GAS FORUM RAMADA PARC HOTEL, BUCHAREST OCTOBER 3 RD, 2012
|
|
- Elizabeth Morton
- 5 years ago
- Views:
Transcription
1 ROMANIA GAS FORUM RAMADA PARC HOTEL, BUCHAREST OCTOBER 3 RD, 2012
2 AGENDA INTRODUCING IPM-PARTNERS PROJECTS SNAPSHOTS PROJECTS SNAPSHOTS - ONGOING TECHNICAL INSPECTIONS-OVERVIEW TECHNICAL INSPECTIONS- WHY? TECHNICAL INSPECTIONS- REFERENCES TECHNICAL INSPECTIONS- STRUCTURE TECHNICAL INSPECTIONS- SNAPSHOTS TECHNICAL INSPECTIONS- BENEFITS QUESTIONS AND ANSWERS
3 INTRODUCING IPM-PARTNERS - Engineering, Construction and Project Management Company, founded in 2009; - Small to Medium sized projects, mostly constructions in oil and gas such as: - Upstream plants, in full or in part; - Oil pipelines; - Gas pipelines; - Civil il works attached to Oil&Gas projects; - Full value chain covered, from basic engineering to commissioning and operation support; - Ongoing projects for important customers in the market: Transgaz, Conpet, Romgaz, Omv Petrom, etc.; - Technical services for oil and gas equipment: inspections, technical state assessment;
4 PROJECTS SNAPSHOTS PREDESTI PARK AND WATER INJECTION STATION Engineering, procurement,construction and commissioning for new gas plant for collecting, separating and measuring the gas production from 15 wells in Predesti field, and the water injection station at well # 86 Pitulati (OMV Petrom, Asset II Oltenia)
5 PROJECTS SNAPSHOTS BI-DIRECTIONAL LPG METERING SKIDS Detail Engineering, Mechanical Fabrication, E&I, Delivery to Turkey, IZMIT Refinery Client: Emerson Process Management, The Netherlands, for Petrol Ofisi, Turkey
6 PROJECTS SNAPSHOTS STEAM JACKETED METERING SKID - LIQUID SULPHUR Detail Engineering, Mechanical Fabrication, Delivery to Netherlands Client: Emerson Process Management, The Netherlands, for Dolphin Energy, Quatar
7 PROJECTS SNAPSHOTS - ONGOING - 20 inches oil pipeline Baraganu-Martinesti, 12,5 km in 8 sections, Engineering, Authority Engineering, Execution, client CONPET S.A, general contractor in association with Habau PPS., execution in progress; - 20 inches, high pressure gas pipeline Turburea-Isalnita, repair for 6 overcrossings, Bradesti-Dolj area, client TRANSGAZ S.A., general contractor in association with Habau PPS, execution in progress; - 24 inches high pressure gas pipeline, Peceneaga-Silistea (Braila County) replacement of 1,3 km old pipeline, incl. 2 under crossings, client TRANSGAZ S.A., general contractor in association with Habau PPS, execution in progress; - Technical assessment for intervention ti equipment type IC5, IP30, TW30, T50 and TW50, general contractor in association with Oil&Gas University Ploiesti, client ROMGAZ S.A., project starting.
8 TECHNICAL INSPECTIONS-OVERVIEW
9
10 TECHNICAL INSPECTIONS- WHY? - Safety operations with named equipment, aligned with user internal regulations and with legal framework; - Compliancy with national/specific ifi regulations; - Financial: extension of the operation time for expensive equipment: - Oi Original i parameters; - Downgraded parameters; - Decreased risk of operating new equipment for which the manufacturers are offering only limited it guarantees. - Simple, yet complex inspection procedure, with huge benefits for the owning organization;
11 TECHNICAL INSPECTIONS- REFERENCES (1) - API Specifications; - API Recommended Practices; - International Association of Drilling Contractors (IADC) Drilling Manual - Romanian Government Decision #2139 from 30 th November 2004, regarding the classification and normal operation period for fixed assets, stating (approximate translation): - Art. 4: Keeping in operation the fixed assets which may affect life, health or environment, after expiration of normal operation period, shall be permitted only based on a technical assessment issued by a certification entity or by technical inspection entities certified for the specific operation area of the fixed asset - Applicable ISCIR Prescriptions (ISCIR- Romanian National Regulatory Entity)
12 TECHNICAL INSPECTIONS- REFERENCES (2) REF ID API RP 4G API Spec. 4F API RP 8B SR EN ISO 13534:2000 Reference Name Recommended practice for use and procedures for Inspection, Maintenance and Repair of Drilling and Well Servicing Structures Specification for Drilling and Well Servicing Structures Recommended Practice for Procedures for Inspection, Maintenance, Repair and Remanufacture of Hoisting Equipment; Drilling and production equipment -- Inspection, maintenance, repair and remanufacture of hoisting equipment;
