SURVEYING I CENG 383
|
|
- Francis Robinson
- 6 years ago
- Views:
Transcription
1 SURVEYING I CENG 383
2 9/21/2011 2
3 Introduction Definition An art of collecting data for mapping the relative positions of points above, below or on the surface of the earth. Surveying also includes the art of locating or setting out points on the ground from a plan or a map. 9/21/2011 3
4 Continued Surveying involves the measurement of distances and angles for one or more of the following purposes: 1. To determine the relative positions of points on the earth s surface to locate arbitrary points, configuration of the ground, direction and length of lines, boundary lines, etc, 2. To set out the line and grades needed for the construction of structures. 3. To calculate areas, volumes and other related quantities. 4. To prepare necessary maps and diagrams of an area. 9/21/2011 4
5 Continued Application Surveying is being used: - In developing databases for natural resource management. In establishing boundaries of public and private lands In preparing navigational maps (land, air, water). To map the earth above and below the sea. In geological and geophysical studies In planning, design, construction, erection, renovation and maintenance of engineering works 9/21/2011 5
6 Classification of surveying I. Engineering Surveying II.Geodetic Surveying III.Plane Surveying IV.Miscellaneous Survey 9/21/2011 6
7 Engineering Surveying Is the surveys which are carried out with some engineering consideration Further classified as: 1. Reconnaissance survey 2. Preliminary survey 3. Location survey 9/21/2011 7
8 Continued.. 1. Reconnaissance survey - is the first engineering survey - is carried out to study the details of the proposed project or scheme. * The successful conduct of the reconnaissance survey entirely depends on the personal qualities of the engineer such as his training and experience, his capacity of observation and interpretation of the features of the territory, etc 9/21/2011 8
9 Continued 2. Preliminary survey The objective of preliminary survey is to conduct the survey along the alternative routes found out by the reconnaissance survey and to determine with greater accuracy the cost along these alternative routs and to decide which route will be the most economical. It should be carried out with great precision 9/21/2011 9
10 Continued 3. Location survey * The main objective of location survey is to carry out the detailed survey along the route which has been found and fixed as the most economical route from the data of the preliminary survey. 9/21/
11 Geodetic Surveys Is also called the trigonometrical surveying as it involves spherical trigonometry. The spherical shape of the earth is considered. The geodetic surveys ensure with the great precision the precise positions of the stations on the surface of the earth. 9/21/
12 Plane Surveys In this type of surveying, the curvature of the earth is not considered and the surface of the earth is treated as a plane surface. The assumption to treat the surface of the earth as plane surface can also be justified on the following two ground: 1. For an area of about 195km 2 on earth s surface, the difference b/n the sum of angles of a spherical triangle and the corresponding plane triangle is only one second. 2. The difference b/n the arc and the subtended chord on the surface of the earth of length 91km is only about 50cm. 9/21/
13 Continued Plane surveys can be subdivided into two broad categories as follows: 1. Depending up on the shape of framework i. Triangulation ii. Traversing 2. Depending upon the type of instruments employed. i. Chain survey iv. Photographic and areal survey. ii. Compass survey v. Tacheometric survey iii. Plane table survey vi. Theodolite survey 9/21/
14 Miscellaneous survey 1. Archaeological Surveys 2. Astronomical Survey 3. Cadastral Survey or Land survey 4. City Survey 5. Geological Surveys 6. Marin Surveys 7. Military Surveys 8. Mining Surveys 9. Topographical Surveys 10. Route surveys 11. Hydrographic surveys 9/21/
15 Principles of surveying 1. The survey work should be carried out from the whole to the part and not from the part to the whole. 2. The length of main lines and the positions of important survey stations should be ascertained by at least two independent measurements. 9/21/
16 Basic Measurements and Instruments Used Horizontal distance: measured by tapes, chains, tacheometers, EDM, pacing, odometer, etc. Vertical distance: measured by levels, tacheometers. Horizontal angles: measured by theodolites, compasses. Vertical angles: measured by theodolites, clinometers. Basic units of measurements table 9/21/
