Figure 8-1 Layout equipment and tools. Tape measure. String line level. Eyepiece level. Laser plane level Delmar/Cengage Learning.

Size: px
Start display at page:

Download "Figure 8-1 Layout equipment and tools. Tape measure. String line level. Eyepiece level. Laser plane level Delmar/Cengage Learning."

Transcription

1 Tape measure String line level Clinometer Eyepiece level Transit Dumpy level Carpenter s or builder s level Electronic measurement Tool Laser plane level Figure 8-1 Layout equipment and tools.

2 Figure 8-2 Determining slope by holding a level board from the high point and measuring from the bottom of the board to the low point.

3 Figure 8-3 Using a clinometer to measure the angle of a slope.

4 5' 5' 5' Project area Project location to be staked 5' Construction stakes placed same distance and direction from project location Figure 8-4 Staking with offsets to reduce restaking time.

5 A. Measure the distance to unknown point from known Points A and B. B. Draw arcs for both distance A and B. Unknown point is where arcs intersect. 20' 20' Unknown point C Known point B C B 23' Known point A Step A 23' A Basemap Step B Figure 8-5 Locating objects using triangulation.

6 5' 5' 2" 5' 1" 4' 4' 2" 5' 0" 3' 11" 3' 10" 5' 4' 11" 4' 10" 4' Hold tapes at beginning and second points. Where 4' on tape from beginning point and 5' on tape from second point intersect, a right angle is formed. Beginning point 90 Measure 3' Second point Figure 8-6 Using a 3,4,5 triangle to turn right angles.

7 Stretch tapes from each point. Where equal measurements cross a right angle is formed 90 Measure equal distance from center line Figure 8-7 Layout of a perpendicular line using the triangler method.

8 Equal diagonal measurements indicate object is square Figure 8-8 Checking for square using diagonal measurements.

9 Tape measure Desired curve Rotate desired measurement Anchor end of tape with screwdriver Figure 8-9 Layout of curves using a large screwdriver anchored at the center point and swinging a tape measure to mark the correct radius. Mark the radius as the tape is moved.

10 Turn right angle and extend line Mark radius point Measure radius distance Mark angle point Radius point Extend line from radius point through angle point the distance of the radius. Mark the ending point Measure curve angle Beginning point Straight line (tangent) of curve A. B. Anchor tape measure at radius point with screwdriver Ending point New tangent at right angle to 2nd line Radius point New curve would begin at ending point Ending point Beginning point Swing tape from beginning point to ending point, marking curve as you C. move D. Curve Figure 8-10 Locating radius points and marking a radius for curves.

11 RADIUS END OF CURVE CHORD RADIUS POINT NEXT CURVE BEGINNING OF CURVE PLAN VIEW ARC SWUNG FOR RADIUS BEGINNING POINT OF CURVE TAPE LAID OUT ALONG CHORD PERSPECTIVE VIEW END OF CURVE, WHERE CHORD MEASUREMENT AND RADIUS ARC INTERSECT TAPE LAID OUT ALONG RADIUM RADIUS POINT Figure 8-11 Using radii and chords to lay out circles.

12 A. Proposed improvements C. Locate baseline in field Tree Wall Baseline Scale Beginning point B. Locate improvements on plan D. Locate improvements in the field Baseline Tree Wall end Wall center Wall end Beginning point Beginning point Baseline Measurements at right angle to baseline Tree Wall end Wall center Wall end Figure 8-12 Using a baseline to locate improvements in the field.

13 Stakes Project boundary A. Nails to hold stringlines Cross pieces Stakes B. Project boundary Stringline above boundary Figure 8-13 Constructing batterboards. (A) Install posts outside the project edges and straddling the boundaries. (B) Attach cross pieces and lines marking project boundaries. Height of the cross pieces can be set to project elevations if you want to locate boundaries and elevations with the same batterboards.

14 Figure 8-14 Leveling a survey instrument. Always turn the leveling screws in opposite directions.

15 Figure 8-15 Focusing a survey instrument. Use caution not to bump the instrument out of level.

16 A B C 8.4 X 100 Benchmark Y Elevation: Elev Elev Surveyors Notes: Point BM Backsite 4.2 (A) H.I Foresite 6.1 (B) 8.4 (C) Elevation Readings on surveyor s rod A H.I B Level viewing plane C Benchmark Elevation: X Elev Y Benchmark Backsite A Height of instrument Foresite B Elevation of point X Foresite C Elevation of point Y (H.I. Foresite B) ( = 98.1) (H.I. Foresite C) ( = 95.8) Elev Figure 8-16 Performing elevation calculations. The surveyor s notes and calculations are shown above the figure.

17 Figure 8-17 Cut markings on a grade stake. This stake shows a cut of 1.6 feet below existing grade (existing grade is indicated by the markings at the bottom of the stake).

18 Figure 8-18 Flagging of proposed plantings to review placement.

Instructors Manual for Construction Surveying and Layout Third Edition Part Three - Applications Chapters Prepared by Wesley G.