13 TECHNICAL INSPECTIONS- REFERENCES (3) REF ID API Spec. 8A API Spec. 8C Reference Name Specification for Drilling and Production Hoisting Equipment Specification for Drilling and Well Servicing Structures ISO Petroleum and natural gas industries -- Drilling and 13535:2003 production equipment -- Hoisting equipment (cobranded with API Spec. 8C) API RP 7L Inspection, Maintenance, Repair and Remanufacture of Drilling Equipment API RP 9B Recommended Practice of Application, Care and Use of Wire Rope for Oilfield Services
14 TECHNICAL INSPECTIONS- REFERENCES (4) REF ID API RP 5A5 API Spec. 5B API Spec. 7 API RP 7G PT C1: 2010 PT C4: 2010 PT C6: 2010 Reference Name Field Inspection of New Casing, Tubing, and Plain End Drill Pipe *** ISO Adoption from ISO 15463:2003 *** Specification for Threading, Gauging and Thread Inspection of Casing, Tubing, and Line Pipe Threads Specification for Rotary Drill Stem Elements Drill Stem Design and Operating Limits Cazane de abur, cazane de apă fierbinte, supraîncălzitoare și i economizoare independente d Recipiente metalice stabile sub presiune Conducte metalice sub presiune pentru fluide
15 TECHNICAL INSPECTIONS- STRUCTURE (1) - INSPECTION PREPARATION: - Planning and approve with customer; - Identification of applicable procedures; - Prepare and approve new procedures, if the case; - Check status of inspection tools (verification, calibration, availability) - NDT material preparation
16 TECHNICAL INSPECTIONS- STRUCTURE (2) - INSPECTION PERFORMANCE: - Visual control; - Non Destructive Testing: UT(g), MT, PT, UT(v) UT(s); - Dimensional Verification and Control; - Functional Control; - Release of NDT reports, and Visual Inspection Reports; - Engineering calculation with specialized software;
17 TECHNICAL INSPECTIONS- STRUCTURE (3) - ISSUE AND RELEASE ASSESSMENT REPORT; - Possible outcomes: - Keep the equipment in operation for a specified duration, at the design parameters; - Keep the equipment in operation for a specified duration, at downgradedd d parameters; - Repair recommendations for extending operation duration to be specified; - Decommissioning i i recommendations; - Assessment certificate, which includes the above recommendations;
18 TECHNICAL INSPECTIONS- SNAPSHOTS (1) DRAWWORK, ready for inspection
19 TECHNICAL INSPECTIONS- SNAPSHOTS (2) Drilling Crown Block during NDT Rotary Swivel, after NDT Testing procedure.
20 TECHNICAL INSPECTIONS- SNAPSHOTS (3) Substructure, crack at visual control.
21 TECHNICAL INSPECTIONS- SNAPSHOTS (4) Travelling block defect, Identified d via MT testing.
22 TECHNICAL INSPECTIONS- SNAPSHOTS (5) Substructure, advanced corrosion at visual control.
23 TECHNICAL INSPECTIONS- SNAPSHOTS (6) Effort and maximum displacement simulation for a verified derrick. It allows calculation for the remaining operation period with no repairs.
24 TECHNICAL INSPECTIONS- BENEFITS - Legal compliancy, both international and local regulatory framework; - Internal HSEQ and maintenance compliancy; - Reduced Risk Operations, for used and even new equipment, given limitations of the manufacturer guarantees; - Reduced costs with new equipment; - Efficient usage of owned equipment;
25 QUESTIONS AND ANSWERS
26 THANK YOU FOR YOUR ATTENTION! ILEANA HATEGAN Technical Inspections Manager IPM-PARTNERS ROMANIA S.R.L. Strada Trei Ierarhi nr. 2 PLOIESTI, PH , ROMANIA office@ipm-partners.com
PROJECT: Ultrasonic Metering Gas Flow Monitoring System
Ledererhof 4, A-1010, Vienna, Austria 2 nd Trei Ierarhi Street, Ploiesti PH, RO-100010, Romania www.ipm-partners.com PROJECT: Ultrasonic Metering Gas Flow Monitoring System Bucharest, Ramada Parc Hotel
More informationThe Evolution & Future of API Coiled Tubing Standards. Ryan Addison Tenaris Coiled Tubes API Co-Chairman Resource Group for Coiled Tubing
The Evolution & Future of API Coiled Tubing Standards Ryan Addison Tenaris Coiled Tubes API Co-Chairman Resource Group for Coiled Tubing API Overview Presentation Outline Resource Group on Coiled Tubing
More informationAPI Standards Overview
32 nd Gas-Lift Workshop The Hague, The Netherlands February 2-6, 2009 API Standards Overview Roland Goodman Upstream Standards Manager American Petroleum Institute This presentation is the property of
More informationIWCF Well Control Level 5. Celle Drilling Conference 2017
IWCF Well Control Level 5 Celle Drilling Conference 2017 Contents IWCF well control level 5 course program Background - who is it for Structure and contents Delivery approach Questions Why? Level 5 background
More informationISO INTERNATIONAL STANDARD
INTERNATIONAL STANDARD ISO 10407-2 First edition 2008-10-15 Petroleum and natural gas industries Rotary drilling equipment Part 2: Inspection and classification of used drill stem elements Industries du
More informationOverview and Update of API Standards
Overview and Update of API Standards IADC South East Asia Chapter Meeting Kuala Lumpur, Malaysia March 21, 2017 Eric Ho American Petroleum Institute Singapore Scope of Presentation API Background API Standards