17 Continued Scales * The scale of a map or a plan is the ratio of a distance measured on the plan or map to its corresponding distance on the ground. Examples Large scales:- < 1:200 Intermediate scales: - 1:2000 to 1:10,000 Small scales: - 1:10,000 to 1:100,000,000 For plans Site plans: - 1:50 to 1:500 Detail plans: - 1:1 to 1:20 9/21/
18 Continued Map: - the scale is too small to allow every feature to be properly represented. Conventional symbols are used to represent features that would otherwise be too small to be recognized. Plan: - on the other hand, shows all features on the ground correctly to scale. 9/21/
19 Surveying Activities A complete Surveying activity involves the following steps: - 1. Field operations 2. Office Work 3. Use of instruments 9/21/
20 1. Field operations Field operation involve To determine the relative altitudes of points To establish stations and bench marks. To locate the details To measure distances and angles. To set out boundary lines and grades for a variety of construction works such as culvert, bridges, buildings, sewers, waterlines etc. To survey contours of the land area, etc. To carry out miscellaneous notes which would be of immense help in plotting. 9/21/
21 2. Office work 1. Planning and design of the survey specification coordinate system and datum, selection of equipment and procedure. 2. Calculations and adjustment of data 3. Preparation of plans, maps, etc. 9/21/
22 3. Use of instruments Precautions that has to take while using the survey instruments are as follows: The lifting and shifting of the instrument should be carried out with extreme care. The movable parts and screws of the instrument should not be tightened with force. But they should be lubricated to have smooth working. The instructions supplied by the manufacturer should be lubricated to have smooth working. The instrument should be properly taken while starting the work and should be placed back in its original position when the work is over. The instrument should be suitably protected from rain, dust, sun, storm, etc. The instrument should never be left unguarded. Otherwise it is likely to be damaged by cattle, traffic or blowing wind. While placing the instrument on smooth surfaces, care should be taken to see that its legs do not spread out. 9/21/
23 Method of keeping note 1. Written description of what has been done 2. Using sketch 3. Tabulation of numerical data 4. Combination of the above 9/21/
24 Reference systems 1. Geographic reference system fig 2. Grid reference system - the earth surface is divided in to rectangular grid for horizontal reference. - Advantages of this system are the ease of calculation (plane Geometry and trigonometry) and the availability of one common datum for the X and Y dimensions in large area 3. Vertical reference system - A vertical datum is a surface which all elevations and depths are referred. - the referenced datum most widely used is that of mean sea level (msl) which is assigned an elevation of 0.000m. 9/21/
Important Questions. Surveying Unit-II. Surveying & Leveling. Syllabus
Surveying Unit-II Important Questions Define Surveying and Leveling Differentiate between Surveying and Leveling. Explain fundamental Principles of Surveying. Explain Plain and Diagonal Scale. What is
More informationSuveying Lectures for CE 498
Suveying Lectures for CE 498 SURVEYING CLASSIFICATIONS Surveying work can be classified as follows: 1- Preliminary Surveying In this surveying the detailed data are collected by determining its locations
More informationDepartment of Civil and Environmental Engineering
Department of Civil and Environmental Engineering CEE213L Surveying & Introduction to GIS Lab SURVEYING LABORATORY NORTH SOUTH UNIVERSITY Center of Excellence in Higher Education The First Private University
More informationEngineering Surveying -1 CE212 Chain Survey
Engineering Surveying -1 CE212 Chain Survey Lecture 2016, September 26-27 Muhammad Noman Chain Survey Chain survey is the simplest method of surveying. In this survey only measurements are taken in the
More informationPART XII: TOPOGRAPHIC SURVEYS
PART XII: TOPOGRAPHIC SURVEYS 12.1 Purpose and Scope The purpose of performing topographic surveys is to map a site for the depiction of man-made and natural features that are on, above, or below the surface
More information8/17/2014. Process of directly or indirectly measuring vertical distances to determine the elevation of points or their differences in elevation
Process of directly or indirectly measuring vertical distances to determine the elevation of points or their differences in elevation Leveling results are used: To design highways, railroads, canals, sewers,
More informationCHAPTER 2 GEODESY AND DATUMS IN NAVIGATION
CHAPTER 2 GEODESY AND DATUMS IN NAVIGATION GEODESY, THE BASIS OF CARTOGRAPHY 200. Definition Geodesy is the application of mathematics to model the size and shape of the physical earth, enabling us to
