DOUBELL JUMBO MK II OPERATIONS GUIDE DOUBELL JUMBO MK II OPERATIONS MANUAL DOUBELL JUMBO MK II

Size: px
Start display at page:

Download "DOUBELL JUMBO MK II OPERATIONS GUIDE DOUBELL JUMBO MK II OPERATIONS MANUAL DOUBELL JUMBO MK II"

Transcription

1 DOUBELL JUMBO MK II The world of brick-making can be likened to making a cup of coffee. Even when you have a coffee-machine, you still must adjust the strength until you get the coffee you want. Making a brick is the same - you must experiment with the mixture ratios that you put into the machine until you get the brick you want. The actual operating of the machine is far simpler & this guide will help you understand the machine by providing an overview of everything affecting the operation of the Jumbo MK II. As you become experienced with the machine, you may find your own tips & tricks - please contact us & tell us all about your discoveries! Copyright Doubell Machines & Equipment 1

2 1 Setup Setting up the Jumbo MK II is a simple checklist procedure. Before starting the brick-making operation, please ensure that your machine is at the "ready" position by following this checklist of tasks. 1.1 Fit the Mould If there is a mould fitted, remove it by doing the following: Release the arm catches to lower the tamper into the mould-box Loosen & remove the bolts of the carrier plate attaching the tamper Loosen & remove the bolts of the mould bracket, attaching the mould-box Remove the rear wheel brackets Slide out the mould DOUBELL JUMBO MK II OPERATIONS GUIDE The new mould is fitted in reverse: Remove rear wheel brackets Slide in entire mould Raise mould arm to lower mould bracket into mould box Raise tamper arm to lower the carrier plate onto the tamper Fit & tighten bolts on mould bracket attaching the mould box Adjust tamper left/right & forward/back until footplates are not touching the inside of the mould box Fit & tighten bolts on the carrier plate attaching the tamper Replace rear wheel brackets Adjustments to the tamper can be made by lifting the tamper up so that the footplates are level with the top of the mould box. If the tamper is not dead centre (i.e. the footplates are touching the mould box anywhere) then loosen the bolts attaching the carrier plate to the tamper, adjust the tamper accordingly & re-tighten the bolts. 1.2 Adjust the Wheel Brackets Different moulds have different heights. To cater for this, the machine height relative to the mould height must be adjusted. The setting is correct when the mix bin is flush (aligned) with the top of the mould box. The height of the machine is changed by taking the bolts out of the wheel brackets, sliding them up/down until the desired height is achieved & replacing the bolts. 1.3 Vibrator If your machine is fitted with a vibrator, ensure that oil & petrol/diesel levels are optimal. If there are electrical cords, make sure they do not cross any moving parts of the machine such as the mould. Copyright Doubell Machines & Equipment 2

3 For electric vibrators with extension cables running to a power source, be careful than enough slack is given so that the cord never crosses the bricks/blocks & potentially damages them. Have the cord run along the side of the column of blocks if it must be run at the back of the machine. Alternatively, have the cord run from the front & shorten as bricks/blocks are laid. 2 Operation DOUBELL JUMBO MK II OPERATIONS GUIDE The operation of the machine has been broken down into easy-to-follow steps. This instruction set will assume that mix is ready to use & the yard has enough operating space. The number of workers to conduct the machine is decided by you. Usually for optimal operations, it is advised to have 2 workers on the machine. 2.1 Ready Machine The "ready" position of the machine is achieved by making sure the following is set: The machine is clear of bricks/blocks laid Raise mould arms ( mould box on ground ) Locked tamper arms ( tamper raised above mould box ) 2.2 Add Mixture Assuming the mix is of the correct quality, tip the mix from the barrow into the mix bin in the front of the machine. 2.3 Fill Mould With the provided rake, push the mixture back into the open mould box. Continue pushing mix into the mould until all cavities are filled level to the top of the mould box. Remove excess mix for the top by pulling it back with the rake into the front bin. 2.4 Drop Tamper Place one foot onto the brake pedal to prevent the machine from moving about. Release the Tamper Arm catch to drop the tamper onto the mixture in the mould. 2.5 Compact Mix In a manual setting, the tamper is repeatedly raised & then dropped into the mould. This process is repeated until the mixture is compacted to the height correct height of the brick/block. When the shaft nut has been lowered to the top sleeve, the mix has been fully compacted. 2.6 Raise Mould While the tamper is lowered, grip & pull only the mould box arm to raise both the mould box & the tamper. Lock this arm & release foot from brakes. 2.7 Move Machine Pull machine forward until there is a safe distance from the newly laid bricks/blocks. Copyright Doubell Machines & Equipment 3

4 3 Maintenance DOUBELL JUMBO MK II OPERATIONS GUIDE Maintenance is an important part to the working day. Without proper maintenance, poor quality bricks/blocks could be manufactured & the lifetime of the machine severely reduced. Maintenance can divided into the start & end of the work day, for simplicity, as well as a periodical check-up. 3.1 Start of Operation Before the day begins, perform the following tasks: Grease the pillow blocks (bearings that rotate the arms) Grease shafts Tighten carrier plate - shaft nut Tighten all visible nuts / bolts 3.2 End of Operation To lengthen the life of the machine, care must be taken at the end of the work day. CLEANING After the day's work, the residual cement/mix should be cleaned from the machine bin & mould box. For hardened dirt, a metal scraping brush can be used. Hitting the tamper to remove dirt should be avoided as this may damage the legs over time & could affect the quality of the brick/blocks made. STORAGE When the machine is not in use, it should be stored away in a covered area, out of the way of rain or other adverse weather conditions. It is advisable to apply oil/grease to the mould box overnight to minor dirt from hardening. 3.3 Periodical Check springs are still tight enough Check handles & arm catches are not worn out Check for visible cracks in the frame/arms in cases of heavy long- term usage Check mould cavities are still shapely Check mounting rubbers Copyright Doubell Machines & Equipment 4

