PROCUREMENT NOTICE (14,000 Euro plus)

Size: px
Start display at page:

Download "PROCUREMENT NOTICE (14,000 Euro plus)"

Transcription

1 Łódź, date ORBUD Trade Tomasz Jackowski Ul. Traktorowa Łódź VAT: Regon: Tel PROCUREMENT NOTICE (14,000 Euro plus) 1. Ordering Party ORBUD Trade Tomasz Jackowski Ul. Traktorowa Łódź VAT: Regon: Contract granting procedure Pursuant to art. 3 sect. 1 items 1-5, 7 of the act of 29th January 2004 The Public Procurement Law (Off. J. of 2010, no. 113, item 759 uniform text, as amended). 3. Title of the project within III Priority Axis of the Regional Operating Programme of the Łódź Province Increasing competitiveness of ORBUD TRADE by investing in innovative solutions in hosiery techniques. 4. Name of the priority axis and measure under which the project is carried out III Priority axis of the Regional Operating Programme of the Łódź Province: Economy, Innovativeness, Entrepreneurship Measure III.2 : Increasing innovativeness and competitiveness of companies. 1

2 5. Description of the subject of the procurement The subject matter of the order is purchase of 6 flat knitting machines: 1. A flat knitting machine 12gg with Devore technology or equivalent, computer controlled 2 pieces Machine main parameters: - needles 12gg - number of working systems between 2 and 6-2 working beds - manufacturing options: jacquard, intarsia, fully fashion A detailed description of the required Devore or equivalent technology has been included in schedule no A flat knitting machine 12gg with Devore technology or equivalent and with positive feeding equipment, computer controlled - 1 piece Machine main parameters: - needles 12gg - number of working systems between 2 and 6-2 working beds - manufacturing options: jacquard, intarsia, fully fashion A detailed description of the required Devore or equivalent technology and the positive feeding equipment has been included in schedule no A flat knitting machine 10gg with Devore technology or equivalent and with positive feeding equipment, computer controlled - 1 piece Machine main parameters: - needles 10gg - number of working systems between 2 and 6-2 working beds - manufacturing options: jacquard, intarsia, fully fashion A detailed description of the required Devore or equivalent technology and the positive feeding equipment has been included in schedule no. 1. 2

3 4. A flat knitting machine 7gg with Ascon or equivalent technology, computer controlled 2 pieces Machine main parameters: - needles 7gg - number of working systems between 2 and 6-2 working beds - manufacturing options: jacquard, intarsia, fully fashion A detailed description of the required Ascon or equivalent technology has been included in schedule no Method for calculating the price a) The ordering party shall accept gross price in PLN as provided by Contractors. b) The Ordering Party shall round the results to two decimals. c) The offer which scores the higher number of points granted according to the criteria provided shall be deemed most advantageous. 7. Description of criteria the Beneficiary shall use when choosing the best offer together with importance of particular criteria and offering method. Compliance with to all below mentioned criteria in respect of access and choice shall be assessed on the basis of the information provided in the submitted bid and other bidder's documents accompanying the offer. During examination and assessment, the Ordering Party may request from bidders explanations regarding the offer and documents submitted and may request any bidder to supplement the documentation. The Ordering Party has established the following criteria and their importance that shall be considered at bid assessment: 1. Assessment according to the access criterion. The Ordering Party shall assess if the offered machines have equipment and parameters described under item 5 of the Procurement, and in particular if the meet the requirements regarding the manufacturing technology (a description in schedule no. 1). 3

4 The criterion shall be assessed on the basis of the information included in the submitted offer and accompanying documents on the basis of the "meets does not meet" formula. Scoring: Maximum number of points to be scored: 1 assessment "meets" = 1 point, assessment "does not meet" = 0 points Bids which score 1 point according to the access criterion shall be assessed according to the selection criterion. 2. Assessment according to the selection criterion: Bid price: criterion rank 100% Maximum number of points to be scored : 10 Scoring within the criterion: The bid price criterion (C) the offer shall be valuated using the following formula: C = ( Cmin / Cb) x 100% x 10 where: C - bid price, Cmin the lowest bid price among the offers considered, Cb price of the assessed bid The ordering party shall accept gross price in PLN as provided by Contractors. The bid offer shall be a value expressed in monetary units which the Ordering Party shall be obliged to pay the Contractor for the subject matter of the procurement. Should the bid price be provided in EURO, the average exchange rate of PLN to EUR for converting the procurement value into PLN shall be 4,0196. The average exchange rate has been defined pursuant to art. 35 sect. 3 of the Public Procurement Law. The ordering party shall accept for assessment the total bid price as provided by the Contractor. 4

5 8. Deadline for procurement completion The required deadline for order completion shall be 31 st December Any offers whose performance date exceeds the aforementioned date shall not be considered. 9. Description of the method for preparing bids, place and date of submitting and opening the bids. 1. The procurement notice is available in the electronic format at and in the paper version in the company's seat: Orbud Trade ul. Traktorowa 128, Łódź. 2. Bids should be submitted in an electronic form at: or in a written form at the Ordering Party's seat: Orbud Trade ul. Traktorowa 128, Łódź. Should a bid be submitted via in the form of attached files, such files should be in a format that allows their opening, e.g. PDF. 3. The deadline for submitting bids shall expire on at 6.00 pm. 4. Any bids submitted after the deadline shall not be considered. 5. Information about the best offer chosen shall be published on The estimated date to sign the contract shall be between and Description of conditions for participating in the procedure and the method for assessment of meeting these conditions Bids may be submitted by contractors who: 1) have necessary knowledge and experience to complete the procurement 2) have necessary technical potential to complete the procurement or shall provide a written undertaking by other entities to make available technical potential and persons capable to complete the procurement 3) have persons capable to complete the procurement 4) are in an economic and financial situation which ensures completion of the procurement, 5) are not excluded from the procurement procedure. Submitting a bid as a response to this procurement notice shall be identical to submitting a declaration that the bidder complies with the abovementioned criteria. 5