More information10/9/2018. Introduction to Surveying. Chapter -One-
Introduction to Surveying Chapter -One- 1 GENERAL INFORMATION FALL 2018-2019 Assistant Lecturer : Asmaa Ab. Mustafa Research Assistant: Course Title : Surveying Course Code : ARCH 224 Class No : S. 203
More informationIntroduction to Surveying. Chapter -One-
Introduction to Surveying Chapter -One- 1 GENERAL INFORMATION FALL 2016 Assistant Lecturer : Asmaa Abdulmajeed Research Assistant: Zanyar Bazyan Course Title : Surveying 1 Course Code : CE 215 Class No
More informationEarth Sciences 089G Short Practical Assignment #4 Working in Three Dimensions
Earth Sciences 089G Short Practical Assignment #4 Working in Three Dimensions Introduction Maps are 2-D representations of 3-D features, the developers of topographic maps needed to devise a method for
More informationS u r v e y i n g f o r M i n i n g E n g i n e e r i n g ( 1 1 B ) 30S/30E/30M
9 1 4 9 S u r v e y i n g f o r M i n i n g E n g i n e e r i n g ( 1 1 B ) 30S/30E/30M 9 1 4 9 S u r v e y i n g f o r M i n i n g E n g i n e e r i n g ( 1 1 B ) 3 0 S / 3 0 E / 3 0 M Course Description
More informationELEMENTS OF CIVIL ENGINEERING (110004) MARKS DISTRIBUTION AND IMPORTANT QUESTIONS OF ALL THE UNITS
ELEMENTS OF CIVIL ENGINEERING (110004) MARKS DISTRIBUTION AND IMPORTANT QUESTIONS OF ALL THE UNITS Unit-1 SCOPE OF CIVIL ENGINEERING One or two Questions are generally asked from this Unit the weightage
More informationCHAPTER 2 GEODESY AND DATUMS IN NAVIGATION
CHAPTER 2 GEODESY AND DATUMS IN NAVIGATION GEODESY, THE BASIS OF CARTOGRAPHY 200. Definition Geodesy is the science concerned with the exact positioning of points on the surface of the earth. It also involves
More informationdetermining the relative height of different
Levelling & Contouring Principle of levelling Principle:-The principle of levelling is to obtain horizontal line of sight with respect to which vertical distances of the points above or below this line
More informationLecture # 7 Coordinate systems and georeferencing
Lecture # 7 Coordinate systems and georeferencing Coordinate Systems Coordinate reference on a plane Coordinate reference on a sphere Coordinate reference on a plane Coordinates are a convenient way of
More informationLEVELING. Definitions
Definitions An elevation of a point : The vertical distance between the point and the reference level surface ( datum ),the most commonly used datum is the mean sea level (MSL ). Leveling : The process
More informationCHAPTER 3 MARGINAL INFORMATION AND SYMBOLS
CHAPTER 3 MARGINAL INFORMATION AND SYMBOLS A map could be compared to any piece of equipment, in that before it is placed into operation the user must read the instructions. It is important that you, as
More informationCOURSE SYLLABUS SURVEYING I
Solution Manual for Surveying Fundamentals and Practices 6th Edition by Nathanson Lanzafama Emeritus Link full download: http://testbankcollection.com/download/solution-manual-forsurveying-fundamentals-and-practices-6th-edition-by-nathanson-lanzafamaemeritus/
More informationFACULTY OF CIVIL ENGINEERING & EARTH RESOURCES ENGINEERING SURVEY FIELDWORK. LEVELING (Standard Of Procedure)
FACULTY OF CIVIL ENGINEERING & EARTH RESOURCES ENGINEERING SURVEY FIELDWORK LEVELING (Standard Of Procedure) Subject Code Date Group Number Student Name & ID Number Group Member Name & ID Number 1 2 Lecturer
More informationCHAPTER 11 SURVEY CADD
CHAPTER 11 SURVEY CADD Chapter Contents Sec. 11.01 Sec. 11.02 Sec. 11.03 Sec. 11.04 Sec. 11.05 Sec. 11.06 Sec. 11.07 Sec. 11.08 Sec. 11.09 Sec. 11.10 General Description of Survey File Contents of Survey
More informationSurvey Requirements. Design Guidelines and Standards. June Office of the University Architect
Design Guidelines and Standards Survey Requirements June 2004 Office of the University Architect Construction Management P.O. Box 210181 Cincinnati, Ohio 45221-0181 Table of Contents Survey Requirements
More informationSTATE UNIVERSITY CONSTRUCTION FUND
DIRECTIVE 1C-12 Issue date: August 2012 1. General SURVEY, MAPPING AND UTILITY LOCATING This Directive has been developed as a general guide for the survey and mapping effort required for Fund projects.
More informationDOUBLE PROPORTION MADE COMPLEX
DOUBLE PROPORTION MADE COMPLEX Jerry L. Wahl Branch of Cadastral Surveys Bureau of Land Management California State Office 2800 Cottage Way, E-2841 Sacramento, California 95825 ABSTRACT Our ever increasing
More informationQuestion bank. Unit 1: Introduction
Question bank Unit 1: Introduction 1. Define surveying. 2. State the objects of surveying 3. State and explain the principle of surveying 4. State and explain the classification of surveying 5. Differentiate
More informationContour An imaginary line on the ground surface joining the points of equal elevation is known as contour.
