A Superconducting Helical Undulator-Based FEL Prototype Cryomodule

Size: px
Start display at page:

Download "A Superconducting Helical Undulator-Based FEL Prototype Cryomodule"

Transcription

1 A Superconducting Helical Undulator-Based FEL Prototype Cryomodule E. Gluskin PI, APS/ANL P. Emma Co-PI, SLAC, Y. Ivanyushenkov Co-PI, APS/ANL Sep. 19, Introduction and Motivation Undulators serve as the primary source of radiation for modern storage rings, and more recently for the advent of Free-Electron Lasers (FELs). The performance of future FELs can be greatly enhanced using the much higher magnetic fields of superconducting undulators (SCU) [1]. For example, the upper limit of the spectral tuning range of the LCLS-II hard x-ray (HXR) FEL can be extended from just under 5 kev using a hybrid-permanent magnet undulator (PMU), to over 8 kev using a helical SCU of similar length and gap (see Figure 2). In addition, SCUs have no permanent magnet material and are therefore expected to be orders of magnitude less sensitive to demagnetization through radiation dose; a major issue at LCLS-II with its nearly 1-MW electron beam power. A previous R&D effort [2] was executed in in order to develop and compare two competing planar SCU magnet technologies by building, testing, tuning, and measuring two 1.5-m long planar SCU prototype magnets using two different superconducting wire technologies: NbTi at ANL, and Nb 3Sn at LBNL. Although the Nb 3Sn magnet did not reach its full excitation current (< 75%), the NbTi magnet demonstrated all technical specifications, including an rms phase-shake of < 5 degrees, x and y first fieldintegrals of < 40 µt-m, and x and y second field-integrals of < 150 µt-m 2, etc. This program clearly demonstrated the NbTi SCU magnet technology, but did not address many other technical issues associated with using SCUs in a long FEL undulator, such as magnet alignment and support within a cold cryomodule, integrated electron beam focusing, beam position monitor (BPM) diagnostics, cryogenic cooling capacity, etc. Therefore, we propose an additional phase of R&D that is needed in order to make the SCU solution a viable option for future FEL design and construction. By September of 2019, this new 3-yr R&D proposal aims to demonstrate the practicality of superconducting undulators for FELs by designing, building, and testing a prototype SCU-Cryomodule which includes two 1.5-m long NbTi SCU magnets (likely helical), a cold phase-shifter, a cold BPM, a cold quadrupole focusing magnet, and a scalable cryogenic cooling system. A sketch of the SCU-Cryomodule (SCU-CM) is shown in Figure 1. Figure 1: Prototype SCU-CM with two 1.5-m long magnets, a cold quad, phase shifter, and BPM. 1

2 This prototype includes only two SCU magnets, one phase shifter, and one cold quadrupole in order to keep costs down while still addressing the main technical issues. The production SCU-CM will more likely hold 3 magnets, 3 phase shifters, and two quadrupoles (one at the upstream end for focusing and one at the downstream end for beam-based alignment). The smaller prototype is not designed for use in an FEL, but is rather designed to demonstrate and address each main technical challenge as listed below. 2. R&D Goals The following 10 technical goals need to be addressed with the SCU-Cryomodule prototype such that, when this R&D program is finished, and assuming each of these points has been addressed adequately, the SCU will then have been demonstrated as a reasonably low-risk technology for any future FEL. 1. Component-to-Component Alignment: Transverse relative alignment (< 50 µm) of the 2 SCU undulator magnets, focusing quadrupole, and BPM all with respect to one another and achieved at cold temperatures (~ 4K). 2. Component-to-Fiducial Alignment: Transverse alignment (< 100 µm) of the cold internal assembly with respect to external fiducials. 3. Field Integrals: Control of 1 st and 2 nd field integrals in x and y as measured over the full internal assembly (including quadrupole and phase-shifter magnets) to within specified tolerances (e.g., < 40 µt-m), including stray fields. 4. Phase Shake: Measurement and control of rms phase shake over the full internal assembly to within specified tolerances (e.g., < 5 rms). 5. Phase-Shifter: Design, fabrication, and demonstration of an appropriate, tunable, cold, magnetic phase shifter with tolerable 1 st and 2 nd field integrals in x and y. 6. Cold-Quadrupoles: Design, fabrication, and demonstration of an appropriate, cold quadrupole magnet. The quadrupole should also include x and y beam steering coils (e.g., ±500 G-cm each). 7. Cryo-System: Initially a cryo-cooler system, but with engineering design considerations to allow future evolution of the CM design to a conceptual 4K refrigerator system. 8. BPM: Design, fabrication, and demonstration (in bench tests) of a linear, high-resolution (< 1 µm rms) cavity BPM with transverse alignment as listed in item 1 above. 9. Beam Vacuum Chamber: Design, fabrication, and demonstration of a cold, smooth (< 0.2 µm rms), 5-mm ID beam chamber, with high electrical conductivity on the beam side (e.g., Al or Cu). Beam heating is expected only at the level of 1 W/m (LCLS-II at 120 kw avg. beam power). 10. Thermal-Cycle Stability: The internal component alignment, field integrals, and phase shake must be repeatable to specified tolerances over cool-down and warm-up cycles. 2

