1 Section Nine /Platform Environment /Platform Environment The rig site are broken into basic work areas. These are: Substructure /Platform Environment The rig site are broken into basic work areas. These are: Derrick 1
2 /Platform Environment The rig site are broken into basic work areas. These are: Mud Pit Area /Platform Environment The rig site are broken into basic work areas. These are: Mud Pumps & Mixing Equipment Area /Platform Environment The rig site are broken into basic work areas. These are: Generator House (s) 2
3 /Platform Environment The rig site are broken into basic work areas. These are: Yard As most all land rigs are transportable, they are moved to a drill location and takes place. Once the well is completed the rig is dismantled during the process. Raising and lowering the derrick is part of the rigging up and down operation. On most rigs you must tie up the monkeyboards, fingerboards and traveling block. Certain safety rules must be followed during these operations. Much of the equipment and materials is heavy and can cause serious injury. Don t get under, between, or behind heavy loads. Never ride a suspended load. Ensure that any operator is aware that you are close to the working equipment. 3
4 Never walk behind a ramp or stand between a moving vehicle or any other solid object such as a structure, pump or tank. Do not stand near a crane which could flip over. Always stand where a truck driver can see and knows where you are.do not get between the trucks and equipment being moved. Use tag lines when handling a suspended load and if possible use power assisted equipment (winch, gin pole trucks etc.) to move and load equipment. Always have a clear line of sight or use a signalman when moving equipment. Pipe and drill collars are very dangerous, Never try to stop rolling drill pipe tubulurs etc let it fall and come to complete rest and use a forklift or truck to hoist this type of load. 4
5 Never stand or walk under a suspended load. Be aware of and watch for all moving loads around you. As soon as possible (-UP) install steps, handrails and floor plates. Cover all floor opening as soon as possible. Use all PPE require to job safely. Pay particular attention to fall prevention using tie-offs and safety harness. Use on any unguarded surface 6 feet or more above the next level. This involves many aspects of the / operations. Ask your supervisor for these tasks and follow 100% fall prevention usage in all these task area. 5
6 The rig floor is where the action is during a drilling operation. Lets discuss: Crew Driller Drawworks Tripping areas Drilling The driller is responsible to the toolpusher and his responsibilities includes; Being the front line supervisor Responsible for the crew and drilling operations during his tour Responsible for the directing and training of the crew and is knowledgeable of all aspects of the drilling operation Company Man ToolPusher Driller Derrickman Rotary Helper Motorman The derrickman is responsible to the driller and his responsibilities includes; Operates and maintains the mud pumps and the mud system Works in the derrick while tripping pipe and running casing Maintains derrick and is knowledgeable of duties of motorman and rotary helper Company Man ToolPusher Driller Derrickman Rotary Helper Motorman 6
7 The motorman is responsible to the driller and his responsibilities includes; Installs and services rig motors, rotary drives, air compressors and related equipment Installs and maintains service lines Operates the catline and winches and is knowledgeable of duties of rotary helper Company Man ToolPusher Driller Derrickman Rotary Helper Motorman The rotary helper is responsible to the driller and his responsibilities includes; Assists the Driller, derrickman and motorman Carries out housekeeping Digs & cleans ditches etc. and is knowledgeable of his duties and to perform them in a safe manner Company Man ToolPusher Driller Derrickman Rotary Helper Motorman Driller s Console The driller s console, located next to the drawworks (which is located in the rear of the rig floor) and is operated by the driller during hoisting operations. The console controls: Drawworks Catheads Tongs Spinning Chain Rotary Table Mud Pumps 7
8 Tripping Pipe Tripping pipe means either pulling pipe out of the well bore (tripping out) or tripping in, bringing pipe into the well bore, such as after changing a drill bit. This is done by breaking or making a connection using elevators, slips and tongs. Pipe is then stored on the rig floor (stands) reaching up in the derrick into the finger board. Rotary Table The rotary table is located at the center of the rig floor above the well bore and turns the drill string in a rotating motion and is powered by the rotary table drive. Mousehole The mousehole is used to store the drill pipe which was brought through the V door. V-Door The V-door is the opening to the catwalk in the front part of the rig floor where pipe and other materials are pulled to the rig floor The door should be chained and secured when not in use. 8
9 BOP Controls The BOP Remote Control console is used to operate the BOP (Blow Out Preventor which is located underneath the rig floor). The accumulator keeps enough pressure to operate the BOP. By opening or closing the proper control on the remote control unit, the BOP operator directs the accumulator to open or close the BOP. BOP Remote Control Monkeyboard The monkeyboard is a working platform on the derrick and is used by the derrickman while tripping pipe to handle pipe stands. Fingerboard Is the metal structure to store the pipe stands in the metal fingers. Crown Block Crown Block Is a large set of pulleys (sheaves) on the top of the derrick in which the drilling line is strung to reduce the weight of the drill string on the drilling line and drawworks. Traveling Block Is another set of sheaves where the drilling line from the crown block is strung and is able to move up and down with the swivel, kelly and drill string attached Traveling Block 9