More informationPerformance-Based Safety Regulation
Performance-Based Safety Regulation Peter Bjerager, DNV GL National Academy of Sciences, 15 April 2016 1 SAFER, SMARTER, GREENER DNV GL in brief We classify, certify, verify and test against regulatory
More informationPersonalized Service, Industry Expertise. Franklin Howard
Personalized Service, Industry Expertise. Franklin Howard PRODUCTS Franklin Howard International provides high quality drilling equipment and spare parts from top manufacturers in the United States. Warranty
More informationAPI COPM CPMA Chapter 20.X
API COPM CPMA Chapter 20.X David Courtney Pamela Chacon Matt Zimmerman Dan Cutting 24 23 February 2017 Houston, TX Copyright 2017, Letton Hall Group. This paper was developed for the UPM Forum, 22 23 February
More informationCertificate of Registration
Pipe Inspection Non-destructive Testing (NDT), storage and maintenance services for new and used oil country tubular goods (OCTG), line Pipe and drilling equipment (pipe and tools). Industrial NDT Nondestructive
More informationRegulatory Reforms in Mexico Energy Production and Environmental Protection. A Technical Regulator for a New Market Frame
Regulatory Reforms in Mexico Energy Production and Environmental Protection A Technical Regulator for a New Market Frame February 12th, 2014 CONTENT Legal Framework Strategic Design Regulatory Policy Gradual
More informationODS Metering Systems. Offshore Metering Packages. Systems
M E T E R I N G S Y S T E M S Offshore Metering Packages Pipeline Metering Metering Control Systems is part of ODS BV based in The Netherlands with a workforce of 420 employees and a turnover of 240 million
More informationTechnical Specifications: Supply of Seamless Grade TP304L Pipe and Grade WP304L Pipework Fittings to the ITER Organization (IO).
IDM UID: R22L3M ver 1.4 Technical Specifications: Supply of Seamless Grade TP304L Pipe and Grade WP304L Pipework Fittings to the ITER Organization (IO). Contents 1 Terms and Acronyms... 3 2 Background...
More informationDE027: X-mas Tree & Wellhead Operations, Maintenance & Testing
DE027: X-mas Tree & Wellhead Operations, Maintenance & Testing DE027 Rev.001 CMCT COURSE OUTLINE Page 1 of 5 Training Description: Wellhead and x-mas tree is the main equipment for oil production, water
More informationIntegrity Management of Offshore Assets
OIL & GAS Integrity Management of Offshore Assets Opening session Leif Collberg 05 May 2017 1 DNV GL 2015 05 May 2017 SAFER, SMARTER, GREENER How regulations can solve the challenge of being performance
More informationNTL No N05 Increased Safety Measures for Energy Development on the OCS Effective June 8, 2010
NTL No. 2010-N05 Increased Safety Measures for Energy Development on the OCS Effective June 8, 2010 Frequently Asked Questions (FAQ s) Updated July 9, 2010 A. General Questions QA1: With the issuance of
More informationCommittee on Standardization of Oilfield Equipment & Materials (CSOEM) New Member Orientation
Committee on Standardization of Oilfield Equipment & Materials (CSOEM) New Member Orientation Roland Goodman Manager, Upstream Standards goodmanr@api.org New Member Orientation Presentation will cover:
More informationReliance Industries Limited
Reliance Industries Limited Notice Inviting Expression of Interest (RIL/E&P/EOI/2010/05) (Under International Competitive Bidding) For BLOCK NO : KG-DWN-98/3 (KG D6) Reliance Industries Limited (RIL),
More informationIBC Information and Communication Committee, Nils Andreas Masvie 27 January Paris Marriott Opera Hotel. Ungraded
Is standardization a cost cutting panacea in today s low oil price environment? Sharing lessons from recent mega-projects e.g. Nord Stream and South Stream IBC Information and Communication Committee,
More informationCommittee on Standardization of Oilfield Equipment & Materials (CSOEM) New Member Orientation
Committee on Standardization of Oilfield Equipment & Materials (CSOEM) New Member Orientation Roland Goodman Manager, Upstream Standards goodmanr@api.org New Member Orientation Presentation will cover:
More informationGRAPHICAL INTERFACE FOR EXPERIMENTAL ANALYSIS OF NONDESTRUCTIVE TESTING OF DRILL PIPES
GRAPHICAL INTERFACE FOR EXPERIMENTAL ANALYSIS OF NONDESTRUCTIVE TESTING OF DRILL PIPES Stan Ioana-Gabriela, Assistant lecturer, U.P.G. Ploiesti Niculae Georgrta-Claudia, Lecturer Dr., U.P.G. Ploiesti ABSTRACT:In
More informationVisual Testing of Pipe Threads
From NDT Technician, Vol. 10, No. 1, pp: 1 5. Copyright 2011 The American Society for Nondestructive Testing, Inc. The American Society for Nondestructive Testing www.asnt.org FOCUS AAs an oil well is
More information4 Briefing. Responsible investor
