Install Manual GC Max-Span Ground System Piles, Portrait, Bottom Mount Configuration
|
|
- Calvin Shelton
- 5 years ago
- Views:
Transcription
1 Install Manual GC Max-Span Ground System Piles, Portrait, Bottom Mount Configuration CONTENTS I II III IV V VI VII VIII IX GENERAL SAFETY PRECAUTIONS AND RESPONSIBILITY OF INSTALLER MATERIALS AND TOOLS REQUIRED SYSTEM COMPONENTS INSTALLATION OF SYSTEM SYSTEM OVERVIEW MATERIALS, STORAGE AND WARRANTY SITE SELECTION PREVENTATIVE MAINTENANCE
2 I General Please carefully follow this manual to learn how to correctly install the GameChange Solar Max-Span Ground System. The Max-Span Ground System is engineered and tested to withstand wind and snow loads to specification when installed properly. Failure to precisely follow the install manual and to install the racking system properly may decrease the performance of the installation and will void the warranty. This is the generic manual and it includes all components utilized in all variations of the Max-Span Ground System. Please refer to your particular permit/layout detail sheets and bill of materials for the specific components for your system as some components may not be required. II Safety Precautions and Responsibility of Installer The installer is responsible for the following: Following all instructions in this Install Manual Utilization of only qualified personnel Using only GameChange parts. Using other parts to complete the installation as substitutes may void the warranty. Making sure the ground structure (notably in the case of a capped landfill) can support the loading resulting from the Max-Span Ground System Following all safety procedures as outlined in this Install Manual, both for mechanical and electrical aspects of the solar PV array installation Following all safety instructions that are required by relevant local, regional and national organizations Materials are packaged in optimal manner to protect components. Do not un-package until time of installation. Un-packaging and restacking may cause damage to components. General safety precautions: Plan for safe practice during any installation activity with respect to hazards from tripping, falling, lifting, repetitive stress, and any overhead or electrical hazards. Refer to OSHA safety guidelines. Metal components often have sharp edges. Handle carefully! Wearing gloves is good practice. This document is not prescriptive regarding safety and does not purport to address all the safety concerns that may arise with its use. Contractors should become familiar with all applicable safety, health and regulatory requirements before beginning work. Electrical safety notice The Max-Span Ground System is a mechanical system and contains no live parts. Mechanical installers and electricians should coordinate in order to ensure that all personnel are aware of electrical hazards that may result once panels have been placed on the racking structure. Build rate Estimated mechanical installation rate (racks and panels per day) for an array consisting of commercial-class modules installed with the Max-Span Ground System and assuming a well-equipped five-person crew working 8 hours / day with full task interchangeability: approximately 227 panels and racks per day. 15 men install 1.05 MW per week with 300 watt modules. Field modifications and Work arounds Unauthorized field modification and workarounds of Gamechange components or assemblies may affect GameChange warranty coverage. Provide marked up drawings for Gamechange s review, comment and approval prior to attempting. Installers laying out or installing arrays may encounter undocumented or unexpected obstacles requiring a work around. Since PV arrays are intended to be primarily regular and repeating structures, work arounds should be brought to the attention of GameChange personnel prior to being done. If approved by GameChange, they should be noted on working drawings. Rev GC Max-Span TM - Install Manual Piles, Portrait, Bottom Mount Configuration 2
3 All regional safety requirements shall be followed when installing the Max-Span Ground System. All equipment/tools shall be properly maintained and inspected prior to use. This installation manual is intended for use by professional installers with a working knowledge of construction principles. If the install manual is not followed completely the warranty may be voided and the solar system may not operate optimally. III Materials and Tools Required The following tools are required for the installation of the Max-Span Ground System: String line, 48 inch long level and 30 foot tape measure Anti-seize may be beneficial to prevent galling for bolts used to mount panels, but is not required GameChange rack materials (see below) Wrenches and deep and short sockets and drivers: 7/16 inch (for 1/4-inch hex bolts and nuts), 9/16 (for 3/8), and 1 1/8 (for 3/4) Inclinometer of level with digital degree read out Rev GC Max-Span TM - Install Manual Piles, Portrait, Bottom Mount Configuration 3
4 IV System Components The Max-Span Ground System contains the following parts: (This is the generic manual and it includes all components utilized in all variations of the Max-Span Ground System. Please refer to your particular permit/layout detail sheets and bill of materials for the specific components for your system as some components may not be required.) StickyPile TM Post (GC61) NS Beam (GC62H) Brace for NS Beam (GC64HX) EW Purlins (GC63) Bend Strap (GC871) (if req d) Roll Tie (GC872) (if req d) Roll Strap (GC873) Purlin Angle (GC874) (if req d) Purlin Washer (GC126) Wide Beam Washer (GC125) Associated Hardware for Posts (Piles), Braces, Beams, EW Purlins, and other components: Flange nuts, and hex bolts (or flange bolts); 3/8-16 x 1 inch, and 3/4-10 x 1 1/2 inch: Magnacoat Washers 3/8 and 3/4 inch; Hot dip galvanized, magnacoat or stainless steel Panel Mounting Hardware: Stainless steel: o Hex bolts - 1/4-20 x 3/4 inch long o Flange nuts (1/4-20) o External tooth star washer (5/16 inch) Rev GC Max-Span TM - Install Manual Piles, Portrait, Bottom Mount Configuration 4
5 V Assembly and Installation Instructions Step 1: Placement of the Posts Post Installation 1.0 Measure the footprint of the array according to the installer s design and site plan. 2.0 Find the edges of the array according to provided design. 3.0 Drop a string line on the southern edge. 4.0 Mark Post Locations with locator nails according to array plan starting at south-east corner of array -Make sure define distance between foundations is measured from center of post to center of next post along the ground (not from plan view). Otherwise foundation locations will creep if there is rolling terrain since plan view does not factor in dimensions differences caused by terrain. This could make purlin attachment more difficult. 5.0 Install first Post to the proper height above the ground 5.1 There is an adjustment range given by GameChange for posts with a minimum embedment depth governing on one side and the distance for ground clearance requirement on the other. 5.2 This is typically from 4 to 8 inches. 5.3 It is good to vary embedment depth from minimum to maximum allowed on this range in order to align tops of piles in a flat or relatively smoothly sloping fashion as per the ground being flat or sloping. 6.0 Make sure the two longer sides (approximately 6-inch) face East-West, and the open side faces north North 7.0 Make sure next Posts are installed at specified distances from marked locations: 7.1 East-west +/- 1 inches The racking system allows for +/- 2 inches but this will make more adjustment of purlins necessary and slow down installation. 7.2 North-south +/- 1 inch 8.0 Make sure posts are squared to within +/- 1 degree to the azimuth of the array. 9.0 Tops of the posts are leveled to be at a consistent height or slope depending on the topography of the land (with a tolerance of optimally +/- 1 inch). Note that embedment depth will vary. GameChange provides range of embedment depth to allow for this. Be careful to always meet minimum embedment depth Make sure post is plumb, optimally +/- 1 degree so long as: 10.1 Not more than +/- 1 1/2 inches on east to west direction at top of post (from the proper post location marked on ground). The racking system allows for +/- 2 1/2 inches but this will make more adjustment of purlins necessary and slow down installation) 10.2 Not more than +/- 1 inch north to south direction at top of post (from the proper post location marked on ground) Rev GC Max-Span TM - Install Manual Piles, Portrait, Bottom Mount Configuration 5