3 3. Parameters We base the prototype SCU design on the Hard X-Ray (HXR) FEL at LCLS-II, which is driven by a new superconducting linac (4 GeV) at up to 1 MHz. The FEL photon energy tuning range at 4 GeV is 1.3 kev to 5.0 kev. The FEL x-ray pulse energy as a function of the single (tunable) photon energy is shown in Figure 2 for various undulator types, all with the same lower-limit tuning range of 1.3 kev at 4 GeV (which sets the period in each case). The solid-blue curve is the LCLS-II baseline design using a planar permanent magnet undulator (PMU) with 26-mm period and 7-mm full magnetic gap. Also shown for comparison are the performance curves for a planar NbTi SCU with 7-mm gap (solid-green), a helical NbTi SCU with 9-mm winding diameter (dotted-red), and a helical NbTi SCU with 6-mm winding diameter (dashed-magenta). In all cases the vacuum chamber ID (or minimum internal dimension for planar) is 5 mm. The emittance for these curves is 0.5 µm, the peak current is 1 ka, the energy spread is 0.5 MeV, and the undulator s magnetic length in all cases is 115 m (140-m beamline length with 0.82 packing factor). The various undulator parameters are listed in Table 1. Figure 2: FEL X-ray pulse energy as a function of the (tunable) single-photon energy, with each curve as a different undulator type and with the same lower-limit tuning range of 1.3 kev at 4 GeV. The solid-blue curve is a PMU with 7-mm full magnetic gap and 26-mm period. The solid-green curve is a NbTi planar SCU with 7-mm magnetic gap and 19.4-mm period, the dotted-red curve is a NbTi helical SCU with 9-mm winding diameter and 15.5-mm period, and the dashed-magenta curve is a NbTi SCU with 6-mm winding diameter (wound directly on vacuum chamber) and 18.2-mm period. The 6-mm helical winding diameter is the most aggressive approach with the conductors wound directly on the thin vacuum chamber (0.5-mm wall thickness), and no iron. The 9-mm helical winding diameter (including iron) is a lower performance compromise which might be a fallback option if the 6-mm case is 3

4 not feasible. Both options will be explored within this R&D program, especially targeting the 6-mm winding diameter. The parameters of the other SCU-CM components are listed in Table 2, including the quadrupole magnet strength, BPM position resolution, and the phase-shifter tunability range. Table 1: Parameters of the various undulator types in Figure 2. Parameter symbol PMU P-1 H-1 H-2 unit Undulator technology (NbTi for SCU) - PMU SCU SCU SCU - Undulator winding geometry - planar planar helical helical - Full magnetic gap (or winding diam. for helical) g m mm Vacuum chamber ID (or min. internal dimension) g vc mm Undulator period (for 1.3-keV lower tuning limit) λ u mm Max. K value (80% short-sample limit) K max Max. on-axis peak magnetic field (80% s-s limit) B max T Table 2: Parameters of the other SCU-CM components (at 4 GeV). Parameter symbol value unit Max. quadrupole magnet length-integrated gradient GL ±2 T Magnetic length of quadrupole magnet (approx.) L 50 mm Pole-tip radius of quadrupole magnet r 5 mm Max. pole-tip field of quadrupole magnet B Q ±0.2 T Max. integrated field of x and y correctors within quad BL ±500 G-cm Phase shifter range (phase integral) T 2 mm 3 BPM x and y beam position resolution (rms) σ x,y < 1 µm 4. Cryogenic System The cryogenic system is designed to support the R&D goals described in the previous section(s). The general system concept is an extension of existing APS SCU technology and includes the following main subsystems: Insulating vacuum vessel and associated vacuum system Cold mass support system (capable of addressing the component-to-component alignment R&D goal) Cold mass assembly (including undulator magnets and associated beamline components) Refrigeration system (initially cryocooler-based but amenable to straightforward modification to a cryoplant-compatible system) Thermal radiation shield Figure 3 shows an overview of the concept. The vacuum vessel is based on the HSCU cryostat currently under construction for the APS and takes a modular form, making use of standard vacuum hardware (flanges, etc.) where possible. This keeps costs and lead time low and results in a versatile design easily re-configured as necessary. The central full-diameter 6-way cube cross, together with the end flanges, 4

