1 QUANTITY SURVEYS Introduction In engineering surveying, we often consider a route (road, sewer pipeline, channel, etc.) from three distinct perspectives. The plan view of route location is the same as if we were in an aircraft looking straight down. The profile of the route is a side view or elevation (see Figures 1) in which the longitudinal surfaces are highlighted (e.g., of road, top and bottom of pipelines, etc.). The cross section shows the end view of a section at a point ( in Figure 1) and is at right angles to the center line. These three views taken together completely define the route in X, Y, and Z coordinates. Cross Sections and Profiles Figure1 Cross sections are a series of elevations taken at right angles to a base line at specific stations, whereas profiles are a series of elevations taken along a base line at some specified repetitive station interval. The elevations thus determined can be plotted on maps and plans either as spot elevations or as contours, or they can be plotted as end areas for construction quantity estimating. As in offset ties, the baseline interval is usually 100 ft., although in rapidly changing terrain the interval is usually smaller (e.g., 50 ft.). In addition to the regular intervals, cross sections are also taken at each abrupt change in the terrain (top, bottom of slopes, etc.).
2 Figure 2 Figure 2 illustrates how the rod readings are used to define the ground surface. a. In Figure 2(a) the uniform slope permits a minimum (centerline and both limits of the survey) number of rod readings. b. In Figure 2(b) the varied slope requires several more (than the minimum) rod readings to adequately define the ground surface c. In Figure 2(c) illustrates how cross sections are taken before and after construction. The profile consists of a series of elevations along the baseline. If cross sections have been taken, the necessary data for plotting a profile will also have been taken. If cross sections are not planned for an area for which a profile is required, the profile elevations can be determined by simply taking rod readings along the line at regular intervals and at all points where the ground slope changes.
3 Figure 3 Typical field notes for profile leveling are shown in Figure 3. Cross sections are booked in different formats. Figure 4 Figure 4 shows cross sections booked in standard level note format. All the rod readings for one station (that can be "seen" from the HI) are booked together.
4 Figure 5 Figure 5 shows the positions of the rod readings at station In cases where the terrain is very rugged, making the level and rod work very time-consuming (many instrument setups). Electronic tacheometer instruments (ETI), also known as total station, can very quickly measure distances and differences in elevation; the rod man holds a reflecting prism mounted on a range pole instead of holding a rod. Many of these instruments have the distance and elevation data recorded automatically for future computer processing, while others require that the data be manually entered into the data recorder. This method can be used to advantage on a multitude of surveying projects, including right-angle offset and cross sections. Road and highway construction often requires the location of granular (sand, gravel) deposits for use in the highway road beds. These borrow pits (gravel pits) are surveyed to determine the volume of material "borrowed" and transported to the site. Before any excavation takes place, one or more reference baselines are established and two bench marks (at minimum) are located in convenient locations. The reference lines are located in secure locations where neither the stripping and stockpiling of top soil or the actual excavation of the granular material will endanger the stakes. Cross sections are taken over (and beyond) the area of proposed excavation. These original cross sections will be used as a datum against which interim and final excavations will be measured. The volumes calculated from the cross sections are often converted to tons for payment purposes. In many locations, weigh scales are located at the pit to aid in converting the volumes and as a check on the calculated quantities. The original cross sections are taken over a grid at 50 ft. (20 m) intervals. As the excavation proceeds, additional rod readings (in addition to 50 ft. grid readings) for top and bottom of excavation are required. Permanent targets can be established to assist in the alignment of the cross section lines running perpendicular to the base line at each 50 ft. station. If permanent targets have not been erected, a surveyor on the base line can keep the rodman on line by using a prism or by estimated right angles.