6 V Assembly and Installation Instructions Step 1: Placement of the Posts Refusal Instructions Inform Game Change immediately if refusal is encountered when driving posts. Refusal is defined as a blow count of 10 or more per inch (120 blows per foot). Refusal of posts shall be addressed as follows: Option 1 Use post at shallower embedment depth a) Based on the embedment of the post at time of refusal and the location of the post relative to the array, GameChange engineering staff may determine it to be acceptable to leave the post at the shallower embedment depth. If instructed by GameChange engineering staff, cut the top of the post to the appropriate height and field drill bolt holes for connection to the beams per post drawings. b) Pull testing may be required to confirm the post at the shallower depth has sufficient resistance to the design uplift and lateral forces. Pull test procedures, including test loads, will be provided by GameChange engineering staff. Option 2 Install post in Aggregate Base Course a) Pull Post out using a crane attached to the topmost slots (or equivalent method) b) Drill hole for Post using a 10 drill to the depth prescribed for Post embedment depth within tolerances. c) Fill hole with aggregate base course. Depending on site conditions, this method may not be applicable, or compaction of the aggregate fill may be required. Consult GameChange engineering staff for more information. d) Drive post at original location, through aggregate, in accordance with typical post installation instructions above. Option 3 Install shorter post in concrete pier a) Pull Post out using a crane attached to the topmost slots (or equivalent method) b) Drill hole for Post using a 12 drill to the depth prescribed for Post embedment depth within tolerances. c) Insert Post into drilled hole and hold plumb. Temporary wooden bracing supports may be used for this. d) Fill with 4,000 psi concrete, in consultation with GameChange to amount of concrete and method of installation. Installing Posts using drill and concrete pouring method to ensure proper Post top alignment: Attach tape to the drill bit (for pre-drilling holes for pile holes to be filled in with concrete) so that the distance from the tape to the bottom of the drill bit is the same as the height of the post. Set a stake at each end of a row line. Attach a string (or aircraft cable and use come-alongs to keep taught) from one stake to the other, and make sure it is at the proper post height above the ground. Dill holes vertically and plumb until bottom of the tape is level with the string. Remove drill and place post in hole. This will align every post to a consistent slope Embedment depth will vary, make sure minimum embedment depth meets GameChange requirements. Please consult with GameChange for more detail. Rev GC Max-Span TM - Install Manual Piles, Portrait, Bottom Mount Configuration 6
7 Deformation at the top of the piles rarely occurs, and typically only when piles are driven into rock, and is minor and easily remedied. Deformation could cause problems for the installation of the NS Beam. If any deformation at the top of the piles occurs during installation: a) If mushrooming is locally isolated above any slots or features and within 1/8 inch of the original drawing dimension (4 15/16 ), use a hammer (or equivalent equipment) to reshape the top end of the Post back to within 1/16 inch of the original drawing dimension. b) If piles are deformed more than 1/8 inch then consult with GameChange regarding re-use. If there is any cracking of galvanized coating on piles make sure to wire brush then paint area with zinc rich paint. Rev GC Max-Span TM - Install Manual Piles, Portrait, Bottom Mount Configuration 7
8 V Assembly and Installation Instructions Step 2: Beam/Brace Assembly 1.0 Place NS Beam on top of Post such that longer part is to South, aligning the 3/4-inch mounting hole with 3/4-inch width slot on top of Post. 2.0 Attach NS Beam to Post using 2.1 3/4-inch bolts 2.2 3/4-inch washers (under bolt heads, on NS Beam side) 2.3 3/4-inch serrated flange nuts (inside Post) 2.4 3/4-inch washers (under serrated flange nuts, inside Post) 2.5 Leave hand tight to allow for adjustment in later steps 3.0 Align 3/4-inch hole on Brace to 3/4-inch width slot in the middle of the Post Attach Brace to Post using 3.1 3/4-inch bolts 3.2 3/4-inch washers (under bolt head, on Post side) 3.3 3/4-inch serrated flange nuts 3.4 3/4-inch washers (under serrated flange nuts, inside Brace) 3.5 Leave hand tight to allow for adjustment in later steps Rev GC Max-Span TM - Install Manual Piles, Portrait, Bottom Mount Configuration 8
9 4.0 Align 3/4-inch slots on Brace to 3/4-inch slots on NS Beam. Attach Brace to NS Beam using 4.1 3/4-inch bolts 4.2 3/4-inch washers (under bolt head, on NS Beam side) 4.3 3/4-inch serrated flange nuts 4.4 3/4-inch washers (under serrated flange nuts, inside Brace) 4.5 Leave hand tight to allow for adjustment in later steps Note: Make sure to review assembly print for specific job and attach to hole that results in tilt as required for installation 5.0 Repeat steps for NS Beam and Brace on adjacent Posts. When installing Beams; make sure all Beams are at the tilt as required for the installation. The NS Beams have to be oriented correctly in the North-South direction, aligned properly in the East-West direction, and are to be at a consistent level height or slope. Using a string line will be helpful to do this. Tighten hardware to specifications. Rev GC Max-Span TM - Install Manual Piles, Portrait, Bottom Mount Configuration 9
10 V Assembly and Installation Instructions Step 3: Purlin Assembly 1.0 EW Purlins attach to NS Beams using: 1.1 Two 3/8-inch bolts 1.2 Two serrated flange nuts 1.3 One Purlin Washer (must use Purlin Channel Washers for 16 gauge Purlins) 1.4 One Wide Beam Washer 2.0 EW Purlins should be installed facing uphill or downhill as shown in drawing set for each individual system provided as by GameChange. 3.0 Post distances may vary due to site conditions or Post installation variances, therefore do not install all table purlins first. If you install all table purlins first, you will likely need to go back and take some of these off and reinstall if connector purlins do not reach. It is better to install only a few table purlins ahead and then go across the row using table then connector purlins as you go. 4.0 Attach first EW Purlin at center holes on the southernmost position to the first and second NS Beams using center set of holes for EW Purlin attachment. 4.1 Hardware attachment sequence: Insert 3/8-inch bolt through Purlin Washer nearest to EW Purlin wall, EW Purlin, NS Beam, and Wide Beam Washer. Make sure Purlin Washer is pushed up tight against the wall of the Purlin, this is important Attach 3/8-inch flange nuts below NS Beam Insert 3/8-inch bolt through EW Purlin furthest from EW Purlin wall, NS Beam, and Wide Beam Washer Attach 3/8-inch flange nuts below NS Beam Finger Tight on hardware After Panels mounted and Purlins properly aligned, tighten hardware to specification, using driver to turn bolt head Alternatively bolts may come up and flange nuts be above purlin 4.2 Then, noting the length of the connecting EW purlin, attach the second southernmost EW Purlin to the third and fourth NS Beams. 4.3 For completing EW Purlin installation on tables: Rev GC Max-Span TM - Install Manual Piles, Portrait, Bottom Mount Configuration 10
