1 ENGINEERING DIVISION PUBLIC INFRASTRUCTURE AND DEVELOPMENT HANDBOOK Table of Contents Section Title Page I. Design Standards and Material Specifications A. Watermain I-2 B. Sanitary Sewer I-8 C. Storm Sewer and Stormwater Management Systems I-13 D. Roadways, Sidewalks and Pathways I-16 E. Grading I-18 F. Erosion Control I-19 II. III. IV. Drafting Standards A. General II-2 B. Watermain II-3 C. Sanitary Sewer II-4 D. Storm Sewer and Stormwater Management Systems II-5 E. Roadways II-6 F. Grading & Erosion Control II-7 As-Built Standards A. Public Infrastructure III-2 B. Grading & Drainage III-3 Appendix Standard Details (30 sheets, 29 details) Stormwater Management Application Packet (10 sheets) Example Design Sheets-Sanitary Sewer & Water Main (2 sheets) Example As-builts-Sanitary Sewer, Water Main, & Storm Sewer (3 sheets) Example As-builts- Commercial & Residential Grading (2 sheets) Example Easement Exhibit (1 sheet) Note: Technical changes to the Public Infrastructure and Development Handbook shall be provided to the Board of Public Works and/or the Water and Sewer Board on a quarterly basis. Material changes affecting policy shall not be made to the Handbook without concurrence from the appropriate Board in advance. Last Revised: June 5, 2007 ENGINEERING DIVISION 2000 N. CALHOUN ROAD BROOKFIELD, WI PHONE: FAX:

2 Section I - Design Standards and Material Specifications Title Page A. Watermain I-2 B. Sanitary Sewer I-8 C. Storm Sewer and Stormwater Management Systems I-13 D. Roadways, Sidewalks, and Pathways I-16 E. Grading I-18 F. Erosion Control I-19 Note: The City of Brookfield Design Standards and Material Specifications have been provided in an effort to assist with public and private infrastructure design. This section was intended to provide general guidance to the design engineer. The Engineer must also follow all applicable State of Wisconsin & Federal guidelines. The City of Brookfield Engineering Division reserves the right to alter or add requirements through the review process. Specific design questions not detailed in the following sections should be directed to the City Engineering Division ( ). I-1

3 A. WATERMAIN Design Standards 1. Water Mains shall typically be located 12 feet off the north and east right-of-way (R.O.W.) lines, or as otherwise approved by the City Engineer. Where watermains are located outside the R.O.W. but contiguous to it, an easement will be required a distance of 15 feet on both sides of the centerline of the watermain, or to the right-of-way line, whichever is less. Where watermains are located on private property, not contiguous to R.O.W., a 30 foot easement will be required. All hydrants must be included in the right-of-way or in an easement and service valves must be placed at the edge of the right-of-way or at the easement line. 2. Minimum depth for watermains shall be 6 feet to the top of pipe from finished grade. 3. Water appurtenance locations shall be as follows: 1. Hydrants a. 5 feet off water main (Refer to Appendix- Standard Detail No. BRK.009, BRK.009A) b. One at each intersection (5.0 feet from right-of-way line, away from intersection) c. At far end of cul-de-sac d. Mid-block locations at lot line extended e. Maximum spacing shall be 500 feet in all cases (measured along the watermain) f. All high points in water main installation shall be placed at hydrant locations 2. Valves a. At intersections adjoining street line extended toward intersection b. 5 from hydrant tees (on the high side) c. On hydrant branches 30 inches from hydrant d. Maximum spacing shall be 800 feet in all cases e. Three valves shall be installed at all main crosses and two valves shall be installed on all main tees, unless otherwise approved by the City Engineer. 3. Air Vents a. At high points in line when no hydrant is present, minimum 2 inches in diameter. (Engineering approval required) b. At ends of water laterals 4 inches in diameter and larger 4. Flushing Hydrants a. At temporary ends of watermain, minimum 2 inches in diameter. 4. Elevations of water main shall refer to flowline or invert of pipe. 5. Minimum water main size shall be 8 inch diameter, 6 inch diameter for hydrant leads. 6. Installation of tracer wire - #10 gauge direct bury copper wire (coated) shall be taped to the top of all PVC and HDPE water main. The copper wire shall be wrapped around the pipe at the beginning and at the end of the water main installation. The copper wire shall extend along the entire length of the pipe in a continuous fashion. Splices must be made using connectors approved by the Engineer, or by twisting the wires together a minimum of ten (10) turns. At all crosses and tees, the tracing wires running both directions shall be interconnected. The contractor shall properly tape all splices/inter-connects to provide proper water proof insulation. The wire shall extend along each hydrant lead to a tracer wire CITY OF BROOKFIELD I-2 ENGINEERING DIVISION

4 access box located immediately behind each hydrant and shall run up into the tracer wire access box and connect to a stainless steel terminal bolt on the underside of the lid. The next run of tracer wire will connect to the second stainless steel terminal bolt on the underside of the lid, run down into the tracer wire access box, back along the hydrant lead and continue along the water main. Both wires in the access box shall have enough slack to allow for settlement, easy removal of the lid and future maintenance (restripping of the wire ends). Provide tracer wire access box by Valvco, inc. or equal. Tracer wire access box shall also include 2 inch diameter schedule 40 PVC pipe from a depth equal to the hydrant lead and extending halfway into the access box. Access box shall be set flush with final grade with 2 inch of adjustment available up and down. Any bare wire shall be covered with water proof insulation protector. The Contractor shall test all tracer wire for continuity in the presence of a City Inspector. All costs for the tracer wire along the water main shall be included in the unit bid prices for water main. All costs for the tracer wire access box and tracer wire along the hydrant leads shall be included in the unit bid price for hydrant assembly. 7. Single family residential services shall, at a minimum, be 1-1/4 inch HDPE pipe (larger sizes may be approved with Engineering Division approval). 8. Crushed stone backfill (as specified by the Wisconsin Standard Specifications for Sewer and Water Construction) is required under or within 5 of pavement; otherwise approved spoil backfill. 9. Maintain a 6 inch minimum vertical separation with all sanitary and storm sewers when crossing over. Maintain an 18 inch minimum vertical separation with all sanitary and storm sewers when crossing under. 10. Permitting and Approvals- All public water main extensions must also be approved by the Wisconsin Department of Natural Resources. All submittals must be completed by the developer s design engineer. (Please contact the City Engineering Division for fire flow tests, the minimum residential fire flow must be designed to be 1500 GPM at a calculated residual pressure of 20 PSI, the required flows for other uses must follow the current ISO fire flows and be approved by the Engineering Division). These submittals must first be transmitted to the City Engineering Division for review and approval; the City will then transmit the appropriate materials to the permitting agency. Material Specifications - Watermain 1. Watermain Pipe PVC shall be C-900, Class 150 (DR18) for 4 inch through 12 inch sizes. PVC shall be C-905, Class 150 (DR18) for sizes larger than 12 inch. HDPE shall be AWWA C-906, DR 11, ductile iron pipe size (DIPS), high-density polyethylene (HDPE) water pipe for use as a fluid pressure conduit. HDPE pipe shall be made from virgin resins exhibiting a cell classification of PE C as defined in ASTM D3350 with an established hydrostatic-design-basis of 1,600 psi for water at 73 degrees Fahrenheit. The resin shall be listed by the Plastic Pipe Institute (PPI) in its pipe-grade registry Technical Report (TR) 4, Listing of Plastic Pipe Compounds. Pipe shall be NSF listed by the manufacturer with the pipe bearing the NSF logo or mark. Pipe shall be marked as prescribed by AWWA C-906 and NSF. Pipe markings shall include nominal size, OD base (i.e. 12 inch ductile iron pipe sizing, DIPS) dimension ratio, pressure class, WPR, AWWA C-906, manufacturer s name, manufacturer s production code including day, month, CITY OF BROOKFIELD I-3 ENGINEERING DIVISION

5 year extruded, and manufacturer s plant and extrusion line. Pipe manufacturer shall have an approved in-house QA/QC program providing compliance to the testing specifications and requirements of AWWA C-906 and ISO 9001 certification. Ductile Iron shall be Class 350 (cement lined), AWWA C-151 slip joint pipe with compression type push-on rubber gaskets conforming to AWWA C-111 (unless an alternate joint is approved by the City Engineer). 2. Joints PVC pipe shall have push-on bell joints with rubber gasket. HDPE pipe shall be joined by means of a zero leak-rate heat fusion or electrofusion butt joint and approved mechanical joints, meeting the specifications and requirements of AWWA C Ductile Iron shall be slip joint pipe with compression type push-on rubber gaskets conforming to AWWA C-111 (unless an alternate joint is approved by the City Engineer). 3. Fittings Shall be Ductile Iron with mechanical joints conforming to Chapter of the Standard Specifications, A.W.W.A. C-110 and C-111 with the exception of the manufacturer's design dimensions and thicknesses. Compact Ductile Iron fittings are allowed in accordance with Chapter of the Standard Specifications. HDPE mechanical joint adapters shall conform to AWWA C-906 for connections to dissimilar materials (PVC or ductile iron). A butt fused HDPE mechanical joint adapter with a stainless steel internal stiffener shall be used. The DR for any polyethylene fitting shall be 9 (unless otherwise approved by the City Engineer). 4. Services Shall be 1-1/4 inch to 2 inch CTS C-901 SDR-9 HDPE Water Tube. On HDPE services, solid stainless steel insert sleeves should be included with the curb stop and corporation stop. Joints shall be with pack joint compression fittings as manufactured by Mueller, McDonald and Ford. 5. Corporation Stops For HDPE Water Tube 1 x 1-1/4, 1-1/2, 1-1/2 x 2 & 2 Shall be: Mueller H McDonald 4701BQ Ford F Ground Key Stop Valve (Curb Stops) 1 ¼ x 1 x 1 ¼ Shall be: Mueller P McDonald 6104Q Ford B44-455M CITY OF BROOKFIELD I-4 ENGINEERING DIVISION

