UNLESS OTHERWISE SPECIFIED: DRAWN
|
|
- Virgil Hicks
- 5 years ago
- Views:
Transcription
1 DIY -2 20cm Goal DIY - Center Structure DIY -3 Ramp/Platform lso Needed: Rolling Goal set, am-2832 or am-2849 Game Ball set, am-2968 FRCTIONL /8 9/4/4 DIY5 DIY -0 SCLE: :24
2 Material Qty Needed DWG Using this Material Possible Source /2" Thick Plywood, 4x8ft sheet sheet -2, -3, -4, -5, -6, 3-3 Home Improvement /4" Thick Plywood, 4x8ft sheet sheet -, -7, 3-, 3-2, 3-4 Home Improvement 3/4" PVC Pipe, 5ft length 2-8 4" PVC Pipe 24" needed 2- Home Improvement, Hardware store Home Improvement, Hardware store Cardstock or Manila Folder 4 Sheets 2-2, 2-3 Office supply store 0-32 x 2.00 Socket Head Cap Screw (SHCS) 4-2, -8 Hardware store, ndymark (am-97) 0-32 Nylock nut 4-2, -8 #8 x.00 Wood screws box of 75+, 3 #8 x.50 Wood screws 4 Screws -6 Tape (similar to duct tape) s needed 2 Hardware store, ndymark (am-59) Home Improvement, Hardware store Home Improvement, Hardware store Home Improvement, Hardware store Home Improvement store examples: Home Depot, Lowes, Etc Hardware store examples: ce, Fastenal, Handy Hardware FRCTIONL /8 9/4/4 DIY5 - Buyers Guide SCLE: : DIY -0-
3 /2" Thick Plywood /4" Thick Plywood Side Panel Lower Side Panel Upper Front Panel Front Panel 4'- Ball Tray Ramp Half Field Side Support Field Side Support Field Side Support Upper Cross Brace Ramp Platform Floor Plate 8'- 8'- Back Support FRCTIONL /8 DIY5 - Plywood Layout DIY -0-2 SCLE: :24
4 Hang 20cm Goals from wood screws Support the Ball Tray tab with the Kickstand FRCTIONL DIY5 - Center Structure SCLE: :24 DIY -
5 BoM NO. PRT Name DWG Number QTY. Front panel Side panel upper Side panel lower ramp half Upper Cross Brace -5 6 Ball tray Floor plate -7 8 Pipe Diverter Kickstand cm Goal #0-32 x Bolt am #0 Lock Nut am #8 x.000 Wood Screw 38 8 #8 x.500 Wood Screw 4 FRCTIONL /8 DIY5 - Center Structure BoM DIY - SCLE: :24
6 " 9" " 32" 38 2 " 47" 48" 4 " R.06 2" 2.62 " 3 2 " " 24".0 (4 places) Predrilled for # 8 Wood Screw Use Template on dditional Sheet for Pattern Cutout FRCTIONL /4" Thick Plywood DIY5 - Front Panel DIY -- SCLE: :
7 3" 8 " " DETIL Use this 00% scale drawing as a template for your cutout FRCTIONL /4" Thick Plywood DIY5 - Front Panel, Cut Out DIY -- SCLE: :
8 " " 7" 2 2 " 29" " 3 2 " " 4" " 4 " 8".2 Clearance for a # 0 Bolt.0 (3 places) Predrilled for # 8 wood screw FRCTIONL /2" Thick Plywood DIY5 - Side Panel Upper DIY --2 SCLE: :
9 4" 8" 5 8 ".2 THRU HOLE " FRCTIONL /2" Thick Plywood DIY5 - Side Panel Lower DIY --3 SCLE: :
10 2 8 " 3 2 " 4".93.0 Clearance fit for 3/4" PVC Pipe 8" FRCTIONL /2" Thick Plywood DIY5 - Ramp Half DIY --4 SCLE: :
11 23" 4" FRCTIONL /8 /2" Thick Plywood DIY5 - Upper Cross Brace DIY --5 SCLE: :
12 " " 4 " Centered 5 6 " 3 2 " 4 2 " 5 8 ".0 (2 places) predrilled for #8 x.50 wood screw to be used as a hinge 2 " FRCTIONL /8 /2" Thick Plywood DIY5 - Ball Tray SCLE: :4 DIY --6
13 5" 3 4 " R" (Typ) 3 4 " 5" ".0 (4 places) Predrilled for #8 wood screw 3 2 " " " Both Diagonals " 4 " (2 places) 3 FRCTIONL /8 /4" Thick Plywood DIY5 - Floor Plate SCLE: :8 DIY --7
14 " Diverter Pipe 9 2 " 0 2 " (2 Places) Clearance hole for a #0-32 bolt. These holes must be aligned within +/- /32" " Kickstand FRCTIONL /8 3/4" PVC Pipe DIY5 - Pipes SCLE: :4 DIY --8
15 Notch in Backboard lines up with hole in Tube Backboard Backboard is taped to Tube assembly hangs from Center Structure on a wood screw Tube Base Using tabs, Base is taped to Tube BoM NO. PRT Name DWG Number QTY. 20cm Goal Tube cm Backboard cm Base Tape, as needed FRCTIONL /8 DIY5-20cm Goal SCLE: :4 DIY -2
16 4 2 " " 3 8 " Thru one side " FRCTIONL /8 4" PVC Pipe DIY5-20cm Goal Tube SCLE: :4 DIY -2-
17 Use two of these 00% scale template to cut out your backboard from a manila folder, match sheets using center line FRCTIONL /8 See Note Manila Folder or Card Stock DIY5-20cm Goal backboard SCLE: : DIY -2-2
18 7" 4" Fold Tabs up and tape to bottom of Upper Goal tube Use this 00% scale template to cut out your backboard from a manila folder FRCTIONL /8 See Note DIY5-20cm goal base SCLE: : DIY -2-3 Manila Folder or Card Stock
