NATIONAL GOVERNMENT CONSTITUENCIES DEVELOPMENT FUND BOARD KITUI WEST CONSTITUENCY PROJECT PROPOSAL FINANCIAL YEAR 2017/2018
|
|
- Louise Hensley
- 5 years ago
- Views:
Transcription
1 S/NO PROJECT NAME PROJECT ACTIVITY AMOUNT STATUS ADMINISTRATION AND RECURRENT EXPENDITURE 1 Employee Payment of NG-CDFC staff salaries and Gratuity 1,650, On-going salaries 2 NSSF Payment of NSSF Deductions 28, On-going 3 NHIF Payment of NHIF Deductions 49, On-going 5 Goods and Services 6 Committee Expenses Payment of Committee Sitting allowances, Transport, fuel, conferences, Stationery, Printing, Rent Payment of committee Sitting allowances, Facilitation, Transport, fuel, conferences and Seminars 1,980, On-going 500, On-going MONITORING EVALUATION AND CAPACITY BUILDING 7 Goods and Purchase of fuel, Printing, stationery, airtime, travel and 484, On-going Services Subsistence 8 Committee Payment of committee Allowances, Facilitation, Transport, 620, On-going Expenses Conferences and Seminars 9 NG- Training of NG-CDFC, PMCs and NG- NG-CDFC Staff on NG- 1,500, On-going OTHER PROJECTS 10 Kitui West NG- CDF Office Construction (Phase II) Completion of NG-CDFC Office: - Chain-Link Fencing and a Gate, 5 Door Pit Latrine with Urinal, Car Parking, Paving Slab, 2 Water Tank Bases, 2 Plastic Tanks (10,000 Liters), Grillage, Others: - Walling, Doors, Windows, Ramp and Stairs. 5,000, On-going Page 1 of 12
2 11 Furnishing and Equipping of NG-CDF Office Purchase of office furniture and equipment - Office tables and Chairs, Conference tables and Chairs, Waiting benches, Work station, Coat hangers, Steel cabinets, Padlocks, Curtains (Assorted), Laptops, Desktops, Printers, Photocopier, Water dispensers, Refrigerator, Power UPS. 3,000, New 12 Constituency Innovation Hubs Project Installation of Satelite antenna, Router, Digital access kit, Digital ruggedized Tablet, WI-FI with outdoor wireless device complete with 12U cabinet with installation accessories by Telkom Kenya Ltd - in Mutonguni, Matinyani, Kauwi and Kithumula / Mutonga 1,169, each 4,677, New 13 Constituency Strategic Plan Consultative and Validation forums, Consultancy fee, Fact sheet data collection, Printing and Launching of the Strategic Plan. 3,200, New 14 Kwa Mutonga Completion of Social Hall:- riddles, roofing, shuttering, 800, On-going EMERGENCY Emergency To cater for emergency needs in the constituency 4,568, On-going BURSARY 15 Bursary - s Payment of bursary to needy students in secondary s 9,702, On-going 16 Bursary - Payment of bursary to needy students in Tertiary Institutions 7,500, On-going EDUCATION PRIMARY SCHOOLS Page 2 of 12
3 17 A.I.C Kiuwani 18 Kaanzoni 19 Kakumi Primary 20 Kalimani Completion of 1 classroom: - Plastering, flooring. Completion of 1 classroom:- Plastering, Flooring, Window panes 300, On-going 21 Kangungi Completion of Fencing the school Compound (chain-link) 22 Katheuni 23 Kathuma 24 Kauma Primary 25 Kavoo Primary Completion of 1 classroom:- Plastering, Window panes and Painting. Completion of 1 classroom:- Plastering, flooring, shatters and Painting. Completion of an Administration Block:- Plastering, Flooring, Painting and Partition. 300, On-going 500, On-going Page 3 of 12
4 26 Kiseveni Plastering, flooring, shutters and painting of 6 classrooms. 696, New 27 Kunikila 250, On-going 28 Kwa Mukoo Completion of 1 Classroom:- Shuttering 29 Kwa Silu 30 Kyambevo 31 Maaini Primary 32 Malatani 33 Manzi-Itumo 34 Mumbuni Completion of An Administration Block: - Plastering, Flooring, Painting and Partition. Completion of 1 classroom:-roofing, Plastering, Flooring, shuttering 300, On-going 300, On-going Page 4 of 12