Instructors Manual for Construction Surveying and Layout Third Edition Part Three - Applications Chapters Prepared by Wesley G. Instructors Manual for Construction Surveying and Layout Third Edition Part Three - Applications Chapters 19-22 Prepared by Wesley G. Crawford TABLE OF CONTENTS Chapter 19 - Layout Techniques... 3 Chapter

More information

Construction Surveying and Layout

Construction Surveying and Layout Construction Surveying and Layout A Field Engineering Methods Manual Third Edition WESLEY G. CRAWFORD.CREATIVE CONSTRUCTION Creative Construction Publishing, Inc. 2720 South River Road West Lafayette,

More information

Suveying Lectures for CE 498

Suveying Lectures for CE 498 Suveying Lectures for CE 498 SURVEYING CLASSIFICATIONS Surveying work can be classified as follows: 1- Preliminary Surveying In this surveying the detailed data are collected by determining its locations

More information

1 Exam Prep Prov Module: Distance Measurement and Leveling Questions and Answers

1 Exam Prep Prov Module: Distance Measurement and Leveling Questions and Answers 1 Exam Prep Prov Module: 28306-05 Distance Measurement and Leveling Questions and Answers 1. Site layout involves extensive use of plans. A. Foundation B. Elevation C. Floor D. Plot 2. Contour lines are

More information

How to Design a Geometric Stained Glass Lamp Shade

How to Design a Geometric Stained Glass Lamp Shade This technique requires no calculation tables, math, or angle computation. Instead you can use paper & pencil with basic tech drawing skills to design any size or shape spherical lamp with any number of

More information

COSC 301 Construction Surveying & Layout Activity VI Transit; Existing Building (As built) and Vertical Angles

COSC 301 Construction Surveying & Layout Activity VI Transit; Existing Building (As built) and Vertical Angles COSC 301 Construction Surveying & Layout Activity VI Transit; Existing Building (As built) and Vertical Angles Introduction 1. Review chapter 4 The Digital Transit and watch and understand chapter 5 Control

More information

Version 1.0 English. Leica Builder Series How to Guide, Add-On

Version 1.0 English. Leica Builder Series How to Guide, Add-On Version 1.0 English Leica Builder Series How to Guide, Add-On Builder, Table of Contents To use the product in a permitted manner, please refer to the detailed safety instructions in the User Manual. 2

More information

h r c On the ACT, remember that diagrams are usually drawn to scale, so you can always eyeball to determine measurements if you get stuck.

h r c On the ACT, remember that diagrams are usually drawn to scale, so you can always eyeball to determine measurements if you get stuck. ACT Plane Geometry Review Let s first take a look at the common formulas you need for the ACT. Then we ll review the rules for the tested shapes. There are also some practice problems at the end of this

More information

Thinking Irregularly. Timber Framers Guild Eastern Conference Roanoke, Virginia November 9, 2006

Thinking Irregularly. Timber Framers Guild Eastern Conference Roanoke, Virginia November 9, 2006 Thinking Irregularly Timber Framers Guild Eastern Conference Roanoke, Virginia November 9, 2006 Basic information Main Roof slope is 9 : 12 Adjacent Roof slope is 10-1/2 : 12 Run of main roof is 12 The

More information

Metal Fab 2017 Continuing Education. Field measuring tips & techniques

Metal Fab 2017 Continuing Education. Field measuring tips & techniques Metal Fab 2017 Continuing Education Field measuring tips & techniques Class objectives Things to be looking for when field measuring Seeing the field measure / design through the eyes of the fabricator,

More information

Location of Structure on Site

Location of Structure on Site Chapter 1 Location of Structure on Site A number of factors affect the location of a structure on a site, as well as the type of building that may be erected. Once the site is chosen, different methods

More information

This Land Surveying course has been developed by. Failure & Damage Analysis, Inc.

This Land Surveying course has been developed by. Failure & Damage Analysis, Inc. This Land Surveying course has been developed by Failure & Damage Analysis, Inc. www.discountpdh.com www.pepdh.com Bridge Surveying SURVEYS Bridge surveying is necessary to locate a site, obtain information

More information

Special Right Triangles and Right Triangle Trigonometry

Special Right Triangles and Right Triangle Trigonometry Special Right Triangles and Right Triangle Trigonometry Reporting Category Topic Triangles Investigating special right triangles and right triangle trigonometry Primary SOL G.8 The student will solve real-world

More information

Department of Civil and Environmental Engineering

Department of Civil and Environmental Engineering Department of Civil and Environmental Engineering CEE213L Surveying & Introduction to GIS Lab SURVEYING LABORATORY NORTH SOUTH UNIVERSITY Center of Excellence in Higher Education The First Private University

More information

Name No. Geometry 9-3 1) Complete the table: Name No. Geometry 9-1 1) Name a secant. Name a diameter. Name a tangent. Name No. Geometry 9-2 1) Find JK

Name No. Geometry 9-3 1) Complete the table: Name No. Geometry 9-1 1) Name a secant. Name a diameter. Name a tangent. Name No. Geometry 9-2 1) Find JK Geometry 9-1 1) Name a secant 1) Complete the table: Name a diameter Name a tangent Geometry 9-2 1) Find JK 2) Find the measure of 1 Geometry 9-2 2) 3) At 2:00 the hands of a clock form an angle of 2)

More information

1 st Subject: 2D Geometric Shape Construction and Division

1 st Subject: 2D Geometric Shape Construction and Division Joint Beginning and Intermediate Engineering Graphics 2 nd Week 1st Meeting Lecture Notes Instructor: Edward N. Locke Topic: Geometric Construction 1 st Subject: 2D Geometric Shape Construction and Division

More information

Tapered or Conical Tee

Tapered or Conical Tee TRADE OF Industrial Insulation PHASE 2 Module 2 Geometry & Pattern Development UNIT: 9 Produced by In cooperation with subject matter expert: Michael Kelly SOLAS 2014 Table of Contents Unit Objective...