19 Meeting between Ramp and Platform should not have a gap Platform Ramp Screw holes 9" 4 Back Support " Third Support placed in center fo Ramp/platform BoM NO. PRT Name DWG Number QTY. Ramp 3-2 Platform Field Side Support Back Support #8 x.000 Wood Screw FRCTIONL /8 DIY5 - Ramp/Platform DIY -3 SCLE: :6
20 " " " 36" 4 " 7 8 " This Side meets up with Platform 23 2 " ".0 (9 places) Predrilled for #8 wood screw FRCTIONL /8 /4" Thick Plywood DIY5 - Ramp SCLE: :8 DIY -3-
21 4 " 8 " 2" 22" 4 " 7 8 " This Side meets up with Ramp 23 2 " ".0 (9 places) predrilled for #8 wood screw FRCTIONL /8 /4" Thick Plywood DIY5 - Platform SCLE: :6 DIY -3-2
22 2 3 4 " " " FRCTIONL /8 /2" Thick Plywood DIY5 - Field Side Support SCLE: :8 DIY -3-3
23 4 " 7 8 " 23 2 " " " " ".0 (6 places) Predrilled for #8 wood screw FRCTIONL /8 /4" Thick Plywood DIY5 - Back Support SCLE: :4 DIY -3-4
DIY Field Guide ANDYMARK, INC.
ANDYMARK, INC. Intro For the 2014-2015 FTC Game Cascade Effect, teams can purchase official field hardware from AndyMark, or they can build do-it-yourself (DIY) versions of the same hardware. The competitions
More information32 Gallon Perforated Square Receptacle
32 Gallon Perforated Square Receptacle 992-031 24 5/" 24 5/" 39 1/2" 30 1/2" ITEM NO. PART NUMBER DESCRIPTION QTY. 1 653-006 Receptacle Base 1 2 653-045 32 Gallon Perforated Side 4 3 653-011 Arch Lid 1
More informationINSTRUCTION BOOKLET #C10 Watch step by step installation instructions at: https://www.wallbedsbywilding.com/wallbed-installation-studio-series/ WARNING! ALL MURPHY/WALLBED SYSTEMS CONTAIN STORED ENERGY.
More informationRangerWare Fiberglass Door System Installation Instructions P/N
Page 1 of 9 RangerWare Fiberglass Door System Installation Instructions P/N 2878016 ORDER OF INSTALLATION Note: To assure proper order, read all Accessory Installation Instructions before beginning. 1.
More informationPost & Rail Crossbuck
Post & Rail Crossbuck 1. Getting Started 6. Crossbuck Be sure to call underground prior to digging Assemble gates (if necessary) and decide where they will be located Stake out the fence line Space and
More informationGlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas)
List of Contents Quantity Description 12 #10 x 1 ½ Flat Head Phillips Screw (see pg. 2) 2 #10 x ½ Pan Head Phillips Screw (see pg. 2) 8 ¼ x 2 ½ Lag Bolt (see pg. 2) 7 ¼ 20 x 5 / 8 Hex Head Bolt (see pg.
More informationWPS crew Doors Installation instructions
WPS-132-133 crew Doors Installation instructions ORDER OF INSTALLATION FOR A COMPLETE ENCLOSURE OF A CREW WPS (Weather Protection System) IS AS FOLLOWS: 1. Heater 2. Rear Thresholds - Right Hand & Left
More informationhttps://www.wallbedsbywilding.com/wallbed-installation-studio-series/
For Wallbed models: KING SIZE INSTRUCTION BOOKLET #C1 Watch step by step installation instructions at: https://www.wallbedsbywilding.com/wallbed-installation-studio-series/ WARNING! ALL MURPHY/WALLBED
More informationFor Wallbed models: KING SIZE INSTRUCTION BOOKLET #C1 Watch step by step installation instructions at: https://www.wallbedsbywilding.com/wallbed-installation-studio-series/ WARNING! ALL MURPHY/WALLBED
More informationMounting Instructions Item No.: xxx
Mounting Instructions Item No.: 271.92.xxx Wall-Beds 1 General Notes For vertical folding beds Successful and safe installation of Bed-Lift and construction of casework requires a professional skill level
More informationDuraRac Shelving System
GM Full Size Van Assembly Installation Instructions Sheet 1 of 13 BEFORE YOU START! IMPORTANT INSTALLATION STEPS ARE DENOTED USING A STOP SIGN. THESE STEPS MUST BE PERFORMED IN THE SPECIFIED ORDER TO ENSURE
More informationINSTRUCTION BOOKLET #C20
INSTRUCTION BOOKLET #C0 WARNING! ALL MURPHY/WALLBED SYSTEMS CONTAIN STORED ENERGY. FAILURE TO USE AND FOLLOW THESE INSTRUCTIONS DURING THE INSTALLATION PROCESS COULD RESULT IN SEVERE PERSONAL INJURY TO
More informationINSTRUCTION BOOKLET #C0 Watch step by step installation instructions at: https://www.wallbedsbywilding.com/wallbed-installation-studio-series/ WARNING! ALL MURPHY/WALLBED SYSTEMS CONTAIN STORED ENERGY.