5 4 Troubleshooting As you become familiar with the machine, you will be able to identify causes to problems encountered & come up with solutions based on your experience & brick-making intuition. Until that time comes, you can refer to this troubleshooting guide for helpful insights. While some problems may have multiple possible causes, we have tried to group difficulties into 2 sections: Machine-Related & Brick-Related. 4.1 Machine-Related These are problems that relate to the brick-making machine The handle won't stay down The catch is broken or the spring is weak Replace catch part or install new springs There is little vibration Weight settings are incorrect Open vibrator & add/adjust weights. Ensure there is a offbalance There is one shaft that s not going up/down Shaft not secured Tighten screw in carrier plate attaching the shaft Copyright Doubell Machines & Equipment 5

6 4.1.4 The mould is higher/lower than the machine Wheel mould brackets are at an incorrect setting Raise/lower wheel brackets until The mould doesn't lift high enough to clear the bricks when done The arm-mould link is at the incorrect setting Adjust arm-mould link bolt to another setting Handles are sticking Pillow-blocks are sticking Grease handle shaft bearings Tamper doesn't fit into mould box smoothly Mould not aligned Loosen mould box & tamper nuts. Adjust until level & squared. Tighten bolts & nuts on the carrier plate & mould brackets. Copyright Doubell Machines & Equipment 6

7 4.2 Brick-Related These are problems that relate to the brick directly Wider at the bottom than at the top The mix is too liquid Add more aggregate/cement to dry the mix more Brick heights differ Carrier plate is not level Check the tamper plate holding the mould to the shaft is level. Adjust with screw on the shaft Mould tamper is not level If the tamper plate is level, use spacers when attaching the mould tamper to ensure that is level as well. Machine not level - Wheel height incorrect Adjust wheel height so machine is level My brick height is too high Insufficient compaction Compact for longer (if manual, more drops. If vibrator, longer cycle) Copyright Doubell Machines & Equipment 7

8 Pallet on static adaptor not thick enough Correct pallet size Machine's shaftstopper nut is at incorrect setting Readjust shaftstopper nut up/down for correct height Bricks are breaking Likely to be from not standing on the brake while vibrating / compacting Stand on brake while compacting Ground not level Lay concrete slab Mix too dry Add more water Bricks behind are breaking Vibration is transferred along the ground Thicker concrete slab or wider gap between drops Copyright Doubell Machines & Equipment 8

DOUBELL JUMBO SERIES OPERATIONS GUIDE

DOUBELL JUMBO SERIES OPERATIONS GUIDE Applicable Codes: JJM, JJMEVSP, JJMEV3P, JJMPV, JJMDV JJJM, JJJMEVSP, JJJMEV3P, JJJMPV, JJJMDV For any questions pertaining to this guide, contact us: EMAIL: sales@dme.co.za TEL: +27 41 5859060 1 CONTENTS:

More information

Replacing the Reciprocator on the SWF Compact Series Machine (601C and 1201C)

Replacing the Reciprocator on the SWF Compact Series Machine (601C and 1201C) Follow the instructions below to replace the reciprocator in the SWF Compact series machines. The tools required can be found in the tool kit that came with the machine. Preparation 1. First, place the

More information

STENCIL MACHINE OPERATION uline.com H-259, H-347 H-408 CUTTING THE OIL BOARD INSERTING THE OIL BOARD

STENCIL MACHINE OPERATION uline.com H-259, H-347 H-408 CUTTING THE OIL BOARD INSERTING THE OIL BOARD H-259, H-347 H-408 π STENCIL MACHINE 1-800-295-5510 uline.com OPERATION NOTE: No assembly is necessary after you unpack your machine. INSERTING THE OIL BOARD 1. Move the release lever to the right. This

More information

Q-Zone Hoop-Frame. Assembly Instructions. Copyright July 11, 2018 Grace Company (Reproduction Prohibited) Version 1.8

Q-Zone Hoop-Frame. Assembly Instructions. Copyright July 11, 2018 Grace Company (Reproduction Prohibited) Version 1.8 Q-Zone Hoop-Frame Assembly Instructions Copyright July 11, 2018 Grace Company (Reproduction Prohibited) Version 1.8 Table of Contents Table of Contents... i Warranty... ii Parts List Box 1...iii Box 2...

More information

Owner s Manual ODYSSEY BENCH MODEL. O4100B shown REV E. Southern Avenue, Phoenix, AZ USA Workhorseproducts.

Owner s Manual ODYSSEY BENCH MODEL. O4100B shown REV E. Southern Avenue, Phoenix, AZ USA Workhorseproducts. Owner s Manual ODYSSEY BENCH MODEL O4100B shown 67-1375 REV 218 3730 E. Southern Avenue, Phoenix, AZ 85040 USA 800-778-8779 Workhorseproducts.com 1 Table of Contents I. Introduction & Safety Information.

More information

It is highly recommended that you use a thread lock compound such as Loctite brand on all threads to keep them from vibrating loose.

It is highly recommended that you use a thread lock compound such as Loctite brand on all threads to keep them from vibrating loose. Installation instructions for FC12 Forward Controls for Kawasaki Vulcan 750 It is highly recommended that you use a thread lock compound such as Loctite brand on all threads to keep them from vibrating

More information

Installation Instructions for FC2 & FC15 Forward Controls for the Super Magna

Installation Instructions for FC2 & FC15 Forward Controls for the Super Magna Installation Instructions for FC2 & FC15 Forward Controls for the Super Magna It is highly recommended that you use a thread lock compound such as Loctite brand on all threads to keep them from vibrating

More information

ELECTRIC SLIP ROLL MACHINE. Model: ESR-1300X2.5/ESR-1300X4.5 ESR-1550X3.5/ESR-1580X2.0

ELECTRIC SLIP ROLL MACHINE. Model: ESR-1300X2.5/ESR-1300X4.5 ESR-1550X3.5/ESR-1580X2.0 ELECTRIC SLIP ROLL MACHINE Model: ESR-1300X2.5/ESR-1300X4.5 ESR-1550X3.5/ESR-1580X2.0 Operation Manual Table of contents I MAIN SPECIFICATION...2 II SAFETY INSTRUCTIONS.. 2 III OPERATION INSTRUCTIONS..4