6 1 ½ and 2 Shall be: McDonald 6104Q Ford B44-666M (1 ½ ) Ford B44-777M (2 ) All with 2" Minneapolis thread. 7. Service Box (Curb Boxes) For 1 Shall be: Mueller H McDonald 5614 For 1-1/2 and 2" Ball Valve Shall be: McDonald 5615 or equal 8. Service Saddles Stainless steel clamp with rubber gasket and integral service outlet. Cascade Waterworks (CSC2 for 4"-10", CS22 for 12" & 16"), Smith-Blair (372 for 4-12 ), Power Seal or equal. Service saddle required for all services 1-1/4 and larger (except saddle not required for 1-1/4 service if 1 x 1-1/4 corporation stop is used). 9. Gate Valves - A.W.W.A. Spec. C509 Shall be resilient wedge type for 4", 6", 8" or 10" American Flow Control, Series 2500, SS Bolts Clow F-6100, SS Bolts Mueller , SS Bolts Kennedy Ken-seal, SS Bolts M&H, SS Bolts All gate valves shall be furnished with a gate valve adaptor with gasket as manufactured by Adaptor, Inc. A valve extension stem is only required if the operating nut is 8 feet or more below finished grade. If a valve extension stem is required, the length shall be such that the top of the extension is within 8 feet of finished grade. NOTE: Any R.W.G. valve used for cutting in must use a cutting tool that will develop a hole not less 1/2" smaller than the valve. (Any test plugs included on valves shall be replaced with stainless steel plugs.) 10. Butterfly Valves - A.W.W.A. Spec. C504 Shall be for 12" and larger, Clow, Pratt Groundhog, M&H 450 or Mueller Lineseal III. All butterfly valves shall have SS nuts and bolts. CITY OF BROOKFIELD I-5 ENGINEERING DIVISION

7 All butterfly valves shall be furnished with a butterfly valve adaptor with gasket as manufactured by Adaptor, Inc. A valve extension stem is only required if the operating nut is 8 feet or more below finished grade. If a valve extension stem is required, the length shall be such that the top of the extension is within 8 feet of finished grade. 11. Valve Boxes and Lids Shall be: Tyler 6860 Star Pipe Products two-piece cast iron valve box with lid 12. Flush Valve Assembly The following shall be required only if specifically included on the plans: Plug & Air Vent for ends of mains and laterals - see File #43 Standard Specifications Flushing Hydrant for ends of mains Eclipse No. 2 Post Hydrant with stainless steel shaft by Kupferle or equal. 13. Air Release Assembly For high points in mains, see File #42 Standard Specifications. 14. Hydrants Shall have: bronze on bronze seat bronze upper valve plate break away flange oil or grease reservoir coated elbow meets or exceeds A.W.W.A. C502 with a 5-1/2" valve, two 2-1/2" hose nozzles and one pumper nozzle with stainless steel bolts underground, and shall be: Clow Medallion, Mueller Centurian and Kennedy Guardian (with reservoir). All parts used to modify hydrant must be from the original equipment manufacturer. The bars on all hydrants shall be 3/4" diameter. 15. Check Valve Valmatic 1800 series globe style, 125 lb. class, with cast iron body, bronze plug and stainless steel spring. 16. Pressure Switch Mercoid DA-31, PSIG 17. Pressure Gauges Marshalltown Series 44K, 3-1/2" with phosphor bronze Bourdon tube, Gauge scales to be PSI. CITY OF BROOKFIELD I-6 ENGINEERING DIVISION

8 18. Ball Valves Nibco 590 Series ball valves, except for 1/4" valves which shall be Nibco 580 Series ball valves. 19. Meter Yoke Ford Meter Box Co. Straight Line Yoke. Yoke to match owner's 5/8, 5/8 x 3/4 or 3/4 inch meter. Verify meter size. 20. Sampling Faucets Chicago Faucet No. 4, chrome plated brass, 1/2 inch smooth end. 21. Tracer Wire Access Box Shall be Valvco, Inc. Access Box or equal 22. Tapping Sleeves Tapping sleeves shall have a stainless steel body with removable bolts. The outlet, body, flange, bolts and nuts shall be 18-8 type 304 stainless steel. All welds are fully passivated to restore stainless characteristics. Flange shall conform to AWWA Standard C207, "Steel Pipe Flanges for Waterworks Service-Sizes 4 In. Through 144 In.", Class D ANSI 150 lb. with drilling recessed to accept standard tapping valves per MSS-SP 60. Bolt holes straddle pipe centerline. Shell gasket must seal the full circumference of the pipe. Flanged gasket shall be full faced, cut from 1/8 inch thick cloth inserted rubber sheet, boltholes prepunched, conforming to the requirements of ANSI B Approved stainless steel tapping sleeve manufacturers/models: Ford FTSS JCM 432 Power Seal 3490 Smith-Blair CITY OF BROOKFIELD I-7 ENGINEERING DIVISION

9 B. SANITARY SEWER Design Standards 1. Location & Depth a. Sanitary sewers shall typically be located at the centerline of the street or easement b. Sewers in curved streets shall typically not be more than 10 feet from centerline c. Manholes shall be located at the centerline of street/easement d. Sewer depth shall be designed to accommodate gravity flow from the lowest part of all buildings. Residential basements shall have an assumed minimum depth of 10 ft from finished floor elevation to the basement floor elevation. Also, 1.8 ft. should be used for the depth from the basement floor to the sewer lateral to accommodate for clearing the footing depth 2. Design Flow a. Average residential sewer flows shall be 125 gallons per capita per day. Peak residential sewer flows shall include a peaking factor of 5, and an additional 85 gallons per capita per day for inflow and 85 gallons per day for infiltration (Total = 795 gal./capita/day). b. The City of Brookfield maintains a standard loading for residential design flows people per house 2.5 people per unit c. The capacity and velocity of sanitary sewers shall be determined using Manning s Formula using a frictional coefficient of for sanitary sewers d. Sanitary sewer calculations must be submitted with proposed sanitary sewer plans 3. Sanitary Sewer Sizes and Slopes a. Residential: 8 in. (minimum) b. Sanitary sewers shall be sized to provide a minimum velocity of 2 ft/sec at 50 % full c. All sewers must be sized adequately to accommodate future tributary areas as directed by City Engineer d. Public mains located within private property must be placed within an easement. See #8 below for requirements. e. Minimum Slopes: 8 = 0.40 % (dead end reach = 0.60 %) 10 = 0.28 % (dead end reach = 0.40 %) 12 = 0.22 % 15 = 0.15 % 18 = 0.12 % 21 = 0.10 % 24 = 0.08 % Other sizes - Per Engineering Division 4. Sanitary Manholes a. Sanitary manhole rims must be placed 2.0 ft. above the 100-yr floodplain elevation (FPE). When practicable, grade earth around manhole at 4H:1V slope. CITY OF BROOKFIELD I-8 ENGINEERING DIVISION

10 b. Public manholes located within private property must be placed within an easement. See #8 below for requirements. c. Elevations of sewer inverts shall refer to the flowline or invert of pipe in MH. d. Maximum distance between manholes shall be 400 ft. unless approved otherwise e. Drops in manhole (Angle measured between incoming and outgoing sewer pipe) Angle of 0 to 10 degrees = 0.10 ft drop Angle of 10 to 30 degrees = 0.15 ft. drop Angle greater than 30 degrees = 0.25 ft. drop Maximum allowable drop in MH shall be 24 in. Where drops exceed 24 inches an outside drop manhole shall be used (detail can be found in the appendix) Where different sized pipes meet in MH, 80 % flowlines shall match f. Frames, Lids and Seals: All sanitary sewer manholes shall have a heavy duty frame with solid, gasketed selfsealing lid with concealed pick holes (see standard details and material specifications) Sealed bolted-down lids/frames shall be required in floodplain areas All sanitary sewer manholes shall utilize an external seal (see standard details and material specifications) g. Chimney Height: Minimum Height = 6 Inches Maximum Height = 22 Inches 5. Sanitary Sewer Laterals a. A minimum 6 inch diameter sewer lateral shall be installed for residential use, larger sizes for different uses must be approved by the Engineering Division b. Laterals shall be installed to the lot line/street right-of-way or the edge of the easement the sewer resides in c. Laterals may not be connected to manholes except in cul-de-sac where necessary and approved by the City Engineer. Where laterals connect to manholes, the lateral shall extend to the flow line of the pipe or the bench shall be modified to include the lateral as a pipe. d. A minimum slope of 2 % shall be used. Under special approval, City Engineer may authorize the use of 1 % e. Existing laterals not used in development or redevelopment shall be abandoned at the main. Slurry or grout filling of laterals will be required where open cutting existing roadway is not practical. Existing laterals used in new developments or redevelopments must be televised and reviewed by Public Work Inspection prior to reconnection. Should defects or infiltration or inflow (I&I) exist, the City will require appropriate measures be taken which may include relay, lining, or grouting of the lateral. f. Vertical risers shall be used where excessive drop occurs from the property line to the mainline. In general, the sanitary lateral should be placed at a depth between 10 to 13 below finished grade at the property line or at a depth adequate to serve the lowest point of the building to be served. (see standard details and material specifications) 6. Force Main a. Valve spacing shall be placed every 800 ft. CITY OF BROOKFIELD I-9 ENGINEERING DIVISION

11 b. Minimum Design depth: 6 ft. from top of pipe to finished grade c. Tracer wire is required to be secured to the force main d. Minimum design velocity is 2 ft./sec., while maximum shall not exceed 10 ft./sec. e. Air release/vacuum valves and cleanouts must be incorporated into design layout 7. Lift Stations a. Lift Stations are to be avoided. b. Coordinate with Engineering Division for specific design requirements regarding sanitary lift stations. 8. Easements a. The City s standard width for sanitary sewer easements is 30 ft. for a single utility, plus 10 ft. for each additional utility within the easement. b. No structures or trees will be permitted to be placed in Municipal utility easements. Unless avoidable: shrubs, plantings, and shallow berms will be permitted in easement but not within a 5 foot radius of appurtenances. A written explanation of why landscaping or berming must be placed within easements needs to be submitted along with a signed encroachment agreement. c. Grade changes within utility easements is not allowed without prior Engineering approval. d. Written easement documents shall be executed & recorded for all easements depicted on CSM s, plats and plans. The developer/owner shall provide the exhibit and legal description of the easement (see appendix); the City will prepare the actual easement document for signatures and recording. e. Manholes located within private property should be placed within a paved surface where it is practical for easy inspection and cleaning. 9. Permitting and Approvals a. All public sanitary sewer extensions must also be approved by the Wisconsin Department of Natural Resources, and in some cases other permitting agencies such as the Milwaukee Metropolitan Sewerage District. All submittals must be completed by the developer s design engineer. These submittals must first be transmitted to the City Engineering Division for review and owner approval, the City will then transmit the appropriate materials to the permitting agency for their approval. Any variation of the above standards must be approved by the City of Brookfield Engineering Division Material Specifications Sanitary Sewer 1. Sanitary Sewer Main All pipe used for public and private sanitary sewer shall be: PVC, ASTM D-3034, SDR 35 meeting the requirements of Section of the Standard Specifications for Sewer and Water Construction in Wisconsin (Standard Specifications) CITY OF BROOKFIELD I-10 ENGINEERING DIVISION

