Mastering the Machine

Size: px
Start display at page:

Download "Mastering the Machine"

Transcription

1

2 Table of Contents 1 INTRODUCTION 3 2 CONCEPTING THE SYSTEM Establishing System Requirements Selecting a Method Applications Vendor Selection 7 3 DESIGNING THE SYSTEM AND MACHINERY Project Review Mechanical Design Electrical Design Controls and Software Design Safety and Risk Analysis 15 4 BUILDING THE SYSTEM 16 5 ACCEPTANCE AND RUNOFF 17 6 FINAL DOCUMENTATION 18 Appendix A Design and Documentation Checklist 20 2

3 Mastering the Machine A Step-by-Step Guide to Planning, Building and Documenting 1 Introduction Planning and building a production line is a process that can take many months or even years to accomplish. Whether it is a simple machine with a few peripheral material handling sections or a complex multi-million dollar system, it is critical that the process is carefully executed so that it meets budgetary, schedule and performance requirements. There are three common methods a manufacturing company can employ to achieve this goal. The first is to use a company that offers turnkey projects, handling everything from design and scheduling to installation. The second is to purchase all of the elements of the production line separately and assemble them on the plant floor, possibly with the help of a systems integrator. The third is to build the machinery in-house, possibly purchasing some specialty equipment from outside vendors. Many steps among the three methods may overlap, but the delegation of responsibilities differs in each method. This comprehensive guidebook describes all of the stages and steps required for each method in order for a manufacturer to successfully implement a production line. This book will also help guide its readers through the complex maze of documentation and design tools required to accomplish this task. Take note! The following legend is crucial for understanding the documentation process. While secondary and tertiary documents are not optional, there is a sequence to the order of documentation. Listed beneath each subchapter is a list of color-coded requirements in each phase. Here is what the colors represent: 2 Concepting the System Manufacturers usually have a rough idea of the type of system they want, or at least the expected results. They may have an existing production line or machine that is already making product, or they may have a process in mind that will achieve the desired result but that has never been tested. Alternatively, they may 3

4 have no idea at all how to achieve their goal. Regardless of the manufacturer s starting point, this is the phase in which the idea for a machine or process starts to become reality. 2.1 Establishing System Requirements Requirements Documentation Product Specifications Plant Specifications In order to define the system, the basic requirements must be outlined. The resulting requirements documentation should include a description of the product being manufactured, the specifications that must be followed in its manufacture, and an outline of the purpose and scope of the project. The document should not define the technical solution that will be used to produce the product. The first step in developing a concept for a new production system is to determine the required output over time. This can be expressed as parts per period or, in the case of a continuous process, as volume or weight per period. As requirements for the product and process are developed, a manufacturer should also attempt to determine whether the project is viable. In other words, is there justification for proceeding with the project? This is often linked with the cost of labor (number of operators), energy (electricity, water, gas) and new equipment. The individual components used to make up the product itself are also identified at this stage, along with consumables such as adhesives or packaging materials. Most manufacturing companies also have specifications for electrical and mechanical equipment already developed. This may include preferred brands for components, required materials to be used or avoided, fabrication and assembly techniques and any other standards that vendors must adhere to. All of these standards should be referenced in the requirements documentation, which may then be used to provide potential vendors with sufficient information to quote the system or their portion of it. The amount of space available on the factory floor may also be included in the documentation. If floor space has already been designated for a new production line, information such as square footage, maximum equipment height and available utilities may be described here. 2.2 Selecting a Method Quote Requests Vendor Qualification After establishing the production machinery requirements, the method used to implement the project must be determined. A manufacturer may already have vendors the company has worked with in the past. If so, documentation of those companies capabilities, histories, financial conditions and references should already exist in the manufacturer s records. If not, information can be obtained from the vendors themselves, sourced from a questionnaire, website, Dunn and Bradstreet report or other trade resources. 4

5 Figure 1 - Vendor Solution Spectrum As illustrated in figure 1, there is a range of possibilities for implementing a production line. Some manufacturers have a great deal of in-house capabilities when it comes to designing, building and commissioning a new system. Even then special equipment such as packaging machinery, conveyors, test equipment and vibratory bowls are usually purchased from vendors. Other manufacturers may choose to engage an engineering firm or large custom machine builder to deliver and install a turnkey system. In this case, the vendor is taking on the responsibility of ensuring the entire system performs as specified in exchange for an increased margin on all of the associated equipment used for the project. Many systems fall somewhere in between. Even when a large system is designed and built by a custom machine builder, utility connections and millwright services may be handled in-house or by using contractors. Packaging machinery, test equipment and material handling may be purchased separately and integrated into the system. Project management is a key requirement for the manufacturer. The purchaser of the production line usually has a certified project management professional (PMP) in overall control of the project regardless of the method selected. The project manager keeps a master schedule or Gantt chart that includes the work breakdown structures of all the project vendors, dependency relationships between processes and the durations of the design and build stages. Project managers are also tasked with monitoring the budget and scope of the entire project. Vendors may or may not have project managers for their part of the project. Even large machine builders and engineering firms rarely have certified PMPs. Typically an engineer is assigned to these duties. They will likely be able to provide Gantt charts and reports for their part of the system; however, budget and project details may not be easily accessible to the manufacturer/purchaser. 2.3 Applications Proposal Quote Spreadsheet System Architecture Solid Models or Drawings Process Description 5

6 Requirements Documentation Plant Specifications Product Drawings and Samples The proposal and preliminary design of a system is usually handled by an applications engineer or department. In many cases, a sales representative from a vendor has already been in contact with the customer and provided preliminary information to the vendor. This information may include a rough description of a proposed solution as well as the requirements and product specifications outlined in chapter 2.1. Applications engineers often work with designers and other personnel to narrow down methods of processing the product. They may be in direct contact with the customer, typically through the vendor s technical salesperson. In some smaller companies, the role of an applications engineer may also encompass technical sales or design engineering responsibilities as well. Ideally, an applications engineer will want a sample of the product as well. As the proposed solution is designed, a quote spreadsheet is typically used to break down component costs and estimations of labor. A common method used to organize this document is to assign each sensor, actuator, HMI screen and auxiliary device a number of labor hours by discipline. Mechanical and electrical design, PLC and HMI programming and assembly hours can all be handled in this way. Most standard components are not broken down into actual quoted prices from the distributor, but are instead treated as generic items. Test equipment, fastening tools and other auxiliary equipment may be quoted by third parties or historical pricing data used in the spreadsheet. This method of estimating cost though somewhat imprecise saves time when generating quotes. An additional margin is added for purchased devices and riskier parts of the application. Labor costs are generated by discipline, breaking down loaded costs for engineering, assembly, documentation and project management. Machine framing, guarding and structural steel may be calculated by weight or square footage. Fabrication and machining hours are also sometimes handled in this way. 6

7 Figure 2 - System Architecture Concept and system architecture drawings are also generated for inclusion in the proposal. Many companies use solid models to paint a picture of what different parts of the system will look like. Other graphics programs, such as AutoCAD or Microsoft Visio, may be used to generate architectures and other diagrams. The end result of the applications process is to generate a written proposal with firm pricing and scheduling for the customer. 2.4 Vendor Selection Purchase Order Contract and Terms Gantt Chart Team/Contact Info After vendors have been selected, purchase orders are issued for equipment. Payment terms can vary widely, but usually an initial deposit is billed upon receipt of the order, an additional billing occurs after a certain amount of design has occurred or parts are ordered, a third billing takes place after a successful 7