Contour An imaginary line on the ground surface joining the points of equal elevation is known as contour. In other words, contour is a line in which the ground surface is intersected by a level surface
More informationGUJARAT TECHNOLOGICAL UNIVERSITY, AHMEDABAD, GUJARAT COURSE CURRICULUM. Course Title: Surveying (Code: )
GUJARAT TECHNOLOGICAL UNIVERSITY, AHMEDABAD, GUJARAT COURSE CURRICULUM Course Title: Surveying (Code: 3330605) Diploma Programme in which this course is offered Civil /Mining/ Environmental/Transportation
More informationTSA Surveying Course
TSA Surveying Course with ProQual Level 3 in Engineering Surveying A block by block outline Preamble The TSA Surveying Course comprises six study periods of two weeks each spread over a period of two years
More informationS.E. (Civil) (Second Semester) EXAMINATION, 2012 SURVEYING (2008 PATTERN) Time : Three Hours Maximum Marks : 100
Total No. of Questions 12] [Total No. of Printed Pages 8 Seat No. [4162]-108 S.E. (Civil) (Second Semester) EXAMINATION, 2012 SURVEYING (2008 PATTERN) Time : Three Hours Maximum Marks : 100 N.B. : (i)
More informationLeveling. Double-Rodded Leveling. Illustrative Problem. Double-Rodded Leveling 8/17/2014
Double-Rodded Leveling Double-Rodded Leveling A method of determining the differences in elevation between points by employing two level routes simultaneously Two turning points are established such that
More informationHours / 100 Marks Seat No.
17419 21314 3 Hours / 100 Seat No. Instructions (1) All Questions are Compulsory. (2) Answer each next main Question on a new page. (3) Illustrate your answers with neat sketches wherever necessary. (4)
More informationCOSC 301 Construction Surveying & Layout Activity VI Transit; Existing Building (As built) and Vertical Angles
COSC 301 Construction Surveying & Layout Activity VI Transit; Existing Building (As built) and Vertical Angles Introduction 1. Review chapter 4 The Digital Transit and watch and understand chapter 5 Control
More informationLesson 8: Surveying the Forest
Lesson 8: Surveying the Forest TEACHER: SCHOOL: GRADE LEVEL: 9-12 TASKS/COMPETENCIES ANR8046.172 Set up and operate a transit level and rod. ANR8046.173 Read a rod and a level to calculate slope. ANR8046.174
More informationOption 1. Design Options are diverse e.g. new route alignments covering a wide area. Option 2. Design Options are restricted
MINIMUM STANDARD Z/16 SURVEY SPECIFICATIONS 1. GENERAL This specification sets out the Consultant s requirements for topographical survey (ground and aerial) for the Detailed Business Case (DBC) and Pre-Implementation
More informationPROPOSED CURRICULAR STRUCTURE AND SYLLABI OF FULL-TIME DIPLOMA COURSE IN SURVEY ENGINEERING
PROPOSED 5 TH SEMESTER CURRICULAR STRUCTURE AND SYLLABI OF FULL-TIME DIPLOMA COURSE IN SURVEY ENGINEERING PROPOSED CURRICULAR STRUCTURE FOR FIFTH SEMESTER OF THE FULL TIME DIPLOMA COURSE IN SURVEY ENGINEERING
More informationSurveying & Measurement. Detail Survey Topographic Surveying
Surveying & Measurement Detail Survey Topographic Surveying Introduction Mapping surveys are made to determine the relief of the earth s surface and locate critical points on it. to determine the locations
More informationDate Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project
Bureau of Engineering SURVEY DIVISION REQUEST FOR TOPOGRAPHIC SURVEY Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project Caltrans involvement (must
More informationJune 20, 2007 SURVEYING AND MAPPING MANUAL Table of Contents (1) SURVEYING AND MAPPING MANUAL
June 20, 2007 SURVEYING AND MAPPING MANUAL Table of Contents (1) CHAPTER 1 GENERAL SURVEYING AND MAPPING MANUAL TABLE OF CONTENTS 1-1 INTRODUCTION...1 1-1.01 PURPOSE...1 1-1.02 SCOPE...1 1-2 SURVEYING
More informationSection I MISSIONS, CLASSIFICATIONS, AND NETWORKS
Section I. Section II. Section III. CHAPTER 1 Overview of Surveying Surveyors determine horizontal and vertical distances between objects, measure angles between lines, determine the direction of lines,
More informationCHAPTER 7 Total Station Surveying. CE 316 March 2012
CHAPTER 7 Total Station Surveying CE 316 March 2012 249 7.1 Introduction Total station surveying - defined as the use of electronic survey equipment used to perform horizontal and vertical measurements
More informationBeach monitoring with GPS William F Price Department of Civil Engineering, University of Brighton, BRIGHTON, BN1 4GJ, UK
Beach monitoring with GPS William F Price Department of Civil Engineering, University of Brighton, BRIGHTON, BN1 4GJ, UK Abstract In common with many other countries that have an extended coastline, sea
More informationENVI.2030L Topographic Maps and Profiles
Name ENVI.2030L Topographic Maps and Profiles I. Introduction A map is a miniature representation of a portion of the earth's surface as it appears from above. The environmental scientist uses maps as
More informationSample Copy. Not For Distribution.
