St. Patrick Church Altar/Ambo Project
|
|
- Mitchell Norton
- 5 years ago
- Views:
Transcription
1 St. Patrick Church Altar/Ambo Project View progress of our new altar and ambo. From initial design to final construction. Compiled from photos, descriptions, and video from Richard Helgeson
2 Scale Models: Version #1-- Table is scaled to 60" x 60" x 39" high. Human figure is scaled to 5'9" tall. Showing stone top, 8" thick. Legs are Douglas Fir, same material as structure in St. Patricks. Vertical members are 3" thick x 10" wide
3 Version #1--detail at corner
4 Black rough cut granite Version # 2--Same dimensions as #1. Additional element incorporated into top of legs to stand off the stone top.
5 Metal support structure.
6 The altar base has been delivered to my shop after receiving zinc chromate rust proofing treatment. The structure will be well protected. And, no chance of rust staining around the legs of the altar if water is spilled or an over-wet mop wicks water under the base.
7 You can see the bolt holes at the bottom of the leg assemblies. We were allowing for bolting to the floor but that will not be necessary. (These photos were shot with a wide angle lens it distorts perspective. Everything is straight and square.)
8 The altar base has been assembled and I am working on the wood cladding of it.
9 Altar support structure. Ready for wood veneer cladding. Top will be a square slab of black granite.
10 Gluing up the leg assemblies
11
12 Arched parts are glued and ready to be fit.
13 Fitting the foot on the leg assembly. (The base is set up off the floor on blocks so I can finish sand the legs.)
14 The underside being fit.
15 The altar stone is in its crate from Cold Spring. It s a little dusty on top the color is deeper. Looks very impressive in person.
16 Styrofoam mock-up of the altar
17 Stone panel mounted on standoffs creates shadow between stone and wood ambo.
18 Showing spacing around stone
19 Section through stone panel-- viewed from side of ambo. Front of ambo is to the right. The spacing creates depth and shadow around stone. It also allows space to drape a weighted fabric accent down the center of the stone slab. The fabric would have sewn looped ends, with weighted bars inserted through both ends to counterbalance the runner and hold the fabric straight/taut.
20 Showing seasonal textile accent.
21 Room for shelf in back. The bottom would be relieved to allow toekick space so reader could stand comfortably.
22
23 Mock-up block with one of St. Patrick s existing microphones. The craft paper is the size of the large books 14 tall.
24 The microphone will snap into the block, which has shock mount rubber isolation built into it. The craft paper indicates where the top of the book will land.
25
26 The steel will help support the reading surface. It is pierced near the point on the left. A screw will installed vertically, and hold the reading surface to the steel.
27
28
29 The ambo has been finished. I think there is a good balance between the protective film and retaining a natural look.
30 Room for shelf in back. The bottom would be relieved to allow toekick space so reader could stand comfortably. Ambo accent stone and steel. It s reflecting overhead fluorescent light and looks a little gray here. Lots of beautiful flecking.
31 Room for shelf in back. The bottom would be relieved to allow toekick space so reader could stand comfortably. Ambo accent.
32 Learn more about artist Richard Helgeson
2013 Feeney (2/14) # B. Aluminum Railing Systems
2013 Feeney (2/14) #2012-425B Aluminum Railing Systems Aluminum Railing Systems Searching For a Complete Railing System? Look No Further. DesignRail by feeney aluminum railing frame systems combine the
More informationVir Stil Console Lavatory INSTALLATION INSTRUCTIONS
THANK YOU FOR CHOOSING KALLISTA We appreciate your commitment to Kallista quality products. Please take a moment to review this manual before you install your Kallista product. If you encounter any installation
More informationVPN: ISBXLR. Copyright Black Box Corporation. All rights reserved Park Drive Lawrence, PA Fax
VPN: ISBXLR Copyright 2003. Black Box Corporation. All rights reserved. 1000 Park Drive Lawrence, PA 15055-1018 724-746-5500 Fax 724-746-0746 JULY 2003 RM649-R2 RM657 RM664 RM861 RM650 RM658-R2 RM665-R2
More information2015 Feeney (8/15) # D. Aluminum Railing Systems
2015 Feeney (8/15) #2012-425D Aluminum Railing Systems Aluminum Railing Systems Searching For a Complete Railing System? Look No Further. DesignRail by feeney aluminum railing frame systems combine the
More informationA Canadian Canoes Information Sheet MAKING A STRONGBACK USING MANUFACTURED I-BEAMS
A Canadian Canoes Information Sheet MAKING A STRONGBACK USING MANUFACTURED I-BEAMS BACKGROUND: We have worked with Ted Moores (author of CANOECRAFT and KAYAKCRAFT ) for 28 years. For most of that time,
More informationMENDOCINO PLANTER.