More information

Operating, Servicing, and Safety Manual Model " Foot Shear CAUTION: Read and Understand

Operating, Servicing, and Safety Manual Model  Foot Shear CAUTION: Read and Understand Operating, Servicing, and Safety Manual Model 3000 52" Foot Shear CAUTION: Read and Understand These Operating, Servicing, and Safety Instructions, Before Using This Machine. SAFETY The purpose of the

More information

Continuum Frame Assembly Instructions

Continuum Frame Assembly Instructions Continuum Frame Assembly Instructions Copyright January 1, 2017 Jim M. Bagley, GraceWood, Inc (Reproduction Prohibited) Version 2.2 Table of Contents Continuum Frame Table of Contents... i Warranty...ii

More information

Basic steps to time the Gammill quilting machine s rotary sewing hook

Basic steps to time the Gammill quilting machine s rotary sewing hook Basic steps to time the Gammill quilting machine s rotary sewing hook 1.) Turn the machine off and unplug it. 2.) With the needle bar in the raised position, remove the bobbin and bobbin case. 3.) Remove

More information

INSTALLATION MANUAL FORTRESS SERIES

INSTALLATION MANUAL FORTRESS SERIES Guardian Security Structures TEL 1-406-212-2334 EMAIL rg@gssdoors.com WEB www.gssdoors.com FORTRESS SERIES GENERAL INSTALLATION GUIDELINES 1. The door frame is installed using 16 bolt screws 7,5 mm in

More information

M4 Foot Operated Underpinner Instruction Manual

M4 Foot Operated Underpinner Instruction Manual M4 Foot Operated Underpinner Instruction Manual M4 Walker Rd, Bardon Hill, Coalville, Leicestershire LE67 1TU, England Tel. +44 (0)130 1692, Fax +44 (0)130 16929 e mail sales@framerscorner.co.uk M4 Underpinner

More information

Installation instructions for FC14S Forward Controls for Shadow ACE and Aero 1100

Installation instructions for FC14S Forward Controls for Shadow ACE and Aero 1100 Installation instructions for FC14S Forward Controls for Shadow ACE and Aero 1100 It is highly recommended that you use a thread lock compound such as Loctite brand on all threads to keep them from vibrating

More information

ABM International, Inc. Navigator Assembly Manual

ABM International, Inc. Navigator Assembly Manual ABM International, Inc. 1 1.0: Parts List Tablet (Qty. 1) Tablet mount (Qty. 1) NOTE: Mount may appear and operate different then image below Control Box (Qty. 1) Motor Power Supply (Qty. 1) 2 X-axis motor

More information

Side Winder R o u t e r L i f t.

Side Winder R o u t e r L i f t. Woodpeckers PRECISION WOODWORKING TOOLS Side Winder R o u t e r L i f t. INSTALLATION INSTRUCTIONS The wrench handle must be pointing left in order to fully insert or remove it. Lift Wrench Once fully

More information

MODEL H " BYRD SHELIX CUTTERHEAD INSTRUCTIONS

MODEL H  BYRD SHELIX CUTTERHEAD INSTRUCTIONS MODEL H9291 12" BYRD SHELIX CUTTERHEAD INSTRUCTIONS The Model H9291 12" Byrd Shelix cutterhead is designed to replace the straight-knife cutterhead on the Grizzly jointer Model G0609. The total procedure

More information

Copyright MLCS 1

Copyright MLCS 1 Copyright 2007. MLCS 1 WORKING WITH BOX JOINTS Box joints (AKA "Finger Joints") provide a simple, yet equally effective, alternative to dovetail joinery. In particular, they serve well for applications

More information

The Archer Bow Press OPERATING INSTRUCTIONS Partridge Woods Elk Rapids, MI

The Archer Bow Press OPERATING INSTRUCTIONS Partridge Woods Elk Rapids, MI The Archer Bow Press OPERATING INSTRUCTIONS 8203 Partridge Woods Elk Rapids, MI 49629 www.bowforcearchery.com 1 MAINTENANCE AND FINE TUNING Horizontal Pulling Bar The Horizontal Pulling Bar has a break-in

More information

Electric Skein Winder

Electric Skein Winder Electric Skein Winder Assembly and Use Package Contents 1 - Triangular Body (w/ motor) 1 - Cross Arm 1 - Left Foot (w/ yarn guide) 1 - Right Foot 1 - Adjustable Finger (w/ yarn clip) 3 - Adjustable Fingers

More information

LEG CURL IP-S1315 INSTALLATION INSTRUCTIONS

LEG CURL IP-S1315 INSTALLATION INSTRUCTIONS LEG CURL IP-S35 INSTALLATION INSTRUCTIONS Copyright 2009. Star Trac by Unisen, Inc. All rights reserved, including those to reproduce this book or parts thereof in any form without first obtaining written

More information

AUTO STABILIZING AND LEVELLING SYSTEM

AUTO STABILIZING AND LEVELLING SYSTEM Installation Manual Make sure the caravan is parked in a safe place. Make sure the caravan brake is on. Remove all 4 corner steady legs from the caravan. Remove the corner steady legs by removing the 3

More information

TABLE OF CONTENTS DRAWINGS

TABLE OF CONTENTS DRAWINGS TABLE OF CONTENTS Bifold Door Adjustment Procedures...pg 4 Bifold Door Maintenance...pg 6 Safety Concerns...pg 9 Troubleshooting...pg 10 Bifold Door Maintenance Checklist...pg 11 DRAWINGS EK 1880 Bifold

More information

The Phoenix. Professional Quilting Frame. Copyright January 1, 2016 Jim M. Bagley, GraceWood, Inc (Reproduction Prohibited) Version 2.