5 Construction Volumes In highway construction, for economic reasons, the designers try to optimally balance cut and fill volumes. Cut and fill cannot be precisely balanced because of geometric and esthetic design considerations, and because of the unpredictable effects of shrinkage and swell. Shrinkage occurs when a cubic yard is excavated and then placed while being compacted. The same material formerly occupying 1 yd. volume now occupies a smaller volume. Shrinkage reflects an increase in density of the material and is obviously greater for silts, clays, and loams than it is for granular materials such as sand and gravel. Swell is a term used to describe the placing of shattered (blasted) rock. Obviously 1 yd. of solid rock will expand significantly when shattered. Swell is usually in the 15 percent to 20 percent range, whereas shrinkage is in the 10 percent to 15 percent range, although values as high as 40 percent are possible with organic material in wet areas. To keep track of cumulative cuts and fills as the profile design proceeds, the cumulative cuts (plus) and fills (minus) are shown graphically in a mass diagram. The total cut-minus-fill is plotted at each station directly below the profile plot. The mass diagram is an excellent method of determining waste or borrow volumes and can be adapted to show haul (transportation) considerations Figure 6. Figure 6
6 Large fills require borrow material usually taken from a nearby borrow pit. The borrow pit in Figure H1-7 was laid out on a 50 ft. grid. The volume of a grid square is the average height (a + b + c + d )/4 times the area of the base (50 ). The partial grid volumes (along the perimeter of the borrow pit) can be computed by forcing the perimeter volumes into regular geometric shapes (wedge shapes or quarter-cones). Cross Sections and Volumes Cross sections are useful in determining quantities of cut and fill in construction design. If the original ground cross section is plotted, and then the as constructed cross section is also plotted, the end area at that particular station can be computed. Figure 7 In Figure 7, the proposed road at STA is at an elevation below existing ground. This indicates a cut situation (i.e., the contractor will cut out that amount of soil shown between the proposed section and the original section) Figure 8 In Figure 8, the proposed road elevation at station is above the existing ground, indicating a fill situation (i.e., the contractor will bring in or fill in that amount of soil shown)
7 Figure 9 Figure 9 shows a transition section between cut and fill sections End Areas When the end areas of cut or fill have been computed for adjacent stations, the volume of cut or fill between those stations can be computed by simply averaging the end areas and multiplying the average end area by the distance between the end area stations. Figure 10 illustrates this concept. Figure 10 V = {(A1 + A2 )/2} L
8 The above formula gives the general case for volume computation, where A and A are the end areas of two adjacent stations, and L is the distance (feet) between the stations. The answer in cubic feet is divided by 27 to give the answer in cubic yards. The average end area method of computing volumes is entirely valid only when the area of the midsection is, in fact, the average of the two end areas. This is seldom the case in actual earthwork computations; however, the error in volume resulting from this assumption is insignificant for the usual earthwork quantities of cut and fill. For special earthwork quantities (e.g., expensive structures excavation) or for higher-priced materials (e.g., concrete in place), a more precise method of volume computation, the prismoidal formula, must be used. Prismoidal Formula If values more precise than end area volumes are required, the prismoidal formula can be used. A prismoid is a solid with parallel ends joined by plane or continuously warped surfaces. The prismoidal formula is: V = L {A1 + 4Am + A2 )/6} ft 2 or m 2 Where A1 and A2 are the two end areas, Am is the area of a section midway between A1 and A2, and L is the distance from A1 to A2. Am is not the average of A1 and A2, but Am is derived from distances that are the average of corresponding distances required for A1 and A2 computations. This formula is also used for other geometric solids (e.g., truncated prisms, cylinders, and cones). To justify its use, the surveyor must refine the field measurements to reflect the increase in precision being sought. A typical application of the prismoidal formula would be the computation of in place volumes of concrete. The difference in cost between a cubic yard or meter of concrete and a cubic yard or meter of earth cut or fill is sufficient reason for the increased precision.
This Land Surveying course has been developed by. Failure & Damage Analysis, Inc. Earthwork
This Land Surveying course has been developed by Failure & Damage Analysis, Inc. www.discountpdh.com www.pepdh.com Earthwork CHAPTER 4 EARTHWORK Section I. PLANNING OF EARTHWORK OPERATIONS IMPORTANCE In
More informationExcavation and embankment (cut and fill)
Excavation and embankment (cut and fill) Excavation = the removal of soil or rock from its natural location. Embankment = the placement and compaction of layers of earth or rock to form a roadbed of the
More informationLeveling. Double-Rodded Leveling. Illustrative Problem. Double-Rodded Leveling 8/17/2014
Double-Rodded Leveling Double-Rodded Leveling A method of determining the differences in elevation between points by employing two level routes simultaneously Two turning points are established such that
More informationSURVEYING 1 CE 215 CHAPTER -3-
Civil Engineering Department SURVEYING 1 CE 215 CHAPTER -3- PROFILE AND CROSS SECTION LEVELING 1 2 1 3 4 2 5 6 3 7 8 4 9 10 5 11 12 6 13 14 7 15 16 8 17 18 9 19 20 10 21 22 11 23 24 12 25 26 13 27 28 14
More informationSuveying Lectures for CE 498
Suveying Lectures for CE 498 SURVEYING CLASSIFICATIONS Surveying work can be classified as follows: 1- Preliminary Surveying In this surveying the detailed data are collected by determining its locations
More informationThis Land Surveying course has been developed by. Failure & Damage Analysis, Inc.