5 provides access to either end of both magnets and adjacent components. Demountable cryocooler turrets are located on the 6-way cross and include all current leads. Figure 3: FEL SCU R&D cryostat. The cryostat vacuum vessel OD is 20 (standard ISO NW500 size). Figure 4: Cold mass consisting of undulator magnets (gray blocks), vacuum chamber, LHe reservoir system, and cryocooler turrets. The focusing quadrupole is shown at right, in red, and the lower turret thermal shield is suppressed here to make the inter-magnet area (4 ) visible. Alignment capability will be provided both within the cold mass assembly and also between the cold mass assembly and the vacuum vessel. The cold mass support system will consist of several low-heat-leak support rods, which extend outside the vacuum vessel using hermetic bellow assemblies. This permits adjustment of the cold mass position within the cryostat during operation. Individual components will be aligned relative to a common strongback during assembly. Component positions are measured during 5

6 operations via laser displacement sensors mounted on vacuum vessel viewports a technique that is being implemented in the APS HSCU. Beam-based alignment using feedback from alignment quads will be implemented by motorizing the support system adjusters external to the vacuum vessel. The cryostat will support additional alignment techniques, if necessary. Cold adjusters between the strongback and individual components are an example of an enhanced alignment scheme which could be evaluated. Figure 4 shows the cold mass concept. A system of four Sumitomo 4K two-stage cryocoolers, similar to the APS HSCU, is envisioned, although the packaging is different. Magnet cooling is achieved via conduction to liquid helium (LHe) filled cooling channels running the length of the undulator magnet. Ancillary components will be conduction cooled. Heat is extracted by re-condensation of helium vapor in the LHe reservoir system. An alternative cooling method using flowing LHe (such as would be implemented for a string of cryostats fed from a cryoplant/distribution system) is easily implemented by removing the cryocooler turrets and substituting a current lead/bayonet connection turret. A cryoplant (or batch fill system using a storage dewar) would supply LHe to the inlet bayonet to replenish LHe boil-off. Helium boil-off gas would return via the exhaust bayonet either to the cryoplant low pressure return or (for batch mode) to a helium reclamation/vent line. The thermal radiation shield will be conduction cooled using either the 1st-stage capacity of the cryocoolers or (for cryoplant or batch-fill mode) a liquid nitrogen trace tube. Shield design is modular to permit assembly access. 5. Undulator Magnet A helical superconducting magnet consists of a double-helical conductor winding with the currents flowing in the opposite directions, as shown in Figure 5 [3]. The on-axis helical magnetic field value depends mainly on the undulator period length and the conductor winding radius, as well as winding current density. The beam chamber bore diameter therefore becomes a critical parameter for the helical undulator. A 3d magnetic model has been developed in Opera and Radia software packages to be used for the field calculation and optimization of the magnetic design of the undulator once the beam chamber bore is defined. A scaling law analytical equation is also being developed in order to calculate the undulator peak field as a function of several parameters, such as the magnet-winding diameter, undulator period and winding current density [4]. Figure 5: Helical SCU magnetic structure. A concept of continuous winding of a helical undulator (shown in the top left picture of Figure 6) has already been developed at the APS. Recently, a compact coil winding concept was developed and tested. 6

7 The first prototype to be wound is shown in the bottom picture of Figure 6 and the latest model of the design is shown in the top right picture of Figure 6. The main feature of the new design is a more compact distribution of the conductor at the ends of the undulator where the conductor transitions from one helix to the other. The design also reduces the number of conductors in each helical coil pack over an arbitrary number of periods at the end which allows the magnetic field at each end of the device to be gradually reduced. Figure 6: Continuous winding of a helical SCU. Top left is the original design. Top right is the newly developed design. Bottom is the first prototype magnet with the recently developed winding scheme. After winding the helical SCU, the conductor is secured in place on the core through epoxy impregnation. Under the compact winding scheme, the outer diameter of the wound magnet is the same along the entire length of the device. This simplifies the design and construction of the mold used for epoxy impregnation and also allows for tighter machining tolerances of the mold. The reason for requiring tighter machining tolerances on the mold is to allow the mold and core to remain together after epoxy impregnation and use the mold as a strong-back, as shown in Figure 7. The mold is then used to support the magnet assembly inside the cryostat. Figure 7: Helical magnet assembly with strong-back. 7

