic Overview Mark Bew Chairman HMG BIM Working Group Chairman BuildingSMART UK Director ECS Ltd 1 WWW.BENTLEY.COM Introduction HMG BIM Strategy Where are we? Progress
More informationLONGITUDINAL PROFILE COMPLETION
LONGITUDINAL PROFILE COMPLETION Vertical alignment of the ditch bottom determine using cross-sections plot (refer to fig. 0630) according to the chainage direction: ditch bottom on right side... dotted
More informationBest Practice: Corridor Modeling
2014 Bentley Systems, Incorporated Best Practice: Corridor Modeling Presented by: Joe Waxmonsky PE, Bentley Civil 2 WWW.BENTLEY.COM 2014 Bentley Systems, Incorporated Best Practice: Corridor Modeling Agenda
More informationPorter County Plan Commission
Plan Type: Development Plan Administrative DRC PC Primary Plan Administrative DRC PC Secondary Plat/Replat Administrative DRC PC PUD Conceptual Detailed Final Project Information Project Name: Developer
More informationCivil Product Update. Derricke Gray, Product Manager Bentley Civil Americas
Civil Product Update Derricke Gray, Product Manager Bentley Civil Americas 1 WWW.BENTLEY.COM 2016 Bentley Systems, Incorporated 2016 Bentley Systems, Incorporated Agenda Civil Update o Where we are at
More informationSECTION MANHOLES
SECTION 02601 MANHOLES PART 1 GENERAL 1.01 SCOPE OF WORK A. WORK required under this section consists of all materials, accessories, equipment, tools, and labor required to install precast concrete standard
More information3D DESIGN IN ALTERNATIVE DELIVERY Innovation, Savings, and Supplementing TxDOT Resources
3D DESIGN IN ALTERNATIVE DELIVERY Innovation, Savings, and Supplementing TxDOT Resources Brief History 2 Conveying the Design Old Way Reviewing Changes Schematic Intent Design Change 3 4 Conveying the
More informationRRR Design & Modeling with the FDOT Civil 3D State Kit
RRR Design & Modeling with the FDOT Civil 3D State Kit Mike Racca - CADD Applications Development Specialist Production Support Office CADD 605 Suwannee St - MS 40, Tallahassee, Florida 32399 Session Objectives:
More informationOld School Thinking 6/4/2014. Kentucky Transportation Cabinet s 3D Model Pilot Project. Which files are currently submitted? 2D Plans in a 3D world
Kentucky Transportation Cabinet s 3D Model Pilot Project Kevin Martin, PE Jason Littleton, PE Old School Thinking 2D Plans in a 3D world KYTC began requiring 3D submittals 3D models submitted are not QA/QC
More information84 part video tutorial training course. The course is 100% free with no catches or exclusions. You don
Please Note: If you're new to Revit, you may be interested in my " Beginner's Guide to Revit Architecture " 84 part video tutorial training course. The course is 100% free with no catches or exclusions.
More informationDrawing Standards & Conventions for IDD
Drawing Standards & Conventions for IDD This document consists of a set of standards that have been developed to maintain a consistency in Interior Decoration and Design students work. The standards are
More informationThe several methods for making linear measurements are quite simple and straightforward. They are described below:
INTRODUCTION TO LINEAR MEASUREMENTS Many pay items are measured on the basis of linear measurements - items such as guardrail, pipe culvert, curb and gutter, fencing, etc. These measurements usually are
More informationSECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS
SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS 101 General 102 Submittal Requirements A. Initial Submittal B. Second Submittal 103 Plan Requirements A. Subdivisions B. Site Plans 104 Approval of
More informationOpenPlant. Hayley Brown Industry Consultant, Bentley Plant Bentley Systems, In
OpenPlant Hayley Brown Industry Consultant, Bentley Plant tley Systems, In co Introduction What is OpenPlant? OpenPlant is the branding for the next generation of applications and tools based on ISO 15926
More informationNWP of 9 Enclosure
A l b a n y Linn County Tax Lots S03W8BD0050 S03W8BA003 S03W8BA00700 Albany, OR 973 G e o R e s o u r c e s, L L C 000 0 000 000 Feet Scale: :,000 FIGURE : LOCATION MAP Scale: " =,000' Source: Albany GIS
More informationSubdivision Cross Sections and Quantities
NOTES Module 11 Subdivision Cross Sections and Quantities Quantity calculation and cross section generation are required elements of subdivision design projects. After the design is completed and approved
More information3. The PAC (Permit Application Center) will notify the design professional of plan review results.