Photogrammetry, GIS & Remote Sensing Quick Reference Book i EDUCREATION PUBLISHING Shubham Vihar, Mangla, Bilaspur, Chhattisgarh - 495001 Website: www.educreation.in Copyright, 2017, S.S. Manugula, V.
More informationSpecifications for Post-Earthquake Precise Levelling and GNSS Survey. Version 1.0 National Geodetic Office
Specifications for Post-Earthquake Precise Levelling and GNSS Survey Version 1.0 National Geodetic Office 24 November 2010 Specification for Post-Earthquake Precise Levelling and GNSS Survey Page 1 of
More informationPHOTOGRAMMETRY STEREOSCOPY FLIGHT PLANNING PHOTOGRAMMETRIC DEFINITIONS GROUND CONTROL INTRODUCTION
PHOTOGRAMMETRY STEREOSCOPY FLIGHT PLANNING PHOTOGRAMMETRIC DEFINITIONS GROUND CONTROL INTRODUCTION Before aerial photography and photogrammetry became a reliable mapping tool, planimetric and topographic
More informationProgress Towards the Seamless Combination of Bathymetric and Topographic Data in New Zealand
Progress Towards the Seamless Combination of Bathymetric and Topographic Data in New Zealand Matt Amos Senior Technical Advisor National Geodetic Office Introduction Datasets usually defined in terms of
More informationSection E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02
Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02 1. INTRODUCTION This standard is written to provide the professional surveyor (Surveyor) and the client with a guideline for producing
More informationIntroduction to Total Station and GPS
Introduction to Total Station and GPS Dr. P. NANJUNDASWAMY Professor of Civil Engineering J S S Science and Technology University S J College of Engineering Mysuru 570 006 Introduction History GPS Overview
More informationn. years have seen phenomenal development, largely because older methods
PHOTOGRAMMETRY SPt:CIFICATIONS AND PRACTICES FOR THE USE OF AERIAL SURVEYS* Edward T. Telford, Traffic Engineer, and L. L. Funk, Assistant District Engineer, California Highway Department AERIAL photography
More informationMapping The Study Area
While on the beach you will need to take some measurements to show where the study area is relative to the rest of the world and to show what is inside the study area. Once the measurements have been taken,
More informationMODULE 1 INTRODUCTION TO SURVEYING. Some of the important applications of surveying are listed below:
MODULE 1 INTRODUCTION TO SURVEYING Surveying is the art of making measurements of objects on, above or beneath the ground to show their relative positions on paper. The relative position required is either
More informationConstruction Surveying and Layout
Construction Surveying and Layout A Field Engineering Methods Manual Third Edition WESLEY G. CRAWFORD.CREATIVE CONSTRUCTION Creative Construction Publishing, Inc. 2720 South River Road West Lafayette,
More informationDistribution Restriction Statement Approved for public release; distribution is unlimited.