8 6. Quadrupoles, Phase Shifters, and BPMs The superconducting phase shifter (SCPS) has to meet or exceed the requirements applied to the HXR LCLS-II phase shifter (PS). Specifically, the range of the first field integral adjustment should be no less than 80 T 2 mm 3 to 500 T 2 mm 3 from minimum to maximum. It also should not take more space than the HXR PS. The SCPS will have two full strength poles of different polarities and two end sections that allow for the magnetic field in the vicinity of the device to be brought to zero. A quick analysis of the magnetic field produced by the SCPS with the magnetic gap of 9 mm and total magnetic length of 50 mm shows that such a device would generate more than 1 T field on the beam axis and will easily exceed the requirement for the first field integral specified above. Two end sections of the SCPS will incorporate field integral correction coils. Their purpose is to maintain the first and second field integrals within specified tolerances, similar to the LCLS-II. The schematic drawing of the SCPS magnet cross-section is shown in Figure 8. It should be noted that calculations and measurements of the LCLS-II HXR PS magnetic field profile show that the PS ambient field is close to zero at 30 mm distance from the edge of the device. For the SCPS, this value should be even less due to its smaller magnetic gap. The total space of 120 mm along the beam direction allocated for the SCPS should be quite adequate and keeps the undulator magnets closely packed. Similar to the LCLS-II HXR PS, positioning tolerances for the SCPS in all directions are easily achievable. Once in place the SCPS will be calibrated while cold and will not be moved after that. Figure 8: SC phase shifter schematic. The red and blue colors correspond to different directions of the current in the main coils, whereas the pink color represents the end correction coils. The superconducting quadrupole (SCQ) will have to meet specifications very similar to the room temperature quadrupoles of the LCLS-I and LCLS-II. These room temperature quads have been massproduced and demonstrated exemplary performance. The design and fabrication of SCQ will utilize LCLS- I and LCLS-II experience of designing and building quads. A preliminary magnetic analysis of SCQ shows that SCQ will have significant safety margin in the design and operation of all its components. The design and construction of the SCQ would be therefore a straightforward task, and the parameters presented in Table 2 will be easily met. There is no special R&D needed for this task. Special attention though should be given to the alignment of the SCQ with respect to the SCU magnet and its precise, repeatable motion during the beam-based alignment procedure, but this is a different subject covered in the Alignment section of the proposal. 8

9 The design for the Cold Cavity BPM (CCBPM) system leverages the experience gained from Argonne s collaboration on the LCLS project. The general system specifications of CCBPM are described below and in Table 3. Table 3: Cold Cavity BPM (CCBPM) system specifications. Parameter Specification Condition Resolution < 1µm rms Offset Stability < ± 1 µm Offset Stability < ± 3 µm 0.1 nc ±1 mm range 10 hours ±1 mm range 30 days ±1 mm range Gain error < 10 % ±1 mm range The design approach will be based on an X-band cavity BPM. In the pill, a box-like cavity, the TM110 dipole and TM010 monopole modes are excited by the beam passing. The amplitude of the TM110 produces a signal that is directly proportional to the beam displacement. The TM011 signal is proportional to the beam intensity or charge. Both of these signals are required in order to extract a normalized position for both horizontal and vertical planes. The cavity BPM is shown in Figure 9. The beam passes through the monopole reference cavity, shown on the left. The beam excites the TM010 monopole mode signal at GHz, which is proportional to the beam intensity or charge. The second cavity, 36 mm downstream through the 10-mm-diameter beam pipe, is the TM110 dipole cavity shown at the far right. The iris couplers are precisely machined into the solid copper block to ensured repeatable and accurate coupling. The design shown in Figure 9 would be modified to move the windows from the waveguide outputs to the iris coupler outputs. Figure 9: X-band cavity BPM cross section. 9

10 The approach we are considering at this time is to use the X-band cavity BPM shown in Figure 9 as the baseline design. The mechanical and electrical parameters will have to be evaluated once the specifications are finalized. The size of the X-band cavity should be solid OFC suitable for cryomodule environment. The following list of R&D activities will be required. 1. Evaluate the frequency shift going from room temperature to cold temperature. 2. Design and test new window. 3. Design new waveguide to coax transition. 4. Study the minimum number of outputs required out of the cryomodule. 5. Test prototypes, including vacuum test and temperature cycles. 6. Develop cleaning process that meets cryomodule requirements. Figure 10: LCLS X-band cavity BPM. 7. Alignment Strategy The superconducting undulator has undoubtedly the disadvantage of limited access to the magnetic array after cool-down. Therefore, the system alignment strategy is even more important for the SCU. The strategy includes a precise relative alignment of sub-components inside the cryostat supplemented by a beam-based alignment procedure. The cold mass components, including two undulator magnets, a phase shifter, a BPM, and a focusing quad are mounted on a single strong-back which is machined to high precision. These components are precisely aligned in warm conditions. The expected shrinkage of the components during cool down can be calculated, since their geometry and materials are known. The actual position of the components in a cold state will be optically measured through dedicated windows in the cryostat. The actual and design positions will then be compared, and a correction (by shimming) in the component positions will be done during the following warm up. In the second cool down, the actual position will be checked again to confirm that the required level of accuracy is achieved. At the end of this step, all the sub-components are pre-aligned. The quadrupole magnet will be energized in a special test cryostat and its magnetic axis will be measured with respect to fiducial points on the quadrupole body. In such a way, the location of the quadrupole magnetic axis can be optically measured through the cryostat optical windows when the cold mass is cold. The positions of the other cold mass components, relative to the quadrupole, will also be known as described above. This includes the relative alignment of the two undulator magnets. 10

