STOPOREN FACADE SYSTEM TIMBER WINDOW JOINERY - HEAD DETAIL

Size: px
Start display at page:

Download "STOPOREN FACADE SYSTEM TIMBER WINDOW JOINERY - HEAD DETAIL"

Transcription

1 INTERNAL LINING TIMBER LINTEL AS PER NZS 3604 FLEXIBLE FLASHING TAPE INSTALLED OVER AT AIRSEAL ON CORNERS PEF ROD GAP 7.5-8mm APPROX 35 RENDER 20mm DRAINED & VENTED CAVITY - BATTENS AT mm MAX.CTRS. PANEL FLASHING TAPE ONTO and OVER ALU.HEAD FLASHING STO upvc VENTED BASE CAP WITH MIN 5mm GAP ARCHITRAVE OR SLIMLINE DETAIL TIMBER WINDOW HEAD - PROFILE TO NZS MIN. 5mm GAP REQUIRED E2/AS1 COMPLIANT HEAD FLASHING, WITH 15 SLOPE AND 10mm MIN COVER TO JOINERY AND 10mm FLASHING OR PROPRIETARY STOPENDS TIMBER WINDOW JOINERY - HEAD DETAIL PP 870

2 10 FLEXIBLE FLASHING TAPE INSTALLED OVER WALL UNDERLAY AT CORNERS LINE OF JAMB FLASHING AIRSEAL ON PEF ROD GAP 7.5-8mm APPROX TIMBER WINDOW SILL TO NZS 3610 CONTINUOUS PACKING E2/AS1 COMPLIANT SILL FLASHING WITH STOP-END, LAPPED UNDER JAMB FLASHING TURNED INTO FRAMING REVEALS AND TAPED AT CORNERS 25mm MIN. STO POREN PANEL END COVER WITH FLASHING TAPE STO upvc 6mm PREMESHED FINISHING EDGE MS SEALANT 20mm DRAINED & VENTED CAVITY - BATTENS AT mm MAX CTRS. RENDER JOINER TO EXTEND SILL WITH TIMBER FACING TO ACHEIVE MINIMUM 10mm COVER OVER SILL FLASHING (NOTE MEASURE ON SITE) TIMBER WINDOW JOINERY - SILL DETAIL PP 871

3 ARCHITRAVE OR SLIMLINE DETAIL INTERNAL LINING TURNED INTO FRAMING REVEALS AND TAPED AT CORNERS AIRSEAL GAP 10-12mm APPROX. AT JAMBS JAMB PACKER TO SUIT REBATE TIMBER JAMB - PROFILE TO NZS 3610 E2/AS1 COMPLIANT JAMB FLASHING SAWCUT AND SCREWED INTO JAMB WITH MS SEALANT OVER SCREWS PANEL POREN FIXING RENDER STO PREMESHED CORNER ANGLE LINE OF HEAD FLASHING LINE OF SILL FLASHING - LAPPED UNDER JAMB PACKING STO STICK ON JOINERY CONNECTOR ON JAMB FLASHING TIMBER WINDOW JOINERY - JAMB DETAIL PP 872

4 FLASHING TAPE 100mm MIN. UPSTAND TO JAMBS DOOR SILL TO NZS 3610 PROFILES TIMBER DOOR SILL TO NZS 3610 ON SUPPORT BAR STO upvc END CAP AND PREMESHED FINISHING EDGE AIR SEAL BOUNDARY JOISTS E2/AS1 COMPLIANT SILL FLASHING STOP ENDED AND LAPPED UNDER JAMB PACKERS 20mm CAVITY mm MAX. CTRS MS SEALANT TURNED INTO FRAMING REVEALS DPC PANEL RENDER KEEP & BATTENS 20MM UP FROM BOTTOM EDGE OF CLADDING 50 STO upvc VENTED BASE CAP or FOOT TRAY TIMBER DOOR JOINERY - TIMBER FLOOR THRESHOLD DETAIL PP 873

5 FLASHING TAPE 100mm MIN.UPSTAND TO JAMBS TIMBER SILL TO NZS 3610 STO ADJUSTABLE FOOT TRAY ADAPTED TO SUIT 50 20mm REBATE WITH DPM, PEF ROD AND MS SEALANT AIRSEAL CONCRETE H3.2 TIMBER PACKER ON DPC TO SUPPORT SILL SECURED TO CONCRETE SLAB WITH MASONRY ANCHORS TIMBER DOOR JOINERY - CONC. FLOOR THRESHOLD DETAIL PP 874

6 5 20mm DRAINED CAVITY PANEL RENDER INTERIOR LINING TIMBER LINTEL AS PER NZS 3604 AIRSEAL OVER PEF ROD GAP 7.5-8mm APPROX 50mm 35mm MIN. 10 FLASHING TAPE ONTO STO upvc VENTED BASE CAP MIN. 5mm GAP REQUIRED ALUMINUM WINDOW HEAD FLASHING MIN.15 SLOPE AND 10mm COVER AT WINDOW HEAD SEALANT REQUIRED FOR VERY HIGH AND EXTRA HIGH WIND ZONES PROPRIETARY NK PVCu WINDOW 1. IN EXTRA HIGH WIND ZONES INCREASE FLASHING UPSTAND TO 60mm AND USE A RIGID UNDERLAY 2. 10mm MINIMUM HEAD FLASHING OR PROPRIETARY STOPENDS REQUIRED NK PVCu JOINERY - HEAD DETAIL PP 875

7 PROPRIETARY NK PVCu WINDOW RSEAL ON PEF ROD GAP 7.5-8mm APPROX. RETURNED INTO OPENINGS & FLASHING PE CONTINUOUS ALONG LL MIN 100mm UP JAMBS & 50mm ONTO FACE OF TIMBER FRAMING TO NZS 3604 INTERIOR LINING FRAME BLOCK MS SEALANT STO upvc SILL FLASHING FOR NK PVCu JOINERY STO PREMESHED upvc CNR JOINERY SUPPORT BAR REQUIRE FOR OPENINGS OVER 600mm 20mm DRAINED CAVITY PANEL RENDER NK PVCu JOINERY - SILL DETAIL PP 876

8 FLASHING TAPE (100mm UP JAMBS) AIRSEAL ON PEF ROD GAP 7.5-8mm APPROX. H1.2 PACKER TO SUPPORT JOINERY STOTHERM 20mm VH CAVITY BATTEN LINE OF HEAD FLASHING OVER WITH STOPEND RENDER STO upvc JAMB FLASHING GLUE OR BED FLASHING IN PLACE BEFORE RENDERING PROPRIETARY NK PVCu WINDOW MS SEALANT TO JAMBS STO upvc PRE MESHED ANGLE NK PVCu JOINERY - JAMB DETAIL PP 877