11 4.3.1 Install the third EW Purlin up the NS Beam Using the tape measure to confirm the table is square(by cross measuring or golden 345 triangle May need to tighten bolts to hold the table square Install the second EW Purlin and the fourth EW Purlin Use a tape measure or t-square to make the second and fourth EW Purlins are square with the first and third. 4.4 Attach connector EW Purlin to between the table EW Purlins. There will be a nominal drop of 1/8 to 1/4 inch from one purlin to the next, which will result in a small corresponding drop from one panel to the next at these junctions. This is normal for connecting systems and is not a shading or functional issue. Try to attach slots at center if possible. This will make for better spaced panel install Hardware attachment sequence: /8-inch bolts (or serrated head bolts), washers (on either side, one under the bolt head and another under the nut) and serrated flange nuts Alternatively bolt direction may be reversed. Connector EW Purlin Table EW Purlin Picture of table / connecting EW Purlin system installed: Connecting purlins allow for articulation to handle east-west slopes of up to 8% 4.5 Repeat for all table EW Purlins and connecting EW Purlins 4.6 Make sure to attach the alternating table EW Purlins and connecting EW Purlins starting at one end of row and continue to the other end of the row. 4.7 Do not attach table EW Purlins at several points along the row in isolated table format or you may not be able to utilities all of the EW adjustment features provides as easily as if you start on one end and work your way across. Rev GC Max-Span TM - Install Manual Piles, Portrait, Bottom Mount Configuration 11
12 V Assembly and Installation Instructions Step 4: Additional Support Attachments Attaching the Bend Strap 1.0 Bend Straps shall be installed on the underside of the EW Purlins approximately midway between two adjacent Beams. Use 3/8-16 hex bolts and serrated flange nuts. Torque to specification. Attaching the Roll Ties 2.0 Roll Ties shall be installed on the EW Purlins approximately midway between two adjacent Beams (one on either side of the Bend Strap). Assembly drawing will identify where the Roll Ties are to be installed. One Roll Tie will be installed from the top of the southern Purlin web to the bottom of the northern Purlin leg. The other Roll Tie will be installed from the top of the northern Purlin web to the bottom of the southern Purlin leg. Use 3/8-16 hex bolts and serrated flange nuts. The Roll Ties must be taut, this is very important. Torque to specification. Attaching the Roll Straps 3.0 Roll Straps shall be installed at both ends of first and third EW Purlins to the Beams. Use 3/8-16 hex bolts and serrated flange nuts. The Roll Straps must be taut, this is very important. Torque to specification. Bolts through purlin may be installed in either direction with flange nut on either side, however bolts through beam must have head above beam and Flange nut under Beam. Torque to specification. Attaching the Purlin Angle 4.0 Purlin Angles (if required) shall be installed on the underside of the EW Purlins at the holes next to the NS Beams on the upper EW Purlins, holes near the center of the lowest EW Purlin, and the respective holes that line up for the 2 nd and 3 rd Purlin. Use 3/8-16 hex bolts and serrated flange nuts. Torque to specification. Rev GC Max-Span TM - Install Manual Piles, Portrait, Bottom Mount Configuration 12
13 Roll Strap (GC873) Roll Ties, Bend Strap, and Roll Straps installed: Rev GC Max-Span TM - Install Manual Piles, Portrait, Bottom Mount Configuration 13
14 V Assembly and Installation Instructions Step 5: Module Attachment Panel Mounting Hardware: Stainless steel: o Hex bolts - 1/4-20 x 3/4 inch long o Flange nuts (1/4-20) o External tooth star washer 1.0 Attaching first panel to EW Purlin through mounting holes in EW Purlins nearest to NS Beam: 1.1 Place star washer at one location per panel inside panel frame. 1.2 Insert hex bolt through the EW Purlin, through the mounting hole in the back of the panel, then through the star washer. 1.3 Attach with a flange nut on end of bolt inside panel frame over star washer. 1.4 Tighten bolt to specification. 1.5 Repeat 1.1 through 1.4 for three more bolts for each panel without using star washer. Bottom mount method: Portrait configuration: Alternate Panel Mounting Method: If panel mounting hole diameter or slot width is 0.28 or less, the orientation of the bolt and nut can be flipped such that the stack-up order from top to bottom is: hex bolt head, star washer, panel frame mounting hole, EW Purlin mounting hole, and flange nut. 2.0 Repeat for all panels. 3.0 For bottom mount attachment of panels GameChange typically provides slotted panel mounting holes to enable panel adjustment in case purlins are not perfectly aligned due to rolling or otherwise uneven ground situations. 4.0 It is the customer s responsibility to make sure to follow panel spacing guidelines if any are given by panel vendor in their specification sheet or elsewhere, otherwise panel warranty could be voided. In all cases make sure panel spacing is the greater of 1/8 inch or the minimum called out by the panel vendor. This will allow for thermal expansion of panels. GameChange systems typically enable ¼ inch panel spacing if aligned properly. 4.1 Spacing between panels can be set by placing a temporary spacer such as bolt shaft or plywood of same thickness as required for panel spacing between panels while they are being installed. This spacer should be removed after panel installation is complete. Rev GC Max-Span TM - Install Manual Piles, Portrait, Bottom Mount Configuration 14