8 runoff at the builder s location (Factory Acceptance Testing or FAT), and final billing occurs after runoff at the purchaser s facility (Site Acceptance Test or SAT). Percentages for these milestones are often negotiated beforehand since requested terms often differ between vendor and buyer. A contract is often signed with stipulations in case of late delivery, order cancellation or other clauses. These contractual provisions may be required in addition and prior to the generation of a Statement of Work (SOW). If a turnkey solution is used for a large system, this process is often repeated among the main contractor, subcontractors and OEMs. This can be repeated several layers deep to the point where it is difficult for the purchaser to see all of the scheduling details at every level. Communication among all levels of project implementation is a key component of a project s success. Figure 3 - Project Schedule Gantt Chart After the project manager has created a master Gantt chart for the system, it is important that it is updated regularly. As subcontractors update their charts typically on a weekly basis results need to be reflected on the master chart of the customer s project manager. To help facilitate communication among all of the team members involved in a project, a chart or list is often generated with contact information including names, titles, s and phone numbers. Putting this in a chart format can be useful to help illustrate each member s position and responsibilities within the organization. Team contact information may include subcontractor personnel also, but aside from qualification purposes, subcontractor personnel are usually not contacted directly by the purchaser. 8

9 3 Designing the System and Machinery After the purchase orders are placed and contracts signed by the appropriate representatives, a formal Statement of Work (SOW) is usually issued. This can be considered as the beginning of the design process. A kickoff meeting is often held at the beginning of the project to acquaint team members and review the project. This meeting is usually scheduled to give team leaders adequate time beforehand to review specifications and preliminary design information. 3.1 Project Review Statement of Work (SOW) Proposal Project Schedule Before and during the project kickoff meeting all parties involved review the existing project documentation. Negotiations concerning details of the project should be captured in the SOW document generated by the purchaser. The Statement of Work encapsulates the deliverables and work activities as detailed in the proposal generated by the vendor. The project schedule should be updated and reflected accurately in the SOW, and details of the requirements documentation may also be reiterated at this point. A common mistake that is often made when creating the SOW is that the manufacturer does not capture and align differences between the requirements documentation and the vendor s proposal. The SOW is usually considered a formal binding contract between vendor and purchaser, so if differences between the proposal and SOW exist, litigation will usually side with the SOW since the document was created later in the process and is, therefore, considered more final. Revisions to the SOW are not uncommon even after the kickoff meeting. Representatives of both parties should sign the SOW and all its revisions to bind the agreement. The project schedule often changes for many reasons engineering changes, part availability and unforeseen occurrences can all affect the schedule. The purchaser and vendor must both agree to clauses that address these circumstances. 3.2 Mechanical Design Timing Chart Solid Models 2D Prints (Assembly Drawings) Stress/Load Analysis Motor Sizing Pneumatic, Hydraulic and Piping Sizing Mechanical BOM Proposal Statement of Work Concepts outlined in the proposal may have changed during the project review. These are not necessarily reflected in the SOW unless they impact the cost or procedural aspects of the project. As mentioned in the applications section of this book, solid models may have been created as part of the proposal. If the 9

10 project description has not changed drastically, these solid models can serve as the basis for the mechanical design. If the manufacturing method has changed since the proposal, a new description of the process should be contained in the SOW. The first step many designers take is to create a rough outline of what the system will look like. A sequential list of operations is generated and actuators identified. This becomes the basis for a timing chart, which shows a graphical representation of machine operation. The timing chart is an important means of communication among the mechanical, electrical and controls engineering teams since it creates the names of many of the machinery actuators and processes. Because of this, all teams should have input into the contents of the timing chart. Figure 4 - Mechanical Timing Chart Solid modeling software allows a designer to simulate actuator movement, check for interferences and sometimes even calculate forces and stresses for machinery. There are also other simulation software products used to calculate stress and strain for mechanical systems and finite element analysis. Structural weights can be easily calculated since the type of material is usually designated in the model properties. Solid modeling software is also used to generate two-dimensional (2D) prints for machinists and assembly technicians. These prints may be used to generate CNC programs or maintained in a folder for reference. Mechanical designers usually size motors since the weights and inertias are easily generated by the solid modeling software. After being sized, the actual components are generally selected with input from the electrical designers. Servo motor sizing is usually done with motion analysis software external to the solid modeling tools. This is because gearboxes and motors have often been tested in applications by the vendor using various custom criteria. Therefore, the servo manufacturer usually provides the servo modeling software. Pneumatic and hydraulic actuators are also sized based on calculated speeds and tooling weights obtained from solid models. While actuators may be selected by a mechanical designer, valves and other devices 10

11 are primarily selected by electrical designers, and piping for process and flow applications is usually sized by mechanical or process engineers. Again, special software is often available from the vendors of related equipment, and many engineers have spreadsheets developed for this purpose also. As commercial components are selected for the machine, a Bill of Materials (BOM) is generated. Solid modeling programs have the capability of linking these BOM part numbers to assemblies within the model. Solid models or AutoCAD (.dxf or.dwg) files for many commercial components are available from the manufacturer. 3.3 Electrical Design Single Line Drawings Fusing and Circuit Breakers I/O List Electrical CAD Cable Schedule Electrical BOM P&ID Instrument Index Utilities Motor Sizing Mechanical BOM Proposal Statement Of Work Electrical design typically lags behind mechanical design by several weeks or even months. Before components such as circuit breakers, fuses, valves and motor starters can be selected and sized, the mechanical designer must provide information on the elements of the system. Once voltage and current requirements for equipment are known, the electrical design process can begin. Usually a set of single line drawings is generated to show the major components and branch protection for power distribution. This forms the basis of the electrical schematic package. 11

12 Figure 5 - Single Line Diagram Electrical drawings are created using a CAD package such as AutoCAD. Advanced software packages have the ability to create a BOM as components are drawn, attaching properties to the elements for easy reference. Unlike mechanical drawings, where physical components need to be scaled to dimensions, electrical schematics often use boxes or symbols to represent components. For PLCs or other controllers, an I/O list is created by assigning all of the sensors, buttons and actuators to input and output points. This is often done by the project engineer or programmer for reasons that will be discussed later. The I/O list is used to generate individual pages for each card or I/O device. Architectural drawings are updated to reflect the SOW. These can be used as the basis for communications layouts, which are also drawn in the schematics. As all of the required electrical and mechanical components are determined during the design phase, the BOM is updated. Advanced CAD packages will also help determine the number of terminal blocks and other power distribution devices to be used in the control panel. Physical drawings of the control components are obtained from the vendor s website or a CAD library and used to create a panel layout. A typical electrical schematic package includes a table of contents, device and symbol page, single lines, power distribution, communications, I/O structure and physical layout including panel drawings. A cable schedule listing interconnections between electrical enclosures and devices is often generated for electricians during installation. Information on the physical layout of the system is required for this document to determine lengths. 12

