ICOPAL SP1 CLAMPING RING OUTLET
|
|
- Calvin Elliott
- 5 years ago
- Views:
Transcription
1 V1.2 ICOPAL SP1 CLAMPING RING OUTLET For use with Icopal Single-Ply Membranes Monarplan PVC, Sureplan FPO and Universal POCB
2 CONTENTS CONTENTS... 1 OVERVIEW... 2 PREPARATION... 4 WARM DECK ROOFS ICOPAL SP1 INSULATION BOX... 4 WARM DECK ROOFS VAPOUR CONTROL LAYER AND TIMBER KERB... 4 CONNECTION OF THE PIPE SPIGOT TO THE OUTLET BODY... 4 USE IN REFURBISHMENT APPLICATIONS... 5 INSTALLATION... 6 MONARPLAN PVC or SUREPLAN FPO SINGLE PLY MEMBRANES...6 ICOPAL UNIVERSAL POCB SINGLE PLY MEMBRANE...9 INSTALLATION OF RAISED SQUARE GRATE
3 OVERVIEW This document contains Installation Recommendations for the Icopal Roofgard SP1 Clamping Ring Outlet onto a Monarplan PVC, Sureplan FPO or Icopal Universal Single Ply Membrane in a warm deck roof build up. The outlet may also be installed in cold and inverted roof situations, in both new build and refurbishment scenarios. The Icopal SP1 range of clamping ring type outlets has been specifically designed to provide a secure and durable seal between the aluminium body and Icopal single ply roofing membranes. SP1 Dome Outlet Grate SP1 Flat Outlet Grate SP1 Raised Square Grate TYPICAL WARM INSULATED SYSTEM Notes: 1. Icopal single ply waterproofing membrane. 2. Icopal SLP300 separation layer, where specified. 3. Thermazone insulation, as specification. 4. Icopal Vapour Control Layer, as specification. 5. Substrate, prepared in accordance with current instructions. 6. Icopal Vapour Control Layer, to detail. 7. Timber hard edge. 8. Icopal SP1 Insulation Box, to outlet position. 9. Icopal SP1 Insulation Shims, where required. 10. Icopal SP1 Clamping Ring Outlet. 11. Icopal SP1 Leaf Grate. Dome version shown. 2
4 TYPICAL COLD ROOF SYSTEM Notes: 1. Icopal single ply waterproofing membrane. WARM 2. Icopal INSULATED protection/separation SYSTEM layer, where specified. 3. Substrate, prepared in accordance with current instructions. 4. Icopal SP1 Clamping Ring Outlet. 5. Icopal SP1 Leaf Grate. Dome version shown. TYPICAL WARM INVERTED SYSTEM Notes: 1. Icopal single ply waterproofing membrane. 2. Icopal protection layer, where specified. 3. Substrate, prepared in accordance with current instructions. 4. Icopal separation layer, where specified. 5. Inverted Roof Insulation board. 6. Filter/Water reducing layer. 7. Ballast (paving on supports shown). 8. Icopal SP1 Clamping Ring Outlet. 9. Icopal SP1 Extension Ring (two units shown). 10. Icopal SP1 Terrace Grate. 3
5 PREPARATION WARM DECK ROOFS ICOPAL SP1 INSULATION BOX The height of the Icopal SP1 Insulation Box should match the height of the main deck insulation at the point where the Icopal SP1 Outlet is to be installed (unless a sump detail is to be created, in which case the Insulation Box thickness would be less than the main deck insulation thickness). The standard depth of the SP1 Insulation Box is 90mm therefore if, for example, the main deck insulation thickness is 110mm, then 2 No. 10mm thick SP1 Insulation Box Shims should be used below the SP1 Insulation Box to raise it 20mm to the height of the main deck insulation. See diagram on previous page. WARM DECK ROOFS VAPOUR CONTROL LAYER AND TIMBER KERB The vapour control layer should be installed in accordance with current installation instructions. The membrane should be installed across the roof deck and cut and sealed around the hole for the downpipe. A square timber kerb/hard edge should then be placed centrally around the outlet hole. The internal dimensions of the timber kerb should allow the 600 x 600mm Icopal Insulation Box to fit snugly inside. The height of the timber kerb should match that of the surrounding insulation layer. Flashing pieces of the vapour control layer should be installed dressing vertically up the timber kerb and sealed to the main VCL membrane. CONNECTION OF THE PIPE SPIGOT TO THE OUTLET BODY Apply a low modulus, high performance silicone to the threaded area of the pipe spigot and spread well into the threaded grooves. Insert the male threaded end into the female thread within the outlet body. Ensure correct alignment of the thread, taking care not to cross thread. Hand tighten as far as possible, and then wipe off any excess silicone both internally and externally. Apply Low Modulus silicone sealant to threaded area of pipe spigot. Ensure silicone is spread well into the threaded grooves. Screw pipe spigot into the outlet body and hand tighten. Wipe away excess silicone. 4
6 USE IN REFURBISHMENT APPLICATIONS When refurbishing a flat roof with existing 100mm outlets, contractors should use the Icopal SP1 82mm Roof Outlet body with threaded spigot and fit the rubber finned SP1 Refurbishment Adaptor Ring to the end as shown in the photograph. Lubricate the inside of the existing roof outlet using silicone lubricant, then push the Icopal SP1 82mm Outlet with pipe spigot and finned SP1 Refurbishment Adaptor Ring into the existing roof outlet to form a water tight seal. Roof Outlet Spigot with Refurbishment Adapter attached. SP1 Refurbishment Adapter Ring. 82mm Outlet, slotted into existing 100mm downpipe SP1 Refurbishment Adapter Ring 5