This Land Surveying course has been developed by Failure & Damage Analysis, Inc. www.discountpdh.com www.pepdh.com Bridge Surveying SURVEYS Bridge surveying is necessary to locate a site, obtain information
More informationCONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 MAY 1993 CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS 422.01 SCOPE 422.02 REFERENCES 422.03 DEFINITIONS
More informationSection E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02
Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02 1. INTRODUCTION This standard is written to provide the professional surveyor (Surveyor) and the client with a guideline for producing
More informationEngineering Surveying -1 CE212 Contouring Lectures. Lecture 2016, November 29 th Muhammad Noman
Engineering Surveying -1 CE212 Contouring Lectures Lecture 2016, November 29 th Muhammad Noman Contour An Imaginary line on the ground surface joining the points of equal elevation is known as contour.
More information8/17/2014. Process of directly or indirectly measuring vertical distances to determine the elevation of points or their differences in elevation
Process of directly or indirectly measuring vertical distances to determine the elevation of points or their differences in elevation Leveling results are used: To design highways, railroads, canals, sewers,
More informationLegal Description & Site Plan Requirements and Layouts
Legal Description & Site Plan Requirements and Layouts Plot Plan * A plot plan shows the location of a house from an aerial view. * The site plan, also known as a plot or lot plan includes: 1. Site plan
More informationCOURSE SYLLABUS SURVEYING I
Solution Manual for Surveying Fundamentals and Practices 6th Edition by Nathanson Lanzafama Emeritus Link full download: http://testbankcollection.com/download/solution-manual-forsurveying-fundamentals-and-practices-6th-edition-by-nathanson-lanzafamaemeritus/
More informationSurveying & Measurement. Detail Survey Topographic Surveying
Surveying & Measurement Detail Survey Topographic Surveying Introduction Mapping surveys are made to determine the relief of the earth s surface and locate critical points on it. to determine the locations
More informationTOWN OF DOUGLAS EARTH REMOVAL SPECIAL PERMIT APPLICATION FORM Pursuant to Section 6.1 of the Douglas Zoning Bylaw
I. Owner Information II. Applicant Information III. Representative Information IV. Operator Information er.doc Page 1 of 5 Douglas Planning Board V. Site Information Assessors Map Assessors Parcel Deed
More informationDepartment of Civil and Environmental Engineering
Department of Civil and Environmental Engineering CEE213L Surveying & Introduction to GIS Lab SURVEYING LABORATORY NORTH SOUTH UNIVERSITY Center of Excellence in Higher Education The First Private University
More informationSurvCADDR. Section - Profile Module. File Modify Display Draw Inq-Set Pnts Profiles Design Sections Misc PRODUCT DESCRIPTION BENEFITS & ADVANTAGES
File Modify Display Draw Inq-Set Pnts Profiles Design Sections Misc SurvCADDR Section - Profile Module PRODUCT DESCRIPTION engineeringsoftwareforanexpandinguniverse The Section - Profile Module creates
More informationREVIEW TOPICS CEEN 2320 FINAL EXAM
REVIEW TOPICS CEEN 2320 FINAL EXAM Be familiar with all materials covered in class, your class handouts and the notes you took in class, your homework assignments, test questions, formulas, tables, figures.