10 Swivel Is connected to the traveling block and sustains the weight of the drill stem while permitting the stem to rotate. It also provides a connection for drilling mud to enter the drill string through the kelly hose. Kelly Is a pipe 4 or 6 flat sides attached to the top of the swivel. This pipe is attached at the bottom of the drill string.. The kelly bushing fits into the rotary table so the drill string can be rotated in a drilling motion kelly hose kelly A rotary drill works more like a screwdriver, turning rapidly to force its way down. The rotary table rests on the floor of the oil derrick and is turned by an engine to turn the bit. The rotary table holds the kelly, the uppermost part of the hollow drill stem. The kelly attaches to the drill pipe, which connects to the drill collar that holds the bit. The draw works is what lowers and raises the drill stem out of the hole. A cable runs from the hoisting drum at the bottom of the derrick over two sets of pulleys farther up. A hook connects the lower pulley to the kelly to allow it to be raised and lowered. Working on the Derrick A body harness is required when working at heights above 6 feet. Never work on the derrick without a full body harness and proper tie off. Be aware of objects that may fall from the derrick. If you are working on the derrick, make sure no one is at the risk of being struck by falling objects. Make sure the area below you is clear. Tongs Tongs are large wrenches to makeup (connect) or break out (disconnect) drill pipe, casing, tubing or other pipe. We call this operation that use tongs making or breaking a connection. Different types of tongs are used such as pipe tongs or casing tongs depending on a particular use. The supervisor will instruct personnel in proper use and maintenance of tongs. 10
11 Slips Slips are wedge-shaped pieces of metal with toothlike gripping dies. They are used in the rotary table to prevent the pipe from slipping down into the hole or to hold the pipe in place. The supervisor will instruct you in the proper use and maintenance of slips. Elevators Elevators are connected by bails to the traveling block next to the swival. Elevators are used for tripping pipe in or out of the wellbore by latching the elevators around the pipe. The elevators raise and lower the pipe while holding it by the pipe shoulder of the tool joint The supervisor will instruct you in proper use and maintenance of elevators. Spinning Chain Spinning chains are very dangerous. It is used to spin pipe joints together while making a connection or trip. The supervisor will instruct you on the safe use of the spinning chain and do not use until you are qualified to do so. A qualified person should be at the driller s console to stop the spinning chain if necessary. 11
12 Stabbing Pipe Stabbing pipe is part of making a connection where the make up string of tubulars (call a stand) or a single pipe is connected to the drill string suspended in the rotary table. The supervisor will instruct you in the proper procedure and safety measure. Mud Pit & Equipment Drilling mud is a mixer of water, drilling mud, and other chemicals that is circulated through the well bore during drilling. Mud is used to bring cuttings to the surface, cool and lubricate the bit and drill stem, and support the wall of the bore hole. The supervisor will instruct you in the proper PPE use, use and maintenance of mud pits and equipment. Pressurized Equipment Pressure is a form of energy that is commonly used in drilling (air, mud, hydraulic, steam) Pressurized mud is an example where the pressure is generated by mud pumps and circulated through pressure lines. Your supervisor will instruct you in the proper use and maintenance of pressurized lines and equipment. 12
13 Electrical Equipment Only qualified and authorized personnel are to perform electrical repair and maintenance. Discontinue use of any defective or unsafe electrical equipment and report it to your supervisor. Motorized Equipment Motorized equipment such as cranes, forklifts, and trucks are widely used on drilling sites. Only those trained and authorized personnel are allowed to operate and maintain this equipment. CONGRATULATIONS You have completed the course...now Click on the Internet Back button in the Top- Left of the Screen to Exit the Course and Return to Orientation Topic Page. Cd
03/31/2012. Site Preparation. Classifying Oil & Gas Operations. Presented By: Sharon Engle NSIPA & IAAW Annual Seminar April 19, 2012 Las Vegas, NV
Classifying Oil & Gas Operations Presented By: Sharon Engle NSIPA & IAAW Annual Seminar April 19, 2012 Las Vegas, NV 1. Catline Boom and Hoist Line 2. Drilling Line 3. Monkeyboard 4. Traveling Block 5.
More informationContents. iii. 3 Cable-Tool and Rotary Drilling 11 Cable-Tool Drilling 11 Rotary Drilling 14
Figures v Tables xii Preface xiii Units of Measurement xv Metric Conversion Factors xvi 1 Introduction 1 2 History 5 The Drake Well, 1850s 6 California, Late 1800s 8 The Lucas Well, 1901 8 3 Cable-Tool
More information"DRILLING-101: Everything a Geoscientist needs to know about Well Engineering but was afraid to ask"
London Petrophysical Society (a chapter of the SPWLA) One-day Seminar "DRILLING-101: Everything a Geoscientist needs to know about Well Engineering but was afraid to ask" 25th September 2014 The Geological
More informationThe Lease Pumper s Handbook. Chapter 4 Understanding the Oil Well. Section B DRILLING OPERATIONS
4B-1 The Lease Pumper s Handbook Chapter 4 Understanding the Oil Well Section B DRILLING OPERATIONS No two wells are alike, even if they are located near each other and are drilled into the same oil-bearing
More informationPersonalized Service, Industry Expertise. Franklin Howard
Personalized Service, Industry Expertise. Franklin Howard PRODUCTS Franklin Howard International provides high quality drilling equipment and spare parts from top manufacturers in the United States. Warranty
More informationGTSC Rig for Hands-on Training
GTSC Rig for Hands-on Training The Rig To meet the high demand of Petroleum Industry, GTSC has launched the Middle East s first fully operational Training Rig & Well in May 2010 at its main building location
More informationMSR/MSB Mechanical Setting Tool
Tech Unit No: 0620000004 Revision: B Approved By: Quality Engineer Date: 2014-12-16 MSR/MSB Mechanical Setting Tool FEATURES: Special designed Bow Spring provides positive control and allows one size Mechanical
More informationFundamentals Of Petroleum Engineering DRILLING OPERATIONS
Fundamentals Of Petroleum Engineering DRILLING OPERATIONS Mohd Fauzi Hamid Wan Rosli Wan Sulaiman Department of Petroleum Engineering Faculty of Petroleum & Renewable Engineering Universiti Technologi
More informationTRENCHLESS CONSTRUCTION METHODOLOGIES
TRENCHLESS CONSTRUCTION METHODOLOGIES Paragraph 2 of the Administrative Order issued by the Pennsylvania Department of Environmental Protection on January 3, 2018, to Sunoco Pipeline, L.P., ( Sunoco )
More informationMSR/MSB Mechanical Setting Tool
Tech Unit No: 0620000004 Revision: C Approved By: Quality Engineer Date: 201-1-9 MSR/MSB Mechanical Setting Tool FEATURES: Special designed Bow Spring provides positive control and allows one size Mechanical
More informationOPERATING MANUAL SHOCK TOOL OWS WENZEL DOWNHOLE TOOLS LTD.