9 20mm DRAINED CAVITY PANEL RENDER INTERIOR LINING TIMBER LINTEL AS PER NZS 3604 AIRSEAL OVER PEF ROD GAP 7.5-8mm APPROX 5 PROPRIETARY TAPE OVER HEAD FLASHING SUPPLIED AND INSTALLED BY FLASHMAN CONTRACTOR upvc VENTED BASE TRAY 25mm MIN. FROM OUTSIDE OF FRAMING TO BACK OF WINDOW FLANGE 25 MIN. 5mm GAP REQUIRED FLASHMAN EXTRUDED ALUMINIUM ONE PIECE CAVITY CLOSURE AND HEAD FLASHING WITH STOP END (SHOWN DASHED) SEALANT REQUIRED FOR VERY HIGH AND EXTRA HIGH WIND ZONES ALUMINIUM WINDOW JOINERY FLASHMAN HEAD FLASHING PP 878

10 FLASHMAN ALUMINIUM MITRE SOAKER SUPPLIED BY FLASHMAN INSTALLED BY BUILDER AIRSEAL ON PEF ROD GAP 7.5-8mm APPROX. RETURNED INTO OPENINGS & FLASHING TAPE CONTINUOUS ALONG SILL MIN 100mm UP JAMBS & 50mm ONTO FACE OF WALL UNDERLAY 14 GAUGE HOT DIP GALV.(316SS WHERE REQ.) S.T.H.C 600mm CTRS. WITH 65mm MIN. FRAME PENETRATION. SUPPLIED BY FLASHMAN TIMBER FRAMING TO NZS mm MIN. FROM OUTSIDE FACE OF THE FRAMING LINE TO THE BACK OF WINDOW FLANGE SUPPORT PACKER FLASHMAN BACK PLATE - SHOWN DASHED FLASHMAN EXTRUDED ALU.EURO SILL WITH END CAP - SHOWN DASHED ALT.METRO SILL - SHOWN DASHED 8 STO STICK ON JOINERY CONNECTOR 8mm MIN. H3.1 PACKER SUPPLIED AND INSTALLED BY FLASHMAN 20mm DRAINED CAVITY POREN FIXING RENDER FLASHMAN SILL FLASHING PP 879

11 INTERNAL LINING TIMBER FRAMING TO NZS3604 AIRSEAL ON PEF ROD GAP 7.5-8mm APPROX. FLASHING TAPE (100mm UP JAMBS) H1.2 PACKER TO SUPPORT JOINERY INSTALLED AS PER E2/AS1 ALUMINIUM WINDOW JOINERY 25 25mm MIN. FROM OUTSIDE FACE OF FRAMING TO BACK OF WINDOW FLANGE DO NOT FIX THROUGH FLASHING H3.1 PACKER SUPPLIED AND INSTALLED BY FLASHMAN CONTRACTOR FLASHMAN EXTRUDED ALUM. JAMB FLASHING upvc STICK ON JOINERY CONNECTOR STO upvc END CAP TO END OF PANEL LINE OF ALT. METRO SILL BELOW - SHOWN DASHED LINE OF FLASHMAN EURO SILL FLASHING FLASHMAN JAMB FLASHING PP 880

12 INSTALLED AS PER E2/AS1 20mm DRAINED CAVITY PANEL INTERIOR LINING TIMBER LINTEL AS PER NZS PANEL RENDER STO CAVITY JAMB FLASHING STOPENDS FLASHING TAPE ONTO STO upvc VENTED BASE CAP AIRSEAL OVER PEF ROD GAP 7.5-8mm APPROX 1. IN EXTRA HIGH WIND ZONES INCREASE FLASHING UPSTAND TO 60mm AND USE A RIGID UNDERLAY 2. 10mm MINIMUM HEAD FLASHING OR PROPRIETARY STOP ENDS REQUIRED 5 MIN. 5mm GAP REQUIRED ALUMINIUM WINDOW HEAD FLASHING MIN.15 SLOPE AND 10mm COVER AT WINDOW HEAD SEALANT REQUIRED FOR VERY HIGH AND EXTRA HIGH WIND ZONES PROPRIETARY HOMERIT PVC WINDOW JOINERY HOMERIT PVC JOINERY - HEAD DETAIL PP 881

13 AIRSEAL ON PEF ROD GAP 7.5-8mm APPROX. RETURNED INTO OPENINGS & FLASHING TAPE CONTINUOUS ALONG SILL MIN 100mm UP JAMBS & 50mm ONTO FACE OF AS PER E2/AS1 TIMBER FRAMING TO NZS 3604 INTERIOR LINING 5 PROPRIETARY HOMERIT PVC WINDOW JOINERY JOINERY SUPPORT BAR REQUIRE FOR OPENINGS OVER 600mm MS SEALANT 5mm GAP BETWEEN JOINERY & RENDER STO upvc ADJUSTABLE CNR STO upvc CAVITY FACE FIXED SILL & JAMB FLASHING 20mm DRAINED CAVITY PANEL POREN FIXING RENDER HOMERIT PVC JOINERY - SILL DETAIL PP 882

14 INTERNAL LINING TIMBER FRAMING TO NZS3604 LAPPED & STAPLED ONTO INSIDE FRAME COVERED WITH FLASHING TAPE AS PER E2/AS1 AIRSEAL ON PEF ROD GAP 7.5-8mm APPROX. FLASHING TAPE AS PER E2/AS1 H1.2 PACKER TO SUPPORT JOINERY STOTHERM 20mm VH CAVITY BATTENS PANEL FIXING RENDER PROPRIETARY HOMERIT PVC WINDOW JOINERY MS SEALANT STO upvc CAVITY JAMB FLASHING STO upvc PRE MESHED ADJUSTABLE CNR HOMERIT PVC JOINERY - JAMB DETAIL PP 883

C.00. Ullrich Aluminium Co. Ltd. Ulltraclad Aluminium Cladding September Wall Batten Elevation. Horizontal battens between verticals at soffit

C.00. Ullrich Aluminium Co. Ltd. Ulltraclad Aluminium Cladding September Wall Batten Elevation. Horizontal battens between verticals at soffit Horizontal battens between verticals at soffit 2 C.04 600 600 600 600 Cavity batten at 600 mm centres 1 C.03 Batten fixing points 1 C.04 1 C.07 1 C.12 1 C.13 1 C.14 Meter Box Window 1 C.08 1 C.09 800 800