7 INSTALLATION MONARPLAN PVC or SUREPLAN FPO SINGLE PLY MEMBRANES Following installation of the Icopal SP1 Outlet and Insulation Box proceed as follows: Note: PVC membranes, such as Monarplan, are not compatible with EPS insulation. A separation layer, such as the Icopal SLP300, must be installed beneath the membrane to protect the PVC waterproofing membrane and prevent plasticiser migration. In adhered single ply membrane situations, the adhesive should not be applied to the EPS insulation box. Apply only to the surrounding compatible insulation, and in the case of PVC membranes, apply the SLP300 separation fleece locally over the insulation box extending out for a minimum 50mm. Roll the single ply membrane out over the Icopal SP1 Outlet and Insulation Box. Using your fingers, locate the lip of the outlet body below the single ply membrane. Use the Clamping Ring of the outlet (in an upside down position) as a template, and line up the circumference. Using a pencil, mark the inside edge of the flange of the outlet body. 6
8 Using a sharp blade, cut out and remove the circular piece of the membrane in the middle of the outlet body. Using a pencil, locate and mark where the five clamping ring bolt holes are positioned on the outlet body. This can be done via touch by pressing down to feel where the holes are through the membrane. Using a 12mm drill bit, drill out the marked bolt holes in the membrane. Important: Ensure that the drill does not bite into the bolt holes and remove any of the aluminium casting. 7
9 Remove the protective wax paper over the butyl strip in the recessed ring of the outlet body. Locate and place the clamping ring over the bolt holes. Align and insert the securing bolts, tightening in a cross sequence until fully tightened. Position the Outlet Leaf Grate (either dome or flat) to the Clamping Ring, secure with the fixings and using a Hex key, tighten appropriately. The outlet detail is now complete. 8
10 ICOPAL UNIVERSAL POCB SINGLE PLY MEMBRANE Following installation of the Icopal SP1 Outlet and Insulation Box proceed as follows: Remove the protective wax paper over the butyl strip in the recessed ring of the outlet body. Protective wax paper to be removed Cut a square section 600mm x 600mm of Icopal Universal SA membrane, remove the backing sheet and apply over the Insulation Box, in accordance with current application methods. Using your fingers, locate the lip of the outlet body below the single ply membrane. Use the Clamping Ring of the outlet (in an upside down position) as a template, and line up the circumference. Using a pencil, mark the inside edge of the flange of the outlet body. 9
11 Using a sharp blade, cut out and remove the circular piece of the membrane in the middle of the outlet body. Using a pencil, locate and mark where the five clamping ring bolt holes are positioned on the outlet body. This can be done via touch by pressing down to feel where the holes are through the membrane. Using a 12mm drill bit, drill out the marked bolt holes in the membrane. Important: Ensure that the drill does not bite into the bolt holes and remove any of the aluminium casting. 10
12 Locate and place the clamping ring over the bolt holes. Align and insert the securing bolts, tightening in a cross sequence until fully tightened. Position the Outlet Leaf Grate (either dome or flat) to the Clamping Ring, secure with the fixings and using a Hex key, tighten appropriately. Install the main field area membrane to complete the outlet detail. 11
13 INSTALLATION OF RAISED SQUARE GRATE The SP1 Raised Square Grate can be used in applications with paving, terraces/balconies or green roofs. When installing an Icopal SP1 Outlet within one of the aforementioned roof configurations, use the SP1 Terrace Grate Kit. This raises the height of the grate and allows it to be flush with the finished roof level. The SP1 Extension Ring is 110mm high, and additional extension rings can be stacked one on top of another to raise the height of the square grate to match the overall system depth. Note: For heights above 3 Extension Rings, please contact Icopal Limited for guidance. Conversely, the SP1 Extension Rings and Threaded Rods may be cut down to provide a shallower depth, should that be required. SP1 Square Grate with a single SP1 Extension Ring. SP1 Square Grate with two SP1 Extension Rings. 12
14 Following the installation of the Icopal SP1 Outlet: Place the SP1 Extension Ring inside the body of the roof outlet and position it so that the larger unthreaded holes line up with two the M6 threaded lugs projecting from the blue clamping flange. Insert M6 threaded rods. Add additional Extension rings if required, then secure with nuts and washers, as shown. Cut the M6 threaded rods to the required height. Place the SP1 Square Grate on top of the SP1 Extension Ring and insert the 2 No. M8 bolts and washers through the recessed holes as shown. Before fully tightening the bolts, rotate the grate to align to the correct orientation of the paving grid if required. Fully tighten to complete the installation. 13
15 Icopal Limited Icopal Limited Barton Dock Road Barton Stretford Dock Road Stretford Manchester Manchester United Kingdom United M32 0YL Kingdom M32 Tel: +44 0YL (0) Tel: Fax: +44 (0) Fax: +44 (0) ICO3241 November 2016 Version 1.2 NOTE: This information is given in good faith being based on the latest knowledge known to Icopal Limited. Whilst every effort has been made to ensure the contents of the publication are current while going to press, customers are advised that products, techniques and Codes of Practice are under constant review and liable to change without notice. Up to date information is available from our Technical Services Department on request. Responsibility cannot be accepted for the application of products, and no claims can be considered, where the manufacturer s instructions have not been followed. The user should not assume; based on information provided in this sheet, that the product is suitable for any abnormal use. All products are sold subject to our standard conditions of sale, available on request.