Issue Responsible investor 4 Briefing Wednesday 8 th February 2012 In 2010, we accepted all 26 recommendations made by the Bly Report our internal investigation into the Deepwater Horizon incident. BP
More informationServices. Technology and Innovation
Services Technology and Innovation 1 Services Technology and Innovation in the LPG sector TÜV AUSTRIA Italia - Blu Solutions contributes - since 2004 - to the improvement of safety, environmental sustainability
More informationIntegrity Monitoring? New thinking in the approach to Subsea IMMR. Dr Karl Woods, Snr Subsea Reliability Engineer 22/2/2017
Integrity Monitoring? New thinking in the approach to Subsea IMMR Dr Karl Woods, Snr Subsea Reliability Engineer 22/2/2017 Disclaimer and important notice This presentation contains forward looking statements
More informationIntroduction to Fitness For Service November 10, 2016, University of Alberta, Edmonton.
Advancing Your Career! November 10, 2016 University of Alberta Engineering Teaching and Learning Center, 6th floor room 060 (ETLC 6 060) 116 Street NW., Edmonton, AB T6G 2V4 About This Workshop This workshop
More informationUpstream / Upstream Safety Sessions
Upstream / Upstream Safety Sessions U01 API Spec Q2 Our Journey to theworld s First Oil and Gas Quality Management System Standard for Service Supply Organizations Euan Ramsay, Regional Business Development
More informationGOST TUBING AND COUPLINGS
GOST 633-80 TUBING AND COUPLINGS Tubing is used for oil and gas production. Tubing shall be made seamless, plain- or upset end and couplings with high-seal connections. Coupling-free connections are possible.
More informationNOIA ANNUAL MEETING CONCERNS/INITIATIVES. BSEE Update. Joe Levine BSEE Washington DC April 11, 2014
NOIA ANNUAL MEETING Technology BSEE OCS Policy TECHNOLOGY Committee CONCERNS/INITIATIVES BSEE Update Joe Levine BSEE Washington DC April 11, 2014 Presentation Overview BSEE Research Program Research Drivers
More informationCapacitive level meters CLM 40 INSTRUCTIONS MANUAL. průmyslová elektronika
průmyslová elektronika INSTRUCTIONS MANUAL Capacitive level meters CLM 40 Before level meters usage please read instructions in this service manual and keep it for further use. Service manual is for all
More informationDiverse Capabilities Targeted Solutions
Diverse Capabilities Targeted Solutions Today s Leader, Tomorrow s Innovation As a vertically integrated manufacturer with direct control over the entire supply chain from raw materials to finished product,
More informationPIONEER TRADING CO., LTD.
PRECISION KURODA LTD. OIL COUNTRY GAUGES API THREAD GAUGES PREMIUM CONNECTION GAUGES THREAD MEASURING INSTRUMENTS CONTACT TO: PIONEER TRADING CO., LTD. 4-1 Kuzuha-Asahi 3-Chome Hirakata Osaka 573-1111,
More informationAPI COPM and Petroleum Measurement Standards Overview. Paula Watkins API Manager, Measurement Standards
API COPM and Petroleum Measurement Standards Overview Paula Watkins API Manager, Measurement Standards API Standards Program The API Standardization Department formed in 1923 The first API standard was
More informationLocation. Established in 2015 Office location: Klepp Næringspark, Norway.
Location Established in 2015 Office location: Klepp Næringspark, Norway. Vision to be leader within On-Site machining & Decommissioning segment with a main focus on mature plants, offshore installations,
More informationISO INTERNATIONAL STANDARD
INTERNATIONAL STANDARD ISO 28781 First edition 2010-08-15 Petroleum and natural gas industries Drilling and production equipment Subsurface barrier valves and related equipment Industries du pétrole et
More informationIndustry & Govt Changes Post Macondo
Cover graphic should fill and not exceed the defined grey box. Industry & Govt Changes Post Macondo Gary F. Devlin VP Quality & Customer Experience March 2013 Deepwater Industry / Focus Approach Joint
More informationAPI Buttress Connections
IDM Code GDL00382/2 / March 2018 API Buttress Connections Scope These guidelines apply specifically to the use of API Buttress connections. This document is based on API 5C1 standard which is the main
More information9 th ANNUAL ROMANIA OIL & GAS Conference & Exhibition 2017
9 th ANNUAL ROMANIA OIL & GAS Conference & Exhibition 2017 21 NOVEMBER 2017 Ramada Parc Hotel - Bucharest, Romania Organized by: Co-organizer: Under the patronage of: With the support of: MINISTERUL ENERGIEI
More informationThis document is a preview generated by EVS
TECHNICAL SPECIFICATION SPÉCIFICATION TECHNIQUE TECHNISCHE SPEZIFIKATION CEN ISO/TS 16530-2 December 2015 ICS 75.180.10 English Version integrity - Part 2: integrity for the operational phase (ISO/TS 16530-2:2014)
More informationEmployability Enhancement Program for Engineers. Transformation of an engineering degree holder to a real Engineer, who can do more at work.