More informationFLOATING FLOOR SOCKET WITH BRASS FLOOR PLATE
Instruction Manual FLOATING FLOOR SOCKET WITH BRASS FLOOR PLATE P A R T S L I S T Item Qty Description Item Qty Description A 1 Floating Floor Socket Tube F 2 Spacer B 1 Brass Floor Plate G 3 #10 Plastic
More informationINSTRUCTION BOOKLET #34. For Wallbed models: KING SIZE SIERRA WITH STORAGE HEADBOARD
For Wallbed models: KING SIZE SIERRA WITH STORAGE HEADBOARD INSTRUCTION BOOKLET #34 WARNING! ALL MURPHY/WALLBED SYSTEMS CONTAIN STORED ENERGY. FAILURE TO USE AND FOLLOW THESE INSTRUCTIONS DURING THE INSTALLATION
More informationINSTALLATION GUIDE Locker With Top Shelf Transit Low Roof & Nissan NV Low Roof ( Aluminum )
INSTALLATION GUIDE 7115 Locker With Top Shelf Transit Low Roof & Nissan NV Low Roof ( Aluminum ) QUICK START GUIDE Phase 1 - Assembly q 1.1 Setup... q 1.2 Locker w/ Top Shelf Assembly... 3-5 6-13 Phase
More informationCable Tray Kit: - Cable Tray - Cable Tray Cover - Power Block Support (x2) Top Support Kit: (x2) - 2 Top Supports. Quantities are per bench
Parts Included (per back to back bench) Column Kit: (x2) - 1 LH & 1 RH Column - Control Box - Hand Switch Cable Tray Kit: - Cable Tray - Cable Tray Cover - Power Block Support (x2) Depth Support Kit: -
More informationInstallation Instructions
Contents Page General Information and Installer Tips.......... 2 Panels & Posts............................. 3 Enclosure Description..................... 4 Hinge Door Hardware................... 4-5 Step-by-Step
More informationGlideRite Retractable Cover System For Hot Spot Spas (SE & SLX only)
List of Contents Quantity Description 12 #10 x 1 ½ Flat Head Phillips Screw (see pg. 2) 2 #10 x ½ Pan Head Phillips Screw (see pg. 2) 8 ¼ x 2 ½ Lag Bolt (see pg. 2) 7 ¼ 20 x 5 / 8 Hex Head Bolt (see pg.
More informationSide Mount INSTRUCTION BOOKLET #C122 BED STYLE: PARK CITY
Side Mount BED STYLE: PARK CITY INSTRUCTION BOOKLET #C1 WARNING! ALL MURPHY/WALLBED SYSTEMS CONTAIN STORED ENERGY. FAILURE TO USE AND FOLLOW THESE INSTRUCTIONS DURING THE INSTALLATION PROCESS COULD RESULT
More informationTrack Rack. * Track Racks are not lockable
The Track Rack s unique staggered, sliding hook design creates the greatest parking efficiency while still providing easy access to any particular bike. When adding or removing a bike to the rack, simply
More informationQuick-Drain Installation Requirements Large Volume Drainage Models
Quick-Drain Installation Requirements Large Volume Drainage Models Installation of the Quick-Drain-QFLV and Quick-Drain-HFLV Fluid Management Systems is a straightforward process. These installation instructions
More information08+ KAWASAKI KLR PD NERF
08+ KAWASAKI KLR PD NERF 0505-1299 Before you begin, place the bike on a hard level surface where you have room to work. Lay out the parts included in this kit and compare to the parts list on page 5 of
More informationPORCH-LOC INSTALLATION INSTRUCTIONS
PORCH-LOC INSTALLATION INSTRUCTIONS 2017 HB&G Building Products, Inc. Porch-Loc Installation Instructions NOTE: DISCARD THE INSTALLATION INSTRUCTIONS AND HARDWARE THAT CAME IN YOUR PERMAPOST PACKAGING
More informationTransit Connect Full/Half Installation Instructions