More information

Technical Graphics Higher Level

Technical Graphics Higher Level Coimisiún na Scrúduithe Stáit State Examinations Commission Junior Certificate Examination 2005 Technical Graphics Higher Level Marking Scheme Sections A and B Section A Q1. 12 Four diagrams, 3 marks for

More information

Trade of Metal Fabrication. Module 6: Fabrication Drawing Unit 13: Parallel Line Development Phase 2

Trade of Metal Fabrication. Module 6: Fabrication Drawing Unit 13: Parallel Line Development Phase 2 Trade of Metal Fabrication Module 6: Fabrication Drawing Unit 13: Parallel Line Development Phase 2 Table of Contents List of Figures... 4 List of Tables... 5 Document Release History... 6 Module 6 Fabrication

More information

Locating the House on the Building Site

Locating the House on the Building Site 9 Locating the House on the Building Site Section 9.1 Basic Site Layout Section 9.2 Establishing Lines & Grades Chapter Objectives After completing this chapter, you will be able to: Create a simple building

More information

Industrial Insulation PHASE 2 Module 2 Geometry & Pattern Development UNIT: 11 Valves & Flanges

Industrial Insulation PHASE 2 Module 2 Geometry & Pattern Development UNIT: 11 Valves & Flanges TRADE OF Industrial Insulation PHASE 2 Module 2 Geometry & Pattern Development UNIT: 11 Produced by In cooperation with subject matter expert: Michael Kelly SOLAS 2014 Table of Contents Unit Objective...

More information

Installation Fence Guide Kodiak Iron. Exceptional Fencing Extraodinary Customer Service

Installation Fence Guide Kodiak Iron. Exceptional Fencing Extraodinary Customer Service Installation Fence Guide Kodiak Iron Exceptional Fencing Extraodinary Customer Service Kodiak Fence System Installation Guide Thank you for the purchasing the Kodiak Fence System. Fence installation is

More information

Question bank. Unit 1: Introduction

Question bank. Unit 1: Introduction Question bank Unit 1: Introduction 1. Define surveying. 2. State the objects of surveying 3. State and explain the principle of surveying 4. State and explain the classification of surveying 5. Differentiate

More information

Crime Scene Diagramming: Back to Basics

Crime Scene Diagramming: Back to Basics Crime Scene Diagramming: Back to Basics Kent E. Boots It is quite common in crime scene reconstruction for some type of analysis, e.g., trajectory, blood spatter, etc., to be based on measurements taken

More information

Chapter 1. Beam and Sill Plates

Chapter 1. Beam and Sill Plates Chapter 1. Beam and Sill Plates 1.1 ESTABLISHING SQUARE SILL PLATE CHALK LINES 1.2 INSTALLING TREATED SILL PLATES 1.3 INSTALLING LAMINATE BEAM Tools needed by volunteers: Hammer Nail apron Tape measure

More information

Chapter 2 Using Drawing Tools & Applied Geometry

Chapter 2 Using Drawing Tools & Applied Geometry Chapter 2 Using Drawing Tools & Applied Geometry TOPICS Preparation of Tools. Using of Tools Applied Geometry PREPARATION OF TOOLS Fastening Paper to Drafting Board 1. Place the paper close to the table

More information

Surface Developments. Sacramento City College Engineering Design Technology. Surface Developments 1

Surface Developments. Sacramento City College Engineering Design Technology. Surface Developments 1 Surface Developments Sacramento City College Engineering Design Technology Surface Developments 1 Surface Developments A surface development is a full-size layout of an object made on a single flat plane.

More information

Unit 4: Geometric Construction (Chapter4: Geometry For Modeling and Design)

Unit 4: Geometric Construction (Chapter4: Geometry For Modeling and Design) Unit 4: Geometric Construction (Chapter4: Geometry For Modeling and Design) DFTG-1305 Technical Drafting Instructor: Jimmy Nhan OBJECTIVES 1. Identify and specify basic geometric elements and primitive

More information

6.00 Trigonometry Geometry/Circles Basics for the ACT. Name Period Date

6.00 Trigonometry Geometry/Circles Basics for the ACT. Name Period Date 6.00 Trigonometry Geometry/Circles Basics for the ACT Name Period Date Perimeter and Area of Triangles and Rectangles The perimeter is the continuous line forming the boundary of a closed geometric figure.

