User Guide for the e NABLE Hand Test Rig

Size: px
Start display at page:

Download "User Guide for the e NABLE Hand Test Rig"

Transcription

1 User Guide for the e NABLE Hand Test Rig by Shannon Barry, Samantha Mason, Tia Parks, Charles Rumfola, and David Schwartz Table of Contents Notes 2 Materials Needed 2 Option #1: Preparing the 80/20 3 Option #2: Ordered Components 4 Assemble 80/20 Frame Bottom Frame 4 Top Frame 6 Additional Components Purchased Connectors 7 Built Components 7 Mounting the Motor 9 Mounting the Strain Gage 10 Securing the Horizontal 80/20 Sliding Bar 11 Mounting the Clamp 12 Electronic Instructions/Code 14 Strain Gage Assembly/Calibration 16 Final Assembly 17 Tests 17 References 21 Software Code 22 Strain Gauge Calibration Code 25 1

2 Notes Option 1: Make/cut connection parts of the assembly Option 2: Buy all the connection parts of the assembly Materials Needed a. Option 1 (Total expected cost: $264.42) b. Option 2 (Total expected cost: $312.18) c. Required Tools i. Allen Key ii. ¼ 20 tap and tap handle (use oil to help with the threading) iii. Table Saw iv. Mill (optional) 2

3 1. Option #1: Preparing the 80/20 (Cut from two 10ft lengths) a. Required Lengths of 80/20: i. Two 2ft lengths ii. Two 1.5ft lengths iii. Four 1ft lengths iv. One 6in length v. One 4in length Figure 1: Pieces of 80/20 Cut to Size b. Cutting process: The lengths can be cut using a bandsaw or a table saw, whichever is more readily available. i. Using a circular saw Note: 80/20 is aluminum extrusion and relatively easy to cut but the pieces can also be bought in pre cut lengths from McMaster Carr ( See Option #2 ) Figure 2: 10 foot long piece of 80/20 being cut 3

4 c. Tapping the 80/20 i. After the pieces are cut the hole in the middle of the 80/20 needs to be threaded for connectors, shown in Figure 4. Using a ¼ 20 tap, shown in Figure 3, the pieces can be threaded by hand, shown in Figure Remember to add oil when threading! Figure 3: Example Tap and Handle Figure 4: 80/20 Profile Figure 5: Tapping of the 80/20 was done by hand 2. Option #2: Ordered Components a. Buy pre cut lengths of 80/20 on McMaster Carr. Required lengths listed in Step 1a. b. Buy Aluminum Connectors shown in Figure 12, McMaster Carr PN47065T Assemble 80/20 Frame a. Bottom Frame 4

5 i. Lay the two 2ft lengths so they are parallel and then take two 1ft lengths at either end so it looks like a rectangle. ii. To attach one of the 1ft lengths to the two 2ft lengths. Take two 2 way connectors and slide it into place and thread the bolts through the holes of the connector into the 80/20. To see the connection holes and the how the tabs slide into the 80/20, see Figure 6. At the end of this step, the assembly should be the same as Figure 7. Figure 6: 2 way Connectors Figure 7: Completion of Assembly Step 2 iii. Attach the three way connectors to the other end of the rectangle. There will be a vertical piece added later, shown in Figure 8. 5

6 iv. Figure 8: 3 way Connector In the rectangle, place a 1ft length inside so that it is parallel to the other 1ft lengths, shown in Figure 9. This middle piece will slide. Figure 9: Completion of Assembly Step 4 b. Top Frame i. Lay two 1.5ft lengths so that they are parallel. Then lay one 1ft length so that it is perpendicular and attach the pieces using a two way connector. The piece should resemble a U. ii. Place a 1ft length between the 1.5ft lengths. This piece will slide but there will be two brackets that will be used to support the 80/20 since this section is vertical, shown in Figure 10. 6

7 Figure 10: Completion of Assembly Step 2 Figure 11: Two halves of the 80/20 Assembly, before connection 4. Additional Components a. Purchased Connectors i. End Feed Fasteners, McMaster Carr 47065T142. Need 5 packages of 4. ii. Aluminum Brackets for Single Profile Extrusions, McMaster Carr 47065T236. Need 2. b. Built Components i. Six additional connectors can be made from ⅛ thick aluminum. These connectors can also be purchased from McMaster Carr PN47065T832 ( See Option #2 ). Figure 12: Aluminum Connector Design ii. Clamp Bracket 7

8 iii. Figure 13: Clamp Bracket Design Motor Plate Figure 14: Motor Plate Design iv. Motor arm. 3D printed,.stl attached at the end of this document. This piece can also be made out of aluminum. 8

9 Figure 15: Motor Arm Design v. Strain Gage Holder. 3D printed,.stl can be downloaded here. 1. May need to be altered based on glue and wire positioning. vi. Strain Gage Dowel. Cut a 1.5 wooden rod in half. Add a #10 hole to attach to the strain gage, see Figure 21. vii. Motor Screws. #8 32 rod needs to be cut into 3.5in lengths. 5. Mounting the Motor a. Mounting the Motor Plate i. Using the motor screws and nylock nuts attach the motor to the motor plate, as shown in Figure 16. ii. Slide the motor plate into the middle/sliding piece of the bottom frame (Figure 9). Figure 16 shows the finished mounting of the motor/motor plate on the assembly frame. Figure 16: Motor Plate Attachment 9

10 b. Mounting the Motor Arm i. Put the center hole of the mounting hub on the motor shaft and use a set screw to tighten it to the motor shaft, shown in Figure 17. Figure 17: Universal Mounting Hub ii. Then attach the Motor Arm to the Universal Mounting Hub using #4 40 screws, shown in Figure 18. iii. Figure 18: Motor Arm Attachment Put a ⅜ threaded rod through one of the ⅜ holes in whichever is most appropriate for your individual test. Add a nut to the end to secure the shaft, also shown in Figure Mounting the Strain Gage a. Attaching the Movable Vertical Bar i. The movable bar is supported vertically by two brackets, McMaster Carr PN47065T236. These brackets use end feed fasteners to allow the bar to slide, McMaster Carr PN47065T

11 Figure 19: Support Brackets ii. For added support put two aluminum connectors on the back part of the bar, as shown in Figure 20. Figure 20: Back Bar Connectors b. Attach the 3D printed Strain Gage Holder i. Using an end feed connector, McMaster Carr PN47065T142, on the back of the piece and by sliding the head of a #10 32 screw through the 80/20. The #10 32 screw goes through the Strain Gage and the Strain Gage Holder. Tighten the #10 32 screw, the Strain Gage base cannot move during a test. Shown in Figure

12 Figure 21: Strain Gage Holder ii. Attach the wooden dowel to the top part of the Strain Gage. The final Strain Gage Mounting should look like Figure 22. Figure 22: Strain Gage Mounting 7. Securing the Horizontal 80/20 Sliding Bar i. Take two of the Aluminum Connectors made in the previous section and lay the connectors on the ends of the 1ft lengths and use the End Feed Fasteners, McMaster Carr 47065T142, in the holes, shown in Figure

13 Figure 23: Aluminum Connectors, Part 1 8. Mounting the Clamp a. Drill holes into clamp i. Use the top left holes in Figure 13 as a reference for drilling the holes, since the pieces have to match up. The holes should be 1/4 in diameter. b. Clamp Bracket Assembly i. Take the 6in length of 80/20 and stand it vertically between the horizontal/motor bar and the top part of the assembly/strain Gage bar. ii. Add connectors to both sides of the base of the 6in bar to make sure it stands, as shown in Figure 24. Figure 24: Clamp Mounting Connectors iii. Using the Clamp Bracket in Figure 13, attach two feed end fasteners, McMaster Carr 47065T142, to the vertical holes and slide them into the 6in bar of 80/20. 13