GATHER THESE TOOLS FOR ASSEMBLY & INSTALLATION 7/16 wrench, T45 Torx socket, 7/16 socket, 3/8 drive ratchet - 3/8 socket One 1/8 square end driver bit provided - Electric drill/driver/18v cordless One
More informationEnd of Row Doors. Revision Number 1
End of Row Doors Single Swing Door Café Style Doors Revision Number 1 Wright Line LLC 160 Gold Star Boulevard Worcester, MA 01606 Tel: 800-225-7348 508-852-4300 Fax: 508-365-6178 www.wrightline.com info@wrightline.com
More informationINSTRUCTION BOOKLET #C21. For Wallbed models: KING SIZE
For Wallbed models: KING SIZE INSTRUCTION BOOKLET #C1 WARNING! ALL MURPHY/WALLBED SYSTEMS CONTAIN STORED ENERGY. FAILURE TO USE AND FOLLOW THESE INSTRUCTIONS DURING THE INSTALLATION PROCESS COULD RESULT
More information33/3527A. Devices covered by these instructions: 33/3527A-F (Fire) Surface Vertical Rod Exit Device
*911403-00* 911403-00 Surface Vertical Rod Exit Device 33/3527A Installation Instructions Devices covered by these instructions: 33/3527A Surface Vertical Rod Exit Device 33/3527A-F (Fire) Surface Vertical
More informationED1300/1300F SERIES CONCEALED VERTICAL ROD DEVICE INSTALLATION INSTRUCTIONS
ED1300/1300F SERIES CONCEALED VERTICAL ROD DEVICE INSTALLATION INSTRUCTIONS Ver.2 1300 SERIES CONCEALED VERTICAL ROD DEVICE Top Strike Latch Screws Strike Screws Release Plunger Top Latch Plunger Screws
More informationAdjustable Countertop Installation
Adjustable Countertop Installation Applies to Models: A1, A2, A3, A4, A5, & A6 Required Tools: Stud Finder, Level 1/4 deep well socket, Screwdrivers, Tape Measure, Drill and Drill Bits Language of origin:
More informationClearSpan Twist-of-the-Wrist Assembly Instructions
ClearSpan Twist-of-the-Wrist Assembly Instructions Curved-Wall for Roll-Up Side Flat-Wall for Curtain Application 2008 ClearSpan All Rights Reserved. Reproduction is prohibited without permission. Revision
More informationTS-20KD-1010 LOW PROFILE CARGO SCALE INSTALLATION GUIDE
TS-20KD-1010 LOW PROFILE CARGO SCALE INSTALLATION GUIDE Triner Scale & Mfg. Co., Inc. 8411 Hacks Cross Rd. Olive Branch, MS 38654 Phone: 800-238-0152 Fax: 662-809-2386 Description The Triner Scale Model
More informationINSTALLATION GUIDE N5-DS48-4
INSTALLATION GUIDE N5-DS48-4 Shelving ( steel ) Transit High Roof & Medium Roof Promaster Standard Roof & High Roof Nissan NV High Roof Sprinter Low Roof & High Roof Box Truck / Trailer QUICK START GUIDE
More informationDesigned for flexibility... Engineered to last. CYCLE-SAFE / TWO-TIERED INSTALLATION
CYCLE-SAFE / TWO-TIERED INSTALLATION Designed for flexibility... Engineered to last. Two-Tiered Locker Installation Supplement to ProPark Owners Manual CYCLE-SAFE / TWO-TIERED INSTALLATION TWO-TIERED LOCKER
More informationFLOATING FLOOR SOCKET WITH HINGED FLOOR PLATE
Inspect all contents prior to installation. Report any missing parts to dealer immediately. Read all instructions before proceeding. Instruction Manual FLOATING FLOOR SOCKET WITH HINGED FLOOR PLATE P A
More informationBX1956 Installation Instructions Chrysler PT Cruiser (Include Turbo)
BX1956 Installation Instructions 2001-04 Chrysler PT Cruiser (Include Turbo) Serial No. The front fascia and metal bumper are removed for baseplate installation. Factory metal bumper will not be reinstalled.