More information

Geometry. Practice Pack

Geometry. Practice Pack Geometry Practice Pack WALCH PUBLISHING Table of Contents Unit 1: Lines and Angles Practice 1.1 What Is Geometry?........................ 1 Practice 1.2 What Is Geometry?........................ 2 Practice

More information

Legal Description & Site Plan Requirements and Layouts

Legal Description & Site Plan Requirements and Layouts Legal Description & Site Plan Requirements and Layouts Plot Plan * A plot plan shows the location of a house from an aerial view. * The site plan, also known as a plot or lot plan includes: 1. Site plan

More information

Sketching Fundamentals

Sketching Fundamentals Sketching Fundamentals Learning Outcome When you complete this module you will be able to: Make basic engineering sketches of plant equipment. Learning Objectives Here is what you will be able to do when

More information

CENTER WING SECTION (CWS) WORK REPORT

CENTER WING SECTION (CWS) WORK REPORT CENTER WING SECTION (CWS) WORK REPORT No. Check Parts / Description Qty PHASE 1: Preparations 1 [ ] 6V1-3 Rear ribs 2R & 2L 1 [ ] L Angle 6 2 [ ] 6V2-1 Rear Ribs.032 2R & 2L 2 [ ] 6V5-1 Gear Rib Doubler

More information

An Introduction to Dimensioning Dimension Elements-

An Introduction to Dimensioning Dimension Elements- An Introduction to Dimensioning A precise drawing plotted to scale often does not convey enough information for builders to construct your design. Usually you add annotation showing object measurements

More information

9.1 and 9.2 Introduction to Circles

9.1 and 9.2 Introduction to Circles Date: Secondary Math 2 Vocabulary 9.1 and 9.2 Introduction to Circles Define the following terms and identify them on the circle: Circle: The set of all points in a plane that are equidistant from a given

More information

Chapter 3. Wall Layout

Chapter 3. Wall Layout GFCAHFH March 15, 2018 Construction Manual Version 18.0 Chapter 3. Wall Layout 3.1 LAYING OUT EXTERIOR WALLS 3.2 CUTTING EXTERIOR WALL PLATES 3.3 MARKING WINDOW AND DOOR LOCATIONS ON EXTERIOR WALL PLATES

More information

June 2016 Regents GEOMETRY COMMON CORE

June 2016 Regents GEOMETRY COMMON CORE 1 A student has a rectangular postcard that he folds in half lengthwise. Next, he rotates it continuously about the folded edge. Which three-dimensional object below is generated by this rotation? 4) 2

More information

Swanton Pacific Railroad Track Manual

Swanton Pacific Railroad Track Manual Swanton Pacific Railroad Track Manual By E. J. Carnegie January 2003 This manual is dedicated to Elmer Stone for the many years that he worked, taught, and directed the track operations of the Swanton

More information

Engineering Graphics, Class 5 Geometric Construction. Mohammad I. Kilani. Mechanical Engineering Department University of Jordan

Engineering Graphics, Class 5 Geometric Construction. Mohammad I. Kilani. Mechanical Engineering Department University of Jordan Engineering Graphics, Class 5 Geometric Construction Mohammad I. Kilani Mechanical Engineering Department University of Jordan Conic Sections A cone is generated by a straight line moving in contact with

More information

What role does the central angle play in helping us find lengths of arcs and areas of regions within the circle?

What role does the central angle play in helping us find lengths of arcs and areas of regions within the circle? Middletown Public Schools Mathematics Unit Planning Organizer Subject Geometry Grade/Course 10 Unit 5 Circles and other Conic Sections Duration 16 instructional + 4 days for reteaching/enrichment Big Idea

More information

Page 1 part 1 PART 2

Page 1 part 1 PART 2 Page 1 part 1 PART 2 Page 2 Part 1 Part 2 Page 3 part 1 Part 2 Page 4 Page 5 Part 1 10. Which point on the curve y x 2 1 is closest to the point 4,1 11. The point P lies in the first quadrant on the graph

More information

3 Kevin s work for deriving the equation of a circle is shown below.

3 Kevin s work for deriving the equation of a circle is shown below. June 2016 1. A student has a rectangular postcard that he folds in half lengthwise. Next, he rotates it continuously about the folded edge. Which three-dimensional object below is generated by this rotation?

More information

SEMI-PRIVACY PANEL AND GATE INSTALLATION INSTRUCTIONS

SEMI-PRIVACY PANEL AND GATE INSTALLATION INSTRUCTIONS SEMI-PRIVACY PANEL AND GATE INSTALLATION INSTRUCTIONS 1 BEFORE YOU START, IT S IMPORTANT TO CHECK: That fence or the fence post footings do not exceed your lot lines of your property. If you can locate

More information

MODELING AND DESIGN C H A P T E R F O U R

MODELING AND DESIGN C H A P T E R F O U R MODELING AND DESIGN C H A P T E R F O U R OBJECTIVES 1. Identify and specify basic geometric elements and primitive shapes. 2. Select a 2D profile that best describes the shape of an object. 3. Identify

More information

Automated Machine Guidance

Automated Machine Guidance Design Manual Chapter 5 - Roadway Design 5H - Automated Machine Guidance 5H-1 Automated Machine Guidance A. Concept Automated machine guidance (AMG) for grading is a process in which grading equipment,

More information

We will study all three methods, but first let's review a few basic points about units of measurement.

We will study all three methods, but first let's review a few basic points about units of measurement. WELCOME Many pay items are computed on the basis of area measurements, items such as base, surfacing, sidewalks, ditch pavement, slope pavement, and Performance turf. This chapter will describe methods

More information

Cigar Box Guitar Instructors Guide

Cigar Box Guitar Instructors Guide Building the Cigar Box Guitar Instructors Guide Developed by Building to Teach 1-18-17 Building the Cigar Box Guitar -(c) Building To Teach 2014 Introduction This project really engages students and helps

More information

Radius Return Select this option to annotate the elevations along the radius return of the intersection.