The Phoenix. Professional Quilting Frame. Copyright January 1, 2016 Jim M. Bagley, GraceWood, Inc (Reproduction Prohibited) Version 2. The Phoenix Professional Quilting Frame Copyright January 1, 2016 Jim M. Bagley, GraceWood, Inc (Reproduction Prohibited) Version 2.1 1 The Phoenix Professional Quilting Frame Parts List Box 1...3 Box

More information

ICU TRACKLESS SLIDING DOOR

ICU TRACKLESS SLIDING DOOR Interior View 0 Installation Instructions Tools Required: Screwdrivers Small Straight (Flat Blade) - for Terminal Block wiring # Phillips (Crosspoint) - for various #8, #0, and #4 screws Wrenches / Sockets

More information

Installation And Care Instructions. Vertical Honeycomb Shades

Installation And Care Instructions. Vertical Honeycomb Shades Installation And Care Instructions Vertical Honeycomb Shades Rev 5/2013 Table Of Contents Getting Started... 3 Parts Overview... 4 Materials Required... 5 Tools Required... 6 Outside Mount Installation...

More information

400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS

400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS 12/11/07 PAGE 1 OF 12 400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS Thank you for purchasing our product! *Please read these instructions

More information

Assembly Instructions 10 X 10 Aluminum Roof Support

Assembly Instructions 10 X 10 Aluminum Roof Support Assembly Instructions 10 X 10 Aluminum Roof Support Aluminum Roof Support Bolt Package 16-5/16 X 2 ¼ SS Bolt 24-5/16 X 1 SS Bolt 40-5/16 SS Nylon Lock Nuts 16-5/16 SS Flat Washers 28-4 ½ Wood Screws 36-1

More information

SERVICE MANUAL MODEL: 13512, 14412, 15312

SERVICE MANUAL MODEL: 13512, 14412, 15312 SERVICE MANUAL MODEL: 13512, 14412, 15312 CONTENTS TROUBLESHOOTING... 1-3 SERVICE ACCESS (1) FACE COVER, BELT COVER... 4 SERVICE ACCESS (2) BASE PLATE... 5 SERVICE ACCESS (3) FRONT COVER... 6 SERVICE ACCESS

More information

INSTALLATION AND CARE INSTRUCTIONS

INSTALLATION AND CARE INSTRUCTIONS INSTALLATION AND CARE INSTRUCTIONS Vertical Applications Honeycomb Shades 52 C8-10-3401 Rev 2/14 CONTENTS Introduction...2 Before You Begin...3 Vertical Application Parts Overview...4 Materials Required...5

More information

PROPELLER SHAFT PROPELLER SHAFT PR 1

PROPELLER SHAFT PROPELLER SHAFT PR 1 PR1 PR2 Precaution PRECAUTION Be careful not to grip the propeller shaft tube too tightly in the vise as this will cause deformation. TROUBLESHOOTING Problem Possible cause Remedy Page Noise Sleeve yoke

More information

Depending on the size you ordered you will have either 5 Foot sections which will build the 10 Foot frame or 6 Foot sections which will build the 12

Depending on the size you ordered you will have either 5 Foot sections which will build the 10 Foot frame or 6 Foot sections which will build the 12 XL Quilting Frame 1 Depending on the size you ordered you will have either 5 Foot sections which will build the 10 Foot frame or 6 Foot sections which will build the 12 Foot frame Printed 2 June 2014 Updated

More information

Star Trac Turbo Trainer Assembly & Setup

Star Trac Turbo Trainer Assembly & Setup Star Trac Turbo Trainer Use the following procedures to unpack and assemble your Turbo Trainer manufactured by Star Trac. UNPACKING AND PARTS LIST Position the shipping carton so the Heavy End logo is

More information

The Queen Quilter Professional Quilters Kit Frame

The Queen Quilter Professional Quilters Kit Frame The Queen Quilter Professional Quilters Kit Frame Assembly Instructions Table of Contents: Before you begin......................... Pg. 2 Wood parts............................. Pg. 3 Hardware..............................

More information

1. Turn off or disconnect power to unit (machine). 2. Push IN the release bar on the quick change base plate. Locking latch will pivot downward.

1. Turn off or disconnect power to unit (machine). 2. Push IN the release bar on the quick change base plate. Locking latch will pivot downward. Figure 1 Miniature Quick Change Applicators, of the end feed type, are designed to crimp end feed strip terminals to prestripped wires. Each applicator is set up to accept the strip form of certain specific

More information

SPIDA SAW OPERATIONS MANUAL

SPIDA SAW OPERATIONS MANUAL SPIDA SAW OPERATIONS MANUAL CM SERIAL NUMBER. OCTOBER 2000 CONTENTS Page description 1.) Contents 2.) Safety First 3.) CM Overview 4.) CM Specifications 5.) CM Installation 6.) CM Operation Setting the

More information

52 5 N. Instructions & Parts List. From the library of: Superior Sewing Machine & Supply LLC

52 5 N. Instructions & Parts List. From the library of: Superior Sewing Machine & Supply LLC 52 5 N Instructions & Parts List z L.f) N L!) _J w 0 0 ~ INSTRUCTION BOOK FOR MODEL 5 2 5 N 1. Starting. Attach the operation handle (No.54) to the machine and after confirming that the switch (No.56)

More information

Machine Quilting Frame assembly, and instruction manual

Machine Quilting Frame assembly, and instruction manual Machine Quilting Frame assembly, and instruction manual Table of Contents Parts List................. Pg. 2 Step 1 - Legs............... Pg. 4 Step 2 - Lower Leg Brace....... Pg. 5 Step 3 - Frame Ends..........

