1 Process of directly or indirectly measuring vertical distances to determine the elevation of points or their differences in elevation Leveling results are used: To design highways, railroads, canals, sewers, water supply systems etc, having grade lines that best conform the existing topography; To lay out construction projects according to planned elevations; To calculate volume of earthworks and other materials; To investigate drainage characteristics of an area; Level Surface A curved surface which h is at any point perpendicular to the direction of gravity or the plumb line Level Line A curved line in a level surface, all points of which are normal to the direction of gravity and equidistant from the center of the earth Horizontal Surface A plane that is tangent to a level surface at a particular point. It is also perpendicular to the plumb line at the same point Production of topographic maps 1
2 Horizontal Line A straight line which is tangent to a level line at one point This line is perpendicular to the direction of gravity at the point of tangency Vertical Line A line parallel to the direction of gravity Mean Sea Level An imaginary surface of the sea which is midway between high and low tides It is taken as the reference surface to which most ground elevations are referred Zero elevation Datum Any convenient level surface coincident or parallel with mean sea level to which elevations of a particular area are referred Elevation The vertical distance above or below mean sea level or any other selected datum Difference in Elevation The vertical distance between the two level surfaces in which the points lie Geoid Serves as datum for elevations and astronomical observations 1. Direct or Spirit Leveling 2. Reciprocal Leveling 3. Profile Leveling 4. Trigonometric Leveling 5. Stadia Leveling 6. Barometric Leveling 7. Cross-Section Leveling 8. Borrow-Pit Leveling 2
3 Commonly employed method of determining the elevation of points some distance apart by a series of set ups of leveling instrument along a selected route Most precise method of leveling Used when a high degree of accuracy is required Vertical distances are measured above or below a level line and these values are used to compute the elevation of points or their differences in elevation Forms of direct leveling: Differential Leveling Double-Rodded Leveling Three-wire Leveling The process of accurately determining the difference in elevation between two intervisible points located at a considerable distance apart and between which points leveling could not be performed in the usual manner Commonly employed when leveling across canyons and gullies where it would be difficult or impossible to maintain a foresight and a backsight distance of nearly equal lengths Used to determine differences in elevation between points at designated short measured intervals along an established line to provide data from which h a vertical section of the ground surface can be plotted Best suits the requirements needed in the design of roads, railroads, canals, drainage systems and transmission lines 3
4 Employed in determining by trigonometric computations the difference in elevation between two points from measurements of its horizontal or slope distance and the vertical angle between the points Its degree of precision may be improved by using precise measurements such as optical theodolites and total geodetic stations which measure angles to seconds Combines features of direct leveling with those of trigonometric leveling. Any surveying instrument may be employed in stadia leveling as long as it has telescope to read vertical angles and is equipped with stadia hairs in addition to the standard cross hairs. Provide reasonable accuracy for preliminary surveys, mapping and rough leveling where quick measurements are needed Differences in elevation between points are computed from observed vertical angles and the 3-intercepts on a rod held at each point backsighted or foresighted Involves the determination of differences in elevation between points by measuring the variation in atmospheric pressure at each point by means of a barometer Depends on the basic principle that differences in elevation are proportional to the differences in atmospheric pressure Method of leveling wherein short profiles at right angles to the line of work are usually plotted at regular intervals for the purpose of obtaining a representation of the ground surface which is necessary in highway or railroad construction 4