More information

STOLITE CONSTRUCTION SYSTEM EXT.CORNER - MANUF.STONE/STOLITE

STOLITE CONSTRUCTION SYSTEM EXT.CORNER - MANUF.STONE/STOLITE RENDER TIMBER FRAMING WALL UNDERLAY CONTINUOUS AROUND CORNERS, POLYPROPYLENE TAPE APPLIED TO PROTECT WALL UNDERLAY 75mm MIN.WIDE CLIP ON MS SEALANT ON PEF ROD SEALANT TO JUNCTION PROPRIETARY MANUF.STONE

More information

The WANZ Guide to Window Installation

The WANZ Guide to Window Installation The WANZ Guide to Window Installation as described in E2/AS1 Amendment 5 1 October 2012 Ver. 1.2 Window Association of New Zealand Page 2 of 74 Contents Overview Page 5 Objective Page 5 Scope Page 5 Opening

More information

STOPOREN FACADE SYSTEM DRAWING REGISTER

STOPOREN FACADE SYSTEM DRAWING REGISTER Drawing Description STO DRAWING REGISTER Drawing No. Drawing Register PP 001-006 Introduction Series 000 StoPoren Facade System StoArmat Render System PP 007 StoPoren Facade System StoPoren Render System

More information

System for 2+ Level Buildings

System for 2+ Level Buildings Issued Sept 205 Contact Info@symonite.co.nz System for 2+ Level Buildings Typical Details Issued: September 205 TYPICAL DETAILS CONTENTS.0 TYPICAL VERTICAL JOINTS 2.0 EXT. CORNER / TYPICAL HORIZONTAL JOINT

More information

Fibre Cement G C. Batten Fixing Setout ST-01. Jan 2014 A4 PROFILE DATE SCALE DETAIL DETAIL NO. Plank joint. 600mm stud crs.

Fibre Cement G C. Batten Fixing Setout ST-01. Jan 2014 A4 PROFILE DATE SCALE DETAIL DETAIL NO. Plank joint. 600mm stud crs. Plank joint 600mm stud crs 600mm 600mm 600mm Horizontal Structural Timber Cavity atten 50x20mm H3.1 atten fixing points 800mm 800mm 300mm 800mm Max. Nog spacing 50mm All intermediate battens to be 50x20mm

More information

ALPINE TRAY. To get the best from this product please follow these recommendations.

ALPINE TRAY. To get the best from this product please follow these recommendations. F I X I N G D E TA I L S ALPINE TRAY The standing seam roofing profile is designed to withstand some of New Zealand s harshest weather in our toughest environments. To get the best from this product please

More information

E2 REDWAY FLASHINGS. Product. Scope. Appraisal No. 977 [2017] Appraisal No. 977 (2017) BRANZ Appraisals

E2 REDWAY FLASHINGS. Product. Scope. Appraisal No. 977 [2017] Appraisal No. 977 (2017) BRANZ Appraisals E2 REDWAY FLASHINGS BRANZ Appraisals Technical Assessments of products for building and construction. Redway Developments Limited 162 Kendal Ave Burnside Christchurch Tel: 03 358 5775 Email: info@e2flashings.co.nz

More information

The WANZ Guide to Window Installation. as described in E2/AS1 Amendment 7

The WANZ Guide to Window Installation. as described in E2/AS1 Amendment 7 The WANZ Guide to Window Installation as described in E2/AS1 Amendment 7 1 November 2017 Version 1.4 0800 397 263 technical@altus.co.nz The WANZ Guide to Window Installation as described in E2/AS1 Amendment

More information

How-To-build guide Garden shed

How-To-build guide Garden shed How-To-build guide Garden shed What you can build using this guide This guide will show you how to build a re-locatable garden shed. Before you begin building Contact your local territorial authority to

More information

BBS Rusticated & Splaycut Cavity System

BBS Rusticated & Splaycut Cavity System BBS Rusticated & Splaycut Cavity System 2018 www.bbstimbers.co.nz www.cedarcorp.co.nz BBS Rusticated & Splaycut Weatherboard Cavity Wrap System Installation Specifications 1.0 General Information Introduction

More information

Ulltraclad Aluminium Cladding. Contents. 1.0 General Information Design Information Installation Information 7. 4.

Ulltraclad Aluminium Cladding. Contents. 1.0 General Information Design Information Installation Information 7. 4. Ulltraclad Aluminium Cladding Contents 1.0 General Information 2 2.0 Design Information 4 3.0 Installation Information 7 4.0 Maintenance 10 5.0 Health & Safety 10 1 1.0 General Information 1.1 Introduction

More information

TARANAKIPINE WEATHERBOARD SYSTEM Installation information and technical drawings TIMBER WEATHERBOARDS NATURALLY BETTER FOR MORE THAN A CENTURY www.taranakipine.co.nz 1 CONTENTS May 2015 For the latest

More information

Quantum Sliding Door. Features & Benefits. Trend Windows & Doors Design Manual Q-Mk-1 May 2014

Quantum Sliding Door. Features & Benefits. Trend Windows & Doors Design Manual Q-Mk-1 May 2014 Quantum Sliding Door Features & Benefits 110 FRAME Robust 102mm semi commercial aluminium door frame. Combine with windows or can be used in integrated with Trend s Crestlite commercial applications. PANELS

More information

4256HM JAMES HARDIE MONOLITHIC CLADDING

4256HM JAMES HARDIE MONOLITHIC CLADDING 4256HM JAMES HARDIE MONOLITHIC CLADDING 1. GENERAL This section relates to the supply and fixing of fibre cement flush finish cladding: - James Hardie Monotek Sheet for textured coating systems - James

More information

ADGV_001_FASTPOS. Date Jan 2013 Detail. Profile. Fastener Positioning Scale 1:20 Detail No. ADGV_ mm from top edge. 600mm MAX CTRS TIMBER STUDS

ADGV_001_FASTPOS. Date Jan 2013 Detail. Profile. Fastener Positioning Scale 1:20 Detail No. ADGV_ mm from top edge. 600mm MAX CTRS TIMBER STUDS ADGV_001_FASTPOS Panel Timber Frame 12mm from top edge 600mm MAX CTRS TIMBER STUDS 200 mm MAX CTRS 50mm from corner Fastener Positioning Scale 1:20 No. ADGV_001 ADGV_003_SHTEDGEPOS Centre line of Timber