15 V Assembly and Installation Instructions Step 6: Wire Management It is the installers responsibility to install wiring properly. Care should be taken fasten wire firmly in place to prevent movement or chaffing against metal parts over time. Wires should be checked on a routine basis to make sure they remain firmly attached and in place. IV Assembly and Installation Instructions Step 7: Grounding The modules and EW Purlins are all bonded together across the entire row, East and West. To achieve grounding of the system, GameChange recommends installing Cooper, Burndy, or Eaton UL approved grounding lug(s) with 1/4-inch bolts as in accordance with NEC Article 690 to the Post below the last EW Purlin which has panels attached to it which are to be bonded, using 8 gauge copper wire. The Purlin to Purlin bonded connection is rated for up to 25 amps. Therefore, conductors with expected currents greater than 25 amps may not be installed on the racking system without installing additional grounding measures. The entire system needs to be grounded from a single point to an appropriate grounding source. **Please confirm with an electrician, as this is their responsibility** In case of a configuration where there is a break in the array, UL 2703 listed jumpers (e.g., Burndy WILEYBRAID) may be used to bond one segment of the array to the next (only one jumper in between two tables). Install jumpers via unused or field-drilled holes on the Purlin, Beam, or Post, and using UL 2703 approved attachment methods. VI System Overview The Max-Span Ground System is a simple, affordable, easily installed ground-based solar mounting system. Components are made from galvanized and stainless steel. Max-Span Ground System may be installed on solar arrays of up to 200,000 solar panels each (approximately 50 MW). Maximum panel size for the system shall be 45 x 82 inches. Slopes up to 10% are allowable under all normal conditions for continuous systems, and up to 30% for table systems only in consultation with GameChange personnel. VII Materials, Storage and Warranty All materials are made from non-corrosive materials, galvanized, magni coated or stainless steel, with a product warranty of twenty (20) years. Rev GC Max-Span TM - Install Manual Piles, Portrait, Bottom Mount Configuration 15
16 Make sure to install system within several days of receipt of components. Storage of components in a damp or wet environment can lead to white rust on galvanized parts as well as other damage on other protective coatings which can lead to accelerated corrosion of components, and void the warranty. Galvanization is especially prone to white rust when components are still bundled because the zinc coating requires airflow over its surface to establish its protective patina, otherwise water can cause corrosion of the zinc and it has no protection against it in enclosed spaces, such as those between parts that are bundled. VIII Site Selection Proper preparation of surface must be ensured for a well-performing system to be installed. For continuous racking without breaks, ground must be at an east-west slope not to exceed 5 percent to minimize east /west shading from panel to panel. Grading of the ground on the installation area is the responsibility of the customer and should be completed properly to enable the slope tolerance for the Max-Span Ground System. General guidelines include: Choose a clear area free of shading Suggested ten (10) foot border surrounding array IX Preventative Maintenance Proper preventative maintenance must be conducted or warranty may be voided. After installation of the Max-Span Ground System, installer must annually monitor for any surface rust that may occur over time due to scraping of the components or for any other reason. While the extensive galvanizing protection should minimize any such rusting, it is essential that preventative maintenance be performed annually to include: Identifying any rust areas Wire brush the rust area to remove all rust Coat the area with 70%+ zinc rich or equivalent field life paint This step is not required if rust is limited to edges which were cut during fabrication After extreme wind turbulence (in excess of 80% of design wind speed), and on an annual basis, an inspection must be done for mechanical movement (which could also be due to any reason including thermal expansion and contraction). Any mechanical movement must be rectified. Torque settings must be checked for all hardware. All Clips shall be checked to make sure there is no gap between the side of the Clips and modules. It is estimated that two qualified persons should be able to properly inspect and maintain racking for approximately 1,000 panels per day. Rev GC Max-Span TM - Install Manual Piles, Portrait, Bottom Mount Configuration 16
1 of 6 SITE PLAN MW. Sample GAMECHANGE SOLAR. Sample. Sample AERIAL VIEW. Array Information. Design Information. Racking.
AERIAL VIEW Array Information PV Modules Racking Manufacturer NEO Solar Gamechange Racking Model D6M-B4A 23-Degree MaxSpan Dimensions Weight 77.0"x39.1"x1.57" 56.2 lbs Quantity 5184 407 Ground learance
More informationInstall Manual GC Pour-in-Place Round Tub Ballasted Ground Galvanized Purlin System - Bottom Mount Configuration 1 and 2 Up Portrait
Install Manual GC Pour-in-Place Round Tub Ballasted Ground Galvanized Purlin System - Bottom Mount Configuration 1 and 2 Up Portrait CONTENTS I II III IV V VI VII VIII IX X XI GENERAL SAFETY PRECAUTIONS
More information1 of 9 SITE PLAN modules at 325W kw. Sample GAMECHANGE SOLAR. Sample. Sample AERIAL VIEW. Array Information. Design Information.
AERIAL VIEW Array Information PV Modules Racking Manufacturer Hyundai Gamechange Racking Model HiS-S325TI 5-Degree GC Grid-Lite Dimensions." x 39.29" x.9" Weight 5. lbs Quantity 224 224 modules at 325W
More information1 of 5 SITE PLAN 26' ' " Front to Front. 16'-48 Row Spacing kw modules at 310W. Sample
3" 26'-96 Array nformation Manufacturer Astronergy Gamechange HSM662 P Dimensions 76.93" x 38.98" x.57" Quantity 9690 640 Tubs learance 9690 modules at 30W 9" 65'-6 Design nformation " Front to Front 6'-48
More informationPOWER PEAK TM ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation. Version 1, Rev D P/N
POWER PEAK TM ASSEMBLY ISTRUCTIOS step-by-step assembly and installation Version 1, Rev D P/ 5803028 The Power Peak TM A few words about this product The Power Peak is designed to mount on standard I-Beams
More informationRayport G Eco Dealer Kit
Rayport G Eco Dealer Kit Installation Guide www.aetenergy.com Supporting a Cleaner, Greener Tomorrow 1. Table of Contents 1. Table of Contents P2 2. Installer Notes P3 3. Parts List P4-7 4. Tool List P8
More informationINSTALLATION GUIDE SM SOLAR MOUNT PUB15JAN01
MOUNT INSTALLATION GUIDE PUB5JAN0 SM SOLAR Wrenches and Torque Wrench Size Recommended Torque (ft-lbs) /4 Hardware 7/6 *0 3/8 Hardware 9/6 *30 # Hardware 5/6 0 Torques are not designed for use with wood
More informationINSTALLATION GUIDE SM SOLAR MOUNT PUB15JUN15
MOUNT INSTALLATION GUIDE PUB5JUN5 Wrenches and Torque SM SOLAR Wrench Size Recommended Torque (ft-lbs) /4 Hardware 7/6 *0 3/8 Hardware 9/6 *30 # Hardware 5/6 0 Torques are not designed for use with wood
More informationMay 14, Installation Manual
May 14, 2012 Installation Manual Contents MAG TRACKER Components...1 Mount Installation...7 Module Installation & Grounding...11 Maintenance...14 Warranty......14 Contact Information......14 May 14, 2012
More informationInstalling flat panels on the MPL15 wall mount
Installing flat panels on the MPL15 wall mount The MPL15 (DS-VW775) is a full-service video wall mount that can accommodate tiled LCD panels with up to a 400 x 400 mm VESA pattern in portrait and landscape
More informationSolarMount (E)volution
SolarMount (E)volution SOLARMOUNT (E)VOLUTION: THE BEST JUST GOT BETTER. Engineering, Excellence, and Ease. Performance Engineered for versatility and reduced installation time, SolarMount (E)volution
More informationClearSpan PolyMax Windbreak Wall
ClearSpan PolyMax Windbreak Wall Photo may show a different but similar model. 2007 ClearSpan All Rights Reserved. Reproduction is prohibited without permission. Revision date: February 2007ldg STK# DIMENSIONS
More informationCSS Central Mount System
CSS-20 Installation Manual CSS-20 Safety Notifications Below are the installation instructions for the CSS-20-2 Long Span Beam Mounting System. Please read these safety notifications prior to beginning
More informationAWNING SYSTEM INSTALLATION INSTRUCTIONS ALL VERTICAL WALLS
INSTALLATION MANUAL AWNING SYSTEM INSTALLATION INSTRUCTIONS ALL VERTICAL WALLS TABLE OF CONTENTS Table of Contents... 3 Components... 4 System Components... 6 Attachment Components... 7 Module Compatibility...