INSTALLATION GUIDE SLIMLINE ROOF LANTERN 4 PANE CONFIGURATION
INSTALLATION GUIDE SLIMLINE ROOF LANTERN 4 PANE CONFIGURATION SLIMLINE STEP-BY-STEP INSTALLATION GUIDE Thank you for choosing Roof Maker, we hope you are delighted with your new rooflight. Our roof lanterns
More informationcaroma marc newson wall basin mixer
caroma marc newson wall basin mixer water efficient tapware (nominal flow rate = 5 L/min) PLUMBERS INSTALLATION INSTRUCTIONS IS1213A(07/12) Important Information Brazed connections should NOT be made directly
More informationTraditional Undermount: S Method (Undermount):
TOOLS REQUIRED 15.1 TOOLS REQUIRED The installation of Corian shape product must be a precise and exacting process to ensure that a good fit is always created. Using the correct tools is essential. In
More informationfor Flexi Sun Lite Planning the layout
for Flexi Sun Lite These instructions refer to installations on a flat and pitched roof. Various roof flashing units are available according to the particular roof covering. The roof flashing will be boxed
More informationInstallation Instructions
MOUNT TUB SYSTEMS HAMPTON TRIM KIT T980.702 Installation Instructions T980.702 T980.712 T980.722 T980.732 Thank you for selecting American-Standard...the benchmark of fine quality for over 100 years. To
More informationfor Rigid Sun Lite Planning the layout
for Rigid Sun Lite These instructions refer to installations on a flat and pitched roof. Various roof flashing units are available according to the particular roof covering. The roof flashing will be boxed
More informationBEST PRACTICE GUIDE. Socket Bases. Working with Concrete Slabs
Working with Concrete Slabs When working with concrete slabs the barrier protection can be erected in three ways - with socket bases, adjustable slab edge brackets and multi slab clamps. Socket Bases 1
More informationcaroma marc newson shower mixer
caroma marc newson shower mixer PLUMBERS INSTALLATION INSTRUCTIONS IS1215A(07/12) Important Information Brazed connections should NOT be made directly onto the mixer, as excessive heat will cause permanent
More informationAustin Standing Seam Awning Assembly and Installation Instructions. Assembly Instructions
Austin Standing Seam Awning Assembly and Installation Instructions Be sure to use safety glasses when assembling and installing the awning. Some metal parts may have sharp edges. Use work gloves to handle
More informationInstallation Guide Simplicity Alfresco. V1.9 Lu070318
0333 305 5272 www.canoports.co.uk Installation Guide Simplicity Alfresco V1.9 Lu070318 Tools Required Below is a list of tools that you will require to install your the Simplicity Alfresco System. Cordless
More informationDura-Lock Roof System
DLR-14 Dura-Lock Roof System Assembly and Installation Instructions Read the instructions before starting the job. They explain the steps required to produce a finished product that will meet factory specifications.
More informationMALEKO WALL-MOUNT FAUCET INSTALLATION
SKU(s): 934146 BEFORE YOU BEGIN We recommend consulting a professional if you are unfamiliar with installing bathroom fixtures and plumbing. Signature Hardware accepts no liability for any damage to the
More informationBalustrade Systems / Installation Instructions
A. PARTS AND SUPPLIES NEEDED FOR INSTALLATION Hardware included for each 10 section of rail: 2 3 x 1-1/2 L-brackets 4 1-3/4 x 3/16 Blue hex-head screws for anchoring the L-brackets to the newel cap, column
More informationInstallation Guide Contemporary Alfresco V1.3 LU
Installation Guide Contemporary Alfresco V1.3 LU 010818 Tools Required Below is a list of tools that you will require to install you're the Contemporary Alfresco System. Cordless Drill Mastic Gun Spirit
More informationDesk/Wall-Mount Rack
Desk/Wall-Mount Rack Patent(s) Pending Installation Instructions Post P/N: 119-1752 119-1781 119-1782 119-4014 Frame P/N: 119-1591 119-1754 119-1755 Kit Contents (2) Frames (4) Posts Assembly Hardware
More informationGROWING BETTER THROUGH DESIGN. 6ft Lean-To LEAN-TO. Assembly Instructions 04/02
GROWING BETTER THROUGH DESIGN 6ft Lean-To LEAN-TO Assembly Instructions 04/02 6ft Lean-To Greenhouse Base Plan Introduction/Tools/Contents / / Contents This is a copy of our Lean-To greenhouse base plan.