More informationINSTALLATION INSTRUCTIONS CONTOURED LIGHT BAR APPLICATION: CHEVY EQUINOX/ GMC TERRAIN PART NUMBERS: ,
INSTALLATION INSTRUCTIONS CONTOURED LIGHT BAR APPLICATION: 2010-2014 CHEVY EQUINOX/ GMC TERRAIN PART NUMBERS: 32-21020, 32-21025 ITEM QUANTITY DESCRIPTION TOOLS NEEDED 1 1 CONTOUR BAR TORQUE WRENCH 2 1
More informationQuick-Drain Installation Requirements
Quick-Drain Installation Requirements Installation of the Quick-Drain-QF and Quick-Drain-HF Fluid Management Systems is a straightforward process. These installation instructions are written in a general
More informationWelding Thunder 2015 Fold-and-Go Picnic Table
Welding Thunder 05 Fold-and-Go Picnic Table DRWN James Veldhuis 8/0/05 rizona Western College Q PPROVED SCLE / TableFrameWithRecievers SHEET OF CUT LIST QUNTITY DIMENSION " Tubing.05 Wall 9" " Tubing.05
More informationWILDING WALLBEDS INSTALLATION INSTRUCTION Side Mount
WILDING WALLBEDS INSTALLATION INSTRUCTION Side Mount For Wallbed models: Do-It-Yourself Insturction booklet C92 WARNING! ALL MURPHY/WALLBED SYSTEMS CONTAIN STORED ENERGY. FAILURE TO USE AND FOLLOW THESE
More informationInstallation Instructions
Installation Instructions For Models: Model Number / Description File Name 1540 Classic Series P-Lam Toilet Partitions 1540.pdf 1 INSTALLATION INSTRUCTIONS LAMINATED PLASTIC TOILET PARTITIONS 1540 Classic
More informationPost & Rail. Includes: Crossbuck, 2-Rail, 3-Rail and 4-Rail POST SUPPORT OPTIONS
Post & Rail Includes: Crossbuck, 2-Rail, 3-Rail and 4-Rail STAGGER RAIL ENDS FOR GREATER STRENGTH ALLOW 1-1/2" GAP ON HINGE SIDE OF GATE AND 1-1/4" ON LATCH SIDE OF GATE HARDWARE DIG HOLES 30" MINIMUM
More informationOxford Stalls Installation Instructions
Oxford Stalls Installation Instructions RAMM Horse Fencing and Stalls 13150 Airport Hwy. Swanton, OH 43558-9615 1-800-434-8456 Rev. 8/15/17 Before You Start Typical stall sizes are 10 x 10, 12 x 12 or
More informationHOUSE PARTS PACKED IN HOUSE BOX PARTS IN PLASTIC BAG (HARDWARE) PARTS IN SMALL PLASTIC BAG (FLOOR CLIPS) PARTS PACKED IN BUNDLE
Check parts against this list before starting assembly. Refer to illustrations on pages 6 and 7 to view house parts. If any shortages are found, refer to Packing Slip for claim instructions. Item 3 5 6
More informationUNIVERSAL COMPOSITE GATE FRAME INSTRUCTIONS
This gate frame kit is designed to work with most composite railing brands. It can accommodate a maximum gate width of 48. Railing & balusters are not included with kit. Tools needed to assemble gate:
More informationInstruction Manual FLOATING FLOOR SOCKET WITH CHROME FLOOR PLATE
Instruction Manual FLOATING FLOOR SOCKET WITH CHROME FLOOR PLATE P A R T S L I S T Item Qty Description Item Qty Description A 1 Floating Floor Socket Tube G 3 #10 Plastic Tubular Nut B 1 Chrome Floor
More informationVersatrac Bypass Door Units, Conventional and Top Track, 300 and 400 Series
Versatrac Bypass Door Units, Conventional and Top Track, 300 and 400 Series TM Rough opening width (finished opening width plus 9/16") Notch for top track units (used as frame header) Rough opening height
More informationASSEMBLY INSTRUCTIONS YS480 PELLET COOKER - 24 YS640 PELLET COOKER - 32
ASSEMBLY INSTRUCTIONS YS480 PELLET COOKER - 24 YS640 PELLET COOKER - 32 RECOMMENDED TOOLS NUT DRIVERS OR SOCKET WRENCH 5/16 SOCKET 3/8 SOCKET 7/16 WRENCH BOX CUTTER OR UTILITY KNIFE yodersmokers.com 2
More informationK9 KIT INSTALLATION INSTRUCTIONS CROWN VIC KK-K9-F7-K
K9 KIT INSTALLATION INSTRUCTIONS 1998-2011 CROWN VIC KK-K9-F7-K TOOLS REQUIRED: Power Drill (Cordless preferable) Drill Bit Set Standard Wrench and Socket Set Metric Socket Set Screwdriver Set Torx Bit
More information96 WING SPAN SPITFIRE (COPYRIGHT PROTECTED 2014) ALL RIGHTS RESERVED
96 WING SPAN SPITFIRE (COPYRIGHT PROTECTED 2014) ALL RIGHTS RESERVED GENERAL INSTRUCTIONS Should you elect to use the recommended Door Skin, which is 1/8 mahogany plywood measuring 36 x 88. Have it cut
More informationLARGE PLYWOOD CUTTING GUIDE
Copyright 2015 Shanty-2-Chic.com Workbench I f you are tight on space but large on ideas this bench is just what you need. Sturdy and mobile this bench has an ingenious fold out wing that gives you over
More informationRear Mount Installation Instructions
Rear Mount Installation Instructions Ford Transit Low Roof 130 WB Frame Kit Part #: DTC 0809-011 V1.0.10.12.18 IMPORTANT INSTALLATION STEPS ARE DENOTED USING A STOP SIGN. THESE STEPS MUST BE PERFORMED
More informationAssembly Instructions 10 X 10 Aluminum Roof Support
Assembly Instructions 10 X 10 Aluminum Roof Support Aluminum Roof Support Bolt Package 16-5/16 X 2 ¼ SS Bolt 24-5/16 X 1 SS Bolt 40-5/16 SS Nylon Lock Nuts 16-5/16 SS Flat Washers 28-4 ½ Wood Screws 36-1
More informationINSTALLATION INSTRUCTIONS FOR FRONT CASTING DECK RAIL Ranger
INSTALLATION INSTRUCTIONS FOR FRONT CASTING DECK RAIL Ranger TOOLS REQUIRED FOR INSTALLATION: Drill motor, (1) 5/16 inch drill bit, (1) 13/64 drill bit, (1) 3/16 inch hex wrench (1) 3/32 inch hex wrench.