More information

The Roofing Store TRS 9 35MM 78MM 150MM 78MM PRODUCT TECHNICAL DATA

The Roofing Store TRS 9 35MM 78MM 150MM 78MM PRODUCT TECHNICAL DATA TRS 9 35MM 78MM 150MM 78MM THICKNESS END SPAN INTERNAL SPAN MINIMUM PITCH 0.55MM 2.30M 3.20M 3 DESCRIPTION TRS 9 profile is designed for commercial and industrial roofing. The profile is suitable for low

More information

A-lign Technical Manual

A-lign Technical Manual A-lign Technical Manual Bevelback Weatherboard Nail-free Boardface System Solution High Moisture Protection From Renewable Wood Fast Install & Less Waste NZBC Compliant Primed & Undercoated BRANZ Appraised

More information

SPECIFICATION FOR. BRANZ Appraisal Certificate # 621 (2008)

SPECIFICATION FOR. BRANZ Appraisal Certificate # 621 (2008) SPECIFICATION FOR TEKTON WEATHERIZATION SYSTEM BRANZ Appraisal Certificate # 621 (2008) MW TWS 10/07/2012 Page 1 SYSTEM DESCRIPTION The Tekton Weatherization System consists of TEKTON Wall Underlay, Tekton

More information

THIS DRAWING IS INDICATIVE ONLY AND BY NO MEANS COMPREHENSIVE

THIS DRAWING IS INDICATIVE ONLY AND BY NO MEANS COMPREHENSIVE BRANZ Appraised Appraisal No. 547 [2007] NURALITE Nuralite Waterproofing Ltd. 53A Victoria Street, Onehunga, Auckland 1061, Zealand TEL: (64) (9) 579-2046 FAX: (64) (9) 579-5136 email: info@nuralite.co.nz

More information

UPVC Door Measuring Guide

UPVC Door Measuring Guide UPVC Door Measuring Guide Guide to measuring for your new wdc upvc door www.wdc-doorsdirect.co.uk This guide presumes that the user is either an experienced trade person or a competent DIYer You will need

More information

Liniar Window. installation guide

Liniar Window. installation guide Liniar Window installation guide This installation guide is designed to show you the best way to fit Liniar windows, and covers all styles of window made from Liniar s lead-free 70mm PVCu profile. Not

More information

JAMES HARDIE RIGID AIR BARRIERS

JAMES HARDIE RIGID AIR BARRIERS Product 1.1 James Hardie Rigid Air Barriers are a range of rigid wall underlay materials including RAB Board and HomeRAB Pre-Cladding. They are sealed fibre cement sheets designed for use as rigid wall

More information

General Installation Guidelines

General Installation Guidelines g e n e r a l i n s t a l l a t i o n g u i d e l i n e s General Installation Guidelines Although Nutec Building Planks do not contain asbestos fibres, it is nevertheless recommended that when working

More information

Timber Cavity Batten Technical Specifiction

Timber Cavity Batten Technical Specifiction Timber Cavity Batten Technical Specifiction OCTOBER 2016 I NEW ZEALAND Contents 1 APPLICATION AND SCOPE 3 1.1 Application 3 1.2 Scope 3 1.3 Details 3 1.4 Specific Design 3 2 DESIGN 3 2.1 Compliance 3 2.2

More information

Pipe penetration refer CT15. Viking CertainTeed Shingles General Roof details

Pipe penetration refer CT15. Viking CertainTeed Shingles General Roof details Vented ridge refer CT02 Substrate Viking SuperStrand or F11 Roofing ply Pipe penetration refer CT15 Valley details refer CT07 and CT08 refer CT17 and CT18 for requirements Drip-edge refer CT01 Barge detail

More information

A Shell construction

A Shell construction A Shell construction A 4/2012 Content 1 BASE AND WALL ANCHORING 1.1 Base with mortar bed 1.2 Base with sill plate 1.3 Base with raised sill plate 1.4 Concrete base (mortar bed) 1.5 Concrete base (sill

More information

Acceptable Standards of Domestic Construction

Acceptable Standards of Domestic Construction Truss or Rafter Roof Batten Triple grip fastener (for roof trusses) Foil lined Insulation blanket Top plate Sprocket Brick tie Top plate strapping at 1200mm max. cts. Note: Holding down straps should be

More information

9.0 PS Pacbld Sidings

9.0 PS Pacbld Sidings The application: 9.0 PS Pacbld Sidings Revision: June 2017 9.0 PS Pacbld Sidings Full Manual Revision: Jun 2017 Contents 1. Product Information 2. Quality Assurance Check Sheet 3. Maintenance 4. Details

More information

PVCu FOLD & SLIDE DOOR OUTWARD OPENING

PVCu FOLD & SLIDE DOOR OUTWARD OPENING PVCu FOLD & SLIDE DOOR OUTWARD OPENING STEP-BY-STEP FULLY ILLUSTRATED ASSEMBLY INSTRUCTIONS This product is covered by a 10 year manufacturer s guarantee. Should any part of it become defective due to

More information

WINDOW JAMB FITTED SILL FLASHING GOES BEHIND SILL FIXING FIN AND AT LEAST 3 BRICK COURSES DOWN (LAP IF NECESSARY) WEEP HOLES ABOVE FLASHING

WINDOW JAMB FITTED SILL FLASHING GOES BEHIND SILL FIXING FIN AND AT LEAST 3 BRICK COURSES DOWN (LAP IF NECESSARY) WEEP HOLES ABOVE FLASHING upvc Window upvc Window Brick Veneer Applications Cavity Brick Applications IMPOR TANT Ensure building loads do not bear on window WINDOW FITTED Ensure building loads do not bear on window FOR ALTERNATE

More information

RECOMMENDED INSTALLATION PROCEDURE LEVEL 3

RECOMMENDED INSTALLATION PROCEDURE LEVEL 3 Step 1. Install Sill Flashing Product: 9" or 12" RainBuster #440 SubZero Flashing Tape 1.A Flashing Length = (Rough Opening Width) + 12" 1.B Install sill flashing flush with the sill of the rough opening.

More information

Best Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications.