MENDOCINO PLANTER The Mendocino Planters are made with thick 3/4" walls. They ship finely finished in 5 parts to quickly reassemble and begin your gardening. Planters are measured externally and the internal
More informationBenham Design Concepts
Benham Design Concepts Custom Furniture By Brian Benham I Specialize in Building Unique Custom Pieces www.benhamdesignconcepts.com brianb@benhamdesignconcepts.com 719-347-5112 I'm the furniture maker and
More informationGlass Only (GO Glass) Glass sent with clips and screws 1" - 16"
Glass Only (GO Glass) Glass sent with clips and screws PRODUCT GO Glass is glass cut to size sent with clips, screws, and instructions for installation into doors. GO = GLASS ONLY 1" - 16" LEAD TIME 5-8
More informationAUXILIARY FRAMING AND ACCESSORIES
CUSTOM CABINETS & RACKS STRUT AND ACCESSO- RIES JUNCTION KITS ANGLE AND BRACE KITS SPLICE KITS BRACE KITS INSTALLATION KITS WALL ANGLE KITS RUBBER END CAPS SUPPORT INSTALLATION AND SUPPORT KITS STANCHION
More informationBuild Your Own Feeders Double-sided or Single-sided using Premier s panels!
Build Your Own Feeders Double-sided or Single-sided using Premier s panels! 800-282-6631 premier1supplies.com Premier s Double-Sided Feeder For large sheep and rams Material List 1. From Premier a. Four
More information136 PLYWOOD DESK 522
136 PLYWOOD DESK 522 Simple in design and inexpensive, this plywood desk is made from a single 4- x 8-foot panel. Plywood is available with many hardwood veneers; it can also be covered with plastic laminate,
More informationPatio Table. Page 1 of 16
Patio Table www.andrewharriswoodwork.com Page 1 of 16 Introduction This plan makes a table that is unit which is 95 ½ inches long and 49 inches wide. The distance from the underside of the top edging to
More informationHarriet Chair with Modifications
Harriet Chair with Modifications This modification of the Harriet chair includes a slat back, padded seat, and is 2 inches wider than the original plan. The overall dimensions of the finished chair: 38
More informationTop Installation Booklet
Top Installation Booklet. CUT-AWAY VIEW OF COMPLETED TOP INSTALLATION Before tackling the replacement of the top material on a Closed Cars, it is best to have all necessary materials for the job near at
More informationInstall Instructions for Corvallis #4008GRC Mantel
Install Instructions for Corvallis #4008GRC Mantel Please read this manual before installing the suite. This manual should remain with the homeowner. Updated 12/10/13 NOTE the installation requirements
More information6X3 Oscar Shed Assembly Manual
6X3 Oscar Shed Assembly Manual Revision #7 Jan 1st, 2017 Thank you for purchasing our 6x3 Oscar Storage Shed. Please take the time to identify all the parts prior to assembly. Please use Safety Eyewear
More informationSCI-FAB Product Specifications. Casework Section 1. Part 1 General
SCI-FAB Product Specifications Casework Section 1 Part 1 General 1.1 SCOPE OF WORK Includes all factory fabricated stainless steel casework as required by the project drawings. 1.2 TYPICAL INCLUSIONS A.