13 For process applications with distributed I/O and instrumentation, a P&ID (Piping and Instrumentation Drawing) is created with the information contained in electrical and mechanical designs. These drawings are not typically used for machinery but may be required by some engineering firms or purchasers of manufacturing equipment. P&IDs can be extremely helpful when troubleshooting systems. Figure 6 - Piping and Instrumentation Drawing (P&ID) After the creation of P&ID documents, an instrument index may also be required. This is a list that acts as a cross-reference among P&ID device numbers, manufacturer part numbers and electrical schematics, indicating the specific page numbers on which devices are located. If component or instrumentation cut sheets are combined into a single document, the instrument index can also be used to locate the sheets. 3.4 Controls and Software Design Flow Chart/GRAFCET I/O List/Tag Generator HMI Screen Flow Diagram Equipment Interfaces Controls Program 13

14 HMI Program SCADA/Data Collection Program Proposal Statement of Work The type of controllers used in an automation project will vary depending on the type of application and customer specifications. The selected controllers and manufacturer will then determine what method of programming and software will be required. Most software design processes use some kind of flowchart to lay out the program. A common tool for presentation of software flow is GRAFCET, a stage transition command graph and programming method. Figure 7 - Flowchart and GRAFCET Software Design The I/O list that was used as a basis for the electrical schematics is also used in flowcharting the program. Transitions or decisions are often based on input status, while steps represent the actuation of outputs. The I/O list can also be used as the basis for a spreadsheet that generates tags for the program; names for I/O variables, HMI component names, machine faults and many other program elements can be automatically created using spreadsheet functions. This allows for standardization and saves a great deal of time during program and system development. Flow charts are used to develop controls programs in a variety of languages. Common programming methods include ladder logic (LD), structured text (ST), sequential function charts (SFC), instruction list (IL), and function block diagram (FBD). These languages are used for programming PLCs and some motion control systems and are detailed in the IEC standard for the programming of programmable controllers. Because these programs can be very long, they are not typically printed for use in a manual but are maintained as software files with embedded comments. Development software is required for opening these software files and is not compatible between different brands, so it is important that the purchaser of the production machinery specifies the software and control platform. The programming software is not usually included with the machinery and can cost several thousand dollars. 14

15 Other types of controllers are often used for process control including DCS (Distributed Control Systems), personal computers and embedded controllers. These may be programmed in proprietary languages from the manufacturer or more standard open languages like C++. DCS control is often used when there are a large number of analog points such as in process control. Software developers also often develop a map of HMI screens for customer and peer review. As with programming software for the controller, the development software is not usually included with the purchase of the system unless specified. HMI programming documentation rarely extends much beyond this since the software is graphical in nature. SCADA (System Control and Data Acquisition) programs generally reside on standard computers (PCs). They are usually programmed in proprietary languages or high level computer languages like C, C#, C++ or the like. Documentation and commenting of the program is important but, like other control programs, are rarely printed. 3.5 Safety and Risk Analysis Hazard Worksheet/Safety Classifications Failure Mode Effects Analysis (FMEA) Seismics RoHS and ESD Compliance Clean Rooms MSDS, SDS, PSDS Mechanical Design Documents Electrical Design Documents Software Design Documents As the mechanical and electrical designs proceed, potential physical hazards to operators or equipment must be identified and documented. Hazards to personnel are classified by the severity of the potential injury, frequency of exposure and distance from the hazard. Worksheets are used to determine what type of safety devices must be used to guard or deactivate equipment. Doors with safety switches, emergency stop cables or buttons, and light curtains or safety scanners are common devices used in machine safety systems. Separate controllers dedicated to safety are also becoming more common. Hazard spreadsheets are also useful in automatically classifying hazards and recommending solutions based on the information entered. Safety classifications and approvals vary among different industries based on the level of hazard inherent to the substances used, severity of electrostatic discharge or environmentally harmful emissions, and the potential risk involved to operators and end-users. A Failure Mode Effects Analysis (FMEA) is a technique used to identify potential causes of failure in components, assemblies and subsystems. Reliability and quality engineers use this technique to reduce or eliminate the root causes of failure and their effects on system operations. This technique is most often used in government-related jobs or by large engineering firms, but it can also surface in some industrial projects. 15

16 Seismic calculations are also sometimes required for government-related projects or systems with special requirements. Dimensions of control cabinets and mechanical structures, as well as the method of securing equipment to the floor or ground, are relayed to companies that specialize in these calculations for evaluation. These specialists sometimes require design approval prior to the system s installation. Other approvals may include compliance with RoHS (Restriction of Hazardous Substances) and ESD (Electrostatic Discharge) requirements. Circuit board and electronics manufacturers have special requirements related to their manufacturing processes that include these certifications. Pharmaceutical and medical device manufacturers have additional machinery requirements in order to consistently produce and deliver a product that meets its predetermined and specified attributes. Often, equipment will have specific material and clean room requirements included in their specifications. Clean rooms have certification procedures that ensure a low level of environmental pollutants. Equipment that is located in clean rooms must be designed to generate minimal air contamination. Compliance with IEC, OSHA and FDA regulations related to specific products is required for manufacturers. For this reason, machine builders who specialize in this type of equipment are often selected. Food service equipment also requires special material and manufacturing techniques that ensures biological contaminants are minimized and equipment can be easily cleaned. Again, these specifications should be included in the purchaser s documentation, and there are usually companies available that specialize in this type of machinery. Machines that use consumables such as adhesives or other liquid substances must be accompanied by Material Safety Data Sheets (MSDS), which describe storage, disposal and spill-handling procedures. Closely related are Safety Data Sheets (SDS) for chemicals and Product Safety Data Sheets (PSDS) for certain manufactured products. These documents must be located near the point of use for the substances or devices. 4 Building The System Engineering Change Order (ECO) Red-lining Power-on Checklists Mechanical Design Documents Electrical Design Documents As stages of the design process are completed, drawings are released to machinists, technicians and assemblers for fabrication. There are no specific documents required during this stage outside of updating design drawings. Checklists and other internal documents are often used to ensure completion of required activities and to ensure personnel are aware of the correct procedures. During the design process, changes are often made to the system. If these changes fall outside of the original scope of the project, an Engineering Change Order (ECO) is issued. ECOs may consist of simple changes to the existing design or more complex stations that contain all the elements of a small machine. 16

17 Oversights in the original design may also prompt additional changes to the design documents. Assembly personnel may find that parts don t fit correctly or electricians may discover that wiring changes need to be made. A common method used to capture these changes is to manually red line the drawings. A red pen is used to mark up drawings showing the way that a task was done. The initials of the person making the red line, along with the date is written next to the change. This can be easier than constantly going back to the designer to update drawings; changes are captured on the shop floor and passed back to the designers at a later time. For this reason, it is important to maintain only one master set of printed drawings on the floor at a time. These are typically stamped approved so they are not confused with other working copies that may be present. Updated drawings are returned to designers who make revisions to the original schematics or prints. Revision numbers are sequenced in the title block of the drawings along with the date of the revision. Notes are also placed on the drawing explaining the change, revision number and date. Powering up a machine or line for the first time requires a number of safety checklists and briefings for personnel working around the machinery. Guard devices are often bypassed and machine operation has not been tested, so extra care must be taken when working on equipment. 5 Acceptance and Runoff Dry Cycle Production Run Validation Factory Acceptance Test (FAT) Report Site Acceptance Testing (SAT) Proposal Statement of Work After the startup and debug of machinery is complete, there is often a period of time where the machine will run continuously with no parts. This phase, often known as dry cycle, is used to put run time on mechanical and electrical components. Loose wiring and bolts are often found at this time as the vibration of machinery exposes these oversights. This procedure should be noted in the SOW if required since machinery often requires parts to operate; a special mode must be designed into machinery to accomplish this task. Factory Acceptance Testing or FAT is performed wherever the equipment is manufactured to verify whether the system and its safety instrumentation operate correctly. The FAT can be used as an integration test confirmation or during validation. After disassembly, shipping and reassembly of machinery, a Site Acceptance Test (SAT) is performed. Before machinery is accepted as complete certain requirements must be achieved. These requirements may include a certain output rate, percentage of accepted or correctly manufactured product or a minimum overall equipment effectiveness (OEE). 17