More informationInstallation Guide. Capped Cellular PVC Fencing. Table of Contents. Storage and Handling Tools Needed Fence Layout and Locating Posts
Capped Cellular PVC Fencing Installation Guide Table of Contents Storage and Handling Tools Needed Fence Layout and Locating Posts Installation instructions 4 x 4 Over Sleeve Post - 3.5 Rail Privacy Shadowbox
More informationInstallation Manual Tilt Leg
Installation Manual Tilt Leg Solar Mounting Solutions March www.ironridge.com 2010 IronRidge, Inc. All Rights Reserved Version 2.0 2 Tilt Leg Installation Guide Introduction The Tilt Leg is a flexible
More informationInstallation Instructions
Column & Beam Units with Debris Netting Installation Instructions Laminated Wood Systems, Inc. Seward, Nebraska 800-949-3526 2015 LWS, INC. AVR-NET INSTALL 05-12-16 AVR Installation Notes 1 Safety The
More informationBLACK WIDOW COMPOSITE
PAGE-1 UPDATED 3-6-2015 REV.1 BLACK WIDOW COMPOSITE Detailed installation manual PAGE-2 UPDATED 3-6-2015 SpiderRax, Inc. REVISION PAGE Installation Manual For BWC-S, BWC-B,BWC-F DATE PAGES REASON OLD LEVEL
More informationCertainTeed INSTALLATION GUIDE SIMTEK FENCE PRODUCTS. Fence Installation Guide 3', 4' & 6' High
CertainTeed INSTALLATION GUIDE SIMTEK FENCE PRODUCTS Fence Installation Guide 3', 4' & 6' High INSTALLATION GUIDE These instructions are designed to assist both professional installers and do-it-yourselfers
More informationPRIVACY INSTALLATION FOR: Standard 6 H x 8 W Privacy Fence 4 x 4 Post Sleeve & Brackets Dog Ear or Straight-Edge Pickets 1.75 x 3.
PRIVACY INSTALLATION FOR: Standard 6 H x 8 W Privacy Fence 4 x 4 Post Sleeve & Brackets Dog Ear or Straight-Edge Pickets 1.75 x 3.5 Rail Storage and Handling Fence Preparation and Layout Locate and Set
More informationMTS-SP100. RENOGY Pole Mount System E Philadelphia St, Ontario, CA Version: 1.2
MTS-SP100 RENOGY Pole Mount System 2775 E Philadelphia St, Ontario, CA 91761 1-800-330-8678 1 Version: 1.2 Important Safety Instructions Please save these instructions. This manual contains important safety,
More informationSILVERBACK INSTALLATION MANUAL
SILVERBACK INSTALLATION MANUAL R-SERIES SOLAR RACKS T OLL FREE 866-766-3727 WWW.ROOFSCREEN.COM Introduction... 2 The Silverback Solar Racking System... 2 This manual... 2 Application... 2 System Overview...
More informationROOF MOUNT. *Class A* Fire Rated INSTALLATION MANUAL
ROOF MOUNT 4008083 *Class A* Fire Rated INSTALLATION MANUAL Contents DISCLAIMER 1 RATINGS 1 CHECKLIST 2 PRIMARY COMPONENTS 3 1. ATTACH BASES 3 2. PLACE RAILS 3 3. SECURE LUG 4 4. CLAMP MODULES 4 EXPANSION
More informationInstallation Instructions. Tools Needed. Tape measure. Level. Shovel or Post hole digger. Concrete. Drill. Stakes. Mallet or hammer.
Installation Guide EcoStone Fence 1330 West 400 North Orem, UT 84057 Toll Free 1.866.648.9336 Tel. 1.801.655.5236 Fax 1.801.655.5240 www.ecostonefence.com Installation Instructions Introduction. These
More informationPV-ezRack Solar Terrace II-A Installation guide
PV-ezRack Solar Terrace II-A Installation guide Contents 1 Introduction..2 2 Tools & Components.3 3 System overview.4 4 Installation steps..7 5 Notices and Safety Precautions.. 14 6 Project Case...16 7
More informationItem 550 Chain Link Fence
Item Chain Link Fence 1. DESCRIPTION 2. MATERIALS Furnish, install, remove, repair, or replace chain link fence and gates. Furnish certification from the chain link fence materials manufacturer stating
More informationFS Uno mounting instructions. 2 Pile driving (Ramming) 5. 6 Components list Torque specifications 15
FS Uno System Mounting instructions CONTTS Page 1 General - Safety, planning and tools 2 2 Pile driving (Ramming) 5 3 Rack overview - Components and fasteners 6 4 Mounting of the individual assembly groups
More informationUPDATED REV.5 BLACK WIDOW. Detailed installation manual. Patent pending P/N: BW-S, BW-B, BW-F.
PAGE-1 UPDATED 2-3-2015 REV.5 BLACK WIDOW Detailed installation manual PAGE-2 UPDATED 2-3-2015 SpiderRax, Inc. REVISION PAGE Installation Manual For BW-S, BW-B,BW-F DATE PAGES REASON OLD LEVEL NEW LEVEL
More informationSILVERBACK INSTALLATION MANUAL
SILVERBACK INSTALLATION MANUAL S-SERIES SOLAR RACKS T OLL FREE 877-765-2759 WWW.SILVERBACKSOLAR.COM Introduction... 2 The Silverback Solar Racking System... 2 This manual... 2 Application... 2 System Overview...