5 Method of leveling wherein short profiles at right angles to the line of work are usually plotted at regular intervals for the purpose of obtaining a representation of the ground surface which is necessary in highway or railroad construction Wye Level Dumpy Level Builder s Level Automatic Level Tilting Level Digital Level Common components: Telescope Geodetic Level A telescope to create a line of sight and enable a reading to be taken on a graduated rod, and A system to orient the line of sight in a horizontal plane Transit Level vials Automatic compensators Level Vials Laser Level Hand Level 5
6 Leveling Rod / Staff A graduated rod which is used for measuring the vertical distance between the line of sight through a leveling instrument and the point whose elevation is either required or known Made of wood, fiberglass, metal Tripod Leveling instruments are all mounted on tripods Serve as a base to prevent movement of the instrument after it is set up 1. Instrumental Errors Instrument Out of Adjustment When the line of sight of the telescope is not parallel to the axis of the level vial When reading is taken on a rod, the result is an error consistently either plus or minus, and with a magnitude which is proportional to the distance between the instrument and the rod The error will also be greatly minimized i i or eliminated i if the backsight and foresight distances are kept nearly equal 1. Instrumental Errors Rod Not Standard d Length Usually due to imperfections in their manufacture. A rod of incorrect length will introduce a systematic error in leveling work. It is important that rod lengths are compared periodically with a standardized steel tape. 6
7 1. Instrumental Errors Defective Tripod The movement of the level due to settling of the tripod legs can cause possible errors in leveling work. The tripod usually settles in soft ground or due to vibrations caused by vehicular traffic. Smooth surfaces such as concrete pavements and steel plates should be avoided. 2. Personal Errors Bubble Not Centered Rod readings will be in error when the bubble is not centered in the level vial. Various conditions: tripod settling in soft ground; and factors which could all be attributed to carelessness on the part of the instrumentman. Parallax Causing relative displacement between the image of the cross hairs and the image formed by the focusing lens. 2. Personal Errors Faulty Rod Readings Usually the result of the length of sight, poor weather conditions, and the skill of the instrumentman and the rodman. Rod Held Not Plumb It is easy to determine if the rod is held plumb or not since it can be checked if it is held parallel to the vertical cross hair. This type of error can e avoided either by waving the rod or attaching a rod level to it to facilitate holding it plumb. 2. Personal Errors Incorrect Setting of Target Target may slip downward because it is not clamped firmly at the exact position signalled by the instrumentman. Unequal Backsight and Foresight Distances It is sufficient to approximate only by eye foresight and backsight distances in ordinary leveling work. 7
8 3. Natural Errors Curvature of the Earth The effect of the curvature of the Earth is to increase the rod reading Atmospheric Refraction Makes the rod appear unsteady when a sight is taken it. Temperature Variations Misreading the Rod Incorrect Recording Erroneous Computations Rod Not Fully Extended Moving Turning Points Wind Settlement of the Instrument Faulty Turning Points 8
Leveling. Double-Rodded Leveling. Illustrative Problem. Double-Rodded Leveling 8/17/2014
Double-Rodded Leveling Double-Rodded Leveling A method of determining the differences in elevation between points by employing two level routes simultaneously Two turning points are established such that
More informationdetermining the relative height of different
Levelling & Contouring Principle of levelling Principle:-The principle of levelling is to obtain horizontal line of sight with respect to which vertical distances of the points above or below this line
More informationLEVELING. Definitions
Definitions An elevation of a point : The vertical distance between the point and the reference level surface ( datum ),the most commonly used datum is the mean sea level (MSL ). Leveling : The process
More informationAims. -Heights, datums and bench marks. -Levelling equipment. -Field procedure for levelling. -Calculating reduced levels