6 11. The project is co-financed from the European Regional Development Fund 6

7 SCHEDULE NO Devore or equivalent technology The Devore or equivalent technology involves manufacturing hosiery from two yarns: the binding one and the motif one. The binding yarn is present in all loops. The motif yarn is thicker and clearly distinguishes itself against the binding yarn and is only present in selected loops of a pattern. This results in knit comprising single loops and double loops made from two yarns. A pattern appears on the knit surface which imitates lace or openwork. Making knit in this technology using a flatbed knitting machine requires a replacement of standard cams in the knitting machine lock with special cams. The cams are replaced only in two binding systems. Knit is made using the technology of pulling by incomplete push (pulling with locked needle). 2. Ascon or equivalent technology Special measuring equipment of Ascon or equivalent type measures the length of the yarn incorporated in the knit and should compare it to the setpoint and introduce appropriate correction in the knitting machine setting parameters. This operation should be executed automatically during the knitting machine work. In a machine equipped with such a device an accidental change of work pattern is minimal. This is of special importance in case of smooth knit in order to reduce and eliminate horizontal stripping. Horizontal stripping appears on smooth knit, when the yarn length difference in loops between subsequent rows is ca. 5%. Active measuring equipment allows to obtain uniform structure of knit, reduces horizontal stripping and allows calibration of adjusting gear, which is subject to wear and tear, in the knitting machine. 7

8 3. Positive feeding gear Specialist feeding equipment is used to feed yarn to the knitting area in the machine. This gear: unwinds the yarn feeds a prepared section of yarn to the knitting area under fixed, continuously adjusted tension. 8

Subject: Knitting Design Technology. Unit 2: Design variation using colour. Quadrant 1 E-Text

Subject: Knitting Design Technology. Unit 2: Design variation using colour. Quadrant 1 E-Text Subject: Knitting Design Technology Unit 2: Design variation using colour Quadrant 1 E-Text Learning Objectives The learning objectives of this unit are to: Describe ways of creating multiple coloured

More information

Brother Knitting Machine Orientation

Brother Knitting Machine Orientation K - Carriage Diagram 1. Row Counter Tripper 2. Carriage Handle 3. Tension Dial 4. Change Knob 5. Holding Cam Lever 6. Cam Button Release Lever 7. Weaving Pattern Brushes 8. Weaving Pattern Lever 9. Yarn

More information

Subject: Knitting Design Technology. Unit 1: Basic flatbed knitting. Quadrant 1 E-text

Subject: Knitting Design Technology. Unit 1: Basic flatbed knitting. Quadrant 1 E-text Subject: Knitting Design Technology Unit 1: Basic flatbed knitting Quadrant 1 E-text Learning Objectives The learning objectives of this unit are to: Differentiate woven and knitted fabrics. Classify knitting

More information

Single Jersey Plain. Single Lacoste. Needle set out. Cam arrangement F K. Needle set out. Cam arrangement F1 F2 F3 F4 K T K K K K K T

Single Jersey Plain. Single Lacoste. Needle set out. Cam arrangement F K. Needle set out. Cam arrangement F1 F2 F3 F4 K T K K K K K T Structure Single Jersey Plain Sample Needle set out 1 1 Cam arrangement F K Single Lacoste Needle set out 1 2 Cam arrangement F1 F2 F3 F4 K T K K K K K T Double Lacoste Needle set out 1 2 Cam arrangement

More information

DEVELOPMENT OF THE LBChain PLATFORM SERVICE PRE-COMMERCIAL PROCUREMENT CONDITIONS

DEVELOPMENT OF THE LBChain PLATFORM SERVICE PRE-COMMERCIAL PROCUREMENT CONDITIONS Annex 1 to the Tender Development of the LBChain Platform Service APPROVED by Minutes No 2 of the Pre-commercial Procurement Commission of 13 March 2018 formed by Order No V 2017/(1.7.E-260603)- 02-198)

More information

Specification of essential terms of the contract

Specification of essential terms of the contract INSTYTUT FIZYKI POLSKIEJ AKADEMII NAUK PL - 02-668 WARSAW, POLAND, AL. LOTNIKÓW 32/46 Tel. (48-22) 843 66 01 Fax. (48-22) 843 09 26 REGON: P-000326061, NIP: 525-000-92-75 DZPIE/004/2010 Specification of

More information

Demand Side Response Methodology (DSR) for Use after a Gas Deficit Warning (GDW) Background. Draft Business Rules

Demand Side Response Methodology (DSR) for Use after a Gas Deficit Warning (GDW) Background. Draft Business Rules Demand Side Response Methodology (DSR) for Use after a Gas Deficit Warning (GDW) Draft Business Rules Version 0.1 Following the broad consensus of Workgroup 0504 meeting 3 (WG3), held on the 10 September

More information

NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP July 28, 2017

NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP July 28, 2017 NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP 697-16-016 July 28, 2017 Reference is made to the Request for Proposal (RFP) to Service Providers for Nevada Shared Radio Replacement Project, upon

More information

MONETARY AGREEMENT between the European Union and the Vatican City State (2010/C 28/05)

MONETARY AGREEMENT between the European Union and the Vatican City State (2010/C 28/05) 4.2.2010 Official Journal of the European Union C 28/13 MONETARY AGREEMENT between the European Union and the Vatican City State (2010/C 28/05) THE EUROPEAN UNION, represented by the European Commission

More information

1.1 The International Correspondence Chess Federation (ICCF) is a non-profit federation which organises a purely recreational sports activity.