18 6 Final Documentation Recommended Spare Parts Bills of Material Product Cut Sheets As-Built Mechanical Drawings Final Electrical Schematics Operator Manual Maintenance Manual Controls Program Software Validations and Certifications Warranty Mechanical Solid Models and Drawings 18

19 Electrical Drawings Mechanical BOM Electrical BOM As part of a completed production line, a full set of documentation must be supplied to the end-user. This may be in printed or electronic form, but it is usually a combination of both. Much of the documentation presented to the customer comes from information contained in the documents previously discussed in this book. The recommended spare parts list is generated by analyzing the bills of material generated during the design of the machine or system. It is important that updated BOMs are used to encapsulate all of the items required. Recommended spare parts should include items such as fuses, control components like I/O cards and processors, sensors and wearable tooling. If a component is subject to breakage or wear, it should be considered for the recommended spare parts list. Some major components may have long lead times from the factory. Assessment of downtime potential needs to be weighed against the cost of the parts. In some cases, suppliers may have programs to keep items on the shelf at all times for emergencies. In addition to the recommended spares list, a full bill of materials should be included for all purchased components. This list should include the manufacturer s name and part number at a minimum, and, ideally, contact information for the manufacturer and vendor should also be included. Many purchasers of automated equipment will also require cut sheets for some components, which contain technical specifications and setup information for electronic devices. Most of these sheets are easily obtained online or may be photocopied from a catalog. Instruction sheets are also usually packaged with components and should be saved when the system is being fabricated. Mechanical and electrical drawings and schematics should be updated with all engineering changes and redlines performed during the build process. Title blocks should be modified to indicate the revision number and final or approved status of the drawings. Electrical drawings should show all wiring connections and panel layouts with complete wiring numbers and physical panel layouts cross-referenced to the electrical BOM. Mechanical drawings should include 2D drawings of removable tooling and replaceable or wear items. Some customers may also require solid model files. Operator manuals give step-by-step instructions on how a machine operates. The manual often has many illustrations of different parts of the machine and screen prints of the operator interface. Because of this, digital photographs need to be taken of machinery before it is disassembled and shipped. Close-ups of critical sensors, major assemblies and safety devices should be taken along with pictures of control panels and peripheral machinery. The purpose of these photographs is to give operators and maintenance personnel a clear indication of where things are located. Maintenance manuals describe procedures used to remove components, lubricate and adjust mechanical devices, and replace worn tooling. Setup and calibration of measurement devices and sensors are also often covered here. Like the operator manual, pictures are generally used to locate parts on the machine or system. Maintenance manuals may also contain additional cut sheets or manufacturer specifications for purchased assemblies. Recommended schedules for equipment maintenance are usually included in this manual. 19

20 Controls software and other program documentation is usually saved onto a CD or DVD ROM. Physical printouts of controls programs are rarely included in the documentation due to the length of code, however a.pdf copy may sometimes be included for customers who do not have the programming software. Controls software programs should be well documented so technicians can easily interpret the code. Additionally, a read-me file is often a good idea to describe what types of programming software may be needed to open controls or device programs. This text file may also be a good place to record software version or revision numbers. Validation documents, records of machine runoff and certifications of instrumentation or device calibration are also usually included in the final documentation, as well as a record of the warranty or service agreements made at the time of original purchase. Due to the volume of paper required to print all of the required documentation, much of it may be saved in electronic format. Operator and maintenance manuals and electrical schematics are usually printed and kept with the machine. 20

21 Appendix Design and Documentation Checklist Master Documentation Checklist Company: Project Number: Project Name: Date: Requirements Documentation (Purchaser) Documents Yes No Not Required Comments Product Specifications Plant Specifications Requirements Document Vendor Selection (Purchaser) Documents Yes No Not Required Comments Quote Requests Vendor Qualification 21

22 Applications (Vendor) Documents Yes No Not Required Comments Proposal Quote Spreadsheet System Architecture Solid Models or Drawings Process Description Initial Project Layout (Purchaser/Vendor) Documents Yes No Not Required Comments Purchase Order Contract and Terms Gantt Chart Team Contact Information Project Review (Purchaser/Vendor) Documents Yes No Not Required Comments Statement of Work Proposal Project Schedule 22

23 Mechanical Design (Vendor) Documents Yes No Not Required Comments Timing Chart Solid Models 2D Prints (Assembly Drawings) Stress/Load Analysis Motor Sizing Pneumatic, Hydraulic and Piping Sizing Mechanical BOM Electrical Design (Vendor) Documents Yes No Not Required Comments Single Line Drawings Fusing and Circuit Breakers I/O List Electrical CAD Cable Schedule Electrical BOM P&ID Instrument Index 23

24 Controls and Software Design (Vendor) Documents Yes No Not Required Comments Flow Chart/Grafcet I/O List/Tag Generator HMI Screen Flow Diagram Equipment Interfaces Controls Program HMI Program SCADA/Data Collection Program Safety and Risk Analysis (Purchaser/Vendor) Documents Yes No Not Required Comments Hazard Worksheet/Safety Classifications Failure Mode Effects Analysis (FMEA) Seismics RoHS and ESD Compliance Clean Rooms MSDS, SDS, PSDS 24

25 Building the System (Vendor) Documents Yes No Not Required Comments Engineering Change Order (ECO) Red-lines Power-on Checklists Acceptance and Runoff (Purchaser/Vendor) Documents Yes No Not Required Comments Dry Cycle ( hrs. continuous) Production Run Validation Factory Acceptance Test (FAT) Report Site Acceptance Testing (SAT) 25

26 Final Documentation (Vendor) Documents Yes No Not Required Comments Recommended Spare Parts Bills of Material Product Cut Sheets As-Built Mechanical Drawings Final Electrical Schematics Operator Manual Maintenance Manual Controls Program Software Validations and Certifications Warranty 26

This specification describes the general requirements for Engineering Services provided to Vale.

This specification describes the general requirements for Engineering Services provided to Vale. 1/9 1.0 PURPOSE This specification describes the general requirements for Engineering Services provided to Vale. 2.0 GENERAL For the purposes of this document, the Engineering Consultant shall be referred

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 013300 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply

More information

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01 33 23 - SHOP DRAWINGS, PRODUCT DATA, AND PART 1 - GENERAL 1.1 SUMMARY A. Products include, but are not limited to, the following construction submittals: 1. Shop Drawings. 2. Product Data. 3.