11 Finally, for an FEL composed of production-level cryomodules, a high-precision beam-based alignment (BBA) procedure [5] will be used during beam operations (not possible with the prototype), which uses beam position readings from the BPMs, and takes advantage of the quadrupole field gradients in order to center the undulator segments and quadrupoles onto the electron beam trajectory. This procedure has been applied routinely at LCLS-I since The method finds the magnetic centers of the focusing quadrupoles with respect to the beam by varying the electron beam energy by large factors (3-4) and measuring the induced beam kicks generated by a series of off-axis quadrupoles, using all BPM position readings. The cryostat will be set on camshaft movers, similar to conventional undulator girders, and they will be used to apply an alignment correction. This should work well for the quadrupole magnets but it leaves the undulator magnets potentially misaligned. However, if the focusing quadrupole is also precisely and permanently aligned transversely to the magnetic center of its adjacent undulator segment (to < 50 µm rms, as at LCLS-I), then both the focusing quadrupole and its adjacent undulator segment will be aligned when the local magnet movers are adjusted. If a second quadrupole magnet, an alignment quad, is added (not included in the prototype module), and is also well aligned to the upstream end of the adjacent undulator segment, then a final step in the BBA procedure will be to turn on and off the alignment quadrupole, record the induced kick in each plane, and correct its x and y position, which is pinned to the upstream end of its adjacent undulator segment. Note that the special alignment quadrupoles are only switched on during beam-based alignment, and are switched off during FEL operations. Only the focusing quadrupole magnets at the end of each cryostat are switched on during FEL operations (i.e., used for electron focusing). Each of two motion control platforms will allow ±1 mm independent x and y position adjustment at each end of the cryostat, providing control with at least four degrees of freedom (x, y, pitch, and yaw) of the two joined undulator segments and their adjacent quadrupole as one rigid structure. The two undulator segments within the cryostat must be well aligned to a straight line (to ~50 µm rms in both x and y for helical undulators). In this way, when the position adjustments are used to center the quad onto the electron beam, the set of undulator segments within one cryostat will then be aligned all along its length. The BBA procedure is global and therefore also aligns the full multi-cryostat undulator system to a straight line. In addition, all BPM readings are re-calibrated (in terms of a readback offset) so they all read zero in both x and y after BBA is complete, as routinely done at LCLS-I. Note that the full BBA procedure cannot be applied for this SCU cryomodule proto-type, since it will not be tested with an electron beam, but the various systems needed to execute BBA will all be tested, including the motion control platforms. In any case, BBA is already well tested at LCLS-I for 7 years now, and does not need further demonstration. 8. Magnetic Measurements Vertical Cold Test System The existing Vertical Cold Test System (VCTS) at ANL is used to perform coil training and Hall probe magnetic measurements of SC magnets in a LHe bath. Two vertical cryostats are presently being utilized. The smaller cryostat has a 200-mm ID and is 1.9 m in depth. The larger cryostat has a 318-mm ID and is 4 m in depth. The smaller cryostat can be used for testing magnets up to 1 m in length, whereas the larger cryostat can accommodate magnets up to 2 m in length. 11

12 By performing SC coil training and magnetic measurements of the magnet cores in LHe bath the performance can be confirmed prior to assembly into the final horizontal cryomodule. It has been found with the planar SCU s that the required number of training quenches (to achieve the critical current) after one thermal cycle is roughly 10% of the initial number of quenches. The vertical LHe bath testing is thus a crucial step in the process of producing a high performance SCU. Vertical Magnetic Measurement System The magnetic measurements performed on SCUs in the vertical cryostats are primarily Hall probe based. The smaller cryostat has a linear stage capable of 1.5 m travel for driving a carbon-fiber Hall probe assembly through the mid-plane of the SCU under test. The larger cryostat is capable of 2.1 m of Hall probe travel. Horizontal Cold Test System The existing Horizontal Cold Test System (HCTS) is used to test all aspects of an SCU cryomodule prior to installation into the APS storage ring. The HCTS consists of vacuum equipment, cryocoolers, system control and monitoring, and the magnetic measurement system. Presently the system can accommodate up to 4 cryocoolers, 40 thermal sensors, two LHe sensors, 8 heaters, 16 voltage taps, and all the required vacuum monitoring and control. The system is scalable for future development as the needs arise. Horizontal Magnetic Measurement System The horizontal magnetic measurement system will be an extended version of existing system shown in Figure 11, which was successfully used for the measurements of the APS undulators SCU0 and SCU1 [6]. It implements a warm tube concept in which a titanium guiding tube is located in the cold beam chamber of the cryostat. The guiding is thermally isolated from the beam chamber and is self-heated by passing an electrical current through it. The guiding tube bore is open to air and accommodates a carbon fiber stick with Hall probes or wire measurement coils. In this design, the temperature of the Hall sensors is kept close to room temperature. The wire coils are of rectangular or figure-8 types to measure the first and the second field integrals. Figure 11: SCU horizontal magnetic measurement system with 3-m linear stage for Hall probe scans. SCU0 cryomodule (on left). 12