OPERATING MANUAL SHOCK TOOL OWS WENZEL DOWNHOLE TOOLS LTD. Release Notes: Release 2 Issued May 2016 Document # OM ST 001, Shock Tool Operating Manual Reviewed By: RG 1 P age OPERATING MANUAL SHOCK TOOL
More informationWhen a drilling project is commenced, two goals must be achieved:
Technologies Drilling Technologies Oil well drilling is a complex operation and the drilling industry engages the services of personnel and a complicated array of machinery and materials to drill an oil/gas
More informationOILWELL PT1100A, S/N P199A61, p/b CAT 3508, S/N 95Y01254, w/5 x 6 Charge Pump (Rebuilt)
Capabilities: DEPTH RATING 18,000 Draw Works OIME SL 1500 1 1/4 DL Brake PARMAC 342 Hydromatic Engines (3) CAT 3412 Engines, S/Ns 81Z11431 & 81708039 Mast PYRAMID 146 x 23 815,000# SHL w/6 Sheave Crown
More informationImportant Notice. caution: Use proper lifting equipment and correct procedures to avoid injury.
Integrity. Partnership. Quality. COMMERCIAL DOOR INSTALLATION INSTRUCTIONS SERIES 1900, 1950, 2000, 2250, 2500, 2750 Important Notice In the following text, the word: Warning: Indicates that serious injury
More informationSimple Machines. Contact the National Museum of the U.S. Navy for Field Trip and School Visit opportunities!
Simple Machines In this packet, we will be learning the basic physics behind simple machines! We are then going to practice these principles in easy and fun activities that can be done in the classroom
More informationSeeing through software
Seeing through software Gefei Liu and Cissy Zhao, Pegasus Vertex Inc., USA, explain how the use of advanced software can help engineers see underground by predicting subsurface conditions. Oil well drilling
More information18000 HDL FOUR POST LIFT LB CAPACITY INSTALLATION AND OWNER'S MANUAL
18000 HDL FOUR POST LIFT 18000 LB CAPACITY INSTALLATION AND OWNER'S MANUAL WARNING! Do not raise a vehicle unless the front stops are in place, the parking brake is set, and the wheels are chocked. Stay
More informationREPAIR INSTRUCTIONS: CABLE
The repair instructions describe replacing the Cable in the Easy Sun PARASOL Sunshade. These repair instructions are intended only for persons with experience of using the tools required. Please read the
More informationMODEL 83 Pail Handler
MORSE MFG. CO., INC. 727 West Manlius Street P.O. Box 518 East Syracuse, NY 13057-0518 Phone: 315-437-8475 Fax: 315-437-1029 Email: service@morsemfgco.com Website: www.morsemfgco.com COPYRIGHT 2005 MORSE
More informationDRILLING & WORKING TOOLS
EAGLE EQUIPMENT SUPPLIES & SERVICES PTE LTD 48 Toh Guan Road East #06-107 Enterprise Hub, Singapore 608586 Tel : (65) 6795 2411 Fax: (65) 6795 5877 Email: eesss@singnet.com.sg Company Registration (UEN)
More informationinstallation guide
JANUS INTERNATIONAL 1 866 562 2580 w w w. j a n u s i n t l. c o m 2000 2500 3000 installation guide RIGHT DRIVE END SHOWN LH OPPOSITE LEFT TENSION END SHOWN RH OPPOSITE PUSH-UP OPERATION 2000 2500 3000
More informationModuels in PetroTrainer. PetroTrainer. How PetroTrainer is used
PetroTrainer E-Learning for the Petroleum industry PetroTrainer is probably the world s largest and most comprehensive tool made for training purposes in the petroleum industry. The ITC Boreskolen started
More informationHD installation guide
JANUS INTERNATIONAL 1 866 562 2580 www.janusintl.c o m 1950 1950HD installation guide RIGHT DRIVE END SHOWN LH OPPOSITE LEFT TENSION END SHOWN RH OPPOSITE PUSH-UP OPERATION 1950 1950HD SHOWN A rolling
More informationForce multipliers and speed multipliers Machines can make work easier by reducing the amount of force necessary to move an object or increasing the
MACHINES A machine is a device that makes work easier by transmitting or transforming energy. They have been used since ancient times to help people move heavy objects, bring substances like water from
More informationTABLE OF CONTENTS DRAWINGS
TABLE OF CONTENTS Bifold Door Adjustment Procedures...pg 4 Bifold Door Maintenance...pg 6 Safety Concerns...pg 9 Troubleshooting...pg 10 Bifold Door Maintenance Checklist...pg 11 DRAWINGS EK 1880 Bifold
More informationMUELLER E-5TM. and D-5TM. Drilling Machines. Reliable Connections. E-5 General Information 2. D-5 General Information 3. Operating Instructions 4-5
operation Instructions manual MUELLER E-5TM and D-5TM TAble of contents PAGE E-5 General Information 2 Drilling Machines D-5 General Information 3 Operating Instructions 4-5 E-5 Parts 6 D-5 Parts 7! WARNING:
More informationSubsea Pump System - Optimized for Rapid Deployment & Operation within the Primary Barrier. Brian Piccolo, Technology Development Mgr.