More informationAccessory Assembly Instructions 7/1/2016
C209 Trash Barrel Holder Installation for NB/PC Series Contents: Metal holder (2) screws (2) nuts Green trashcan 2A. Holder can also be orientated as shown above. For other configurations, bracket can
More informationKENECO FLOW RACK INSTALLATION INSTRUCTIONS
KENECO FLOW RACK INSTALLATION INSTRUCTIONS Shipment and Components: Keneco flow racks are shipped unassembled and consist of some, but not necessarily all, of the following basic components: Vertical Frames
More informationINSTALLATION GUIDE. C20-DH STRAIGHT PARTITION Sprinter Partition ( Perforated Window, No Access, Steel )
INSTALLATION GUIDE C20-DH STRAIGHT PARTITION Sprinter Partition ( Perforated Window, No Access, Steel ) QUICK START GUIDE Phase 1 - Assembly q 1.1 Setup... q 1.2 Partition assembly... 3-4 5-6 Phase 2 -
More informationBaby Grande with Crank, Housing, and Side Rails Installation Instructions
Baby Grande with Crank, Housing, and Side Rails Installation Instructions Tools Needed Hardware Provided (per shade) Hardware Needed Drill 3/8 Metal Drill Bit ¼ Masonry Drill Bit Measuring Tape Pencil
More informationTools Required. Bench Hardware. Bench Parts. Planter Hardware. Planter Parts. BENCH/PLANTER INSTALLATION GUIDELINES for
Arbor Collection / Harvest Collection / Terra Collection Page 1 Please read all instructions completely before starting any part of the installation. Each AZEK and Kit comes complete with all hardware,
More informationShetland Stalls Installation Instructions
Shetland Stalls Installation Instructions RAMM Horse Fencing and Stalls 13150 Airport Hwy. Swanton, OH 43558-9615 1-800-434-8456 Rev. 1/9/18 Before you start Kit can accommodate up to 12 wide stall front
More informationTOOLS REQUIRED Metal Wood Wood and Metal Screws. #16 Drill #12-24 Tap. 1/8 Drill
DEVICES COVERED IN THIS DOCUMENT: 4700S Surface Vertical Rod Device 4700SF Fire Exit Surface Vertical Rod Device TOOLS REQUIRED Metal Wood Wood and Metal Screws Sex Bolts #7 Drill ¼ -20 Tap #16 Drill #12-24
More informationField Specs & Assembly Instructions
VEX Robotics Sack Attack Field Specs & Assembly Instructions 4/13/2012 Copyright 2012. VEX Robotics Inc. VEX Robotics Sack Attack A Introduction A P P E N D I X Game Field This document will provide detailed
More informationRoll In W/L Dock PAGE 1
Roll In W/L Dock PAGE 1 1 2 3/8 X 1 CARRIAGE BOLT SS 3/8 FLANGE NUT BRASS 3 4 1/2-13 X 1.25 SQ BOLT SS 1/2 SQ NUT BRASS 5 3/8-16 X 2.5" BOLT SS PAGE 2 6 7 BRACE BRKT SINGLE AXLE TUBE 8 9 3" AXLE WASHER
More informationaluminium profile system
aluminium profile system 63 AME System aluminium profiles overview series profiles introduction 80x80 x80 x80/180 x Aluminium profiles are provided with longitudinal grooves which can be used in conjunction
More informationRythmik Audio. DS1500v - 3 cu ft vented enclosure. Articulate bass for the discerning audiophile. Feet Dimensions: 1.5 x 1.5 x 2.5
DS1500v - 3 cu ft vented enclosure Driver: DS1500 15 (Driver cutout: 14 1/16") Enclosure dimensions: 18 wide x 24 deep x 25 high Enclosure material: ¾ MDF (Medium Density Fibreboard) Feet Dimensions: 1.5
More informationQwik-Fence Installation Instructions
Qwik-Fence Installation Instructions 1 Tools Required The following installation instructions should be used as a guide for installing Folding Guard Qwik-Fence Partitions. Good common sense and appropriate
More informationSINGLE TRACK BYPASS (patent pending) barn door hardware
SINGLE TRACK BYPASS (patent pending) barn door hardware Installation Manual What is included in your kit: Part number Part name Quantity 1 Inner door hanger 2 2 Outer door hanger 2 3 5/16 x 1.5 lag bolts
More informationInstallation Manual for Metal Toilet Partitions Elite & Elite Plus Series
P a g e 1 Table of Contents Page General Notes and Tools Required 3 STEP 1: Establish Floor Bracket Locations 4 STEP 2: Fasten Floor Brackets 4 & 5 STEP 3: Erect Panels 6 STEP 4: Erect Wall Pilaster 7
More informationGeneral Prisoner Transport Install Instructions PT-2-INST
General Prisoner Transport Install Instructions PT-2-INST 50 or 60 high x 80, 100 & 120 inch long / Double Compartment Inserts Also refer to PT-A-3XX instructions for vehicle specific mounting measurements
More informationVSD-6500 Frame Exploded View LIFT P/N
