GAS FORUM RAMADA PARC HOTEL, BUCHAREST OCTOBER 3 RD, 2012

Size: px
Start display at page:

Download "GAS FORUM RAMADA PARC HOTEL, BUCHAREST OCTOBER 3 RD, 2012"

Transcription

1 ROMANIA GAS FORUM RAMADA PARC HOTEL, BUCHAREST OCTOBER 3 RD, 2012

2 AGENDA INTRODUCING IPM-PARTNERS PROJECTS SNAPSHOTS PROJECTS SNAPSHOTS - ONGOING TECHNICAL INSPECTIONS-OVERVIEW TECHNICAL INSPECTIONS- WHY? TECHNICAL INSPECTIONS- REFERENCES TECHNICAL INSPECTIONS- STRUCTURE TECHNICAL INSPECTIONS- SNAPSHOTS TECHNICAL INSPECTIONS- BENEFITS QUESTIONS AND ANSWERS

3 INTRODUCING IPM-PARTNERS - Engineering, Construction and Project Management Company, founded in 2009; - Small to Medium sized projects, mostly constructions in oil and gas such as: - Upstream plants, in full or in part; - Oil pipelines; - Gas pipelines; - Civil il works attached to Oil&Gas projects; - Full value chain covered, from basic engineering to commissioning and operation support; - Ongoing projects for important customers in the market: Transgaz, Conpet, Romgaz, Omv Petrom, etc.; - Technical services for oil and gas equipment: inspections, technical state assessment;

4 PROJECTS SNAPSHOTS PREDESTI PARK AND WATER INJECTION STATION Engineering, procurement,construction and commissioning for new gas plant for collecting, separating and measuring the gas production from 15 wells in Predesti field, and the water injection station at well # 86 Pitulati (OMV Petrom, Asset II Oltenia)

5 PROJECTS SNAPSHOTS BI-DIRECTIONAL LPG METERING SKIDS Detail Engineering, Mechanical Fabrication, E&I, Delivery to Turkey, IZMIT Refinery Client: Emerson Process Management, The Netherlands, for Petrol Ofisi, Turkey

6 PROJECTS SNAPSHOTS STEAM JACKETED METERING SKID - LIQUID SULPHUR Detail Engineering, Mechanical Fabrication, Delivery to Netherlands Client: Emerson Process Management, The Netherlands, for Dolphin Energy, Quatar

7 PROJECTS SNAPSHOTS - ONGOING - 20 inches oil pipeline Baraganu-Martinesti, 12,5 km in 8 sections, Engineering, Authority Engineering, Execution, client CONPET S.A, general contractor in association with Habau PPS., execution in progress; - 20 inches, high pressure gas pipeline Turburea-Isalnita, repair for 6 overcrossings, Bradesti-Dolj area, client TRANSGAZ S.A., general contractor in association with Habau PPS, execution in progress; - 24 inches high pressure gas pipeline, Peceneaga-Silistea (Braila County) replacement of 1,3 km old pipeline, incl. 2 under crossings, client TRANSGAZ S.A., general contractor in association with Habau PPS, execution in progress; - Technical assessment for intervention ti equipment type IC5, IP30, TW30, T50 and TW50, general contractor in association with Oil&Gas University Ploiesti, client ROMGAZ S.A., project starting.

8 TECHNICAL INSPECTIONS-OVERVIEW

9

10 TECHNICAL INSPECTIONS- WHY? - Safety operations with named equipment, aligned with user internal regulations and with legal framework; - Compliancy with national/specific ifi regulations; - Financial: extension of the operation time for expensive equipment: - Oi Original i parameters; - Downgraded parameters; - Decreased risk of operating new equipment for which the manufacturers are offering only limited it guarantees. - Simple, yet complex inspection procedure, with huge benefits for the owning organization;

11 TECHNICAL INSPECTIONS- REFERENCES (1) - API Specifications; - API Recommended Practices; - International Association of Drilling Contractors (IADC) Drilling Manual - Romanian Government Decision #2139 from 30 th November 2004, regarding the classification and normal operation period for fixed assets, stating (approximate translation): - Art. 4: Keeping in operation the fixed assets which may affect life, health or environment, after expiration of normal operation period, shall be permitted only based on a technical assessment issued by a certification entity or by technical inspection entities certified for the specific operation area of the fixed asset - Applicable ISCIR Prescriptions (ISCIR- Romanian National Regulatory Entity)

12 TECHNICAL INSPECTIONS- REFERENCES (2) REF ID API RP 4G API Spec. 4F API RP 8B SR EN ISO 13534:2000 Reference Name Recommended practice for use and procedures for Inspection, Maintenance and Repair of Drilling and Well Servicing Structures Specification for Drilling and Well Servicing Structures Recommended Practice for Procedures for Inspection, Maintenance, Repair and Remanufacture of Hoisting Equipment; Drilling and production equipment -- Inspection, maintenance, repair and remanufacture of hoisting equipment;

13 TECHNICAL INSPECTIONS- REFERENCES (3) REF ID API Spec. 8A API Spec. 8C Reference Name Specification for Drilling and Production Hoisting Equipment Specification for Drilling and Well Servicing Structures ISO Petroleum and natural gas industries -- Drilling and 13535:2003 production equipment -- Hoisting equipment (cobranded with API Spec. 8C) API RP 7L Inspection, Maintenance, Repair and Remanufacture of Drilling Equipment API RP 9B Recommended Practice of Application, Care and Use of Wire Rope for Oilfield Services