Subsea Pump System - Optimized for Rapid Deployment & Operation within the Primary Barrier Brian Piccolo, Technology Development Mgr. Agenda Pumped Riser System (PRS) Vision Initial Concept Operational
More informationElectric Skein Winder
Electric Skein Winder Assembly and Use Package Contents 1 - Triangular Body (w/ motor) 1 - Cross Arm 1 - Left Foot (w/ yarn guide) 1 - Right Foot 1 - Adjustable Finger (w/ yarn clip) 3 - Adjustable Fingers
More informationThe DeltaGrip System. Safety and Operating Instructions. Trigger. Air Supply Connection. Handle Assembly. Air Line Assembly.
The DeltaGrip System Safety and Operating Instructions Trigger Air Supply Connection Handle Assembly Air Line Assembly Punch Die Pneumatic Diaphragm Assembly Shackle, Pin & Jam Nut Jaw Frame Shoulder Screw
More informationHardware and Components:
Hardware and Components: (A) 4X 5/16 x 1 Carriage Bolt (B) 2X 5/16 x 2-1/4 Carriage Bolt (C) 2X 5/16 x 3-1/4 Hex Bolt (D) 2X 5/16 x 3/4 Hex Bolt (E) 2X 5/16 x 1-1/4 Hex Bolt (F) 5/16 x 2-1/4 Hex Bolt (G)
More informationLadiz Niroo Company (Joint Stuck) Supplier of Drilling Equipment. Drilling Catalogue
Ladiz Niroo Company (Joint Stuck) Supplier of Drilling quipment Drilling Catalogue LNCO is involved in the field of supplying consumable equipment for Oil & Gas Drilling Industries. 1 :Oil and Gas Drilling
More informationSETTING UP THE MODEL 210-3, -4, and -5 EQ MT
SETTING UP THE MODEL 210-3, -4, and -5 EQ MT SAFETY PRECAUTIONS FOR THE MODEL 210-3, -4, -5 EQ MT System Under Pressure: Shut off air supply and disconnect air hose before disassembling or disconnecting
More informationTraining Solutions. The core of drilling innovation
Training Solutions The core of drilling innovation Training Solutions 1 Drillmec Training Center Drillmec is a global leader in the design, manufacture and distribution of drilling and workover rigs for
More informationOPERATOR S MANUAL WARNING. Read and become familiar with this manual BEFORE operating unit.
OPERATOR S MANUAL For Models 350 & 210 Model 350 Model 210 WARNING Read and become familiar with this manual BEFORE operating unit. Before operating this equipment, thoroughly read this set of instructions,
More informationPlease read and understand the OnBoard Timpani Cart Owner s Manual before using the Timpani Cart.
Assembly and Owner s Manual OnBoard Timpani Cart Performance Position Towing Position CONTENTS Important User Information...........................2 General......................................2 Manufacturer.................................2
More informationDrill Line Tension Guide User Procedure Manual
Oilfield Solutions Inc. Drill Line Tension Guide User Procedure Manual Special Instructions I Conditions of Use Reading this user procedure manual prior to use is essential. Slip & Cut, Drill Line Tension
More informationDrilling Courses Overview Pressure control and drilling equipment course offering
Drilling Courses Pressure control and drilling equipment course offering Content Introduction 3 Pressure control equipment Multiplex (MUX) control system overview Mark III subsea BOP control system electrical
More information50 Gordon Drive, Rockland, Maine MOUNT KIT. Ford Super Duty F250/350/450/ Installation Instructions
Fisher Engineering 50 Gordon Drive, Rockland, Maine 04841-2139 www.fisherplows.com October 1, 2007 Lit. No. 64689, Rev. 03 MOUNT KIT Ford Super Duty F250/350/450/550 2005-07 Installation Instructions Read
More informationNORWAY. Norwegian Industrial Property Office (12) APPLICATION (19) NO (21) (13) A1. (51) Int Cl.
(12) APPLICATION (19) NO (21) 11782 (13) A1 NORWAY (1) Int Cl. E21B 43/00 (06.01) E21B 43/01 (06.01) E21B 43/12 (06.01) Norwegian Industrial Property Office (21) Application nr 11782 (86) Int.application.day
More informationEMB MANUFACTURING INC.