Topic 2: Levelling Aims -Heights, datums and bench marks -Levelling equipment -Field procedure for levelling -Calculating reduced levels -Sources of error in levelling -Other levelling methods Levelling
More informationUNIT 4 LEVELLING 4.1 INTRODUCTION. Structure. 4.1 Introduction. 4.2 Definitions of Basic Terms 4.3 Basic Principle 4.4 Instruments and Equipment
UNIT 4 LEVELLING Levelling Structure 4.1 Introduction Objectives 4.2 Definitions of asic Terms 4.3 asic Principle 4.4 Instruments and Equipment 4.4.1 Different Types of Level 4.4.2 Levelling Staff 4.4.3
More informationSURVEYING 1 CE 215 CHAPTER -3-
Civil Engineering Department SURVEYING 1 CE 215 CHAPTER -3- PROFILE AND CROSS SECTION LEVELING 1 2 1 3 4 2 5 6 3 7 8 4 9 10 5 11 12 6 13 14 7 15 16 8 17 18 9 19 20 10 21 22 11 23 24 12 25 26 13 27 28 14
More informationFigure Sample field notes from cross-section leveling at first three stations shown in figure NAVEDTRA 14069A 15-26
method so that a point 100 feet away is within 1 foot of the true perpendicular. Measure elevations consisting of abrupt changes or breaks in the ground with a rod and level. Use a metallic tape to measure
More informationDepartment of Civil and Environmental Engineering
Department of Civil and Environmental Engineering CEE213L Surveying & Introduction to GIS Lab SURVEYING LABORATORY NORTH SOUTH UNIVERSITY Center of Excellence in Higher Education The First Private University
More informationSuveying Lectures for CE 498
Suveying Lectures for CE 498 SURVEYING CLASSIFICATIONS Surveying work can be classified as follows: 1- Preliminary Surveying In this surveying the detailed data are collected by determining its locations
More informationFACULTY OF CIVIL ENGINEERING & EARTH RESOURCES ENGINEERING SURVEY FIELDWORK. LEVELING (Standard Of Procedure)
FACULTY OF CIVIL ENGINEERING & EARTH RESOURCES ENGINEERING SURVEY FIELDWORK LEVELING (Standard Of Procedure) Subject Code Date Group Number Student Name & ID Number Group Member Name & ID Number 1 2 Lecturer
More information1. Features Calibration Compensator Lock Button Circular bubble Line-of-sight...10
CONTENTS 1. Features... 2 2. Using the instrument... 5 2.1 Setting Up and Centering the Bubble...5 2.2 Focusing the Instrument...6 2.3 Reading Measurements Using a Leveling Rod...7 2.3.1 Height Reading...7
More informationS.E. (Civil) (Second Semester) EXAMINATION, 2012 SURVEYING (2008 PATTERN) Time : Three Hours Maximum Marks : 100
Total No. of Questions 12] [Total No. of Printed Pages 8 Seat No. [4162]-108 S.E. (Civil) (Second Semester) EXAMINATION, 2012 SURVEYING (2008 PATTERN) Time : Three Hours Maximum Marks : 100 N.B. : (i)
More informationIAN HUMBY TEACHING. List of Hand-Outs. Levelling
IAN HUMBY TEACHING List of Hand-Outs Levelling 6-1 Equipment List (Levelling) 11-1 to 11-3 Introduction to Levelling 11-4 Levelling Terminology 12-1 to 12-2 Measuring Height Change by Basic Methods 13-1
More informationTo determine the difference in levels of points/objects. To determine the depth cutting and filling in engineering works.
UET-11-CE-SCET WAH SURVEYING-I Dumpy (Wye) Level LEVELLING: It is a surveying method used to determine the level of points/objects with reference to the selected datum. It is also used to set out engineering
More informationChapter 8. Electronic Survey Measurement. Dr. Maher A. El-Hallaq Lecturer of Surveying The Islamic University of Gaza
Chapter 8 Electronic Survey Measurement Dr. Maher A. El-Hallaq Lecturer of Surveying The Islamic University of Gaza Contents Introduction. Parts of a total station. Handling a total station. Total station
More informationInstruction Manual. Automatic Levels Model No , ,
4579H_Manuals 4/4/11 8:37 AM Page 1 Automatic Levels Model No. 40-6926, 40-6960, 40-6962 Instruction Manual Congratulations on your choice of this Automatic Level. We suggest you read this instruction
More informationContour An imaginary line on the ground surface joining the points of equal elevation is known as contour.
Contour An imaginary line on the ground surface joining the points of equal elevation is known as contour. In other words, contour is a line in which the ground surface is intersected by a level surface
More informationSurveying & Measurement. Detail Survey Topographic Surveying
Surveying & Measurement Detail Survey Topographic Surveying Introduction Mapping surveys are made to determine the relief of the earth s surface and locate critical points on it. to determine the locations
More informationENGI 3703 Surveying and Geomatics