More informationALLORA SWING PANEL INSTALLATION INSTRUCTIONS
ALLORA SWING PANEL INSTALLATION INSTRUCTIONS Before Installation Please check that your Allora Swing Panel is undamaged SEQUENCE OF INSTALLATION These instructions are also available from the Athena website:
More informationwww.wildmanconstruction.com Changing your toilet is an easy project that should take half a day or less. The most common toilet has a separate tank that mounts on top of the bowl. These instructions apply
More informationThis installation guide has been created to assist in constructing a Liniar conservatory roof from a kit format.
1.00 - Introduction This installation guide has been created to assist in constructing a Liniar conservatory roof from a kit format. Please note, each roof has been individually designed to meet specific
More informationAllora ALCOVE ENCLOSURE INSTALLATION BEFORE INSTALLATION CHECK THAT YOUR ALLORA SHOWER ENCLOSURE SYSTEM IS UNDAMAGED
Allora ALCOVE ENCLOSURE INSTALLATION BEFORE INSTALLATION CHECK THAT YOUR ALLORA SHOWER ENCLOSURE SYSTEM IS UNDAMAGED ALCOVE SHOWER Your shower can be installed to open Left hand or Right hand by rotating
More informationAssembly Instructions 10 X 10 Aluminum Frame Building
Assembly Instructions 10 X 10 Aluminum Frame Building 27 97 9 8 47 36 74 52 10 10 X 10 Square Building W/ Dome Includes: The Steel Entry Door with a Dead Bolt Lock assembly and Aluminum Door Frame. Metal
More informationROOF CURB INSTALLATION INSTRUCTIONS: VERTICAL STANDING SEAM PANEL
: p: (800) 284-1412 f: (903) 759-3598 www.lmcurbs.com 827 fisher rd longview, tx 75604 Installation Check List: Attach Sub-Frames Layout Curb on Back-up Channels Apply Sealants & Set Curb in Place Fasten
More informationFortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.
Installation Instructions for FortressCable H-Series Stair Panels with Simplified Stair Bracket SSB-05 and Fe Posts It is the responsibility of the installer to meet all code and safety requirements, and
More informationB-Too Drilling and Tapping Machine Instruction and Maintenance Manual
B-Too Drilling and Tapping Machine Instruction and Maintenance Manual Thank you for your purchase of the B-Too Drilling and Tapping Machine. Please read and understand this short operation manual. Our
More informationInstallation Instructions for. Before You Begin TOOLS REQUIRED
Composite Railing System STEP-BY-STEP Installation Instructions for Spectrum Composite Railing Virtually maintenance free 20-year warranty EverNew Spectrum Railing system is designed to work with a number
More informationRigid and Flex Tubular Skylights Installation Instructions
Rigid and Flex Tubular Skylights Installation Instructions S ST o not return to the store! For assistance with your Tubular Skylight installation, or for additional product information, call our toll-free
More informationRiser Extension INSTALLATION GUIDE 40100AX35 / 40100AX18. Manual 40100X35-8
Riser Extension INSTALLATION GUIDE 40100AX35 / 40100AX18 Manual 40100X35-8 3 2 4 Access covers with bolts supplied with Interceptor 1 5 14 6 11 15 Sampling Port/Cleanout cap supplied with Interceptor 12
More informationCardo DOOR & RETURN SHOWER ENCLOSURE INSTALLATION PLEASE READ THESE INSTRUCTIONS CAREFULLY.
Cardo DOOR & RETURN SHOWER ENCLOSURE INSTALLATION PLEASE READ THESE INSTRUCTIONS CAREFULLY. IT IS RECOMMENDED TO USE A TRAINED SHOWER INSTALLER FOR THIS SHOWER TO OBTAIN THE BEST INSTALLATION. D Square
More informationCONSERVATORY ROOF INSTALLATION GUIDE Issue
CONSERVATORY ROOF INSTALLATION GUIDE Issue 3 CONTENTS 1. Statements 2. General assemblies 3. Victorian / Edwardian roof installation 4. Jack rafter installation 5. P-shaped roof installation 6. Lean-to
More informationAustin Standing Seam Awning with Overhead Braces Assembly and Installation Instructions. Assembly Instructions
Austin Standing Seam Awning with Overhead Braces Assembly and Installation Instructions Be sure to use safety glasses when assembling and installing the awning. Some metal parts may have sharp edges. Use
More informationSINKS AND LAVATORIES. Steps to completion: These items are essential for installing all sinks:
DUPONT CORIAN SOLID SURFACE FABRICATION/INSTALLATION FUNDAMENTALS NA/ENGLISH SINKS AND LAVATORIES INTRODUCTION This bulletin discusses installing DuPont Corian solid surface sinks and lavatories. OVERVIEW
More informationAssembly Instructions 10 X 10 Aluminum Roof Support