TRACEZ Training Services Oman www.tracezglobal.com Employability Enhancement Program for Engineers Transformation of an engineering degree holder to a real Engineer, who can do more at work. EEP- Introduction
More informationNational Craft Assessment and Certification Program S P E C I F I C A T I O N S
National Craft Assessment and Certification Program S P E C I F I C A T I O N S INDUSTRIAL MAINTENANCE MECHANIC V4 MEMT32_04 Released June 2013 Focus Statement A journey-level Industrial Maintenance Mechanic
More informationDEVELOPMENT OF SUBSEA REGULATIONS IN THE NORWEGIAN PETROLEUM INDUSTRY FOLLOW UP AND USE OF STANDARDS
NH GRAND HOTEL KRASNAPOLSKY AMSTERDAM 3-5 APRIL 2017 DEVELOPMENT OF SUBSEA REGULATIONS IN THE NORWEGIAN PETROLEUM INDUSTRY FOLLOW UP AND USE OF STANDARDS Trond Sundby Petroleum Safety Authority, Norway
More informationTurning the wheels of your success
INDUSTRIAL SERVICES Turning the wheels of your success A comprehensive package of integrated services combining traditional certification and inspection with innovative business solutions based on the
More informationSelect, wear adjust, use and maintain personal protective equipment
ANALYSIS PROFILE PROTECT SELF AND OTHERS Identify, interpret and apply applicable Acts, Codes and regulations Select, wear adjust, use and maintain personal protective Recognize and assess hazards and
More informationOil and Gas UK Well Integrity Guidelines
Oil and Gas UK Well Integrity Guidelines The Well, the Completion and the Xmas Tree The Equipment and the People A Definition of Well Integrity Key UK Legislative Requirement for Well Integrity Oil and
More informationPRODUCTION CHEMISTRY
PRODUCTION CHEMISTRY Proserv is the fresh alternative in global energy services. We are a technology-driven company providing products, services and bespoke solutions to clients across the drilling, production
More informationOneSubsea Subsea Sampling System
OneSubsea Subsea Sampling System Shailesh Rathod 22 23 February 2017 Houston, TX Copyright 2017, Letton Hall Group. This paper was developed for the UPM Forum, 22 23 February 2017, Houston, Texas, U.S.A.,
More informationISO INTERNATIONAL STANDARD
INTERNATIONAL STANDARD ISO 10424-2 First edition 2007-11-15 Petroleum and natural gas industries Rotary drilling equipment Part 2: Threading and gauging of rotary shouldered thread connections Industries
More informationEMW-C and EMW-I NDT for Annulus and Internal Pipe Inspection
EMW-C and EMW-I NDT for Annulus and Internal Pipe Inspection WaveTrue Science + Technologies 504 El Paraiso Rd NE Albuquerque, NM 87113 CEO Ron Floit President John DeWees (888) 711-2532/ (212) 625-6622
More informationMismatched Iron Connections. Shankar Narayan
Mismatched Iron Connections Shankar Narayan Mismatched Hammer Unions Ongoing Issue 2009 Halliburton. All Rights Reserved. 2 Pressure Rating & Figure Number Figure 602 6,000 PSI Figure 1002 10,000 PSI Figure
More informationPipeline Technology Conference 2010
THRESHOLDS, ACCURACIES AND RESOLUTION: QUANTITATIVE MEASUREMENT AND ITS ADVANTAGES FOR METAL LOSS INSPECTION A. Barbian, M. Beller, A. Hugger, C. Jäger, A. Pfanger NDT Systems & Services Stutensee, Germany
More informationPipeline Design & Installation Systems
Pipeline Design & Installation Systems Rigid pipeline subsea tie-backs new operational challenges Paul Georgeson Operations Support Manager Wood Group Kenny Agenda - Overview - Materials - Inspection -
More informationSAMAMAT FLOW CONTROL L.L.C.