Distance Measurement Errors (Chapter 6) We have reviewed at vertical distance measurement and identified errors associated with those. Now we turn to horizontal distance measurement. There are a number
More informationConstruction Surveying and Layout
Construction Surveying and Layout A Field Engineering Methods Manual Third Edition WESLEY G. CRAWFORD.CREATIVE CONSTRUCTION Creative Construction Publishing, Inc. 2720 South River Road West Lafayette,
More informationIntroduction to Surveying. Chapter -One-
Introduction to Surveying Chapter -One- 1 GENERAL INFORMATION FALL 2016 Assistant Lecturer : Asmaa Abdulmajeed Research Assistant: Zanyar Bazyan Course Title : Surveying 1 Course Code : CE 215 Class No
More informationSURVEYING I CENG 383
SURVEYING I CENG 383 9/21/2011 2 Introduction Definition An art of collecting data for mapping the relative positions of points above, below or on the surface of the earth. Surveying also includes the
More information10/9/2018. Introduction to Surveying. Chapter -One-
Introduction to Surveying Chapter -One- 1 GENERAL INFORMATION FALL 2018-2019 Assistant Lecturer : Asmaa Ab. Mustafa Research Assistant: Course Title : Surveying Course Code : ARCH 224 Class No : S. 203
More information1 Exam Prep Prov Module: Distance Measurement and Leveling Questions and Answers
1 Exam Prep Prov Module: 28306-05 Distance Measurement and Leveling Questions and Answers 1. Site layout involves extensive use of plans. A. Foundation B. Elevation C. Floor D. Plot 2. Contour lines are
More informationQUANTITY SURVEYS. Introduction
QUANTITY SURVEYS Introduction In engineering surveying, we often consider a route (road, sewer pipeline, channel, etc.) from three distinct perspectives. The plan view of route location is the same as
More informationIF YOU WERE GIVEN the task of installing a drainage
Applying Profile Leveling Techniques IF YOU WERE GIVEN the task of installing a drainage system, how would you determine the slope needed to keep the water flowing? Profile leveling is an option. As part
More informationFundamentals of Surveying (LE/ESSE )
Fundamentals of Surveying (LE/ESSE 2620 3.0) Lecture 4 Distance Measurement Dr.-Ing. Jianguo Wang Geomatics Engineering York University Fall 2017 1 4-1. Introduction 1. Concepts Distance measurements are
More informationQuestion bank. Unit 1: Introduction
Question bank Unit 1: Introduction 1. Define surveying. 2. State the objects of surveying 3. State and explain the principle of surveying 4. State and explain the classification of surveying 5. Differentiate
More informationEarth Sciences 089G Short Practical Assignment #4 Working in Three Dimensions
Earth Sciences 089G Short Practical Assignment #4 Working in Three Dimensions Introduction Maps are 2-D representations of 3-D features, the developers of topographic maps needed to devise a method for
More informationCHAPTER 2 GEODESY AND DATUMS IN NAVIGATION
CHAPTER 2 GEODESY AND DATUMS IN NAVIGATION GEODESY, THE BASIS OF CARTOGRAPHY 200. Definition Geodesy is the application of mathematics to model the size and shape of the physical earth, enabling us to
More informationThis Land Surveying course has been developed by. Failure & Damage Analysis, Inc.
This Land Surveying course has been developed by Failure & Damage Analysis, Inc. www.discountpdh.com www.pepdh.com Bridge Surveying SURVEYS Bridge surveying is necessary to locate a site, obtain information
More informationLecture # 7 Coordinate systems and georeferencing
Lecture # 7 Coordinate systems and georeferencing Coordinate Systems Coordinate reference on a plane Coordinate reference on a sphere Coordinate reference on a plane Coordinates are a convenient way of
More information32X AUTOMATIC LEVEL SL SI BUL /241 AL32 FATMAX
KITL32 32X UTOMTI LEVEL 32X UTOMTI LEVEL SL SI UL 1-77-238/241 L32 FTMX 5 6 7 Fig. 1 3 2 1 8 9 11 12 13 10 4 Fig. 2 2 L32 FTMX FETURES (Fig. 1) 1 ase Plate 2 Horizontal ircle 3 Horizontal ircle Reference
More informationAutoCAD 2016 for Civil Engineering Applications
Introduction to AutoCAD 2016 for Civil Engineering Applications Learning to use AutoCAD for Civil Engineering Projects Nighat Yasmin Ph.D. SDC P U B L I C AT I O N S Better Textbooks. Lower Prices. www.sdcpublications.com
More informationApplications and Setups
1 Applications and Setups Manhole stake This section describes three fundamentals for using the Model DG813/613 to install gravity flow pipe; they are Grade, Elevation, and Line otherwise known as G-E-L.