More information

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.:

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.: WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO-00111 Job No.: 16-7003 To Respondent of Record: ADDENDUM 2 July 5, 2017 This addendum, applicable to work referenced

More information

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia BULLETIN NO. 6 TO THE PLANS AND SPECIFICATIONS FOR JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia EwingCole Architects.Engineers.Interior Designers.Planners

More information

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 01 33 00 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

[Note to PSC: Include these sections in the Contract Documents, even though some are not included in the U of I Facilities Standards]

[Note to PSC: Include these sections in the Contract Documents, even though some are not included in the U of I Facilities Standards] SECTION 01 78 23 - OPERATION AND MAINTENANCE DATA PART I - GENERAL 1.1 SUMMARY A. Operation and Maintenance Data shall be submitted in appropriately-sized binders, with dividers, and organized by each

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014)

***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014) DRAFT UFGS- 01 XX XX (FEB 2014) ------------------------ Drafting Activity: USACE UNIFIED FACILITIES GUIDE SPECIFICATION SECTION TABLE OF CONTENTS DIVISION 01 GENERAL REQUIREMENTS SECTION 01 XX XX (FEB

More information

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS PART 1 GENERAL 1.01 SECTION INCLUDES A. Project Record Documents. B. Operation and Maintenance Manuals. C. Warranties and bonds. 1.02 RELATED REQUIREMENTS SECTION 01 78 00 A. Section 01 30 00 - Administrative

More information

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER.

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER. SECTION 01300 - PART 1 - GENERAL 1.1 GENERAL A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER. B. Unless otherwise noted, within 14 days after the date of commencement as stated in

More information

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 01 3300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

Construction Phase Project Management and Documentation

Construction Phase Project Management and Documentation Construction Phase Project Management and Documentation Bill Mason CDM Smith Outline Design Bidding Construction Start-up & Closeout 2 DESIGN Design Preliminary Engineering Report Plans Specifications

More information

East Central College

East Central College SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

A. Action Submittals: Written and graphic information that requires Architect's responsive action. SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

The Benefits of Using the Electrical Toolset in AutoCAD

The Benefits of Using the Electrical Toolset in AutoCAD The Benefits of Using the Electrical Toolset in AutoCAD A productivity study detailing the differences between AutoCAD and the Electrical toolset. Built specifically to create and modify electrical controls

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01330 SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide submittals in accordance with the General Conditions as modified by the Supplementary Conditions,

More information

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration SECTION 01 340 - SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

The modular Mechatronics Training System mms 4.0: hands-on, flexible, scalable

The modular Mechatronics Training System mms 4.0: hands-on, flexible, scalable The modular Mechatronics Training System mms 4.0: hands-on, flexible, scalable 2 Drive & Control Academy Your Training Partner More knowledge, more benefits: Mechatronics to touch, understand, and use

More information

Canadian Technology Accreditation Criteria (CTAC) ELECTROMECHANICAL ENGINEERING TECHNOLOGY - TECHNICIAN Technology Accreditation Canada (TAC)

Canadian Technology Accreditation Criteria (CTAC) ELECTROMECHANICAL ENGINEERING TECHNOLOGY - TECHNICIAN Technology Accreditation Canada (TAC) Canadian Technology Accreditation Criteria (CTAC) ELECTROMECHANICAL ENGINEERING TECHNOLOGY - TECHNICIAN Technology Accreditation Canada (TAC) Preamble These CTAC are applicable to programs having titles

More information

SECTION OPERATION AND MAINTENANCE DATA

SECTION OPERATION AND MAINTENANCE DATA SECTION 01787 OPERATION AND MAINTENANCE DATA PART 1 GENERAL 1.01 SUMMARY A. Compile product data and related information appropriate for OWNER's maintenance and operation of products furnished under Contract.

More information

PARKER HANNIFIN TEST STAND

PARKER HANNIFIN TEST STAND PARKER HANNIFIN TEST STAND Dan Laird Abstract This paper will review a partnership between Parker-Hannifin Mobile Cylinders and Youngstown State University (YSU). The Mobile Cylinders Group makes hydraulic

More information

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

A. Action Submittals: Written and graphic information that requires Engineer's responsive action. SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-26 00 00.00 20 (July 2006) ------------------------------- Preparing Activity: NAVFAC Superseding UFGS-26 00 00.00 20 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

DIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS

DIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS DIVISION 1 - GENERAL REQUIREMENTS SECTION 01300 - SUBMITTALS PART 1 - GENERAL 1.1 STIPULATIONS A. The section "Special Requirements" forms a part of this section by this reference thereto and shall have

More information

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA If project is not administered in PRISM, coordinate use of Exhibit 6 submittal schedule with this section. SECTION 01 33 23 SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 REQUIREMENTS INCLUDED

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01 33 00 SUBMITTAL PROCEDURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes. 1. Submittal procedures. 2. Product data. 3. Shop drawings. 4. Samples. 5. Design data. 6. Test reports. 7. Certificates.

More information

PMA ONLINE TRAINING. Commercial Drawings. One Hour Continuing Education

PMA ONLINE TRAINING. Commercial Drawings. One Hour Continuing Education PMA ONLINE TRAINING Commercial Drawings One Hour Continuing Education PMA training disclaimer The information provided in this document is intended for use as a guideline and is not intended as, nor does

More information

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 013300 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA SECTION 01 78 00 CLOSE-OUT SUBMITTALS PART 1 - GENERAL 1.1 GUARANTEES A. Compile and submit guarantees, bonds, and service and maintenance contracts specified in the individual B. Guarantees from Subcontractors

More information

SECTION PROJECT MANAGEMENT AND COORDINATION

SECTION PROJECT MANAGEMENT AND COORDINATION SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

Software Services, Section 16748, Add as an attachment to this section Attachment A enclosed with this addendum.

Software Services, Section 16748, Add as an attachment to this section Attachment A enclosed with this addendum. This addendum is hereby made part of the Request for Bid for the above-named project and shall be taken into consideration by all firms preparing a submittal on this project. Acknowledge receipt of this

More information

STANDARD SPECIFICATIONS SECTION SUBMITTAL PROCEDURES

STANDARD SPECIFICATIONS SECTION SUBMITTAL PROCEDURES STANDARD SPECIFICATIONS SECTION 01330 SUBMITTAL PROCEDURES PART 1 GENERAL 1.1 DESCRIPTION A. Section includes general requirements and procedures related to preparation and transmittal of Submittals to

More information

This specification is intended to provide guidance to the Engineer (Internal or Consultant) in regards to Vendor Information Requirements.

This specification is intended to provide guidance to the Engineer (Internal or Consultant) in regards to Vendor Information Requirements. 1/5 1.0 PURPOSE This specification is intended to provide guidance to the Engineer (Internal or Consultant) in regards to Vendor Information Requirements. It outlines the expectations for requesting Vendor

More information

11.0 INSTRUMENTATION LOOP DIAGRAMS

11.0 INSTRUMENTATION LOOP DIAGRAMS 11.0 INSTRUMENTATION LOOP DIAGRAMS Table of Contents 11.0 INSTRUMENTATION LOOP DIAGRAMS... 11-1 11.1 HISTORY OF CHANGE... 11-2 11.2 INSTRUMENT LOOP DIAGRAMS (ILD)... 11-4 11.2.1 Drawing Content... 11-4

More information

Project Superfinish. Full-Production Superfinishing Machine ELECOMP Capstone Design Project

Project Superfinish. Full-Production Superfinishing Machine ELECOMP Capstone Design Project Project Superfinish Full-Production Superfinishing Machine ELECOMP Capstone Design Project 2018-2019 Sponsoring Company Supfina Machine Company, Inc. 181 Circuit Drive, North Kingstown RI 02852 Phone:

More information

Vanderbilt University Standard Specification Revised 2/6/08

Vanderbilt University Standard Specification Revised 2/6/08 SECTION 01 78 23 OPERATION AND MAINTENANCE DATA PART 1 GENERAL 1.01 RELATED SECTIONS A. Section 01 77 00 Closeout Procedures B. Section 01 78 39 Project Record Documents 1.02 SUMMARY A. This section provides

More information

Jacksonville District Master

Jacksonville District Master -01 33 00 (April 2006) From USACE / NAVFAC / AFCESA UFGS UNIFIED FACILITIES GUIDE SPECIFICATIONS Revised thoughout - changes not indicated by CHG tags SECTION TABLE OF CONTENTS DIVISION 01 - GENERAL REQUIREMENTS

More information

SECTION OPERATIONS AND MAINTENANCE MANUALS TRACTION POWER EQUIPMENT

SECTION OPERATIONS AND MAINTENANCE MANUALS TRACTION POWER EQUIPMENT SECTION 01832 OPERATIONS AND MAINTENANCE MANUALS TRACTION POWER EQUIPMENT PART 1 - GENERAL 1.01 DESCRIPTION OF WORK A. Furnish SEPTA with comprehensive Operations and Maintenance Manuals of all equipment

More information

Section Meetings Section Material and Equipment. None Required

Section Meetings Section Material and Equipment. None Required January 2000 Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK PART 2 PRODUCTS The General Conditions of the Contract, General Requirements and Supplemental

More information

Facility P&ID Drawings and why you need them!

Facility P&ID Drawings and why you need them! and why you need them! Graham Nasby City of Guelph Water Services Guelph, Ontario, Canada 2018 ISA Water/Wastewater & Automatic Controls Symposium (WWAC) 7-9 August 2018, Bethesda, Maryland, USA No part

More information

SUBMITTAL PROCEDURES

SUBMITTAL PROCEDURES SUBMITTAL PROCEDURES PART 1 GENERAL The ASPA Project Engineer (APE) may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective

More information

NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP July 28, 2017

NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP July 28, 2017 NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP 697-16-016 July 28, 2017 Reference is made to the Request for Proposal (RFP) to Service Providers for Nevada Shared Radio Replacement Project, upon

More information

Introduction to Robotics in CIM Systems

Introduction to Robotics in CIM Systems Introduction to Robotics in CIM Systems Fifth Edition James A. Rehg The Pennsylvania State University Altoona, Pennsylvania Prentice Hall Upper Saddle River, New Jersey Columbus, Ohio Contents Introduction

More information

2017 ELECTRICAL SAFETY SERVICES. Arc Flash Electrical Maintenance Lockout/Tagout And More

2017 ELECTRICAL SAFETY SERVICES. Arc Flash Electrical Maintenance Lockout/Tagout And More 2017 ELECTRICAL SAFETY SERVICES Arc Flash Electrical Maintenance Lockout/Tagout And More ABOUT LEWELLYN TECHNOLOGY Improving workplace safety since 1993 Daryn Lewellyn founded Lewellyn Technology more

More information

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS PART 1 GENERAL 1.01 SECTION INCLUDES A. Project Coordination. B. Preconstruction meeting. C. Progress meetings. D. Preinstallation conferences. E. Requests for information (RFI). F. Coordination drawings.

More information

BIM Introduction. Building Information Management Definitions, Applications and general information. Betty Bezos

BIM Introduction. Building Information Management Definitions, Applications and general information. Betty Bezos BIM Introduction Building Information Management Definitions, Applications and general information Betty Bezos betty@bezos.com 9/1/2017 1 9/1/2017 2 Innovations in BIM 3D Design: 3D visualizations allow

More information

Anticipated schedule, Page 2. Change the Contract Term from 635 Days to be 1,127 Days.

Anticipated schedule, Page 2. Change the Contract Term from 635 Days to be 1,127 Days. This addendum is hereby made part of the Request for Bid for the above-named project and shall be taken into consideration by all firms preparing a submittal on this project. Acknowledge receipt of this

More information

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 General

More information

This specification describes the minimum technical requirements for drawings, as applicable to all disciplines.

This specification describes the minimum technical requirements for drawings, as applicable to all disciplines. SPEC-0800 1/5 1.0 PURPOSE This specification describes the minimum technical requirements for drawings, as applicable to all disciplines. 2.0 VALE DRAWING TYPE DEFINITIONS Engineering Drawings Engineering

More information

00-General Drawings. Doc. no.: NA-00-STS002

00-General Drawings. Doc. no.: NA-00-STS002 Gæðaskjal (GSK) GSK-1773 Date of issue: 24.11.2016 Revision no.:2.0 Responsible: Einar Friðgeir Björnsson Editor: Rafn Magnús Jónsson 00-General Drawings Doc. no.: NA-00-STS002 This standard technical

More information

Advance Automation & Electronics (AAE)

Advance Automation & Electronics (AAE) Advance Automation & Electronics (AAE) Advance Automation & Electronics (AAE) is an Industrial Control Automation company and one of the leading Training providers in PLCs, AC/VFD Drives, Motor Control

More information

Teciam. Part C. Virtual Mechatronics

Teciam. Part C. Virtual Mechatronics Teciam Part C Teciam > Fundamentals > Contents Table of Contents Introduction Introduction... C-3 Conceptualisation Conceptualisation... C-3 Diversified Contents Diversified Contents... C-4 Technology

More information

NATIONAL UNIVERSITY OF SINGAPORE. EE3302/EE3302E Industrial Control Systems. E2: PLC Programming for Sequence Control

NATIONAL UNIVERSITY OF SINGAPORE. EE3302/EE3302E Industrial Control Systems. E2: PLC Programming for Sequence Control NATIONAL UNIVERSITY OF SINGAPORE EE3302/EE3302E Industrial Control Systems E2: 1. Objectives The experiment is designed to provide experience in programming a modern IECcompliant PLC system for sequence

More information

ISO INTERNATIONAL STANDARD. Robots for industrial environments Safety requirements Part 1: Robot

ISO INTERNATIONAL STANDARD. Robots for industrial environments Safety requirements Part 1: Robot INTERNATIONAL STANDARD ISO 10218-1 First edition 2006-06-01 Robots for industrial environments Safety requirements Part 1: Robot Robots pour environnements industriels Exigences de sécurité Partie 1: Robot

More information

Heat Exchanger Construction Checklist

Heat Exchanger Construction Checklist Heat Exchanger Checklist Project: Pump tag: Building: Location: Submittal / Approvals Submittal. The above equipment and systems integral to them are complete and ready for functional testing. The checklist

More information

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals. SECTION 01300 PART 1 GENERAL 1.1 SECTION INCLUDES A. Description of Requirements B. Submittal Procedures C. Specific Submittal Requirements D. Action on Submittals E. Repetitive Review 1.2 DESCRIPTION

More information

1.0 INTRODUCTION DEFINITIONS DRAWING CONTROL PREPARATION OF SPECIFICATIONS AND DATASHEETS... 5

1.0 INTRODUCTION DEFINITIONS DRAWING CONTROL PREPARATION OF SPECIFICATIONS AND DATASHEETS... 5 TABLE OF CONTENTS 1.0 INTRODUCTION... 3 2.0 DEFINITIONS... 4 3.0 DRAWING CONTROL... 4 4.0 PREPARATION OF SPECIFICATIONS AND DATASHEETS... 5 5.0 GUIDELINES FOR PREPARATION OF DRAWINGS... 5 6.0 CONTENTS

More information

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.1 DESCRIPTION A. This specification defines the general requirements and procedures for submittals. A submittal is information

More information

This section applies to the requirements for the performance of power system studies by both the Design Engineer and the Contractor.