More informationLocks and Catches Catches and Furniture Bolts
Magnetic catch with low noise closure Material: Plastic housing Version: with closed surface and internal magnet, magnets no viewable : Press fixing Pull 0. kg, for drilling hole Ø8 mm white 26.01.701
More informationa.k.a. casegoods instructions
a.k.a. casegoods instructions a a.k.a. workwall installation IMPORTANT NOTES Failure to install product according to installation instruction will result in loss of warranty. Tools required for assembly
More informationlibrary shelving january 1, 2018 price list
library shelving january 1, 2018 price list Revolution Products 259 Whip O Will Drive Clinton, SC 29325 (864) 201-1357 / sales@revolutionproducts.com Welcome to BASICS Wood Shelving from Revolution Products.
More informationA Metal Polishing Jig. By Norm Berls
A Metal Polishing Jig By Norm Berls Why make a metal polishing jig Objective: polish small steel parts to a mirror-like finish. Silicon Carbide abrasive paper works well under certain conditions. Paper
More informatione series student furniture k > 12 & beyond : desks and tables extendibility
e series student furniture k > 12 & beyond : desks and tables extendibility The e series is designed to meet the demands of any academic setting and still look great. Durable enough for K through 12 and
More informationSutton Screened in Awning / Porch
Sutton Screened in Awning / Porch Sections: Project Overview Roof Work Cedar Framing Canopy Frame Screen Frames Misc. Sheet 1 - - - Index Sheet 2 - - - Project Summary Sheet 3 - - - Roof Work overview
More informationTANGENT SHELVING. Tangent has won numerous design awards since its introduction in 1997:
TANGENT SHELVING Tangent is an innovative, strong, and graceful shelving system. Tangent is unique because of its beautifully simple means of assembly. When the shelves are eased into their supports, they
More informationConcept
Concept squaretop Spring loaded Concept Squaretop rises from the surface for access to 4 power outlets and two telecom plates, populated with the connectors you specify. Specifications: All steel construction.
More informationINSTALLATION INSTRUCTIONS
Tools required for the installation. A. Core Drill 87mm Drill bit B. Tape measure C. Spirit Level D. Marking pen E. Caulking gun F. Cutting Pliers G. Cordless Drill and Philips head bit, 5mm Drill bit.
More informationFortress Al HOME posts must always be secured to the deck framing. Fortress Al HOME posts should never be attached to only the deck boards.
Installation Instructions for Fortress Al HOME Traditional Adjustable Panels with Simplified and Al HOME Posts It is the responsibility of the installer to meet all code and safety requirements, and to
More informationantebellum home in Eutaw, Alabama, built in 1860 (Google it for photos).
You Can Build the Kirkwood Bookcase By Jeff Branch A vid readers will tell you they often need a new way to store all of their books. I ve seen some pretty creative ways to stockpile books - in some instances
More informationMove System Swivel Caster Installation ( )
Move System Swivel Caster Installation (002-10265-00) Caution Always disconnect power to chair before removing covers or performing any service procedures. Step 1: Remove Top Cover A) Position chair to
More informationDHS-500 IMPACT SYSTEM INSTALLATION MANUAL
DHS-500 IMPACT SYSTEM INSTALLATION MANUAL TABLE OF CONTENTS SECTION PAGE GENERAL NOTES 3 EXTRUSION & PARTS IDENTIFICATION 4-5 DETERMINE FRAME SIZE 6 FABRICATE VERTICAL MULLIONS & FILLERS 7-8 FABRICATE
More informationSETUP INSTRUCTIONS If you would like to tell us about your experience with your setup instructions please us at