CECW-EP Engineer Manual 1110-1-1005 Department of the Army U.S. Army Corps of Engineers Washington, DC 20314-1000 Engineering and Design TOPOGRAPHIC SURVEYING Distribution Restriction Statement Approved
More informationServices Overview. Northeast Blueprint
Services Overview 2D CAD Conversions Paper to CAD 2D CAD Conversions Construction Engineering / CAD Services Construction Markups Consultant Drawings Coordinated Drawings As -Builts Steel Structural Detailing
More informationLegal Description & Site Plan Requirements and Layouts
Legal Description & Site Plan Requirements and Layouts Plot Plan * A plot plan shows the location of a house from an aerial view. * The site plan, also known as a plot or lot plan includes: 1. Site plan
More informationDEVELOPMENT PLAN CHECKLIST
Project Identification Information: DEVELOPMENT PLAN CHECKLIST 1.0 GENERAL 1.1 Additional information as required by specific Land Use 1.2 All sheets to include sheet number ( of ) 1.3 Seal and signature
More informationCHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN
N/A Waiver (1) Four (4) copies of application form. (2) Fifteen (15) copies of plan (3) Subdivision/site plan application fee & professional review escrow deposit (4) Variance application fee & professional
More informationPart II: Filed School
Part II: Filed School Instructors: Name: Dr. Kenneth Snelgrove Sitotaw Yirdaw Office: EN4019 EN1035C Phone: 737 4820 737 3547 E-mail: ksnelgrove@engr.mun.ca Sitotaw@engr.mun.ca Teaching Assistants: TBA
More informationCONCEPT REVIEW GUIDELINES
Department of Planning & Community Development @ Jefferson Station 1526 E. Forrest Avenue Suite 100 East Point, GA 30344 404.270.7212 (Phone) 404.765.2784 (Fax) www.eastpointcity.org CONCEPT REVIEW GUIDELINES
More informationTABLE OF CONTENTS 1200 PLAN PREPARATION
1200 PLAN PREPARATION TABLE OF CONTENTS PAGE 1201 General Plan Sheet Information... 12-1 1201.1 Introduction... 12-1 1201.2 Unit of Measure... 12-1 1201.3 Plan Sheet Materials and File Format... 12-1 1201.4
More informationSURVEY GUIDANCE AND FORMS
Appendix H Clean Water Nashville Overflow Abatement Program GUIDANCE FOR DESIGN SURVEY GUIDANCE AND FORMS Version 2.0 April 2014 1 Table of Contents Section 1 Survey and Mapping... 1 1.1 Introduction...
More informationPROPOSED NATIONAL GEODETIC DATABASE (NGDB) Coordinates. Orthometric Height Source
Stations Name1, Name2, Name3 Custodian Orthometric Height Height Identifier MSL/AHD height Vert Class, Vert order, Ht method Supersedes, superseded by (double linked list AHD/MSL datum COMMENTS Fieldbooks
More informationActive and Passive Microwave Remote Sensing
Active and Passive Microwave Remote Sensing Passive remote sensing system record EMR that was reflected (e.g., blue, green, red, and near IR) or emitted (e.g., thermal IR) from the surface of the Earth.
More informationUNIT 4 LEVELLING 4.1 INTRODUCTION. Structure. 4.1 Introduction. 4.2 Definitions of Basic Terms 4.3 Basic Principle 4.4 Instruments and Equipment
UNIT 4 LEVELLING Levelling Structure 4.1 Introduction Objectives 4.2 Definitions of asic Terms 4.3 asic Principle 4.4 Instruments and Equipment 4.4.1 Different Types of Level 4.4.2 Levelling Staff 4.4.3
More informationAppendix A Lower Columbia River Chart Datum Modeling
Appendix A Lower Columbia River Chart Datum Modeling David Evans and Associates, Inc. David Evans and Associates, Inc. 2801 SE Columbia Way, Ste. 130 Vancouver, WA 98661 (360) 314-3200 1.0 Vertical Datum
More informationPRELIMINARY DRAFT CIRCULATION NOTICE
PRELIMINARY DRAFT CIRCULATION NOTICE Our Ref: Date WRD 05/T-5 31-12-2004 TECHNICAL COMMITTEE: Geological Investigation And Sub-Surface Exploration Sectional Committee, WRD 05 ------------------------------------------------------------------------------------------------------------
More informationFigure 8-1 Layout equipment and tools. Tape measure. String line level. Eyepiece level. Laser plane level Delmar/Cengage Learning.
3 2 1 0 Tape measure String line level Clinometer Eyepiece level Transit Dumpy level Carpenter s or builder s level Electronic measurement Tool Laser plane level Figure 8-1 Layout equipment and tools.