5 35 Mwatate Completion of 1 classroom:- Plastering, Flooring, Window Panes 36 Ndiuni Primary 37 Nzemeli 38 Syomuitu Completion of 2 classrooms:- Shuttering and painting Completion of 1 Classroom:-Plastering, Flooring, Shutters and Flooring 300, On-going EDUCATION SECONDARY SCHOOLS 39 Iiani Construction of a Science Laboratory:- Flooring, Plastering, Shuttering, piping system and painting. 1,000, New 40 Ilako Mututa 41 Katheuni 42 Kithumula 43 Kitunduni Completion of a Library: - Roofing, Shuttering, flooring, Painting and Electrical wiring. Equipping of Science Laboratory:-Tables, Sinks, Gas and Water piping. 700, On-going 1,000, New Completion of Multipurpose Hall:- Walling and Roofing 1,500, On-going Completion of 2 classrooms:- plastering, flooring, shuttering 1,000, On-going Page 5 of 12
6 44 Kivani Mixed Day Sec. Completion of Science Laboratory:- Walling, roofing, plastering, flooring and painting. 1,000, On-going 45 Kwa Mwambi 46 Kyeni Mixed Day Sec. Completion of Science Laboratory:- Roofing, Plastering, Flooring, shuttering Completion of 1 classroom:- Plastering, Flooring 1,000, On-going 47 Matinyani Boys' Sec. 48 Mikuyu Mikya Mixed Day Sec. Completion of Dormitory:- Roofing, Flooring, Plastering, Plumbing, electrical wiring and painting. Completion of a Dormitory:-Roofing, Flooring, Plastering, Shuttering 1,400, On-going 1,500, On-going 49 Mithiikwani 50 Mutonguni Girls' Sec. 51 Mutulu Sec. 52 St. Benedict Kwa Mutonga Sec. Completion of Administration Block:- Raising of walls, roofing, flooring and painting Completion of Fencing of school Compound (chain-link) and Ceiling of Science Laboratory Completion of 2 Staff houses:- Flooring, shuttering, Plumbing, electrification, Security Grills Completion of a Multi-Purpose Hall:- Shuttering, plastering, Flooring and painting. 1,000, On-going 700, On-going 1,000, On-going 1,000, On-going Page 6 of 12
7 53 St. Michael Kavumbu Sec. 54 St. Pauls Kalinditi Completion of 2 classrooms:- Plastering, Flooring, shuttering 400, On-going 55 St. Peters Construction of 1 classroom to completion 1,000, New Ngengekani Sec. 56 St. Philips Mutini Completion of a Dining Hall:- Roofing, window panes, plastering, Flooring and painting. 1, 57 Utoo Mixed Day Completion of 2 classrooms:- Plastering, Flooring, shuttering 500, On-going TERTIARY INSTITUTIONS 58 Kauwi Resource Completion of Resource Centre:- Flooring, Plastering, ceiling, 500, On-going SECURITY PROJECTS 59 Kalimbevo Assistant Chiefs Office 60 Kasakini Assistant Chief Office Construction of office to Kshs. 800,000 and Kshs. 300,000 ( Chairs, tables, Waiting benches and curtains) 1,100, New Completion of Office:- Plastering, Flooring. 100, On-going Page 7 of 12
8 61 Katheuni Assistant Chiefs Office 62 Kiseveni Assistant Chiefs office 63 Kithuiani Assistant Chief Office 64 Kyondoni Admistration Police- line 65 Matinyani Police Head Quarters 66 Mutonguni Chiefs Office 67 Mutulu Admistration Police- Line 68 Nzakame Assistant Chiefs Office 69 Nzinia Assistant Chief office Construction of office to Kshs. 800,000 and Kshs. 300,000 ( Chairs, tables, Waiting benches and curtains) Construction of office to Kshs. 800,000 and Kshs. 300,000 ( Chairs, tables, Waiting benches and curtains) Construction of office to Kshs. 800,000 and Kshs. 300,000 ( Chairs, tables, Waiting benches and curtains) Completion of 4 Admistration Police Units: - Plastering, flooring, Shuttering and Verandah. Completion of the Administration Office:- Plastering, flooring, Shuttering, Partition Completion of Office:-Shutters, Plastering, Flooring, electrification Completion of 7 Admistration Police Houses:- Walling, Roofing, Plastering, flooring, Shuttering. Construction of office to Kshs. 800,000 and Kshs. 300,000 ( Chairs, tables, Waiting benches and curtains) Completion of the Office:-Partition, Plastering, Flooring and Painting. 1,100, New 1,100, New 1,100, New 250, On-going 1,180, On-going 300, On-going 1,500, On-going 1,100, New SPORTS 70 Constituency Constituency Sports Tournament: supply of balls, nets, 1,736, On-going Page 8 of 12
9 ENVIRONMENT 71 Mutulu 72 Kauma 73 Kyaani Girls 74 Matinyani Boys' 75 Kalimani 76 St. Johns Kwa Mulungu 77 St. Benedict Kwa Mutonga Page 9 of 12
10 78 St. Philips Mutini 79 Katutu Girls 80 Katheka Boys 81 Kasue 82 Ilako Mututa Sec. 83 Kakeani 84 Musengo 85 Mutonguni Girls' Page 10 of 12