208 VK-233 General Layout 0 0 Plan View SETUP INSTRUCTIONS If you would like to tell us about your experience with your setup instructions please email us at info@classicexhibits.com 208 General Information
More informationSECTION METAL FABRICATIONS
SECTION 05100 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for metal fabrications, including minimum requirements for fabricator, and galvanizing. 1.02 REFERENCE STANDARDS A. ASTM
More informationScissor Stool. Written By: Feitan
Scissor Stool If the stool is going to be kept indoors simply rub all the pieces with a Minwax WipeOn Poly before assembling the stool. If it is going to go outdoors use Minwax SparUrathane and coat all
More informationFLUSH WOOD DOOR AND MODERN JAMB SPECIFICATION GUIDE
TRU&MODERN FLUSH WOOD DOOR AND MODERN JAMB SPECIFICATION GUIDE The Tru&Modern Flush Door (TMF Series) product represents a whole new approach to the flush door. One where we engineer for quality and beauty
More informationMurphy Door DIY Flush-Mount Bookshelf & Hardware Installation Manual
Murphy Door DIY Flush-Mount Bookshelf & Hardware Installation Manual The Murphy Door Flush-Mount Bookshelf was designed to install in the space normally occupied by a door. It is NOT designed to install
More information14 x 14 super quad. VISIT LINK BELOW FOR INSTALL VIDEO
in-ground installation instructions & user guide 14 x 14 super quad VISIT LINK BELOW FOR INSTALL VIDEO https://www.maxairtrampolines.com/pages/support-information-videos Page 2 TABLE OF CONTENTS Materials,
More informationTransition Range Installation, Care & Adjustment Instructions
Introduction The following instructions will enable you to complete the final assembly and adjustment of your new furniture. Hardware Box Each of the cabinets contains a Hardware box that contains all
More informationPROJECT PLANS EXPANDABLE CRAFT CENTER
R PROJECT PLANS EXPANDABLE CRAFT CENTER Whether you re working on craft projects, sewing, or pursuing another hobby, this craft center offers a great place to work. It features a large work surface that
More informationAmerica s leading woodworking authority To download these plans, you will need Adobe Reader installed on your computer. If you want to get a free copy, visit: http://adobe.com/ reader. Having trouble downloading
More informationSelecting Wood Furniture
Smart Shopping for Home Furnishings Selecting Wood Furniture Dr. Leona Hawks Home Furnishings & Housing Specialist 1987 HI 12 Shopping for wood furniture? Selecting high-quality wood chairs and benches
More informationArlink 8000 Workstation
Arlink 8000 Workstation Instructions for Assembly Introduction Basic Frame Assembly Worksurface Assembly Drawer and Power Beam Assembly Light Fixture and Shelves Worksurface Grounding Instructions Wrist
More informationMasterpiuma3 Glass &Tile Cutters:
Masterpiuma3 Glass &s: 2414 Converse Street Dallas, Tx 75207 T: 972-386-4900 F: 214-447-9581 Conceptsurfaces.com Lead Time: 1-2 Weeks/ Free Shipping for orders of $1,500 or more. 44P3 17-1/4 Can cut all
More informationC. Samples for Initial Selection: Manufacturer's color charts showing the full range of colors available.
SECTION 105113 - METAL LOCKERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationVintage Railcar Assembly
Vintage Railcar Assembly This model is about 150mm long and is designed to fit a track with 36mm between the inside surfaces of the two rails. In other words it is compatible with most of my other rail-mounted
More informationOffice Partitions WARNING. Assembly Instructions. Customer Service A S S E M B LY HARDWARE H1 H2 H3 H4 H5 H8 H9 H10 H11 H12
Customer Service 1-800-645-2986 Assembly Instructions WARNING In order to prevent structural failure, instability, t i p - o v e r, and/or serious injury, please follow i n s t ructions care f u l l y.