More informationELEMENTS OF CIVIL ENGINEERING (110004) MARKS DISTRIBUTION AND IMPORTANT QUESTIONS OF ALL THE UNITS
ELEMENTS OF CIVIL ENGINEERING (110004) MARKS DISTRIBUTION AND IMPORTANT QUESTIONS OF ALL THE UNITS Unit-1 SCOPE OF CIVIL ENGINEERING One or two Questions are generally asked from this Unit the weightage
More informationLesson 8: Surveying the Forest
Lesson 8: Surveying the Forest TEACHER: SCHOOL: GRADE LEVEL: 9-12 TASKS/COMPETENCIES ANR8046.172 Set up and operate a transit level and rod. ANR8046.173 Read a rod and a level to calculate slope. ANR8046.174
More informationCHAPTER 5 Vertical Control. CE 316 January 2012
CHAPTER 5 Vertical Control CE 316 January 01 137 5.1 Introduction Vertical Datums Leveling Techniques and Corrections Bench Mark Design and Construction Bench Mark Data Trigonometric Barometric Leveling
More informationCOSC 301 Construction Surveying & Layout Activity VI Transit; Existing Building (As built) and Vertical Angles
COSC 301 Construction Surveying & Layout Activity VI Transit; Existing Building (As built) and Vertical Angles Introduction 1. Review chapter 4 The Digital Transit and watch and understand chapter 5 Control
More informationPART XII: TOPOGRAPHIC SURVEYS
PART XII: TOPOGRAPHIC SURVEYS 12.1 Purpose and Scope The purpose of performing topographic surveys is to map a site for the depiction of man-made and natural features that are on, above, or below the surface
More informationAppendix III Graphs in the Introductory Physics Laboratory
Appendix III Graphs in the Introductory Physics Laboratory 1. Introduction One of the purposes of the introductory physics laboratory is to train the student in the presentation and analysis of experimental
More informationImportant Questions. Surveying Unit-II. Surveying & Leveling. Syllabus
Surveying Unit-II Important Questions Define Surveying and Leveling Differentiate between Surveying and Leveling. Explain fundamental Principles of Surveying. Explain Plain and Diagonal Scale. What is
More information1.6 Beam Wander vs. Image Jitter
8 Chapter 1 1.6 Beam Wander vs. Image Jitter It is common at this point to look at beam wander and image jitter and ask what differentiates them. Consider a cooperative optical communication system that
More informationREFLECTION THROUGH LENS
REFLECTION THROUGH LENS A lens is a piece of transparent optical material with one or two curved surfaces to refract light rays. It may converge or diverge light rays to form an image. Lenses are mostly
More informationSymmetrical Parabolic Curve In highway practice, abrupt change in the vertical direction of moving vehicles should be avoided. In order to provide
Symmetrical Parabolic Curve In highway practice, abrupt change in the vertical direction of moving vehicles should be avoided. In order to provide gradual change in its vertical direction, a parabolic
More informationCHAPTER 7 Total Station Surveying. CE 316 March 2012
CHAPTER 7 Total Station Surveying CE 316 March 2012 249 7.1 Introduction Total station surveying - defined as the use of electronic survey equipment used to perform horizontal and vertical measurements
More informationCONTOURS SURVEYING 1 CE 215 CHAPTER -3- Ishik University / Sulaimani Civil Engineering Department 12/7/2017. Ishik University / Sulaimani
Civil Engineering Department SURVEYING 1 CE 215 CHAPTER -3- CONTOURS 1 2 1 3 4 2 PURPOSE OF CONTOURING Contour survey is carried out at the starting of any engineering project such as a road, a railway,
More informationModule-2 Lecture-1 Angle plate, steel rule, spring calipers. (Refer Slide Time: 00:14)
Metrology Prof. Dr. Kanakuppi Sadashivappa Department of Industrial and Production Engineering Bapuji Institute of Engineering and Technology-Davangere Module-2 Lecture-1 Angle plate, steel rule, spring
More informationFigure 8-1 Layout equipment and tools. Tape measure. String line level. Eyepiece level. Laser plane level Delmar/Cengage Learning.
3 2 1 0 Tape measure String line level Clinometer Eyepiece level Transit Dumpy level Carpenter s or builder s level Electronic measurement Tool Laser plane level Figure 8-1 Layout equipment and tools.
More informationSample Copy. Not For Distribution.
Photogrammetry, GIS & Remote Sensing Quick Reference Book i EDUCREATION PUBLISHING Shubham Vihar, Mangla, Bilaspur, Chhattisgarh - 495001 Website: www.educreation.in Copyright, 2017, S.S. Manugula, V.
More informationNodal Ninja SPH-1 User Manual
Nodal Ninja SPH-1 User Manual Nodal Ninja SPH-1 is a professional spherical bracket (360 degree pano bracket) for taking panoramic still images or virtual tours. It supports cameras with tripod mount under
More informationDTM-952R Windows CE Total Station SMART MAX GEOSYSTEMS CO., LTD
DTM-952R Windows CE Total Station SMART MAX GEOSYSTEMS CO., LTD Forward... 1 1 Descriptions and functions of components of the instrument... 3 1.1 Component descriptions... 3 1.2 Display... 5 1.2.1 Main
More informationInstructors Manual. for. Construction Surveying and Layout. Third Edition. Part One - Surveying Field Practices. Chapters 1-10.
Instructors Manual for Construction Surveying and Layout Third Edition Part One - Surveying Field Practices Chapters 1-10 Prepared by Wesley G. Crawford TABLE OF CONTENTS Chapter 1 - Construction Surveying...