VSD-6500 Frame Exploded View LIFT P/N 511-65075-01 34 34 45 96 55 108 22 9 7 55 54 34 89 90 56 24 99 23 111 SEE SHEET 4 34 91 45 106 20 55 26 68 95 5 55 109 7 22 8 54 53 71 66 5 95 31 58 6 6 46 60 73 25
More informationKAWASAKI KLRE PD NERF HTP4-8-5 & HIGHWAY PEGS HTP4-1-4B
Thank you for purchasing Happy Trails products. Our products are proudly hand made in Boise Idaho, USA. If you have any questions or concerns about the installation of this product, please contact us directly
More informationDoc #: 2100-AD Revision: - Installation of the DESI Zenith Work Platforms. Author(s): Derek Guenther, Miranda Saucedo, Tammie Lavoie
Doc #: 2100-AD-015-0074 Revision: - Installation of the DESI Zenith Work Platforms Author(s): Derek Guenther, Miranda Saucedo, Tammie Lavoie Contents Revision History... 3 1.0 Purpose... 4 2.0 Applicable
More informationPAK Drum Roll Top Assembly Instructions. Note: 2 people will be required to assemble roll top
PAK901 4 Drum Roll Top Assembly Instructions Note: 2 people will be required to assemble roll top PLEASE READ ASSEMBLY INSTRUCTIONS CARFULLY Tools required: 5/8 Socket & Ratchet 9/16 Deep Well Socket &
More informationTIRE RACK INSTALLATION INSTRUCTIONS Dodge Sprinter
Aluminess Products Inc 9402 Wheatlands Ct. #A Santee, CA 92071 619-449-9930 TIRE RACK INSTALLATION INSTRUCTIONS 07-11 Dodge Sprinter Please read before beginning Stainless steel hardware may bind together
More informationK9 KIT INSTALLATION INSTRUCTIONS CROWN VIC with Fire Suppression System Model KK-K9-F7-K-FS
K9 KIT INSTALLATION INSTRUCTIONS 2005-2011 CROWN VIC with Fire Suppression System Model KK-K9-F7-K-FS TOOLS REQUIRED: Power Drill (Cordless preferable) Drill Bit Set Standard Wrench and Socket Set Metric
More informationEquilibrium. Conference Table. Installation Instruction. Revision B 11/07/16
Equilibrium Conference Table Installation Instruction Revision B 11/07/16 Equilibrium End User Agreement Enwork Equilibrium table bases must be installed directly onto a four inch minimum thickness concrete
More informationHow To Measure Your Finished Opening
3000 Series Bifold Doors How To Measure Your Finished Opening MEASURE FROM RIGHT TO LEFT 2 PLACES (WIDTH) MEASURE FROM TOP TO BOTTOM 2 PLACES (HEIGHT) Tools Required for Assembly: Tools Needed: Phillips
More informationGeneral Guidelines:
ASSEMBLY INSTRUCTIONS Congratulations on your new Patriot Dock purchase. This manual contains instructions to assemble basic dock configurations for use at typical residential shoreline application. Please
More informationBioPrism Solid Surface
Please read all instructions before installing products. These instructions are intended for use with InPro s standard toilet partitions, which include 58 high doors and wall panels, when deviating from
More informationFIRST 200 Bedford Street, Manchester, NH (603) FAX (603)
ITEM 5 6 7 8 9 5 6 7 8 9 5 6 7 8 QTY 6 8 8 6 PRT NUMER HW- HW- HW- PP- PP- PP- PP- PP-5 PP-6 PP-9 PP-- PP- - - - - -7-8 -9 - - - -5-6 -7-8 -9 - Parts List DESCRIPTION Carriage bolt, /- x -/" Lock Nut/-
More informationCNC Router Parts PRO Machine Kit Cable Track Installation Instructions
1 1 X CABLE TRACK TRAYS & BRACKETS The cable track on the side of the system is supported by a metal tray (or multiple trays for longer systems such as a PRO4896). These trays hang from brackets on the
More informationLOWLINE SINGLE FOLD DOWN WALL BEDS
ASSEMBLY INSTRUCTIONS LOWLINE SINGLE FOLD DOWN WALL BEDS Tools Required For Assembly No 2 & No 4 Phillips Head Screwdrivers No 2 Slot Head Screwdriver Hammer Electric Drill (Hammer Drill for Masonry) 6.5mm
More informationMay 14, Installation Manual
May 14, 2012 Installation Manual Contents MAG TRACKER Components...1 Mount Installation...7 Module Installation & Grounding...11 Maintenance...14 Warranty......14 Contact Information......14 May 14, 2012
More informationHover. Installation Instructions. Raised Panel. Version
Installation Instructions Version 8-2-17 Raised Panel Table of Contents Page Raised Panel Trough 3-13 Platform Trough 14-20 Platform 120 Degree Trough 21-24 Electrical 25-28 Type A Electric Bases 29-31
More information400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS
12/11/07 PAGE 1 OF 12 400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS Thank you for purchasing our product! *Please read these instructions
More informationThis document will provide detailed specifications, BOM information, and assembly instructions for the Official Competition Field.