14 TECHNICAL INSPECTIONS- REFERENCES (4) REF ID API RP 5A5 API Spec. 5B API Spec. 7 API RP 7G PT C1: 2010 PT C4: 2010 PT C6: 2010 Reference Name Field Inspection of New Casing, Tubing, and Plain End Drill Pipe *** ISO Adoption from ISO 15463:2003 *** Specification for Threading, Gauging and Thread Inspection of Casing, Tubing, and Line Pipe Threads Specification for Rotary Drill Stem Elements Drill Stem Design and Operating Limits Cazane de abur, cazane de apă fierbinte, supraîncălzitoare și i economizoare independente d Recipiente metalice stabile sub presiune Conducte metalice sub presiune pentru fluide

15 TECHNICAL INSPECTIONS- STRUCTURE (1) - INSPECTION PREPARATION: - Planning and approve with customer; - Identification of applicable procedures; - Prepare and approve new procedures, if the case; - Check status of inspection tools (verification, calibration, availability) - NDT material preparation

16 TECHNICAL INSPECTIONS- STRUCTURE (2) - INSPECTION PERFORMANCE: - Visual control; - Non Destructive Testing: UT(g), MT, PT, UT(v) UT(s); - Dimensional Verification and Control; - Functional Control; - Release of NDT reports, and Visual Inspection Reports; - Engineering calculation with specialized software;

17 TECHNICAL INSPECTIONS- STRUCTURE (3) - ISSUE AND RELEASE ASSESSMENT REPORT; - Possible outcomes: - Keep the equipment in operation for a specified duration, at the design parameters; - Keep the equipment in operation for a specified duration, at downgradedd d parameters; - Repair recommendations for extending operation duration to be specified; - Decommissioning i i recommendations; - Assessment certificate, which includes the above recommendations;

18 TECHNICAL INSPECTIONS- SNAPSHOTS (1) DRAWWORK, ready for inspection

19 TECHNICAL INSPECTIONS- SNAPSHOTS (2) Drilling Crown Block during NDT Rotary Swivel, after NDT Testing procedure.

20 TECHNICAL INSPECTIONS- SNAPSHOTS (3) Substructure, crack at visual control.

21 TECHNICAL INSPECTIONS- SNAPSHOTS (4) Travelling block defect, Identified d via MT testing.

22 TECHNICAL INSPECTIONS- SNAPSHOTS (5) Substructure, advanced corrosion at visual control.

23 TECHNICAL INSPECTIONS- SNAPSHOTS (6) Effort and maximum displacement simulation for a verified derrick. It allows calculation for the remaining operation period with no repairs.

24 TECHNICAL INSPECTIONS- BENEFITS - Legal compliancy, both international and local regulatory framework; - Internal HSEQ and maintenance compliancy; - Reduced Risk Operations, for used and even new equipment, given limitations of the manufacturer guarantees; - Reduced costs with new equipment; - Efficient usage of owned equipment;

25 QUESTIONS AND ANSWERS

26 THANK YOU FOR YOUR ATTENTION! ILEANA HATEGAN Technical Inspections Manager IPM-PARTNERS ROMANIA S.R.L. Strada Trei Ierarhi nr. 2 PLOIESTI, PH , ROMANIA office@ipm-partners.com

PROJECT: Ultrasonic Metering Gas Flow Monitoring System

PROJECT: Ultrasonic Metering Gas Flow Monitoring System Ledererhof 4, A-1010, Vienna, Austria 2 nd Trei Ierarhi Street, Ploiesti PH, RO-100010, Romania www.ipm-partners.com PROJECT: Ultrasonic Metering Gas Flow Monitoring System Bucharest, Ramada Parc Hotel

More information

The Evolution & Future of API Coiled Tubing Standards. Ryan Addison Tenaris Coiled Tubes API Co-Chairman Resource Group for Coiled Tubing

The Evolution & Future of API Coiled Tubing Standards. Ryan Addison Tenaris Coiled Tubes API Co-Chairman Resource Group for Coiled Tubing The Evolution & Future of API Coiled Tubing Standards Ryan Addison Tenaris Coiled Tubes API Co-Chairman Resource Group for Coiled Tubing API Overview Presentation Outline Resource Group on Coiled Tubing

More information

API Standards Overview

API Standards Overview 32 nd Gas-Lift Workshop The Hague, The Netherlands February 2-6, 2009 API Standards Overview Roland Goodman Upstream Standards Manager American Petroleum Institute This presentation is the property of

More information

IWCF Well Control Level 5. Celle Drilling Conference 2017

IWCF Well Control Level 5. Celle Drilling Conference 2017 IWCF Well Control Level 5 Celle Drilling Conference 2017 Contents IWCF well control level 5 course program Background - who is it for Structure and contents Delivery approach Questions Why? Level 5 background

More information

ISO INTERNATIONAL STANDARD

ISO INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 10407-2 First edition 2008-10-15 Petroleum and natural gas industries Rotary drilling equipment Part 2: Inspection and classification of used drill stem elements Industries du

More information

Overview and Update of API Standards

Overview and Update of API Standards Overview and Update of API Standards IADC South East Asia Chapter Meeting Kuala Lumpur, Malaysia March 21, 2017 Eric Ho American Petroleum Institute Singapore Scope of Presentation API Background API Standards

More information

Performance-Based Safety Regulation

Performance-Based Safety Regulation Performance-Based Safety Regulation Peter Bjerager, DNV GL National Academy of Sciences, 15 April 2016 1 SAFER, SMARTER, GREENER DNV GL in brief We classify, certify, verify and test against regulatory

More information

Personalized Service, Industry Expertise. Franklin Howard

Personalized Service, Industry Expertise. Franklin Howard Personalized Service, Industry Expertise. Franklin Howard PRODUCTS Franklin Howard International provides high quality drilling equipment and spare parts from top manufacturers in the United States. Warranty