More informationPractice Workbook. Cross Sections: Creating, Annotating, and Volumes. SELECTseries 4 ( ) or newer
Practice Workbook This workbook is designed for use in Live instructor-led training and for OnDemand self study. The explanations and demonstrations are provided by the instructor in the classroom, or
More informationContact Us : E Surveying Solutions AMR #7, Circular ring Road Nandini Layout Bangalore Karnataka, India. Phone:
E Surveying Solutions work towards bring the survey community together and utilize your engineering and our software skills to deliver effective services, by introducing cutting edge technology at an affordable
More informationSurvey Requirements. Design Guidelines and Standards. June Office of the University Architect
Design Guidelines and Standards Survey Requirements June 2004 Office of the University Architect Construction Management P.O. Box 210181 Cincinnati, Ohio 45221-0181 Table of Contents Survey Requirements
More informationPART XII: TOPOGRAPHIC SURVEYS
PART XII: TOPOGRAPHIC SURVEYS 12.1 Purpose and Scope The purpose of performing topographic surveys is to map a site for the depiction of man-made and natural features that are on, above, or below the surface
More informationCleveland State University
CVE 212 - Surveying Lab #4 LOCATION SURVEY EQUIPMENT Right angle mirror (pentaprism) Surveyor s tape Plumb bobs Range poles INTRODUCTION Many times the surveyor is called upon to catalog details of a project
More informationThe several methods for making linear measurements are quite simple and straightforward. They are described below:
INTRODUCTION TO LINEAR MEASUREMENTS Many pay items are measured on the basis of linear measurements - items such as guardrail, pipe culvert, curb and gutter, fencing, etc. These measurements usually are
More informationCONTRACT PLANS READING
CONTRACT PLANS READING A training course developed by the FLORIDA DEPARTMENT OF TRANSPORTATION This 2009 revision was carried out under the direction of Ralph Ellis, P. E., Associate Professor of Civil
More informationContour An imaginary line on the ground surface joining the points of equal elevation is known as contour.
Contour An imaginary line on the ground surface joining the points of equal elevation is known as contour. In other words, contour is a line in which the ground surface is intersected by a level surface
More information1.1 GENERAL RECORD DRAWING REQUIREMENTS
Page 1 of 5 VILLAGE OF ROMEOVILLE RECORD DRAWINGS CHECKLIST PART I GENERAL Record drawings are required to provide a means of schematic verification that the intent of the approved engineering design has
More informationSECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts.
SECTION 58 PRECAST CONCRETE BOX CULVERT 58.1 DESCRIPTION A. General This work consists of furnishing and installing Pre-cast Concrete Box Culverts. B. Related Work Section 51 Section 52 Section 53 Section
More information580 - NOISE BARRIERS OPSS 580 INDEX
580 - OPSS 580 INDEX 580.1 GENERAL 580.1.1 Noise Barrier Design Elements 580.1.1.1 Wind-Load Designs 580.1.1.2 Sound-Absorptive Barriers 580.1.1.3 Noise Barrier Colour, Pattern and Texture 580.1.2 Grading
More informationCOPYRIGHTED MATERIAL. Contours and Form DEFINITION
1 DEFINITION A clear understanding of what a contour represents is fundamental to the grading process. Technically defined, a contour is an imaginary line that connects all points of equal elevation above
More informationTRIBAL BUILDING AND DEVELOPMENT Plan Check Submittal
TRIBAL BUILDING AND DEVELOPMENT Plan Check Submittal Complete sets of plans are required. Plans shall be stamped and wet signed by the architect or engineer. (signed and accompanied with letter from Homeowners
More informationCHAPTER F IVE ROBOTIC TOTAL STATION
CHAPTER F IVE ROBOTIC TOTAL STATION 5 ROBOTIC TOTAL STATION 5 OVERVIEW If necessity is the mother of invention, then the invention of the Total Station robotic instrument truly fits the requirements of
More informationSTATE UNIVERSITY CONSTRUCTION FUND
DIRECTIVE 1C-12 Issue date: August 2012 1. General SURVEY, MAPPING AND UTILITY LOCATING This Directive has been developed as a general guide for the survey and mapping effort required for Fund projects.
More informationTYPICAL SECTIONS TYPICAL NO. 1 (MAINLINE) STA TO STA STA TO STA ROUNDING DETAIL TYPICAL NO.
FILL SECTION TYPICAL NO. 1 (MAINLINE) STA. 2434. TO STA. 244035.16 STA. 244396.83 TO STA. 2449. CUT SECTION ROUNDING DETAIL FILL SECTION TYPICAL NO. 3 (DETOUR) CUT SECTION STA. 242849.86 TO STA. 2453.88
More informationENGINEERING SURVEYING (221 BE) Setting Out And Site Control. Sr Tan Liat Choon Mobile:
ENGINEERING SURVEYING (221 BE) Setting Out And Site Control Sr Tan Liat Choon Email: tanliatchoon@gmail.com Mobile: 016-4975551 WHAT IS SETTING OUT Setting out is all about transferring measurements from
More informationCHAPTER 11. Plan Standards
CHAPTER 11 Plan Standards A. Introduction The city requires uniform public improvement plans for ease of record keeping and understanding. The following standards govern most plan submittals to the city.