Planning and Development Dept. Infrastructure Division P.O. Box 11706, or 155 Johnston Street Rock Hill, South Carolina 29731-1706 Phone: 803-329-5515 FAX: 803-329-7228 www.cityofrockhill.com AS-BUILT
More informationCOMOS Walkinside 10.2
COMOS Walkinside 10.2 Why Immersive Training? Knowledge retention through learning Leverage the power of: Human graphic memory from 3D contextual simulations Repetition of scenario-driven work tasks Time-scale
More informationUNDERGROUND UTILITY TRENCHES AND VAULTS Page 1 of 6 ADDENDUM #1
Page 1 of 6 ADDENDUM #1 PART 1 GENERAL 1.01 PRINCIPAL WORK IN THIS SECTION A. The requirements of the Owner's General Conditions, Supplementary Conditions, Special Conditions, and Division 1 - General
More informationConstruction Plan Reading Basics & Applications
Construction Plan Reading Basics & Applications July 12 th, 2016 / 4 p.m. Richland County Transportation Penny Office Instructor Ben W. Lewis, PE Welcome & Introductions Instructor Ben W. Lewis, PE Project
More informationAnne Arundel County Dept. of Inspections and Permits Water Sewer Plan Checklist
Project Name Project Number Engineer Plans are to be designed based on the standards set forth in the Anne Arundel County Design Manual Standards and Specifications, and all other manuals as stipulated
More informationSurvey Aspects of Automated Machine Control. The Changing Role of the Construction Surveyor / Inspector/Grader
Survey Aspects of Automated Machine Control The Changing Role of the Construction Surveyor / Inspector/Grader Charlie Brown, PE, PLS NCDOT State Location & Surveys Engineer AASHTO TIG AMG Work Group The
More informationProgramme TOC. CONNECT Platform CONNECTION Client MicroStation CONNECT Edition i-models what is comming
Bentley CONNECT CONNECT Platform MicroStation CONNECT Edition 1 WWW.BENTLEY.COM 2016 Bentley Systems, Incorporated 2016 Bentley Systems, Incorporated Programme TOC CONNECT Platform CONNECTION Client MicroStation
More informationAnalysis & Geoprocessing: Case Studies Problem Solving
Analysis & Geoprocessing: Case Studies Problem Solving Shawn Marie Simpson Federal User Conference 2008 3 Overview Analysis & Geoprocessing Review What is it? How can I use it to answer questions? Case
More informationPLANNED SIGN PROGRAM CHECKLIST
Planning and Building Agency Planning Division 20 Civic Center Plaza P.O. Box 1988 (M-20) Santa Ana, CA 92702 (714) 647-5804 PLANNED SIGN PROGRAM CHECKLIST Applicant, please return this checklist with
More informationEssential Skills: Reading and Interpreting Maps and Plans
Essential Skills: Reading and Interpreting Maps and Plans Prepared for: NEW YORK STATE PLANNING FEDERATION April 14, 2015 Prepared by: BME ASSOCIATES Peter G. Vars, P.E. Stages of Plan Review Concept /
More informationREQUIREMENTS. for ENGINEERING SERVICES PUBLIC CONSTRUCTION PROJECTS
REQUIREMENTS for ENGINEERING SERVICES on PUBLIC CONSTRUCTION PROJECTS April, 2007 David W. Johnson Senior Engineer Design & Construction Requirements for Engineering Services on Public Construction Projects
More information