1.1 The International Correspondence Chess Federation (ICCF) is a non-profit federation which organises a purely recreational sports activity. International Correspondence Chess Federation ICCF Financial Regulations ( Valid from 0 1 / 0 1 / 2018 ) 1. Introduction 1.1 The International Correspondence Chess Federation (ICCF) is a non-profit federation

More information

Demonstrate knowledge of the cam actions of weft-knitting latch needle machines

Demonstrate knowledge of the cam actions of weft-knitting latch needle machines Page 1 of 5 Demonstrate knowledge of the cam actions of weft-knitting latch needle machines Level 3 Credits 7 Purpose This unit standard is for mechanics of all types of weft-knitting machines that use

More information

Petroleum Safety Levy Methodology. Decision Paper

Petroleum Safety Levy Methodology. Decision Paper Petroleum Safety Levy Methodology Decision Paper DOCUMENT TYPE: REFERENCE: Decision Paper CER/14/429 DATE PUBLISHED: 7 th August 2014 VERSION 3.0 The Commission for Energy Regulation, The Exchange, Belgard

More information

Knitting unit ADF ADF B ADF W ADF BW. Carriages knitting systems

Knitting unit ADF ADF B ADF W ADF BW. Carriages knitting systems Knitting unit ADF 530-32 ADF 530-32 B ADF 530-32 W ADF 530-32 BW Carriages knitting systems 1 3 1 3 1 3 1 3 Combined knitting-transfer systems with split function 1 3 3 3 3 Electronic wear-free selection

More information

THE NEW DEFINITION OF FLEXIBILITY.

THE NEW DEFINITION OF FLEXIBILITY. PRODUCTS WWW.ADF3.STOLL.COM THE NEW DEFINITION OF FLEXIBILITY. 2 LOOKING FOR A MACHINE THAT DELIVERS ENDLESS PATTERN POSSIBILITIES? A MACHINE THAT CAN DO MORE THAN JUST INTARSIA, MULTI GAUGE AND PLATING?

More information

Procedure for ERO Support of Frequency Response and Frequency Bias Setting Standard. Event Selection Process

Procedure for ERO Support of Frequency Response and Frequency Bias Setting Standard. Event Selection Process This procedure outlines the Electric Reliability Organization (ERO) process for supporting the Frequency Response Standard (FRS). A Procedure revision request may be submitted to the ERO for consideration.

More information

6 th Sem. B.Tech ( Fashion & Apparel Technology)

6 th Sem. B.Tech ( Fashion & Apparel Technology) 6 th Sem. B.Tech ( Fashion & Apparel Technology) PCFT 4304 KNITTING & NON WOVEN Module- I (10 hours) Definition of knitting, General classification of Knitting Machine - Flat & Circular, Knit, Tuck & Float

More information

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration SECTION 01 340 - SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

Lecture # 6. knitting fundamentals

Lecture # 6. knitting fundamentals Lecture # 6 knitting fundamentals Knitting Fundamentals Knitting Definition Knitting is one of several ways to turn thread or yarn into cloth. Unlike woven fabric, knitted fabric consists entirely of horizontal

More information

Marcia DeCoster. Bead Art and Instruction.

Marcia DeCoster. Bead Art and Instruction. Bead Art and Instruction www.marciadecoster.com See page - for basic right angle weave directions if required Make the bezel With Size beads, make a strip of right angle weave units long and rows high.

More information

Guidance on design of work programmes for minerals prospecting, exploration and mining permits

Guidance on design of work programmes for minerals prospecting, exploration and mining permits MINERALS GUIDELINES JUNE 2017 CROWN MINERALS ACT 1991 MINERALS PROGRAMME FOR MINERALS (EXCLUDING PETROLEUM) 2013 CROWN MINERALS (MINERALS OTHER THAN PETROLEUM) REGULATIONS 2007 Guidance on design of work

More information

Office of Small and Medium Enterprises (OSME) Bureau des petites et moyennes entreprises (BPME)

Office of Small and Medium Enterprises (OSME) Bureau des petites et moyennes entreprises (BPME) Build in Canada Innovation Program To Kickstart Innovation Programme d innovation Construire au Canada Encourager l'innovation Office of Small and Medium Enterprises (OSME) Bureau des petites et moyennes

More information

CODE OF CONDUCT FOR PROMOTIONAL GAMES OF CHANCE 2014

CODE OF CONDUCT FOR PROMOTIONAL GAMES OF CHANCE 2014 CODE OF CONDUCT FOR PROMOTIONAL GAMES OF CHANCE 2014 This is a translated document. The Dutch version of the document is the only applicable and authentic version." Contents Preamble 1 Article 1 Definitions

More information

point for needles, in mm; point for sinkers, in mm; α p angle of thread feeding, in ; wt coefficient of pitch take-up.

point for needles, in mm; point for sinkers, in mm; α p angle of thread feeding, in ; wt coefficient of pitch take-up. Krzysztof Kowalski, Bogdan Włodarczyk, *Tomasz Marek Kowalski Department of Knitting Technology, *Computer Engineering Department, Technical University of Lodz ul. Żeromskiego 6, 9-924 Łódź, Poland E-mail:

More information

July Contents. Gas Demand Side Response Methodology Final Version. UK Gas Transmission

July Contents. Gas Demand Side Response Methodology Final Version. UK Gas Transmission July 2016 Contents ef Gas Demand Side Response Methodology Final Version UK Gas Transmission Background This document sets out the Gas Demand Side Response (DSR) Methodology which is required to be established

More information

Provisional Cast On Set Up Cast On

Provisional Cast On Set Up Cast On Provisional Cast On The provisional cast on uses waste yarn and a crochet hook to create a cast on edge that is easily removable. This allows for stitches to be seamlessly picked up and worked from the

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 013300 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply

More information

Ch. 813 INTERACTIVE GAMING ADVERTISEMENTS CHAPTER 813. INTERACTIVE GAMING ADVERTISEMENTS, PROMOTIONS AND TOURNAMENTS TEMPORARY REGULATIONS

Ch. 813 INTERACTIVE GAMING ADVERTISEMENTS CHAPTER 813. INTERACTIVE GAMING ADVERTISEMENTS, PROMOTIONS AND TOURNAMENTS TEMPORARY REGULATIONS Ch. 813 INTERACTIVE GAMING ADVERTISEMENTS 58 813.1 CHAPTER 813. INTERACTIVE GAMING ADVERTISEMENTS, PROMOTIONS AND TOURNAMENTS TEMPORARY REGULATIONS Sec. 813.1. Definitions. 813.2. Advertising. 813.3. Promotions.

More information

Toronto Reference Library Premium Rental Space Renovation Award of Tender

Toronto Reference Library Premium Rental Space Renovation Award of Tender STAFF REPORT ACTION REQUIRED 13. Toronto Reference Library Premium Rental Space Renovation Award of Tender Date: February 22, 2016 To: From: Toronto Public Library Board City Librarian SUMMARY The purpose

More information

details of, or auxiliary devices incorporated in such machines are covered by D04B 15/00 and

details of, or auxiliary devices incorporated in such machines are covered by D04B 15/00 and D04B KNITTING weft knitting machines are covered by D04B 7/00 - D04B 13/00, details of, or auxiliary devices incorporated in such machines are covered by D04B 15/00 and articles made by such machines are

More information

Tender Specifications for a study assessing the macro socio and economic impacts of fuel cell and hydrogen technologies

Tender Specifications for a study assessing the macro socio and economic impacts of fuel cell and hydrogen technologies Tender Specifications for a study assessing the macro socio and economic impacts of fuel cell and hydrogen technologies Table of Contents 1. Introduction... 2 1.1 The FCH JU activities... 2 1.2 Context...

More information

CITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT

CITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT CITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT ADDENDUM NO. 1 TO REQUEST FOR PROPOSALS For EQUIPMENT FOR THE 2014 CITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT WASTEWATER TREATMENT PLANT IMPROVEMENT PROJECT:

More information

COUNTY OF ORANGE ORANGE COUNTY SHERIFF-CORONER COMMUNICATIONS & TECHNOLOGY DIVISION REQUEST FOR INFORMATION FOR

COUNTY OF ORANGE ORANGE COUNTY SHERIFF-CORONER COMMUNICATIONS & TECHNOLOGY DIVISION REQUEST FOR INFORMATION FOR COUNTY OF ORANGE ORANGE COUNTY SHERIFF-CORONER COMMUNICATIONS & TECHNOLOGY DIVISION REQUEST FOR INFORMATION FOR COUNTY OF ORANGE 800 MHz CCCS PUBLIC SAFETY DISPATCH CONSOLE SYSTEM RFI NO. 055-581775-SX

More information

KOGO BLANKETS. We have detailed some of the different ways that this can be done. Please choose which of these 3 methods that suits you.

KOGO BLANKETS. We have detailed some of the different ways that this can be done. Please choose which of these 3 methods that suits you. KOGO BLANKETS There are lots of different ways to knit blankets. SECTION A We have detailed some of the different ways that this can be done. Please choose which of these 3 methods that suits you. 1. Knitted

More information

Rules and Regulations on the use of TATRYSKI pass

Rules and Regulations on the use of TATRYSKI pass Rules and Regulations on the use of TATRYSKI pass Regulations on the use of electronic proximity cards and other transponders of the SKIDATA system in Ski Resorts belonging to the TATRYSKI common card

More information

KOGO BLANKETS. We have detailed some of the different ways that this can be done. Please choose which of these 3 methods that suits you.

KOGO BLANKETS. We have detailed some of the different ways that this can be done. Please choose which of these 3 methods that suits you. KOGO BLANKETS There are lots of different ways to knit blankets. SECTION A We have detailed some of the different ways that this can be done. Please choose which of these 3 methods that suits you. 1. Knitted

More information

Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines

Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines Fifth Edition Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines April 2007 Ministry of the Environment, Japan First Edition: June 2003 Second Edition: May 2004 Third

More information

SECTION A. RFI: Request from Contractor seeking interpretation, information, or clarification of the Contract Documents.

SECTION A. RFI: Request from Contractor seeking interpretation, information, or clarification of the Contract Documents. SECTION 01 3000 PART 1 GENERAL 1.1 SECTION INCLUDES A. Electronic document submittal service. B. Preconstruction meeting. C. Submittals for review, information, and project closeout. D. Submittal procedures.