More information670 10/26/17 SSD: 07/14/16, 09/16/17 Page 1 of 6
SSD: 07/14/16, 09/16/17 Page 1 of 6 S P E C I A L P R O V I S I O N Section MISCELLANEOUS INCIDENTALS Item.822 - GNSS Construction Inspection Equipment Description SAMPLE PROJECT 12345 10/30/17 1.1 Work
More informationDate Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project
Bureau of Engineering SURVEY DIVISION REQUEST FOR TOPOGRAPHIC SURVEY Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project Caltrans involvement (must
More information1. The topographic map below shows a depression contour line on Earth's surface.
1. The topographic map below shows a depression contour line on Earth's surface. Points A, B, C, and D represent surface locations. Contour line elevations are in feet. Which profile best shows the topography
More informationMAINTENANCE HOLES, CATCH BASINS AND DITCH INLETS - MTC FORM 407 INDEX
407-1 - MAINTENANCE HOLES, CATCH BASINS AND DITCH INLETS - MTC FORM 407 INDEX 407-1.1 GENERAL Tender Items Specifications Standard Drawings 407-1.1.1 Frame and Grate Selection 407-1.1.2 Selection of Structure
More informationMATH MEASUREMENT AND GEOMETRY
Students: 1. Students choose appropriate units of measure and use ratios to convert within and between measurement systems to solve problems. 1. Compare weights, capacities, geometric measures, time, and
More informationMEASURING IN THE PLANE AND SPACE G.MG.A.3: AREA AND SURFACE AREA
MEASURING IN THE PLANE AND SPACE G.MG.A.3: AREA AND SURFACE AREA 95 A farmer has 64 feet of fence to enclose a rectangular vegetable garden. Which dimensions would result in the biggest area for this garden?
More informationSECTION DEWATERING TANKAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS
SECTION 31 23 19 - DEWATERING TANKAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
More informationTo determine the difference in levels of points/objects. To determine the depth cutting and filling in engineering works.
UET-11-CE-SCET WAH SURVEYING-I Dumpy (Wye) Level LEVELLING: It is a surveying method used to determine the level of points/objects with reference to the selected datum. It is also used to set out engineering
More informationWe will study all three methods, but first let's review a few basic points about units of measurement.
WELCOME Many pay items are computed on the basis of area measurements, items such as base, surfacing, sidewalks, ditch pavement, slope pavement, and Performance turf. This chapter will describe methods
More informationSPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections
SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS Section 1 Definitions 2 Scope of Work 3 Extent of Work 4 Inspection and Performance of Work 5 Trenching 6 Duct Installation
More informationB422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422
B422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422 422.1 GENERAL The work under these tender items consists of the fabrication and installation in open cut of precast reinforced
More informationLaser Grading Sports Fields
www.stma.org Laser Grading Sports Fields What is Laser Grading? Grading is the process of leveling a land surface to a desired gradient by cutting, filling, and smoothing the soil. In the athletic field
More informationWith time, the evolution of anchors have led to different designs More than one anchor type may be suitable for a particular purpose Thus there are
Supreme range of Soil & rock anchors Introduction Used to anchor into concrete, masonry, stone With time, the evolution of anchors have led to different designs More than one anchor type may be suitable
More information.1 Applicability: These criteria shall be applied as follows:
DESIGN CRITERIA DIVISION 4800 STREET LIGHTING 4801 GENERAL: These criteria shall be adhered to for the design of all publiclyfinanced or privately-financed traffic signal systems to be installed in the
More informationGrading, Erosion and Sediment Control (GESC) Checklist
Development Services Department 100 N. Wilcox Street, Castle Rock CO 80104 Planner of the Day 303-660-1393 Grading, Erosion and Sediment Control (GESC) Checklist A complete Grading, Erosion and Sediment
More informationCITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360)
CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA 98501 (360) 754-4180 Email: cdd@ci.tumwater.wa.us WATER-SEWER-STREET-STORM (IN CITY) Submittal Checklist TUM - RCVD BY DATE STAMP APPLICANT INFORMATION
More informationSlope analysis & Grading. Earth shape and earthwork Topographic map Slope form Slope analysis Grading
6 Slope analysis & Grading Earth shape and earthwork Topographic map Slope form Slope analysis Grading 81 Topographic Map Topographic Contour map Topographic contour map are composed of a series of line
More informationExisting and proposed contours at 1-foot intervals. The fill and/or excavation quantities in cubic yards.