14 iv. Add two feed end fasteners, McMaster Carr 47065T142, to the two horizontal holes of the Clamp Bracket in Figure 13. Slide the 4in piece of 80/20 through those fasteners. v. Attach the clamp to the remaining holes. The final Clamp Bracket assembly is shown in Figure 25. Figure 25: Clamp Bracket Assembly c. Add cushioning and brackets to clamp jaw i. Using a hot glue gun, attach the angle brackets to each end of the clamp and the foam on top of the angle brackets as shown in Figure 26. Figure 26: Brackets and Foam 14

15 9. Electronic Instructions/Code a. Connect Arduino and shields together i. First step is to acquire the Arduino board and the two shields, be sure to solder the pins onto the motor shield if needed. ii. There is a small black part that comes with the motor shield, do not lose that! That is the jumper needed to gain power from the Arduino. iii. Simply stack the Arduino and shields in the following order; Arduino Uno (Bottom), Motor shield, and Strain Gauge shield (Top) b. Ports used by strain gauge and how to connect i. Attach wires of strain gage to wires that have connectors on the ends. ii. Attaching the strain gauge to the strain gauge shield should be simple. Attach to the strain port on the RobotShop shield. 15

16 c. Ports used by motor i. VIN jumper must be connected. ii. The Stepper ports are M1 and M2. d. Software needed to run tests (with download links) i. The software runs on a loop where the motor moves forward by stepjump every loop until the motor has cumulatively moved up to maxangle. For every motor movement, the strain gauge calculates the force being exerted on it. If the force detected is greater than the maxforce value assigned, the experiment will immediately stop. When the maxangle or maxforce are reached, the motor runs in reverse to its original position. ii. Arduino code download: Grip Strength Test Code 1. Also available in Software Code section 2. Adjustable Parameters: a. stepjump Number of steps be to taken for every movement. The larger the number, the quicker the experiment will be. Therefore, the least it should be is 1. b. maxangle Desired final angle measurement. This should be less than 90 because either the testing rig or the e NABLE Hand/Arm may break if it is actuated too far. c. maxforce Maximum force allowed so that the testing rig or the e NABLE Hand/Arm will not break it that force is attained. 16

17 3. The strain gauge must also be calibrated, requiring the editing of: ReadingA_Strain2, LoadA_Strain2, ReadingB_Strain2, LoadB_Strain2, and zero. iii. PLX DAQ daq 1. Download this free add on for Microsoft Excel 2. Check port settings easily in Arduino when plugged into USB 3. Baud should be set to 9600, as per the code e. Power requirements i. The external power supply is connected to the Arduino Uno board. This external power supply is required to run the motor and motor shield which requires more than 7 Volts. ii. The USB b cord was connected to the Arduino Uno board. f. Button 3 Prong i. Left +3.3V 1. Note: May need to be GND based on orientation ii. Middle Port 9 iii. Right GND 1. Note: May need to be +3.3V based on orientation 10. Strain Gage Assembly/Calibration a. Orientation of strain gauge must be in the formation that it will be used. This can be done by attaching a scale to the strain gauge and pulling it away at a designated force. The strain gauge will output integer values for Reading_Strain2 which should be saved as equivalent to the load applied. After saving off two reading and strain pairs, they should be put into the code ReadingA_Strain2 with LoadA_Strain2 and ReadingB_Strain2 with LoadB_Strain2. Through interpolation, this should allow for appropriate readings. b. In the Grip Strength Test Code, the zero value is an extra precaution to fix the readings so that it actually outputs 0 lbs when there is no force being exerted. c. The code is in the Strain Gauge Calibration Code section or downloaded here. 17

18 11. Final Assembly a. Ideal location of each component is based on hand dimensions. b. Motor position i. Center of motor should be lined up with pivot point of gauntlet. ii. Left right position can be changed by loosening the bolts on the motor plate and sliding it left or right, then tightening the bolts again. iii. Forward back position can be changed by loosening bolts connected to the motor bar but on the frame, then tightening the bolts again. c. Strain gage position i. Should be barely touching digits of prosthetic hand. ii. Vertically adjusted by loosening bolts on the angles. iii. Horizontally adjusted by loosening bolts on the aluminum plates. d. Clamp position i. Move so that the center of the digits line up to the black line on the dowel. ii. Vertically move via bolts connected to Clamp Bracket. iii. Horizontally move by loosening bolts attached to frame. 18

19 12. Tests These tests are to verify that all of the parameters are met so that all devices are calibrated to the same accuracy, within error. a. Entire Apparatus Test Date completed: Performed by: Requirement # Importance Metric Unit Target Value Subsystem S1 9 Cost $ 200 Entire Apparatus S2 6 Weight of tester lbs 50 Entire Apparatus S8 7 Equipment: Base/Pivot Point Clamp Arduino Power Supply Motor Motor Shield Strain Gauge Strain Gauge Shield Wooden Dowel Cost and Weight Test Repeatability using gauge R&R % 10% due to measurement error Entire Apparatus Equipment Cost Base/Pivot Point Clamp Arduino Power Supply Motor Motor Shield Strain Gauge Strain Gauge Shield Wooden Dowel Total Weight: Total Cost: 19

20 Gauge R&R: Measures the amount of variation in the measurement system arising from the measurement device and the people taking the measurements 1.) Three team member will set up the system and run it using 5 different hands (for a collection of 15 data points) 2.) Collect the data for each trial on each team member 3.) Plug into minitab or another statistical software 4.) Determine the variability between users and equipment Variation due to measurement error: b. Motor Test Date completed: Performed by: Requirement # Importance Metric Unit Target Value Subsystem S3 5 Duration of Test min 5 Motor S5 8 Torque oz/in 250 Motor S7 8 Equipment Base/Pivot Point Arduino Motor Motor Shield Power Supply/Computer Angle Measurement Accuracy +/ 2 Motor Duration Test Start test and time how long it takes until the fingers of the hand reach 45 degrees. Test # Duration #1 #2 #3 #4 Average: 20

21 Torque Test 1) Attach a bar to the end of the stepper. 2) Add weights to the end of the bar. 3) See chart below. Weight (lbs) Pass/Fail Time Between Steps (s) Weight of Bar: Length of Bar: Angle Measurement Accuracy Test 1) Mount protractor to base with 0 degrees being our neutral position. 2) Input number of steps and measure angle using the protractor. 3) See chart below. Number of Steps Angle Measured (Protractor) Theoretical Angle (Stepper) Error ( 土 ) Average: 21

22 c. Strain Gauge Test Date completed: Performed by: Requirement # Importance Metric Unit Target Value Subsystem S4 9 Max Force of Sensor lbs 50 Load Cell S6 8 Force Measurement Accuracy oz +/ 1 Load Cell Equipment Power Supply/Computer Arduino Strain Gauge Shield Strain Gauge Wooden Dowel Max Force Test and Force Measurement Accuracy Test: 1) Attach load cell to one of the dowel halves and hang the assembly horizontally. 2) Hangs weights off the load cell. 3) See chart below. Weight (lbs) Pass/Fail Error ( 土 ) Average: Max Weight Needed for Test: References (picture) 22