More information

API COPM CPMA Chapter 20.X

API COPM CPMA Chapter 20.X API COPM CPMA Chapter 20.X David Courtney Pamela Chacon Matt Zimmerman Dan Cutting 24 23 February 2017 Houston, TX Copyright 2017, Letton Hall Group. This paper was developed for the UPM Forum, 22 23 February

More information

Certificate of Registration

Certificate of Registration Pipe Inspection Non-destructive Testing (NDT), storage and maintenance services for new and used oil country tubular goods (OCTG), line Pipe and drilling equipment (pipe and tools). Industrial NDT Nondestructive

More information

Regulatory Reforms in Mexico Energy Production and Environmental Protection. A Technical Regulator for a New Market Frame

Regulatory Reforms in Mexico Energy Production and Environmental Protection. A Technical Regulator for a New Market Frame Regulatory Reforms in Mexico Energy Production and Environmental Protection A Technical Regulator for a New Market Frame February 12th, 2014 CONTENT Legal Framework Strategic Design Regulatory Policy Gradual

More information

ODS Metering Systems. Offshore Metering Packages. Systems

ODS Metering Systems. Offshore Metering Packages. Systems M E T E R I N G S Y S T E M S Offshore Metering Packages Pipeline Metering Metering Control Systems is part of ODS BV based in The Netherlands with a workforce of 420 employees and a turnover of 240 million

More information

Technical Specifications: Supply of Seamless Grade TP304L Pipe and Grade WP304L Pipework Fittings to the ITER Organization (IO).

Technical Specifications: Supply of Seamless Grade TP304L Pipe and Grade WP304L Pipework Fittings to the ITER Organization (IO). IDM UID: R22L3M ver 1.4 Technical Specifications: Supply of Seamless Grade TP304L Pipe and Grade WP304L Pipework Fittings to the ITER Organization (IO). Contents 1 Terms and Acronyms... 3 2 Background...

More information

DE027: X-mas Tree & Wellhead Operations, Maintenance & Testing

DE027: X-mas Tree & Wellhead Operations, Maintenance & Testing DE027: X-mas Tree & Wellhead Operations, Maintenance & Testing DE027 Rev.001 CMCT COURSE OUTLINE Page 1 of 5 Training Description: Wellhead and x-mas tree is the main equipment for oil production, water

More information

Integrity Management of Offshore Assets

Integrity Management of Offshore Assets OIL & GAS Integrity Management of Offshore Assets Opening session Leif Collberg 05 May 2017 1 DNV GL 2015 05 May 2017 SAFER, SMARTER, GREENER How regulations can solve the challenge of being performance

More information

NTL No N05 Increased Safety Measures for Energy Development on the OCS Effective June 8, 2010

NTL No N05 Increased Safety Measures for Energy Development on the OCS Effective June 8, 2010 NTL No. 2010-N05 Increased Safety Measures for Energy Development on the OCS Effective June 8, 2010 Frequently Asked Questions (FAQ s) Updated July 9, 2010 A. General Questions QA1: With the issuance of

More information

Committee on Standardization of Oilfield Equipment & Materials (CSOEM) New Member Orientation

Committee on Standardization of Oilfield Equipment & Materials (CSOEM) New Member Orientation Committee on Standardization of Oilfield Equipment & Materials (CSOEM) New Member Orientation Roland Goodman Manager, Upstream Standards goodmanr@api.org New Member Orientation Presentation will cover:

More information

Reliance Industries Limited

Reliance Industries Limited Reliance Industries Limited Notice Inviting Expression of Interest (RIL/E&P/EOI/2010/05) (Under International Competitive Bidding) For BLOCK NO : KG-DWN-98/3 (KG D6) Reliance Industries Limited (RIL),

More information

IBC Information and Communication Committee, Nils Andreas Masvie 27 January Paris Marriott Opera Hotel. Ungraded

IBC Information and Communication Committee, Nils Andreas Masvie 27 January Paris Marriott Opera Hotel. Ungraded Is standardization a cost cutting panacea in today s low oil price environment? Sharing lessons from recent mega-projects e.g. Nord Stream and South Stream IBC Information and Communication Committee,

More information

Committee on Standardization of Oilfield Equipment & Materials (CSOEM) New Member Orientation

Committee on Standardization of Oilfield Equipment & Materials (CSOEM) New Member Orientation Committee on Standardization of Oilfield Equipment & Materials (CSOEM) New Member Orientation Roland Goodman Manager, Upstream Standards goodmanr@api.org New Member Orientation Presentation will cover:

More information

GRAPHICAL INTERFACE FOR EXPERIMENTAL ANALYSIS OF NONDESTRUCTIVE TESTING OF DRILL PIPES

GRAPHICAL INTERFACE FOR EXPERIMENTAL ANALYSIS OF NONDESTRUCTIVE TESTING OF DRILL PIPES GRAPHICAL INTERFACE FOR EXPERIMENTAL ANALYSIS OF NONDESTRUCTIVE TESTING OF DRILL PIPES Stan Ioana-Gabriela, Assistant lecturer, U.P.G. Ploiesti Niculae Georgrta-Claudia, Lecturer Dr., U.P.G. Ploiesti ABSTRACT:In

More information

Visual Testing of Pipe Threads

Visual Testing of Pipe Threads From NDT Technician, Vol. 10, No. 1, pp: 1 5. Copyright 2011 The American Society for Nondestructive Testing, Inc. The American Society for Nondestructive Testing www.asnt.org FOCUS AAs an oil well is

More information

4 Briefing. Responsible investor

4 Briefing. Responsible investor Issue Responsible investor 4 Briefing Wednesday 8 th February 2012 In 2010, we accepted all 26 recommendations made by the Bly Report our internal investigation into the Deepwater Horizon incident. BP

More information

Services. Technology and Innovation

Services. Technology and Innovation Services Technology and Innovation 1 Services Technology and Innovation in the LPG sector TÜV AUSTRIA Italia - Blu Solutions contributes - since 2004 - to the improvement of safety, environmental sustainability

More information

Integrity Monitoring? New thinking in the approach to Subsea IMMR. Dr Karl Woods, Snr Subsea Reliability Engineer 22/2/2017

Integrity Monitoring? New thinking in the approach to Subsea IMMR. Dr Karl Woods, Snr Subsea Reliability Engineer 22/2/2017 Integrity Monitoring? New thinking in the approach to Subsea IMMR Dr Karl Woods, Snr Subsea Reliability Engineer 22/2/2017 Disclaimer and important notice This presentation contains forward looking statements

More information

Introduction to Fitness For Service November 10, 2016, University of Alberta, Edmonton.