Best Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications. Best Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications. EXTERIOR INSULATION & FINISH SYSTEM CONSTRUCTION Data Published Courtesy

More information

BARRIER SPECIFICATION & INSTALLATION GUIDE SEPTEMBER 2017

BARRIER SPECIFICATION & INSTALLATION GUIDE SEPTEMBER 2017 BARRIER SPECIFICATION & INSTALLATION GUIDE SEPTEMBER 2017 Information contained within is specific to structural plywood products and must not be used with any other plywood products, no matter how similar

More information

Installation instructions: Elements Vulcan+ Newport Hector Cladding

Installation instructions: Elements Vulcan+ Newport Hector Cladding Technical Data Wood Species Thermally Modified Softwood (Pinus Radiata) Images Profile Newport Hector - Light Band Sawn face - Secret fix 5.4 6.0 8.5 3.0 25.0 3.0 111.0 3.0 12.0 R 3.0 7.0 7.0 123.0 15.0

More information

NEW HOME WARRANTY A REFERENCE GUIDE FOR TYPICAL WALL AND WINDOW DETAILS (RAINSCREEN SYSTEM) SHOWN AS FIBRE CEMENT CLADDING

NEW HOME WARRANTY A REFERENCE GUIDE FOR TYPICAL WALL AND WINDOW DETAILS (RAINSCREEN SYSTEM) SHOWN AS FIBRE CEMENT CLADDING NEW HOME WARRANTY A REFERENCE GUIDE FOR TYPICAL WALL AND WINDOW DETAILS (RAINSCREEN SYSTEM) SHOWN AS Reference Guide 0.1 GENERAL 0.1 Reference Guide 0.2 Index 0.3 Disclaimer & Limitations 0.4 General Notes

More information

NULINE PLUS WEATHERBOARD CAVITY SYSTEM. Product. Scope. Appraisal No. 641 [2015]

NULINE PLUS WEATHERBOARD CAVITY SYSTEM. Product. Scope. Appraisal No. 641 [2015] NULINE PLUS WEATHERBOARD This Appraisal replaces BRANZ Appraisal No. 641 (2009). BRANZ Appraisals Technical Assessments of products for building and construction. Appraisal Holder: BGC Fibre Cement Australia

More information

ASS 70 FD folding/sliding door installation guide

ASS 70 FD folding/sliding door installation guide ASS 70 FD folding/sliding door installation guide 2 Preparation IMPORTANT These doors should be fitted by competent and trained installers. Please read these instructions thoroughly before beginning the

More information

Windows Installed into Walls with Polyiso and Wood Framing. Installation Instructions Picture Frame Method Revised 10/24/2016

Windows Installed into Walls with Polyiso and Wood Framing. Installation Instructions Picture Frame Method Revised 10/24/2016 Windows Installed into Walls with Polyiso and Wood Framing Installation Instructions Picture Frame Method Revised 10/24/2016 Background There are many acceptable ways to mount and detail windows for support

More information

STEEL FRAMING WEATHERBOARD SYSTEM

STEEL FRAMING WEATHERBOARD SYSTEM T A R A NAK IPINE STEEL FRAMING WEATHERBOARD SYSTEM Installation information and technical drawings TIMBER WEATHERBOARDS NATURALLY BETTER FOR MORE THAN A CENTURY www.taranakipine.co.nz T A R ANAKIPINE

More information

TEKTON WEATHERIZATION SYSTEM SPECIFICATION

TEKTON WEATHERIZATION SYSTEM SPECIFICATION MWNZ Tekton Weatherization System AUG 2017 TEKTON WEATHERIZATION SYSTEM SPECIFICATION SYSTEM DESCRIPTION The Tekton Weatherization System consists of TEKTON Wall Underlay, Tekton SEAM TAPE, TRADE-SEAL

More information

Installation Guide. Evolve bi-fold. 8. Door restrictor- optional p9. 1. Before you start p2. 9. Adjustment. 2. Measuring and surveying p2

Installation Guide. Evolve bi-fold. 8. Door restrictor- optional p9. 1. Before you start p2. 9. Adjustment. 2. Measuring and surveying p2 Evolve bi-fold Installation Guide 1. Before you start p2 8. Door restrictor- optional p9 2. Measuring and surveying p2 3. Configuration details p4 4. Installation p5 5. Glazing p5 6. Glazing packer details

More information

Windows Installed into Walls with Polyiso and Wood Framing. Installation Instructions Standard Method Revised 10/24/2016

Windows Installed into Walls with Polyiso and Wood Framing. Installation Instructions Standard Method Revised 10/24/2016 Windows Installed into Walls with Polyiso and Wood Framing Installation Instructions Standard Method Revised 10/24/2016 Background There are many acceptable ways to mount and detail windows for support

More information

ASS 70 FD folding / sliding door. Installation Guide

ASS 70 FD folding / sliding door. Installation Guide ASS 70 FD folding / sliding door Installation Guide IMPORTANT! These doors should be fitted by competent and trained installers. Please read these instructions thoroughly before beginning the installation.

More information

TYPICAL BARGE DETAIL - CROSS SECTION

TYPICAL BARGE DETAIL - CROSS SECTION SELECTED OWENS CORNING ASPHALT SHINGLES APPLY A BEAD OF BITUMASTIC ADHESIVE/SEALANT METAL BARGE DRIP EDGE FLASHING No15 RAG FELT ROOF UNDERLAY PLYWOOD ROOF FRAME BARGE BOARD SOFFIT LINING (IF APPLICABLE)

More information

ISSUE Erection Manual

ISSUE Erection Manual Erection Manual The details and information in this book are for guidance of the erection of panels and flooring only. They are not site specific. Refer to the relevant panel drawings for the site, which

More information

DurasheetTM Fibre Cement

DurasheetTM Fibre Cement DurasheetTM Fibre Cement fibre cement sheets Durasheet TM - tough and durable History & Mission BGC Fibre Cement is a proud Australian owned manufacturer of fibre cement products. BGC has state-of-the-art

More information

Extrusions GB-3-IN01. Updated: Scale: REV: - This Drawing is Protected by Copyright Altus NZ Ltd.