More informationInstallation Instructions - Model V4JSD 1
Installation Instructions - Model V4JSD 1 Support Assemblies: Parts list: (Note see enclosed cut sheet for quantities and dimensional information) A vertical structural member (1 ½ x 1 ½ modular frame)
More informationClearSpan End Frame Kit 26' Wide x 12' High
ClearSpan End Frame Kit 26' Wide x 12' High Diagram shows the end frame kit for an end wall without a door. (Door and end panel are purchased separately.) Rafter and struts shown in the above diagram are
More informationOutline. Grounding Washer, Electrical Equipment Bond (WEEB) Acme Cable Clips Acme Conduit Entry (ACE) Questions
www.we-llc.com Outline Grounding Washer, Electrical Equipment Bond (WEEB) Acme Cable Clips Acme Conduit Entry (ACE) Questions Bonding & Grounding Grounding Terms Equipment Grounding: The National Electrical
More informationClearSpan Mini Cold Frames
ClearSpan Mini Cold Frames Photo may show a different but similar model. 2009 ClearSpan All Rights Reserved. Reproduction is prohibited without permission. STK# DIMENSIONS 105152 6' W x 5' H x 6' L 105153
More informationClearSpan Mini Grab Bag Shelters
ClearSpan Mini Grab Bag Shelters Photo may show a different but similar model. Baseboard is not included. 2008 ClearSpan All Rights Reserved. Reproduction is prohibited without permission. STK# DIMENSIONS
More informationSHADOWBOX INSTALLATION FOR: Standard 6 H x 8 W Shadowbox Fence 5 x 5 Routed Posts Dog Ear or Straight-Edge Pickets 1.75 x 3.5 Rail
SHADOWBOX INSTALLATION FOR: Standard 6 H x 8 W Shadowbox Fence 5 x 5 Routed Posts Dog Ear or Straight-Edge Pickets 1.75 x 3.5 Rail Storage and Handling Fence Preparation and Layout Locate and Set Posts
More informationAssembly Instructions
InTandem Table System November 20 InTandem Table System - Worksurface #4 x/" 4 wood screw power beam Tools Provided T-0 Extended Torx Driver T-25 Torx Driver Additional Tools Required Soft protective
More informationorientation Conergy SunTop Instructions for professional installation
On-roof Framed modules Portrait orientation Landscape Three-tab Shingle Plain tile Slate Double Roman tile Metal roof Material warranty orientation Conergy SunTop Instructions for professional installation
More informationINSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS SPORTSMAN WINCH MOUNT GRILLE GUARD APPLICATION: 2016-2018 Toyota Tacoma PART NUMBER: 40-93885, 45-93880, 46-23885 ITEM QUANTITY DESCRIPTION TOOLS NEEDED 1 1 WINCH TRAY 15MM SOCKET
More informationPRE-ENGINEERED HORSE STALL SYSTEMS 4884 HSD STANDARD SLIDING DOOR. & Assembly. Installation Instructions
PRE-ENGINEERED HORSE STALL SYSTEMS 4884 HSD STANDARD SLIDING DOOR & Assembly Installation Instructions 4884 HSD Standard Sliding Door Components Some Considerations When Choosing Your Stall System - 1
More informationROOF MOUNT. *Class A* Fire Rated INSTALLATION MANUAL
ROOF MOUNT 4008083 *Class A* Fire Rated INSTALLATION MANUAL CONTENTS DISCLAIMER 1 RATINGS 1 CHECKLIST 2 PRIMARY COMPONENTS 3 0. ATTACH BASES 3 1. PLACE RAILS 3 2. SECURE LUG 4 3. CLAMP MODULES 4 EXPANSION
More informationGrowSpan Round Cold Frames
GrowSpan Round Cold Frames Photo may show a different but similar model. 2016 Growers Supply All Rights Reserved. Reproduction is prohibited without permission. STK# DIMENSIONS 103099 12' W x 8' H x 24'
More informationClearSpan Mini Grab Bag Shelters
ClearSpan Mini Grab Bag Shelters Photo may show a different but similar model. Baseboard is not included. 2008 ClearSpan All Rights Reserved. Reproduction is prohibited without permission. STK# DIMENSIONS
More informationClearSpan End Frame Kit 30' Wide x 11' High
ClearSpan End Frame Kit 30' Wide x 11' High Diagram shows the end frame kit for an end wall without a door. (Door and end panel are purchased separately.) Rafter and mounting feet shown in the above diagram
More informationDouble Truss Shelter Model# SST W9.14xL14.2xH4.88m Assembly Instructions
Double Truss Shelter Model# SST304716 W9.14xL14.2xH4.88m Assembly Instructions Page 1 RECOMMENDED TOOLS Equipment List Speed Wrench 22#.23#.24# Hammer (30lb) Rope (12#) Long Tape (50m) Hammer Drill*1 Lifter*2
More information5/16" Flange nut. Bolt Keeper Plate (8" Sq. SYS.) (3) 1/2" x 3" Hex head connector zinc plated bolt w/ washers and nut. Anchor 3" sq. 7 Ga.
2 1/2" x 2 1/2" x 10 Ga. 6" 5" 4" Variable Slipbase (8" Sq. SYS.) 5/16 Corner Bolt W/ nut 5/16" Flange nut Stub Insert (8" Sq. SYS.) Bolt Keeper Plate (8" Sq. SYS.) (3) 1/2" x 3" Hex head connector zinc
More informationMighty Mo GX Series Cabinet Installation Guide. OR Rev /11
Mighty Mo GX Series Cabinet Installation Guide OR-71601787 Safety and Warning ATTENTION The exclamation point within an equilateral triangle is intended to alert the user to the presence of important operating
More informationAssmann Corporation of America TANK INSTALLATION AND USE GUIDELINES FOR BULK STORAGE TANKS
Assmann Corporation of America TANK INSTALLATION AND USE GUIDELINES FOR BULK STORAGE TANKS General Information Assmann polyethylene storage tanks are manufactured to give you the toughest, most reliable
More informationSunPower Installation Manual
SunPower SF System Planning and Assembly SunPower SUNPOWER CORPORATION WWW.SUNPOWERCORP.COM Pub #101001-SP2 October 2010 - Rev. 8 2010 by SunPower, Corp All rights reserved. Part I. Scope, components,
More information400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS
12/11/07 PAGE 1 OF 12 400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS Thank you for purchasing our product! *Please read these instructions
More informationPATRIOT DOCKS ASSEMBLY INSTRUCTIONS
6/1/2008 PATRIOT DOCKS ASSEMBLY INSTRUCTIONS Congratulations on your new Patriot Dock purchase. This manual contains instructions to assemble basic dock configurations for use at typical shoreline application.