More information

MK52 Series ULTRA-LOW FREQUENCY VIBRATION ISOLATION WORKSTATION ASSEMBLY AND OPERATION INSTRUCTIONS

MK52 Series ULTRA-LOW FREQUENCY VIBRATION ISOLATION WORKSTATION ASSEMBLY AND OPERATION INSTRUCTIONS MK52 Series ULTRA-LOW FREQUENCY VIBRATION ISOLATION WORKSTATION ASSEMBLY AND OPERATION INSTRUCTIONS i Information contained in this document is subject to change without notice and does not represent a

More information

MODUS 770 AND MODUS 1280 (FLAT PACK) OPERATIONAL, ASSEMBLY & FIXING INSTRUCTION LEAFLET

MODUS 770 AND MODUS 1280 (FLAT PACK) OPERATIONAL, ASSEMBLY & FIXING INSTRUCTION LEAFLET MODUS 770 AND MODUS 1280 (FLAT PACK) TM TM OPERATIONAL, ASSEMBLY & FIXING INSTRUCTION LEAFLET NOTE: Ensure that all relevant personnel read the points listed below and that a copy is passed on to staff

More information

Ford / Opel, GM Rose Joint Kit Instruction Booklet GGT-570 For use on car or out of car replacement

Ford / Opel, GM Rose Joint Kit Instruction Booklet GGT-570 For use on car or out of car replacement Ford / Opel, GM Rose Joint Kit Instruction Booklet GGT-570 For use on car or out of car replacement 1 of 12 GGT-570 General Instructions Introduction: The GGT-570 Rose Joint kit suits both Ford and Opel

More information

INSTALLATION INSTRUCTIONS FOR HAND OPERATED MODELS: 170, 171-R, 171-N, 172, 260

INSTALLATION INSTRUCTIONS FOR HAND OPERATED MODELS: 170, 171-R, 171-N, 172, 260 INSTALLATION INSTRUCTIONS FOR HAND OPERATED MODELS: 170, 171-R, 171-N, 172, 260 I. SUSPENDED INSTALLATIONS NOTE: MODEL 260 FENSTEEL TRACK IS ASSEMBLED IN THE SAME MANNER AS DESCRIBED BELOW WITH THE EXCEPTION

More information

Assembly Instructions 10 X 10 Aluminum Frame Building

Assembly Instructions 10 X 10 Aluminum Frame Building Assembly Instructions 10 X 10 Aluminum Frame Building 27 97 9 8 47 36 74 52 10 10 X 10 Square Building W/ Dome Includes: The Steel Entry Door with a Dead Bolt Lock assembly and Aluminum Door Frame. Metal

More information

Hydraulic Clamp Carrier. Installation & Operation Manual

Hydraulic Clamp Carrier. Installation & Operation Manual Hydraulic Clamp Carrier Installation & Operation Manual Hydraulic Clamp Carrier Installation & Operation Manual Quick Machinery Company 8272 Peninsula Drive Kelseyville, CA 95451 phone: (707) 272-6719

More information

Installation instructions for FC9 & FC18 Forward Controls for Yamaha V-Max

Installation instructions for FC9 & FC18 Forward Controls for Yamaha V-Max Installation instructions for FC9 & FC18 Forward Controls for 1985-2007 Yamaha V-Max It is highly recommended that you use a thread lock compound such as Loctite brand on all threads to keep them from

More information

Inventory (Figure 2)

Inventory (Figure 2) MODEL T10127 12" SPIRAL CUTTERHEAD INSTRUCTIONS The Model T10127 indexable insert spiral cutterhead is designed to replace the straightknife cutterhead from the Grizzly jointer Model G0609. The total procedure

More information

6. Brakes. 6.1 Disc Brakes. General Notes on Disc Brakes

6. Brakes. 6.1 Disc Brakes. General Notes on Disc Brakes 6. Brakes 6.1 Disc Brakes General Notes on Disc Brakes There are a number of points to observe with disc brakes, this applies to both hydraulically and mechanically operated brakes and to those of all

More information

INSTALLATION AND CARE INSTRUCTIONS

INSTALLATION AND CARE INSTRUCTIONS INSTALLATION AND CARE INSTRUCTIONS Vertical Applications Honeycomb Shades CONTENTS Introduction...2 Before You Begin...3 Vertical Application Parts Overview...4 Materials Required...5 Tools Required...6

More information

TOOLS REQUIRED Metal Wood Wood and Metal Screws. #16 Drill #12-24 Tap. 1/8 Drill

TOOLS REQUIRED Metal Wood Wood and Metal Screws. #16 Drill #12-24 Tap. 1/8 Drill DEVICES COVERED IN THIS DOCUMENT: 4700S Surface Vertical Rod Device 4700SF Fire Exit Surface Vertical Rod Device TOOLS REQUIRED Metal Wood Wood and Metal Screws Sex Bolts #7 Drill ¼ -20 Tap #16 Drill #12-24

More information

Pneumatic Clamp Carrier. Installation & Operation Manual

Pneumatic Clamp Carrier. Installation & Operation Manual Pneumatic Clamp Carrier Installation & Operation Manual Pneumatic Clamp Carrier Installation & Operation Manual Quick Machinery Company 8272 Peninsula Drive Kelseyville, CA 95451 phone: (707) 272-6719

More information

Brother Industries, Ltd. Nagoya, Japan

Brother Industries, Ltd. Nagoya, Japan 4. 2001. This service manual has been compiled for explaining repair procedures of the MODEL XL-6562, XL6452, XR- 46. This was produced based on up-to-date product specifications at the time of issue,

More information

SERVICE MANUAL AND PARTSLIST

SERVICE MANUAL AND PARTSLIST SERVICE MANUAL AND PARTSLIST Next 20 CONTENTS WHAT TO DO WHEN... 1~3 SERVICE ACCESS FACE COVER... 4 TOP COVER... 4 BASE COVER... 5 REAR COVER... 6 FRONT COVER... 7 MECHANICAL ADJUSTMENT NEEDLE THREAD TENSION...

More information

Horizontal and Vertical. Metal Cutting Band Saw MODEL: BS-115

Horizontal and Vertical. Metal Cutting Band Saw MODEL: BS-115 Horizontal and Vertical Metal Cutting Band Saw MODEL: BS-5 SAFETY. Know your band saw. Read the operator s Manual carefully. Learn the operations, applications and limitation.. Use recommended accessories.