23 Software Code // Grip Strength Test Code // Stepper Motor #include <Wire.h> #include <Adafruit_MotorShield.h> #include "utility/adafruit_pwmservodriver.h" // Create the motor shield object with the default I2C address Adafruit_MotorShield AFMS = Adafruit_MotorShield(); // to motor port #1 (M1 and M2), 200 steps in this motor Adafruit_StepperMotor *mymotor = AFMS.getStepper(200, 1); float currentstep = 0; // Current step number float anglejump = 5.4; // Angle that it should increment up by. Should be done at multiples of 1.8 // Because the motor has 200 steps for 360 degrees, therefore 360/200 = 1.8 degrees per step float stepjump = (anglejump/1.8); // Number of steps to be taken at once float maxangle = 75.6; // Desired final angle measurement float numberofsteps = (maxangle/1.8); // 1.8 degress per step float currentangle; // Angle that the motor is currently at compared to the starting position float maxforce = 8.0; // Maximum force allowed so that the hand or apparatus will not break // Strain2 // Order from left to right while looking at "Strain2": Red Green White Black float ReadingA_Strain2 = ; // Values from Strain_Gauge_Calibration_ float LoadA_Strain2 = 7.7; // (lbs) float ReadingB_Strain2 = ; float LoadB_Strain2 = 0.0; // (lbs) float zero = 2.20; // zero reading char* forces[]={"no.", "Yes. Testing is stopping now. Save the Excel file."; // text to output based on the force measured compared to the maxforce // If maxforce is never reached, then "No." will always show up. Therefore, the file/data must be saved when maxangle is attained. int index; // index of forces[] to determine which text to output float reverse; // number of steps to output, either currentstep or numberofsteps int time_step = 1000; // Reading every 1 second. // Initially set as 2500, 2.5 seconds long time = 0; float newreading_strain2; // analog in 1 for Strain 2 float load_strain2; 23

24 // Start Button int buttonpin = 9; // the pin of the push button int var = 0; // Used so that the test will occur only once for every turn on // Used for start button to begin moving stepper and taking readings void setup() { Serial.begin(9600); // set up Serial library at 9600 bps // Stepper Motor AFMS.begin(); // create with the default frequency 1.6KHz mymotor >setspeed(10); // 10 rpm // PLX DAQ set up Serial.println("CLEARDATA"); // Clears up any data left from previous projects Serial.println("LABEL,Time,Current Step,Load Measured,Forces too high?"); // Write LABEL so Excel knows the next things will be the names of the columns Serial.println("RESETTIMER"); // Resets timer to 0 // Start Button pinmode(buttonpin, INPUT); // initialize the push button as input delay(1000); // 1 second delay to give user time to step away printing(); // prints the first value, the 0 point void loop() { if (digitalread(buttonpin) == LOW){ // When button is pressed, testing begins var = 1; // Starts the testing when var = 1 delay(2500); // 2.5 second delay for user to step away if (var == 1){ // Testing has begun if (currentstep < (numberofsteps)){ // Keeps going until all positions are tested and recorded mymotor >step(2*stepjump, FORWARD, INTERLEAVE); // stepjump steps foward, using single coil stepping newreading_strain2 = analogread(1); // analog in 1 for Strain 2 // Calculate load by interpolation load_strain2 = ((LoadB_Strain2 LoadA_Strain2)/(ReadingB_Strain2 ReadingA_Strain2)) * (newreading_strain2 ReadingA_Strain2) + LoadA_Strain2 + zero; delay(time_step); // delay to account for time_step 24

25 // PLX DAQ printing currentstep = currentstep+stepjump; // Increment up currentstep by stepjump currentangle = (currentstep*1.8); // Updates currentangle if (load_strain2 >= maxforce){ // Safety measure when measured force is beyond acceptable values index = 1; // Prints "Yes. Testing is stopping now. Save the Excel file." endsequence(currentstep); // Reverses stepper to starting position printing(); else{ index = 0; // Prints "No." printing(); else{ var = 2; // Test never reached maxforce but did reach numberofsteps if (var == 2){ // Test is over endsequence(numberofsteps); // Reverses stepper to starting position void endsequence(float endsteps) { // Brings back to starting position //endsteps is an input designated by whether the test completed, thus it is numberofsteps // or is the forces were too high, thus it is currentstep mymotor >step(endsteps, BACKWARD, SINGLE); // Bring back to start position var = 0; // Will not restart testing until the button is pressed again currentstep = 0; // Re initializes start position void printing(){ if(millis() > time_step+time) { Serial.print("DATA,TIME,"); // prints time... this is standard for all PLX DAQ Serial.print(currentAngle); // prints currentstep Serial.print(","); Serial.print(load_Strain2); // prints strain 2 load Serial.print(","); Serial.println(forces[index]); // prints response to question if forces are too high, thus if it is above maxforce time = millis(); 25

26 Strain Gauge Calibration Code // Strain Gauge Calibration Code // SGS Calibration by linear interpolation for Strain 1 and Strain 2 // Apply two known loads to the Strain Gauge sensor and record the values obtained below // You can use Strain 1 or Strain 2 or the two Strains at the same time. float ReadingA_Strain2 = ; float LoadA_Strain2 = 3.5; // (Kg,lbs..) float ReadingB_Strain2 = ; float LoadB_Strain2 = 0.0; // (Kg,lbs..) int time_step = 250 ; // reading every 2.5s long time = 0; void setup() { Serial.begin(9600); // setup serial baudrate void loop() { float newreading_strain2 = analogread(1); // analog in 1 for Strain 2 // Calculate load by interpolation float load_strain2 = ((LoadB_Strain2 LoadA_Strain2)/(ReadingB_Strain2 ReadingA_Strain2)) * (newreading_strain2 ReadingA_Strain2) + LoadA_Strain2; // millis returns the number of milliseconds since the board started the current program if(millis() > time_step+time) { Serial.print("Reading_Strain2 : "); Serial.print(newReading_Strain2); // display strain 2 reading Serial.print(" Load_Strain2 : "); Serial.println(load_Strain2); // display strain 2 load Serial.println('\n'); time = millis(); 26

Community College of Allegheny County Unit 4 Page #1. Timers and PWM Motor Control

Community College of Allegheny County Unit 4 Page #1. Timers and PWM Motor Control Community College of Allegheny County Unit 4 Page #1 Timers and PWM Motor Control Revised: Dan Wolf, 3/1/2018 Community College of Allegheny County Unit 4 Page #2 OBJECTIVES: Timers: Astable and Mono-Stable

More information

FC3920K and FC5539K Automatic Foam Cutting CNC Machines

FC3920K and FC5539K Automatic Foam Cutting CNC Machines FC3920K and FC5539K Automatic Foam Cutting CNC Machines Disclaimer You accept all risks and responsibilities for looses, damages costs and other consequences resulting directly or indirectly from using

More information

MILL ONE. Assembly Manual. Manual Illustrated by Gontarz Design Studio

MILL ONE. Assembly Manual. Manual Illustrated by Gontarz Design Studio MILL ONE Assembly Manual Manual Illustrated by Gontarz Design Studio Safety Warnings and Guidelines 1. Be sure to carefully follow provided machine assembly instructions before machine use to ensure operator

More information

Code Product Qty 1 Top Vertex 3 2 Hot End Housing 1 3 Bottom Vertex 3 4 Print Platform Lock 3 5 End Stop Holder 3 6 Filament Feeder Motor Bracket 1 7

Code Product Qty 1 Top Vertex 3 2 Hot End Housing 1 3 Bottom Vertex 3 4 Print Platform Lock 3 5 End Stop Holder 3 6 Filament Feeder Motor Bracket 1 7 List of Parts Code Product Qty 1 680mm Extrusion 3 2 Power Supply 1 3 240mm Extrusion 9 4 42mm Nema 17 Stepper Motor 3 5 Slider-Hotend Connecting Rod 6 6 48mm Nema 17 Stepper Motor 1 7 Linear Rail with

More information

CONTENTS PRECAUTIONS BEFORE STARTING OPERATION PREPARATION FOR OPERATION CAUTIONS ON USE OPERATION

CONTENTS PRECAUTIONS BEFORE STARTING OPERATION PREPARATION FOR OPERATION CAUTIONS ON USE OPERATION CONTENTS PRECAUTIONS BEFORE STARTING OPERATION ------------------------------------- 1 PREPARATION FOR OPERATION 1. Adjustment of needle bar stop position ---------------------------------------------------------

More information

Roborodentia Robot: Tektronix. Sean Yap Advisor: John Seng California Polytechnic State University, San Luis Obispo June 8th, 2016

Roborodentia Robot: Tektronix. Sean Yap Advisor: John Seng California Polytechnic State University, San Luis Obispo June 8th, 2016 Roborodentia Robot: Tektronix Sean Yap Advisor: John Seng California Polytechnic State University, San Luis Obispo June 8th, 2016 Table of Contents Introduction... 2 Problem Statement... 2 Software...