More informationASSEMBLY INSTRUCTIONS
Universal Top-of-Pole Mount 8 Modules (UTPM8) Module Type G ASSEMBLY INSTRUCTIONS step-by-step assembly and installation Version 1, Rev A PCN 022714-1 Universal Top-of-Pole Mount 8 Modules (UTPM8) for
More informationFXL-168 FIXED RACK ASSEMBLY INSTRUCTIONS SALES ORDER #
ZOMEWORKS FXL-168 FIXED RACK ASSEMBLY INSTRUCTIONS SALES ORDER # 1 1011 Sawmill Road NW, PO Box 25805, Albuquerque, NM 87125 USA (505) 242-5354 / (800) 279-6342 / FAX (505) 243-5187 E-mail: zomework@zomeworks.com
More informationGLOSSARY OF TERMS SECTION 8
GLOSSARY OF TERMS SECTION 8 Anchor Bolt Angle Base Plate Bay Blocking CCB Centerline Chord Cladding Clip Closure Strip An A-307 steel bolt embedded in the concrete footing to anchor the base plate of the
More informationSunTrackerTwo Preparation
TOLL FREE:(888)29-2705 FAX:(941)77-9460 info@eco-smart.com SunTrackerTwo Preparation Cutting Holes and Preparing Curbs T.G.I Or Truss CIRALIGHT INSTALLATION MANUAL Page 1 Cutting Holes and Preparing Curbs
More informationSTRATUS SHELTER. Take bike parking to new heights
Take bike parking to new heights The Stratus Shelter is a striking bike shelter option for any transit station, university campus, or multi-family residential building project. It is constructed of American
More informationRayport G Eco Dealer Kit
Rayport G Eco Dealer Kit Installation Guide Contents 1. Installer Notes..... P2 2. Parts List........ P3-7 3. Tool List.... P8 4. Assembly.... P9-19 www.aetenergy.com Supporting a Cleaner, Greener Tomorrow
More information12 x 12 Flat Top Pergola
x Flat Top Pergola Model: Regency, Roosevelt A S S E M B L Y G U I D E O P T I O N A L A C C E S S O R Y Bolt Down Bracket Kit ( for Pergola) Ver./MAR 0 Ta b l e o f Co n t e n t s PAGE x Flat Top Pergola
More informationASSEMBLY INSTRUCTIONS
Universal Top-of-Pole Mount 6 Modules (UTPM6) Module Type G ASSEMBLY INSTRUCTIONS step-by-step assembly and installation Version 1, Rev A PCN 020314-1 Universal Top-of-Pole Mount 6 Modules (UTPM6) for
More informationOVERVIEW You are installing 2 Major components: SITE PREP Remove organics
OVERVIEW You are installing 2 Major components: Dimensionally stable exterior frame with pre-drilled thread-bar holes. High yield thread-bar in a predetermined grid pattern (slab) and a heavy concentration
More informationINSTALLATION INSTRUCTIONS CONTOURED LIGHT BAR APPLICATION: CHEVY EQUINOX/ GMC TERRAIN PART NUMBERS: ,
INSTALLATION INSTRUCTIONS CONTOURED LIGHT BAR APPLICATION: 2010-2014 CHEVY EQUINOX/ GMC TERRAIN PART NUMBERS: 32-21020, 32-21025 ITEM QUANTITY DESCRIPTION TOOLS NEEDED 1 1 CONTOUR BAR TORQUE WRENCH 2 1
More informationEquilibrium. Conference Table. Installation Instruction. Revision B 11/07/16
Equilibrium Conference Table Installation Instruction Revision B 11/07/16 Equilibrium End User Agreement Enwork Equilibrium table bases must be installed directly onto a four inch minimum thickness concrete
More informationOptimast Installation Method Statement. F108.
Optimast Installation Method Statement. F108. Contents Page 1) Product Description. 2) Durability....... 3) Profile & Baseplate..... 4) Anchor Cradle and Foundation Stud Set Detail Drawings 4a) 127...
More informationDowntown Rack. Custom logo option available
Custom logo option available Downtown Rack The Downtown Rack uses thick, square-tube construction that can t be cut with a pipe cutter. The extended width of the Downtown Rack makes for easy bike parking
More informationTENANT IMPROVEMENT 16 FEBRUARY WEST 27TH STREET, 4TH FLOOR 100% CD OWNER/BID ADD 1-03/08/2018
SECTION 055000 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply
More informationTREX PERGOLA INSTALLATION INSTRUCTIONS
RECOMMENDED TOOLS/SUPPLIES: Pencil 4' Level Measuring Tape Framing Square/Speed Square 8' High Step Ladder (Two recommended) Hacksaw or Bolt Cutters Socket Wrench with 9/16" Socket and 3/4" Deep Socket
More informationAluminum Lake Truss Dock Instructions
Table of Contents Aluminum Lake Truss Dock Instructions 1. Dock Assembly and Set-Up 1.1 Quick Start 1.2 Positioning Quick Clips 1.3 Installing Dock Legs 1.4 Installing Foot Pads 1.5 Installing Cross Braces
More information12 x 12 Flat Top Pergola
x Flat Top Pergola A S S E M B LY G U I D E Model: Freemont OPTIONAL ACCESSORY Bolt Down Bracket Kit ( for Pergola) Ver /NOV 00 AI-BP0-0- Ta b l e o f Co n t e n t s PAGE x Flat Top Pergola Introduction
More informationASSEMBLY INSTRUCTIONS FOR SERVICE BODY A MOUNT RACKS
ASSEMBLY INSTRUCTIONS FOR SERVICE BODY A MOUNT RACKS T12 Service Body A shown with optional middle crossbar Package Contents: HARDWARE KIT PARTS (8) 3/8-16 x 3 CARRAIGE BOLTS (1) RAIL DRIVER S SIDE ASSEMBLIES
More informationFortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.
Installation Instructions for Fortress Horizontal Cable Panel System with UB-05 Brackets and Fe Posts It is the responsibility of the installer to meet all code and safety requirements, and to obtain all
More informationSafe and secure Dero
B I K E D E P OT Safe and secure Whether the project is at a transit station, university campus, or residential building, the Bike Depot s modular design lets customers easily build out to meet their space
More informationIMPORTANT -- SPECIAL INSTALLATION INSTRUCTIONS
IMPORTANT -- SPECIAL INSTALLATION INSTRUCTIONS ** READ ALL INSTALLATION INSTRUCTIONS BEFORE STARTING!** If at any point, you have questions, call 1-800-851-0865...(The manufacturer will not be responsible
More informationINSTALLATION INSTRUCTIONS SUBURBAN SERIES CARPORT 25 X 20 X 6 LENGTH CAN BE EXTENDED IN 4 1/2 INCREMENTS HEIGHT CAN BE EXTENDED IN 1 INCREMENTS
INSTALLATION INSTRUCTIONS SUBURBAN SERIES CARPORT 25 X 20 X 6 LENGTH CAN BE EXTENDED IN 4 1/2 INCREMENTS HEIGHT CAN BE EXTENDED IN 1 INCREMENTS BASIC FRAME SIZES (NO EXTENSIONS): 25-1/2 X 18' x 6 EAVE
More informationClearSpan Attached-Style Awning
ClearSpan Attached-Style Awning Photo may show a different but similar model. 2007 ClearSpan All Rights Reserved. Reproduction is prohibited without permission. Revision date: July 2007ldg STK# DIMENSIONS
More informationRayport G Eco Ballasted
Rayport G Eco Ballasted Dealer Kit Installation Guide Contents 1. Installer Notes..... P2 2. Parts List........ P3-6 3. Tool List.... P7 4. Assembly.... P8-16 www.aetenergy.com Supporting a Cleaner, Greener
More informationINSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS R5 STEP BOARD APPLICATION: 2009-2017 Dodge Ram 1500 Quad / Crew Cab 2010-2017 Dodge Ram 2500/3500 Crew Cab PART NUMBER: 28-51040, 28-51045, 28-51050, 28-51055 ITEM QUANTITY DESCRIPTION
More informationFortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.