More informationTopographic Maps. Contour Lines
Topographic Maps Our first task today will consist of locating ourselves with the help of a topographic map. GPS units that can tell you the location of any Dunkin' Donuts within a five mile radius. Paper
More informationCOPYRIGHTED MATERIAL. Contours and Form DEFINITION
1 DEFINITION A clear understanding of what a contour represents is fundamental to the grading process. Technically defined, a contour is an imaginary line that connects all points of equal elevation above
More informationEngineering Surveying -1 CE212 Contouring Lectures. Lecture 2016, November 29 th Muhammad Noman
Engineering Surveying -1 CE212 Contouring Lectures Lecture 2016, November 29 th Muhammad Noman Contour An Imaginary line on the ground surface joining the points of equal elevation is known as contour.
More informationGeodesy, Geographic Datums & Coordinate Systems
Geodesy, Geographic Datums & Coordinate Systems What is the shape of the earth? Why is it relevant for GIS? 1/23/2018 2-1 From Conceptual to Pragmatic Dividing a sphere into a stack of pancakes (latitude)
More informationInstructors Manual for Construction Surveying and Layout Third Edition Part Three - Applications Chapters Prepared by Wesley G.
Instructors Manual for Construction Surveying and Layout Third Edition Part Three - Applications Chapters 19-22 Prepared by Wesley G. Crawford TABLE OF CONTENTS Chapter 19 - Layout Techniques... 3 Chapter
More informationCONTRACT PLANS READING
CONTRACT PLANS READING A training course developed by the FLORIDA DEPARTMENT OF TRANSPORTATION This 2009 revision was carried out under the direction of Ralph Ellis, P. E., Associate Professor of Civil
More informationThis Land Surveying course has been developed by. Failure & Damage Analysis, Inc. Earthwork
This Land Surveying course has been developed by Failure & Damage Analysis, Inc. www.discountpdh.com www.pepdh.com Earthwork CHAPTER 4 EARTHWORK Section I. PLANNING OF EARTHWORK OPERATIONS IMPORTANCE In
More informationHours / 100 Marks Seat No.
17419 21314 3 Hours / 100 Seat No. Instructions (1) All Questions are Compulsory. (2) Answer each next main Question on a new page. (3) Illustrate your answers with neat sketches wherever necessary. (4)
More informationDetermining the Relationship Between the Range and Initial Velocity of an Object Moving in Projectile Motion
Determining the Relationship Between the Range and Initial Velocity of an Object Moving in Projectile Motion Sadaf Fatima, Wendy Mixaynath October 07, 2011 ABSTRACT A small, spherical object (bearing ball)
More informationCHAPTER 2C - PRELIMINARY DESIGN. General... 2C-1. Review of Work Load... 2C-2 Establishing Priorities... 2C-2
SECTION 2C - 1 - PROJECT REVIEW CHAPTER 2C - PRELIMINARY DESIGN General... 2C-1 SECTION 2C - 2 - COORDINATING TIME SCHEDULES Review of Work Load... 2C-2 Establishing Priorities... 2C-2 SECTION 2C 3 - REVIEW
More informationPractice Problems (Geometrical Optics)
1 Practice Problems (Geometrical Optics) 1. A convex glass lens (refractive index = 3/2) has a focal length of 8 cm when placed in air. What is the focal length of the lens when it is immersed in water
More informationLeica Sprinter Go ahead... Push the button
Sprinter Go ahead... Push the button Sprinter 50 Aim, Push the utton, Read Dust and waterproof Compact and lightweight design Error-free height and distance results Single button operation Out of level
More information3. Product Instruction. 3.1 External Components
INDEX INDEX... 0 1. Preface... 1 2. Precautions... 2 3. Product Instruction... 3 3.1 External Components... 3 3.2 Display And Keypad... 4 4. Specifications Check And Adjustment... 5 4.1 Plat Vial... 5
More informationGUJARAT TECHNOLOGICAL UNIVERSITY, AHMEDABAD, GUJARAT COURSE CURRICULUM. Course Title: Surveying (Code: )
GUJARAT TECHNOLOGICAL UNIVERSITY, AHMEDABAD, GUJARAT COURSE CURRICULUM Course Title: Surveying (Code: 3330605) Diploma Programme in which this course is offered Civil /Mining/ Environmental/Transportation
More informationVertical Shaft Plumbness Using a Laser Alignment System. By Daus Studenberg, Ludeca, Inc.