More information1.1 GENERAL RECORD DRAWING REQUIREMENTS
Page 1 of 5 VILLAGE OF ROMEOVILLE RECORD DRAWINGS CHECKLIST PART I GENERAL Record drawings are required to provide a means of schematic verification that the intent of the approved engineering design has
More informationContents. Notes on the use of this publication
Contents Preface xxiii Scope Notes on the use of this publication xxv xxvi 1 Layout of drawings 1 1.1 General 1 1.2 Drawing sheets 1 1.3 Title block 2 1.4 Borders and frames 2 1.5 Drawing formats 2 1.6
More informationApplication of GPS and Remote Sensing Image Technology in Construction Monitoring of Road and Bridge
2017 3rd International Conference on Social Science, Management and Economics (SSME 2017) ISBN: 978-1-60595-462-2 Application of GPS and Remote Sensing Image Technology in Construction Monitoring of Road
More informationQUANTITY SURVEYS. Introduction
QUANTITY SURVEYS Introduction In engineering surveying, we often consider a route (road, sewer pipeline, channel, etc.) from three distinct perspectives. The plan view of route location is the same as
More informationCOPYRIGHTED MATERIAL. Contours and Form DEFINITION
1 DEFINITION A clear understanding of what a contour represents is fundamental to the grading process. Technically defined, a contour is an imaginary line that connects all points of equal elevation above
More informationAlabama Standards of Practice for Surveying
PDHonline Course L144 (6 PDH) Alabama Standards of Practice for Surveying Instructor: Jerry Thacker, PLS, P.E. and John C. Huang, Ph.D., P.E. 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax,
More informationRecord Drawing Standards for Projects Version 2.1
for Projects Version 2.1 Updated September 21, 2016 Department: Spatial Data Group Engineering & Maintenance 1. INTRODUCTION... 1 2. GENERAL STANDARDS... 1 2.1 Drawing Standards... 1 2.2 Digital Submission
More informationCHAPTER 5 Vertical Control. CE 316 January 2012
CHAPTER 5 Vertical Control CE 316 January 01 137 5.1 Introduction Vertical Datums Leveling Techniques and Corrections Bench Mark Design and Construction Bench Mark Data Trigonometric Barometric Leveling
More informationInstruction with Hands-on Practice: Creating a Bathymetric Database & Datum Conversion
Instruction with Hands-on Practice: Creating a Bathymetric Database & Datum Conversion Tanya Beck Coastal and Hydraulics Laboratory Engineer Research and Development Center May 17, 2010 US Army Corps of
More informationHow to Design a Geometric Stained Glass Lamp Shade
This technique requires no calculation tables, math, or angle computation. Instead you can use paper & pencil with basic tech drawing skills to design any size or shape spherical lamp with any number of
More informationAC : THE PEDAGOGY OF THE SURVEYING LABORATORY
C 2008-724: THE PEDGOGY OF THE URVEYING LBORTORY Philip Brach, University of the District of Columbia PHILIP L. BRCH, PH.D., P.E., F-NPE Distinguished Professor (Emeritus), former Dean, Past President,
More informationAmplitude balancing for AVO analysis
Stanford Exploration Project, Report 80, May 15, 2001, pages 1 356 Amplitude balancing for AVO analysis Arnaud Berlioux and David Lumley 1 ABSTRACT Source and receiver amplitude variations can distort
More informationOverview of Tides and Water Levels
Overview of Tides and Water Levels www.tidesandcurrents.noaa.gov New Orleans, Baton Rouge, Lafayette, LA March 2009 Gerald Hovis, NOAA - National Ocean Service William Sweet, NOAA - National Ocean Service
More informationBATHYMETRIC DATA AND NAUTICAL CHART DATUMS
Distr. LIMITED ECA/NRD/CART.9/USA.2 October 1996 Original: ENGLISH Ninth United Nations Regional Cartographic Conference for Africa Addis Ababa, Ethiopia 11-15 November 1996 A GLOBAL APPROACH TO UPDATE
More informationDRAFT TANZANIA STANDARDS
DRAFT TANZANIA STANDARDS TBS/MMDC 2 (5178) P3 Glossary of mining terms- part 1: Surveying TANZANIA BUREAU OF STANDARDS TBS 2017 1st edition Glossary of Mining terms. Part 1: Surveying Foreword This draft
More informationList of Figures. List of Forms
City of Columbia Engineering Regulations PART 1: SUBMISSION OF PLANS Table of Contents Paragraph Description Page No. 1.1 General 1-1 1.2 Engineer s Report 1-1 1.3 Plans 1-3 1.4 Revisions to Approved Plan
More informationThis Land Surveying course has been developed by. Failure & Damage Analysis, Inc.