This document will provide detailed specifications, BOM information, and assembly instructions for the Official Competition Field. Teams who do not need an official field should refer to the separate low-cost
More informationHEADRAIL BRACED INSTALLATION MANUAL. Tools Required
Tools Required 4 ft. level Hammer Hammer drill Misc. screwdriver bits Hacksaw Misc. drill bits, including 4mm (5/32 ) & 8mm (5/16 ) 6mm (1/4 ) masonry bit 11mm (7/16 ) wrench 13mm (1/2 ) wrench Chalkline
More informationIMPORTANT! Recommended Tools. 7/16 Deep socket Phillips screwdriver
IMPORTANT! Read all instructions carefully before commencing any work. Always wear proper safety equipment. Some installation steps will require two or more installers. Recommended Tools Ratchet 10-mm
More informationV.01. Fritsjurgens Pivot Door System. Fitting Instructions. FritsJurgens MPDS-S80 RVS F9000-serie
V.01 Fritsjurgens Pivot Door System Fitting Instructions FritsJurgens MPDS-S80 RVS F9000-serie fritsjurgens MPDS-S80 RVS F9000-SERIES fitting instructions Parts Fitting template Adjustment spanner S01
More informationGrade 8 Enriched Math Catapult Project 2012 Step by Step Instructions to building a catapult
Grade 8 Enriched Math Catapult Project 2012 Step by Step Instructions to building a catapult Grade 8 Enriched Math Project INSTRUCTION SHEET FOR CATAPULT Procedures, materials and tools: below is a step-bystep
More informationThis document will provide detailed specifications, BOM information, and assembly instructions for the Official Competition Field.
This document will provide detailed specifications, BOM information, and assembly instructions for the Official Field. Teams who do not need an official field should refer to the separate low-cost field
More informationAssembly and installation help
Assembly and installation help A supplement to the directions The Purpose of this tutorial is to expand (not replace) upon the directions that come with the system and to help provide shortcuts, the first
More informationASSEMBLY INSTRUCTIONS DIY WALL BED KIT QUEEN BI FOLD DOOR CABINET & MECHANISM. Tools Required For Assembly. 6.5mm Masonry Drill Bit
ASSEMBLY INSTRUCTIONS DIY WALL BED KIT QUEEN BI FOLD DOOR CABINET & MECHANISM Tools Required For Assembly No 2 & No 4 Phillips Head Screwdrivers No 2 Slot Head Screwdriver Hammer Electric Drill (Hammer
More informationKwik-Lock. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.
Serving the Truck & Trailer Industry Since 1944 Installation Instructions Attention Dealers: Please give this owners manual to the customer when the product is delivered. Call 800-535-9545 www.aeroindustries.com
More informationFast, Flexible, Functional
FA ZTEK T H E S H A P E O F T H I N G S T O C O M E T-Slotted Aluminum Solutions Fast, Flexible, Functional FAST Prompt, timely shipments Shortest possible turnaround Large in-stock inventory of standard
More information33/35A Series. Devices covered by these instructions: Rim Exit Device. CD33/35A Rim Exit Device EL33/35A Rim Exit Device SS33/35A Rim Exit Device
911402-00 Rim Exit Device 33/35A Series Installation Instructions Devices covered by these instructions: 33/35A Rim Exit Device CD33/35A Rim Exit Device EL33/35A Rim Exit Device SS33/35A Rim Exit Device
More informationMotorcycle Lift Assembly Instructions
Motorcycle Lift Assembly Instructions Copyright JCS 2009 Rev1M Page 1 Lift Table Assembly Instructions The following pages will assist you in the construction of your Motorcycle Lift Table. You will find
More informationINSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS For Wallbed models: Do-It-Yourself BOOKLET #C90 WARNING! ALL MURPY/WALLBED SYSTEMS CONTAIN STORED ENERGY. FAILURE TO USE AND FOLLOW THESE INSTRUCTIONS DURING THE INSTALLATION
More informationA Portable, Human-Powered Lathe Designed and Built by Scott Lewis Illustrations by David Heim
Tailstock Toolrest and banjo Drive belt guard Headstock post Headstock spindle Page 1 Metric dimensions Tailstock post Drive belt tensioner Drive belt and flywheel Chair Bicycle pedals, sprockets, and
More informationInstalling flat panels on the MPL15 wall mount
Installing flat panels on the MPL15 wall mount The MPL15 (DS-VW775) is a full-service video wall mount that can accommodate tiled LCD panels with up to a 400 x 400 mm VESA pattern in portrait and landscape
More information