13 The scanning Hall probe system can perform on-the-fly field measurements at 2 cm/s, with 0.2 mm between measurements and longitudinal range of 3 m. The Hall probe data is used to determine local field errors and phase errors. Hall probe assemblies using up to three Hall sensors (attached to carbon-fiber tubing and driven by a linear stage) are used to measure the vertical and horizontal fields along the length of the SCU. For cryostats longer than 3 m, an additional linear stage will be used such that scanning Hall probe measurements could be performed on each half of a 5-m cryostat with two independent 3-m linear stages. Stretched Wire, Rotating or Fixed Coil A stretched wire loop, which can be configured as rectangular, delta, or figure-8, is used to determine the static and dynamic (such as during a quench) 1st and 2nd field integrals. For static fields the coil loop is rotated and a Lock-in-amplifier is used to measure the integrated fields. For dynamic measurements, the loop is oriented to measure the vertical or horizontal fields, typically during a forced quench. Depending on the particular beam chamber geometry, the wire loop can be translated along the transverse axis approximately ±1 cm to measure the integrated multipole components. 9. Schedule The duration of the project is about 11 quarters (690 working days) as shown in the chart below. 13

14 10. Cost Estimate The estimated cost of the project is 5.5 $M, including 1.4 $M of ANL overhead, as listed in Table 4. Table 4: Cost estimate for the project. Project Grand Total with ANL Overhead ($M) ANL Overhead ($M) Project Total without ANL Overhead ($M) M&S ($M) Effort ($M) Project Tasks: M&S ($K) Effort ($K) Design Procurement Fabrication and Component Assembly FEL SCU Module Assembly Instrumentation and Control System Development Measurement System FEL SCU Module Cold Test Summary This proposal is intended to develop superconducting undulator technology for use in future FELs by demonstrating the main engineering challenges in a small, low-cost SCU cryomodule, which will eventually develop into an FEL building block. This prototype module will not be constructed for use in an actual electron accelerator, but it will include all of the main technical issues that need to be demonstrated (see 10-item list of goals in section 2) in order to reduce the risk of this technology and make it viable for any future FEL where SCU technology can be beneficial. The project is expected to require 3 years of effort and is to be carried out at the Argonne National Laboratory where extensive SCU knowledge, facilities, and experience are already available. This project is the next logical step to follow the SCU-magnet R&D that was successfully carried out in References [1] J. Bahrdt, Y. Ivanyushenkov, Short Period Undulators for Storage Rings and Free Electron Lasers, Journal of Physics, Conf. Series, 425 (2013), [2] P. Emma et al., A Plan for the Development of Superconducting Undulator Prototypes for the LCLS-II and Future FELs, in Proc. of 36th Int. Free-Electron Laser Conf., Basel, 2014, THA03. [3] S.H. Kim and C. Doose, Development of a model superconducting helical undulator for the ILC positron source, in Proceedings of PAC07, Albuquerque, New Mexico, 2007, TUPJE068. [4] S.H. Kim, A scaling law for the magnetic fields of superconducting undulators, Nucl. Instrum. Methods A, 546 (2005), [5] P. Emma et al., NIM A 429: , [6] C. Doose, M. Kasa, Magnetic Measurements of the First Superconducting Undulator at the Advanced Photon Source, in Proc. of 2013 Part. Acc. Conf., Pasadena, CA, pp , THPBA06. 14

A PLAN FOR THE DEVELOPMENT OF SUPERCONDUCTING UNDULATOR PROTOTYPES FOR LCLS-II AND FUTURE FELS

A PLAN FOR THE DEVELOPMENT OF SUPERCONDUCTING UNDULATOR PROTOTYPES FOR LCLS-II AND FUTURE FELS A PLAN FOR THE DEVELOPMENT OF SUPERCONDUCTING UNDULATOR PROTOTYPES FOR LCLS-II AND FUTURE FELS P. Emma, N. Holtkamp, H.-D. Nuhn, SLAC, Stanford, CA 94309, USA; D. Arbelaez, J. Corlett, S. Myers, S. Prestemon,

More information

HIGH MAGNETIC FIELD SUPERCONDUCTING MAGNETS FABRICATED IN BUDKER INP FOR SR GENERATION

HIGH MAGNETIC FIELD SUPERCONDUCTING MAGNETS FABRICATED IN BUDKER INP FOR SR GENERATION HIGH MAGNETIC FIELD SUPERCONDUCTING MAGNETS FABRICATED IN BUDKER INP FOR SR GENERATION K.V. Zolotarev *, A.M. Batrakov, S.V. Khruschev, G.N. Kulipanov, V.H. Lev, N.A. Mezentsev, E.G. Miginsky, V.A. Shkaruba,

More information

Physics Requirements Document Document Title: SCRF 1.3 GHz Cryomodule Document Number: LCLSII-4.1-PR-0146-R0 Page 1 of 7

Physics Requirements Document Document Title: SCRF 1.3 GHz Cryomodule Document Number: LCLSII-4.1-PR-0146-R0 Page 1 of 7 Document Number: LCLSII-4.1-PR-0146-R0 Page 1 of 7 Document Approval: Originator: Tor Raubenheimer, Physics Support Lead Date Approved Approver: Marc Ross, Cryogenic System Manager Approver: Jose Chan,