11 86 Mutonguni Boys 87 Muthamo 88 Muthale Girls Sec. 89 Kauwi 90 Kyondoni Girls Sec. 91 Kwa Mutonga 92 Kathivo Primary 93 Kyondoni 94 Matinyani AIC Page 11 of 12
12 95 Mutonguni Supply and installation of 2 Litter bins and 2 Hand washing 56, New Page 12 of 12
5 Committee Expenses Payment of committee sitting allowances, transport, conferences
NATIONAL GOVERNMENT CONSTITUENCIES DEVELOPMENT FUND BOARD HAMISI CONSTITUENCY PROJECT PROPOSAL FOR FINANCIAL YEAR 2017/2018 S/NO Project Name Project Activity ADMINISTRATION AND RECURRENT EXPENDITURE 1
More informationCommittee expenses Committee expenses 1,482, On going. CDFC/ PMC Capacity building CDFC/ PMC Capacity building 1,000,000.
KAITI NG-CDF Project Proposal 2015/2016 Financial Year Project Name Project Activity Amount STATUS WATER Water tanks Purchase of 120 water tanks to public primary and secondary schools(list attached to
More informationDeck Tutorial. Decks and Porches. Drawing Decks
Deck Tutorial The Deck Tutorial continues where the Landscaping Tutorial left off, and explains how to create a deck off the back of the house and connect it to the terrain with an exterior staircase.
More informationDeck Tutorial. Decks and Porches. Drawing Decks
Deck Tutorial The Deck Tutorial continues where the Landscaping Tutorial left off, and explains how to create a deck off the back of the house and connect it to the terrain with an exterior staircase.
More informationREVENUE MOBLISATION, ALLOCATION & FISCAL COMMISSION
SUMMARY REVENUE MOBLISATION, ALLOCATION & FISCAL COMMISSION CODE 0246001 MDA PERSONNEL COST OVERHEAD COST RECURRENT CAPITAL =N= =N= =N= =N= REVENUE MOBLISATION, ALLOCATION & FISCAL COMMISSION 1 577 304
More informationDeck Tutorial. Chapter 8: Decks and Porches
Decks and Porches Chapter 8: Deck Tutorial Now we ll continue where the Landscaping Tutorial left off and create a deck off the back of the house, connecting it to the terrain with an exterior staircase.
More informationMarcus Moziah Garvey Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationOCPS Submittal Register for Product Data and Shop Drawing Reviews
OCPS mittal Register for Product Data and Shop Drawing s Project ification Drawings - D Shop Drawings - Product Data - Test - TR Test Data - TD Calculations - Calc Certification - Cert 02 22 27 Pre-demolition
More informationMalle classroom furniture
School furniture Malle classroom furniture Comfortable, practical, adjustable Malle classroom furniture is adjustable, with the exception of the teacher s table and chair. Pupil desks come in one-person
More informationEverett McKinley Dirksen Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationDESIGN INSTRUCTIONS TO ARCHITECTS AND ENGINEERS [ ] SCHEMATICS [ ] DESIGN [ ] CONSTRUCTION
DEPARTMENT OF VETERANS AFFAIRS DESIGN INSTRUCTIONS TO ARCHITECTS AND ENGINEERS LOCATION : VAMC, PROJECT TITLE : PROJECT NO. : [ ] SCHEMATICS [ ] DESIGN [ ] CONSTRUCTION DEVELOPMENT DOCUMENTS EQUIPMENT
More informationBeit Hanina School. Remarks: Work Plan. Basement floor Plan. Scale: 1:50 Sheet name: A1
0 Work Plan Basement floor Plan Scale: :0 A 0 Work Plan Ground floor Plan Scale: :0 A 0 Work Plan First floor Plan Scale: :0 A 0 Work Plan Second floor Plan Scale: :0 A 0 Work Plan Third floor Plan Scale:
More informationMarcus Moziah Garvey Elementary School S Morgan St Chicago, IL 60643
Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item
More informationA1.1 FOX GARAGE VAN VAN VAN VAN 11/16/ WASHINGTON BLVD ST. LOUIS, MO REVISIONS FLOOR PLAN - LEVEL /01/14
BUILDING FLOOR PLAN TES: 1. ALL DIMENSIONS ARE TO FACE OF CONCRETE OR CENTERLINE OF COLUMN (U). 2. SEE ENLARGED STAIR PLANS (A2.1-A2.3) FOR DETAILED INFORMATION T SHOWN. 3. SEE FINISH ELEVATIONS (A3.1-A3.2)
More informationADMINISTRATION DEPARTMENT Plant Management Division. An Inventory of Its State Office Building Drawings
MINNESOTA HISTORICAL SOCIETY Minnesota State Archives ADMINISTRATION DEPARTMENT Plant Management Division An Inventory of Its State Office Building Drawings OVERVIEW OF THE RECORDS Agency: Minnesota. Dept.