ABSTRACT Vertical Shaft Plumbness Using a Laser Alignment System By Daus Studenberg, Ludeca, Inc. Traditionally, plumbness measurements on a vertical hydro-turbine/generator shaft involved stringing a
More informationGOVERNMENT POLYTECHNIC MUZAFFARPUR
GOVERNMENT POLYTECHNIC MUZAFFARPUR CIVIL ENGINEERING DEPARTMENT 3 RD SEM SURVEYING LAB MANNUAL SUBJECT CODE-160150306 Government Polytechnic Muzaffarpur EXPERIMENT NO- 1 AIM: Measurement of distance by
More informationCITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS
CITY OF LA MARQUE CHAPTER 2 -------------------------------------------- GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS CHAPTER 2 ------------------------------------------------
More informationLocating the House on the Building Site
9 Locating the House on the Building Site Section 9.1 Basic Site Layout Section 9.2 Establishing Lines & Grades Chapter Objectives After completing this chapter, you will be able to: Create a simple building
More informationnot to be republished NCERT Introduction To Aerial Photographs Chapter 6
Chapter 6 Introduction To Aerial Photographs Figure 6.1 Terrestrial photograph of Mussorrie town of similar features, then we have to place ourselves somewhere in the air. When we do so and look down,
More informationLocation of Structure on Site
Chapter 1 Location of Structure on Site A number of factors affect the location of a structure on a site, as well as the type of building that may be erected. Once the site is chosen, different methods
More informationLEA_IT_COD High precision Optical Collimator. Instruments and Systems for Geotechnical and Structural Monitoring
LEA_IT_COD1101100 High precision Optical Collimator LEA_IT_COD1101100 High precision Optical Collimator Description _ The optical alignment collimator is an instrument produced by Pizzi Instruments and
More informationLINEAR EQUATIONS IN TWO VARIABLES
LINEAR EQUATIONS IN TWO VARIABLES What You Should Learn Use slope to graph linear equations in two " variables. Find the slope of a line given two points on the line. Write linear equations in two variables.
More informationBASIC TERMS OF ROAD GEOMETRY
BASIC TERMS OF ROAD GEOMETRY Contour line = a line, which connects terrain points of the same elevation Contour line interval (equidistance) = elevation difference between contour lines Line of maximum
More informationGeometric Dimensioning and Tolerancing
Geometric dimensioning and tolerancing (GDT) is Geometric Dimensioning and Tolerancing o a method of defining parts based on how they function, using standard ASME/ANSI symbols; o a system of specifying
More informationSupplementary Notes to. IIT JEE Physics. Topic-wise Complete Solutions
Supplementary Notes to IIT JEE Physics Topic-wise Complete Solutions Geometrical Optics: Focal Length of a Concave Mirror and a Convex Lens using U-V Method Jitender Singh Shraddhesh Chaturvedi PsiPhiETC
More informationChapter 2 Levelling 2.1 Introductory Remarks
Chapter 2 Levelling 2.1 Introductory Remarks This Chapter introduces you to the theory and practical skills of levelling, a process of determining elevations (heights) or differences in elevations. It
More informationSlope analysis & Grading. Earth shape and earthwork Topographic map Slope form Slope analysis Grading
6 Slope analysis & Grading Earth shape and earthwork Topographic map Slope form Slope analysis Grading 81 Topographic Map Topographic Contour map Topographic contour map are composed of a series of line
More informationModule-4 Lecture-2 Perpendicularity measurement. (Refer Slide Time: 00:13)
Metrology Prof. Dr. Kanakuppi Sadashivappa Department of Industrial and Production Engineering Bapuji Institute of Engineering and Technology-Davangere Module-4 Lecture-2 Perpendicularity measurement (Refer
More informationCITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS
CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE E-10 ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS The City of Lompoc has determined that the Engineering Division should administer and issue Encroachment
More informationSurvey Requirements. Design Guidelines and Standards. June Office of the University Architect
Design Guidelines and Standards Survey Requirements June 2004 Office of the University Architect Construction Management P.O. Box 210181 Cincinnati, Ohio 45221-0181 Table of Contents Survey Requirements
More informationSURVEYING FOR ENGINEERS