More information

THE CRYOGENIC SYSTEM OF TESLA

THE CRYOGENIC SYSTEM OF TESLA THE CRYOGENIC SYSTEM OF TESLA S. Wolff, DESY, Notkestr. 85, 22607 Hamburg, Germany for the TESLA collaboration Abstract TESLA, a 33 km long 500 GeV centre-of-mass energy superconducting linear collider

More information

Insertion Devices Lecture 4 Undulator Magnet Designs. Jim Clarke ASTeC Daresbury Laboratory

Insertion Devices Lecture 4 Undulator Magnet Designs. Jim Clarke ASTeC Daresbury Laboratory Insertion Devices Lecture 4 Undulator Magnet Designs Jim Clarke ASTeC Daresbury Laboratory Hybrid Insertion Devices Inclusion of Iron Simple hybrid example Top Array e - Bottom Array 2 Lines of Magnetic

More information

Physical Design of Superconducting Magnet for ADS Injection I

Physical Design of Superconducting Magnet for ADS Injection I Submitted to Chinese Physics C' Physical Design of Superconducting Magnet for ADS Injection I PENG Quan-ling( 彭全岭 ), WANG Bing( 王冰 ), CHEN Yuan( 陈沅 ) YANG Xiang-chen( 杨向臣 ) Institute of High Energy Physics,

More information

TECHNICAL CHALLENGES OF THE LCLS-II CW X-RAY FEL *

TECHNICAL CHALLENGES OF THE LCLS-II CW X-RAY FEL * TECHNICAL CHALLENGES OF THE LCLS-II CW X-RAY FEL * T.O. Raubenheimer # for the LCLS-II Collaboration, SLAC, Menlo Park, CA 94025, USA Abstract The LCLS-II will be a CW X-ray FEL upgrade to the existing

More information

RF STATUS OF SUPERCONDUCTING MODULE DEVELOPMENT SUITABLE FOR CW OPERATION: ELBE CRYOSTATS

RF STATUS OF SUPERCONDUCTING MODULE DEVELOPMENT SUITABLE FOR CW OPERATION: ELBE CRYOSTATS RF STATUS OF SUPERCONDUCTING MODULE DEVELOPMENT SUITABLE FOR CW OPERATION: ELBE CRYOSTATS J. Teichert, A. Büchner, H. Büttig, F. Gabriel, P. Michel, K. Möller, U. Lehnert, Ch. Schneider, J. Stephan, A.

More information

DEVELOPMENT OF A BETA 0.12, 88 MHZ, QUARTER WAVE RESONATOR AND ITS CRYOMODULE FOR THE SPIRAL2 PROJECT

DEVELOPMENT OF A BETA 0.12, 88 MHZ, QUARTER WAVE RESONATOR AND ITS CRYOMODULE FOR THE SPIRAL2 PROJECT DEVELOPMENT OF A BETA 0.12, 88 MHZ, QUARTER WAVE RESONATOR AND ITS CRYOMODULE FOR THE SPIRAL2 PROJECT G. Olry, J-L. Biarrotte, S. Blivet, S. Bousson, C. Commeaux, C. Joly, T. Junquera, J. Lesrel, E. Roy,

More information

4. Superconducting sector magnets for the SRC 4.1 Introduction

4. Superconducting sector magnets for the SRC 4.1 Introduction 4. Superconducting sector magnets for the SRC 4.1 Introduction The key components for the realization for the SRC are: the superconducting sector magnet and the superconducting bending magnet (SBM) for

More information

A Study of undulator magnets characterization using the Vibrating Wire technique

A Study of undulator magnets characterization using the Vibrating Wire technique A Study of undulator magnets characterization using the Vibrating Wire technique Alexander. Temnykh a, Yurii Levashov b and Zachary Wolf b a Cornell University, Laboratory for Elem-Particle Physics, Ithaca,

More information

two pairs of dipole steering windings that t inside the quadrupole yoke an RF beam position monitor (BPM) consisting of a pill box RF cavity,

two pairs of dipole steering windings that t inside the quadrupole yoke an RF beam position monitor (BPM) consisting of a pill box RF cavity, Chapter 6 Quadrupole Package The quadrupole package is shown in Fig. 6.1. It consists of a superferric quadrupole doublet powered in series enclosed in a stainless steel vessel and cooled by 4 K LHe; two

More information

XFEL Cryo System. Project X Collaboration Meeting, FNAL September 8-9, 2010 Bernd Petersen DESY MKS (XFEL WP10 & WP13) 1 st stage. Possible extension