PLAN REQUIREMENTS The plans for street design shall conform to the requirements of Sections 3 and 4. The following requirements shall also be shown on the plans where applicable. Road and Storm Plans:
More informationdetermining the relative height of different
Levelling & Contouring Principle of levelling Principle:-The principle of levelling is to obtain horizontal line of sight with respect to which vertical distances of the points above or below this line
More informationThe Basics. HECRAS Basis Input. Geometry Data - the basics. Geometry Data. Flow Data. Perform Hydraulic Computations. Viewing the Output
The Basics HECRAS Basis Input Geometry Data. Flow Data. Perform Hydraulic Computations by G. Parodi WRS ITC The Netherlands Viewing the Output ITC Faculty of Geo-Information Science and Earth Observation
More informationCITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST
CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil ing Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST The following checklist consists of the minimum requirements for preparation
More informationCity of Massillon Site Plan Checklist
City of Massillon Site Plan Checklist The following information MUST be included with all Site Plans submitted for review and processing in order to constitute a complete Site Plan Package. Incomplete
More informationSECTION SITE SURVEYS
SECTION 02 21 13 SITE SURVEYS SPEC WRITER NOTE: 1. Delete text between // // not applicable to project. Edit remaining text to suit project. 2. Use this section to specify survey required before design
More informationLocation of Structure on Site
Chapter 1 Location of Structure on Site A number of factors affect the location of a structure on a site, as well as the type of building that may be erected. Once the site is chosen, different methods
More informationSECTION 6A ROADWAY PLAN PREPARATION
SECTION 6A ROADWAY PLAN PREPARATION Table of Contents Page No 6A.1 GENERAL...1 6A.2 PRELIMINARY PLANS...3 6A.2.1 PRELIMINARY PLAN SHEETS...3 6A.2.2 PRELIMINARY PROFILE SHEETS...4 6A.3 PHASE A PLANS...4
More informationAutoCAD 2016 for Civil Engineering Applications
Introduction to AutoCAD 2016 for Civil Engineering Applications Learning to use AutoCAD for Civil Engineering Projects Nighat Yasmin Ph.D. SDC P U B L I C AT I O N S Better Textbooks. Lower Prices. www.sdcpublications.com
More informationFigure 8-1 Layout equipment and tools. Tape measure. String line level. Eyepiece level. Laser plane level Delmar/Cengage Learning.
3 2 1 0 Tape measure String line level Clinometer Eyepiece level Transit Dumpy level Carpenter s or builder s level Electronic measurement Tool Laser plane level Figure 8-1 Layout equipment and tools.
More informationCrow Wing County Mound Design
Property Owner: Date: Mailing Address: City: State: Zip: Home Phone Number: - - Cell: - - Site Address: City: State: Zip: Driving directions if no address issued: Legal Description: Sec: Twp: Range: Township
More informationInstructors Manual for Construction Surveying and Layout Third Edition Part Three - Applications Chapters Prepared by Wesley G.
Instructors Manual for Construction Surveying and Layout Third Edition Part Three - Applications Chapters 19-22 Prepared by Wesley G. Crawford TABLE OF CONTENTS Chapter 19 - Layout Techniques... 3 Chapter
More informationGeometry. Practice Pack
Geometry Practice Pack WALCH PUBLISHING Table of Contents Unit 1: Lines and Angles Practice 1.1 What Is Geometry?........................ 1 Practice 1.2 What Is Geometry?........................ 2 Practice
More informationAutomated Machine Guidance
Design Manual Chapter 5 - Roadway Design 5H - Automated Machine Guidance 5H-1 Automated Machine Guidance A. Concept Automated machine guidance (AMG) for grading is a process in which grading equipment,
More informationSatellite monitoring of a large tailings storage facility
ABSTRACT Satellite monitoring of a large tailings storage facility Benjamin Schmidt, Matt Malgesini Golder Associates Inc., USA Jim Turner PhotoSat Ltd, Canada Jeff Reinson Goldcorp Inc., Canada Minera
More informationAuthorized Agent: City of Manassas Check List Attached: Contact: Address: Phone Number: Fax Number: Developer s Name: Phone Number:
CITY OF MANASSAS DEPARTMENT OF COMMUNITY DEVELOPMENT DEVELOPMENT SERVICES DIVISION 9027 Center Street Room 201 Manassas, Virginia, 20110 Phone: 703-257-8278 Fax: 703-257-5831 Application Date: APPLICANT
More informationCHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN
N/A Waiver (1) Four (4) copies of application form. (2) Fifteen (15) copies of plan (3) Subdivision/site plan application fee & professional review escrow deposit (4) Variance application fee & professional
More informationExisting and Design Profiles
NOTES Module 09 Existing and Design Profiles In this module, you learn how to work with profiles in AutoCAD Civil 3D. You create and modify profiles and profile views, edit profile geometry, and use styles
More informationCONTOURS SURVEYING 1 CE 215 CHAPTER -3- Ishik University / Sulaimani Civil Engineering Department 12/7/2017. Ishik University / Sulaimani
Civil Engineering Department SURVEYING 1 CE 215 CHAPTER -3- CONTOURS 1 2 1 3 4 2 PURPOSE OF CONTOURING Contour survey is carried out at the starting of any engineering project such as a road, a railway,
More informationConstruction Surveying and Layout
Construction Surveying and Layout A Field Engineering Methods Manual Third Edition WESLEY G. CRAWFORD.CREATIVE CONSTRUCTION Creative Construction Publishing, Inc. 2720 South River Road West Lafayette,
More informationConstruction Plan Reading Basics & Applications
Construction Plan Reading Basics & Applications July 12 th, 2016 / 4 p.m. Richland County Transportation Penny Office Instructor Ben W. Lewis, PE Welcome & Introductions Instructor Ben W. Lewis, PE Project
More informationMath Review Questions
Math Review Questions Working with Feet and Inches A foot is broken up into twelve equal parts called inches. On a tape measure, each inch is divided into sixteenths. To add or subtract, arrange the feet
More informationBASIC TERMS OF ROAD GEOMETRY
BASIC TERMS OF ROAD GEOMETRY Contour line = a line, which connects terrain points of the same elevation Contour line interval (equidistance) = elevation difference between contour lines Line of maximum
More informationCONSTRUCTION SPECIFICATION FOR MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 407 NOVEMBER 2013 CONSTRUCTION SPECIFICATION FOR MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION TABLE OF CONTENTS 407.01
More informationBasic Surveying. Kabul, Afghanistan February 2011
Basic Surveying Kabul, Afghanistan February 2011 1 This watershed rehabilitation and restoration training was prepared by the U.S. Department of Agriculture (USDA) team of Jon Fripp (Civil Engineer USDA/NRCS),
More informationB-PERMIT PLAN CHECK MANUAL
B-PERMIT PLAN CHECK MANUAL 5. SEWER PLANS Sewer Plans are usually submitted in conjunction with Street Plans to meet the requirements of conditions imposed on a Planning or Zoning action. In some cases
More informationChapter 8 Practice Test
Chapter 8 Practice Test Multiple Choice Identify the choice that best completes the statement or answers the question. 1. In triangle ABC, is a right angle and 45. Find BC. If you answer is not an integer,
More informationFor crossing under a railroad, contact the specific railroad company's engineering department.
PAGE 330524-1 SECTION 330524 SPECIFIER: This section is for the underground installation of piping by directional drilling. When specifying this method of piping installation, care must be taken to ensure
More informationGE 6152 ENGINEERING GRAPHICS
GE 6152 ENGINEERING GRAPHICS UNIT - 4 DEVELOPMENT OF SURFACES Development of lateral surfaces of simple and truncated solids prisms, pyramids, cylinders and cones - Development of lateral surfaces of solids
More informationList of Figures. List of Forms
City of Columbia Engineering Regulations PART 1: SUBMISSION OF PLANS Table of Contents Paragraph Description Page No. 1.1 General 1-1 1.2 Engineer s Report 1-1 1.3 Plans 1-3 1.4 Revisions to Approved Plan
More informationUnit 6, Activity 1, Measuring Scavenger Hunt
Unit 6, Activity 1, Measuring Scavenger Hunt Name: Measurement Descriptions Object 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. Blackline Masters, Mathematics, Grade 7 Page 6-1 Unit 6, Activity 4, Break it Down Name
More information5.4 You Nailed It! A Practice Understanding Task
SECONDARY MATHEMATICS III // MODULE 5 MODELING WITH GEOMETRY 5.4 Tatiana is helping her father purchase supplies for a deck he is building in their back yard. Based on her measurements for the area of