Extrusions GB-3-IN01. Updated: Scale: REV: - This Drawing is Protected by Copyright Altus NZ Ltd. Extrusions Updated: N/A Scale: N.T.S REV: - Dwg Dwg Revision Rev No Description Description Date GB-3-IN01 Index Page - - - - - GB-3-001 Extrusions - - - - - GB-3-002 Extrusions - - - - - GB-3-003 Extrusions

More information

DURABARRIER RIGID SHEATHING / AIR BARRIER

DURABARRIER RIGID SHEATHING / AIR BARRIER APRIL 2013 RIGID SHEATHING / AIR BARRIER AUSTRALIAN OWNED & MANUFACTURED WWW.BGCINNOVADESIGN.CO.NZ WWW.BGC.COM.AU/FIBRECEMENT APRIL 2013 INTRODUCING INNOVA INNOVA IS A BRAND NEW RANGE OF FACADE AND FLOORING

More information

UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND DETAILS SEVERE WEATHER

UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND DETAILS SEVERE WEATHER CAMPUS STANDARDS APPENDIX I UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND DETAILS SEVERE WEATHER February 21, 2014 WINDOW INSTALLATION SEQUENCING GUIDE Issued By: Pyatok Architects and Allana Buick &

More information

SHADOWCLAD SPECIFICATION & INSTALLATION GUIDE

SHADOWCLAD SPECIFICATION & INSTALLATION GUIDE SHADOWCLAD SPECIFICATION & INSTALLATION GUIDE FOR CAVITY CONSTRUCTION MAY 2018 Information contained within is specific to Shadowclad structural plywood products and must not be used with any other plywood

More information

UNIT 5: EXTERIOR DOORS AND WINDOWS

UNIT 5: EXTERIOR DOORS AND WINDOWS KEY CONCEPTS 1. Identify tools needed for exterior door and window installation 2. Last step to weather proofing the home 3. Steps to installing exterior doors and windows 4. Maintenance and safety of

More information

PROTECTO SILL WINDOW SEALING SYSTEM. Product. Scope. Appraisal No. 444 [2017]

PROTECTO SILL WINDOW SEALING SYSTEM. Product. Scope. Appraisal No. 444 [2017] PROTECTO SILL WINDOW SEALING SYSTEM This Appraisal replaces BRANZ Appraisal No. 444 (2011) BRANZ Appraisals Technical Assessments of products for building and construction. Marshall Innovations Limited

More information

TRADE SILL FLASHING TAPE. Product. Scope. Appraisal No. 712 [2012] Appraisal No. 712 (2012) Amended 19 July BRANZ Appraisals

TRADE SILL FLASHING TAPE. Product. Scope. Appraisal No. 712 [2012] Appraisal No. 712 (2012) Amended 19 July BRANZ Appraisals TRADE SILL FLASHING TAPE Amended 19 July 2017 BRANZ Appraisals Technical Assessments of products for building and construction. Marshall Innovations Limited PO Box 9411 Greerton Tauranga Tel: 07 543 0948

More information

Dear Contractor, I am glad that you are interested in our window rebate program.

Dear Contractor, I am glad that you are interested in our window rebate program. Dear Contractor, I am glad that you are interested in our window rebate program. I have included three documents with this letter. One is our form to indicate your intention to participate in the program.

More information

Installation Instructions

Installation Instructions TEL: 09 579-8895 FAX: 09 579-2933 EMAIL: sales@nzfiredoors.co.nz NZ Fire Doors Ltd, 89 Gavin Street, Ellerslie, PO Box 12709, Penrose 1642, Auckland, New Zealand. www.nzfiredoors.co.nz Installation Instructions

More information

ThermoSpan EPS. Metalcraft COMMERCIAL ROOFING CREPS. Insulated Panel Systems DETAIL LIST

ThermoSpan EPS. Metalcraft COMMERCIAL ROOFING CREPS. Insulated Panel Systems DETAIL LIST ThermoSpan EPS DETAIL LIST 00 / 15 COVER SHEET 01 / 15 RIDGE DETAIL 02 / 15 HEAD FLASHING DETAIL 03 / 15 EAVES GUTTER DETAIL 04 / 15 INSULATED GUTTER 05 / 15 INSULATED BOX GUTTER 06 / 15 BARGE CAPPING

More information

Window Frame Installation Instructions For Nail-on and Block Frames

Window Frame Installation Instructions For Nail-on and Block Frames General The key to any window or door installation is preparation. This extends from storage of the product to the final installation and to all points in between. Careful planning and attention to detail

More information

INSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS

INSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS 2008 Pella Corporation Part Number: 803V0101 INSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS Installation Instructions for Typical Wood Frame Construction. These instructions were developed

More information

A-lign Technical Manual

A-lign Technical Manual A-lign Technical Manual Vertical Shiplap Weatherboard High Moisture Protection Fast Install & Less Waste Primed & Undercoated From Renewable Wood System Solution From Renewable Wood BRANZ Appraised NZBC

More information

ES2. fully integrated screening system for bifold doors. load balancing technology. tough PVC-coated polyester mesh.

ES2. fully integrated screening system for bifold doors. load balancing technology. tough PVC-coated polyester mesh. ES2 fully integrated screening system for bifold doors load balancing technology tough PVC-coated polyester mesh tight technology ES2 BIFOLD DOOR SCREENING SYSTEM ES2: DOOR SCREENING SYSTEM BIFOLDING HARDWARE

More information

Timber to Timber - Timber to Concrete - Timber to Steel

Timber to Timber - Timber to Concrete - Timber to Steel 01/2017 TIMBER CONNECTORS NOT TO BE USED IN EXTERIOR SITUATIONS Stainless Steel alternatives are available where stated Timber to Timber - Timber to Concrete - Timber to Steel MiTek manufactures and markets

More information

The Leka System Installation Guide

The Leka System Installation Guide Installation Guide The Leka System Installation Guide The following guide has been created to assist in the fabrication and installation of the Leka System. Please note that each roof is individual and

More information

How to operate (folding)

How to operate (folding) How to operate (folding) LEFT HAND STACKING OUTWARD OPENING How to operate (folding) RIGHT HAND STACKING OUTWARD OPENING LOCK BOTH LEVER HANDLE AND FLAT HANDLE UTILISING THE D-HANDLE LOCATED ABOVE THE

More information

VENTED GABLE DETAIL ROOF PANEL GABLE FLASHING 24" C/C MAX. BUTYL SEALANT TAPE ROOF PURLIN FLASH AB-1, AB-2, AB-3, OR AB-4

VENTED GABLE DETAIL ROOF PANEL GABLE FLASHING 24 C/C MAX. BUTYL SEALANT TAPE ROOF PURLIN FLASH AB-1, AB-2, AB-3, OR AB-4 ROOF PANEL GABLE FLASHING FASTENER @ 24" C/C MAX. ROOF PURLIN BUTYL SEALANT TAPE FLASH AB-1, AB-2, AB-3, OR AB-4 FASTENER @ EVERY MAJOR RIB OR 12" C/C MAX. F-J TRIM FABRAL ALUMINUM SOFFIT FASTENER 24"

More information

WEB BASED CORE APPLICATION SPECIFIC INSTALLATION INFORMATION AND METHODS

WEB BASED CORE APPLICATION SPECIFIC INSTALLATION INFORMATION AND METHODS CORE WEB BASED CORE APPLICATION SPECIFIC INSTALLATION INFORMATION AND METHODS Proper Window & Door Flashing Although all possible measures have been taken to insure the accuracy of the material presented,

More information

Installation Guidelines For Quaker Window Products Aluminum flange fin sub sill & receptor system using a T mulled twin window unit.