TRAILER WOOD PROCESSOR MODELS WP865, WP835, WP635 ASSEMBLY INSTRUCTION MANUAL Please review and understand the operators manual before attempting to operate this machinery. EMB MANUFACTURING INC. 4144
More informationDropped Objects Who s Responsible. Presented by Bob Thompson, Chevron Indonesia
Dropped Objects Who s Responsible Presented by Bob Thompson, Chevron Indonesia Design - Bolt fell from URA to Drillfloor - 1.6kg x 25m A bolt attaching the gripper head to the upper racking arm came loose
More informationAudi Q7 Running board Fitting Instructions
Audi Q7 Running board Fitting Instructions Parts list Item Designation 1 2 3 4 5 6 7 Running board Support bracket Covers Screw M8x40 Screw M8x20 Blind rivet Screw for plating 4.8x16 Quantity 2 6 4 14
More informationCONVEY-ALL TCH-1070, TCH-1075, TCH-1080 & TCH-1085 MODEL CONVEYOR WITH SCISSOR LIFT UNDERCARRIAGE ASSEMBLY MANUAL
CONVEY-ALL TCH-1070, TCH-1075, TCH-1080 & TCH-1085 MODEL CONVEYOR WITH SCISSOR LIFT UNDERCARRIAGE ASSEMBLY MANUAL LIMITED WARRANTY Convey-All warrants to the buyer that the new machinery is free from defects
More informationIntroduction to PPE and T&P
Introduction to PPE and T&P Learning Objective By the end of this session, you will be able to: Explain what safety PPE, tools and plants are, their purpose and their uses 2 Let s Discuss What do you mean
More informationWESTERN PRODUCTS, P.O. BOX , MILWAUKEE, WI MOUNT KIT. Ford Super Duty F250/350/450/
WESTERN PRODUCTS, P.O. BOX 245038, MILWAUKEE, WI 53224-9538 www.westernplows.com October 1, 2007 Lit. No. 64680, Rev. 03 33259 MOUNT KIT Ford Super Duty F250/350/450/550 2005-07 Installation Instructions
More informationCOILED TUBING DESIGN & OPERATIONS
Training Title COILED TUBING DESIGN & OPERATIONS Training Date & Duration Will be held at any 5 star hotel- 5 Days Coiled Tubing Design & Operations 5 days 15-19 December 2013 US $ 4,250 Abu Dhabi Training
More informationMODEL C-71-5 TWO-MAN EARTH DRILL
DO NOT THROW AWAY IMPORTANT MANUAL MODEL TWO-MAN EARTH DRILL Operator s Manual P.O.BOX 290 San Bernardino, CA. 92402 Phone (909) 478-5700 Fax (909) 478-5710 (800) 922-4680 E-mail: sales@groundhoginc.com
More informationSHOP PRESS ASSEMBLY INSTRUCTIONS
SHOP PRESS ASSEMBLY INSTRUCTIONS CP403-40 TON ELECTRIC PRODUCTION PRESS CP405-50 TON ELECTRIC PRODUCTION PRESS WITH WINCH PRESS SPECIFICATIONS Arcan Model No. A B C D E F G H I J K L CP403 74" 32" 29.75"
More informationSPIDA SAW OPERATIONS MANUAL
SPIDA SAW OPERATIONS MANUAL CM SERIAL NUMBER. OCTOBER 2000 CONTENTS Page description 1.) Contents 2.) Safety First 3.) CM Overview 4.) CM Specifications 5.) CM Installation 6.) CM Operation Setting the
More informationThor Audi A4/S4 Skid Plate Installation Instructions
Thor Audi A4/S4 Skid Plate Installation Instructions Parts List: 1 Aluminum Skid Plate 2 Aluminum Side Wings 10 10mm Flat Washers 3 8mm Flat Washers 3 8mm Speed Clips 2 10x40mm Bolts 3 8x35mm Bolts 2 Rivet-nuts
More informationWestern Products, PO Box , Milwaukee, WI MOUNT KIT. Ford Super Duty F-250/350/450/
Western Products, PO Box 245038, Milwaukee, WI 53224-9538 www.westernplows.com March 1, 2010 Lit. No. 68201, Rev. 04 31269 MOUNT KIT Ford Super Duty F-250/350/450/550 2008-10 Installation Instructions
More information20 TON HyDRAULIC SHOP PRESS with GRID GUARD 06/2015 INSTRUCTION MANUAL MODEL: KHP-20T-GG COPYRIGHT 2015 ALL RIGHTS RESERVED BY KING CANADA TOOLS INC.
06/2015 20 TON HyDRAULIC SHOP PRESS with GRID GUARD MODEL: KHP-20T-GG INSTRUCTION MANUAL COPYRIGHT 2015 ALL RIGHTS RESERVED BY KING CANADA TOOLS INC. warranty INFORMATION 2-yEAR LIMITED WARRANTY FOR THIS
More informationMOUNT KIT. Ford Super Duty F 250/350/450/ Installation Instructions CAUTION. Read this document before installing the snowplow.
November 15, 2014 Lit. No. 64680, Rev. 04 33259 MOUNT KIT Ford Super Duty F 250/350/450/550 2005-07 Installation Instructions Read this document before installing the snowplow. See your sales outlet/web
More information3/14/2015 Contacted and Solicited bids from construction vendors to build location. (San Jan, Orbit, Sweat, Storm).