Radius Return Select this option to annotate the elevations along the radius return of the intersection. ODOT_IntersectionDetail.mvba Application Name: Current version: Required MicroStation Version: Required GEOPAK Version: Video Documentation ODOT_IntersectionDetail.mvba V11.07.15 MicroStation XM or V8i

More information

Step 2: Extend the compass from the chosen endpoint so that the width of the compass is more than half the distance between the two points.

Step 2: Extend the compass from the chosen endpoint so that the width of the compass is more than half the distance between the two points. Student Name: Teacher: Date: District: Miami-Dade County Public Schools Test: 9_12 Mathematics Geometry Exam 1 Description: GEO Topic 1 Test: Tools of Geometry Form: 201 1. A student followed the given

More information

JUNIOR CERTIFICATE 2009 MARKING SCHEME TECHNICAL GRAPHICS HIGHER LEVEL

JUNIOR CERTIFICATE 2009 MARKING SCHEME TECHNICAL GRAPHICS HIGHER LEVEL . JUNIOR CERTIFICATE 2009 MARKING SCHEME TECHNICAL GRAPHICS HIGHER LEVEL Sections A and B Section A any ten questions from this section Q1 12 Four diagrams, 3 marks for each correct label. Q2 12 2 marks

More information

Chapter 3. Wall Layout

Chapter 3. Wall Layout Chapter 3. Wall Layout 3.1 LAYING OUT EXTERIOR WALLS 3.2 CUTTING EXTERIOR WALL PLATES 3.3 MARKING WINDOW AND DOOR LOCATIONS ON EXTERIOR WALL PLATES 3.4 MARKING STUDS ON EXTERIOR WALL PLATES 3.5 LAYING

More information

Installation Instructions. Tools Needed. Tape measure. Level. Shovel or Post hole digger. Concrete. Drill. Stakes. Mallet or hammer.

Installation Instructions. Tools Needed. Tape measure. Level. Shovel or Post hole digger. Concrete. Drill. Stakes. Mallet or hammer. Installation Guide EcoStone Fence 1330 West 400 North Orem, UT 84057 Toll Free 1.866.648.9336 Tel. 1.801.655.5236 Fax 1.801.655.5240 www.ecostonefence.com Installation Instructions Introduction. These

More information

CertainTeed INSTALLATION GUIDE SIMTEK FENCE PRODUCTS. Fence Installation Guide 3', 4' & 6' High

CertainTeed INSTALLATION GUIDE SIMTEK FENCE PRODUCTS. Fence Installation Guide 3', 4' & 6' High CertainTeed INSTALLATION GUIDE SIMTEK FENCE PRODUCTS Fence Installation Guide 3', 4' & 6' High INSTALLATION GUIDE These instructions are designed to assist both professional installers and do-it-yourselfers

More information

Creo Revolve Tutorial

Creo Revolve Tutorial Creo Revolve Tutorial Setup 1. Open Creo Parametric Note: Refer back to the Creo Extrude Tutorial for references and screen shots of the Creo layout 2. Set Working Directory a. From the Model Tree navigate

More information

Angle Measure and Plane Figures

Angle Measure and Plane Figures Grade 4 Module 4 Angle Measure and Plane Figures OVERVIEW This module introduces points, lines, line segments, rays, and angles, as well as the relationships between them. Students construct, recognize,

More information

FINAL REVIEW. 1) Always, Sometimes, or Never. If you answer sometimes, give an example for when it is true and an example for when it is not true.

FINAL REVIEW. 1) Always, Sometimes, or Never. If you answer sometimes, give an example for when it is true and an example for when it is not true. FINL RVIW 1) lways, Sometimes, or Never. If you answer sometimes, give an eample for when it is true and an eample for when it is not true. a) rhombus is a square. b) square is a parallelogram. c) oth

More information

Hours / 100 Marks Seat No.

Hours / 100 Marks Seat No. 17419 21415 3 Hours / 100 Seat No. Instructions (1) All Questions are Compulsory. (2) Answer each next main Question on a new page. (3) Illustrate your answers with neat sketches wherever necessary. (4)

More information

INTRODUCTION. 1. How to construct the cross sectional shapes

INTRODUCTION. 1. How to construct the cross sectional shapes 1 Making the Violin Geometric Arching Shape and A Method of Thickness Graduating Plates By Robert Zuger Mejerigatan 16 SE26734 Bjuv Sweden Email: zuger.robert@telia.com INTRODUCTION In an earlier report

More information

MATH 130 FINAL REVIEW version2

MATH 130 FINAL REVIEW version2 MATH 130 FINAL REVIEW version2 Problems 1 3 refer to triangle ABC, with =. Find the remaining angle(s) and side(s). 1. =50, =25 a) =40,=32.6,=21.0 b) =50,=21.0,=32.6 c) =40,=21.0,=32.6 d) =50,=32.6,=21.0

More information

The Sheet Metal Bath Tub. Copyright Bud Goodman 2004

The Sheet Metal Bath Tub. Copyright Bud Goodman 2004 The Sheet Metal Bath Tub. Copyright Bud Goodman 2004 Here is a great way to have some fun, strengthen your layout skills and create a useful product that you can use yourself or pass on as a gift. The

More information

APPLIED GEOMETRY COORDINATE SYSTEM LINE CONSTRUCTION LINE CONSTRUCTION BISECTING LINE OR ARC LINE CONSTRUCTION

APPLIED GEOMETRY COORDINATE SYSTEM LINE CONSTRUCTION LINE CONSTRUCTION BISECTING LINE OR ARC LINE CONSTRUCTION OORDINTE SSTEM PPLIED GEOMETR ( LINE, NGLE, POLGON, R, IRLE, ND UTILITIES) LINE ONSTRUTION 10. 9. 8. 7. 6. 5. 4. 3. 2. Z 1. 0. 0. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. :: 2 steps are used to create one line.