12 2. Sanitary Sewer Laterals All pipe used for sanitary sewer laterals shall be: PVC, ASTM D-3034, SDR 35 meeting the requirements of Section of the Standard Specifications. Sanitary laterals shall be 6 in diameter. 3. Sanitary Force Main All pipe used for sanitary force mains shall be: AWWA C-900 meeting the requirements of section or HDPE, ASTM F-714, SDR 11 meeting the requirements of section Sanitary Manholes Sanitary manholes shall conform to the following: All manholes shall be precast reinforced concrete and have a minimum inside diameter of 48 inches. Minimum wall thickness shall be per Table No. 1 in File No. 12 of the Standard Specifications. Precast concrete manhole base, barrel risers, cone section and adjusting rings shall meet the requirements of ASTM C-478. Manhole external seals shall be provided for each manhole and shall be manufactured by Adaptor, Inc. Manholes shall be constructed per drawing BRk 11, 11A and 11B and vacuum tested in accordance with Section of the Standard Specifications. 5. Bedding, Cover and Backfill Materials Bedding, cover and backfill materials shall be as follows: Bedding and cover material shall conform to Table 32 of the Standard Specifications and shall be 3/8 crushed limestone with a minimum of 6 inches of bedding to a cover 12 inches above the crown of the pipe. Granular backfill shall conform to Section of the Standard Specifications. Spoil backfill (may be used in locations settlement is not critical and approved by the City) shall conform to Section of the Standard Specifications. Slurry backfill (where required by the City Engineer) shall conform to Section of the Standard Specifications. 6. Fittings All fittings used for sanitary pipe and laterals shall be as follows: Fittings for sewer laterals shall be PVC, ASTM D-3034, SDR 35 and meet the requirements of Section of the Standard Specifications. Couplings for connecting dissimilar pipe materials shall be non-shear coupling as manufactured by DFW/HPI or shall be made with a flexible mechanical compression joint coupling conforming to ASTM C-594 Type B with stainless steel bands and shear ring CITY OF BROOKFIELD I-11 ENGINEERING DIVISION

13 conforming to ASTM A-167 as manufactured by Joints, Inc. (Calder) of Gardena, CA; Fernco Joint Sealer Co. of Ferndale, MI; or equal and in addition, using a transitional bushing conforming to ASTM C-594 Type B when pipe with different outside diameters are to be connected. Flexible saddles for connecting laterals to an existing sanitary sewer shall be as manufactured by NDS or approved equal. CITY OF BROOKFIELD I-12 ENGINEERING DIVISION

14 C. Storm Sewer and Stormwater Management Systems Design Standards 1. Storm sewers shall be typically located 10 ft. to 12 ft. off the south or west right-of-way line with sufficient manholes set behind the curb to allow connection of inlets to same. 2. Inlets shall not substitute as manholes. 3. Storm sewers to have a minimum cover of 18 inches. 4. Storm sewer elevations shall refer to the flowline or invert of the pipe. 5. Inlets at intersections shall be 1 ft. from the end of curb and gutter radius. 6. Inlet spacing maximum of 300 feet from crest of hill or previous inlet structure so as to limit the maximum travel distance to 300 feet. 7. Inlets shall be located on the upstream side of the radii, upstream of sidewalks/bikepaths, and low points of an intersection. 8. Manhole spacing shall not exceed 400 feet. 9. Manholes located within private property should be placed within a paved surface where it is practical for easy inspection and cleaning. 10. Storm sewer pipe shall be reinforced concrete pipe (RCP) Class III with a minimum diameter of 12 inches. 11. The minimum design storm for all conduits shall be Southeastern Wisconsin Regional Planning Commission (SEWRPC) 10-year, 24-hour event. Storm Sewer sizing calculations must be submitted with the Civil Design Plan set. (Note: Dead-low points may require dual inlets and/or grate capacity analysis.) 12. Site design must provide an emergency overland flow path capable of handling SEWRPC s 100-year, 24-hour storm event or greater. 13. The City of Brookfield Engineering Division requires designs for both minor and major storm events and requires all new developments to meet the following minimum standards: A. Minor Storms (10-yr, 24-hr recurrence interval storm event) 1. Stormwater systems managing this storm event shall be designed to provide an acceptable level of access to property and of traffic service. Designed to provide two clear 10-foot lanes for moving traffic on existing arterial streets, and one clear 10-foot lane for moving traffic on existing collector and land access streets. Flow of stormwater along and across the full pavement width of collector and land access streets shall be acceptable during storm events greater than the 10-year storm event. (When the street is an integral part of the system) B. Major Storms (100-yr, 24-hr recurrence interval storm event) 1. Development of a stormwater system (pipe and/or overland flow) that manage this storm are designed in order to prevent significant property damage and safety hazards. 14. All new and replacement bridges and culverts over waterways shall be designed according to the following: 1. SEWRPC s 10-year, 24-hr storm event for minor and collector streets. 2. SEWRPC s 50-year, 24-hr storm event for arterial streets and highways, other than freeways and expressways. 3. SEWRPC s 100-year, 24-hr storm event for freeways, expressways, and railways CITY OF BROOKFIELD I-13 ENGINEERING DIVISION

15 15. Stormwater Management Designs should all follow City of Brookfield Title 14 requirements and all applicable state requirements. MMSD requirements also apply to all areas within the MMSD sanitary sewer service boundary. A stormwater management application packet is included in the appendix. The application is required for most projects. 16. Where applicable, Designer shall submit to the City one copy of a Preliminary Stormwater Management Plan (SWMP). This report shall include the following items: a. Project overview / Executive Summary b. Name of the Owner/Developer c. Pre-development watershed description d. Post-development watershed description e. Method of Analysis f. Soil Type g. Curve Numbers h. Stormwater runoff quality with SLAMM analysis Sediment reduction of at least 80% must be demonstrated i. Construction Site Erosion & Sediment Controls (BMP s) j. Summary table of Stormwater Calculations Pre-development (2, 10 & 100-yr, 24-hr events) Post-development (2, 10 & 100-yr, 24-hr events) k. Existing hydrology conditions map showing: Existing topography contours (minimum 2 interval) Existing site Drainage basins Time of concentration paths Curve numbers Runoff volumes (Q) in cfs for the 2, 10 & 100-yr, 24-hr events l. Proposed hydrology conditions map showing: Proposed topography contours (minimum 2 intervals) overlaid on existing Proposed site plan/design Drainage basins/subcatchments Time of concentration paths Curve numbers Runoff volumes (Q) in cfs for the 2, 10 & 100-yr, 24-hr events m. Stormwater Facility Maintenance Plan. Maintenance Plan shall include: i. Contact name ii. Telephone number iii. Signature of Owner iv. Cleaning/maintenance methods v. Cleaning/maintenance schedule n. Stormwater basin design o. Outlet control structure design 17. Upon City approval of the civil site design and SWMP, Designer shall provide the City with two (2) signed and sealed (by a P.E.) copies of the SWMP (seal to be affixed to cover/title page of report and Item 12 of SWMP Application). CITY OF BROOKFIELD I-14 ENGINEERING DIVISION

16 18. Wet detention basins and infiltration devices shall not be located: a. Within the boundary of a recharge area to a wellhead identified in a wellhead area protection plan b. Within 100 feet of a private well c. Within 100 feet of a transient, noncommunity public water system d. Within 1,200 feet of a well serving a public water system other than a transient noncommunity system 17. Wet detention basins, where contamination of the groundwater is possible, should be lined with an impermeable liner. 18. Permitting and Approvals- Most stormwater management systems must also be approved by the Wisconsin Department of Natural Resources, and in some cases other permitting agencies such as the Milwaukee Metropolitan Sewerage District. For MMSD (and occasionally other agencies) submittals, forms and plans must be completed by the developer s design engineer. These submittals must first be transmitted to the City Engineering Division for review and owner approval, the City will then transmit the appropriate materials to the MMSD (occasionally other agencies) for their approval. CITY OF BROOKFIELD I-15 ENGINEERING DIVISION