Operator Torchlight Energy Page 1 3/12/2015 Mark McCoy, engineer with Mojo, met with University Lands representative, Drew McEachern and the land rancher, John Hunter to discuss access roads to Orogrande
More informationPower Train Lift Max. Capacity: 1,250 lbs.
655 EISENHOWER DRIVE OWATONNA, MN 55060 USA PHONE: (507) 455-7000 TECH. SERV.: (800) 533-6127 FAX: (800) 955-8329 ORDER ENTRY: (800) 533-6127 FAX: (800) 283-8665 INTERNATIONAL SALES: (507) 455-7223 FAX:
More informationParts Manual for: MODELS / I.D. : / ZTH5223A / ZTH5225A / ZTH6125A
Parts Manual for: MODELS / I.D. : 968999153 / ZTH5223A 968999154 / ZTH5225A 969999155 / ZTH6125A Husqvarna policy is to improve its products whenever it is possible and practical to do so. In an effort
More informationNorth Dakota State University Power Tool Operations and Maintenance
North Dakota State University Power Tool Operations and Maintenance I. Introduction This NDSU procedure provides guidelines for the use of power tools. The intent is to establish proper safety procedures
More informationAppendix B Drilling Methods
Appendix B Drilling Methods B-1. Introduction A brief discussion of available drilling methods is included below. It is not the intent of this manual to include a detailed description of these methods.
More informationFORD MOUNT INSTALLATION INSTRUCTIONS
WESTERN PRODUCTS, P.O. BOX 245038, MILWAUKEE, WI 53224-9538 Lit. No. 64289 June 1, 2003 FORD MOUNT INSTALLATION INSTRUCTIONS Bronco (4X4 only) F-150 (4X4 only), F-250/350 Super Duty 1980 1991 Model No.
More informationHAND AND POWER TOOLS
HAND AND POWER TOOLS Steingass Mechanical Contracting, Inc. 754 Progress Drive Medina, Ohio 44256 (330) 725-6090 HAND AND POWER TOOLS General All power tools whether furnished by Steingass Mechanical Contracting,
More informationReliance SG800 Series Steel Water Gage Valves
Installation, Operation, & Maintenance Instructions R500.541D1 10/16/2016 Reliance SG800 Series Steel Water Gage Valves Note: Design variations in Steel Water Gage Valves necessitate typical illustrations,
More informationN. 15th Street, Middlesboro, KY FLIP TARP DUMP BODY INSTALLATION INSTRUCTIONS
1-800-248-7717 1002 N. 15th Street, Middlesboro, KY 40965 FLIP TARP DUMP BODY INSTALLATION INSTRUCTIONS Congratulations on your purchase of a Mountain Flip Tarp Dump Body tarping system. With tarping systems
More informationEA-04a: Repair McGuire Dock (Lift Roller)
Page 1 of 6 EA-04a: Repair McGuire Dock (Lift Roller) SAFETY FIRST o Follow all Caterpillar facility safety standards when performing this task. o Place orange cones at the entrance to the dock to let
More informationEASY-IN POOL STEP SYSTEM NE132
EASY-IN POOL STEP SYSTEM NE132 This instruction manual features multiple guides for the step unit components. 7939 EASY POOL STEP (NE113) FOR USE WITH: EASY-IN POOL STEP (NE126) 6492 PARTS & HARDWARE FOR
More information2-Door EXO-Top Roof Rack System
Page 1/29 Part 13516.01 2-Door EXO-Top Roof Rack System! WARNING The EXO-Top Roof Rack System is rated to a dynamic 300 lb, evenly distributed load. Further loading could result in serious injury or death.
More informationSession: Introduction to PPE and T&P
Session: Introduction to PPE and T&P Learning Objectives Explain what safety PPE, tools and plants are, their purpose and their uses Evaluation Criteria Interactive Questioning Duration Resources Facilitator
More informationOXDALE PRODUCT LTD OPERATING AND MAINTENANCE MANUAL TM400 AND TM400 BIG BASE LOG SPLITTER KEEP FOR FUTURE USE
OXDALE PRODUCT LTD OPERATING AND MAINTENANCE MANUAL TM400 AND TM400 BIG BASE LOG SPLITTER KEEP FOR FUTURE USE 1 CONTENTS Safety 3 Labels 5 Quick Guide 6 In Depth Instructions 8 Operating Instructions 12
More informationLASERS, TRANSITS & LOCATORS AIR TEST EQUIPMENT
LASERS, TRANSITS & LOCATORS AUTO LEVEL $40 $160 $480 BLOWER 12 VOLT W/ HOSE $25 $100 $300 GAS DETECTOR $55 $220 $660 GRADE POLE $5 $20 $60 LOCATOR $20 $80 $240 LOCATOR SIGNAL GENERATOR $20 $80 $240 MAGNETIC
More informationMotorcycle Lift Assembly Instructions
Motorcycle Lift Assembly Instructions Copyright JCS 2009 Rev1M Page 1 Lift Table Assembly Instructions The following pages will assist you in the construction of your Motorcycle Lift Table. You will find
More informationGENERAL OPERATIONAL PRECAUTIONS WARNING! When using electric tools, basic safety precautions should always be followed to reduce the risk of fire, electric shock and personal injury, including the following.