More informationAmos Alonzo Stagg Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationWendell E Green Elementary School 1150 W 96th St Chicago, IL 60643
11 W 9th St Chicago, IL 3 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationMy CDM Visit: A Social Story. We Find the Museum We might drive to the event. We might park the car and walk over to the Museum.
My CDM Visit: A Social Story Children s Discovery Museum is a fun place where I can look at, touch, play, and explore things. I might go there soon. I can learn about the Museum before I go. There are
More informationSt. John s United Methodist Church Facility Stewardship Plan Last update: 9 May 2011
As responsible stewards of our facility, this list is maintained by the trustees to identify tasks we need to have completed to keep our church well groomed and attractive to present a welcoming, safe,
More information3D Weaving Innovation Centre Disruption to Clothworker South
3D Weaving Innovation Centre Disruption to Clothworker outh Refurbishment works are continuing within the Clothworkers outh building as part of the 3D Weaving Innovation Centre project. The works have
More informationExample Macro WTS Facility
Example Macro WTS Facility Partially screened panel antennas attached to the face of an existing rooftop-penthouse, on a medical office building Cable trays used to minimize visibility of cabling Example
More informationDeck Tutorial. Chapter 8: Decks and Porches
Chapter 8: Deck Tutorial Now we ll continue where the Landscaping Tutorial left off and create a deck off the back of the house, connecting it to the terrain with an exterior staircase. You may want to
More informationAUCTION CATALOGUE 10H00
001 1 x BABY CAR SEAT, SAFETY BELT, CABLES, TELEPHONES & OTHER GOODS 002 1 x ASSORTED PAINTS, TOOLBOX & PLASTIC CRATES 003 1 x ASSORTED WOODEN PANELS & PICTURE FRAMES 004 1 x ASSORTED PLASTIC CRATES, POT,
More informationBUILDING REGISTER AND SUMMARY OF RESULTS
Page of 5 Project Ref: A7698 Client : Cheshire County Council Site: 874 Redsands Childrens Centre, Nantwich Location Accessibilty Installation Approximate Asbestos Condition Surface A7698 / Ground Floor
More informationWendell Smith Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationWINTER 15 EXAMINATIONS Subject Code: Model Answer- Building Drawing Page No- 01 /15
Subject Code: 17309 Model Answer- Building Drawing Page No- 01 /15 Important Instruction to Examiners:- 1) The answers should be examined by key words & not as word to word as given in the model answers
More informationDeck Tutorial. Chapter 6: Decks and Porches
Chapter 6: Deck Tutorial Now we ll continue where the Landscaping Tutorial left off and create a deck off the back of the house, connecting it to the terrain with an exterior staircase. You may want to
More informationEPIC Academy High School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationResidential Construction Checklist Single and Two Family Construction
DATE: _ Building Inspection Submittal Requirements Residential Construction Checklist Single and Two Family Construction Submit a City of Big Spring Permit Application, checklist, and 3 complete hard copy
More informationArchitecture, Construction, and Engineering Technical Charter
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationShades of blinds for greenhouses A01G 9/22 Shop furniture Picture frames
CPC - E06B - 2018.01 E06B FIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES (shades or blinds for greenhouses A01G
More informationJackie Robinson Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationRUDRAKSH RUDRAKSH. Key Plan 2,3 & 4 BHK LUXURIOUS APARTMENTS. Developers: Trisha Infrastructure Ltd. Architect: Foram Architect & Engineers
Key Plan N W E S T o wa r d Fathegunj Brambhat Chatralayi Mental hospital Road Kasiben Children Hospiatal Harish Nagar Society Gandhigram Society Hirawanti Chamber Aarya kanya Road Jalaram Mandir Road
More informationAndrew Carnegie Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationFACTORY. Presentation sketches Actual Site photographs Drawings
FACTORY Presentation sketches Actual Site photographs Drawings Factory Presentation sketches 1) Front Façade From the Main Road side The façade of the pub showcases a complete look of a manufacturing unit
More informationMahalia Jackson Elementary School 917 W 88th St Chicago, IL 60620
W 88th St Chicago, IL 0 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationDPTI.UNLEY HS STEMWORK Sheet No Sheet Size Sheet Name
HOME ECONOMICS ADMINISTRATION & STUDENT SERVICES FH TECHNICAL STUDIES GENERAL TEACHING, CANTEEN & STAFFROOM OVAL FH ADMINISTRATION & GENERAL SCIENCE CAR PARK PMT GENERAL TEACHING, RESOURCE & SCIENCE GEORGE
More informationADDENDUM #2 September 12, 2018
Physical Plant Services Project Management 1000 Rim Drive Phone: (970) 247-7523 Fax: (970) 247-7555 Project No. 2007-130P18 Whalen Gymnasium Expansion and Renovation for Exercise Science Request for Qualifications
More informationEast African Roofing Systems Ltd.