Installation Guidelines For Quaker Window Products Aluminum flange fin sub sill & receptor system using a T mulled twin window unit. Installation Guidelines For Quaker Window Products Aluminum flange fin sub sill & receptor system using a T mulled twin window unit. Installer: Read these instructions completely before starting any installation.

More information

Curtain Wall Installation Guide

Curtain Wall Installation Guide Curtain Wall Installation Guide Curtain Wall Installation Guide 1 IMPORTANT NOTICES! Important Notices & Information Manufacturer s Notes: The building envelope must be correctly prepared with weather

More information

Installation guide for 20/20

Installation guide for 20/20 Introduction The following installation instructions are recommended minimum requirements for the 20/20. The designer and fixer should ensure that tiles are installed in accordance with BS 5534; The British

More information

Gable HomeshedsTM INSTALLATION BEFORE YOU START TOOLS REQUIRED GUIDE LARGE SPAN. Council Approval. Before Starting

Gable HomeshedsTM INSTALLATION BEFORE YOU START TOOLS REQUIRED GUIDE LARGE SPAN. Council Approval. Before Starting INSTALLATION GUIDE Gable HomeshedsTM LARGE SPAN BEFORE YOU START Council Approval It is important to contact your local council before building your Stratco Gable Homeshed. You will have already received

More information

KS SERIES - VERTICAL INSTALLATION

KS SERIES - VERTICAL INSTALLATION CS-DS-01-KSV CS DISCLAIMER CS-PJ-01-KSV KS42SL EXPANDED PANEL JOINT CS-PJ-02-KSV KS42SL ENGAGED PANEL JOINT CS-PJ-03-KSV KS45SL EXPANDED PANEL JOINT CS-PJ-04-KSV KS45 FLAT ENGAGED PANEL JOINT CS-PJ-05-KSV

More information

Side Light Frame Pack Assembly Instructions

Side Light Frame Pack Assembly Instructions Please read this complete set of assembly instructions before starting the installation and only when you understand the construction method start to follow the step by step guide. IDENTIFY THE PACK CONTENTS

More information

Before installation, check your local and state requirements for this type of install.

Before installation, check your local and state requirements for this type of install. 1 Remove Packaging & Inspect Your Patio Door Remove shipping materials such as corner covers or pads. 2 Inspect Rough Opening Verify that the width and height of the patio door are each 1/2" to 3/4" smaller

More information

Finesse Profiles. Nailstrip

Finesse Profiles. Nailstrip Installation Details Profile and Lap Detail 265/465 38mm NAILSTRIP *other widths available CD GRADE PLYWOOD 19mm STRUCTURE SILICONE * MIN 20mm VENTILATION GAP * WHEN ROOF PITCH IS UNDER 7.5 OR TOTAL COMBINED

More information

Door Canopy. PDL Building Products Industrial Parkway, N. Olmsted, OH Phone:

Door Canopy. PDL Building Products Industrial Parkway, N. Olmsted, OH Phone: Door Canopy Door Canopies are attractive and efficient while eliminating the need and expense of drafting and manufacturing canopies as part of the building package. Construction: 26 gauge material around

More information

INSTALLATION SHOP DRAWINGS FOR MINNEAPOLIS, MN

INSTALLATION SHOP DRAWINGS FOR MINNEAPOLIS, MN MINNEAPOLIS, MN 2-0- 2-- General Notes Abbreviations Deviations from Architectural Specifications Deviations from Architectural Drawings ALUM. = ALUMINUM B.O. = BY OTHERS CONT. = CONTINUOUS. = CLEARANCE

More information

Side Light Frame Pack Assembly Instructions

Side Light Frame Pack Assembly Instructions Side Light Frame Pack Assembly Instructions Please read this complete set of assembly instructions before starting the installation and only when you understand the construction method start to follow

More information

MULTISLIDE DOORS INSTALLATION GUIDE & SITE PREPARATION

MULTISLIDE DOORS INSTALLATION GUIDE & SITE PREPARATION MULTISLIDE DOORS INSTALLATION GUIDE & SITE PREPARATION TOOLS AND SUPPLIES 1 TOOLS CHECK LIST 1. laser level 2. hammer 3. pry bars 4. ladders 5. utility knife 6. screw gun 7. applicator foam gun 8. "j"

More information

FD30 & FD60 FRAME & DOOR INSTALLATION GUIDE

FD30 & FD60 FRAME & DOOR INSTALLATION GUIDE FD30 & FD60 FRAME & DOOR INSTALLATION GUIDE SUPPORTING CONSTRUCTION The supporting construction may be timber or steel stud plasterboard partition, metal stud demountable partition or masonry wall, but

More information

CROSSBAR RAFTER ISOMETRIC

CROSSBAR RAFTER ISOMETRIC Super Sky Products' typical glazing system consists of glass panels or "lites" which are attached to the main framing members using extruded aluminum "retainers" or "pressure plates". These retainers are

More information

Integrity Polygon and Round Top Installation and Finishing Instructions

Integrity Polygon and Round Top Installation and Finishing Instructions Integrity Polygon and Round Top Installation and Finishing Instructions 08/20/2004 70852 BEFORE YOU BEGIN IMPORTANT: Read these instructions thoroughly before beginning to install your Integrity Polygon

More information

Note. Returns are blocks / mouldings that have finished sides suitable for doors and windows as shown below. Surround return.

Note. Returns are blocks / mouldings that have finished sides suitable for doors and windows as shown below. Surround return. Installation detail. More than a wall finish, it s a complete thermally insulated interlocking stone cladding system. To get started you will need... Electric/battery power drill, a 100mm or 125mm angle

More information

Installation Guide. WarmCore. Folding Sliding door system. Glass Packing. Pre-Installation. Removing the Existing Door.