17 D. ROADWAYS, SIDEWALKS AND PATHWAYS Design Standards 1. Typical road section shall be as shown on the City Standard Cross-Section (City Standard Plate Detail No. BRK.001) 2. Elevations shall refer to finished grade (minimum grade of all streets shall be 0.500%) 3. Centerline radius shall be not less than 200 ft. A smaller radius may be considered by the City Engineer if traffic calming efforts are deemed necessary to the project. 4. Minimum radius (measured at back of curb) shall be 25 ft., curb shall be placed from PC to PT at all new or redeveloped intersections. 5. Longitudinal grades of City owned roadways shall not exceed 10% on local roads and 6% on secondary and major streets. Longitudinal grades shall not be less that 0.5%. 6. Cross slope shall be 2% for traveled lanes, and shall not exceed 4% for shoulders and parking lanes. 7. Tapers shall be designed in accordance with latest version of the MUTCD based on design speeds. 8. Major streets shall have a right-of way width of not less than 120 feet, a 48 ft. pavement width, separated by a 24 ft. median strip, and a pavement consisting of a minimum of 8 in. crushed stone base course and 8 in. Portland cement concrete surface or 6 inches of asphalt concrete pavement over a 10 in. stone base subject to paragraph Secondary streets shall have a right-of-way width of not less than 90 ft., a pavement width of 52 ft. and a pavement consisting of a minimum of 8 in. crushed stone base course and a 6 in. bituminous concrete surface or an 8 in. Portland cement concrete surface with 6 in. stone base course subject to paragraph Local streets shall have a right-of-way width of not less than 60 ft. and a pavement consisting of a minimum of 8 in. stone base and a 5-1/2 in. asphaltic concrete pavement or a 6 in. stone base with a 7 in. non-reinforced concrete pavement subject to paragraph 15. The pavement shall be 34 ft. for collector streets and 22 ft. for minor streets, except that minor streets in industrial subdivisions shall be a minimum of 30 ft. wide and shall be constructed in accordance with secondary street specifications. 11. Cul-de-sacs shall meet the requirements for a minor street and shall provide a turnaround of 120 ft. in diameter right-of-way, of which 80 ft. in diameter shall be paved. 12. Pathways shall be 6 feet or 8 feet wide 5 inch thick concrete cross-section. Configuration will vary for each development, but the preferred design will have a 2% cross-slope on the pathway draining to a 4% cross-slope with an eight foot terrace area draining off the back of curb. 13. Pathways may need to be within an easement from time to time. The easement required will contain a minimum of one foot on both sides of the pathway. An easement exhibit with legal description must be prepared by the developer and submitted to the City for review and preparation of easement documents. 14. Cross sections may be required in some instances. 15. Perform and submit an engineering analysis on the pavement cross-section that is suitable for the soil and loading conditions for which the pavement will be used. 16. Horizontal Curves. A minimum sight distance with clear visibility, measured along the centerline, shall be provided of at least three hundred feet (300) on major streets, two CITY OF BROOKFIELD I-16 ENGINEERING DIVISION

18 hundred feet (200) on secondary streets and one hundred twenty feet (120) on all other streets. 17. Vertical Curves. All changes in street grades shall be connected by vertical curves of a minimum length equivalent to thirty (30) times the algebraic difference in the rate of grade for major streets and secondary streets and twenty (20) times this minimum length for all other streets. 18. Tangents. A tangent of at least one hundred (100) feet long shall be introduced between reverse curves on major and collector streets. Material Specifications- Roadways & Pathways Contact the City s Engineering Division Roadway Engineer for Current Specifications CITY OF BROOKFIELD I-17 ENGINEERING DIVISION

19 E. GRADING Design Standards 1. Use existing drainage channels wherever possible. 2. Grades shall be established to avoid erosion, flooding of structures or public infrastructure, and nuisance ponding of water. 3. Plan View (The information under this heading shall be shown within the boundaries of the development and a minimum of 200 adjacent where necessitated by the development.)- NOTE: A draft grading plan is required prior to Plan Commission approvals for most projects (this requirement may be waived by the City Engineer on a case by case basis). Items d, f, & g are not required for most draft grading plans. a. Existing contour lines shall be shown in light or dashed lines with elevation shown in light numbers. b. Proposed contour lines where different from existing shall be shown in bold solid lines with bold elevation numbers. c. Proposed building elevations (yard grade at front entrance) shall be indicated at the building setback line. For exposed or partially exposed basements yard grade at rear shall also be indicated on plans. d. Proposed finished elevations to 0.1 of a foot at all lot corners, at setback line plus twenty feet along lot lines, and other points deemed necessary should be shown. e. Spot grades on pavement areas, walks, ditchlines, swales, berms, property corner elevations. f. Finished street centerline elevations shall be indicated at 100 stations, all intersections, cul-de-sacs and other changes in slope. (Stationing should match the centerline stationing of the utility plans.) g. Channel or swale flow-lines shall be indicated every 50 within public land or easement. h. Existing and proposed storm sewer utilities, rims, inverts and sizes i. Ponds, spillways and outlet elevations j. Top and bottom of retaining wall elevations shown k. Other information pertinent to grading shall be shown and labeled. l. Drainage & other pertinent easements shall be shown on plans. m. Any other information pertinent to grading, such as wetland limits, 100-year surface water elevations, two foot above 100 yr floodplain within area shown or within 200 adjacent shall be indicated on plans. 4. An as-built grading plan is required for all commercial and residential site development. Refer to Section III for requirements. CITY OF BROOKFIELD I-18 ENGINEERING DIVISION

20 F. EROSION CONTROL Design Standards 1. Provide best management practices for erosion control using Wisconsing Department of Natural Resources (WDNR) Construction Site Erosion and Sediment Control Standards and all other applicable WDNR requirements. 2. Plan shall represent adjacent site conditions for a minimum of Erosion control plan should be overlaid on the site grading plan on a separate sheet. 4. A safe overland flow path is to be provided from all areas of the site to be captured in accordance with the stormwater management plan during all phases of construction. 5. Plan View a. Existing contour lines should be shown in light or dashed lines with elevation labels (2 max interval) b. Proposed contour lines should be shown where different from existing in bold lines with elevation labels (2 max interval) c. Topsoil stockpiles to be shown and circled with silt fence d. Plan should include a construction phasing schedule e. Plan should include the following note on the construction phasing schedule: All exposed soil areas not disturbed for up to seven days must be immediately restored with seed and mulch. f. Temporary Erosion Control devices shown and labeled Inlet baskets Silt Fence Erosion bales Temporary ditch checks (straw bales, rolls, or silt fence) Temporary seeding and mulching Temporary settling basin Dewatering basin Gravel construction entrance / Stone tracking mat g. Permanent Erosion Control devices shown and labeled Sod Rip Rap Permanent seeding and mulching Permanent sediment basin CITY OF BROOKFIELD I-19 ENGINEERING DIVISION

21 Section II - Drafting Standards Title Page A. General II-2 B. Watermain II-3 C. Sanitary Sewer II-4 D. Storm Sewer and Stormwater Management Systems II-5 E. Roadways II-6 E. Grading & Erosion Control II-7_ Note: The City of Brookfield Plan Standards have been provided in an effort to assist with public and private infrastructure design. This section was intended to provide general guidance to the design engineer. The City of Brookfield Engineering Division reserves the right to alter or add requirements through the review process. Specific questions not detailed in the following sections should be directed to the City Engineering Division ( ). II-1

22 SECTION II DRAFTING STANDARDS A. GENERAL 1. Plans shall be prepared on sheets measuring 34 inches across and 22 inches high, unless otherwise specified under plan preparation standards. 2. Title blocks conforming to the City Standard shall be located in the lower right hand corner of the plan view and readable from the 34 inch side of the sheet. Location of limits of improvement shall be given by distance and direction from the centerline of the nearest cross street. (Title Block City Standard Plate No. BRK.019) 3. Seal and signature of the registered Professional Engineer who prepared the plans shall be affixed immediately to the left of the title block. 4. Profile view shall be located below the plan view on plan-profile drawings, and the two views should be in alignment vertically. 5. North direction shall be at the top or to the right of the sheet and indicated by an arrow and the letter N. 6. Stationing shall be at 100 intervals from South to North or West to East and shall be indicated on plan and profile. The stationing will start at an even station and at a centerline intersection of two streets. Every 100 station shall be noted. 7. Date of drawing and dates of all revisions shall be shown. 8. All plans shall read from the bottom (34 inch side) and the right side of the plan, unless the streets shown enter the main street of the plan at an angle that dictates it to be read from the left. 9. All existing and proposed right-of-way and lot lines to be shown with a solid line; only future rightof-way and lot lines to be shown dashed. 10. All proposed improvements shall be drawn with bold lines. 11. Plans shall be drafted with AutoCAD (most current version or as approved by City Engineer). 12. Plan View a. Lot, block, street, property or subdivision, ¼ section and easement lines shall be shown. b. Lot and block numbers, subdivision name and addresses, property owner name, tax key numbers, shall be shown, if known. c. If the plan is in an existing subdivision or in a street or easement through or adjacent to unplatted lands, the property owners name, address, and tax key are to be shown. The names, addresses, and tax keys can be obtained at the City Assessor s office. d. Lot or property frontage, street width and easement dimensions shall be indicated (existing and proposed). e. Street names shall be shown. f. Street centerline shall be indicated. 13. Profile View a. Elevations shall be based on the UGVD29 datum and given to the nearest 0.01 feet. b. The benchmarks used shall be indicated on the plans. c. To convert to UGVD29 datum from old City datum use II-2

23 SECTION II DRAFTING STANDARDS B. WATERMAIN 1. Scale of plans shall be 1 = 50 horizontal and 1 = 5 vertical. 2. Water main system plan to be 200 scale only (drawing size not to exceed 22 x 34 ). 3. Plan View a. Pipe diameter, fitting center-to-center length, and lateral spacing shall be dimensioned. b. Elevations of the center of hydrant nozzle shall be indicated. c. Existing underground improvements shall be indicated and the size labeled. d. Existing surface improvements shall be indicated with solid light lines and labeled. e. Proposed underground improvements shall be indicated and the size labeled. f. Existing and proposed pavement shall be shown and the name labeled. 4. Profile View a. Draw pipe as two solid lines, indicating crown and flowline of pipe. b. Flowline elevations shall be shown at fittings and breaks in grade. c. Grades shall be indicated in percent slope, to the nearest 0.001%. d. Pipe diameter and fitting center-to-center length shall be dimensioned. e. Pipe type and class shown. f. Fitting elevations must be labeled. g. Crushed stone and spoil backfill limits shall be dimensioned and labeled. h. Existing or proposed grade above water main shall be drawn and labeled. i. Crossings with existing or proposed underground improvements shall be drawn with the name, diameter, elevation, and station indicated. j. Concrete cradles shall be drawn where storm sewer crosses above. II-3