This section applies to the requirements for the performance of power system studies by both the Design Engineer and the Contractor. Basis of Design This section applies to the requirements for the performance of power system studies by both the Design Engineer and the Contractor. Background Information A Short Circuit and Coordination

More information

AVEVA PDMS. Business Benefits. Accurate and clash-free 3D plant design

AVEVA PDMS.  Business Benefits. Accurate and clash-free 3D plant design AVEVA PDMS Accurate and clash-free 3D plant design With ever increasing global demand for products from process and power plants, AVEVA PDMS enables companies to design, construct and maintain high quality

More information

ELECTRICAL NETWORKS SPECIFICATION TECHNICAL SPECIFICATION FOR A 230V/110V AND 400V/110V TRANSFORMER

ELECTRICAL NETWORKS SPECIFICATION TECHNICAL SPECIFICATION FOR A 230V/110V AND 400V/110V TRANSFORMER Approval Amendment Record Approval Date Version Description 03/05/2017 1 Initial issue PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 1 of 13 Table of Contents 1. Purpose...

More information

OPERATING INSTRUCTIONS

OPERATING INSTRUCTIONS OPERATING INSTRUCTIONS Manually-operated die cutter flex and step flex AFZ-1200 H08M000057 1 HABASIT ITALIANA S.P.A. VIA MEUCCI, 8 I 31029 VITTORIO VENETO (TV) MACHINE MODEL: AFZ-1200 AND AFZ-1200/P DESCRIPTION:

More information

Engineering Technologies/Technicians CIP Task Grid Secondary Competency Task List

Engineering Technologies/Technicians CIP Task Grid Secondary Competency Task List Secondary Task List 100 ENGINEERING SAFETY. 101 Implement a safety plan. 102 Operate lab equipment according to safety guidelines. 103 Use appropriate personal protective equipment. 104 Comply with OSHA

More information

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal City of Winnipeg Brady Road Landfill Site Section 01300 New Entrance and Scale Facility Page 1 of 4 SUBMITTALS 1. SHOP DRAWINGS 1.1 General.1 Arrange for the preparation of clearly identified Shop Drawings

More information

OPERATION MANUAL MOB 112

OPERATION MANUAL MOB 112 OPERATION MANUAL MOB 112 1 Contents 1 GENERAL... 4 1.1 Information regarding the operating instruction... 4 1.2 Limitation of liability... 4 1.3 Warranty... 5 2 TECHNICAL DATA... 6 2.1 Dimension... 6 2.2

More information

For more accurate electrical controls design, there s a logical choice: AutoCAD Electrical.

For more accurate electrical controls design, there s a logical choice: AutoCAD Electrical. For more accurate electrical controls design, there s a logical choice: AutoCAD Electrical. If you design machines or products that move, electrical controls are probably a key component of your design

More information

2017 CDM Smith All Rights Reserved November 2016 SECTION PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS)

2017 CDM Smith All Rights Reserved November 2016 SECTION PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS) ATTACHMENT 5, CONTRACT 13, ADDENDUM 3 2017 CDM Smith 14955-109447 SECTION 01725 PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS) PART 1 GENERAL 1.01 DESCRIPTION A. The Owner and Contractor shall utilize the

More information

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following: SECTION 01 31 00 PROJECT MANAGEMENT AND COORDINATION PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

Instrumentation and Control Technician A Guide to Course Content Implementation Beginning with Level 1 April 2013

Instrumentation and Control Technician A Guide to Course Content Implementation Beginning with Level 1 April 2013 Instrumentation and Control Technician A Guide to Course Content Implementation Beginning with Level 1 April 2013 Instrumentation and Control Technicians maintain, diagnose, calibrate and repair measurement

More information

INDUSTRIAL ROBOTS AND ROBOT SYSTEM SAFETY

INDUSTRIAL ROBOTS AND ROBOT SYSTEM SAFETY INDUSTRIAL ROBOTS AND ROBOT SYSTEM SAFETY I. INTRODUCTION. Industrial robots are programmable multifunctional mechanical devices designed to move material, parts, tools, or specialized devices through

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-11 47 00 (August 2017) ----------------------------- Preparing Activity: USACE Superseding UFGS-11 47 00 (February 2009) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

MESP TECHNICAL SPECIFICATION FOR AN ESSENTIAL SERVICES SUPPLY STEP UP TRANSFORMER

MESP TECHNICAL SPECIFICATION FOR AN ESSENTIAL SERVICES SUPPLY STEP UP TRANSFORMER Engineering Specification TECHNICAL SPECIFICATION FOR AN ESSENTIAL Version: 3 Issued: 14 October 2016 Owner: Chief Engineer Approved By: Andrew Russack Head of Engineering - Electrical PRINTOUT MAY NOT

More information

SECTION PROJECT COORDINATION VIA BIM

SECTION PROJECT COORDINATION VIA BIM SECTION 01 31 13 PROJECT COORDINATION VIA BIM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

ADDENDUM TO RFQ/P DOCUMENTS PROJECT # ADDENDUM: #01

ADDENDUM TO RFQ/P DOCUMENTS PROJECT # ADDENDUM: #01 ADDENDUM TO RFQ/P DOCUMENTS PROJECT #14-013 ADDENDUM: #01 Solano Community College District SCCD REQUEST FOR QUALIFICATIONS/PROPOSAL Project: HVAC & EMS Efficiency Project Implementation Date: 03/28/2014

More information

Estates Development & Projects

Estates Development & Projects Estates Development & Projects Production Guidelines for the Building Fabric Manual (incorporating Health & Safety File) Guidance for the Technical Author REVISION 10.2 Issue Date 09/2017 Contents Part

More information

Analog Inputs and Outputs

Analog Inputs and Outputs Analog Inputs and Outputs PLCs must also work with continuous or analog signals. Typical analog signals are 0-10 VDC or 4-20 ma. Analog signals are used to represent changing values such as speed, temperature,

More information

GTU- Centre of Excellence in Automation

GTU- Centre of Excellence in Automation Gujarat Technological University Centre of Excellence in Automation LABS UNDER CENTER OF EXCELLENCE Hydraulic Lab. Pneumatic Lab. Sensor Lab. Programmable logic controller(plc) Robotics & Mechatronics

More information

VACUUM INTERRUPTER APPLICATION NOTES Filename: VIAN X-Rays and Vacuum Interrupters Revision: 0 PAGE 1

VACUUM INTERRUPTER APPLICATION NOTES Filename: VIAN X-Rays and Vacuum Interrupters Revision: 0 PAGE 1 Revision: 0 PAGE 1 X-Rays and Vacuum Interrupters INTRODUCTION: Vacuum Interrupters made by Eaton carry a label that warns the user about the possibility of X-radiation. This warning needs some explanation