More informationPORTABLE PULLER 55 Ton Capacity
SPX Corporation 5885 11th Street Rockford, IL 61109-3699 USA Internet Address: http://www.powerteam.com Tech. Services: (800) 477-8326 Fax: (800) 765-8326 Order Entry: (800) 541-1418 Fax: (800) 288-7031
More informationLASERS, TRANSITS & LOCATORS AIR TEST EQUIPMENT
LASERS, TRANSITS & LOCATORS AUTO LEVEL $40 $160 $480 BLOWER 12 VOLT W/ HOSE $25 $100 $300 GAS DETECTOR $55 $220 $660 GRADE POLE $5 $20 $60 LOCATOR $20 $80 $240 LOCATOR SIGNAL GENERATOR $20 $80 $240 MAGNETIC
More informationSiem WIS. Siem WIS AS. Closed Loop Drilling CLD. August Siem WIS AS.
AS Closed Loop Drilling CLD August 2010 2010 AS. Technology summary has secured intellectual property rights (IPR) for all key components of its portfolio: CircSub To drill with constant Mud Circulation
More informationPolicy Sponsor: Assistant Vice President Facilities Management. Responsible Unit: Trade Services
Safe Work Instructions for Powered Mitre Cut Hack Saw (Mitercut Model 220M) Policy Sponsor: Assistant Vice President Facilities Management Responsible Unit: Trade Services Approval Date: November 2016
More informationRead all instructions before using the log splitter, especially safety instructions.
Operation manual for log splitter ELH500, ELH700, ELH1100, TRH700 och TRH1100 Read all instructions before using the log splitter, especially safety instructions. Faxes Fabriks AB Hestravägen 7 330 26
More informationParts Manual for MODELS: ZKH52222 ZKH52252 ZKH61252
Parts Manual for MODELS: ZKH52222 ZKH52252 ZKH61252 Professional Quality Lawn Care Equipment since 1945 THIS MANUAL INCLUDES UPDATES ON PAGES 6,10, & 20. Yazoo/Kees Power Equipment policy is to improve
More informationFORD MOUNT INSTALLATION INSTRUCTIONS
WESTERN PRODUCTS, P.O. BOX 245038, MILWAUKEE, WI 53224-9538 Lit. No. 67449 FORD MOUNT INSTALLATION INSTRUCTIONS Bronco, F-150/250/350 4X4 1992-1996 and Ford F-250 2WD (over 8,500 GVWR) Ford F-350 2WD (over
More informationSETTING UP THE MODEL 85B
SETTING UP THE MODEL 85B SAFETY PRECAUTIONS FOR THE MODEL 85B System Under Pressure: Shut off air supply and disconnect air hose before disassembling or disconnecting parts. Flying Debris: During boring,
More informationDoc #: 2100 AD Revision: MOSAIC Removal Procedure. Author(s): Hillary Mathis, Bill McCollam
Doc #: 2100 AD 015 0020 Revision: MOSAIC Removal Procedure Author(s): Hillary Mathis, Bill McCollam Contents Contents... 2 Revision History... 3 1. Purpose... 4 2. Applicable To... 4 3. Scope... 4 4. Definitions...
More informationMPD ACTIVE PRESSURE MANAGEMENT Next-generation MPD technology, built by manufacturing specialists
MPD ACTIVE PRESSURE MANAGEMENT Next-generation MPD technology, built by manufacturing specialists Our experienced service personnel have supported operators with more than 80+ wells drilled to date. Our
More informationOnBoard Bass Drum/Gong Cart
Assembly and Owner s Manual OnBoard Bass Drum/Gong Cart CONTENTS Important User Information...................................................................2 Safety...................................................................................3
More informationREGATTA PATH LIGHT (RGP)
NEEDED FOR INSTALLATION: 5/64 & 5/32 Allen Wrench Waterproof Wire Connectors Warning Low Voltage Hot Surface Wear Gloves By Others Gloves IMPORTANT SAFETY INFORMATION - READ, FOLLOW, AND SAVE THESE INSTALLATION
More informationHollow Stem Auger Modifications
Hollow Stem Auger Modifications Auger Extensions Auger Extensions are used to compensate for the distance from the ground up to the rig. To order these extensions please specify: 1. Length: standards are
More informationTools Hand and Power. OSHA Office of Training and Education 1
Tools Hand and Power 1 Hazards Workers using hand and power tools may be exposed to these hazards: objects that fall, fly, are abrasive, or splash harmful dusts, fumes, mists, vapors, and gases frayed
More information121PB - PRO UNEVEN BARS
Sales & Service sasportonline.com Head Office 135 Forestview Road P.O. Box 40 Orillia, Ontario Canada L3V 6H9 Toll Free (800) 563-6479 Phone (705) 325-2274 Fax (705) 325-1485 USA Office 7879 Will Rogers
More informationMOUNT KIT. GM K2500/2500HD/3500/3600 Silv/Sierra GM C3500/3600 Silv/Sierra. Installation Instructions CAUTION
November 15, 2014 Lit. No. 41516, Rev. 02 69981 MOUNT KIT GM K2500/2500HD/3500/3600 Silv/Sierra 2011 - GM C3500/3600 Silv/Sierra 2011 - Installation Instructions Read this document before installing the
More informationTRAFFIC SIGNAL ELECTRICIAN, 3819
01-31-92 TRAFFIC SIGNAL ELECTRICIAN, 3819 Summary of Duties: A Traffic Signal Electrician performs skilled technical work and acts as a lead for and works with a signal construction crew constructing,
More informationHardware and Components:
Hardware and Components: (A) 5/16 x 2 Hex Bolt (B) 5/16 x 2-1/4 Hex Bolt (C) 5/16 x 2-1/2 Hex Bolt (D) 4X 5/16 x 3/4 Hex Bolt (E) 4X 5/16 x 1-1/4 Hex Bolt (F) 11X 5/16 Flat Washer (G) 12X 5/16 Nylock Nut
More informationBM25 VERTICAL BROACHER INSTRUCTIONS BOOK
VERTICAL BROACHER BM25 INSTRUCTIONS BOOK PRADA NARGESA, S.L Ctra. de Garrigàs a Sant Miquel s/n 17476 PALAU DE STA. EULALIA (GIRONA) SPAIN Tel. 972 568085 - Fax 972 568320 www.nargesa.com - nargesa@nargesa.com
More informationCOMMERCIAL MOWERS PARTS MANUAL FOR: MODELS: ZKH52221 ZKH52251 ZKH61221 ZKH61251
PARTS MANUAL FOR: COMMERCIAL MOWERS MODELS: ZKH52221 ZKH52251 ZKH61221 ZKH61251 FD KEES POWER EQUIPMENT, L.L.C. 700-800 PARK AVENUE BEATRICE, NEBRASKA, U.S.A. 68310 PRINTED IN USA MANUAL NO.-102935 REV.