More information

Quill Stop V2 Installation Guide 11/16/2014

Quill Stop V2 Installation Guide 11/16/2014 Thank you for purchasing the Quill Stop for the Sieg X3 (Grizzly G0463) and SX3 (Grizzly G0619) mills. Your feedback is always appreciated. Please email questions and comments to gregpriest@cox.net. What

More information

Parts List. Robotic Arm segments ¼ inch screws Cable XBEE module or Wifi module

Parts List. Robotic Arm segments ¼ inch screws Cable XBEE module or Wifi module Robotic Arm 1 Legal Stuff Stensat Group LLC assumes no responsibility and/or liability for the use of the kit and documentation. There is a 90 day warranty for the Sten-Bot kit against component defects.

More information

ABM International, Inc.

ABM International, Inc. ABM International, Inc. Lightning Stitch required 1 1.0: Parts List head and motor assembly (Qty. 1) Reel stand (Qty. 1) Needle bar frame clamp (Qty. 1) Motor drive (Qty. 1) 2 Cable harness with bracket

More information

Sten-Bot Robot Kit Stensat Group LLC, Copyright 2013

Sten-Bot Robot Kit Stensat Group LLC, Copyright 2013 Sten-Bot Robot Kit Stensat Group LLC, Copyright 2013 Legal Stuff Stensat Group LLC assumes no responsibility and/or liability for the use of the kit and documentation. There is a 90 day warranty for the

More information

LEG CURL IP-S1315 INSTALLATION INSTRUCTIONS

LEG CURL IP-S1315 INSTALLATION INSTRUCTIONS LEG CURL IP-S35 INSTALLATION INSTRUCTIONS Copyright 2009. Star Trac by Unisen, Inc. All rights reserved, including those to reproduce this book or parts thereof in any form without first obtaining written

More information

SERVICE PARTS LIST PAGE 1 OF 6 BASE ASSEMBLY SPECIFY CATALOG NO. AND SERIAL NO. WHEN ORDERING PARTS 12" SLIDING COMPOUND MITER SAW

SERVICE PARTS LIST PAGE 1 OF 6 BASE ASSEMBLY SPECIFY CATALOG NO. AND SERIAL NO. WHEN ORDERING PARTS 12 SLIDING COMPOUND MITER SAW PAGE 1 OF 6 BASE ASSEMBLY 00 0 CATALOG NO. EXAMPLE: SPECIFY CATALOG NO. AND NO. WHEN ORDERING PARTS 6955-20 1 02-80-0050 Thrust Bearing (1) 2 05-80-0510 M5 x 12mm Flat Head T-20 Screw (5) 3 05-81-0135

More information

Assembly and installation help

Assembly and installation help Assembly and installation help A supplement to the directions The Purpose of this tutorial is to expand (not replace) upon the directions that come with the system and to help provide shortcuts, the first

More information

Mill One V2 Assembly Manual

Mill One V2 Assembly Manual Mill One V2 Assembly Manual Throughout this policy the words "we", "us" and "our", or Sienci Labs will be used to refer to Sienci Labs Inc. herein and Mill One or machine will refer to Sienci Labs Sienci

More information

Super Sky Surfer 2000 Assembly Instructions

Super Sky Surfer 2000 Assembly Instructions Super Sky Surfer 2000 Assembly Instructions Note: Plug and Play version of the Sky Surfer comes with fuselage pre-glued and motor/servos installed. If you wish to route antennas or wires through the tail,

More information

SHERLINE Lathe Digital Readout

SHERLINE Lathe Digital Readout SHERLINE Lathe Digital Readout P/N 8200 (Inch), P/N 8260 (Metric) The Digital Readout in the modern machine shop Digital readouts are popular on full size machine tools because they make the life of a

More information

TECHNICAL INFORMATION

TECHNICAL INFORMATION TECHNICAL INFORMATION P 1 / 11 Model No. Description CONCEPT AND MAIN APPLICATIONS Specification Standard equipment TCT saw blade... 1 Rear table set (exclusively Europe, Turkey, South Africa..1 2704 This

More information

FASTENERS, MEASUREMENTS AND CONVERSIONS

FASTENERS, MEASUREMENTS AND CONVERSIONS FASTENERS, MEASUREMENTS AND CONVERSIONS Bolts, Nuts and Other Threaded Retainers Although there are a great variety of fasteners found in the modern car or truck, the most commonly used retainer is the

More information

M4 Foot Operated Underpinner Instruction Manual

M4 Foot Operated Underpinner Instruction Manual M4 Foot Operated Underpinner Instruction Manual M4 Walker Rd, Bardon Hill, Coalville, Leicestershire LE67 1TU, England Tel. +44 (0)130 1692, Fax +44 (0)130 16929 e mail sales@framerscorner.co.uk M4 Underpinner

More information

Band-Master ATS Nano Pneumatic Banding Tool Operating Instructions

Band-Master ATS Nano Pneumatic Banding Tool Operating Instructions Band-Master ATS 601-118 Nano Pneumatic Banding Tool CONTENTS 601-118 Overview... 3 Safety.... 5 Initial Tool Set-up... 5 Regulator assembly mounting... 5 Attach tool head to regulator.... 6 Operating instructions...

More information

John Duffyʼs Manual Mill Gadget. Build Instructions

John Duffyʼs Manual Mill Gadget. Build Instructions John Duffyʼs Manual Mill Gadget Build Instructions This mill can be assembled over a few days, and has up to 1/1000 th accuracy on X and Y, and about 1/100 th on Z. It costs around $50 for the physical

More information

RYOBI 10 IN (254 MM) TABLE SAW MODEL NO. BT REPAIR SHEET

RYOBI 10 IN (254 MM) TABLE SAW MODEL NO. BT REPAIR SHEET RYOBI 0 IN (2 MM) TABLE SAW MODEL NO. BT00- REPAIR SHEET 2 RYOBI 0 in. (2 mm) TABLE SAW - MODEL NO. BT00- FOR MITER TABLE ASSEMBLY, REFER TO FIGURE B FOR BLADE GUARD ASSEMBLY, REFER TO FIGURE E FOR RIP

More information

SHERLINE Mill Digital Readout

SHERLINE Mill Digital Readout SHERLINE Mill Digital Readout P/N 8100 (Inch) Digital Readouts in the modern machine shop Digital readouts are popular on full-size shop mills because they make the life of a machinist much simpler. They

More information

Deck Mount Installation with Bench

Deck Mount Installation with Bench Deck Mount Installation with Bench 1. Mark track with square. 2. Cut tracks with saw. 3. Drill ¼ hole (if needed.) 4. Countersink track. 5. Countersink all track 6. File all track ends. ends. 7. Lay out