Installation Instructions for Fortress Vertical Cable Panel System with Brackets and Fe Posts It is the responsibility of the installer to meet all code and safety requirements, and to obtain all required
More informationMoo-Tel Small Animal Hut
Moo-Tel Small Animal Hut Photo may show a different but similar model. 2010 ClearSpan All Rights Reserved. Reproduction is prohibited without permission. STK# DIMENSIONS 104602 4 6" W x 4' 10" H x 8 2"
More informationASSEMBLY INSTRUCTIONS
Universal Top-of-Pole Mount 5 Modules (UTPM5) Module Type G ASSEMBLY INSTRUCTIONS step-by-step assembly and installation Version, Rev A PCN 0904- Universal Top-of-Pole Mount 5 Modules (UTPM5) for Module
More informationINSTALLATION INSTRUCTIONS LS X 12-2 X 7 1/2 FRAME LOAFING SHED
INSTALLATION INSTRUCTIONS LS-12 12 X 12-2 X 7 1/2 FRAME ACTUAL FRAME BASE SIZE: 12 X 12-2 LOAFING SHED Our unique assembly process quickly transforms the individual pieces into a finished structure that
More informationINSTALLATION INSTRUCTIONS FOR FRONT CASTING DECK RAIL Ranger
INSTALLATION INSTRUCTIONS FOR FRONT CASTING DECK RAIL Ranger TOOLS REQUIRED FOR INSTALLATION: Drill motor, (1) 5/16 inch drill bit, (1) 13/64 drill bit, (1) 3/16 inch hex wrench (1) 3/32 inch hex wrench.
More informationINSTALL INSTRUCTIONS WELCOME TO THE NEWAGE PERFORMANCE CABINETRY SERIES NEWAGE STEEL WELDED CABINETRY
NEWAGE STEEL WELDED CABINETRY WELCOME TO THE NEWAGE PERFORMANCE CABINETRY SERIES ALL CABINETS MUST BE MOUNTED TO STUDS ON A SECURE WALL, AS PER THESE INSTRUCTIONS. FAILURE TO DO SO MAY RESULT IN SERIOUS
More informationIMPORTANT -- SPECIAL INSTALLATION INSTRUCTIONS
IMPORTANT -- SPECIAL INSTALLATION INSTRUCTIONS ** READ ALL INSTALLATION INSTRUCTIONS BEFORE STARTING!** If at any point, you have questions, call 1-800-851-0865...(The manufacturer will not be responsible
More informationFENCE INSTALLATION GUIDE 6 HIGH FENCE
FENCE INSTALLATION GUIDE 6 HIGH FENCE 1.866.648.9336 www.simtekfence.com INSTALLATION GUIDE These instructions are designed to assist both professional installers and do-it-yourselfers of SimTek decorative
More informationCYCL E STAT IO N. High Capacity
CYCL E STAT IO N High Capacity The Dero Cycle Station provides high-capacity, covered bike parking for bicycle commuters. With a high roof and open platform, the Dero Cycle Station allows bike corrals,
More informationFloating Lake Truss Dock Instructions
Table of Contents Floating Lake Truss Dock Instructions 1. Dock Assembly and Set-Up 1.1 Installing Dock Floats 1.2 Positioning Quick Clips 1.3 Installing Anchor Posts 1.4 Installing Docks into the Water
More information10x10 Trellis Pergola
0x0 Trellis Pergola ASSEMBLY GUIDE Ver.0-7 Table of Contents PAGE Introduction & Overview...................................................... Pergola Materials Overview..............................................................
More informationLenox Slide Lock Pergola
ASSEMBLY GUIDE Models: Lenox OPTIONAL ACCESSORIES Bolt Down Bracket Kit ( for Pergola) Ver.0-076 Table of Co n t e n t s Introduction & Overview...................................................... Pergola
More informationINSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS SNYPER TUBULAR FENDERS APPLICATION: 2007-2017 Jeep Wrangler JK PART NUMBER: 62-1005, 62-1015 ITEM QUANTITY DESCRIPTION TOOLS NEEDED 1,2 2 FRONT FENDERS, DRIVER (1) AND PASSENGER
More informationASSEMBLY GUIDE. Barcelona Pergola. 12 X16 (365CMx487CM) VER /01/19
ASSEMBLY GUIDE Barcelona Pergola 12 X16 (365CMx487CM) VER 1.9 04/01/19 GETTING STARTED First off, allow us to say thank you for the investment you have made in our fine pergola. This pergola is designed
More informationInstallation and Assembly: In-wall Mount for 32" to 71" Flat Panel Screens
Installation and Assembly: In-wall Mount for 32" to 71" Flat Panel Screens Model# IM760P, IM760P-S IM760PU, IM760PU-S Screen size range 32" to 71" (81 to 180 cm) 32" to 60" (81 to 152 cm) IM760P IM760P-S
More informationThe Festival Assembly Instructions
The Festival Assembly Instructions Toll Free: 866.768.8465 Hours: 9-5 Monday-Friday EST www.homeplacestructures.com Package ships as shown CONTACT INFORMATION: HomePlace Structures 301 Commerce Drive New
More informationPRE-ENGINEERED HORSE STALL SYSTEMS SDFD SLIDING DOOR c/w FOLD-DOWN GRILL. & Assembly. Installation Instructions
PRE-ENGINEERED HORSE STALL SYSTEMS 4800 SDFD SLIDING DOOR c/w FOLD-DOWN GRILL & Assembly Installation Instructions 4800 SDFD Sliding Door c/w Fold-Down Grill Components - 1 3 /4" x 2" x 88" channels (2)
More informationMM540 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS
MM50 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS Please read this entire manual before you begin. Do not unpack any contents until you verify all requirements on PAGE.
More information12 x 12 Flat Top Pergola
x Flat Top Pergola Model: Freemont A S S E M B L Y G U I D E O P T I O N A L A C C E S S O R Y Bolt Down Bracket Kit ( for Pergola) Ver.-057 Ta b l e o f Co n t e n t s PAGE x Flat Top Pergola Introduction
More informationStorefront Installation Guide
Storefront General Notes: 1. Check Contract Documents and Shop Drawings. Understand and clarify any Field Verify Notes and approvals of drawings and products to be familiar with the project. Installation
More informationMOUNTING INSTRUCTIONS CONCRETE PURLIN BRACKET
CONCRETE PURLIN BRACKET VERSION MARCH 2015 GENERAL INSTRUCTIONS Safety: Systems may only be installed and operated by properly trained and technically suitable people (i.e. MCS accredited installers).
More informationHeartland Perma-Column 1841 E 1450 Rd. Lawrence, KS (785)
141 E 1450 Rd. Lawrence, KS 66044 (75) 594-5696 Perma-Column Installation Instructions i Unlike any other concrete post-frame foundation system, Perma-Column Precast Concrete Piers use 10,000 psi concrete
More informationLoading Dock Safety Gate
Installation Instructions/Operation and Maintenance Manual Models LDSG-120-PCY LDSG-144-PCY Table of Contents Product Information...2 Parts List...3 Installation Instructions...5 Operation...13 Inspection
More informationASSEMBLY INSTRUCTIONS FOR HAULER II SERVICE BODY A RACK
ASSEMBLY INSTRUCTIONS FOR HAULER II SERVICE BODY A RACK T12USBA-1 shown above Package Contents: HARDWARE KIT PARTS (4) 3/8-16 x 3 CARRAIGE BOLTS (1) RAIL DRIVER S SIDE ASSEMBLY (20) 3/8-16 x 2 CARRAIGE
More informationDura-Lock Roof System
DLR-14 Dura-Lock Roof System Assembly and Installation Instructions Read the instructions before starting the job. They explain the steps required to produce a finished product that will meet factory specifications.
More information