24 SECTION II DRAFTING STANDARDS C. SANITARY SEWER 1. Scale of plans shall be 1 = 50 horizontal and 1 = 5 vertical. 2. Stationing shall begin at downstream manhole (when sanitary is the only utility on the plan and when sanitary is in an easement.) 3. Sanitary system plan to be 100 scale or larger. Consultant must use the City system plans for approval submittal (drawing size not to exceed 22 x 34 ). 4. Plan View a. Pipe diameter, manhole center-to-center length, and lateral spacing shall be dimensioned. b. Existing underground improvements shall be indicated and the size labeled. c. Existing surface improvements shall be indicated with solid light lines and labeled. d. Proposed underground improvements shall be indicated and the size labeled. e. Existing and proposed pavement shall be shown and the name labeled. 5. Profile View a. Draw pipe as two solid lines, indicating crown and flowline of pipe. b. Flowline elevations shall be shown at manholes. c. Grades shall be indicated in percent slope, to the nearest 0.001%. d. Pipe diameter, manhole center-to-center length and riser length shall be dimensioned. e. Sewer pipe strength shall be labeled. f. Elevations of manhole rim shall be indicated. g. Crushed stone and spoil backfill limits shall be dimensioned and labeled. h. Existing or proposed grade above sewer shall be drawn and labeled. i. Crossings with existing or proposed underground improvements shall be drawn with the name, diameter, elevation, and station indicated. II-4

25 SECTION II DRAFTING STANDARDS D. STORM SEWER/STORMWATER MANAGEMENT 1. Scale of plans shall be 1 = 40 horizontal and 1 = 4 vertical. 2. Storm system plan to be 200 scale or larger. (Drawing size not to exceed 22 x 34 ) 3. Plan View a. Pipe diameter, lengths, center-to-center of manholes, and/or inlets shall be dimensioned. b. Existing underground improvements shall be indicated and the size labeled. c. Existing surface improvements shall be indicated with solid light lines and labeled. d. Proposed underground improvements shall be indicated and the size labeled. e. Existing and proposed pavement shall be shown and the name labeled. 4. Profile View a. Draw pipe as two solid lines, indicating crown and flowline of pipe. b. Flowline elevations shall be shown at manholes and inlets. c. Slope shall be indicated in percent slope, to the nearest 0.001%. d. Pipe diameter and manhole center-to-center length shall be dimensioned. e. Sewer pipe strength shall be labeled. f. Elevations of manhole rim and inlet gutter shall be indicated. g. Granular material backfill shall be dimensioned and labeled. Unlabeled sections shall require excavated material. h. Concrete cradles shall be required where other proposed utilities cross under storm sewers, when minimum clearance can t be maintained or when soil conditions dictate usage. i. Crossings with existing or proposed underground improvements shall be drawn with the name, diameter, elevations and station indicated. j. Grade profiles shall be shown at proposed/existing centerlines and the proposed/existing grade above the proposed utility. II-5

26 SECTION II DRAFTING STANDARDS E. ROADWAYS 1. Scale of plans shall be 1 = 40 horizontal and 1 = 4 vertical. 2. Plan View a. Stations shall be indicated by tick marks along the centerline and every 100 station shall be labeled. Elevations shall also be given at intersections, PT, & PC. b. Curb radii shall be dimensioned to the face of the curb 25 radius minimum. (Back of curb radius ) c. Flange lines and back-of-curb lines shall be drawn. (When proposed on the plan, these lines shall be drawn bold. Proposed, future, and existing curbs shall be labeled as such.) d. Flange elevations shall be indicated at all curved curb and gutter sections, cul-de-sacs and warped pavement sections from beginning to end and not farther apart than 25. e. Grades shall be given in plus or minus to the nearest 0.001%. f. Vertical curves must meet or exceed K values. g. Existing underground improvements shall be indicated and the size labeled. h. Proposed underground improvements shall be indicated and the size labeled. 3. Profile View a. All stations shall coincide with accented vertical lines. b. Proposed finished centerline grade shall be drawn as a heavy line, when built on plan. c. Existing centerline grade. d. Proposed elevations and stationing shall be given at each station, at intersections, street lines extended and at ¼ points along vertical and horizontal curves (and the P.C., P.T. & P.I s) e. Grades shall be specified in plus or minus percent to the nearest 0.001%. II-6

27 SECTION II DRAFTING STANDARDS F. GRADING & EROSION CONTROL 1. The name of the landscape architect and/or professional engineer who prepared the plans shall be shown. 2. Scale of the plans shall be 1 = 100 for master plan and 1 = 50 for individual plan sheets. 3. Plan View (The information under this heading shall be shown within the boundaries of the development and a minimum of 200 adjacent where necessitated by the development.) a. Existing contour lines shall be shown in light or dashed lines with elevation shown in light numbers. b. Proposed contour lines where different from existing shall be shown in bold solid lines with bold elevation numbers. c. Proposed building elevations (yard grade at front entrance) shall be indicated at the building setback line. For exposed or partially exposed basements yard grade at rear shall also be indicated on plans. d. Finished street centerline elevations shall be indicated at 100 stations, all intersections, cul-desacs and other changes in slope. (Stationing should match the centerline stationing of the utility plans.) e. Channel or swale flow-lines shall be indicated every 50 within public land or easement. f. Other information pertinent to grading shall be shown and labeled. g. Drainage easements shall be shown on plans. h. 100-year surface water elevations within area shown shall be indicated on plans. II-7

28 Section III As-Built Standards Title Page A. Public Infrastructure III-2 B. Grading & Drainage III-3 Note: The City of Brookfield As-Built Plan Standards have been provided in an effort to assist with As-built Preparation. This section was intended to provide general guidance to the design engineer. The City of Brookfield Engineering Division reserves the right to alter or add requirements through the review process. Specific questions not detailed in the following sections should be directed to the City Engineering Division ( ). III-1

CITY OF MUSKEGO DRAFTING STANDARDS

CITY OF MUSKEGO DRAFTING STANDARDS CITY OF MUSKEGO DRAFTING STANDARDS GENERAL - These standards apply to all plans. 1. Plans must be prepared on sheets measuring 36 inch across and 22 inch to 24 inch high unless otherwise specified under

More information

CHAPTER 11. Plan Standards

CHAPTER 11. Plan Standards CHAPTER 11 Plan Standards A. Introduction The city requires uniform public improvement plans for ease of record keeping and understanding. The following standards govern most plan submittals to the city.

More information

UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1

UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1 UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1 ENGINEERING STANDARDS FOR UTILITY AND STREET CONSTRUCTION PLANS MARCH 2014 CONSTRUCTION PLAN SHEET FORMAT REQUIREMENTS REPRODUCIBLE MYLAR 1.

More information

LOWNDES COUNTY ENGINEERING PLAN REVIEW CHECKLIST. Design Professional: Phone: Developer: Phone: 2 nd Submittal (No Fee)

LOWNDES COUNTY ENGINEERING PLAN REVIEW CHECKLIST. Design Professional: Phone: Developer: Phone: 2 nd Submittal (No Fee) MEMORANDUM MICHAEL B. FLETCHER, P.E. COUNTY ENGINEER 327 N. Ashley Street Valdosta, GA 31601 Telephone: (229) 671-2424 Fax: (229) 245-5299 mfletcher@lowndescounty.com LOWNDES COUNTY ENGINEERING PLAN REVIEW

More information

City of Massillon Site Plan Checklist

City of Massillon Site Plan Checklist City of Massillon Site Plan Checklist The following information MUST be included with all Site Plans submitted for review and processing in order to constitute a complete Site Plan Package. Incomplete

More information

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS 101 General 102 Submittal Requirements A. Initial Submittal B. Second Submittal 103 Plan Requirements A. Subdivisions B. Site Plans 104 Approval of

More information

Porter County Plan Commission

Porter County Plan Commission Plan Type: Development Plan Administrative DRC PC Primary Plan Administrative DRC PC Secondary Plat/Replat Administrative DRC PC PUD Conceptual Detailed Final Project Information Project Name: Developer

More information

Existing and proposed contours at 1-foot intervals. The fill and/or excavation quantities in cubic yards.

Existing and proposed contours at 1-foot intervals. The fill and/or excavation quantities in cubic yards. PLAN REQUIREMENTS The plans for street design shall conform to the requirements of Sections 3 and 4. The following requirements shall also be shown on the plans where applicable. Road and Storm Plans:

More information

Sewer Line Extension Permit Design Checklist

Sewer Line Extension Permit Design Checklist CHECKLIST C1 Revised 4/7/2017 Sewer Line Extension Permit Design Checklist DISCLAIMER - This checklist is provided to Consulting Engineers for the express purpose of assisting them in compiling sewer line

More information

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST YES* GENERAL SUBMISSION ITEMS Does the submission include: 1. Thirteen (13) copies of completed Application Form? 2. Thirteen (13) copies of the Preliminary

More information

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN N/A Waiver (1) Four (4) copies of application form. (2) Fifteen (15) copies of plan (3) Subdivision/site plan application fee & professional review escrow deposit (4) Variance application fee & professional

More information

SECTION III STANDARD DRAWINGS ROYSE CITY GENERAL CONSTRUCTION NOTES & DETAILS

SECTION III STANDARD DRAWINGS ROYSE CITY GENERAL CONSTRUCTION NOTES & DETAILS 9. STANDARD DETAILS SECTION III STANDARD DRAWINGS ROYSE CITY GENERAL CONSTRUCTION NOTES & DETAILS j:\clerical\royse city\1-4086 general services\168-tech const standards review\tcss manual\2018 tcss manual\sec-9a

More information

Appendix C Construction Details

Appendix C Construction Details 7172 Kennedy Road Warrenton, Virginia 20187 Appendix C Construction Details November 2017 TABLE OF CONTENTS THRUST BLOCKS Anchorage for 11 1/4 o, 22 1/2 o & 45 o Upper Vertical Bends... AV 01 Buttresses

More information

SECTION 3 IMPROVEMENT PLAN REQUIREMENTS

SECTION 3 IMPROVEMENT PLAN REQUIREMENTS SECTION 3 IMPROVEMENT PLAN REQUIREMENTS CONTENTS Page 3-1 Digital Submittals 3-2 3-2 Paper Size and Scale 3-2 3-3 Drafting Standard 3-2 3-4 Title Sheet 3-2 3-5 Title Block 3-3 3-6 Drainage, Sewer, Water,

More information

Authorized Agent: City of Manassas Check List Attached: Contact: Address: Phone Number: Fax Number: Developer s Name: Phone Number:

Authorized Agent: City of Manassas Check List Attached: Contact:   Address: Phone Number: Fax Number: Developer s Name: Phone Number: CITY OF MANASSAS DEPARTMENT OF COMMUNITY DEVELOPMENT DEVELOPMENT SERVICES DIVISION 9027 Center Street Room 201 Manassas, Virginia, 20110 Phone: 703-257-8278 Fax: 703-257-5831 Application Date: APPLICANT