Introduction to Fitness For Service November 10, 2016, University of Alberta, Edmonton. Advancing Your Career! November 10, 2016 University of Alberta Engineering Teaching and Learning Center, 6th floor room 060 (ETLC 6 060) 116 Street NW., Edmonton, AB T6G 2V4 About This Workshop This workshop

More information

Upstream / Upstream Safety Sessions

Upstream / Upstream Safety Sessions Upstream / Upstream Safety Sessions U01 API Spec Q2 Our Journey to theworld s First Oil and Gas Quality Management System Standard for Service Supply Organizations Euan Ramsay, Regional Business Development

More information

GOST TUBING AND COUPLINGS

GOST TUBING AND COUPLINGS GOST 633-80 TUBING AND COUPLINGS Tubing is used for oil and gas production. Tubing shall be made seamless, plain- or upset end and couplings with high-seal connections. Coupling-free connections are possible.

More information

NOIA ANNUAL MEETING CONCERNS/INITIATIVES. BSEE Update. Joe Levine BSEE Washington DC April 11, 2014

NOIA ANNUAL MEETING CONCERNS/INITIATIVES. BSEE Update. Joe Levine BSEE Washington DC April 11, 2014 NOIA ANNUAL MEETING Technology BSEE OCS Policy TECHNOLOGY Committee CONCERNS/INITIATIVES BSEE Update Joe Levine BSEE Washington DC April 11, 2014 Presentation Overview BSEE Research Program Research Drivers

More information

Capacitive level meters CLM 40 INSTRUCTIONS MANUAL. průmyslová elektronika

Capacitive level meters CLM 40 INSTRUCTIONS MANUAL. průmyslová elektronika průmyslová elektronika INSTRUCTIONS MANUAL Capacitive level meters CLM 40 Before level meters usage please read instructions in this service manual and keep it for further use. Service manual is for all

More information

Diverse Capabilities Targeted Solutions

Diverse Capabilities Targeted Solutions Diverse Capabilities Targeted Solutions Today s Leader, Tomorrow s Innovation As a vertically integrated manufacturer with direct control over the entire supply chain from raw materials to finished product,

More information

PIONEER TRADING CO., LTD.

PIONEER TRADING CO., LTD. PRECISION KURODA LTD. OIL COUNTRY GAUGES API THREAD GAUGES PREMIUM CONNECTION GAUGES THREAD MEASURING INSTRUMENTS CONTACT TO: PIONEER TRADING CO., LTD. 4-1 Kuzuha-Asahi 3-Chome Hirakata Osaka 573-1111,

More information

API COPM and Petroleum Measurement Standards Overview. Paula Watkins API Manager, Measurement Standards

API COPM and Petroleum Measurement Standards Overview. Paula Watkins API Manager, Measurement Standards API COPM and Petroleum Measurement Standards Overview Paula Watkins API Manager, Measurement Standards API Standards Program The API Standardization Department formed in 1923 The first API standard was

More information

Location. Established in 2015 Office location: Klepp Næringspark, Norway.

Location. Established in 2015 Office location: Klepp Næringspark, Norway. Location Established in 2015 Office location: Klepp Næringspark, Norway. Vision to be leader within On-Site machining & Decommissioning segment with a main focus on mature plants, offshore installations,

More information

ISO INTERNATIONAL STANDARD

ISO INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 28781 First edition 2010-08-15 Petroleum and natural gas industries Drilling and production equipment Subsurface barrier valves and related equipment Industries du pétrole et

More information

Industry & Govt Changes Post Macondo

Industry & Govt Changes Post Macondo Cover graphic should fill and not exceed the defined grey box. Industry & Govt Changes Post Macondo Gary F. Devlin VP Quality & Customer Experience March 2013 Deepwater Industry / Focus Approach Joint

More information

API Buttress Connections

API Buttress Connections IDM Code GDL00382/2 / March 2018 API Buttress Connections Scope These guidelines apply specifically to the use of API Buttress connections. This document is based on API 5C1 standard which is the main

More information

9 th ANNUAL ROMANIA OIL & GAS Conference & Exhibition 2017

9 th ANNUAL ROMANIA OIL & GAS Conference & Exhibition 2017 9 th ANNUAL ROMANIA OIL & GAS Conference & Exhibition 2017 21 NOVEMBER 2017 Ramada Parc Hotel - Bucharest, Romania Organized by: Co-organizer: Under the patronage of: With the support of: MINISTERUL ENERGIEI

More information

This document is a preview generated by EVS

This document is a preview generated by EVS TECHNICAL SPECIFICATION SPÉCIFICATION TECHNIQUE TECHNISCHE SPEZIFIKATION CEN ISO/TS 16530-2 December 2015 ICS 75.180.10 English Version integrity - Part 2: integrity for the operational phase (ISO/TS 16530-2:2014)

More information

Employability Enhancement Program for Engineers. Transformation of an engineering degree holder to a real Engineer, who can do more at work.