More information

Hawko Zhaga Systems Installation Instructions

Hawko Zhaga Systems Installation Instructions Hawko Zhaga Systems Installation Instructions Contents Wire Suspension Installation 4 Recessed Brackets 6 Fixed Suspension Rods 8 Swivel Suspension Rods 10 Surface Mount Ceiling 12 Surface Mount Wall

More information

Customer Notice: Congratulations again on your SawStop purchase, and thank you! -SawStop Tualatin, OR

Customer Notice: Congratulations again on your SawStop purchase, and thank you! -SawStop Tualatin, OR Customer Notice: Congratulations on the purchase of this Sliding Crosscut Attachment. As the owner of a SawStop saw, you are familiar with our high standards for quality, fit and finish. Different from

More information

Progeny Integrated Mobile Unit Unpacking/Assembly Guide

Progeny Integrated Mobile Unit Unpacking/Assembly Guide Summary: The following instruction will guide you through the unpacking and installation of the Progeny Mobile Unit. Any question or concerns or suggestions should be directed to Progeny Technical Support

More information

Building a vertical wobbler

Building a vertical wobbler Building a vertical wobbler I wanted to build a simple steam engine that would also run on compressed air. At Chris Heapy s website (http://easyweb.easynet.co.uk) I found drawings of a small double acting

More information

Yes 20 Charging Wall Cabinet for Tablets

Yes 20 Charging Wall Cabinet for Tablets Built with Anthro-DNA Owner's Manual for Yes 20 Charging Wall Cabinet for Tablets Part # YESCABGMPW Components at a Glance 1 2 4 5 8 7 10 3 6 9 Front of Cabinet (closed) 1. Locking front door to User area.

More information

model tsa-sa48 Sliding Crosscut Table installation guide

model tsa-sa48 Sliding Crosscut Table installation guide model tsa-sa48 Sliding Crosscut Table installation guide A Note About Color Variations Among Anodized Aluminum Components Congratulations on the purchase of this SawStop Sliding Crosscut Table. We at SawStop

More information

RYOBI 10 in. TABLE SAW - MODEL NO. BT3000

RYOBI 10 in. TABLE SAW - MODEL NO. BT3000 FOR MITER TABLE ASSEMBLY, REFER TO FIGURE 0 RYOBI 0 in. TABLE SAW - MODEL NO. BT000 FIGURE 5: 0 in. TABLE SAW FOR BLADE GUARD ASSEMBLY, REFER TO FIGURE FOR RIP FENCE ASSEMBLY, REFER TO FIGURE FOR MOTOR

More information

Kossel Rev B Build Guide V1.0

Kossel Rev B Build Guide V1.0 Kossel Rev B Build Guide V1.0 1 Table of Contents: Step 1: BASE ASSEMBLY Gathering parts: Building the Corners and Base: Step 2: UPPER ASSEMBLY Building Upper: Step 3: VERTICAL RAIL INSTALLATION Building

More information

OPERATIONS MANUAL. Port-O-Slitter

OPERATIONS MANUAL. Port-O-Slitter Tapco Products Company The World Leader in Specialty Tools for the Professional Port-O-Slitter OPERATIONS MANUAL General instructions, set up, accessories and guide to using your portable precision slitting,

More information

RYOBI 10 in. (254 mm) TABLE SAW MODEL NO. BT3100 REPAIR SHEET

RYOBI 10 in. (254 mm) TABLE SAW MODEL NO. BT3100 REPAIR SHEET RYOBI 0 in. (4 mm) TABLE SAW MODEL NO. BT00 REPAIR SHEET FOR MITER TABLE ASSEMBLY, REFER TO FIGURE B FOR BLADE GUARD ASSEMBLY, REFER TO FIGURE E FOR RIP FENCE ASSEMBLY, REFER TO FIGURE C FOR MOTOR ASSEMBLY,

More information

BABY WOLF LOOM. Assembly Instructions for Knocked-Down Looms

BABY WOLF LOOM. Assembly Instructions for Knocked-Down Looms BABY WOLF LOOM Assembly Instructions for Knocked-Down Looms BEFORE YOU BEGIN Please read through the directions before beginning to assemble your loom. Unpack the loom parts carefully. Do not throw away

More information

Parts Catalog. S-Series Slicer Smart Manual SG13. Model:

Parts Catalog. S-Series Slicer Smart Manual SG13. Model: , 07 99507 ECN 065 Parts Catalog S-Series Slicer Smart Manual Model: SG SG 0/0/07 Rev. G IMPORTANT! TO EXPEDITE SHIPMENT OF PARTS, ALWAYS SPECIFY MODEL, REV, PART NUMBER, AND SERIAL NUMBER OF UNIT. GLOBE

More information

SPINKS BIN SCALES INSTRUCTIONS/OPERATIONS MANUAL FOR SCALE MODELS: ,000 lb ,000 lb ,268 kg ,500 kg.

SPINKS BIN SCALES INSTRUCTIONS/OPERATIONS MANUAL FOR SCALE MODELS: ,000 lb ,000 lb ,268 kg ,500 kg. SPINKS BIN SCALES INSTRUCTIONS/OPERATIONS MANUAL FOR SCALE MODELS: 415442 5,000 lb. 415473 10,000 lb. 415520 2,268 kg. 415498 4,500 kg. FEBRUARY, 2000 MANUAL NO. 000250 TABLE OF CONTENTS CONCRETE PLACEMENT...Page

More information

Community College of Allegheny County Unit 7 Page #1. Analog to Digital

Community College of Allegheny County Unit 7 Page #1. Analog to Digital Community College of Allegheny County Unit 7 Page #1 Analog to Digital "Engineers can't focus just on technology; they need to develop their professional skills-things like presenting yourself, speaking

More information

SERVICE PARTS LIST PAGE 1 OF 6 BASE ASSEMBLY SPECIFY CATALOG NO. AND SERIAL NO. WHEN ORDERING PARTS 12" DUAL BEVEL COMPOUND MITER SAW B27B

SERVICE PARTS LIST PAGE 1 OF 6 BASE ASSEMBLY SPECIFY CATALOG NO. AND SERIAL NO. WHEN ORDERING PARTS 12 DUAL BEVEL COMPOUND MITER SAW B27B PAGE 1 OF 6 BASE ASSEMBLY 00 0 EXAMPLE: Component Parts (Small #) Are Included When Ordering The Assembly (Large #). SPECIFY CATALOG NO. AND NO. WHEN ORDERING PARTS = Part number change from previous service

More information

Installing the 3 Indexer: PRS Standard Tools

Installing the 3 Indexer: PRS Standard Tools 888-680-4466 ShopBotTools.com Installing the 3 Indexer: PRS Standard Tools Copyright 2016 ShopBot Tools, Inc. page 1 Copyright 2016 ShopBot Tools, Inc. page 2 Table of Contents Route Cable into Box...5

More information

Coding with Arduino to operate the prosthetic arm

Coding with Arduino to operate the prosthetic arm Setup Board Install FTDI Drivers This is so that your RedBoard will be able to communicate with your computer. If you have Windows 8 or above you might already have the drivers. 1. Download the FTDI driver

More information

18600 Angular Momentum

18600 Angular Momentum 18600 Angular Momentum Experiment 1 - Collisions Involving Rotation Setup: Place the kit contents on a laboratory bench or table. Refer to Figure 1, Section A. Tip the angular momentum apparatus base on

More information

IIHS Side Impact Outrigger

IIHS Side Impact Outrigger IIHS Side Impact Outrigger Assembly Procedure Base Assembly (14.3 lbs) The base assembly consists of a ¼ thick steel plate, a ¼ thick piece of polyethylene, and mounting fixtures for the upper and lower

More information

Giraud Tool Company, Inc.