More information

CENTRAL BANK OF MALTA

CENTRAL BANK OF MALTA CENTRAL BANK OF MALTA DIRECTIVE NO 10 in terms of the CENTRAL BANK OF MALTA ACT (CAP. 204) AUTHENTICATION, FITNESS CHECKING AND RECIRCULATION OF EURO BANKNOTES AND COINS Ref: CBM/10 DIRECTIVE NO 10 DIRECTIVE

More information

E/ECE/324/Rev.1/Add.86/Rev.3/Amend.1 E/ECE/TRANS/505/Rev.1/Add.86/Rev.3/Amend.1

E/ECE/324/Rev.1/Add.86/Rev.3/Amend.1 E/ECE/TRANS/505/Rev.1/Add.86/Rev.3/Amend.1 27 November 2013 Agreement Concerning the Adoption of Uniform Technical Prescriptions for Wheeled Vehicles, Equipment and Parts which can be Fitted and/or be Used on Wheeled Vehicles and the Conditions

More information

Wrap your Knits with

Wrap your Knits with Wrap your Knits with A Loom Knitter's Journal Quick References http://www.goodknitkisses.com/ http://www.goodknitkisses.com/resources/ http://www.goodknitkisses.com/ Find us on Facebook! https://www.facebook.com/goodknitkissesyoutube

More information

BBC NATIONAL SHORT STORY AWARD 2010

BBC NATIONAL SHORT STORY AWARD 2010 ENTRY TERMS AND CONDITIONS BBC NATIONAL SHORT STORY AWARD 2010 The British Broadcasting Corporation in association with Booktrust Award of 15,000 for the winner 3,000 for the runner up 500 for 3 further

More information

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal City of Winnipeg Brady Road Landfill Site Section 01300 New Entrance and Scale Facility Page 1 of 4 SUBMITTALS 1. SHOP DRAWINGS 1.1 General.1 Arrange for the preparation of clearly identified Shop Drawings

More information

TERMS AND CONDITIONS OF THE CALL FOR PROPOSALS

TERMS AND CONDITIONS OF THE CALL FOR PROPOSALS TERMS AND CONDITIONS OF THE CALL FOR PROPOSALS Donostia/San Sebastián 2016 European Capital of Culture Within the framework of Mile of Peace project an OPEN CALL FOR PROPOSALS is being made for the carrying

More information

Incentive Guidelines. Aid for Research and Development Projects (Tax Credit)

Incentive Guidelines. Aid for Research and Development Projects (Tax Credit) Incentive Guidelines Aid for Research and Development Projects (Tax Credit) Issue Date: 8 th June 2017 Version: 1 http://support.maltaenterprise.com 2 Contents 1. Introduction 2 Definitions 3. Incentive

More information

Section Meetings Section Material and Equipment. None Required

Section Meetings Section Material and Equipment. None Required January 2000 Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK PART 2 PRODUCTS The General Conditions of the Contract, General Requirements and Supplemental

More information

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.:

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.: WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO-00111 Job No.: 16-7003 To Respondent of Record: ADDENDUM 2 July 5, 2017 This addendum, applicable to work referenced

More information

Electronic Communications Committee (ECC) within the European Conference of Postal and Telecommunications Administrations (CEPT)

Electronic Communications Committee (ECC) within the European Conference of Postal and Telecommunications Administrations (CEPT) Page 1 Electronic Communications Committee (ECC) within the European Conference of Postal and Telecommunications Administrations (CEPT) ECC RECOMMENDATION (06)05 ON THE PROVISION OF INFORMATION ON THE

More information

FCH2 JU under Horizon 2020 rules - Rules for Participation - Ethics - IPR

FCH2 JU under Horizon 2020 rules - Rules for Participation - Ethics - IPR FCH2 JU under Horizon 2020 rules - Rules for Participation - Ethics - IPR www.fch.europa.eu Lionel Boillot Project Manager Transport Applications Changes in the Rules for Participation H2020 Annexes From

More information

Page 1 of 7 6-K 1 pemex-6k_0114.htm UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C. 20549 FORM 6-K REPORT OF FOREIGN PRIVATE ISSUER PURSUANT TO RULE 13a-16 OR 15d-16 UNDER THE SECURITIES

More information

INSTRUCTIONS FOR KNITTING

INSTRUCTIONS FOR KNITTING INSTRUCTIONS FOR KNITTING CASTING ON The first step in knitting is to cast the yarn onto the needle. This provides the first row of stitches which is usually the bottom edge or selvedge of the piece you

More information

High Performance Engineering

High Performance Engineering Call for Nomination High Performance Engineering Ref. IO/16/CFT/70000243/CDP Purpose The purpose of this Framework Contract is to provide high performance engineering and physics development services for

More information

NOTICE TO BIDDERS PURCHASE OF PORTABLE FORENSIC LASER SCANNING TECHONOLGY

NOTICE TO BIDDERS PURCHASE OF PORTABLE FORENSIC LASER SCANNING TECHONOLGY NOTICE TO BIDDERS Sealed bids will be received by the City of Midwest City at its City Clerk' s office located in the Municipal Building, 100 N. Midwest Blvd., Midwest City, Oklahoma until 2: 00 p. m.,

More information

Request for Quotation (RFQ)

Request for Quotation (RFQ) Request for Quotation (RFQ) Independent Joint Anti-Corruption Monitoring and Evaluation Committee (MEC) invite Security Companies / Logistic Companies to provide their quotation for the following security

More information

UNOFFICIAL TRANSLATION

UNOFFICIAL TRANSLATION Decree 34/2014. (IX. 25.) of the Governor of the Magyar Nemzeti Bank amending MNB Decree No. 11/2011 (IX. 6.) on the processing and distribution of banknotes and on technical tasks relating to the protection