SAMAMAT FLOW CONTROL L.L.C. SFC-MK-LS-001 Rev.: 03 COMPANY PROFILE Company Location Company Information Company Size Nearest Transportation Company Name SAMAMAT FLOW CONTROL L.L.C Company Address Plot
More information2018 Tulane Engineering Forum
2018 Tulane Engineering Forum Friday, April 20, 2018, Morial Convention Center, New Orleans, LA Offshore Oil & Gas Exploration & Production An Overview from a Technical Perspective Okite Obakponovwe BEng
More informationMEC-QW-E-2002 Senior QA/QC Welding Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS
101835-MEC-QW-E-2002 Senior QA/QC Welding Engineer Holds a B. Sc. in Mechanical Power Engineering and has about 15 years hands-on experience working as QA/QC Engineer & Welding Inspector in several industrial
More informationUnderground Storage Operation & Maintenance Services
Underground Storage Operation & Maintenance Services Enhancing operating performance Benefit from 50 years experience in storage operation and maintenance and find the right answers to your questions.
More informationDefining the New Normal for Offshore Drilling Copenhagen 16 June Alan Spackman Vice President, Offshore Regulatory & Technical Affairs
Defining the New Normal for Offshore Drilling Copenhagen 16 June 2011 Alan Spackman Vice President, Offshore Regulatory & Technical Affairs Montara & Macondo Investigations Report of the Montara Commission
More informationLifting Engineering. Capability & Experience
Lifting Engineering Capability & Experience Results for our customers The WorleyParsons consulting group is a collaborative, multidisciplinary team with a broad range of strategic, technical and project
More informationDE059: Hydrocarbon Production Operations
DE059: Hydrocarbon Production Operations DE059 Rev.001 CMCT COURSE OUTLINE Page 1 of 5 Training Description: This five-day course will provide the participants with an integrated view of the hydrocarbon
More informationTitle: IEC TS (First Revision of IEC WT 01) The new standard for Wind Turbines and Wind Farms Onshore and Offshore
Title: IEC TS 61400-22 (First Revision of IEC WT 01) The new standard for Wind Turbines and Wind Farms Onshore and Offshore Author: Address: Mike Woebbeking Germanischer Lloyd Industrial Services GmbH,
More informationThe Essentials of Pipeline Integrity Management
TRAINING METHODOLOGY This interactive training workshop includes the following training methodologies : Lectures Video Discussion of case histories and hands on calculations WHO SHOULD ATTEND The course
More informationSection Nine Rig/Platform Environment. Oil & Gas Training. Oil & Gas Training. Oil & Gas Training. Rig/Platform Environment
Section Nine /Platform Environment /Platform Environment The rig site are broken into basic work areas. These are: Substructure /Platform Environment The rig site are broken into basic work areas. These
More informationAPI 8 Round Connections
API 8 Round Connections Scope These guidelines apply specifically to the use of API 8RD (STC, LTC, EUE, NUE) connections. This document is based on API RP 5C1 which is the main document applicable for
More informationillizwe Engineering Business Profile
ILLIZWE Engineering PTY Ltd was formed in 2013. The founder developed a passion and discovered an opportunity in the industry from year 2004 while working as a Mechanical Engineer, and his main passion
More informationIndustry and Regulatory Cooperation for Better Information
PROFESSIONAL PETROLEUM DATA MANAGEMENT ASSOCIATION Industry and Regulatory Cooperation for Better Information Trudy Curtis CEO, PPDM Association 1 1/28/2014 ABOUT THE PPDM ASSOCIATION Founded 1991 The
More informationINVESTIGATION OF SLUG FLOW IN DEEPWATER ARCHITECTURES. Y. OLANIYAN TOTAL S.A. France
INVESTIGATION OF SLUG FLOW IN DEEPWATER ARCHITECTURES Y. OLANIYAN TOTAL S.A. France CONTENTS Introduction Slug flow in field design phase Field case study Conclusion Investigation of Slug flow in Deepwater
More information4/28/2006. ModuSpec Engineering
4/28/2006 ModuSpec Engineering ModuSpec Engineering History Founded in October 1986 by: Leo Nagtegaal. Company office in the Netherlands, Serooskerke Opening Aberdeen office in 1989. Opening Singapore
More informationIntroductory remarks
Introductory remarks This document is a draft of a permit for Gaz System to construct a natural gas pipeline on the Danish continental shelf in the Baltic Sea. It should be emphasised that it has not yet
More informationGOMR OCS Subsea Pipelines Regulatory Perspectives. Pipeline Section, Regional Field Operations Gulf of Mexico Region Chief, Angie D.
GOMR OCS Subsea Pipelines Regulatory Perspectives Pipeline Section, Regional Field Operations Gulf of Mexico Region Chief, Angie D. Gobert Overview Governing Regulations & Guidance Documents GOMR Pipeline
More informationNote: Do not bury sulphur dioxide lines Use stainless steel pipe and fittings only where specified on project drawings.