More informationForm No Assembly & Operating Instructions for: SAFETY PRECAUTIONS
Form No. 0230 Assembly & Operating Instructions for: 833 20300 83 2220 837 0-0008 078 SHOP PRESS Max. Capacity: 2 Ton These instructions are intended for various shop presses. Some models are shipped assembled
More informationFLIP TARP SINGLE & DOUBLE UNDERBODY TRAILERS
1-800-248-7717 1002 N. 15th Street, Middlesboro, KY 40965 FLIP TARP SINGLE & DOUBLE UNDERBODY TRAILERS INSTALLATION INSTRUCTIONS Congratulations on your purchase of a Mountain Flip Tarp Trailer system.
More informationLOS ANGELES UNIFIED SCHOOL DISTRICT DIVISION OF ADULT AND CAREER EDUCATION SAFETY TEST FOR MACHINIST PROGRAM
LOS ANGELES UNIFIED SCHOOL DISTRICT DIVISION OF ADULT AND CAREER EDUCATION SAFETY TEST FOR MACHINIST PROGRAM School: Industry Sector: Manufacturing & Product Dev. Class: Date: Teacher: Room: (Please Print)
More informationMechanical Technical Assistance Manual for washers
1 Mechanical Technical Assistance Manual for washers, GIRBAU, S.A. Crta de Manlleu, km. 1 08500 VIC (Barcelona) SPAIN Tel. 34 93 8861100 Fax 34 93 8860785 girbau@girbau.es www.girbau.com For USA & CANADA:
More informationAUGER TOOLS. www. .com MINERAL EXPLORATION ENVIRONMENTAL GEOTECHNICAL GEOTHERMAL ROTARY SONIC HDD
AUGER TOOLS MINERAL EXPLORATION ENVIRONMENTAL GEOTECHNICAL GEOTHERMAL ROTARY SONIC HDD www..com AUGER TOOLS TABLE OF CONTENTS AUGER OVERVIEW... 3 HOLLOW STEM AUGERS... 4-12 2 1/4" Hollow Stem Augers...
More informationIMPORTANT SAFETY NOTICE
J. H. FLETCHER & CO. Box 2187 Huntington, WV 25722-2187 304/525-7811 FAX 304/525-4025 IMPORTANT SAFETY NOTICE INFORMATION BULLETIN NO. 122 TO: FROM: OWNERS AND OPERATORS OF J.H. FLETCHER & CO. UNDERGROUND
More informationBlock Foundation. From the 1950s through the 80s. Hydraulically driven. piers provide bearing. for a settling foundation
RESCUING FIXING A A Block Foundation Hydraulically driven piers provide bearing for a settling foundation From the 1950s through the 80s before poured concrete became the norm many homes in northern New
More informationSILVERBROOK DRILLING SERVICES CAPABILITY PROFILE 1. Contact Details
SILVERBROOK DRILLING SERVICES CAPABILITY PROFILE 1. Contact Details Firm Name: Silverbrook Drilling Street address 492 Linthorpe Rd, Pittsworth, Qld 4350 Main Contacts Carol McIntyre Owner / Manager Chris
More informationINSTRUCTION SHEET. PIECE INVENTORY - MOBILE BASES Refer to the diagram for part identification.
INSTRUCTION SHEET D2260 HEAVY-DUTY MINI-MOBILE BASE D2057 HEAVY-DUTY MOBILE BASE D2058 SUPER HEAVY-DUTY MOBILE BASE D2259 EXTENSION KIT FOR D2260/D2057 D2246 EXTENSION RAIL KIT FOR D2058 This Shop Fox
More informationGlide Switches 800 Series
Installation Instructions Glide Switches 800 Series These instructions are for our 800 Series Glide Switches product line, as used with 325 Series Patented Track rail. See the Index to locate the appropriate
More information