More informationGlenwood Canyon Collection Item No. OF-1021
Glenwood Canyon Collection Item No. OF-02 For assistance with assembly, please contact DTYStore.com Customer Satisfaction Center 866-27-855. CS@DTYStore.com Made in Vietnam Glenwood Canyon Collection OF-02
More informationTool 3-1 A2 Bushing 6 Check if the bushing supports (angle iron) are properly welded with the upper part of the structure pipes. welded bushing suppor
Rope Pump MANUFACTURING checklist for quality control A Welding General 1 Check if welding jigs are used for welding of the main parts (wheel, structure frame and bushings) 2 Check if the pump parts are
More informationWHEN DISASSEMBLING ALUMINUM EXTRUSION, TIGHTEN ALL SETSCREWS AND LOCKS TO PREVENT LOSS DURING SHIPPING
Order #xxxxx - Sacagawea - VK-23 - General Layout Step 0 Plan View 0 202 Page of 4 Order #xxxxx - Sacagawea - General Information Step 2 Using You Set-up Instructions: The Visionary Designs Set-up Instructions
More information10 x 12 home air pro. VISIT LINK BELOW FOR INSTALL VIDEO
in-ground installation instructions & user guide 10 x 12 home air pro VISIT LINK BELOW FOR INSTALL VIDEO https://www.maxairtrampolines.com/pages/support-information-videos Page 2 TABLE OF CONTENTS Materials,
More informationButterfly Leaf Dining Table Plans
Butterfly Leaf Dining Table Plans Part 1 An attractive dining table with a secret: the leaf folds and stores inside the table. Season 1, Episode 7 P a g e 2 I first saw a butterfly leaf table in a back
More information14000 Series. Fabrication and Installation Instructions
14000 Series Fabrication and Installation Instructions Revision May 2013 Table of Contents GENERAL CONSTRUCTION NOTES...3 EXTRUDED ALUMINUM PARTS...5 ACCESSORIES...8 OVERVIEW...10 FRAME FABRICATION...15
More informationFortress Railing Overview ACTUAL FREIGHT CHARGES APPLY TO ALL FORTRESS RAIL ORDERS
Fortress Railing Overview 4 3 1 Fe 26 Iron Railing Systems Fortress Use the steps below for the following pages to complete your rail Vertical Cable and Glass Options Available Fortress Iron Railing System
More information7 x 14 flybed tramp. VISIT LINK BELOW FOR INSTALL VIDEO
in-ground installation instructions & user guide 7 x 14 flybed tramp VISIT LINK BELOW FOR INSTALL VIDEO https://www.maxairtrampolines.com/pages/support-information-videos Page 2 TABLE OF CONTENTS Materials,
More informationPORTA-FAB Cleanroom Wall Systems
PORTA-FAB Cleanroom Wall Systems FABLINE BATTEN 2000 INSTALLATION INSTRUCTIONS IMPORTANT Porta-Fab Advises A Thorough Reading of These Instructions Before Beginning Installation. INTRODUCTION Porta-Fab
More informationINSTALLATION INSTRUCTIONS
Tools required for the installation. A. Core Drill 87mm Drill bit B. Tape measure C. Spirit Level D. Marking pen E. Caulking gun F. Cutting Pliers G. Cordless Drill and Philips head bit, 5mm Drill bit.
More informationInstallation Guide Simplicity Alfresco. V1.9 Lu070318
0333 305 5272 www.canoports.co.uk Installation Guide Simplicity Alfresco V1.9 Lu070318 Tools Required Below is a list of tools that you will require to install your the Simplicity Alfresco System. Cordless
More information37.5 M6. If the basin chain hole is not used, please cover it with the screw and nut supplied.
BASIN WASTE FLIP TOP SLOTTED CHROME 20003000018 WASTE SHELL SILICONE WASHER BASIN When fitting the waste, ensure the slotted side faces the overflow channel. SILICONE WASHER * FIXING NUT (OPTION 1) 37.5
More informationTechnical Product Description
Worktops 5. Thickness material structure Front edge Bottom face coating 40 mm, 50 mm Laminate according to standard: EN 438 Wood pore or relief, matt or gloss 2 x Radius 3 mm, 6 mm or 8 mm depending on
More informationFactory Assistance: Phone: Fax: Page 1
CABLE RUNWAY ACCESSORIES Radius Drop / Stringer Drop Provides 3 bend radius Radius drop fits 6, 12 and 18 runway made from 1-1/2 x 3/8 tubing Steel construction Includes (3) cable spools, (1) bolt, (1)
More informationCopyright 1998 KDE Technologies
Modular Computer Corner Desk Unit Copyright 1998 KDE Technologies http://members.tripod.com/~kdetech/ 1. Introduction 2. Plans Sheet one - Isometric Sheet two - Top Detail / Corner Unit Sheet three - Leg
More informationFortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.