More information

CITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS

CITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS CITY OF LA MARQUE CHAPTER 2 -------------------------------------------- GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS CHAPTER 2 ------------------------------------------------

More information

NEWTON COUNTY WATER AND SEWERAGE AUTHORITY RESIDENTIAL, COMMERCIAL, INSTITUTIONAL AND INDUSTRIAL SUBDIVISIONS CONSTRUCTION PLANS CHECK LIST

NEWTON COUNTY WATER AND SEWERAGE AUTHORITY RESIDENTIAL, COMMERCIAL, INSTITUTIONAL AND INDUSTRIAL SUBDIVISIONS CONSTRUCTION PLANS CHECK LIST NEWTON COUNTY WATER AND SEWERAGE AUTHORITY RESIDENTIAL, COMMERCIAL, INSTITUTIONAL AND INDUSTRIAL SUBDIVISIONS CONSTRUCTION PLANS CHECK LIST Project Name Checked By Date Designer Check List marks to be

More information

1.1 GENERAL RECORD DRAWING REQUIREMENTS

1.1 GENERAL RECORD DRAWING REQUIREMENTS Page 1 of 5 VILLAGE OF ROMEOVILLE RECORD DRAWINGS CHECKLIST PART I GENERAL Record drawings are required to provide a means of schematic verification that the intent of the approved engineering design has

More information

SECTION 39 - MANHOLES TABLE OF CONTENTS

SECTION 39 - MANHOLES TABLE OF CONTENTS SECTION 39 - MANHOLES TABLE OF CONTENTS Section Page 39-1 GENERAL... 39.1 39-2 PRECAST CONCRETE MANHOLES... 39.1 39-2.01 Precast Concrete Sewer Manholes... 39.1 39-2.02 Precast Concrete Storm Drain Manholes...

More information

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil ing Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST The following checklist consists of the minimum requirements for preparation

More information

Washington County Road Engineering Plan Submittal/Review Checklist

Washington County Road Engineering Plan Submittal/Review Checklist Washington County Road Engineering Plan Submittal/Review Checklist Washington County Land Use Case File Number: Parcel(s): Developer/Owner Name(s): Developer/Owner E-mail(s): The following elements should

More information

CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS

CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE E-10 ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS The City of Lompoc has determined that the Engineering Division should administer and issue Encroachment

More information

Subdivision Application Checklist

Subdivision Application Checklist City of Portsmouth, New Hampshire Subdivision Application Checklist This subdivision application checklist is a tool designed to assist the applicant in the planning process and for preparing the application

More information

BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006

BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006 Project Name: BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006 Phase: Unit: # Lots: Development Type (residential, commercial, industrial, etc.) Braselton Project No.

More information

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360)

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA 98501 (360) 754-4180 Email: cdd@ci.tumwater.wa.us WATER-SEWER-STREET-STORM (IN CITY) Submittal Checklist TUM - RCVD BY DATE STAMP APPLICANT INFORMATION

More information

Appendix E-4. City of Fort Collins. Requirements for Utility Plans

Appendix E-4. City of Fort Collins. Requirements for Utility Plans Appendix E-4 City of Fort Collins Requirements for Utility Plans Project Name: Project Planner: Design Engineering Firm: Developer: All applications for final development plans must include final development

More information

MAJOR GRADING PLAN CHECKLIST

MAJOR GRADING PLAN CHECKLIST MAJOR GRADING PLAN CHECKLIST PUBLIC WORKS DEPARTMENT / ENGINEERING DIVISION 8130 Allison Avenue, La Mesa, CA 91942 Phone: (619) 667-1166 Fax: (619) 667-1380 Grading plans shall address both rough grading

More information

DEVELOPMENT PLAN CHECKLIST

DEVELOPMENT PLAN CHECKLIST Project Identification Information: DEVELOPMENT PLAN CHECKLIST 1.0 GENERAL 1.1 Additional information as required by specific Land Use 1.2 All sheets to include sheet number ( of ) 1.3 Seal and signature

More information

3. DESIGN SPECIFICATIONS

3. DESIGN SPECIFICATIONS Schedule H to Bylaw 7452, Subdivision Bylaw Page 10 3. DESIGN SPECIFICATIONS 3.1 General 3.1.1 The Design Specifications apply to the design of sanitary sewers, storm drains, waterworks, roadways, and

More information

Town of Westlake Construction Plans Review Checklist

Town of Westlake Construction Plans Review Checklist CONSTRUCTION PLANS CONTENTS All Drawings 24 x 36 Cover Sheet Final Plat Site Plan Demolition Plan Utility Plan Drainage Area Map and Calculations Paving Plan & Profile Sheets Storm Drain Plan & Profile

More information

SAUSALITO-MARIN CITY SANITARY DISTRICT MISCELLANEOUS UPGRADES PROJECT. Addendum No. 2

SAUSALITO-MARIN CITY SANITARY DISTRICT MISCELLANEOUS UPGRADES PROJECT. Addendum No. 2 SAUSALITO-MARIN CITY SANITARY DISTRICT MISCELLANEOUS UPGRADES PROJECT Addendum No. 2 The following shall modify the Contract Documents. The work shall be accomplished in accordance with such modifications.

More information

KC Water Rules and Regulations For Water Main Extensions and Relocations

KC Water Rules and Regulations For Water Main Extensions and Relocations KC Water Rules and Regulations For Water Main Extensions and Relocations MAY 2017 NOTE: Changes from 2016 are highlighted in yellow and appear on Pages 5, 8, 10-11, 13, and 15. Additional changes made

More information

APPENDIX 4. Checklists. Township of King Design Criteria and Standard Detail Drawings

APPENDIX 4. Checklists. Township of King Design Criteria and Standard Detail Drawings APPENDIX 4 Checklists Township of King Design Criteria and Standard Detail Drawings Township of King Design Criteria and Standard Detail Drawings APPENDIX 4 CHECKLISTS Engineering Submissions : The following

More information

STANDARD BID ITEM NUMBERS

STANDARD BID ITEM NUMBERS 10701 TRAFFIC CONTROL LUMP SUM 10702 Traffic Control for Storm Sewer Installation LUMP SUM 10703 Traffic Control for Water Main Installation LUMP SUM 10704 Traffic Control for Sanitary Sewer Installation

More information

SUBDIVISION APPLICATION FOR DRT SUBMITTAL PUBLIC WORKS DEPARTMENT

SUBDIVISION APPLICATION FOR DRT SUBMITTAL PUBLIC WORKS DEPARTMENT Case #: SUBDIVISION APPLICATION FOR DRT SUBMITTAL PUBLIC WORKS DEPARTMENT 171 North Ross Street, Suite 200 Auburn, AL 36830 (334) 501-3000 ~ Fax: (334) 501-7294 Applicant Name: Mailing Address: Email Address:

More information

Plan Preparation Checklist

Plan Preparation Checklist Appendix D Plan Preparation Checklist It is the responsibility of the Designer to complete and submit this checklist along with all required drawings for OUC (EFP) Review. All drawings submitted for OUC

More information

SECTION MANHOLES

SECTION MANHOLES SECTION 33 05 13 MANHOLES PART 1 GENERAL 1.01 SECTION INCLUDES A. CONTRACTOR shall furnish and install precast concrete manhole base, sections, adjusting rings, steps, and manhole ring and cover, complete.

More information

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION 4.0. INTRODUCTION PART 4 STANDARD DRAWINGS FOR CONSTRUCTION In this document, Ivins City adopts the most recent edition (currently 2007), including all amendments, of the APWA Utah Chapter s Manual of

More information

Grease Interceptor Design Checklist

Grease Interceptor Design Checklist CHECKLIST C2 Revised 5/2/2016 Grease Interceptor Design Checklist Public Works DISCLAIMER - This checklist is provided to Consulting Engineers for the express purpose of assisting them in compiling private

More information

Anne Arundel County Dept. of Inspections and Permits Storm Drain Checklist

Anne Arundel County Dept. of Inspections and Permits Storm Drain Checklist Project Name Project Number Engineer Plans are to be designed based on the standards set forth in the Anne Arundel County Design Manual Standards and Specifications, and all other manuals as stipulated

More information

Project Name: County File No.: Checked by: For: Date:

Project Name: County File No.: Checked by: For: Date: Project Name: County File No.: Checked by: For: Date: Print name Firm or agency Items noted in the checklist shall be considered the minimum amount of information necessary for submission of construction

More information

SECTION III SUBMITTALS AND APPROVALS

SECTION III SUBMITTALS AND APPROVALS SECTION III SUBMITTALS AND APPROVALS In order to expedite the approval process of new water distribution system and sanitary sewer collection system extensions, the Hilton Head No. 1 Public Service District

More information

CITY OF REEDLEY NEW DEVELOPMENT PLAN REVIEW CHECK LIST

CITY OF REEDLEY NEW DEVELOPMENT PLAN REVIEW CHECK LIST CITY OF REEDLEY NEW DEVELOPMENT PLAN REVIEW CHECK LIST Tract Number and Subdivision Name: Engineering Firm: Contact Person: Address: City: State: Zip: Phone No. Fax No. Assessor s Parcel Number(s) Tentative

More information

WATER & SEWER CONSTRUCTION SITE PLAN DESIGN SUMMARY COMMERCIAL & RESIDENTIAL

WATER & SEWER CONSTRUCTION SITE PLAN DESIGN SUMMARY COMMERCIAL & RESIDENTIAL WATER & SEWER CONSTRUCTION SITE PLAN DESIGN SUMMARY COMMERCIAL & RESIDENTIAL This summary is not all inclusive of the requirements set forth by the York County Planning & Development Services, York County

More information

SCHEDULE 10 ENGINEERING DRAWING SUBMISSION

SCHEDULE 10 ENGINEERING DRAWING SUBMISSION SCHEDULE 10 ENGINEERING DRAWING SUBMISSION Subdivision, Development and Servicing Bylaw No. 1535 10. ENGINEERING DRAWING SUBMISSIONS TABLE OF CONTENTS 1.0 General 3 1.1. Introduction 3 1.2. General Requirements

More information

Chapter 13 Plan Submittals

Chapter 13 Plan Submittals Chapter 13 Plan Submittals U30013.DOC 02/01/07 Chapter 13 Plan Submittals Section Topic Page 13.1 General 13.1 13.2 Subdivision Plans 13.1 13.3 Capital Improvement Project Plans 13.12 U30013.DOC 02/01/07

More information

CHAPTER 3 INFORMATION REQUIRED FOR PUBLIC IMPROVEMENT CONSTRUCTION PLANS TABLE OF CONTENTS

CHAPTER 3 INFORMATION REQUIRED FOR PUBLIC IMPROVEMENT CONSTRUCTION PLANS TABLE OF CONTENTS CHAPTER 3 INFORMATION REQUIRED FOR PUBLIC IMPROVEMENT CONSTRUCTION PLANS TABLE OF CONTENTS Section Title Page 3.1 General... 3-1 3.1.1 Plan Set...3-1 A. Loveland (City Limits Only)...3-1 3.1.2 Final Mylars...3-1

More information

ACSA PLAN REVIEW CHECKLIST (Guideline Only) (4) Standard water and sewer general plan notes (attached).