More information

having regard to the Commission proposal to Parliament and the Council (COM(2011)0295),

having regard to the Commission proposal to Parliament and the Council (COM(2011)0295), P7_TA-PROV(2012)0210 Issuance of euro coins ***I European Parliament legislative resolution of 22 May 2012 on the proposal for a regulation of the European Parliament and of the Council on the issuance

More information

1. APPLICATION PROCESS

1. APPLICATION PROCESS 1. APPLICATION PROCESS 1.1 Is it possible for a candidate to apply for a Gaming Hall as an individual and at the same time as a member of a consortium? Each candidate is free to choose between an individual

More information

Greater Dayton Regional Transit Authority 4 S. Main Street Dayton, OH 45402

Greater Dayton Regional Transit Authority 4 S. Main Street Dayton, OH 45402 Greater Dayton Regional Transit Authority 4 S. Main Street Dayton, OH 45402 May 31, 2017 TO: RE: Prospective Bidders Request for Quotation (RFQ) Copying Services The Greater Dayton Regional Transit Authority

More information

Match Play. Abbreviations. Materials. A figure flattering poncho that is as fun to knit as it is to wear! Three design options included.

Match Play. Abbreviations. Materials. A figure flattering poncho that is as fun to knit as it is to wear! Three design options included. Match Play A figure flattering poncho that is as fun to knit as it is to wear! Three design options included. Gauge Approximately 23 stitches and 33 rows = 4 in stockinette, knit flat on smaller needle

More information

Application : Broadcasting licence renewal for Super Channel (formerly Allarco Entertainment) Second Phase

Application : Broadcasting licence renewal for Super Channel (formerly Allarco Entertainment) Second Phase March 13, 2019 Filed Electronically Mr. Claude Doucet Secretary General Canadian Radio-television and Telecommunications Commission Ottawa, Ontario K1A 0N2 Dear Mr. Doucet: Re: Application 2017-0743-1:

More information

Lace by Hand. There are two kinds of weaving related lace. Loom controlled Hand manipulated

Lace by Hand. There are two kinds of weaving related lace. Loom controlled Hand manipulated by Hand with Eleanor Best 2005 Lace by Hand There are two kinds of weaving related lace Loom controlled Hand manipulated This study will focus on the hand manipulated aided by sticks where necessary It

More information

Technique and expression 2: knitting 1.5cr

Technique and expression 2: knitting 1.5cr Technique and expression 2: knitting 1.5cr Ladok code: AX1TS1 Written examination for: TD Student code: Exam date: 2017-09-22 Time: 09.00-12.30 Allowed equipment: lens (lupp), pencils, scissor, needles.

More information

The attached information contains mandatory requirements and a submission form.

The attached information contains mandatory requirements and a submission form. The Municipality of Greenstone Greenstone Fire Department REQUEST FOR PROPOSAL (RFP) Fire Department VHF Digital Radio Communication System The Municipality of Greenstone seeks Requests for Proposals (RFP

More information

High Voltage Instrumentation Cables for the ITER Superconducting Magnet Systems

High Voltage Instrumentation Cables for the ITER Superconducting Magnet Systems High Voltage Instrumentation Cables for the ITER Superconducting Magnet Systems Summary for Call for Nominations 1. Background and scope ITER will be the world's largest experimental facility to demonstrate

More information

Case No COMP/M i/ The Telegraph Group. REGULATION (EC) No 139/2004 MERGER PROCEDURE. Article 7(3) Date:

Case No COMP/M i/ The Telegraph Group. REGULATION (EC) No 139/2004 MERGER PROCEDURE. Article 7(3) Date: EN Case No COMP/M.3488 3i/ The Telegraph Group Only the English text is available and authentic. REGULATION (EC) No 139/2004 MERGER PROCEDURE Article 7(3) Date: 9.6.2004 COMMISSION OF THE EUROPEAN COMMUNITIES

More information

Category: ELECTRICITY Requirement: EL-ENG Page: 1 of 13. Document(s): S-E-01, S-E-04 Issue Date: Effective Date:

Category: ELECTRICITY Requirement: EL-ENG Page: 1 of 13. Document(s): S-E-01, S-E-04 Issue Date: Effective Date: Requirements for Certification Category: ELECTRICITY Requirement: EL-ENG-11-02 Page: 1 of 13 Requirements for Certification and Use of Portable Measuring Apparatus for Reverification and Dispute Meter

More information

St. Michael s Invitational Scrabble Championship

St. Michael s Invitational Scrabble Championship St Michael s Invitational Scrabble Championship Date: 5-5-2012 Time: 8:30 am -4:00 pm Venue: SKH St Michael s Primary School (School Hall & Art Room) Address: 23 Fortress Hill Road, North Point, Hong Kong

More information

PROCUREMENT OF SERVO CONTROLLED VOLTAGE STABILIZER FOR STPI-NASIK

PROCUREMENT OF SERVO CONTROLLED VOLTAGE STABILIZER FOR STPI-NASIK PROCUREMENT OF SERVO CONTROLLED VOLTAGE STABILIZER FOR STPI-NASIK Sealed quotations are invited under Two-Bid system from reputed agencies, either by themselves or as a joint venture/consortium/partnership

More information

1 SB By Senator Sanford. 4 RFD: Tourism and Marketing. 5 First Read: 20-FEB-18. Page 0

1 SB By Senator Sanford. 4 RFD: Tourism and Marketing. 5 First Read: 20-FEB-18. Page 0 1 SB325 2 191811-1 3 By Senator Sanford 4 RFD: Tourism and Marketing 5 First Read: 20-FEB-18 Page 0 1 191811-1:n:02/20/2018:AHP/tj LSA2018-837 2 3 4 5 6 7 8 SYNOPSIS: Under existing law, there are no regulations