Assembly Instructions 10 X 10 Aluminum Roof Support Aluminum Roof Support Bolt Package 16-5/16 X 2 ¼ SS Bolt 24-5/16 X 1 SS Bolt 40-5/16 SS Nylon Lock Nuts 16-5/16 SS Flat Washers 28-4 ½ Wood Screws 36-1
More informationAcrylic Claw Foot Tub
Acrylic Claw Foot Tub Wrench or socket Drill & Bits Parts Recommended 2-2 x12 boards 4 Lag Bolts 4 Flat Washers Be sure to re-inforce the floor before securing tub. We recommend 2-2 x12 s securely fastened
More informationROOFSAFE ANCHOR & CABLE
Installation Instructions ROOFSAFE ANCHOR & CABLE THE ULTIMATE IN FALL PROTECTION MANUAL Contents Guidelines for Installation 3 Top Bolt Installation 4 Toggle Installation 5 Concrete Installation 6 Component
More informationInstallation Instructions
Installation Instructions Alpha SolarSmart On Roof Kits for the Installation of Alpha Solar Collectors onto Tile and Slate Type Roofs For Technical help or for Service call... ALPHA HELPLINE Tel: 0 77
More informationINSTALLATION INSTRUCTIONS
INSTRUCTIONS FURNITURE SAPPHIRE Vanity BEFORE YOU BEGIN Please read these instructions carefully to familiarise yourself with the required tools, materials, and installation sequences. Follow the sections
More informationFIXED FLAT ROOFLIGHT: INSTALLATION INSTRUCTIONS (Double & triple glazed)
FIXED FLAT ROOFLIGHT: INSTALLATION INSTRUCTIONS (Double & triple glazed) Thank you for choosing to purchase a ROOF Maker Fixed Flat Rooflight. Assembly Procedure Guidance Please take precaution when moving
More informationCurium 19.4H Installation Instructions & Parts List
Curium 19.4H Installation Instructions & Parts List Illustration Curium 19.4H Right Hand Page 1 of 21 30/06/2016 Revision 1.0 IMPORTANT This shower screen / enclosure must be installed by suitably qualified
More informationRemoving Right-Side. Components. Right-Side. Components. Click Here to Go Back AT THIS POINT
Click Here to Go Back NOTE: There is an oil passage beneath the driven gear/drive gear assembly. This passage should be plugged prior to removing the driven gear and drive gear. Failure to do so could
More informationInstallation. ng Kitt
Installation Instructions Alpha SolarSmart 100 Roof Integrated Flashi ng Kitt for the Installation of Alpha Solar Collectors into Tiled Roofs 1 Integrated Flashing kit for Alpha SolarSmart 1000 CONTENTS
More informationINSTALLATION MANUAL FOR STAINLESS STEEL, GROOVE-END, FLEXIBLE COUPLINGS
PIEDMONT PACIFIC CORPORATION INSTALLATION MANUAL FOR STAINLESS STEEL, GROOVE-END, FLEXIBLE COUPLINGS 4703 Tidewater Ave., Suite G Oakland. CA, 94601, USA Ph: +1 510 434 0990 / Fax: +1 510 436 0990 www.piedmontpacific.com
More informationHONDA RIDGELINE (KIT #601) Installation Instructions (to be used in addition to owners manual)
HONDA RIDGELINE (KIT #601) Installation Instructions (to be used in addition to owners manual) IMPORTANT NOTE: Read before beginning installation. These instructions replace all of Step 1 of the instructions
More informationMethod of Build 1. General
Method of Build 1 General GLAZED ELEVATIONS Viso Double Glazed in glazed form differs from many other systems as the vertical joints can have Viso dry joints or the unique HIDDEN mullion post between glazed
More informationContents. Stage 1. Preparation of the aperture 9. Interior finishing 25
Installation Manual Pitchglaze Roof Window Contents Contents and introduction 2 Delivery 3 Pre Installation 4 Installation 8 Stage 1. Preparation of the aperture 9 Stage 2. Fitting the Pitchglaze 11 Stage
More informationPAK Drum Roll Top Assembly Instructions. Note: 2 people will be required to assemble roll top
PAK901 4 Drum Roll Top Assembly Instructions Note: 2 people will be required to assemble roll top PLEASE READ ASSEMBLY INSTRUCTIONS CARFULLY Tools required: 5/8 Socket & Ratchet 9/16 Deep Well Socket &
More informationNUMBER OF HORIZONTALS REQUIRED FOR 2 ON CENTER SPACING.
K WIK FRAME ASSEMBLY INSTRUCTIONS NUMBER OF HORIZONTALS REQUIRED FOR 2 ON CENTER SPACING. APPROXIMATE DOOR LEAF WEIGHT (LBS.) WITH 29 GAUGE STEEL PANEL ALL PACK AGES INCLUDE #235 STEEL GIRT 2 FT. ON CENTER
More informationInstallation Instructions
READ BEFORE INSTALLING UNIT For Slider Casement Air Conditioners To avoid risk of personal injury, property damage, or product damage due to the weight of this device and sharp edges that may be exposed:
More informationFortress Al Posts must always be secured to the deck framing. Fortress Al Posts should never be attached to only the deck boards.