ACSA PLAN REVIEW CHECKLIST (Guideline Only) (4) Standard water and sewer general plan notes (attached). ACSA PLAN REVIEW CHECKLIST (Guideline Only) Revised: December 3, 2015 General (1) Proper Title (2) Vicinity map on first sheet. (3) Date and latest plan revision. (4) Standard water and sewer general plan

More information

Council Policy Engineering Drawing Submission Requirements

Council Policy Engineering Drawing Submission Requirements POLICY 265 City of Kelowna 1435 Water Street Kelowna, BC V1Y 1J4 250 469-8500 kelowna.ca Council Policy Engineering Drawing Submission Requirements APPROVED June 4, 2001 RESOLUTION: R375/10/04/26 REPLACING:

More information

List of Figures. List of Forms

List of Figures. List of Forms City of Columbia Engineering Regulations PART 1: SUBMISSION OF PLANS Table of Contents Paragraph Description Page No. 1.1 General 1-1 1.2 Engineer s Report 1-1 1.3 Plans 1-3 1.4 Revisions to Approved Plan

More information

City of Beaumont. Public Works Engineering. Street Improvement Plan Checklist REV 4/18/16

City of Beaumont. Public Works Engineering. Street Improvement Plan Checklist REV 4/18/16 City of Beaumont Public Works Engineering Project Name: TR: Project No.: Date: Street Improvement Plan Checklist Chk A. All Sheets 1. 24" x 36" 2. Signed by the engineer-of-work 3. Marked with the contact

More information

SECTION MANHOLES

SECTION MANHOLES SECTION 02601 MANHOLES PART 1 GENERAL 1.01 SCOPE OF WORK A. WORK required under this section consists of all materials, accessories, equipment, tools, and labor required to install precast concrete standard

More information

Survey Requirements. Design Guidelines and Standards. June Office of the University Architect

Survey Requirements. Design Guidelines and Standards. June Office of the University Architect Design Guidelines and Standards Survey Requirements June 2004 Office of the University Architect Construction Management P.O. Box 210181 Cincinnati, Ohio 45221-0181 Table of Contents Survey Requirements

More information

Anne Arundel County Dept. of Inspections and Permits Water Sewer Plan Checklist

Anne Arundel County Dept. of Inspections and Permits Water Sewer Plan Checklist Project Name Project Number Engineer Plans are to be designed based on the standards set forth in the Anne Arundel County Design Manual Standards and Specifications, and all other manuals as stipulated

More information

MSD STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY

MSD STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY MSD M etr o p olitan S e w e r Di s t r ict STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY 40203-1911 STANDARD DRAWINGS DIVISION

More information

Engineering and Construction Services Division Construction Drawings for Sewers and Watermains. T No. Revision T No. Revision Remarks All T drawings

Engineering and Construction Services Division Construction Drawings for Sewers and Watermains. T No. Revision T No. Revision Remarks All T drawings Engineering and Construction Services Division Construction Drawings for Sewers and Watermains Revision No. 8 April All T drawings New title block for each drawing is now standardized. Revision numbers

More information

PLANNING AND DEVELOPMENT

PLANNING AND DEVELOPMENT OVERVIEW Effective January 1, 1992 all applications for multi-family residential and all non-residential building permits require site plan approval before permit issuance. All new developments and existing

More information

DESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA

DESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA DESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA 94544-1395 PUBLIC WORKS DESIGN GUIDELINES TABLE OF CONTENTS SD-100 SERIES SPECIAL DRAWINGS SD-100 8/1991 SILT

More information

Oil-Water Separator Design Checklist

Oil-Water Separator Design Checklist CHECKLIST C3 Revised 5/2/2016 Oil-Water Separator Design Checklist DISCLAIMER - This checklist is provided to Consulting Engineers for the express purpose of assisting them in compiling private oil-water

More information

Application for Site Plan Review

Application for Site Plan Review Application for Site Plan Review 3275 Central Blvd., Hudsonville, Michigan 49426-1450, 616.669.0200 fax 616.669.2330 It is STRONGLY recommended that any application that must go before the Planning Commission

More information

3. The PAC (Permit Application Center) will notify the design professional of plan review results.

3. The PAC (Permit Application Center) will notify the design professional of plan review results. Planning and Development Dept. Infrastructure Division P.O. Box 11706, or 155 Johnston Street Rock Hill, South Carolina 29731-1706 Phone: 803-329-5515 FAX: 803-329-7228 www.cityofrockhill.com AS-BUILT

More information

1 MUNICIPAL INFRASTRUCTURE

1 MUNICIPAL INFRASTRUCTURE Engineering Design Criteria & Standard Drawings Page 5 1 MUNICIPAL INFRASTRUCTURE 1.1 Drawing & Submission Requirements 1.1.1 General This section discusses the requirements for the submission of engineering

More information

ACWWA DRAWING SUBMITTAL INFORMATION - UTILITY DRAWING REQUIREMENTS

ACWWA DRAWING SUBMITTAL INFORMATION - UTILITY DRAWING REQUIREMENTS ACWWA DRAWING SUBMITTAL INFORMATION - UTILITY DRAWING REQUIREMENTS Detailed construction drawings for system extensions shall be prepared for approval with a submittal to the Authority. All construction

More information

Pipe Product Catalog Table of Contents

Pipe Product Catalog Table of Contents Pipe Product Catalog Table of Contents Section A: Drawing #: Page Description A1 Reinforced Concrete Pipe A3 Storm Manhole Sizing Chart (48" - 96") A3.1 Storm Manhole Sizing Chart (108" - 144") A4 48"

More information

PRELIMINARY PLAT CHECK LIST

PRELIMINARY PLAT CHECK LIST Name of Proposed Subdivision: The following items must be included with the initial submittal of a Preliminary Plat: Application, filled out completely Project Narrative Pre-application Conference Report

More information

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.)

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.) 1. Identification CITY OF FENTON 301 South Leroy Street Fenton, Michigan 48430-2196 (810) 629-2261 FAX (810) 629-2004 Site Plan Review Application Project Name Applicant Name Address City/State/Zip Phone

More information

CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION:

CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION: CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION: LOG NO.: LEGEND REVIEW REVIEWED BY DATE / - Requirement satisfied 1 O Requirement not satisfied 2?

More information

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil ing Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST The following checklist consists of the minimum requirements for preparation

More information

Please remove and replace the entire Table of Contents, Section A to Section J and all Appendices.

Please remove and replace the entire Table of Contents, Section A to Section J and all Appendices. Please remove and replace the entire Table of Contents, Section A to Section J and all Appendices. The following is a list of changes to the Design Criteria: 1. A2.01 General Note 4 Utility Coordination

More information

TOWN of LAKESHORE SITE PLAN CHECKLIST

TOWN of LAKESHORE SITE PLAN CHECKLIST TOWN of LAKESHORE SITE PLAN CHECKLIST Last Revised December 17, 2009 Project Name: Project Location: Date Submitted: Name Phone Number E-mail Address Owner: Contractor/ Engineer: ( ) ( ) Applicant: ( )

More information

CONSTRUCTION SPECIFICATION FOR MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION

CONSTRUCTION SPECIFICATION FOR MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 407 NOVEMBER 2013 CONSTRUCTION SPECIFICATION FOR MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION TABLE OF CONTENTS 407.01

More information

STORM M ANHOLE FOR 42" PIPE AND SM ALLER JOB NO. SHEET NO. DATE MARCH 2015 OF MIN OF 3 CRSES MAX OF 5 CRSES 30"MAX 3 OR 3.5 PRECAST ECCENTIC CONC

STORM M ANHOLE FOR 42 PIPE AND SM ALLER JOB NO. SHEET NO. DATE MARCH 2015 OF MIN OF 3 CRSES MAX OF 5 CRSES 30MAX 3 OR 3.5 PRECAST ECCENTIC CONC 01-APR-2015 13:33 = I:\MSV8i\Plotting\piblack.ptb V:\201001\\C\8x11_Howell_Det\stm_det01_8x11_st01.dgn TIME = MIN 3 CRSES MAX 5 CRSES 3 OR 3.5 PRECAST ECCENTIC CONC ID PIPE GRADE A CONC FILL 4" 8" 2-0"SUMP

More information

City of Vaughan Engineering Department DESIGN STANDARD DRAWINGS

City of Vaughan Engineering Department DESIGN STANDARD DRAWINGS City of Vaughan Engineering Department DESIGN STANDARD DRAWINGS March 2004 STANDARD DRAWINGS Partners With The Environment March 2004 FORWARD The March 2004 version of the City of Vaughan Design Standard

More information

.1 Applicability: These criteria shall be applied as follows:

.1 Applicability: These criteria shall be applied as follows: DESIGN CRITERIA DIVISION 4800 STREET LIGHTING 4801 GENERAL: These criteria shall be adhered to for the design of all publiclyfinanced or privately-financed traffic signal systems to be installed in the