1/7 1.0 APPLICATION This specification describes the minimum requirements for piping systems for the following service: Liquid and High Pressure Gaseous Dry Sulphur Dioxide (Less than 100 ppm of water)
More informationGuide for Participants in the BC Booth (1917) Offshore Technology Conference April 30 - May 3, 2007
Guide for Participants in the BC Booth (1917) Offshore Technology Conference April 30 - May 3, 2007 SUMMARY OF KEY DEADLINES 1. BC Offshore Directory Gold, Silver, Bronze Participants, OIBC......1* The
More informationOffshore Wind Risks - Issues and Mitigations
DNV Offshore Wind Soren Karkov DNV an independent foundation Our Purpose To safeguard life, property and the environment Our Vision Global impact for a safe and sustainable future 2 More than 145 Years
More informationDNVGL-CP-0212 Edition March 2016
CLASS PROGRAMME Type approval DNVGL-CP-0212 Edition March 2016 The electronic pdf version of this document, available free of charge from http://www.dnvgl.com, is the officially binding version. FOREWORD
More informationTechnoResource International LLC Engineering and Consultancy Services for Oil and Gas Industry
TechnoResource International LLC Engineering and Consultancy Services for Oil and Gas Industry. About the Company 2 TechnoResource International, LLC carries out construction supervision, engineering and
More informationBHARAT HEAVY ELECTRICALS LIMITED
FIELD QUALITY PLAN OF BOILER PRESSURE PARTS (Erection & Commissioning) FOR BHEL-JHANSI BHARAT HEAVY ELECTRICALS LIMITED BHEL-JHANSI DOC. NO.: REV. NO. : R00 FIELD QUALITY PLAN OF BOILER PRESSURE PARTS
More informationK-PATENTS PROCESS REFRACTOMETER PR-23-RP
A PROCESS REFRACTOMETER FOR LIQUID CONCENTRATION MEASUREMENT FOR THE OIL AND GAS INDUSTRIES K-PATENTS PROCESS REFRACTOMETER PR-23-RP SB:PR-23-RP/1 March 2016 TYPICAL APPLICATIONS UPSTREAM, MIDSTREAM AND
More informationOIL INDIA LIMITED DULIAJAN
ADVERTISEMENT EXPRESSION OF INTEREST (EOI) NO. EOI/O/339/2017-2018 Oil India Limited, a Government of India NAVARATNA Category Enterprise, engaged in the business of Exploration, Production & Transportation
More informationAsset Integrity. Management. Myanmar. Azerbaijan. Russia. Brunei. Ghana. Singapore HQ. Australia. Malaysia
Azerbaijan Tech Offshore Marine LLC 618 M, Subji Str, 202, Apt 16, Baku, Azerbaijan +994 55496 3566 Myanmar Tech Offshore & Marine (Myanmar) Co Ltd No. 207/211, First Floor, Bo Aung Kyaw Street, Kyauktada
More informationmarine, construction, drilling, floating production, decommissioning and renewables industries.
Maritime Assurance & Consulting Ltd (MAC), a Bureau Veritas Group Company, is a UK-based company with a global reach, offering a comprehensive range of support services to the Dynamic Positioning Assurance
More informationMultiple services, singular solutions. for the Oil, Gas & Petrochemical Industry
Multiple services, singular solutions for the Oil, Gas & Petrochemical Industry A.HAK INDUSTRIAL SERVICES CALL US HIS PROTECTING YOUR INVESTMENT At A.Hak Industrial Services (better known as HIS) we provide
More informationSiRCoS Submarine pipeline repair system. Carlo Maria Spinelli - Bratislava, September 2008
SiRCoS Submarine pipeline repair system Carlo Maria Spinelli - Bratislava, 18-19 September 2008 Outline 1 Introduction to subsea pipelines 2 Deep water projects 3 Pipeline damage & scenarios 4 SiRCoS Repair
More informationReversing the trend Collaboration, Robustness and Standardization
Reversing the trend Collaboration, Robustness and Standardization 2017 BSEE Standards Workshop, Houston May 5th 2017 By Dr.ing Geir Loeland. Head of Structural Integrity Section Petroleum Safety Authority
More informationTraining Fees 4,250 US$ per participant for Public Training includes Materials/Handouts, tea/coffee breaks, refreshments & Buffet Lunch
Training Title WELL HEAD OPERATIONS Training Duration 5 days Training Venue and Dates REF OP035 Well Head Operations 5 08-12 May $4,250 Abu Dhabi, UAE Will be held in any of the 5 star hotels. The exact
More informationOILMEX OILMEX BUSINESS GROUP. WELCOME. their processes of design, construction and quality in their diverse management of projects.