More information

ATD AMP Variable Speed Reciprocating Saw Owner s Manual

ATD AMP Variable Speed Reciprocating Saw Owner s Manual ATD-10535 7 AMP Variable Speed Reciprocating Saw Owner s Manual Manufactured in China To ATD Tools, Inc. Specifications TECHNICAL SPECIFICATIONS Voltage: 120V Frequency: 60Hz Power input: 7 Amps No load

More information

3 in 1 (Lawn mower/aerator/raker)

3 in 1 (Lawn mower/aerator/raker) 3 in (Lawn mower/aerator/raker) CAUTION: Before using this product, read this manual and follow all Safety Rules and Operating Instructions. Safety Assembly Operation Maintenance Parts TABLE OF CONTENTS

More information

C70 Window Roller Repair Taken from: Heres the problem:

C70 Window Roller Repair Taken from:  Heres the problem: C70 Window Roller Repair Taken from: http://www.volvospeed.com/vs_forum/topic/115086-how-to-c70-window-rollers-permanent-fix/ Heres the problem: This happened to two separate window assemblys on my c70

More information

Pneumatic Clamp Carrier. Installation & Operation Manual

Pneumatic Clamp Carrier. Installation & Operation Manual Pneumatic Clamp Carrier Installation & Operation Manual Pneumatic Clamp Carrier Installation & Operation Manual Quick Machinery Company 8272 Peninsula Drive Kelseyville, CA 95451 phone: (707) 272-6719

More information

Geology, Prospectors, Mining, Metallurgy, Assaying, Environmental, Geotechnical

Geology, Prospectors, Mining, Metallurgy, Assaying, Environmental, Geotechnical LEGEND INC. Geology, Prospectors, Mining, Metallurgy, Assaying, Environmental, Geotechnical 988 Packer Way Sparks, NV 89431 Tel: (786) 786-3003 Fax: (775) 786-3613 Email: info@lmine.com Web: www.lmine.com

More information

Quick Set Dovetail Jig

Quick Set Dovetail Jig Quick Set Dovetail Jig FOR HELP OR ADVISE ON THIS PRODUCT PLEASE CALL OUR CUSTOMER SERVICE HELP LINE : 01509 500359 THE MANUFACTURER RESERVES THE RIGHT TO ALTER THE DESIGN OR SPECIFICATION TO THIS PRODUCT

More information

Maintenance & Parts list for:

Maintenance & Parts list for: Maintenance & Parts list for: Industrial gun GB 2 Juni 2017 This Maintenance & Parts list for industrial gun is prepared by : Winchester Europe Service V. Parbst & Søn as a comprehensive maintenance guide

More information

OPERATIONS MANUAL. Port-O-Slitter

OPERATIONS MANUAL. Port-O-Slitter Tapco Products Company The World Leader in Specialty Tools for the Professional Port-O-Slitter OPERATIONS MANUAL General instructions, set up, accessories and guide to using your portable precision slitting,

More information

Before use please read & understand this manual, paying particular attention to the safety instructions.

Before use please read & understand this manual, paying particular attention to the safety instructions. OPERATOR S MANUAL AND PARTS LIST 12 HAND PUSH ROLLER MOWER - THHMR Sales & Helpline 01793 333220 www.thehandy.co.uk Before use please read & understand this manual, paying particular attention to the safety

More information

Installation Instructions Parasol Cellular Shades

Installation Instructions Parasol Cellular Shades Installation Instructions Parasol Cellular Shades SlideArch CONTENTS Getting Started: Product View...1 Tools and Fasteners Needed...2 Installation: Installation Overview... Mount the Installation s Inside

More information

Vertical Honeycomb Shades

Vertical Honeycomb Shades Step by Step Installation Instructions Vertical Honeycomb Shades Customer Service 800.248.8888 or visit us online at smithandnoble.com Thank you for purchasing from Smith+Noble. Your new shades have been

More information

Pet Door Panel Installation Manual

Pet Door Panel Installation Manual Pet Door Panel Installation Manual 400-558-1 1 4/3/03, 3:26 PM Components: Pet Door Panel Panel Latch Assembly Foam Weather-stripping Glass Sweep (4) Binding Posts (6) #6 x 1/2 Sheet Metal Screws (4) 8-32

More information

Operating Manual. for CUTTING, PERFORATING, BENDING SLB120

Operating Manual. for CUTTING, PERFORATING, BENDING SLB120 Operating Manual for CUTTING, PERFORATING, BENDING SLB120 31040\B06eng 0896 0 Contents 1. Scope of delivery... 1 2. Technical specifications... 1 3. Applications... 1 4. Commissioning... 2 5. Cutting...

More information

Astro-Physics Inc. 400QMD Lubrication/Maintenance Guide

Astro-Physics Inc. 400QMD Lubrication/Maintenance Guide Astro-Physics Inc. 400QMD Lubrication/Maintenance Guide The following guidelines should be followed to lubricate the three main parts of the 400QMD mount. The QMD stands for Quartz Micro-Drive controller.

More information

Slab rollers Guion Road Indianapolis, Indiana USA (800) Fax: (317)

Slab rollers Guion Road Indianapolis, Indiana USA (800) Fax: (317) Slab rollers 6060 Guion Road Indianapolis, Indiana 46254-1222 USA (800) 374-1600 Fax: (317) 248-9300 www.amaco.com Dear Customer, We hope you enjoy your new brent slab roller. Many different people are

More information

Inventory (Figure 2)

Inventory (Figure 2) MODEL T10130/T10126 6" & 8" SPIRAL CUTTERHEAD INSTRUCTIONS The Model T10126/T10130 indexable insert spiral cutterheads are designed to replace straightknife cutterheads from the Grizzly jointer Models

More information

Assembly Instructions: AM-10 Hand & Foot Cycle Early Intervention Part #: 50-HFC-0105

Assembly Instructions: AM-10 Hand & Foot Cycle Early Intervention Part #: 50-HFC-0105 Assembly Instructions: AM-10 Hand & Foot Cycle Early Intervention Part #: 50-HFC-0105 Refer to the following instructions on how to assemble your tryke. Study the instructions carefully before beginning

More information

MODEL T TON HYDRAULIC PRESS INSTRUCTIONS (For Machines Mfd. Since 10/17)

MODEL T TON HYDRAULIC PRESS INSTRUCTIONS (For Machines Mfd. Since 10/17) MODEL T1241 20-TON HYDRAULIC PRESS INSTRUCTIONS (For Machines Mfd. Since 10/17) For questions or help with this product contact Tech Support at (570) 546-9663 or techsupport@grizzly.com Identification