More information

September 21, Mannik Smith Group 1771 North Dixie Highway Monroe, Michigan RE: LA Fitness City File No.: CVLP

September 21, Mannik Smith Group 1771 North Dixie Highway Monroe, Michigan RE: LA Fitness City File No.: CVLP CITY OF ANN ARBOR, MICHIGAN Public Services Area / Engineering 301 E. Huron Street, P.O. Box 8647 Ann Arbor, Michigan 48107 Phone (734) 794-6410 Fax (734) 994-1744 Web: www.a2gov.org Printed on recycled

More information

SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS

SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS INCORPORATED VILLAGE OF ROCKVILLE CENTRE BUILDING DEPARTMENT SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS Presubmission - Prior to a formal submission, the applicant should meet in person with

More information

B-PERMIT PLAN CHECK MANUAL

B-PERMIT PLAN CHECK MANUAL B-PERMIT PLAN CHECK MANUAL 5. SEWER PLANS Sewer Plans are usually submitted in conjunction with Street Plans to meet the requirements of conditions imposed on a Planning or Zoning action. In some cases

More information

CONCEPT REVIEW GUIDELINES

CONCEPT REVIEW GUIDELINES Department of Planning & Community Development @ Jefferson Station 1526 E. Forrest Avenue Suite 100 East Point, GA 30344 404.270.7212 (Phone) 404.765.2784 (Fax) www.eastpointcity.org CONCEPT REVIEW GUIDELINES

More information

MULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST

MULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST MULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST This application lists the content and format of the submittal requirements to initiate the Design Review process. An incomplete application will not be

More information

CHECKLIST 9-O. 24. Area of project in square feet and acres? C-1 d

CHECKLIST 9-O. 24. Area of project in square feet and acres? C-1 d Development Name: Submitted by: Highlands County Engineering Department Improvement Plan Checklist Date Received: Due Date: Y N E N / S O A Permits/Approvals 1. Copy of water management district permit

More information

APPENDIX K DEPARTMENT OF PLANNING AND CODE ENFORCEMENT SUBDIVISION APPLICATION CENTER SUBMITTAL CHECKLIST

APPENDIX K DEPARTMENT OF PLANNING AND CODE ENFORCEMENT SUBDIVISION APPLICATION CENTER SUBMITTAL CHECKLIST VI-K -1 of 8 APPENDIX K DEPARTMENT OF PLANNING AND CODE ENFORCEMENT SUBDIVISION APPLICATION CENTER SUBMITTAL CHECKLIST Final Submittal Major Subdivision Project Name Subdivision Number Location (Street

More information

SECTION 6A ROADWAY PLAN PREPARATION

SECTION 6A ROADWAY PLAN PREPARATION SECTION 6A ROADWAY PLAN PREPARATION Table of Contents Page No 6A.1 GENERAL...1 6A.2 PRELIMINARY PLANS...3 6A.2.1 PRELIMINARY PLAN SHEETS...3 6A.2.2 PRELIMINARY PROFILE SHEETS...4 6A.3 PHASE A PLANS...4

More information

Essential Skills: Reading and Interpreting Maps and Plans

Essential Skills: Reading and Interpreting Maps and Plans Essential Skills: Reading and Interpreting Maps and Plans Prepared for: NEW YORK STATE PLANNING FEDERATION April 14, 2015 Prepared by: BME ASSOCIATES Peter G. Vars, P.E. Stages of Plan Review Concept /

More information

STATE UNIVERSITY CONSTRUCTION FUND

STATE UNIVERSITY CONSTRUCTION FUND DIRECTIVE 1C-12 Issue date: August 2012 1. General SURVEY, MAPPING AND UTILITY LOCATING This Directive has been developed as a general guide for the survey and mapping effort required for Fund projects.

More information

VILLAGE OF VILLA PARK CENTRAL BOULEVARD IMPROVEMENTS LOCATION MAP (NOT TO SCALE) CORTESI AVE. MYRTLE AVE. CENTRAL BLVD.

VILLAGE OF VILLA PARK CENTRAL BOULEVARD IMPROVEMENTS LOCATION MAP (NOT TO SCALE) CORTESI AVE. MYRTLE AVE. CENTRAL BLVD. Q:\VillaPark_IL\11283000 Astor-Myrtle Sewer Separation Preliminary Design\D.4 CAD\Sheets\North\1. Cover.dwg INDEX OF SHEETS 1 COVER 2 GENERAL NOTES 3 SUMMARY OF QUANTITIES 4 ALIGNMENT 5-9 DRAINAGE AND

More information

CITY OF VISTA STANDARD DRAWINGS

CITY OF VISTA STANDARD DRAWINGS CITY OF VISTA STANDARD DRAWINGS May, 2015 THIS SHEET INTENTIONALLY LEFT BLANK TABLE OF CONTENTS MODIFICATIONS Modifications to San Diego Regional Standard Drawings DRAINAGE STRUCTURES DRN 01 Corrugated

More information

CITY OF SALEM DEPARTMENT OF PUBLIC WORKS ADMINISTRATIVE RULES CHAPTER 109 DIVISION 002 DRAFTING AND DRAWING STANDARDS

CITY OF SALEM DEPARTMENT OF PUBLIC WORKS ADMINISTRATIVE RULES CHAPTER 109 DIVISION 002 DRAFTING AND DRAWING STANDARDS CITY OF SALEM DEPARTMENT OF PUBLIC WORKS ADMINISTRATIVE RULES CHAPTER 109 DIVISION 002 DRAFTING AND DRAWING STANDARDS SECTION 2.1 INTRODUCTION... 1 (a) Objective...1 (b) Applicability...1 2.2 SUBMITTAL

More information

MINOR SUBDIVISION. [ ] [ ] [ ] [ ] B. Dimensions, bearings and curve data for all property lines and easements.

MINOR SUBDIVISION. [ ] [ ] [ ] [ ] B. Dimensions, bearings and curve data for all property lines and easements. MINOR SUBDIVISION 190-69. Minor subdivisions. In addition to the requirements indicated in 190-67 (SEE BELOW), the information below shall be shown on the plans for all minor subdivision applications.

More information

This specification describes the minimum requirements for piping systems for the following service:

This specification describes the minimum requirements for piping systems for the following service: SPEC-3004 1/7 1.0 APPLICATION This specification describes the minimum requirements for piping systems for the following service: Service Water Design Conditions Operating Conditions 10 PSIG @ 33 o F to

More information

SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT

SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT SINGLE-FAMILY SITE PLAN INFORMATION PACKET GENERAL INFORMATION This information packet explains how your application for a single-family site plan will

More information

SECTION 9.00 AS-BUILT DRAWING REQUIREMENTS SUB-INDEX

SECTION 9.00 AS-BUILT DRAWING REQUIREMENTS SUB-INDEX SECTION 9.00 AS-BUILT DRAWING REQUIREMENTS SUB-INDEX 9.00 AS-BUILT DRAWING REQUIREMENTS 9.01 As-Built Check List 1 Supp 1 2016 Supp # 2 Aug. 2017 AS-BUILT DRAWING REQUIREMENTS As-Built Review Fee is $200.00

More information

RECORD DRAWINGS REVISED TO CONFORM TO CONSTRUCTION RECORDS PROVIDED BY CONTRACTOR GMG BY DATE 11/13 CRS NO.

RECORD DRAWINGS REVISED TO CONFORM TO CONSTRUCTION RECORDS PROVIDED BY CONTRACTOR GMG BY DATE 11/13 CRS NO. CELL: (715) 803-8009 MABOSI@WISCONSINPUBLICSERVICE.COM CELL: (715) 573-7806 CHVIRCKS@WISCONSINPUBLICSERVICE.COM CALVIN.KLADE@FTR.COM DGAU@KRONENWETTER.COM SCOTT OLSEN (715) 302-1348 S REVISED TO CONFORM

More information

Ecological Restoration Drafting & Design Guidelines

Ecological Restoration Drafting & Design Guidelines Ecological Restoration Drafting & Design Guidelines Version 2.0 July 2017 Philadelphia Water Ecological Restoration Drafting & Design Guidelines Table of Contents 1.0 INTRODUCTION...2 2.0 GENERAL PLAN

More information

Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02

Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02 Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02 1. INTRODUCTION This standard is written to provide the professional surveyor (Surveyor) and the client with a guideline for producing

More information

50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges

50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges 50.24 Culverts, Bridges and Culvert Bridges Type, Size and Location (T, S & L) Plans shall be required for all Bridges, Culvert Bridges and Culverts of eight-foot (8') clear span or greater as follows:

More information

SECTION BASIC MATERIALS AND METHODS

SECTION BASIC MATERIALS AND METHODS SECTION 15050 BASIC MATERIALS AND METHODS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Pipe and Fittings. 1.02 RELATED SECTIONS A. Basic Mechanical Requirements: Section 15010. B. Supports, Anchors, and Seals:

More information

CITY OF VISTA STANDARD DRAWINGS

CITY OF VISTA STANDARD DRAWINGS CITY OF VISTA STANDARD DRAWINGS May, 2015 THIS SHEET INTENTIONALLY LEFT BLANK TABLE OF CONTENTS MODIFICATIONS Modifications to San Diego Regional Standard Drawings DRAINAGE STRUCTURES DRN 01 Corrugated

More information

APPLICATION FOR SITE PREPARATION PERMIT

APPLICATION FOR SITE PREPARATION PERMIT Engineering Division 550 Landa Street New Braunfels, Texas 78130 (830) 221-4020 1. Subdivision/Plat Name: Location Description/ Nearest Intersection: Acreage: APPLICATION FOR SITE PREPARATION PERMIT No.

More information

REQUIREMENTS. for ENGINEERING SERVICES PUBLIC CONSTRUCTION PROJECTS

REQUIREMENTS. for ENGINEERING SERVICES PUBLIC CONSTRUCTION PROJECTS REQUIREMENTS for ENGINEERING SERVICES on PUBLIC CONSTRUCTION PROJECTS April, 2007 David W. Johnson Senior Engineer Design & Construction Requirements for Engineering Services on Public Construction Projects

More information

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS Section 1 Definitions 2 Scope of Work 3 Extent of Work 4 Inspection and Performance of Work 5 Trenching 6 Duct Installation

More information