Installation Instructions for Fortress Railing Traditional Panels with s and Posts It is the responsibility of the installer to meet all code and safety requirements, and to obtain all required building
More informationInstallation Instructions For Slider Casement Air Conditioners
Installation Instructions For Slider Casement Air Conditioners NOTE: These instructions describe installation in a typical wood framed window with a wood SLIDE-BY sash, or installation in a metal CASEMENT
More informationEurocell conservatory roof system. Installation manual Issue 3
Eurocell conservatory roof system Installation manual Contents Statement General Assemblies Cross Sections Victorian/ Edwardian Roof Installation Jack Rafter Installation P Shape Roof Installation 15-45
More informationSynseal assembly guide 2009:Synseal assembly guide /2/09 12:38 Page 1. Conservatory Roof Assembly Guide
Synseal assembly guide 2009:Synseal assembly guide 2007 9/2/09 12:38 Page 1 Conservatory Roof Effective from February 2009 Synseal assembly guide 2009:Synseal assembly guide 2007 9/2/09 12:39 Page 6 3.1
More informationRota-Bearing Rose & Doorknob Fitting Instructions
Rota-Bearing Rose & Doorknob Fitting Instructions The hole pattern will need to be created prior to fitting the doorknobs. Creating the Hole Pattern 38mm The fitting jig will allow for the accurate creation
More informationAssembly Instructions
Unite Panel System Hinge Door July 2016 #12 x / slotted hex washer head bolt Figure 1 threshold bracket frame Detail F threshold bracket threshold bracket (installed) #12 x / slotted hex washer head bolt
More informationPRODUCT: LOKI INSTALLATION INSTRUCTIONS. Product is covered by U.S. patents. For more information visit
R INSTALLATION INSTRUCTIONS PRODUCT: LOKI CONFIGURATION: SINGLE DOOR MOUNT: GLASS MOUNT Product is covered by U.S. patents. For more information visit www.krownlab.com . TOOLS + MATERIALS REQUIRED TOOLS
More informationPortofino Installation Guide
vjul16 (for 17 or 24 mm Surface Wall Profiles) DO NOT ASSEMBLE WITHOUT FULLY READING THESE INSTRUCTIONS Page 2 Thank you for purchasing this Portofino shower enclosure. Please study these instructions
More informationPrivacy Wall Glass Selections - Polished Edge Slider Door
Privacy Wall Glass Selections - Polished Edge Slider Door 3/6" HEX BIT PUTTY KNIFE #2 ACR BIT SUCTION CUP HOLDERS DOOR LEAF: Satin Tempered Clear Tempered LOCTITE 425 SIDE LIGHT ETCHED GLASS STYLES: Satin
More informationFortress Al HOME posts must always be secured to the deck framing. Fortress Al HOME posts should never be attached to only the deck boards.
Installation Instructions for Fortress Al HOME Traditional Adjustable Panels with Simplified and Al HOME Posts It is the responsibility of the installer to meet all code and safety requirements, and to
More informationPAC-12 Kit Contents. Tools Needed Soldering iron Phillips screwdriver Wire stripper Wrenches, 7/16 and 1/2 Terminal crimp tool Pliers Solder
PAC-2 Kit Contents Part Quantity Screws: 8/32 x 3/8 Screws: 8-32 x 5/6 Screw: 8-32 x /4 #8 internal tooth washers #8 solder lug ring terminals Bolt: Aluminum, /4-20 x.5 /4 internal tooth washer Nut: Aluminum
More informationInstallation Guide Simplicity 6. v3.5 lu171117
0845 869 6006 www.canoports.co.uk Installation Guide Simplicity 6 v3.5 lu171117 Tools Required Below is a list of tools that you will require to install the Simplicity 6 Canopy or Carport. Cordless Drill
More informationskypod INSTALLATION GUIDE CONTENTS Issue 2 If in doubt at any stage NOW INCLUDES ACUTE BE SAFE WHEN WORKING AT HEIGHT
skypod INSTALLATION GUIDE Issue 2 NOW INCLUDES ACUTE CONTENTS 1. Preparing to install 2 2. Installation 4 3. Installing jack rafters 10 4. Installation examples 11 BE SAFE WHEN WORKING AT HEIGHT Ensure
More informationSegmental ring types provided by F P McCann: Segments in stock are front bolted. Back bolted segments are available to order: Cross joint Corbel Ring
Building Manual for F P McCann `Smoothbore Shaft Linings with EPDM Gaskets (rev 04) (To be read in conjunction with the Segmental Shaft and Tunnel Safety Data Sheet) Segmental ring types provided by F
More informationALL SEASON PATIO COVER
ALL SEASON PATIO COVER 61 Where the All Season Patio Cover is to be attached to the home, create a level line showing where the top of the mounting rail is to be located. Install each section with the
More informationModular Locomotive System Instruction Manual for HBK22 Fowler Body Kit
Modular Locomotive System Instruction Manual for HBK22 Fowler Body Kit Roundhouse Engineering Co. Ltd. Units 6-10 Churchill Business Park. Churchill Road, Wheatley. Doncaster. DN1 2TF. England. Tel. 01302
More informationInstallation Instructions
Installation Instructions READ BEFORE INSTALLING UNIT For Slider Casement Air Conditioners INSTALLATION WARNINGS AND CAUTION Carefully read the installation manual before beginning. Follow each step as
More informationSabre Series 2 Inspired Design Precision Engineering
Sabre Series 2 Inspired Design Precision Engineering USER INSTRUCTIONS Thank you for choosing the Keencut Sabre Series 2. Every effort has been made to bring you a precision engineered product with the
More informationGlideRite Retractable Cover System For Hot Spot Spas (SE & SLX only)
List of Contents Quantity Description 12 #10 x 1 ½ Flat Head Phillips Screw (see pg. 2) 2 #10 x ½ Pan Head Phillips Screw (see pg. 2) 8 ¼ x 2 ½ Lag Bolt (see pg. 2) 7 ¼ 20 x 5 / 8 Hex Head Bolt (see pg.