East African Roofing Systems Ltd. Iron Sheet Super Tiger sheets are made from pre-painted galvanized iron sheets and combines increased longevity with low maintenance costs. Super Tigersheets are suitable
More informationMIDDLE SCHOOL EXPLORING TECHNOLOGY (ONE PERSON LAB) New Construction
I. PROGRAM PHILOSOPHY The purpose of this course is to introduce students to the kinds and levels of work performed in todays and our future technological world. Laboratory experiences revolving around
More informationS T U D I O P C M A R T I N E Z EXISTING SITE PLAN SCALE: 1" = 10' - 0" SET # GENERAL NOTES: Site/Roof Drainage Plan OCTOBER 16, 2015 CHABAD
\\CANDELA\projects\-Chabad Center\Current Drawings\Chabad - -A-.0-extg-demo-site-plan.dwg, 0/0/0 :: PM, DWG To PDF.pc A-.0 SITE PLAN SCALE: " = 0' - 0" NORTH GENERAL NOTES: Site/Roof Drainage Plan. THE
More informationBoom Concrete, Inc. Clovermist Precast Vault Toilets
BOOM Clovermist Clovermist Precast Why purchse a BOOM Precast Concrete Restroom? Vault or Flush Styles Vandal Resistance ADA Compliant Low Maintenance Cost Effectiveness Will Not Rust or Rot Esthetics
More informationMorton School of Excellence
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationAlexander Graham Bell Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationA Buyers Premium of 11% inclusive of GST is payable by the purchaser on top of the hammer price on all lots sold.
Auction date: 26/11/2011 Antique, Collectable & Estate Auction Number 001 View Devonport Pty Ltd 14 Rooke Street Devonport Tasmania Auctioneer Esley Dunham A Buyers Premium of 11% inclusive of GST is payable
More informationGeorge Washington Elementary School 3611 E 114th St Chicago, IL 60617
3 E th St Chicago, IL Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up
More informationThe TRADITIONS Collection
The Traditions Collection transforms any backyard into an elegant outdoor dining area with its superior quality and warm, rustic charm. This collection includes a variety of dining table options, offered
More informationHow to measure guide
How to measure guide Before we design your new IKEA kitchen, we will ask you to first provide some measurements of the kitchen space. It is not hard and it will take no more than 15 minutes. We love photos
More informationCelestial. Celestial C
Celestial C by Drees Homes FIREPLACE STANDARD DOOR W/ OUTDOOR LIVING OUTDOOR LIVING 16'2" x 15'9" DINING 13'0" x 10'0" HOBBY W/ GLASS BI-PASS DOORS OWNER'S SUITE 17'0" x 15'0" TRAY CEILING NICHE CARRIAGE
More informationLists of Products FERRÁLIA 2012 DOOR AND FURNITURE FITTINGS AND HARDWARE. pág. 1 de 8 mod. 093b
DOOR AND FURNITURE FITTINGS AND HARDWARE 12126 ACCESS CONTROL 18617 ALARM SYSTEMS 22587 ALUMINUM ACCESSORIES FOR KITCHEN EQUIPMENT 16186 ASSEMBLY 13901 BOLTS 22606 BRIEFCASE STANDS 11423 CURTAIN RAILS
More informationTypical Drawings for Schools
0.85 1.7 0.85 3 3 0.6 3 3 0.85 1.7 0.85 0.3 4 4 1 1 2 2 0.425 0.425 0.425 0.425 1.2 2.4 1.2 0.6 0.6 4 4 1 1 3 3 0.4 0.6 0.3 0.3 3 3 4 4 0.4 4 4 1 1 2 2 Detail of (W 1.2 x 0.4 m) Detail of (W0.6 x 0.4 m)
More informationFrederic Chopin Elementary School 2450 W Rice St Chicago, IL 60622
2 W Rice St Chicago, IL 022 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationSTEM Magnet Academy. Definitions EXTERIOR W Fillmore St Chicago, IL 60607
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationRight On Replicas, LLC Step-by-Step Review * 1959 Chevy Impala Hard Top 2 n 1 1:25 Scale Revell Model Kit # Review