More information

8/17/2014. Process of directly or indirectly measuring vertical distances to determine the elevation of points or their differences in elevation

8/17/2014. Process of directly or indirectly measuring vertical distances to determine the elevation of points or their differences in elevation Process of directly or indirectly measuring vertical distances to determine the elevation of points or their differences in elevation Leveling results are used: To design highways, railroads, canals, sewers,

More information

Geometry 1 FINAL REVIEW 2011

Geometry 1 FINAL REVIEW 2011 Geometry 1 FINL RVIW 2011 1) lways, Sometimes, or Never. If you answer sometimes, give an eample for when it is true and an eample for when it is not true. a) rhombus is a square. b) square is a parallelogram.

More information

Mathematics Revision Guides Loci Page 1 of 10 Author: Mark Kudlowski M.K. HOME TUITION. Mathematics Revision Guides. Level: GCSE Foundation Tier LOCI

Mathematics Revision Guides Loci Page 1 of 10 Author: Mark Kudlowski M.K. HOME TUITION. Mathematics Revision Guides. Level: GCSE Foundation Tier LOCI Mathematics Revision Guides Loci Page 1 of 10 M.K. HOME TUITION Mathematics Revision Guides Level: GCSE Foundation Tier LOCI Version: 2.1 Date: 28-10-2014 Mathematics Revision Guides Loci Page 2 of 10

More information

DEVELOPMENT PLAN CHECKLIST

DEVELOPMENT PLAN CHECKLIST Project Identification Information: DEVELOPMENT PLAN CHECKLIST 1.0 GENERAL 1.1 Additional information as required by specific Land Use 1.2 All sheets to include sheet number ( of ) 1.3 Seal and signature

More information

IAN HUMBY TEACHING. List of Hand-Outs. Levelling

IAN HUMBY TEACHING. List of Hand-Outs. Levelling IAN HUMBY TEACHING List of Hand-Outs Levelling 6-1 Equipment List (Levelling) 11-1 to 11-3 Introduction to Levelling 11-4 Levelling Terminology 12-1 to 12-2 Measuring Height Change by Basic Methods 13-1

More information

12 Constructions and Loci

12 Constructions and Loci MEP Y9 Practice ook 12 onstructions and Loci 12.1 Recap: ngles and Scale Drawing The concepts in this unit rely heavily on knowledge acquired previously, particularly for angles and scale drawings, so

More information

10.13 Sample A.G.E. program

10.13 Sample A.G.E. program The chord angle is the angle that is measured counter clockwise as positive from the beginning to the end points. 10.13 Sample A.G.E. program Consider this profile made up of 9 lines and arcs Notice what

More information

11/12/2015 CHAPTER 7. Axonometric Drawings (cont.) Axonometric Drawings (cont.) Isometric Projections (cont.) 1) Axonometric Drawings

11/12/2015 CHAPTER 7. Axonometric Drawings (cont.) Axonometric Drawings (cont.) Isometric Projections (cont.) 1) Axonometric Drawings CHAPTER 7 1) Axonometric Drawings 1) Introduction Isometric & Oblique Projection Axonometric projection is a parallel projection technique used to create a pictorial drawing of an object by rotating the

More information

Hours / 100 Marks Seat No.

Hours / 100 Marks Seat No. 17419 21314 3 Hours / 100 Seat No. Instructions (1) All Questions are Compulsory. (2) Answer each next main Question on a new page. (3) Illustrate your answers with neat sketches wherever necessary. (4)

More information

(1) Page 482 #1 20. (2) Page 488 #1 14. (3) Page # (4) Page 495 #1 10. (5) Page #12 30,

(1) Page 482 #1 20. (2) Page 488 #1 14. (3) Page # (4) Page 495 #1 10. (5) Page #12 30, Geometry/Trigonometry Unit 8: Circles Notes Name: Date: Period: # (1) Page 482 #1 20 (2) Page 488 #1 14 (3) Page 488 489 #15 26 (4) Page 495 #1 10 (5) Page 495 496 #12 30, 37 39 (6) Page 502 #1 7 (7) Page

More information

Slope Floor. Measurement Methods

Slope Floor. Measurement Methods Slope Floor Measurement Methods Many chair installations are on sloped floors. Hussey Seating uses five different feet for floor mount chairs based on the degree of slope. The slope of the floor is a critical

More information

Geometry For Technical Drawing Chapter 4

Geometry For Technical Drawing Chapter 4 Geometry For Technical Drawing Chapter 4 Sacramento City College EDT 300/ENGR 306 EDT 300/ENGR 306 1 Objectives Identify and describe geometric shapes and constructions used by drafters. Construct various