Installation Guide. WarmCore. Folding Sliding door system. Glass Packing. Pre-Installation. Removing the Existing Door. WarmCore Installation Guide Pre-Installation Glass Packing p5 Removing the Existing Door Glazing Sequence p6 Preparing the Opening Glass Packing Locations for Toe & Heel p6 Door Alignment Sill Options

More information

Fold-A-Way Patio Door ASSEMBLY & INSTALLATION GUIDE

Fold-A-Way Patio Door ASSEMBLY & INSTALLATION GUIDE Fold-A-Way Patio Door ASSEMBLY & INSTALLATION GUIDE This instruction guide provides the minimum recommended procedures to correctly prepare the rough opening, install a fold-a-way patio door unit and apply

More information

Providing 3 Layers of Protection

Providing 3 Layers of Protection Providing 3 Layers of Protection Barrier 1: Barrier 2: Barrier 3: Integrate the Opening Seal the Exterior Seal the Interior Standard Integral Flange After Housewrap Standard Window Integral Flange After

More information

DW HORIZONTAL INSTALLATION

DW HORIZONTAL INSTALLATION AR-PJ-01-DW2H 2" HORIZONTAL PANEL JOINT AR-PJ-02-DW2H 2" VERTICAL PANEL JOINT AR-PJ-03-DW2H 3" HORIZONTAL PANEL JOINT AR-PJ-04-DW2H 3" VERTICAL PANEL JOINT AR-PJ-05-DW2H CUSTOM REVEAL AR-PJ-06-DW2H DW-2000S

More information

maintenance-free free from painting easy to install Fixing Guide Cedral Lap

maintenance-free free from painting easy to install Fixing Guide Cedral Lap maintenance-free free from painting easy to install Fixing Guide Cedral Lap www.cedralsidings.com CONTENT Step by step guide to installing your Cedral façade Required materials and tools 1. Prepare wall(s)

More information

900 SERIES WALL PANELS

900 SERIES WALL PANELS CI-DS-01-900 CI-PP-01-900 CI-PJ-01-900 CI-PJ-02-900 CI-PJ-03-900 CI-BS-01-900 CI-BS-02-900 CI-BS-03-900 CI-BS-04-900 CI-BS-05-900 CI-OC-01-900 CI-OC-02-900 CI-IC-01-900 CI-FO-01-900 CI-FO-02-900 CI-FO-03-900

More information

PIVOT DOOR 3400P INSTALLATION INSTRUCTIONS

PIVOT DOOR 3400P INSTALLATION INSTRUCTIONS Table of Contents I. Tools, Sealant Requirements, Anchor Recommended Table...1 II. Opening, Frame & Panel Verification...2-3 III. Frame Assembly...4 IV. Frame Installation...5-7 V. Glazing Instructions...8

More information

SERIES 4070-T GENERAL ASSEMBLY AND INSTALLATION INSTRUCTIONS

SERIES 4070-T GENERAL ASSEMBLY AND INSTALLATION INSTRUCTIONS Table of Contents I. Care and Maintenance... 2 II. Tools / Materials, Sealant Requirements, & Anchor Instructions... 2 III. Structure Verification & Sub-Sillpan Installation... 3 1. Opening Verification...3

More information

6x6 Shed Plans and Building Guide

6x6 Shed Plans and Building Guide Page 1 Legal 2018 Zac Spade & Christopher D. Brown. All Rights Reserved For information about special discounts available for bulk purchases, sales promotions, fundraising and educational needs, contact

More information

Installation Guidelines For ALUMINUM M-SERIES 3 PANEL SLIDING DOOR

Installation Guidelines For ALUMINUM M-SERIES 3 PANEL SLIDING DOOR www.quakerwindows.comv www.quakercommercialwindows.com PO Box 128 504 Highway 63 South Freeburg, MO 65035 800-347-0438 573-469-4151 (fax) Installation Guidelines For ALUMINUM M-SERIES 3 PANEL SLIDING DOOR

More information

Integrate the Window and WRB (1/2)

Integrate the Window and WRB (1/2) Window and WRB Installation - Window/WRB. Cut the house wrap flush along all sides of the rough opening.. Slope the sill and flash with flashing tape. Push the tape tight into the corners, being careful

More information

SovereignSeries. SovereignSeries

SovereignSeries. SovereignSeries 2 SovereignSeries Overview 21 Awning and Casement Windows 22 Sliding and Stacking Windows and Doors 32 inged Doors 50 Bi-fold and Inline Bi-fold Windows and Doors 62 SovereignSeries 2 SovereignSeries

More information

10x10 Shed Plans and Building Guide

10x10 Shed Plans and Building Guide Page 1 Legal 2018 Zac Spade & Christopher D. Brown. All Rights Reserved For information about special discounts available for bulk purchases, sales promotions, fundraising and educational needs, contact

More information

Deluxe Cabana INSTALLATION INSTRUCTIONS. INSTALLATION Deluxe INSTRUCTIONS Cabana

Deluxe Cabana INSTALLATION INSTRUCTIONS. INSTALLATION Deluxe INSTRUCTIONS Cabana INSTALLATION Deluxe INSTRUCTIONS Cabana 1 Deluxe Cabana 10 Year Guarantee On Sanders workmanship Made in NZ Using NZ timber supplies 40+ Years Experience In business since 1975 Professional Install Available

More information

In the 30-plus years that I ve been a remodeling contractor, I ve

In the 30-plus years that I ve been a remodeling contractor, I ve New Window in Redundant s and attention to detail keep out air and water By Mike Sloggatt In the 30-plus years that I ve been a remodeling contractor, I ve replaced hundreds of windows. The difficulties

More information

DOOR INSTALLATION GUIDE WOOD FRAMING New Construction

DOOR INSTALLATION GUIDE WOOD FRAMING New Construction DOOR INSTALLATION GUIDE WOOD FRAMING New Construction IMPORTANT NOTICES AND INFORMATION Read these instructions in their entirety prior to installing doors. Any local building code requirements supersede

More information

GROWING BETTER THROUGH DESIGN. 6ft Lean-To LEAN-TO. Assembly Instructions 04/02

GROWING BETTER THROUGH DESIGN. 6ft Lean-To LEAN-TO. Assembly Instructions 04/02 GROWING BETTER THROUGH DESIGN 6ft Lean-To LEAN-TO Assembly Instructions 04/02 6ft Lean-To Greenhouse Base Plan Introduction/Tools/Contents / / Contents This is a copy of our Lean-To greenhouse base plan.

More information

A1-1 D O R S E T A V E N U E SITE PLAN SITE PLAN

A1-1 D O R S E T A V E N U E SITE PLAN SITE PLAN -2,000 MORNING PATIO ±0 D O R S E T A V E N U E -2,800 SITE PLAN SCALE 1:200 CHECK ALL DIMENSIONS AND LEVELS ON SITE PRIOR TO CONSTRUCTION, REPORT ANY DISCREPANCIES TO THE ER SK 21.03.2014 SITE PLAN 21.03.14

More information