Right On Replicas, LLC Step-by-Step Review 20140915* 1959 Chevy Impala Hard Top 2 n 1 1:25 Scale Revell Model Kit #85-4315 Review Review and Photos by James Yeager 1959 Chevy was the second year of production
More informationNo 6 Guest House, Church Walks, Llandudno, LL30 2HD
4 MOSTYN STREET LLANDUDNO LL30 2PS (01492) 875125 47 PENRHYN AVENUE RHOS ON SEA, COLWYN BAY LL28 4PS (01492) 544551 AUCTIONEERS ESTATE AGENTS email: llandudno@bdahomesales.co.uk email: rhos@bdahomesales.co.uk
More informationSolutions AGRICULTURAL LABORATORY & CLASSROOM FURNITURE. Education to Industry. Solutions for Your Workspace & Storage Needs
AGRICULTURAL LABORATORY & CLASSROOM FURNITURE Education to Industry for Your Workspace & Storage Needs www.ageducationalsolutions.com 864-256-0621 info@ageducationalsolutions.com Workbenches Potting Benches
More informationSYSTEMS+ ACOUSTIC REQUIREMENTS INNOVATIVE SYSTEMS SOLUTIONS USGBORAL.COM
USGBORAL.COM SYSTEMS+ B 2 B 3 B 4 B 6 B 8 INTRODUCTION MULTI-RESIDENTIAL BUILDINGS COMMERCIAL BUILDINGS EDUCATIONAL FACILITIES HEALTH CARE BUILDINGS B ACOUSTIC REQUIREMENTS INNOVATIVE SYSTEMS SOLUTIONS
More informationWalt Disney Magnet Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationEllen Mitchell Elementary School 2233 W Ohio St Chicago, IL 60612
33 W Ohio St Chicago, IL 0 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationEmmett Louis Till Math and Science Academy 6543 S Champlain Ave Chicago, IL 60637
Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item
More informationContents. Technical Metal Industrial Co. L.L.C.
We, at Technical Metal Industrial Co. L.L.C. take pride in declaring the company s commitment to satisfy our customers by providing high quality products and promptly delivering them as per the agreed
More informationKIPP Charter Bloom. Definitions EXTERIOR S Lowe Ave Chicago, IL Co-locating on This Campus: Hope HS and Kipp Chtr Bloom
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationNorth Lawndale College Prep Charter - Collins
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationCharles N Holden Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationMaterial Description Qty Units Cost Total SQUARE FOOTAGE TOTAL Area 1692 sqft
Material Report for plan: Willowdale A Page 1 of 7 SQUARE FOOTAGE TOTAL Area 1692 sqft EXCAVATION & FOUNDATION EXCAVATION & BACKFILL Conc. Footing (volume) 5 m³ 122.50 612.50 Conc. Footing (length) 6"x20"
More informationJohn Milton Gregory Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationINDEX OF SHEETS FLAMING GORGE RANGER DISTRICT OFFICE ADDITION REGION 4 INTERMOUNTAIN REGION ASHLEY NATIONAL FOREST DRAWING SHEET INDEX
INDEX OF SHEETS SHT. DWG. SHEET TITLE GENERAL 1 G1 COVER SHEET, VICINITY MAP, PROJECT DESCRIPTION 43 A402 INTERIOR ELEVATIONS WOMENS 44 A403 INTERIOR ELEVATIONS MENS 45 A404 INTERIOR ELEVATIONS BUILDING-PLUMBING
More informationRegistered Workshops
Registered Workshops March 24 & 25, 2017 Friday (March 24) 7:30 AM 11:30 AM & Saturday (March 25) 7:45 AM 11:45AM Friday Workshops F1 California Wine Tasting Room by Karen Benson Class Fee: $89 Learn the
More informationLangston Hughes Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationThe Old Police House Hinwick Road Podington NN29 7HU
The Old Police House Hinwick Road Podington NN29 7HU FEATURES A superbly extended and improved detached family home enjoying a private and established plot on the edge of this sought after North Bedfordshire
More informationSKY LIVING COSMOPOLITAN. Start a brand new sky-high chapter of your life in luxury.