This Land Surveying course has been developed by Failure & Damage Analysis, Inc. www.discountpdh.com www.pepdh.com Bridge Surveying SURVEYS Bridge surveying is necessary to locate a site, obtain information
More informationCONTOURS SURVEYING 1 CE 215 CHAPTER -3- Ishik University / Sulaimani Civil Engineering Department 12/7/2017. Ishik University / Sulaimani
Civil Engineering Department SURVEYING 1 CE 215 CHAPTER -3- CONTOURS 1 2 1 3 4 2 PURPOSE OF CONTOURING Contour survey is carried out at the starting of any engineering project such as a road, a railway,
More informationTHE RELATIONSHIP BETWEEN FILL-DEPTHS BASED ON GIS ESTIMATION, EARTHQUAKE DAMAGE AND THE MICRO-TREMOR PROPERTY OF A DEVELOPED HILL RESIDENTIAL AREA
THE RELATIONSHIP BETWEEN FILL-DEPTHS BASED ON GIS ESTIMATION, EARTHQUAKE DAMAGE AND THE MICRO-TREMOR PROPERTY OF A DEVELOPED HILL RESIDENTIAL AREA Satoshi IWAI 1 1 Professor, Dept. of Architectural Engineering,
More informationIntroduction to Datums James R. Clynch February 2006
Introduction to Datums James R. Clynch February 2006 I. What Are Datums in Geodesy and Mapping? A datum is the traditional answer to the practical problem of making an accurate map. If you do not have
More informationThe several methods for making linear measurements are quite simple and straightforward. They are described below:
INTRODUCTION TO LINEAR MEASUREMENTS Many pay items are measured on the basis of linear measurements - items such as guardrail, pipe culvert, curb and gutter, fencing, etc. These measurements usually are
More informationScheme I Sample Question Paper
Sample Question Paper Max. Marks : 70 Time : 3 Hrs. Q.1) Attempt any FIVE of the following. a. Define the term surveying b. List different instruments used for linear measurement. c. Define the term bearing
More informationNational Report of Finland
National Report of Finland 1. Finnish Hydrographic Office The Finnish Hydrographic Office is organized under The Finnish Transport Agency. The Finnish Transport Agency is responsible for the Finnish roads,
More informationSPECIFICATION FOR TOPOGRAPHIC AND HYDROGRAPHIC SURVEYS OF RECLAMATION AND DREDGING WORKS
23 August 2001 SPECIFICATION FOR TOPOGRAPHIC AND HYDROGRAPHIC SURVEYS OF RECLAMATION AND DREDGING WORKS 1.0 EXTENT OF WORKS The main survey works shall comprise of the following : a. Carry out topographic
More informationDRAFT CHAPTER 10 FIELD NOTES
CHAPTER 10 FIELD NOTES The field notes of any survey are the only original record of the survey that the survey team has once it leaves the field. Therefore, the field recorder's notebook must contain
More informationMaps and map interpretation An introduction for geoscientists
Maps and map interpretation An introduction for geoscientists Produced by the University of Derby in conjunction with UKOGL Aims This teaching package provides an introduction to maps and how to identify
More informationAn experimental evaluation of a new approach to aircraft noise modelling
An experimental evaluation of a new approach to aircraft noise modelling F. De Roo and E. Salomons TNO Science and Industry, Stieljesweg 1, 2628CK Delft, Netherlands foort.deroo@tno.nl 903 Common engineering
More informationActive and Passive Microwave Remote Sensing
Active and Passive Microwave Remote Sensing Passive remote sensing system record EMR that was reflected (e.g., blue, green, red, and near IR) or emitted (e.g., thermal IR) from the surface of the Earth.
More information3. GENERAL TIDAL DATUM COMPUTATION PROCEDURES
3. GENERAL TIDAL DATUM COMPUTATION PROCEDURES 3.1 Datum Computation Procedures Overview A vertical datum is termed a tidal datum when it is defined by a certain phase of the tide. Tidal datums are local
More informationPART XIII: HYDRAULIC/ HYDROLOGY SURVEYS
PART XIII: HYDRAULIC/ HYDROLOGY SURVEYS 13.1 Purpose and Scope Hydraulic surveys are required for flow analysis to determine bridge and culvert design characteristics. A hydraulic survey is usually but
More information580 - NOISE BARRIERS OPSS 580 INDEX
580 - OPSS 580 INDEX 580.1 GENERAL 580.1.1 Noise Barrier Design Elements 580.1.1.1 Wind-Load Designs 580.1.1.2 Sound-Absorptive Barriers 580.1.1.3 Noise Barrier Colour, Pattern and Texture 580.1.2 Grading
More informationAutoCAD 2016 for Civil Engineering Applications
Introduction to AutoCAD 2016 for Civil Engineering Applications Learning to use AutoCAD for Civil Engineering Projects Nighat Yasmin Ph.D. SDC P U B L I C AT I O N S Better Textbooks. Lower Prices. www.sdcpublications.com
More informationTo verify the laws of reflection of light using a plane mirror.
To verify the laws of reflection of light using a plane mirror. When light falls on a smooth polished surface, it gets reflected in a definite direction. Fig. 34.1 shows a ray of light PO, incident on
More informationDevelopment of Geoid Based Vertical Datums, A New Zealand Perspective
Technical Seminar Reference Frame in Practice, Development of Geoid Based Vertical Datums, A New Zealand Perspective Matt Amos Manager Positioning and Innovation Land Information New Zealand Sponsors:
More information