Installation Instructions for FortressCable H-Series Cable Panel System With UB-05 Brackets and Fe Posts It is the responsibility of the installer to meet all code and safety requirements, and to obtain
More informationUNIVERSAL TWO TIER. Change Table Model # IMPORTANT: RETAIN FOR FUTURE REFERENCE, READ CAREFULLY
UNIVERSAL TWO TIER Change Table Model # 092103 IMPORTANT: RETAIN FOR FUTURE REFERENCE, READ CAREFULLY Safety Precautions Read all instructions before assembly and use of the change table. Keep instructions
More informationMudroom Unit. Page 1 of 25
Mudroom Unit www.andrewharriswoodwork.com Page 1 of 25 Introduction This plan makes a unit which is 66 ¾ inches tall, 39 ½ inches wide and 18 ½ inches deep. It was custom made for some friends to fit the
More information4-SIDED NAVAJO SHELTER ARIZONA MODEL INSTALLATION INSTRUCTIONS
4-SIDED NAVAJO SHELTER ARIZONA MODEL INSTALLATION INSTRUCTIONS Recommended Tools: Before You Begin: Saftey Glasses, Tape Measure, Carpenters Level, Framing Square, Hex Head Nut Drivers, Chalk Line, Elec.
More informationHeavy Duty Ball Bearing Drawer Slides Full Extension
301FU Series Heavy Duty Ball Bearing Drawer Full Extension Ordering Length 10 12 350mm 14 16 18 20 22 24 26 28 Zinc 301FU10 301FU12 301FU350 301FU14 301FU16 301FU18 301FU20 301FU22 301FU24 301FU26 301FU28
More informationLocker Pedestal Installation Instructions
Locker Pedestal Installation Instructions LK-PED-INST-0314r1 Parts List Single Pedestal Back to Back Pedestal Horizontal Support Tube TS-169 Post Flange TS-190 Post Cap Fasteners Provided: #8 x ¾ round
More informationFortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.
Installation Instructions for Fortress Horizontal Cable Panel System with UB-05 Brackets and Fe Posts It is the responsibility of the installer to meet all code and safety requirements, and to obtain all
More informationDENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION METAL LOCKERS
PART 0 A/E INSTRUCTIONS 0.01 GENERAL DESIGN REQUIREMENTS A. Architect shall coordinate with the DPS Project Manager the type, layout and size of lockers required on the project. B. Varsity athletic Lockers
More informationLeveling Feet, Base Plates and Casters
Leveling Feet, Base Plates and Casters 77 Leveling Foot 1 1 Fastening to profile end Fastening in T-slot of profile For leveling tables and light equipment. Ratchet-type height adjustment requires no tools.
More information(Toll Free); 7am-7pm Pacific Time, Monday-Saturday ELI'S POTTING BENCHES
866.332.2403 (Toll Free); 7am-7pm Pacific Time, Monday-Saturday ELI'S POTTING BENCHES SPECIFICATIONS: DIMENSIONS & DRAWINGS The Eli's Potting Bench is available in 3 standard sizes: 42" W, 48" W and 60"W.
More informationArt Glossary Studio Art Course
Art Glossary Studio Art Course Abstract: not realistic, though often based on an actual subject. Accent: a distinctive feature, such as a color or shape, added to bring interest to a composition. Advertisement:
More informationPotting Store Assembly Instructions
Before assembly We recommend that time is taken to read the instructions before starting assembly, then follow the easy step by step guide. The instruction sheet is only a guide to the assembly. Certain
More informationPLEATED SHADE ARCH INSIDE MOUNT GETTING STARTED. A few simple tools are required: STANDARD HARDWARE
HONEYCOMB AND PLEATED SHADE ARCH GETTING STARTED INSIDE MOUNT A few simple tools are required: HALF ARCH INSTALLATION Your half arch has been shipped in the closed osition. When fanned, the rails will
More informationINSTALLATION INSTRUCTIONS FOR HAND OPERATED SILENT STEEL ADC HEAVY DUTY CURTAIN TRACK MODELS: 280, 281, 282, 280-A, 283-N, 283-R
INSTALLATION INSTRUCTIONS FOR HAND OPERATED SILENT STEEL ADC HEAVY DUTY CURTAIN TRACK MODELS: 280, 281, 282, 280-A, 283-N, 283-R I. SUSPENDED INSTALLATIONS 1. Lay the two track halves on the floor with
More informationCedar 2-Drawer Desktop Storage Cube
Cedar 2-Drawer Desktop Storage Cube 5 ½ Dimensions 5 ½ 5 ½ 2 2 1 7/8 4 ¼ 4 ½ Author s Notes: Build a Cedar 2-Drawer Desktop Storage Cube from just 1 cedar fence picket. No angles, special cuts or rips
More information1.1 SUMMARY. A. This Section includes the following: 1. Loose steel lintels. 2. Shelf angles. 3. Metal floor plate. 4. Pipe bollards.
PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Loose steel lintels. 2. Shelf angles. 3. Metal floor plate. 4. Pipe bollards. B. See Division 5 Section "Pipe and Tube Railings"
More informationAKZ13 13 OC Cantilever. Assembly and Operation Guide
AKZ13 13 OC Cantilever Assembly and Operation Guide Thank you for your purchase of Treasure Garden s AKZ13 Cantilever Umbrella. Please remove all contents from the package, inspect and review checklist.
More informationStorefront Installation Guide
Storefront General Notes: 1. Check Contract Documents and Shop Drawings. Understand and clarify any Field Verify Notes and approvals of drawings and products to be familiar with the project. Installation
More informationTechnical product descriptions WORKTOPS STANDARD SLIM LINE. 1. Material thickness 38 mm. 2. Core/substrate material Chipboard
Technical product descriptions WORKTOPS I STANDARD 1. 38 mm 2. Chipboard 3. Surface material Laminate (CPL, HPL) 4. Laminate thickness 0,6-0,8 mm 5. Surface structure Wood pore or relief, matt, gloss 6.
More informationINSTALLATION INSTRUCTIONS
www.marwincompany.com Kit Number Door Height Rough Opening Height KD200BB68 80 84 ½ KD200BB70 84 88 ½ KD200BB80 96 100 ½ INSTALLATION INSTRUCTIONS 200BB SERIES KD POCKET DOOR FRAME FOR 2 X 4 STUD WALLS
More informationSHELDON Versatile seating
UK street furniture designers & manufacturers As UK based, designers and manufacturers, Street Design can manufacture and supply Sheldon seating to suit your specific requirements. Sheldon versatile seating
More informationVendor: S Page 2 of 11
ASSEMBLY INSTRUCTIONS SANTIAGO 2 DOOR 2 DRAWER SIDEBOARD IMPORTANT: READ THESE INSTRUCTIONS CAREFULLY BEFORE ASSEMBLING OR USING YOUR SANTIAGO 2 DOOR 2 DRAWER SIDEBOARD. PLEASE KEEP THESE INSTRUCTIONS
More informationInstallation Instructions
Installation Instructions Note: Please read this document before beginning installation. If you are not confident with the processes involved, please hire a general contractor to install your flooring
More information(Toll Free); 7am-7pm Pacific Time, Monday-Saturday. Assembly instructions for: ARCHED PERGOLAS WITHOUT LATTICE PANELS
866.332.2403 (Toll Free); 7am-7pm Pacific Time, Monday-Saturday Assembly instructions for: ARCHED PERGOLAS WITHOUT LATTICE PANELS Quantity Description Drawing 4 Posts 4 Braces(28 ) 4 Shorter Braces (22
More informationEND FRAMES. End frames built using pressure treated 2x4 (1 1/2" x 3 1/2") 36" 34" 7/16" pilot hole. 5 1/2" x 1/2" lag bolt 8" wheel 23"
END FRAMES End frames built using pressure treated 2x4 (1 1/2" x 3 1/2") 23" 17 1/2" (B) (B) Measure from the bottom of your stone to 1" below the lip to get your measurement. 17 1/2"(B) 36" 34" 1/2" flat
More informationMARQUEE INSTALLATION HANDBOOK. Curved Structures
MARQUEE INSTALLATION HANDBOOK Curved Structures 12m Curved Roof Beam Assembly Instructions Ensure there are no overhead or underground obstructions or services before starting to assemble frame. Square
More informationInstallation Guide Contemporary Alfresco V1.3 LU
Installation Guide Contemporary Alfresco V1.3 LU 010818 Tools Required Below is a list of tools that you will require to install you're the Contemporary Alfresco System. Cordless Drill Mastic Gun Spirit
More informationStraight Stringer Installation Instructions
Straight Stringer Installation Instructions Floor-to-Wall Installation F L I G H T P L A N Unpack: What s included? Your Stringer Tread Screws (8) per tread (1) Torque Wrench (1) Socket (for the brackets
More informationProject: Trebuchet Overview: This medieval launcher would reek. Materials: 3/4 plywood, 2 of 5/8 threaded. Minimum Cutting Area: 2 sheets of plywood
Project: Trebuchet Overview: This medieval launcher would reek havoc on enemies castles. However, the modern day conversion using 20lbs of weight will easily through a tennis ball the length of a gymnasium.