Employability Enhancement Program for Engineers. Transformation of an engineering degree holder to a real Engineer, who can do more at work. TRACEZ Training Services Oman www.tracezglobal.com Employability Enhancement Program for Engineers Transformation of an engineering degree holder to a real Engineer, who can do more at work. EEP- Introduction

More information

National Craft Assessment and Certification Program S P E C I F I C A T I O N S

National Craft Assessment and Certification Program S P E C I F I C A T I O N S National Craft Assessment and Certification Program S P E C I F I C A T I O N S INDUSTRIAL MAINTENANCE MECHANIC V4 MEMT32_04 Released June 2013 Focus Statement A journey-level Industrial Maintenance Mechanic

More information

DEVELOPMENT OF SUBSEA REGULATIONS IN THE NORWEGIAN PETROLEUM INDUSTRY FOLLOW UP AND USE OF STANDARDS

DEVELOPMENT OF SUBSEA REGULATIONS IN THE NORWEGIAN PETROLEUM INDUSTRY FOLLOW UP AND USE OF STANDARDS NH GRAND HOTEL KRASNAPOLSKY AMSTERDAM 3-5 APRIL 2017 DEVELOPMENT OF SUBSEA REGULATIONS IN THE NORWEGIAN PETROLEUM INDUSTRY FOLLOW UP AND USE OF STANDARDS Trond Sundby Petroleum Safety Authority, Norway

More information

Turning the wheels of your success

Turning the wheels of your success INDUSTRIAL SERVICES Turning the wheels of your success A comprehensive package of integrated services combining traditional certification and inspection with innovative business solutions based on the

More information

Select, wear adjust, use and maintain personal protective equipment

Select, wear adjust, use and maintain personal protective equipment ANALYSIS PROFILE PROTECT SELF AND OTHERS Identify, interpret and apply applicable Acts, Codes and regulations Select, wear adjust, use and maintain personal protective Recognize and assess hazards and

More information

Oil and Gas UK Well Integrity Guidelines

Oil and Gas UK Well Integrity Guidelines Oil and Gas UK Well Integrity Guidelines The Well, the Completion and the Xmas Tree The Equipment and the People A Definition of Well Integrity Key UK Legislative Requirement for Well Integrity Oil and

More information

PRODUCTION CHEMISTRY

PRODUCTION CHEMISTRY PRODUCTION CHEMISTRY Proserv is the fresh alternative in global energy services. We are a technology-driven company providing products, services and bespoke solutions to clients across the drilling, production

More information

OneSubsea Subsea Sampling System

OneSubsea Subsea Sampling System OneSubsea Subsea Sampling System Shailesh Rathod 22 23 February 2017 Houston, TX Copyright 2017, Letton Hall Group. This paper was developed for the UPM Forum, 22 23 February 2017, Houston, Texas, U.S.A.,

More information

ISO INTERNATIONAL STANDARD

ISO INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 10424-2 First edition 2007-11-15 Petroleum and natural gas industries Rotary drilling equipment Part 2: Threading and gauging of rotary shouldered thread connections Industries

More information

EMW-C and EMW-I NDT for Annulus and Internal Pipe Inspection

EMW-C and EMW-I NDT for Annulus and Internal Pipe Inspection EMW-C and EMW-I NDT for Annulus and Internal Pipe Inspection WaveTrue Science + Technologies 504 El Paraiso Rd NE Albuquerque, NM 87113 CEO Ron Floit President John DeWees (888) 711-2532/ (212) 625-6622

More information

Mismatched Iron Connections. Shankar Narayan

Mismatched Iron Connections. Shankar Narayan Mismatched Iron Connections Shankar Narayan Mismatched Hammer Unions Ongoing Issue 2009 Halliburton. All Rights Reserved. 2 Pressure Rating & Figure Number Figure 602 6,000 PSI Figure 1002 10,000 PSI Figure

More information

Pipeline Technology Conference 2010

Pipeline Technology Conference 2010 THRESHOLDS, ACCURACIES AND RESOLUTION: QUANTITATIVE MEASUREMENT AND ITS ADVANTAGES FOR METAL LOSS INSPECTION A. Barbian, M. Beller, A. Hugger, C. Jäger, A. Pfanger NDT Systems & Services Stutensee, Germany

More information

Pipeline Design & Installation Systems

Pipeline Design & Installation Systems Pipeline Design & Installation Systems Rigid pipeline subsea tie-backs new operational challenges Paul Georgeson Operations Support Manager Wood Group Kenny Agenda - Overview - Materials - Inspection -

More information

SAMAMAT FLOW CONTROL L.L.C.

SAMAMAT FLOW CONTROL L.L.C. SAMAMAT FLOW CONTROL L.L.C. SFC-MK-LS-001 Rev.: 03 COMPANY PROFILE Company Location Company Information Company Size Nearest Transportation Company Name SAMAMAT FLOW CONTROL L.L.C Company Address Plot

More information

2018 Tulane Engineering Forum

2018 Tulane Engineering Forum 2018 Tulane Engineering Forum Friday, April 20, 2018, Morial Convention Center, New Orleans, LA Offshore Oil & Gas Exploration & Production An Overview from a Technical Perspective Okite Obakponovwe BEng

More information

MEC-QW-E-2002 Senior QA/QC Welding Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

MEC-QW-E-2002 Senior QA/QC Welding Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS 101835-MEC-QW-E-2002 Senior QA/QC Welding Engineer Holds a B. Sc. in Mechanical Power Engineering and has about 15 years hands-on experience working as QA/QC Engineer & Welding Inspector in several industrial

More information

Underground Storage Operation & Maintenance Services

Underground Storage Operation & Maintenance Services Underground Storage Operation & Maintenance Services Enhancing operating performance Benefit from 50 years experience in storage operation and maintenance and find the right answers to your questions.