More information

Arqiva Limited - Spectrum Access 28GHz Licence Company Registration no: First Issued 30 January Licence Number: /01/17

Arqiva Limited - Spectrum Access 28GHz Licence Company Registration no: First Issued 30 January Licence Number: /01/17 Office of Communications (Ofcom) Wireless Telegraphy Act 2006 SPECTRUM ACCESS LICENCE 28GHz The spectrum authorised under this Licence was formerly authorised under licences issued by Ofcom on 05 July

More information

Company Profile. Company Name. Shima Seiki Mfg., Ltd. (Stock code: 6222) President. Mitsuhiro Shima

Company Profile. Company Name. Shima Seiki Mfg., Ltd. (Stock code: 6222) President. Mitsuhiro Shima Company Profile Company Name President Main Business Established Capital Headquarters Shima Seiki Mfg., Ltd. (Stock code: 6222) Mitsuhiro Shima Manufacture and sale of computerized flat knitting machines,

More information

KKR Credit Advisors (Ireland) Unlimited Company PILLAR 3 DISCLOSURES

KKR Credit Advisors (Ireland) Unlimited Company PILLAR 3 DISCLOSURES KKR Credit Advisors (Ireland) Unlimited Company KKR Credit Advisors (Ireland) Unlimited Company PILLAR 3 DISCLOSURES JUNE 2017 1 1. Background The European Union Capital Requirements Directive ( CRD or

More information

Bulk Electric System Definition Reference Document

Bulk Electric System Definition Reference Document Bulk Electric System Definition Reference Document January, 2014 This draft reference document is posted for stakeholder comments prior to being finalized to support implementation of the Phase 2 Bulk

More information

Certificate by the Architect: Certified that no addition and deletion has been made to the tender documents downloaded from the IIT Madras web site.

Certificate by the Architect: Certified that no addition and deletion has been made to the tender documents downloaded from the IIT Madras web site. INDIAN INSTITUTE OF TECHNOLOGY MADRAS ENGINEERING UNIT CHENNAI 600 036 NOTICE INVITING TENDERS FOR APPOINTMENT OF ARCHITECTURAL CONSULTANT No: 35/ ARC / 2013 14 TECHNICAL BID COVER 2 NAME OF WORK: Providing

More information

pill Los Angeles World Airports

pill Los Angeles World Airports C Y, pill Los Angeles World Airports REPORT TO THE BOARD OF AIRPORT.l COMMISSIONERS Meeting Date: '_`. _. _.. Dominic Nessi, Chief Information Officer 8/20/2015 h Steve Martin, Chief Operating Office CAO

More information

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

TABLE OF CONTENTS. Sr No

TABLE OF CONTENTS. Sr No TABLE OF CONTENTS Sr No Contents Page No. 1. Basics of Knitting 1 2. About warp knitting machine operations 2 3. Warp knitting machine parts 3 4. Operations involved in warp knitting machine 6 5. Operating

More information

Definition of Bulk Electric System Phase 2

Definition of Bulk Electric System Phase 2 Definition of Bulk Electric System Phase 2 NERC Industry Webinar Peter Heidrich, FRCC, Standard Drafting Team Chair June 26, 2013 Topics Phase 2 - Definition of Bulk Electric System (BES) Project Order

More information

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

Support R&D and Innovation in Portugal 2020

Support R&D and Innovation in Portugal 2020 Support R&D and Innovation in Portugal 2020 Director of Regional Policy Unit Conceição Moreno Lisboa, 2014, October, 09 Portugal 2020 Growth based on knowledge and innovation - with priorities in the areas

More information

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 01 33 00 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

GOVERNMENT OF ROMANIA

GOVERNMENT OF ROMANIA GOVERNMENT OF ROMANIA DEPARTMENT FOR INFRASTRUCTURE PROJECTS AND FOREIGN INVESTMENT CONCESSION OF PERIMETERS AND NEGOTIATION OF THE CONDITIONS FOR THE PROJECTS CONCERNING EXTRACTION AND EXPLOITATION OF

More information

Family & Consumer Science Pre-fair Skills Contest Guidebook KNITTING & CROCHETING

Family & Consumer Science Pre-fair Skills Contest Guidebook KNITTING & CROCHETING Family & Consumer Science Pre-fair Skills Contest Guidebook KNITTING & CROCHETING Hood River County Updated: March 2016 Contents 2 Introduction 3 Knitting Skills Contest 7 Crocheting Skills Contest Introduction

More information

ITB TECHNICAL APPROVAL AT /2011

ITB TECHNICAL APPROVAL AT /2011 INSTYTUT TECHNIKI BUDOWLANEJ P L 0 0 6 1 1 W A R S A W, u l. F I L T R O W A 1 Phone: (48 22) 825-04-71; (48 22) 825-76-55; fax (48 22) 825-52-86 M e m b e r o f t h e E u r o p e a n U n i o n o f A g

More information

Capacity Market Prequalification

Capacity Market Prequalification Capacity Market Prequalification T-4 Auction December 2016 Early Auction January 2017 Transitional Arrangement Auction March 2017 Guidance document for Capacity Market participants Capacity Market Prequalification

More information

the LACIS TAPESTRY TABLE LOOM

the LACIS TAPESTRY TABLE LOOM LF11 the LACIS TAPESTRY TABLE LOOM Front Frame Bar Heddles Heddle Rod Back Frame Bar Rod Support Elastic Leg Bar Side Frame Bar Rod The LACIS TAPESTRY TABLE LOOM incorporates a novel shed changing device