Giraud Tool Company, Inc. Motor Upgrade for Gracey Trimmer This package is intended to allow the user to upgrade their Gracey trimmer with a higher rpm motor and convenience features not found in the production offering. This upgrade

More information

Motorized or Crank Operated Fortress Zipper Track Shade with Housing and Side Track Installation Instructions

Motorized or Crank Operated Fortress Zipper Track Shade with Housing and Side Track Installation Instructions Motorized or Crank Operated Fortress Zipper Track Shade with Housing and Side Track Installation Instructions Tools Needed Drill 3/8 Metal Drill Bit ¼ Masonry Drill Bit Measuring Tape Pencil 4 Level Phillips

More information

Easy Engineering Guide

Easy Engineering Guide Index: Unleash Your Creativity! Page 1: The Basics Page 2: Sorting Dowels Page 3: Measuring and Cutting Page 4: Dowels and Holes (Reaming Holes) Page 5: Reaming, Screws, Slide-Stop Material Page 6: Hydraulics/Pneumatics

More information

Obtained from Omarshauntedtrail.com

Obtained from Omarshauntedtrail.com DaveintheGrave's Halloween Props Animated Crawling Skeleton Build a life-size skeleton torso that realistically crawls across the lawn one arm at a time. 1. Motor Base and Linkage Assembly BASE - I used

More information

SHERLINE/WETTROTH 2-or 3-AXIS Lathe Digital Readout P/N 8200 (Metric P/N 8260)

SHERLINE/WETTROTH 2-or 3-AXIS Lathe Digital Readout P/N 8200 (Metric P/N 8260) WEAR YOUR SAFETY GLASSES FORESIGHT IS BETTER THAN NO SIGHT READ INSTRUCTIONS BEFORE OPERATING An optional third handwheel and encoder unit can be used on the vertical milling column to turn your lathe

More information

Nancy s Knit Knacks LLC 4 Yard Option Upgrade Kit Assembly Instructions and User Manual

Nancy s Knit Knacks LLC 4 Yard Option Upgrade Kit Assembly Instructions and User Manual Nancy s Knit Knacks LLC 4 Yard Option Upgrade Kit Assembly Instructions and User Manual Thank you for purchasing our 4 Yard Option (4YO) Upgrade Kit. To install this upgrade you are simply going to assemble

More information

535-Manual. Main Components. Pipe and Bolt Threading Machine. Printed in U.S.A. Ridge Tool Company/Elyria, Ohio, U.S.A.

535-Manual. Main Components. Pipe and Bolt Threading Machine. Printed in U.S.A. Ridge Tool Company/Elyria, Ohio, U.S.A. Pipe and Bolt Threading Machine -Manual Main Components 0 Screw, Button Head /" - 0 x /" () Washer, Flat /" ()" Top Cover 0 0 Cutter Assembly Stop Pin 0 Pin Reamer Assembly Carriage Assembly 0 Stop Screw

More information

This manual will aid in the assembly of the FireBall V90 and FireBall X90. The assembly of both machines will be identical, unless specified.

This manual will aid in the assembly of the FireBall V90 and FireBall X90. The assembly of both machines will be identical, unless specified. This manual will aid in the assembly of the FireBall V90 and FireBall X90. The assembly of both machines will be identical, unless specified. Step #1 Lay all parts out to verify quantities. (2) 2 x 25-1/4

More information

MODEL 36 Di-Acro Hand Shear

MODEL 36 Di-Acro Hand Shear OPERATOR S MANUAL & INSTRUCTIONS MODEL 36 Di-Acro Hand Shear Di-Acro, Incorporated PO Box 9700 Canton, Ohio 44711 3713 Progress Street N.E. Canton, Ohio 44705 330-455-1942 330-455-0220 (fax) Revised 01/02

More information

535A. Main Components. Pipe and Bolt Threading Machine. Printed in U.S.A. Ridge Tool Company/Elyria, Ohio, U.S.A.

535A. Main Components. Pipe and Bolt Threading Machine. Printed in U.S.A. Ridge Tool Company/Elyria, Ohio, U.S.A. Pipe and Bolt Threading Machine A Main Components 0 Screw, Button Head /" - 0 x /" () Washer, Flat /" ()" Top Cover 0 Base Bottom Cover Screw, Pan Head # - x " () Carriage Assembly 0 Front Support Bar

More information

Tools: Sharpie, Square, Vise, Hack saw, Ruler, Punch, Hammer, File. 2. Cut the stock Place stock in vise and cut with hack saw

Tools: Sharpie, Square, Vise, Hack saw, Ruler, Punch, Hammer, File. 2. Cut the stock Place stock in vise and cut with hack saw Purpose: MAKE CATAPULT ARM Step 1 Tools: Sharpie, Square, Vise, Hack saw, Ruler, Punch, Hammer, File Materials: Flat aluminum ½ inch stock (see picture below) Gloves required 1. Pick up the aluminum ½

More information

Yes 20 Charging Wall Cabinet for Tablets

Yes 20 Charging Wall Cabinet for Tablets Built with Anthro-DNA Owner's Manual for Yes 20 Charging Wall Cabinet for Tablets Part # YESCABGMPW Components at a Glance 1 2 4 5 8 7 10 Front of Cabinet (closed) 1. Locking front door to User area. 2.

More information

OWNER S MANUAL. Safety. Please read this owner s manual before use and keep it at hand for reference. Warranty

OWNER S MANUAL. Safety. Please read this owner s manual before use and keep it at hand for reference. Warranty Please read this owner s manual before use and keep it at hand for reference. OWNER S MANUAL Safety Important safety instructions for using the INCRA Miter5000 Before using the INCRA Miter5000, read and

More information

MEC Auto-Mate Assembly Manual. For MEC 9000G/GN and 8567 Grabber Series

MEC Auto-Mate Assembly Manual. For MEC 9000G/GN and 8567 Grabber Series MEC Auto-Mate Assembly Manual For MEC 9000G/GN and 8567 Grabber Series Thank you We really appreciate your support of our product line. But our commitment to you hardly ends here. We won't be satisfied

More information

ELECTRIC RACER BASIC BUILD

ELECTRIC RACER BASIC BUILD Page 1 Name: Set: Date: This guide will take you through the process of creating a basic electric racer. After you finish this build, you should be able to experiment, design and engineer your own racer.

More information

Tin Lizzie 18 Assembly Instructions

Tin Lizzie 18 Assembly Instructions Tin Lizzie 18 Assembly Instructions Revision: 07/29/16 Table of Contents Aides 3 Before You Begin 5 Aides 5 Tools 6 Perfect Stitch Parts 2 12 Modify the Machine 12 Prepare Drill Templates 12 Front Display

More information

Printrbot Simple (Model 1403) Rev F Printrboard

Printrbot Simple (Model 1403) Rev F Printrboard Printrbot Simple (Model 1403) Rev F Printrboard Printrbot Simple is currently shipping with the Rev F Printrboard. Check which rev Printrboard your Simple kit includes and use the corresponding instructions.