More information

Defining the New Normal for Offshore Drilling Copenhagen 16 June Alan Spackman Vice President, Offshore Regulatory & Technical Affairs

Defining the New Normal for Offshore Drilling Copenhagen 16 June Alan Spackman Vice President, Offshore Regulatory & Technical Affairs Defining the New Normal for Offshore Drilling Copenhagen 16 June 2011 Alan Spackman Vice President, Offshore Regulatory & Technical Affairs Montara & Macondo Investigations Report of the Montara Commission

More information

Lifting Engineering. Capability & Experience

Lifting Engineering. Capability & Experience Lifting Engineering Capability & Experience Results for our customers The WorleyParsons consulting group is a collaborative, multidisciplinary team with a broad range of strategic, technical and project

More information

DE059: Hydrocarbon Production Operations

DE059: Hydrocarbon Production Operations DE059: Hydrocarbon Production Operations DE059 Rev.001 CMCT COURSE OUTLINE Page 1 of 5 Training Description: This five-day course will provide the participants with an integrated view of the hydrocarbon

More information

Title: IEC TS (First Revision of IEC WT 01) The new standard for Wind Turbines and Wind Farms Onshore and Offshore

Title: IEC TS (First Revision of IEC WT 01) The new standard for Wind Turbines and Wind Farms Onshore and Offshore Title: IEC TS 61400-22 (First Revision of IEC WT 01) The new standard for Wind Turbines and Wind Farms Onshore and Offshore Author: Address: Mike Woebbeking Germanischer Lloyd Industrial Services GmbH,

More information

The Essentials of Pipeline Integrity Management

The Essentials of Pipeline Integrity Management TRAINING METHODOLOGY This interactive training workshop includes the following training methodologies : Lectures Video Discussion of case histories and hands on calculations WHO SHOULD ATTEND The course

More information

Section Nine Rig/Platform Environment. Oil & Gas Training. Oil & Gas Training. Oil & Gas Training. Rig/Platform Environment

Section Nine Rig/Platform Environment. Oil & Gas Training. Oil & Gas Training. Oil & Gas Training. Rig/Platform Environment Section Nine /Platform Environment /Platform Environment The rig site are broken into basic work areas. These are: Substructure /Platform Environment The rig site are broken into basic work areas. These

More information

API 8 Round Connections

API 8 Round Connections API 8 Round Connections Scope These guidelines apply specifically to the use of API 8RD (STC, LTC, EUE, NUE) connections. This document is based on API RP 5C1 which is the main document applicable for

More information

illizwe Engineering Business Profile

illizwe Engineering Business Profile ILLIZWE Engineering PTY Ltd was formed in 2013. The founder developed a passion and discovered an opportunity in the industry from year 2004 while working as a Mechanical Engineer, and his main passion

More information

Industry and Regulatory Cooperation for Better Information

Industry and Regulatory Cooperation for Better Information PROFESSIONAL PETROLEUM DATA MANAGEMENT ASSOCIATION Industry and Regulatory Cooperation for Better Information Trudy Curtis CEO, PPDM Association 1 1/28/2014 ABOUT THE PPDM ASSOCIATION Founded 1991 The

More information

INVESTIGATION OF SLUG FLOW IN DEEPWATER ARCHITECTURES. Y. OLANIYAN TOTAL S.A. France

INVESTIGATION OF SLUG FLOW IN DEEPWATER ARCHITECTURES. Y. OLANIYAN TOTAL S.A. France INVESTIGATION OF SLUG FLOW IN DEEPWATER ARCHITECTURES Y. OLANIYAN TOTAL S.A. France CONTENTS Introduction Slug flow in field design phase Field case study Conclusion Investigation of Slug flow in Deepwater

More information

4/28/2006. ModuSpec Engineering

4/28/2006. ModuSpec Engineering 4/28/2006 ModuSpec Engineering ModuSpec Engineering History Founded in October 1986 by: Leo Nagtegaal. Company office in the Netherlands, Serooskerke Opening Aberdeen office in 1989. Opening Singapore

More information

Introductory remarks

Introductory remarks Introductory remarks This document is a draft of a permit for Gaz System to construct a natural gas pipeline on the Danish continental shelf in the Baltic Sea. It should be emphasised that it has not yet

More information

GOMR OCS Subsea Pipelines Regulatory Perspectives. Pipeline Section, Regional Field Operations Gulf of Mexico Region Chief, Angie D.

GOMR OCS Subsea Pipelines Regulatory Perspectives. Pipeline Section, Regional Field Operations Gulf of Mexico Region Chief, Angie D. GOMR OCS Subsea Pipelines Regulatory Perspectives Pipeline Section, Regional Field Operations Gulf of Mexico Region Chief, Angie D. Gobert Overview Governing Regulations & Guidance Documents GOMR Pipeline

More information

Note: Do not bury sulphur dioxide lines Use stainless steel pipe and fittings only where specified on project drawings.