COSMOPOLITAN SKY LIVING Start a brand new skyhigh chapter of your life in luxury. Sales Gallery 09 88 IJM PROPERTIES SDN BHD 0080M Suite 00, Menara IJM Land,, Lebuh Tunku Kudin, 00 Gelugor, Pulau Pinang,
More informationUniversity of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL
SECTION 23 00 10 - MECHANICAL SCOPE OF WORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section 23 01
More informationFriedrich Ludwig Jahn Elementary School 3149 N Wolcott Ave Chicago, IL 60657
39 Wolcott Ave Chicago, IL Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationSCHEDULE OF RATES FOR EXTERNAL REDECORATION AND PRE-DECORATION REPAIRS
SCHEDULE OF RATES FOR EXTERNAL REDECORATION AND PRE-DECORATION REPAIRS GROUNDWORKS...6 Steps... 6 Metal Stairs, Walkways and Balustrades... 6 Balustrades and Handrails - Sundry Repairs... 6 Miscellaneous
More informationExhibit Display Rules and Regulations
Exhibit Display Rules and Regulations TCEA Exhibit Display Rules and Regulations function on the principle that all exhibitors should be given an equal opportunity to present their product in the most
More informationPerkins Statewide Articulation Agreement. Documentation item: Secondary Competency Task List Coversheet
Perkins Statewide Articulation Agreement Documentation item: Secondary Task List Coversheet The Secondary School agrees to: A. Implement the approved PDE Program(s) of Study. B. Provide assessment of student
More informationHuntington Beach City School District. M e a s u r e Q B o n d I m p l e m e n t a t i o n S i t e C o m m i t t e e M e e t i n g M a y
Huntington Beach City School District M e a s u r e Q B o n d I m p l e m e n t a t i o n S i t e C o m m i t t e e M e e t i n g M a y 0 1 7 Agenda 1. Where are we in the process?. Measure Q Bond Program
More informationSCHEDULE 1 OFFICERS TO WHICH THE POWERS AND FUNCTIONS ARE DELEGATED
SCHEDULE 1 OFFICERS TO WHICH THE POWERS AND FUNCTIONS ARE DELEGATED Level 1 Level 2 Level 3 Level 4 Level 5 Chief Executive Officer (CEO) Chief Financial Officer (CFO) Chief Operations Officer (COO) Executive
More informationTHE FOLLOWING ITEMS WERE DISCUSSED: 1. HVAC SYSTEM:
4900 Lang Ave NE Albuquerque, NM 87109 505-348-4000 phone 505-348-4055 fax Meeting Minutes Project: Valley View Elementary School Owner: Valley View Public Schools / PSFA Albuquerque Colorado Springs Denver
More informationReuse Inventory: 309 W. Wash, Version 1. Legend. Building Materials. July 26, 2005
Madison Environmental Group, Inc. 25 North Pinckney P.O. Box 1607 Madison, WI 53703 608.280.0800 phone 608.280.8108 fax meg@madisonenvironmental.com Reuse Inventory: 309 W. Wash, Version 1 July 26, 2005
More informationRevised April Unit/Standard Number. Proficiency Level Achieved: (X) Indicates Competency Achieved to Industry Proficiency Level
Secondary Task List 100 DEMONSTRATE SAFETY IN THE BUILDING AND PROPERTY MAINTENANCE PROGRAM 101 Demonstrate knowledge of general shop safety. 102 Wear appropriate personal protective clothing. 103 Wear
More informationSauna Barrel 2.5 M. health, beauty, peace of mind
Sauna Barrel 2.5 M health, beauty, peace of mind Specifications Wood Shape 2.5M LENGTH Ø1.9M WITH TERRACE WITHOUT TERRACE Spruce or thermo wood Round The internal volume of sauna room, m 3 4.69 6.04 Thickness
More informationSLIDING SYSTEMS. Product catalog 2017
SLIDING SYSTEMS Product catalog 2017 Grafipro Oy Product catalog 2017 Table of contents: 3 Areas of use 4 C rails C-30 is a company specialising in aluminium and plastic composite materials. Our expertise
More informationOLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN
KBE APPROVAL DATE: APRIL 2013 including Finding #1 g g OLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN PLAN OF SCHOOL ORGANIZATION 1. Current Plan PS, K-5, 6-8, 9-12 2. Long Range Plan PS, K-5, 6-8, 9-12
More informationDETAILED ESTIMATES OF INCOME Revised Estimates
Sr.N o 5 DETAILED ESTIMATES OF INCOME Receipt 1 INTERNAL RECEIPTS i) Fee & Fine 73999223 85000000 85000000 85000000 ii) Examination Fee 13131384 1100000 1100000 1200000 iii) Enrolment/Regn/Migration &
More informationThe Mayberry. Bayfront Single - Family Homes OPTIONAL ELEVATION B. *Rendering is Artist s Conception.