More information

TOOLS REQUIRED Metal Wood Wood and Metal Screws. #16 Drill #12-24 Tap. 1/8 Drill

TOOLS REQUIRED Metal Wood Wood and Metal Screws. #16 Drill #12-24 Tap. 1/8 Drill DEVICES COVERED IN THIS DOCUMENT: 4700S Surface Vertical Rod Device 4700SF Fire Exit Surface Vertical Rod Device TOOLS REQUIRED Metal Wood Wood and Metal Screws Sex Bolts #7 Drill ¼ -20 Tap #16 Drill #12-24

More information

Elimination of Elevator Bounce

Elimination of Elevator Bounce For the Agilent Archon Autosampler Rework Instructions CAUTION This kit is intended for use by Agilent Service personnel only. Elevator Removal 1 Open top cover. 2 Open front lower door. 3 Remove vial

More information

Obtained from Omarshauntedtrail.com

Obtained from Omarshauntedtrail.com http://www.scary-terry.com/dancskele/dancskele.htm This is a how-to for making a set of dancing skeletons for your Halloween window display. It uses a pair of cheap, glow-in-the-dark plastic skeletons

More information

HANDLING AND ASSEMBLY INSTRUCTIONS FOR TRUE FOCUS 3.0M, 3.8M AND 4.2M ANTENNAS WITH POLAR MOUNT

HANDLING AND ASSEMBLY INSTRUCTIONS FOR TRUE FOCUS 3.0M, 3.8M AND 4.2M ANTENNAS WITH POLAR MOUNT HANDLING AND ASSEMBLY INSTRUCTIONS FOR TRUE FOCUS 3.0M, 3.8M AND 4.2M ANTENNAS WITH POLAR MOUNT Introduction SECTION 1 Thank you for purchasing one of our fine True Focus products. This manual covers the

More information

Legacy Woodworking Machinery a division of Phantom Engineering. The Legacy CNC. Assembly Manual

Legacy Woodworking Machinery a division of Phantom Engineering. The Legacy CNC. Assembly Manual Legacy Woodworking Machinery a division of Phantom Engineering The Legacy CNC Assembly Manual New Orientation of the Legacy Step one: Re-orientation of the machine Remove the X-axis screw and supports.

More information

Sliding Crosscut Table installation guide

Sliding Crosscut Table installation guide Sliding Crosscut Table installation guide model tsa-sa48 A Note About Color Variations Among Anodized Aluminum Components Congratulations on the purchase of this SawStop Sliding Crosscut Table. We at SawStop

More information

IN 578. Tools Required. Torque Specification: 10mm Socket 7/16 Socket 1/2 Socket 1/2 Wrench 7/16 Wrench 1/8 Allen Wrench.

IN 578. Tools Required. Torque Specification: 10mm Socket 7/16 Socket 1/2 Socket 1/2 Wrench 7/16 Wrench 1/8 Allen Wrench. Tools Required 2011-C Ford F250/F350 No Drilling into Vehicle is Required 10mm Socket 7/16 Socket 1/2 Socket 1/2 Wrench 7/16 Wrench 1/8 Allen Wrench FL277 x 1 Torque Specification: 1/4 Bolts - 6 Ft Lbs.

More information

UAL SHOP DRIVE PULLEY

UAL SHOP DRIVE PULLEY SHOP 11-73 M UAL @@@ RIVE PULLEY ismount (Taper Bore) Page 2 ismount (Rotax) Page 3 isassembly (Rotax Page 3 isassembly (Ta per Bore) Page 4 Inspection Page 6 Reassembly Page 7 Remount Page 8 Modification.

More information

RPS. XR Front Drive Updates CORPORATION

RPS. XR Front Drive Updates CORPORATION FACTORY CAT 1. To start a replacement of the XR Front Wheel Drive, make sure the machine is on level ground with the rear wheels chocked and always disconnect the batteries. 2. Locate the Positive and

More information

Model No: TC10. Parts Information: Tyre Changer - Automatic

Model No: TC10. Parts Information: Tyre Changer - Automatic Page 1 of 11 1 TC10.01 BODY 2 TC10.02 COLUMN 3 TC10.03 HORIZONTAL ARM ASS'Y 4 TC10.04 WASHER 5 TC10.05 RUBBER FOOT 6 TC10.06 COVER 7 TC10.07 SCREW M14x42 8 TC10.08 PRESS COVER 9 TC10.09 STOP-UP 10 TC10.10

More information

Pneumatic Clamp Carrier. Installation & Operation Manual

Pneumatic Clamp Carrier. Installation & Operation Manual Pneumatic Clamp Carrier Installation & Operation Manual Pneumatic Clamp Carrier Installation & Operation Manual Quick Machinery Company 8272 Peninsula Drive Kelseyville, CA 95451 phone: (707) 272-6719

More information

Mount to the Wall INSTALLATION MANUAL

Mount to the Wall INSTALLATION MANUAL Mount to the Wall 15 Locate the Wooden Studs This step applies to wooden stud wall installation only. Determine and mark the exact locations of two stud centers on the wall. Wooden studs should be spaced

More information

How To Measure Your Finished Opening

How To Measure Your Finished Opening 3000 Series Bifold Doors How To Measure Your Finished Opening MEASURE FROM RIGHT TO LEFT 2 PLACES (WIDTH) MEASURE FROM TOP TO BOTTOM 2 PLACES (HEIGHT) Tools Required for Assembly: Tools Needed: Phillips

More information

S6 User s Manual USER S MANUAL ver. 1.0

S6 User s Manual USER S MANUAL ver. 1.0 S6 User s Manual SKEETER - 1U LOW PROFILE SOLUTION Table of Contents Tabletop Configuration 2 Tabletop Configuration Accessories 4 Slide Configuration 5 slide configuration accessories 7 rack Mount configuration

More information

TABLE OF CONTENTS REQUIRED TOOLS

TABLE OF CONTENTS REQUIRED TOOLS TABLE OF CONTENTS SECTION SECTION TITLE PAGE NO. 1 2 3 4 5 Assembling Mounting Structure Installing Bicycle Supports Mounting Rack to Wall Adding Sections Customizing Rack Configuration REQUIRED TOOLS

More information

Formulate Designer Series 10 Backwall - Kit 09

Formulate Designer Series 10 Backwall - Kit 09 Formulate Designer Series 10 Backwall - Kit 09 FMLT-DS-10-09 Formulate Designer Series 10ft displays have unique stylistic features and shapes, are portable and easy to assemble. The aluminum tube frame

More information

B Connectors. Automation. Structural Framing System Connectors & Fasteners

B Connectors. Automation. Structural Framing System Connectors & Fasteners BContents B Connectors Gussets... 2 End Fasteners... 4 Anchor Fasteners... 5 Angle Brackets... 6 45 Support Brackets... 8 Butt Fasteners... 9 Hinged Support Brackets... 10-13 Joining Plates... 14-18 Nuts

More information

SHERLINE/WETTROTH Mill Digital Readout P/N 8100 (Metric P/N 8160)

SHERLINE/WETTROTH Mill Digital Readout P/N 8100 (Metric P/N 8160) WEAR YOUR SAFETY GLASSES FORESIGHT IS BETTER THAN NO SIGHT READ INSTRUCTIONS BEFORE OPERATING SHERLINE/WETTROTH Mill Digital Readout P/N 8100 (Metric P/N 8160) The Digital Readout in the Modern Machine

More information

TRAKFAST REPAIR MANUAL DANGER TOOL DISASSEMBLY ALWAYS TAKE THE FOLLOWING PRECAUTIONS BEFORE ANY SERVICE OR ROUTING MAINTENANCE IS PERFORMED:

TRAKFAST REPAIR MANUAL DANGER TOOL DISASSEMBLY ALWAYS TAKE THE FOLLOWING PRECAUTIONS BEFORE ANY SERVICE OR ROUTING MAINTENANCE IS PERFORMED: DANGER ALWAYS TAKE THE FOLLOWING PRECAUTIONS BEFORE ANY SERVICE OR ROUTING MAINTENANCE IS PERFORMED: REMOVE FASTENERS REMOVE FUEL CELL REMOVE BATTERY REMOVE THE MAGAZINE ASSEMBLY Loosen and remove knob

More information

Standard Operating Procedure

Standard Operating Procedure RIT MULTIDISCIPLINARY SENIOR DESIGN 2010 Standard Operating Procedure Baja Water Propulsion Test Stand This SOP specifies how to assemble, use, troubleshoot, and disassemble the water propulsion system

More information

SAFETY INSTRUCTIONS. Wear protective clothing, including safety glasses and steel toe boots.