More information

Installation and Assembly: Flat Video Wall Mount For 40" to 65" Flat Panel Displays

Installation and Assembly: Flat Video Wall Mount For 40 to 65 Flat Panel Displays Installation and Assembly: Flat Video Wall Mount For 40" to 65" Flat Panel Displays Model: DS-VW665 Maximum Load Capacity: 125 lb (57 kg) 1 of 11 ISSUED: 03-22-12 SHEET #: 125-9288-4 06-25-13 NOTE: Read

More information

PROFESSIONAL FLARING TOOL 001ERL 37 & ERL 37

PROFESSIONAL FLARING TOOL 001ERL 37 & ERL 37 PROFESSIONAL FLARING TOOL 001ERL 37 & 45 002ERL 37 001ERL shown here OWNER S MANUAL 199R11215 EDUCATIONAL TIPS Make sure the end of the tube is cut off square. Before flaring, make sure the die clamp is

More information

ICU TRACK SLIDING DOOR

ICU TRACK SLIDING DOOR Interior View 0 Installation Instructions Tools Required: Screwdrivers Small Straight (Flat Blade) - for Terminal Block wiring # Phillips (Crosspoint) - for various #8, #0, and # screws Wrenches / Sockets

More information

Durst Laborator 138 S

Durst Laborator 138 S Durst Laborator 138 S -I- G139 Durst Laborator 138 S Durst Laborator G 139 Servicing instructions L 1 3 8 S G 139 - Replacing the counterweight spring The special tool required for this purpose is supplied

More information

MODEL W1.0X305A(12 ) MODEL W1.0X610A(24 ) HAND BENDING BRAKE ASSEMBLY&OPERATING INSTRUCTION

MODEL W1.0X305A(12 ) MODEL W1.0X610A(24 ) HAND BENDING BRAKE ASSEMBLY&OPERATING INSTRUCTION MODEL W1.0X305A(12 ) MODEL W1.0X610A(24 ) HAND BENDING BRAKE ASSEMBLY&OPERATING INSTRUCTION 1 SAVE THIS MANUAL You will need the manual for the safety warning and precautions, assembly instructions, operating

More information

Installation Instructions for. Before You Begin TOOLS REQUIRED

Installation Instructions for. Before You Begin TOOLS REQUIRED Composite Railing System STEP-BY-STEP Installation Instructions for Spectrum Composite Railing Virtually maintenance free 20-year warranty EverNew Spectrum Railing system is designed to work with a number

More information

Cam Handle Service Guide

Cam Handle Service Guide Cam Handle Service Guide Page 2. Introduction Page 3. Troubleshooting guide Page 4-5. Adjusting the clamp force Page 6-7. Disassembling, greasing and replacing components Page 8-9. Replacing the post bearings

More information

MBM Sprint 3000 Booklet Maker

MBM Sprint 3000 Booklet Maker MBM Sprint 3000 Booklet Maker Instruction Manual Provided By http://www.mybinding.com http://www.mybindingblog.com SPRINT 3000 BOOKLETMAKER OPERATION MANUAL IMP oper3500.doc Page 1 23/01/2004 CONTENTS

More information

SAFETY AND OPERATING MANUAL. Portable versatile workstation

SAFETY AND OPERATING MANUAL. Portable versatile workstation SAFETY AND OPERATING MANUAL Original instructions Portable versatile workstation wu063 1 2 3 4 5 6 7 8 9 Safety instructions Warning! When using this product basic safety precautions should always be followed.

More information

Replacing the Reciprocator on an SWF Multi-head.

Replacing the Reciprocator on an SWF Multi-head. Replacing the Reciprocator on an SWF Multi-head. Follow the instructions below to replace the reciprocator in the SWF multi-head machines. The tools required are found in the tool kit that came with the

More information

Operating Instructions For Lockformer Button Punch Flanger

Operating Instructions For Lockformer Button Punch Flanger Capacity: 20 to 28 Gauge Galvanize Operating Instructions For Lockformer Button Punch Flanger To satisfactorily form the 90º button punch flange on light gauge materials, it was necessary to form the metal

More information

200A FLB VERTICAL 22113V LIFT W/CHAIN DRIVE WINCH

200A FLB VERTICAL 22113V LIFT W/CHAIN DRIVE WINCH PG. 1 OF 11 PORTA-DOCK, INC. 200A FLB VERTICAL 22113V LIFT W/CHAIN DRIVE WINCH STEP 1. Separate and group like parts and fasteners together. Locate the winch side member with the longer upright tube and

More information

PORTABLE ADJUSTABLE BASKETBALL SYSTEM

PORTABLE ADJUSTABLE BASKETBALL SYSTEM Instruction Manual PORTABLE ADJUSTABLE BASKETBALL SYSTEM P A R T S L I S T 5 1/2 and 8 safe play clearance Item Qty Description Item Qty Description A 1 Portable Base Assembly M 4 1/2 Lock Nut B 2 Front

More information

CONTENTS PRECAUTIONS BEFORE STARTING OPERATION PREPARATION FOR OPERATION CAUTIONS ON USE OPERATION

CONTENTS PRECAUTIONS BEFORE STARTING OPERATION PREPARATION FOR OPERATION CAUTIONS ON USE OPERATION CONTENTS PRECAUTIONS BEFORE STARTING OPERATION ------------------------------------- 1 PREPARATION FOR OPERATION 1. Adjustment of needle bar stop position ---------------------------------------------------------

More information

MODEL H-9 HEAVY DUTY BENCH-TYPE UNDERCUTTER INSTRUCTIONS

MODEL H-9 HEAVY DUTY BENCH-TYPE UNDERCUTTER INSTRUCTIONS MODEL H-9 HEAVY DUTY BENCH-TYPE UNDERCUTTER INSTRUCTIONS CAPACITY: Between centers - 32" long x 12" diameter. Between roller V- supports - 35" long x 17" diameter. Maximum armature weight - 200 lbs. SAW

More information

This product is designed for a water supply pressure range of 20 psi (137kPa) minimum to 80psi (550 kpa) maximum.