More informationPlayground Assembly Instructions
Before You Begin Playground Assembly Instructions Locate the playground set on firm, level ground. Assemble the playground on or close to its permanent location Two people are recommended to assemble the
More informationP a r k c o n s o l e s i n k a s s e m b l y i n s t r u c t i o n s
P a r k c o n s o l e s i n k a s s e m b l y i n s t r u c t i o n s Before You Begin: Professional installation by two-person crew is required for this fixture. Install water supply and drain piping
More informationGuardian warm roof conversion system. Installation Guide
Guardian warm roof conversion system Installation Guide 2 www.guardianroof.co.uk Conservatory walls consist largely of glazed elements including windows and doors that may include structural mullions or
More informationCurium 19H Installation Instructions & Parts List
Curium 19H Installation Instructions & Parts List Illustration Curium 19H Right Hand Page 1 of 15 01/07/2016 Revision 2.1 IMPORTANT This shower screen / enclosure must be installed by suitably qualified
More informationEP-60 END OF CAR JUNCTION BOX KIT and ASSEMBLY AND INSTALLATION INSTRUCTIONS
EP-60 END OF CAR JUNCTION BOX KIT 786282 and 786438 ASSEMBLY AND INSTALLATION INSTRUCTIONS Figure 1 EP-60 End of Car Junction Box Kit Item No. Qty. Description P/N Kit No. 786282 Kit No. 786438 1 2 Screw,
More informationINSTALLATION INSTRUCTIONS VENETIAN 84" SLIDING SHOWER DOOR SYSTEM (180º INSTALLATION)
INSTALLATION INSTRUCTIONS VENETIAN 84" SLIDING SHOWER DO SYSTEM (180º INSTALLATION) 28539 Industry Drive, Valencia, CA 91355 Toll Free Phone: (877) 728-3874 Toll Free Fax: (888) 440-9567 Phone: (661) 775-1675
More informationSecuAnch Roof Anchor System
Height Safety Products Email: marketing@fallprotec.com SecuAnch Roof Anchor System 1 Presentation The SecuAnch lifeline is designed to be permanently installed on buildings and other structures where maintenance
More informationD. Drill Bolt Holes Through Topper Shell and Bed Rails
A. Check Mounting Kit Check to make sure that all of the following items are included in the mounting kit. Call 515-272-4372 if you need to obtain a part from BrandFX. Double-stick tape (1 roll) White
More informationClearview Railing System Installation Instructions
Clearview Railing System Installation Instructions Disclaimer: AGS Stainless, Inc. has its Clearview Railing Systems designed by a professional engineer to meet the requirements of the latest national
More informationGiraud Tool Company, Inc.
Motor Upgrade for Gracey Trimmer This package is intended to allow the user to upgrade their Gracey trimmer with a higher rpm motor and convenience features not found in the production offering. This upgrade
More informationDurapipe ABS Jointing Guide
Durapipe ABS Jointing Guide Solvent cement welding offers a simple and quick means of constructing high integrity, leak-free joints. The solvent cement operates by chemically softening the joint surfaces.
More informationFortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.
Installation Instructions for FortressCable H-Series Cable Panel System With UB-05 Brackets and Fe Posts It is the responsibility of the installer to meet all code and safety requirements, and to obtain
More informationTravel Trailer Latch With Dead Bolt Trailer Latch With Dead Bolt. U.S. Patent No. 5,927,773
60-250 Travel Trailer Latch With Dead Bolt 60-251 Trailer Latch With Dead Bolt Service Manual (Installation and Troubleshooting) U.S. Patent No. 5,927,773 CONTENTS 1. BASIC COMPONENTS 2. INSTALLATION OF
More informationFortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.
Installation Instructions for Fortress Vertical Cable Panel System with Brackets and Fe Posts It is the responsibility of the installer to meet all code and safety requirements, and to obtain all required
More informationSide Light Frame Pack Assembly Instructions
Please read this complete set of assembly instructions before starting the installation and only when you understand the construction method start to follow the step by step guide. IDENTIFY THE PACK CONTENTS
More informationInstallation of Balustrade Systems
Installation of Balustrade Systems IMPORTANT: Be sure to mark the center point of each newel post's location prior to installation to insure proper spacing. All product interfaces must use PL Premium Adhesive
More informationLife* Installation Instructions & User Care Instructions. (381kg) (60stone) (840lbs) (254kg) (40stone) (560lbs) (100kg) (220lb) (15stone)
Installation Instructions & User Care Instructions Trimmable Formers (381kg) (60stone) (840lbs) (254kg) (40stone) (560lbs) (100kg) (220lb) (15stone) i Installer- please read all instructions carefully
More informationFortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.