More informationPlastic Trainer-19. I have tried to only use materials available from the big box building centers like Home Depot, Rona (Canada) and Lowe s.
Plastic Trainer-19 I have tried to only use materials available from the big box building centers like Home Depot, Rona (Canada) and Lowe s. The picture above shows the prototypes with an original Cox
More informationCrystal Pink Granite Surface Plates
Crystal Pink Granite Surface Plates Accurate for use in metrology laboratories and wear resistant for use in abrasive shop environments. Crystal Pink is the finest, most durable granite surface plate available
More informationSheet Metal Brake Plans for a 6' Sheet Metal Brake
Sheet Metal Brake Plans for a 6' Sheet Metal Brake,1752'8&7,21 Thank you for purchasing the sheet metal brake plans. The plans include a complete list of material needed and easy to follow steps to build
More informationLEBANON BOARD OF EDUCATION, LEBANON, CONNECTICUT REQUEST FOR PROPOSALS FOR LYMAN MEMORIAL HIGH SCHOOL BOYS LOCKER ROOM 2/24/2017
LEBANON BOARD OF EDUCATION, LEBANON, CONNECTICUT REQUEST FOR PROPOSALS FOR LYMAN MEMORIAL HIGH SCHOOL BOYS LOCKER ROOM 2/24/2017 The Lebanon Board of Education invites sealed proposals for replacement
More informationDIY Rustic Dresser Addicted2DIY.com
DIY Rustic Dresser Addicted2DIY.com *Before beginning this project, please read through all of the plans as well as the blog post associated with this project. Always use safety precautions whenever using
More informationNARROW, MEDIUM AND WIDE STILE, THERMASTILE AND DURASTILE. Installation Instructions
NARROW, MEDIUM AND WIDE STILE, THERMASTILE AND DURASTILE Installation Instructions PART Y015 JUNE 2016 Table of Contents Section 1. GENERAL NOTES AND GUIDELINES... 2. DOOR HARDWARE A. Locks B. Push/Pulls
More information10x12 FOUNDATION GUIDE 10x12 TRICO AND FLORA SHEDS
10x12 FOUNDATION GUIDE 10x12 TRICO AND FLORA SHEDS 10x12 WOOD SKID FLOOR FLOOR SYSTEM FOR 10x12 TRICO AND FLORA SHEDS RAW MATERIALS LIST: 2 (9) FLOOR FRAMING AND SHEATHING: 1) BAND BOARD 2 x 6 x 12 PRESSURE
More informationINGROUND COVER INSTALLATION GUIDE
INGROUND COVER INSTALLATION GUIDE GENERAL INSTRUCTIONS Refer to Anchor Plan provided with cover. Cover must be laid out according to the plan to ensure proper installation. IMPORTANT: DO NOT DRAG COVER
More informationINSTALLATION INSTRUCTIONS FOR HAND OPERATED MODELS: 170, 171-R, 171-N, 172, 260
INSTALLATION INSTRUCTIONS FOR HAND OPERATED MODELS: 170, 171-R, 171-N, 172, 260 I. SUSPENDED INSTALLATIONS NOTE: MODEL 260 FENSTEEL TRACK IS ASSEMBLED IN THE SAME MANNER AS DESCRIBED BELOW WITH THE EXCEPTION
More informationCorner Potting Store Assembly Instructions
Corner Potting Store Assembly Instructions English SS225E Before assembly We recommend that time is taken to read the instructions before starting assembly, then follow the easy step by step guide. The
More informationPEDESTAL INSTALLATION. Guidelines for installing adjustable height pedestals
BASIC REQUIREMENTS Irrespective of the type of pavers or tiles that will be installed over pedestals, the following basic requirement must be met. Decks must be designed not to exceed the load capacity
More information