This product is designed for a water supply pressure range of 20 psi (137kPa) minimum to 80psi (550 kpa) maximum. We appreciate your commitment to Kohler quality. Please take a few minutes to review this manual before you start installation. If you encounter any installation or performance problems, please don t hesitate

More information

JVice Care and Maintenance Thanks for purchasing a Jvice. If properly looked after your Jvice will give a lifetime of tying pleasure.

JVice Care and Maintenance Thanks for purchasing a Jvice. If properly looked after your Jvice will give a lifetime of tying pleasure. JVice Care and Maintenance Thanks for purchasing a Jvice. If properly looked after your Jvice will give a lifetime of tying pleasure. Although it is manufactured from highest quality materials any metal

More information

Installation and Assembly - Universal Articulating Swivel Double-Arm for 42" - 60" Plasma Screens

Installation and Assembly - Universal Articulating Swivel Double-Arm for 42 - 60 Plasma Screens Installation and Assembly - Universal Articulating Swivel Double-Arm for 42" - 60" Plasma Screens Models: PLAV 70-UNL, PLAV 70-UNL-S PLAV 70-UNLP, PLAV 70-UNLP-S R This product is UL Listed. It must be

More information

southpaw enterprises, inc.

southpaw enterprises, inc. southpaw enterprises, inc. Instruction Sheet C-STAND 7100 Store these instructions in a safe place or with the enclosed maintenance checklist Take time to familiarize yourself with the use and maintenance

More information

FBX1104P FBX1104 FBX1106P FBX1106

FBX1104P FBX1104 FBX1106P FBX1106 FBX1104P FBX1104 FBX1106P FBX1106 Second edition : September 2004 No. 040037 INTRODUCTION Thank you for your purchasing Kansai Special's FBX Series. Read and study this instruction manual carefully before

More information

Cut-True 16M Manual Paper Cutter

Cut-True 16M Manual Paper Cutter Cut-True 16M Manual Paper Cutter 2/2013 OPERATOR MANUAL FIRST EDITION TABLE OF CONTENTS TOPIC PAGE Specifications 1 Safety Guidelines 1 Assembly 2 Overview 3 Description of Equipment Parts 3-4 Operation

More information

CS Unitec, Inc. 22 Harbor Avenue, Norwalk, CT Phone: Toll-free:

CS Unitec, Inc. 22 Harbor Avenue, Norwalk, CT Phone: Toll-free: CS Unitec, Inc. 22 Harbor Avenue, Norwalk, CT 06850 Phone: 203-853-9522 Toll-free: 800-700-5919 Email: info@csunitec.com CS Unitec, Inc. 22 Harbor Avenue, Norwalk, CT 06850 Phone: 203-853-9522 Toll-free:

More information

Safety Instructions, Installation & Operator's Manual For. # CLAMSHELL GRASS CA TCHER KIT For 28" & 33" REAR ENGINE RIDING MOWERS

Safety Instructions, Installation & Operator's Manual For. # CLAMSHELL GRASS CA TCHER KIT For 28 & 33 REAR ENGINE RIDING MOWERS Safety Instructions, Installation & Operator's Manual For #6-3125 CLAMSHELL GRASS CA TCHER KIT For 28" & 33" REAR ENGINE RIDING MOWERS 28" REAR ENGINE RIDER WITH CLAMSHELL BAGGER KIT SHOWN SNAPPER, McDonough,

More information

SINCE 1922 P UBLICATION N O

SINCE 1922 P UBLICATION N O SINCE 1922 GARED SPORTS MICRO-Z SET-UP INSTRUCTIONS VERY IMPORTANT! READ INSTRUCTIONS CAREFULLY AND FOLLOW STEP BY STEP SET-UP PROCEDURE P UBLICATION N O. 5 5 1 7 5 2 9 1 6 Recommended tools and accessories.

More information

3.2.3 Rear Door Window and Quarter Window Carrier Assembly

3.2.3 Rear Door Window and Quarter Window Carrier Assembly Tighten all bolts. Tighten bolts marked -1- and -2- in specified sequence. Tightening torque: 8 Nm Remaining bolts can be tightened in any sequence. Insert door window -3- through window recess without

More information

Cordless Operable Sidelights

Cordless Operable Sidelights Installation Instructions Parasol Cellular Shades Cordless Operable Sidelights CONTENTS Getting Started: Product View...1 Tools and Fasteners Needed...2 Installation: Installation Overview... Mount the

More information

HQ Hideaway. Installation and Operation Version 2.2, April 2015 Part # QT40100

HQ Hideaway. Installation and Operation Version 2.2, April 2015 Part # QT40100 HQ Hideaway Installation and Operation Version 2.2, April 2015 Part # QT40100 Copyright 2015 Handi Quilter, Inc. All rights reserved. Printed in the U.S.A. Table of Contents Page Overview 3 To install

More information

INSTALLATION OF WELLS SUPER QUICK CHUCK LEFT HAND ON RED WING LATHE

INSTALLATION OF WELLS SUPER QUICK CHUCK LEFT HAND ON RED WING LATHE DENTAL, INC. TECHNICAL BULLETIN Q824-022510 5860 FLYNN CREEK ROAD READ ALL INSTRUCTIONS P.O. BOX 106 BEFORE PROCEEDING COMPTCHE, CALIFORNIA, U.S.A. 95427 SAVE THIS FOR FUTURE REFERENCE www.wellsdental.com

More information

VISAGE SCREEN SYSTEM - FOUR SIDED (FLAT PACK) OPERATIONAL, ASSEMBLY & FIXING INSTRUCTION LEAFLET

VISAGE SCREEN SYSTEM - FOUR SIDED (FLAT PACK) OPERATIONAL, ASSEMBLY & FIXING INSTRUCTION LEAFLET TM VISAGE SCREEN SYSTEM - FOUR SIDED (FLAT PACK) OPERATIONAL, ASSEMBLY & FIXING INSTRUCTION LEAFLET NOTE: Ensure that all relevant personnel read the points listed below and that a copy is passed on to

More information