Installation Instructions for Fortress Horizontal Cable Panel System with UB-05 Brackets and Fe Posts It is the responsibility of the installer to meet all code and safety requirements, and to obtain all
More informationQuick-Release Sliding Tail Vise 05G30.01
Quick-Release Sliding Tail Vise 05G30.01 U.S. Des. Pat. No. D671,812 U.S. Pat. No. 9,050,710 Introduction The Veritas Quick-Release Sliding Tail Vise is a reworked version of the well-known tail vise that
More informationGlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas)
List of Contents Quantity Description 12 #10 x 1 ½ Flat Head Phillips Screw (see pg. 2) 2 #10 x ½ Pan Head Phillips Screw (see pg. 2) 8 ¼ x 2 ½ Lag Bolt (see pg. 2) 7 ¼ 20 x 5 / 8 Hex Head Bolt (see pg.
More informationIt is highly recommended that you use a thread lock compound such as Loctite brand on all threads to keep them from vibrating loose.
Installation instructions for FC12 Forward Controls for Kawasaki Vulcan 750 It is highly recommended that you use a thread lock compound such as Loctite brand on all threads to keep them from vibrating
More informationBumper Sign INSTALLATION INSTRUCTIONS
Bumper Sign INSTALLATION INSTRUCTIONS BUMPERSIGN TOOL CHECKLIST SDS MAX Rotary Hammer Drill Marker/Pencil SDS MAX 1 Carbide Drill Bit Tape Measure Torque Wrench with ½ Drive Power Source Vacuum ½ Drive
More informationSee Through Indoor / Outdoor Framing and Window Installation Instructions
See Through Indoor / Outdoor Framing and Window Installation Instructions These Instructions are an addendum to the DaVinci Fireplace Installation Manual This addendum is only for use with the Indoor /
More informationDaVinci Fireplace See Through Indoor / Outdoor Framing and Window Installation Instructions
DaVinci Fireplace See Through Indoor / Outdoor Framing and Window Installation Instructions These Instructions are an addendum to the DaVinci Fireplace Installation Manual This addendum is only for use
More informationInstallation Instructions
EZ Launch Accessible Transfer System Installation Instructions Models 500900L, 500900R, 500901L, 500901R 500890, 500906L, 500906R For questions about features, operation/performance, parts, accessories
More informationSURFACE CLIP MOUNT. 1 Insert lens into channel, measure, and cut to length. Remove lens cover from channel. surface. Attach lens cover and end caps
SURFACE CLIP MOUNT 1 Insert lens into channel, measure, and cut to length Remove lens cover from channel Screw mounting clips into mounting Snap channel into mounting clips Attach lens cover and end caps
More informationInstallation instructions for FC14S Forward Controls for Shadow ACE and Aero 1100
Installation instructions for FC14S Forward Controls for Shadow ACE and Aero 1100 It is highly recommended that you use a thread lock compound such as Loctite brand on all threads to keep them from vibrating
More informationINSTALLATION INSTRUCTIONS
NOTE: Bolts should remain hand tight until all bolts are installed. STEP 1 Installing the door base (both sides). 1. Locate the outer, roll cage, mounting bolt (passenger side is shown in the illustration).
More informationBLACK WIDOW COMPOSITE
PAGE-1 UPDATED 3-6-2015 REV.1 BLACK WIDOW COMPOSITE Detailed installation manual PAGE-2 UPDATED 3-6-2015 SpiderRax, Inc. REVISION PAGE Installation Manual For BWC-S, BWC-B,BWC-F DATE PAGES REASON OLD LEVEL
More informationSide Light Frame Pack Assembly Instructions
Side Light Frame Pack Assembly Instructions Please read this complete set of assembly instructions before starting the installation and only when you understand the construction method start to follow
More informationRadon 07 Installation Instructions & Parts List
Radon 07 Installation Instructions & Parts List Illustration Radon 07, H1 Handle Right Hand: Open Out 14/06/2016 Revision 1.1 Page 1 of 21 IMPORTANT This shower screen / enclosure must be installed by
More informationFlush Mount Bezel Kit
#15 13511 Crestwood Place Richmond BC Canada V6V 2G1 Tel: 604-207-1600 Fax: 604-207-8008 www.comnavmarine.com Flush Mount Bezel Kit for Admiral P3, Commander P2/P2VS and Navigator G2 Heads Installation
More informationThis manual will aid in the assembly of the FireBall V90 and FireBall X90. The assembly of both machines will be identical, unless specified.
This manual will aid in the assembly of the FireBall V90 and FireBall X90. The assembly of both machines will be identical, unless specified. Step #1 Lay all parts out to verify quantities. (2) 2 x 25-1/4
More informationTOOLS REQUIRED: HARDWARE INCLUDED: 13MM FLAT WRENCH FOR LEVELING THE STRUCTURE RATCHET WITH 5MM HEX BIT FOR CORNER SCREWS ON TOP TRAVERSE BEAMS
1 TOOLS REQUIRED: RATCHET WITH 5MM HEX BIT FOR CORNER SCREWS ON TOP TRAVERSE BEAMS 13MM FLAT WRENCH FOR LEVELING THE STRUCTURE RUBBER MALLET FOR INSERTING PANELS 8MM HEX BIT WITH EXTENSION FOR HEX BOLT
More information