Note: Do not bury sulphur dioxide lines Use stainless steel pipe and fittings only where specified on project drawings. 1/7 1.0 APPLICATION This specification describes the minimum requirements for piping systems for the following service: Liquid and High Pressure Gaseous Dry Sulphur Dioxide (Less than 100 ppm of water)

More information

Guide for Participants in the BC Booth (1917) Offshore Technology Conference April 30 - May 3, 2007

Guide for Participants in the BC Booth (1917) Offshore Technology Conference April 30 - May 3, 2007 Guide for Participants in the BC Booth (1917) Offshore Technology Conference April 30 - May 3, 2007 SUMMARY OF KEY DEADLINES 1. BC Offshore Directory Gold, Silver, Bronze Participants, OIBC......1* The

More information

Offshore Wind Risks - Issues and Mitigations

Offshore Wind Risks - Issues and Mitigations DNV Offshore Wind Soren Karkov DNV an independent foundation Our Purpose To safeguard life, property and the environment Our Vision Global impact for a safe and sustainable future 2 More than 145 Years

More information

DNVGL-CP-0212 Edition March 2016

DNVGL-CP-0212 Edition March 2016 CLASS PROGRAMME Type approval DNVGL-CP-0212 Edition March 2016 The electronic pdf version of this document, available free of charge from http://www.dnvgl.com, is the officially binding version. FOREWORD

More information

TechnoResource International LLC Engineering and Consultancy Services for Oil and Gas Industry

TechnoResource International LLC Engineering and Consultancy Services for Oil and Gas Industry TechnoResource International LLC Engineering and Consultancy Services for Oil and Gas Industry. About the Company 2 TechnoResource International, LLC carries out construction supervision, engineering and

More information

BHARAT HEAVY ELECTRICALS LIMITED

BHARAT HEAVY ELECTRICALS LIMITED FIELD QUALITY PLAN OF BOILER PRESSURE PARTS (Erection & Commissioning) FOR BHEL-JHANSI BHARAT HEAVY ELECTRICALS LIMITED BHEL-JHANSI DOC. NO.: REV. NO. : R00 FIELD QUALITY PLAN OF BOILER PRESSURE PARTS

More information

K-PATENTS PROCESS REFRACTOMETER PR-23-RP

K-PATENTS PROCESS REFRACTOMETER PR-23-RP A PROCESS REFRACTOMETER FOR LIQUID CONCENTRATION MEASUREMENT FOR THE OIL AND GAS INDUSTRIES K-PATENTS PROCESS REFRACTOMETER PR-23-RP SB:PR-23-RP/1 March 2016 TYPICAL APPLICATIONS UPSTREAM, MIDSTREAM AND

More information

OIL INDIA LIMITED DULIAJAN

OIL INDIA LIMITED DULIAJAN ADVERTISEMENT EXPRESSION OF INTEREST (EOI) NO. EOI/O/339/2017-2018 Oil India Limited, a Government of India NAVARATNA Category Enterprise, engaged in the business of Exploration, Production & Transportation

More information

Asset Integrity. Management. Myanmar. Azerbaijan. Russia. Brunei. Ghana. Singapore HQ. Australia. Malaysia

Asset Integrity. Management. Myanmar. Azerbaijan. Russia. Brunei. Ghana. Singapore HQ. Australia. Malaysia Azerbaijan Tech Offshore Marine LLC 618 M, Subji Str, 202, Apt 16, Baku, Azerbaijan +994 55496 3566 Myanmar Tech Offshore & Marine (Myanmar) Co Ltd No. 207/211, First Floor, Bo Aung Kyaw Street, Kyauktada

More information

marine, construction, drilling, floating production, decommissioning and renewables industries.

marine, construction, drilling, floating production, decommissioning and renewables industries. Maritime Assurance & Consulting Ltd (MAC), a Bureau Veritas Group Company, is a UK-based company with a global reach, offering a comprehensive range of support services to the Dynamic Positioning Assurance

More information

Multiple services, singular solutions. for the Oil, Gas & Petrochemical Industry

Multiple services, singular solutions. for the Oil, Gas & Petrochemical Industry Multiple services, singular solutions for the Oil, Gas & Petrochemical Industry A.HAK INDUSTRIAL SERVICES CALL US HIS PROTECTING YOUR INVESTMENT At A.Hak Industrial Services (better known as HIS) we provide

More information

SiRCoS Submarine pipeline repair system. Carlo Maria Spinelli - Bratislava, September 2008

SiRCoS Submarine pipeline repair system. Carlo Maria Spinelli - Bratislava, September 2008 SiRCoS Submarine pipeline repair system Carlo Maria Spinelli - Bratislava, 18-19 September 2008 Outline 1 Introduction to subsea pipelines 2 Deep water projects 3 Pipeline damage & scenarios 4 SiRCoS Repair

More information

Reversing the trend Collaboration, Robustness and Standardization

Reversing the trend Collaboration, Robustness and Standardization Reversing the trend Collaboration, Robustness and Standardization 2017 BSEE Standards Workshop, Houston May 5th 2017 By Dr.ing Geir Loeland. Head of Structural Integrity Section Petroleum Safety Authority

More information

Training Fees 4,250 US$ per participant for Public Training includes Materials/Handouts, tea/coffee breaks, refreshments & Buffet Lunch

Training Fees 4,250 US$ per participant for Public Training includes Materials/Handouts, tea/coffee breaks, refreshments & Buffet Lunch Training Title WELL HEAD OPERATIONS Training Duration 5 days Training Venue and Dates REF OP035 Well Head Operations 5 08-12 May $4,250 Abu Dhabi, UAE Will be held in any of the 5 star hotels. The exact

More information

OILMEX OILMEX BUSINESS GROUP. WELCOME. their processes of design, construction and quality in their diverse management of projects.