The Mayberry OPTIONAL ELEVATION B *Rendering is Artist s Conception. Bayfront Single - Family Homes Elevations INCLUDED ELEVATION A OPTIONAL ELEVATION B Optional Elevation B Front Porch *Covered porch
More informationOnce you select a model from the model list you will see the following index.
2010 Parts Catalog In the 2010 Parts Catalog, you will be seeing a reproduction of our actual engineering drawings. This new format will require that you use our web tools a little differently. Our drawings
More informationEVACUATION PLAN E G A C H J. Sligo I.T Campus Layout. Evacuation Plan Assembly Points. Assembly. Point 7. Assembly. Point 8. Assembly.
LS LS 143 K Point 7 L Point 8 Point 6 P Point 5 M F E G A C D SOCCER PITCH GAELIC PITCH Point 2 H J B TRAINING AREA Point 3 Sligo I.T Campus Layout Evacuation Plan Points ZONE A5 A/F/5 A/F/4 A/F/3 ZONE
More informationJohn Spry Elementary Community School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationCharles P Caldwell Academy of Math & Science ES 8546 S Cregier Ave Chicago, IL 60617
S Cregier Ave Chicago, IL 0 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationCharles G Hammond Elementary School 2819 W 21st Pl Chicago, IL 60623
Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item
More informationRobert Fulton Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More information40' - 8" x 18' - 0" PROPOSED ONE STORY ADDITION 9' - 0" 22' - 8" 9' - 0" ELEV. -0'-7" ELEV. 0'-0" NEW SUNROOM 22'0 x 17'0 COFFERED CEILING
40' - 8" x 18' - 0" PROPOSED ONE STORY 9' - 0" 22' - 8" 9' - 0" ELEV. -0'-7" DOWN NEW RAISED BLUESTONE PATIO ELEV. -1'-9" BENCH COAT HOOKS NEW MUDROOM 7'0 x 16'9 SHELVES BUILT IN GAS FP ELEV. 0'-0" NEW
More informationWilliam Rainey Harper High School 6520 S Wood St Chicago, IL 60636
0 S Wood St Chicago, IL 03 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationSection 7 - Price Schedule
UNITED NATIONS DEVELOPMENT PROGRAMME ITB 2017-156 Section 7 - Price Schedule Programme Title: PAL10-00094739 / Right to Education in the Gaza Strip Procurement of Furniture Works of Jamal Abd Naser School,
More informationJames Shields Middle School 2611 W 48th St Chicago, IL 60632
2 W 48th St Chicago, IL 02 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationAPPLICATION NOTE. Using Oberon's 1020 Series Indoor/Outdoor Enclosures in Stadiums and other High Density Venues
APPLICATION NOTE Using Oberon's 1020 Series Indoor/Outdoor Enclosures in Stadiums and other High Density Venues Copyright 2014 Oberon, Inc. 4/30/2014 1 Stadiums, sports arenas, concert halls, auditoriums,
More informationWilliam H Seward Communication Arts Academy ES 4600 S Hermitage Ave Chicago, IL 60609
S Hermitage Ave Chicago, IL 9 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report
More informationPROJECT PEGASUS TEMPORARY BUILDINGS EXHIBITION
INTRODUCTION Planning permission was granted by the City of London on th February 0 for a scheme by Hugh Broughton Architects to refurbish and extend the Treasury Building in the Inner Temple. The project
More informationRwabushenyi Memorial Open Chess Championships th November to 3 rd December 2017 Kampala, Uganda
Rwabushenyi Memorial Open Chess Championships 2017 30 th November to 3 rd December 2017 Kampala, Uganda 1. Invitation 1.1 This is the official invitation to the 2017 Uganda Open Chess Championship which
More information