OILMEX OILMEX BUSINESS GROUP. WELCOME OILMEX BUSINESS GROUP emerges from the specific need of the Mexican oil industry to streamline their processes of design, construction and quality in their diverse
More informationfor High School Students Presented in collaboration by:
for High School Students Presented in collaboration by: Find us online www.petroed.com/tea Download our whitepaper! Written for CTE Directors & Ag Teachers Provides information on jobs Outlines the course
More informationInspection and Test Plan for Water Tube Boiler
www.inspectionforindustry.com Inspection and Test Plan for Water Tube Boiler No. AND TEST PLAN REFERENCE DOCUMENT ACCEPTANCE CRITERIA VERIFING DOCUMENT ACTIVITY BY MANUF. TPI CLIENT REMARK 1 PRE MEETING
More informationOFFSHORE CATHODIC PROTECTION AND INTEGRITY
OFFSHORE CATHODIC PROTECTION AND INTEGRITY SEA WATER CORROSION AND PROTECTION. OUR CHALLENGE FOR OFFSHORE INTEGRITY. Sea water is known to be one of the most aggressive environments for metals and for
More information1988 Develops a complete subsea wireline intervention system for use in the North Sea Halliburton/K BR separation
Safety Moment Halliburton History 1900-1955 1919 Erle P. Halliburton starts New Method Oil Well Cementing Co. 1922 Company cements its 500 th well 1938 Halliburton cements the first offshore well using
More informationOil & Gas Products and Services
2015 Value Your Trust Oil & Gas Products and Services Company Profile AMAFHH Petro Services - APS www.amafhh-ps.com AMAFHH Petro Services Oil & Gas Industrial Products & Services (Upstream & Downstream)
More informationOrbost Gas Plant Upgrade Project Community Information Sessions. 18 & 19 September 2018
Community Information Sessions 18 & 19 September 2018 Site location 9/14/2018 2 Ownership Update APA Orbost Gas Plant Pty Ltd (APA) purchased the plant and the export pipeline from Cooper Energy (CoE)
More informationINTEGRATED SUBSEA PRODUCTION SYSTEMS Efficient Execution and Cost-Effective Technologies Deliver Project Success. Deepsea technologies
INTEGRATED SUBSEA PRODUCTION SYSTEMS Efficient Execution and Cost-Effective Technologies Deliver Project Success Deepsea technologies Streamlining Subsea Production Systems for Smaller Fields AFGlobal
More informationNational Craft Assessment and Certification Program S P E C I F I C A T I O N S
National Craft Assessment and Certification Program S P E C I F I C A T I O N S BOILERMAKER PRESSURE VESSEL V2 BLMK34_02 October 2014 Focus Statement A journey level boilermaker is skilled in all aspects
More information.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal
City of Winnipeg Brady Road Landfill Site Section 01300 New Entrance and Scale Facility Page 1 of 4 SUBMITTALS 1. SHOP DRAWINGS 1.1 General.1 Arrange for the preparation of clearly identified Shop Drawings
More informationWATERFLUX 3000 Quick Start
WATERFLUX 3000 Quick Start Electromagnetic flow sensor The documentation is only complete when used in combination with the relevant documentation for the signal converter. KROHNE CONTENTS WATERFLUX 3000
More informationChallenging Inspections of Offshore Pipelines by Intelligent Pig
Challenging Inspections of Offshore Pipelines by Intelligent Pig Subsea Expo Integrity Management & Repair 2 nd February 2017 Presenters: Adrian Griffiths & Ram Subramanian Subsea EXPO 2017 2 nd February
More informationMinutes of Meeting. Meeting attendees introduced themselves. Record of Meeting Attendance is included in the minutes.
Minutes of Meeting 2009 Exploration & Production Standards Conference on Oilfield Equipment and Materials Meeting Tuesday, June 23, 2009 Drilling Well Control Equipment SC16 8:30 am 12:00 pm Chair: Mel
More informationContinuous On-line Measurement of Water Content in Petroleum (Crude Oil and Condensate)
API Manual of Petroleum Measurement Standards TR 2570 EI Hydrocarbon Management HM 56 Continuous On-line Measurement of Water Content in Petroleum (Crude Oil and Condensate) First Edition, October 2010
More informationINSPECTION AND TEST PLAN
BOILER AND TEST PLAN No. AND TEST PLAN REFERENCE DOCUMENT ACCEPTANCE CRITERIA VERIFING DOCUMENT ACTIVITY BY MANUF. TPI CLIENT REMARK 1 PRE MEETING SPEC. SPEC. MOM H H H Before Manufacturing 2 DWG, DESIGN,
More informationWell Life Cycle Integrity. IOM 3 / Energy Institute Technical Meeting 12 th March 2019
Well Life Cycle Integrity IOM 3 / Energy Institute Technical Meeting 12 th March 2019 Contents Agenda UK goal setting Regulations UK wells guidelines Principles of well integrity UK well integrity guidelines
More informationINSTRUMENTATION DESIGN ENGINEERING: Oil & Gas
SmartBrains Engineers & Technologist Pvt. Ltd. DESIGN ENGINEERING: Oil & Gas Building Nation Through SmartBrains Skill Development & Enterpreneurship Website : www.samrtbrains.in To Apply Please contact
More information