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 01 3300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

SECTION - II BID DATA SHEET

SECTION - II BID DATA SHEET SECTION - II BID DATA SHEET Kenya Power and Lighting Company II - 1 Contract: A36 SECTION -II BID DATA SHEET The following bid-specific data for the plant and equipment to be procured shall amend and/or

More information

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 General

More information

UK Broadband Ltd - Spectrum Access 28 GHz Licence Company Registration no: First Issued 22 July Licence Number: /01/18

UK Broadband Ltd - Spectrum Access 28 GHz Licence Company Registration no: First Issued 22 July Licence Number: /01/18 Office of Communications (Ofcom) Wireless Telegraphy Act 2006 SPECTRUM ACCESS LICENCE 28 GHz This Licence replaces the version of the licence issued by Ofcom on 18 February 2016 to UK Broadband Limited.

More information

Sunray Shawl. by dunkelgrün.

Sunray Shawl. by dunkelgrün. Sunray Shawl by dunkelgrün. This pattern is perfect for a 100g [3.5 oz] skein of handspun yarn in sport to fingering weight (approx. 404 yds) lying around in your stash! It has a wide wingspan and a semicircular

More information

Bid #3990DB - Two Way Motorola Radio System District Wide Upgrade

Bid #3990DB - Two Way Motorola Radio System District Wide Upgrade LAKE COUNTY SCHOOLS Leading our Children to Success Procurement Services 29529 CR 561 Tavares FL 32778 (352) 253-6760 Fax: (352) 253-6761 http://lake.k12.fl.us Superintendent: School Board Members: Susan

More information

Coordinate finger jointer operations in solid wood manufacturing

Coordinate finger jointer operations in solid wood manufacturing Coordinate finger jointer operations in solid wood manufacturing 4547 version 5 Page 1 of 5 Level 4 Credits 20 Purpose People credited with this unit standard are able to: demonstrate knowledge of finger

More information

-and- (the Artist ) maquette means the drawing or model, prepared by the Artist, of the proposed Art Work;

-and- (the Artist ) maquette means the drawing or model, prepared by the Artist, of the proposed Art Work; THIS AGREEMENT made in triplicate this th day of, 200 BETWEEN: CITY OF OTTAWA (the City -and- (the Artist WHEREAS the Council of the former City of Ottawa, an old municipality as defined in the City of

More information

Answer: Qualification statement should be provided with the bid.

Answer: Qualification statement should be provided with the bid. Little Diversified Architectural Consulting, Inc. 5815 Westpark Drive Charlotte, North Carolina 28217 Phone: 704-525-6350 Fax: 704-561-8700 Lincoln County Probation Renovation 208 N. Government Street

More information

STANDARD SPECIFICATION FOR CONTRACTOR'S DRAWING AND DATA TRANSMITTAL CONTRACTOR S DRAWING AND DATA TRANSMITTAL STANDARD SPECIFICATION FOR

STANDARD SPECIFICATION FOR CONTRACTOR'S DRAWING AND DATA TRANSMITTAL CONTRACTOR S DRAWING AND DATA TRANSMITTAL STANDARD SPECIFICATION FOR THE ISRAEL ELECTRIC CORPORATION LTD. ENGINEERING PROJECTS GROUP SPECIFICATION No. 01-1E/S STANDARD SPECIFICATION FOR STANDARD SPECIFICATION FOR CONTRACTOR'S DRAWING AND DATA TRANSMITTAL CONTRACTOR S DRAWING

More information

Warp Knitting Basics. March 26, Ja n-15 1

Warp Knitting Basics. March 26, Ja n-15 1 Warp Knitting Basics March 26,2010 16-Ja n-15 1 Weft Warp 16-Ja n-15 2 Warp Knits--the possibilities 16-Ja n-15 3 16-Ja n-15 4 16-Ja n-15 5 Needle Technology Until relatively recently warp knitting machines

More information

Basic Design 2: design experiments and knitting 2.0cr

Basic Design 2: design experiments and knitting 2.0cr Basic Design 2: design experiments and knitting 2.0cr Ladok code: 51FM20 Written examination for: DMODE Student code: Exam date: 2017-04-21 Time: 14.00-17.30 Allowed equipment: lens (lupp), pencils, scissor,

More information

Procurement UNDP Sudan

Procurement UNDP Sudan United Nations Development Programme REQUEST FOR QUOTATION Procurement UNDP Sudan Number: RFQ/DDR/KRT/2010/026 IMPORTANT: ALL CORRESPONDENCE MUST SHOW THE REQUEST FOR QUOTATION NUMBER NAME & ADDRESS OF

More information

Heritage Silk Diamonds Are Forever Shawl

Heritage Silk Diamonds Are Forever Shawl FW196 Heritage Silk Diamonds Are Forever Shawl Designed by Laurie Beardsley Diamonds Are Forever Shawl Designed by Laurie Beardsley Size: 62 long x 20 wide at deepest point (157.5 cm x 51 cm) Gauge: 22

More information

INTERNATIONAL DRAUGHTS FEDERATION. Member of TAFISA

INTERNATIONAL DRAUGHTS FEDERATION. Member of TAFISA INTERNATIONAL DRAUGHTS FEDERATION Member of TAFISA Dobrich Region, Municipality Balchik, Kranevo, Chernomorska str. 41, 9649 Bulgaria, UIC 176513387 tel.+79219562001, e-mail: e-mail: office@idf64.org,vlangin@yandex.ru,

More information