More information

DOUBLE PROPORTION MADE COMPLEX

DOUBLE PROPORTION MADE COMPLEX DOUBLE PROPORTION MADE COMPLEX Jerry L. Wahl Branch of Cadastral Surveys Bureau of Land Management California State Office 2800 Cottage Way, E-2841 Sacramento, California 95825 ABSTRACT Our ever increasing

More information

Activity Template. Subject Area(s): Science and Technology Activity Title: Header. Grade Level: 9-12 Time Required: Group Size:

Activity Template. Subject Area(s): Science and Technology Activity Title: Header. Grade Level: 9-12 Time Required: Group Size: Activity Template Subject Area(s): Science and Technology Activity Title: What s In a Name? Header Image 1 ADA Description: Picture of a rover with attached pen for writing while performing program. Caption:

More information

1. A maintenance technician sights the top of a telephone pole at a 25 angle of elevation as shown.

1. A maintenance technician sights the top of a telephone pole at a 25 angle of elevation as shown. Name 1. A maintenance technician sights the top of a telephone pole at a 25 angle of elevation as shown. Determine the horizontal distance between the technician and the base of the telephone pole to the

More information

UNIT PLAN. Grade Level: Unit #: 7 Unit Name: Circles

UNIT PLAN. Grade Level: Unit #: 7 Unit Name: Circles UNIT PLAN Subject: Geometry Grade Level: 10-12 Unit #: 7 Unit Name: Circles Big Idea/Theme: The understanding of properties of circles, the lines that intersect them, and the use of their special segments

More information

Basic Surveying. Kabul, Afghanistan February 2011

Basic Surveying. Kabul, Afghanistan February 2011 Basic Surveying Kabul, Afghanistan February 2011 1 This watershed rehabilitation and restoration training was prepared by the U.S. Department of Agriculture (USDA) team of Jon Fripp (Civil Engineer USDA/NRCS),

More information

Deck Mount Installation with Bench

Deck Mount Installation with Bench Deck Mount Installation with Bench 1. Mark track with square. 2. Cut tracks with saw. 3. Drill ¼ hole (if needed.) 4. Countersink track. 5. Countersink all track 6. File all track ends. ends. 7. Lay out

More information

JUNIOR CERTIFICATE 2008 MARKING SCHEME TECHNICAL GRAPHICS HIGHER LEVEL

JUNIOR CERTIFICATE 2008 MARKING SCHEME TECHNICAL GRAPHICS HIGHER LEVEL JUNIOR CERTIFICATE 2008 MARKING SCHEME TECHNICAL GRAPHICS HIGHER LEVEL Sections A and B Section A - any ten questions from this Section Q1 12 Four diagrams, 3 marks for each correct label. Q2 12 3 height

More information

QUANTITY SURVEYS. Introduction

QUANTITY SURVEYS. Introduction QUANTITY SURVEYS Introduction In engineering surveying, we often consider a route (road, sewer pipeline, channel, etc.) from three distinct perspectives. The plan view of route location is the same as

More information

This Land Surveying course has been developed by. Failure & Damage Analysis, Inc. Earthwork

This Land Surveying course has been developed by. Failure & Damage Analysis, Inc.   Earthwork This Land Surveying course has been developed by Failure & Damage Analysis, Inc. www.discountpdh.com www.pepdh.com Earthwork CHAPTER 4 EARTHWORK Section I. PLANNING OF EARTHWORK OPERATIONS IMPORTANCE In

More information

Advance Steel. Tutorial

Advance Steel. Tutorial Advance Steel Tutorial Table of contents About this tutorial... 7 How to use this guide...9 Lesson 1: Creating a building grid...10 Step 1: Creating an axis group in the X direction...10 Step 2: Creating

More information

Chapter 23. Garage Construction

Chapter 23. Garage Construction Chapter 23. Garage Construction 23.1 ESTABLISHING CHALK LINES 23.2 MEASURING AND CUTTING WALL PLATES 23.3 MARKING WINDOW & DOOR LOCATIONS ON EXTERIOR WALL PLATES 23.4 MARKING STUDS ON EXTERIOR WALL PLATES

More information

Survey Requirements. Design Guidelines and Standards. June Office of the University Architect

Survey Requirements. Design Guidelines and Standards. June Office of the University Architect Design Guidelines and Standards Survey Requirements June 2004 Office of the University Architect Construction Management P.O. Box 210181 Cincinnati, Ohio 45221-0181 Table of Contents Survey Requirements

More information

Engineering Surveying -1 CE212 Chain Survey

Engineering Surveying -1 CE212 Chain Survey Engineering Surveying -1 CE212 Chain Survey Lecture 2016, September 26-27 Muhammad Noman Chain Survey Chain survey is the simplest method of surveying. In this survey only measurements are taken in the

More information

CHAPTER 11 SURVEY CADD

CHAPTER 11 SURVEY CADD CHAPTER 11 SURVEY CADD Chapter Contents Sec. 11.01 Sec. 11.02 Sec. 11.03 Sec. 11.04 Sec. 11.05 Sec. 11.06 Sec. 11.07 Sec. 11.08 Sec. 11.09 Sec. 11.10 General Description of Survey File Contents of Survey

More information

9-1: Circle Basics GEOMETRY UNIT 9. And. 9-2: Tangent Properties

9-1: Circle Basics GEOMETRY UNIT 9. And. 9-2: Tangent Properties 9-1: Circle Basics GEOMETRY UNIT 9 And 9-2: Tangent Properties CIRCLES Content Objective: Students will be able to solve for missing lengths in circles. Language Objective: Students will be able to identify

More information

CONTINUED. BACK & SEAT RAILS: 1. Sort three (3) 2x2x8 pieces. 2. Measure and cut one (1) 61 length from each piece.