More informationEssential Mathematics Practice Problems for Exam 5 Chapter 8
Math 254B Essential Mathematics Practice Problems for Eam 5 Chapter 8 Name Date This eam is closed book and closed notes, ecept for the Geometry Formula sheet that is provided by the instructor. You can
More informationItem 550 Chain Link Fence
Item Chain Link Fence 1. DESCRIPTION 2. MATERIALS Furnish, install, remove, repair, or replace chain link fence and gates. Furnish certification from the chain link fence materials manufacturer stating
More informationPHOTOGRAMMETRY STEREOSCOPY FLIGHT PLANNING PHOTOGRAMMETRIC DEFINITIONS GROUND CONTROL INTRODUCTION
PHOTOGRAMMETRY STEREOSCOPY FLIGHT PLANNING PHOTOGRAMMETRIC DEFINITIONS GROUND CONTROL INTRODUCTION Before aerial photography and photogrammetry became a reliable mapping tool, planimetric and topographic
More informationCHAPTER 5 HELIPAD AND HELIPORT APPROACH LIGHTING SYSTEMS
CHAPTER 5 HELIPAD AND HELIPORT APPROACH LIGHTING SYSTEMS TM 5-811-5 5-1. General Design 5-2. Terminology Figure 5-1 through 5-3 and the design criteria set forth The following are definitions of terms
More informationSubdivision Cross Sections and Quantities
NOTES Module 11 Subdivision Cross Sections and Quantities Quantity calculation and cross section generation are required elements of subdivision design projects. After the design is completed and approved
More informationMULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST
MULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST This application lists the content and format of the submittal requirements to initiate the Design Review process. An incomplete application will not be
More informationACSA PLAN REVIEW CHECKLIST (Guideline Only) (4) Standard water and sewer general plan notes (attached).
ACSA PLAN REVIEW CHECKLIST (Guideline Only) Revised: December 3, 2015 General (1) Proper Title (2) Vicinity map on first sheet. (3) Date and latest plan revision. (4) Standard water and sewer general plan
More informationDesign of Roundabouts using Corridor Models (Part 1 of 2)
AUTODESK CIVIL3D Design of Roundabouts using Corridor Models (Part 1 of 2) Dynamic vertical modeling By Jack Strongitharm Civil 3D Technical Sales Manager UK and Ireland jack.strongitharm@autodesk.com
More informationDOUBLE PROPORTION MADE COMPLEX
DOUBLE PROPORTION MADE COMPLEX Jerry L. Wahl Branch of Cadastral Surveys Bureau of Land Management California State Office 2800 Cottage Way, E-2841 Sacramento, California 95825 ABSTRACT Our ever increasing
More informationMid-Module Assessment Task
Name Date 1. David is the groundskeeper at Triangle Park, scale shown below. 300 yd. a. David needs to cut the grass four times a month. How many square yards of grass will he cut altogether each month?
More informationPRELIMINARY PLAT CHECK LIST
Name of Proposed Subdivision: The following items must be included with the initial submittal of a Preliminary Plat: Application, filled out completely Project Narrative Pre-application Conference Report
More informationG.MG.A.2: Density. Regents Exam Questions G.MG.A.2: Density
Regents Exam Questions G.MG.A.: Density G.MG.A.: Density 1 A shipping container is in the shape of a right rectangular prism with a length of 1 feet, a width of 8.5 feet, and a height of 4 feet. The container
More informationDRAFTING STANDARDS 9.00 DRAFTING STANDARDS
DRAFTING STANDARDS 9.00 DRAFTING STANDARDS Final plans shall conform in appearance, format, accuracy, and quality to the standards used in the Springfield Engineering Division. Additional standards shall
More informationJune 20, 2007 SURVEYING AND MAPPING MANUAL Table of Contents (1) SURVEYING AND MAPPING MANUAL
June 20, 2007 SURVEYING AND MAPPING MANUAL Table of Contents (1) CHAPTER 1 GENERAL SURVEYING AND MAPPING MANUAL TABLE OF CONTENTS 1-1 INTRODUCTION...1 1-1.01 PURPOSE...1 1-1.02 SCOPE...1 1-2 SURVEYING
More informationSlope Floor. Measurement Methods
Slope Floor Measurement Methods Many chair installations are on sloped floors. Hussey Seating uses five different feet for floor mount chairs based on the degree of slope. The slope of the floor is a critical
More informationChapter 2 Definitions and Acronyms
Advanced Materials and Technology Manual TABLE OF CONTENTS.0 Introduction... 1.1 Definitions... FIGURE.1 Schematic of Gridded All Passes Data and Gridded Final Coverage Data.... 4 FIGURE. Schematic of
More information