More information

Certified Precision Sheet Metal Operator Level I

Certified Precision Sheet Metal Operator Level I Certified Precision Sheet Metal Operator Level I 13 Sections Total of 136 tasks/skills/knowledge areas Section B. Metals, Metallurgy, and Metal Working Processes Section C. Paperwork and Documentation

More information

ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030 ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO. 2018-008-COM.00030 To: Prospective Bidders of Record Date: December 17, 2018 The following changes, additions, revisions, and/or deletions

More information

ISO INTERNATIONAL STANDARD. Safety of machinery Basic concepts, general principles for design Part 1: Basic terminology, methodology

ISO INTERNATIONAL STANDARD. Safety of machinery Basic concepts, general principles for design Part 1: Basic terminology, methodology INTERNATIONAL STANDARD ISO 12100-1 First edition 2003-11-01 Safety of machinery Basic concepts, general principles for design Part 1: Basic terminology, methodology Sécurité des machines Notions fondamentales,

More information

REQUEST FOR QUOTATION INVITATION

REQUEST FOR QUOTATION INVITATION REQUEST FOR QUOTATION INVITATION DATE: July 15, 2010 DPS: REQUIREMENT: SUBJECT: Patricia Farina DPS Contract Administrator Email: Patricia.Farina@cityofchicago.org Telephone: 312-744-7660 Silver Halide

More information

submittals 1s e c t i o n

submittals 1s e c t i o n Architectural Woodwork Standards submittals 1s e c t i o n SECTION 1 introductory Information Introduction...25 What to Expect...25 Purpose...25 Level of Detail...25 Approvals...25 Scheduling...25 The

More information

Training. Education CALENDAR FEDEGARI TECH CENTERS DM#407036

Training. Education CALENDAR FEDEGARI TECH CENTERS DM#407036 2016 CALENDAR COLLABORATION IN THE LIFE SCIENCES WORLD Valued customer, The need to increase efficiency and reliability in pharmaceutical manufacturing presents firms with unique opportunities to develop

More information

Chapter 1 General Design Information

Chapter 1 General Design Information Chapter 1 General Information Introduction The primary aim in both designing and checking is to produce a structure that will safely carry the anticipated loads. The design team, consisting of the designers,

More information

COURSE MODULES LEVEL 3.1 & 3.2

COURSE MODULES LEVEL 3.1 & 3.2 COURSE MODULES LEVEL 3.1 & 3.2 6-Month Internship The six-month internship provides students with the opportunity to apply the knowledge acquired in the classroom to work situations, and demonstrate problem

More information

DIGITAL DATA SUBMISSION STANDARDS Procedures and Guidelines

DIGITAL DATA SUBMISSION STANDARDS Procedures and Guidelines DIGITAL DATA SUBMISSION STANDARDS Procedures and Guidelines 2014 Citizens Wastewater of Westfield - GIS Digital Standards Table of Contents Introduction... 3 Definitions and Terms... 3 Reference Documents...

More information

Industrial Automation

Industrial Automation Software Development & Education Center Industrial Automation (HMI Drives Instrumentation Networking) Industrial Automation Automation is the use of machines, control systems and information technologies

More information

SECTION SHORT CIRCUIT, COMPONENT PROTECTION, FLASH HAZARD AND SELECTIVE COORDINATION STUDY

SECTION SHORT CIRCUIT, COMPONENT PROTECTION, FLASH HAZARD AND SELECTIVE COORDINATION STUDY SECTION 16075 - SHORT CIRCUIT, COMPONENT PROTECTION, FLASH HAZARD AND SELECTIVE COORDINATION STUDY PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Provide a short-circuit, component protection, flash

More information

SPECIFICATIONS FOR NEW UNDERGROUND RESIDENTIAL DISTRIBUTION SYSTEMS

SPECIFICATIONS FOR NEW UNDERGROUND RESIDENTIAL DISTRIBUTION SYSTEMS Page: 4-1 4.0 URD Process and Documentation Requirements 4.1 Process Steps The process of developing underground distribution facilities in a residential area consists of 10 major steps, which are summarized

More information

Wisconsin Technical College System Curriculum Standards Model & Program Design Summary ELECTRICAL & INSTRUMENTATION APPRENTICE

Wisconsin Technical College System Curriculum Standards Model & Program Design Summary ELECTRICAL & INSTRUMENTATION APPRENTICE Curriculum Standards Model & Program Design Summary 50-414-2 ELECTRICAL & INSTRUMENTATION APPRENTICE Program Information Program Electrical & Instrumentation Technicians install, service, troubleshoot;

More information

Introduction to Model-Based Design for Offshore and Marine applications C. Kleijn

Introduction to Model-Based Design for Offshore and Marine applications C. Kleijn Introduction to Model-Based Design for Offshore and Marine applications C. Kleijn Model Based Design Contents Contents 1. Introduction 3 1.1. What is Model-Based Design 3 1.2. How is it used? 3 2. Benefits

More information

Canadian Technology Accreditation Criteria (CTAC) INSTRUMENTATION ENGINEERING TECHNOLOGY - TECHNOLOGIST Technology Accreditation Canada (TAC)

Canadian Technology Accreditation Criteria (CTAC) INSTRUMENTATION ENGINEERING TECHNOLOGY - TECHNOLOGIST Technology Accreditation Canada (TAC) Canadian Technology Accreditation Criteria (CTAC) INSTRUMENTATION ENGINEERING TECHNOLOGY - TECHNOLOGIST Technology Accreditation Canada (TAC) Preamble These CTAC are applicable to programs having titles

More information

OPAL Reactor Training Simulator

OPAL Reactor Training Simulator OPAL Reactor Training Simulator Etchepareborda A. 1, Flury C.A. 1, Lema F. 1, Maciel F. 1, De Lorenzo N. 2, Alegrechi D. 1, Damico M. 1, Ibarra G. 1, Muguiro M. 1, 1 National Atomic Energy Commission,

More information

DPM - Mesta Electronics, Inc. Low Voltage Active Harmonic Filters

DPM - Mesta Electronics, Inc. Low Voltage Active Harmonic Filters DPM - Mesta Electronics, Inc. Low Voltage Active Harmonic Filters Section [26 35 26][16280] Active Harmonic Filters (Low Voltage) Part 1 General 1.1 Summary A. Scope: Provide design and engineering, labor,

More information

Canadian Technology Accreditation Criteria (CTAC) ELECTRICAL ENGINEERING TECHNOLOGY - TECHNOLOGIST Technology Accreditation Canada (TAC)

Canadian Technology Accreditation Criteria (CTAC) ELECTRICAL ENGINEERING TECHNOLOGY - TECHNOLOGIST Technology Accreditation Canada (TAC) Canadian Technology Accreditation Criteria (CTAC) ELECTRICAL ENGINEERING TECHNOLOGY - TECHNOLOGIST Technology Accreditation Canada (TAC) Preamble These CTAC are applicable to programs having titles involving

More information

AMTEC Modules. AMT 102: General PM and Predictive Maintenance AMT 1021: Basic PM AMT 1022: Advanced Technologies

AMTEC Modules. AMT 102: General PM and Predictive Maintenance AMT 1021: Basic PM AMT 1022: Advanced Technologies AMT 100: Computer Literacy AMT 1001: Orientation to Computer Systems AMT 1002: Operating Systems AMT 1003: Computer Applications AMT 1004: Internet/Intranet AMT 101: Fluid Power and Electrohydraulics/Pneumatics

More information