CONTINUED. BACK & SEAT RAILS: 1. Sort three (3) 2x2x8 pieces. 2. Measure and cut one (1) 61 length from each piece. # Materials: Quantity Each: Total Quantity: 2x2x8 6 2x4x8 9 4x4x8 2 4x6x8 1 TIPS FOR SUCCESSFUL PREP WORK: Before starting, carefully read through the entire instruction sheet. Refer to the material list

More information

Sec Geometry - Constructions

Sec Geometry - Constructions Sec 2.2 - Geometry - Constructions Name: 1. [COPY SEGMENT] Construct a segment with an endpoint of C and congruent to the segment AB. A B C **Using a ruler measure the two lengths to make sure they have

More information

Measuring areas, volumes and heights accurately

Measuring areas, volumes and heights accurately Measuring areas, volumes and heights accurately So far in this book, we have used measurement relationships to construct and use mathematical models. In order to interpret your mathematical model realistically,

More information

Coimisiún na Scrúduithe Stáit State Examinations Commission. Junior Certificate Marking Scheme. Technical Graphics.

Coimisiún na Scrúduithe Stáit State Examinations Commission. Junior Certificate Marking Scheme. Technical Graphics. Coimisiún na Scrúduithe Stáit State Examinations Commission Junior Certificate 2013 Marking Scheme Technical Graphics Higher Level Note to teachers and students on the use of published marking schemes

More information

COPYRIGHTED MATERIAL. Contours and Form DEFINITION

COPYRIGHTED MATERIAL. Contours and Form DEFINITION 1 DEFINITION A clear understanding of what a contour represents is fundamental to the grading process. Technically defined, a contour is an imaginary line that connects all points of equal elevation above

More information

Geometry. 4. Look at the diagram below. 1. In the diagram below, AB = 4, AC = 6, XY = 3, and. are similar. What is sin x? XYZ C 35. What is XZ?

Geometry. 4. Look at the diagram below. 1. In the diagram below, AB = 4, AC = 6, XY = 3, and. are similar. What is sin x? XYZ C 35. What is XZ? Geometr. Look at the diagram below.. In the diagram below, =, = 6, XY =, and XYZ are similar. 2 7 Z Y 5 What is sin? What is XZ?. 2 X. 2 5 2 7 2. 5 7. 0 7 2 5. Use the figure below. 2. In the figure below,

More information

Project Maths Geometry Notes

Project Maths Geometry Notes The areas that you need to study are: Project Maths Geometry Notes (i) Geometry Terms: (ii) Theorems: (iii) Constructions: (iv) Enlargements: Axiom, theorem, proof, corollary, converse, implies The exam

More information

A step by step guide to recording a building

A step by step guide to recording a building BUCKINGHAMSHIRE ARCHAEOLOGICAL SOCIETY HISTORIC BUILDINGS GROUP A step by step guide to recording a building First, the essential safety bit! Never work alone (unless you are surveying your own house!)

More information

Locus Locus. Remarks

Locus Locus. Remarks 4 4. The locus of a point is the path traced out by the point moving under given geometrical condition (or conditions). lternatively, the locus is the set of all those points which satisfy the given geometrical

More information

1-4. a: 40 b: 6 c: 7 d: a: 3 b: 5 c: 6 d: 2

1-4. a: 40 b: 6 c: 7 d: a: 3 b: 5 c: 6 d: 2 Lesson 1.1.1 1-3. Shapes (a), (c), (d), and (e) are rectangles. 1-4. a: 40 b: 6 c: 7 d: 59 1-5. a: 3 b: 5 c: 6 d: 2 1-6. a: 22a + 28 b: 23x 17 c: x 2 + 5x d: x 2 + 8x 1-7. Possibilities: Goes to bank,

More information

FENCE INSTALLATION GUIDE 8 HIGH WALLS

FENCE INSTALLATION GUIDE 8 HIGH WALLS FENCE INSTALLATION GUIDE 8 HIGH WALLS 1.866.648.9336 www.simtekfence.com INSTALLATION GUIDE These instructions are designed to assist both professional installers and do-it-yourselfers of SimTek decorative

More information

SEATS (middle and front row): 1. Sort six (6) 2x6x10 pieces. 2. Measure and cut one (1) 72 length and one (1) 48 length from each piece.

SEATS (middle and front row): 1. Sort six (6) 2x6x10 pieces. 2. Measure and cut one (1) 72 length and one (1) 48 length from each piece. # Materials: Quantity Each: Total Quantity: 2x6x8 6 2x6x10 6 2x4x8 4 4x4x8 7 TIPS FOR SUCCESSFUL PREP WORK: Before starting, carefully read through the entire instruction sheet. Refer to the material list

More information