SURVEYING FOR ENGINEERS Also from The Macmillan Press An Introduction to Engineering Fluid Mechanics, Second Edition J. A. Fox Civil Engineering Materials edited by N. Jackson Reinforced Concrete Design
More informationRelief Displacement of Vertical Features
G 210 Lab. Relief Displacement of Vertical Features An increase in the elevation of a feature causes its position on the photograph to be displaced radially outward from the principle point. Hence, when
More informationProperties of Structured Light
Properties of Structured Light Gaussian Beams Structured light sources using lasers as the illumination source are governed by theories of Gaussian beams. Unlike incoherent sources, coherent laser sources
More informationCHAPTER 2 GEODESY AND DATUMS IN NAVIGATION
CHAPTER 2 GEODESY AND DATUMS IN NAVIGATION GEODESY, THE BASIS OF CARTOGRAPHY 200. Definition Geodesy is the science concerned with the exact positioning of points on the surface of the earth. It also involves
More informationSAY- A LASER LEVELING TOOL
SAY- A LASER LEVELING TOOL 1 YASH JAGTAP, 2 ABHISHEK JADHAV, 3 SAISH BHALERAO, 4 BHANUDAS ABHALE, 5 M. V. RAO 1,2,3,4,5 Sandip Polytechnic, Nashik Abstract SAY is a laser level which eliminates temporary
More informationNSPS SURVEY TECHNICIAN CERTIFICATION PROGRAM LEVEL I SAMPLE EXAMINATION QUESTIONS ANSWERS & GUIDE
NSPS SURVEY TECHNICIAN CERTIFICATION PROGRAM LEVEL I SAMPLE EXAMINATION QUESTIONS ANSWERS & GUIDE NATIONAL SOCIETY OF PROFESSIONAL SURVEYORS Revised July 2018 1 This booklet has been prepared to provide
More informationEngineering Surveying -1 CE212 Chain Survey
Engineering Surveying -1 CE212 Chain Survey Lecture 2016, September 26-27 Muhammad Noman Chain Survey Chain survey is the simplest method of surveying. In this survey only measurements are taken in the
More informationPRINCIPLE PROCEDURE ACTIVITY. AIM To observe diffraction of light due to a thin slit.
ACTIVITY 12 AIM To observe diffraction of light due to a thin slit. APPARATUS AND MATERIAL REQUIRED Two razor blades, one adhesive tape/cello-tape, source of light (electric bulb/ laser pencil), a piece
More informationForeword Description of All Parts Battery pack and Charging Initial Setting Preparation for Measurement...
Foreword... 1 1 Description of All Parts... 3 1.1 Name of Parts...3 1.2 Display...5 1.3 Operation Key...6 1.4 Function Keys (soft keys)...6 1.5 Star Key ( ) Mode...8 2 Battery pack and Charging... 12 2.1
More informationCITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST
CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil ing Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST The following checklist consists of the minimum requirements for preparation
More informationPhysics 1411 Telescopes Lab
Name: Section: Partners: Physics 1411 Telescopes Lab Refracting and Reflecting telescopes are the two most common types of telescopes you will find. Each of these can be mounted on either an equatorial
More informationREVIEW TOPICS CEEN 2320 FINAL EXAM
REVIEW TOPICS CEEN 2320 FINAL EXAM Be familiar with all materials covered in class, your class handouts and the notes you took in class, your homework assignments, test questions, formulas, tables, figures.
More informationWaves & Oscillations
Physics 42200 Waves & Oscillations Lecture 33 Geometric Optics Spring 2013 Semester Matthew Jones Aberrations We have continued to make approximations: Paraxial rays Spherical lenses Index of refraction
More informationUse the Point-Slope Form to Write the Equation of a Line
Math 90 8.3 "Writing Equations of Lines" Objectives: * Use the point-slope form to write the equation of a line. * Use the slope-intercept form to write the equation of a line. * Use slope as an aid when
More informationDesign of control network and survey for CSNS. Accelerator center of IHEP Wang tong, Li bo
Design of control network and survey for CSNS Accelerator center of IHEP Wang tong, Li bo 2012.09.11 Contents 1 Project Overview 2 Design of the Primary Control Network 3 Survey Scheme for the Surface
More informationDT8-05 Series Owner s Guide
DT8-05 Series Owner s Guide DT8-05P DT8-05LP DT8-05LS O % FOR CUSTOMER SERICE, PARTS AND REPAIR CALL (765) 581-4097 www.davidwhite.com IMPORTANT: IMPORTANT : IMPORTANTE: Read Before Using Lire avant usage
More informationAC : THE PEDAGOGY OF THE SURVEYING LABORATORY
C 2008-724: THE PEDGOGY OF THE URVEYING LBORTORY Philip Brach, University of the District of Columbia PHILIP L. BRCH, PH.D., P.E., F-NPE Distinguished Professor (Emeritus), former Dean, Past President,
More information