OILMEX OILMEX BUSINESS GROUP. WELCOME. their processes of design, construction and quality in their diverse management of projects. OILMEX OILMEX BUSINESS GROUP. WELCOME OILMEX BUSINESS GROUP emerges from the specific need of the Mexican oil industry to streamline their processes of design, construction and quality in their diverse

More information

for High School Students Presented in collaboration by:

for High School Students Presented in collaboration by: for High School Students Presented in collaboration by: Find us online www.petroed.com/tea Download our whitepaper! Written for CTE Directors & Ag Teachers Provides information on jobs Outlines the course

More information

Inspection and Test Plan for Water Tube Boiler

Inspection and Test Plan for Water Tube Boiler www.inspectionforindustry.com Inspection and Test Plan for Water Tube Boiler No. AND TEST PLAN REFERENCE DOCUMENT ACCEPTANCE CRITERIA VERIFING DOCUMENT ACTIVITY BY MANUF. TPI CLIENT REMARK 1 PRE MEETING

More information

OFFSHORE CATHODIC PROTECTION AND INTEGRITY

OFFSHORE CATHODIC PROTECTION AND INTEGRITY OFFSHORE CATHODIC PROTECTION AND INTEGRITY SEA WATER CORROSION AND PROTECTION. OUR CHALLENGE FOR OFFSHORE INTEGRITY. Sea water is known to be one of the most aggressive environments for metals and for

More information

1988 Develops a complete subsea wireline intervention system for use in the North Sea Halliburton/K BR separation

1988 Develops a complete subsea wireline intervention system for use in the North Sea Halliburton/K BR separation Safety Moment Halliburton History 1900-1955 1919 Erle P. Halliburton starts New Method Oil Well Cementing Co. 1922 Company cements its 500 th well 1938 Halliburton cements the first offshore well using

More information

Oil & Gas Products and Services

Oil & Gas Products and Services 2015 Value Your Trust Oil & Gas Products and Services Company Profile AMAFHH Petro Services - APS www.amafhh-ps.com AMAFHH Petro Services Oil & Gas Industrial Products & Services (Upstream & Downstream)

More information

Orbost Gas Plant Upgrade Project Community Information Sessions. 18 & 19 September 2018

Orbost Gas Plant Upgrade Project Community Information Sessions. 18 & 19 September 2018 Community Information Sessions 18 & 19 September 2018 Site location 9/14/2018 2 Ownership Update APA Orbost Gas Plant Pty Ltd (APA) purchased the plant and the export pipeline from Cooper Energy (CoE)

More information

INTEGRATED SUBSEA PRODUCTION SYSTEMS Efficient Execution and Cost-Effective Technologies Deliver Project Success. Deepsea technologies

INTEGRATED SUBSEA PRODUCTION SYSTEMS Efficient Execution and Cost-Effective Technologies Deliver Project Success. Deepsea technologies INTEGRATED SUBSEA PRODUCTION SYSTEMS Efficient Execution and Cost-Effective Technologies Deliver Project Success Deepsea technologies Streamlining Subsea Production Systems for Smaller Fields AFGlobal

More information

National Craft Assessment and Certification Program S P E C I F I C A T I O N S

National Craft Assessment and Certification Program S P E C I F I C A T I O N S National Craft Assessment and Certification Program S P E C I F I C A T I O N S BOILERMAKER PRESSURE VESSEL V2 BLMK34_02 October 2014 Focus Statement A journey level boilermaker is skilled in all aspects

More information

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal City of Winnipeg Brady Road Landfill Site Section 01300 New Entrance and Scale Facility Page 1 of 4 SUBMITTALS 1. SHOP DRAWINGS 1.1 General.1 Arrange for the preparation of clearly identified Shop Drawings

More information

WATERFLUX 3000 Quick Start

WATERFLUX 3000 Quick Start WATERFLUX 3000 Quick Start Electromagnetic flow sensor The documentation is only complete when used in combination with the relevant documentation for the signal converter. KROHNE CONTENTS WATERFLUX 3000

More information

Challenging Inspections of Offshore Pipelines by Intelligent Pig

Challenging Inspections of Offshore Pipelines by Intelligent Pig Challenging Inspections of Offshore Pipelines by Intelligent Pig Subsea Expo Integrity Management & Repair 2 nd February 2017 Presenters: Adrian Griffiths & Ram Subramanian Subsea EXPO 2017 2 nd February

More information

Minutes of Meeting. Meeting attendees introduced themselves. Record of Meeting Attendance is included in the minutes.

Minutes of Meeting. Meeting attendees introduced themselves. Record of Meeting Attendance is included in the minutes. Minutes of Meeting 2009 Exploration & Production Standards Conference on Oilfield Equipment and Materials Meeting Tuesday, June 23, 2009 Drilling Well Control Equipment SC16 8:30 am 12:00 pm Chair: Mel

More information

Continuous On-line Measurement of Water Content in Petroleum (Crude Oil and Condensate)

Continuous On-line Measurement of Water Content in Petroleum (Crude Oil and Condensate) API Manual of Petroleum Measurement Standards TR 2570 EI Hydrocarbon Management HM 56 Continuous On-line Measurement of Water Content in Petroleum (Crude Oil and Condensate) First Edition, October 2010

More information

INSPECTION AND TEST PLAN

INSPECTION AND TEST PLAN BOILER AND TEST PLAN No. AND TEST PLAN REFERENCE DOCUMENT ACCEPTANCE CRITERIA VERIFING DOCUMENT ACTIVITY BY MANUF. TPI CLIENT REMARK 1 PRE MEETING SPEC. SPEC. MOM H H H Before Manufacturing 2 DWG, DESIGN,

More information

Well Life Cycle Integrity. IOM 3 / Energy Institute Technical Meeting 12 th March 2019

Well Life Cycle Integrity. IOM 3 / Energy Institute Technical Meeting 12 th March 2019 Well Life Cycle Integrity IOM 3 / Energy Institute Technical Meeting 12 th March 2019 Contents Agenda UK goal setting Regulations UK wells guidelines Principles of well integrity UK well integrity guidelines

More information

INSTRUMENTATION DESIGN ENGINEERING: Oil & Gas

INSTRUMENTATION DESIGN ENGINEERING: Oil & Gas SmartBrains Engineers & Technologist Pvt. Ltd. DESIGN ENGINEERING: Oil & Gas Building Nation Through SmartBrains Skill Development & Enterpreneurship Website : www.samrtbrains.in To Apply Please contact

More information