SAFETY INSTRUCTIONS. Wear protective clothing, including safety glasses and steel toe boots. SAFETY INSTRUCTIONS Wear protective clothing, including safety glasses and steel toe boots. DO NOT allow loose clothing or long hair near machine operations. Keep work site and machine clean. Use brush

More information

Model 209 Fireback Replacement

Model 209 Fireback Replacement Model 209 Fireback Replacement Please read all the instructions before you begin the procedure. Confirm that you have all the necessary tools and materials. If you have any questions, technical support

More information

Formulate Designer Series 20 Backwall - Kit 07

Formulate Designer Series 20 Backwall - Kit 07 Formulate Designer Series 20 Backwall - Kit 07 FMLT-DS-20-07 Formulate Designer Series 20ft displays have unique stylistic features and shapes, are portable and easy to assemble. The aluminum tube frame

More information

Senior Swing. Caution

Senior Swing. Caution *740132* 740132 2800 Overhead Concealed Series 9500 Surface Applied Series Senior Swing Installation Instructions Caution LCN Senior Swing The Senior Swing Power Operator System is a low energy product

More information

Assembly Guide for Printrbot - Simple Maker s Edition 1405

Assembly Guide for Printrbot - Simple Maker s Edition 1405 Assembly Guide for Printrbot - Simple Maker s Edition 1405 Last update: March 2016 Please Note: be careful on the steps that are underlined 1 Contents Tools Needed:... 3 First step: Check components and

More information

Hydraulic Clamp Carrier. Installation & Operation Manual

Hydraulic Clamp Carrier. Installation & Operation Manual Hydraulic Clamp Carrier Installation & Operation Manual Hydraulic Clamp Carrier Installation & Operation Manual Quick Machinery Company 8272 Peninsula Drive Kelseyville, CA 95451 phone: (707) 272-6719

More information

SPIDA SAW OPERATIONS MANUAL

SPIDA SAW OPERATIONS MANUAL SPIDA SAW OPERATIONS MANUAL CM SERIAL NUMBER. OCTOBER 2000 CONTENTS Page description 1.) Contents 2.) Safety First 3.) CM Overview 4.) CM Specifications 5.) CM Installation 6.) CM Operation Setting the

More information

Battle Crab. Build Instructions. ALPHA Version

Battle Crab. Build Instructions. ALPHA Version Battle Crab Build Instructions ALPHA Version Caveats: I built this robot as a learning project. It is not as polished as it could be. I accomplished my goal, to learn the basics, and kind of stopped. Improvement

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS Sheet 1 of 5 General: Upon receipt of fixture thoroughly inspect for any freight damage, which should be brought to the attention of the delivery carrier. Compare the catalog description listed on the

More information

Wiring Techniques for Wiring a Lamp

Wiring Techniques for Wiring a Lamp Supplies and Tools that you will need: Provided in your kit: Polarized lamp plug, 9 of SPT-1 18 AWG parallel lamp cord, bushings and grommets Items that you will need to provide: Phillips screwdriver,

More information

Vinyl Cutter Instruction Manual

Vinyl Cutter Instruction Manual Vinyl Cutter Instruction Manual 1 Product Inventory Inventory Here is a list of items you will receive with your vinyl cutter: Product components (Fig.1-4): 1x Cutter head unit complete with motor, plastic

More information

Parts Catalog. S-Series Slicer Manual Frozen Option S13. Model:

Parts Catalog. S-Series Slicer Manual Frozen Option S13. Model: , 07 995 ECN 08 Parts Catalog S S-Series Slicer Manual Frozen Option Model: S 05/0/07 Rev. G IMPORTANT! TO EXPEDITE SHIPMENT OF PARTS, ALWAYS SPECIFY MODEL, REV, PART NUMBER, AND SERIAL NUMBER OF UNIT.

More information

SETUP INSTRUCTIONS If you would like to tell us about your experience with your setup instructions please us at

SETUP INSTRUCTIONS If you would like to tell us about your experience with your setup instructions please  us at 207 VK-964 General Layout 0 0 Plan View www.classicexhibits.com SETUP INSTRUCTIONS If you would like to tell us about your experience with your setup instructions please email us at info@classicexhibits.com

More information

Removing the Z-Axis lead screw

Removing the Z-Axis lead screw Page 1 of 8 TITLE: Sabre Z-Axis Lead Screw Replacement Procedure Gerber FastFact #: 5048 Supplied by: Gerber Hardware Support Last Modified: June 14, 2007 Summary: Tools used: The following procedure explains

More information

This instruction manual is an in-depth look and explanation of how to assemble and install the Murphy Bed properly and efficiently.

This instruction manual is an in-depth look and explanation of how to assemble and install the Murphy Bed properly and efficiently. This instruction manual is an in-depth look and explanation of how to assemble and install the Murphy Bed properly and efficiently. Don t be put off by the size of the instruction manual as the large diagrams

More information

Ready To Go SimpleSpec tm. Installation Manual. For more information, please visit 3-form.com or call

Ready To Go SimpleSpec tm. Installation Manual. For more information, please visit 3-form.com or call Contents Overview ( 1) 3/8" Varia Panel = Cable Tensioner with Cover Plate KIT Stainless Steel: 3-15-1636-K Black Oxide: 3-15-2005-K Cable Tensioner with Cover Plate SS: 3-15-1636 BO: 3-15-2005 + M8 Thread

More information

w w w. h d o n l i n e s h o p. d e AUTOMATIC COMPRESSION RELEASE TOOL GENERAL INSTALLATION -J04654 REV Kit Number Models

w w w. h d o n l i n e s h o p. d e AUTOMATIC COMPRESSION RELEASE TOOL GENERAL INSTALLATION -J04654 REV Kit Number Models -J05 REV. 008-0- GENERAL Kit Number 98-08 Models AUTOMATIC COMPRESSION RELEASE TOOL For model fitment information, see the P&A Retail Catalog or the Parts and Accessories section of www.harley-davidson.com

More information

TITAN2-EDGE Public Access Computer Station Dual Track

TITAN2-EDGE Public Access Computer Station Dual Track TITAN2-EDGE Public Access Computer Station Dual Track TITAN2-EDGE Rev A 6/17 Model TITAN2-EDGE ASSEMBLY AND ADJUSTMENT TITAN2-EDGE PARTS AND TOOLS PLEASE REVIEW these instructions before beginning the

More information

Pneumatic Clamp Carrier. Installation & Operation Manual

Pneumatic Clamp Carrier. Installation & Operation Manual Pneumatic Clamp Carrier Installation & Operation Manual Pneumatic Clamp Carrier Installation & Operation Manual Quick Machinery Company 8272 Peninsula Drive Kelseyville, CA 95451 phone: (707) 272-6719

More information

AM8 Printer A metal frame for your Anet A8 By Pheneeny v1.0 April 20, 2017

AM8 Printer A metal frame for your Anet A8 By Pheneeny v1.0 April 20, 2017 AM8 Printer A metal frame for your Anet A8 By Pheneeny v1.0 April 20, 2017 Please read this entire document before printing parts or building this frame Disclaimer: This guide is for informational purposes

More information