XFEL Cryo System. Project X Collaboration Meeting, FNAL September 8-9, 2010 Bernd Petersen DESY MKS (XFEL WP10 & WP13) 1 st stage. Possible extension XFEL Cryo System Possible extension 1 st stage Project X Collaboration Meeting, FNAL September 8-9, 2010 (XFEL WP10 & WP13) Outline 2 XFEL accelerator structure TESLA technology Basic cryogenic parameters

More information

An Overview of MAX IV Insertion Devices & Magnetic Measurement System. Hamed Tarawneh On behalf of Insertion Devices Team

An Overview of MAX IV Insertion Devices & Magnetic Measurement System. Hamed Tarawneh On behalf of Insertion Devices Team An Overview of MAX IV Insertion Devices & Magnetic Measurement System Hamed Tarawneh On behalf of Insertion Devices Team MAX IV IDs & MagLab 1 Outlook: MAX IV Facility. ID Magnet Lab @ MAX IV. IDs @ 3

More information

LCLS UNDULATOR COMMISSIONING, ALIGNMENT, AND PERFORMANCE *

LCLS UNDULATOR COMMISSIONING, ALIGNMENT, AND PERFORMANCE * LCLS UNDULATOR COMMISSIONING, ALIGNMENT, AND PERFORMANCE * H.-D. Nuhn # for the LCLS Commissioning Team, SLAC National Accelerator Laboratory, Stanford, CA 94309, U.S.A. Abstract The LCLS x-ray FEL has

More information

TESLA Quad Package With BPM

TESLA Quad Package With BPM TESLA Quad Package With BPM H. Brueck, DESY Zeuthen, January 22, 2004 Technology Working Group 1 Topics The TESLA Quadrupole Package Status of Components Magnet Feedthroughs HTc Leads BPM Test in ACC6

More information

Cavity BPMs for the NLC

Cavity BPMs for the NLC SLAC-PUB-9211 May 2002 Cavity BPMs for the NLC Ronald Johnson, Zenghai Li, Takashi Naito, Jeffrey Rifkin, Stephen Smith, and Vernon Smith Stanford Linear Accelerator Center, 2575 Sand Hill Road, Menlo

More information

HIGH POWER COUPLER FOR THE TESLA TEST FACILITY

HIGH POWER COUPLER FOR THE TESLA TEST FACILITY Abstract HIGH POWER COUPLER FOR THE TESLA TEST FACILITY W.-D. Moeller * for the TESLA Collaboration, Deutsches Elektronen-Synchrotron DESY, D-22603 Hamburg, Germany The TeV Energy Superconducting Linear

More information

3 General layout of the XFEL Facility

3 General layout of the XFEL Facility 3 General layout of the XFEL Facility 3.1 Introduction The present chapter provides an overview of the whole European X-Ray Free-Electron Laser (XFEL) Facility layout, enumerating its main components and

More information

Packaging of Cryogenic Components

Packaging of Cryogenic Components Packaging of Cryogenic Components William J. Schneider Senior Mechanical Engineer Emeritus November 19-23 2007 1 Packaging of Cryogenic Components Day one Introduction and Overview 2 What is important?

More information

RF Design of Normal Conducting Deflecting Cavity

RF Design of Normal Conducting Deflecting Cavity RF Design of Normal Conducting Deflecting Cavity Valery Dolgashev (SLAC), Geoff Waldschmidt, Ali Nassiri (Argonne National Laboratory, Advanced Photon Source) 48th ICFA Advanced Beam Dynamics Workshop

More information

PRELIMINARY SPECIFICATIONS MRBR 7.0 TESLA / 210MM ACTIVELY SHIELDED CRYO-COOLED MAGNET SYSTEM

PRELIMINARY SPECIFICATIONS MRBR 7.0 TESLA / 210MM ACTIVELY SHIELDED CRYO-COOLED MAGNET SYSTEM PRELIMINARY SPECIFICATIONS MRBR 7.0 TESLA / 210MM ACTIVELY SHIELDED CRYO-COOLED MAGNET SYSTEM Prepared by:- Magnex Scientific Limited The Magnet Technology Centre 6 Mead Road Oxford Industrial Park Yarnton,

More information

CEBAF waveguide absorbers. R. Rimmer for JLab SRF Institute

CEBAF waveguide absorbers. R. Rimmer for JLab SRF Institute CEBAF waveguide absorbers R. Rimmer for JLab SRF Institute Outline Original CEBAF HOM absorbers Modified CEBAF loads for FEL New materials for replacement loads High power loads for next generation FELs

More information

Demonstration of exponential growth and saturation at VUV wavelengths at the TESLA Test Facility Free-Electron Laser. P. Castro for the TTF-FEL team

Demonstration of exponential growth and saturation at VUV wavelengths at the TESLA Test Facility Free-Electron Laser. P. Castro for the TTF-FEL team Demonstration of exponential growth and saturation at VUV wavelengths at the TESLA Test Facility Free-Electron Laser P. Castro for the TTF-FEL team 100 nm 1 Å FEL radiation TESLA Test Facility at DESY

More information

SC UNDULATOR AND SC WIGGLER FOR CORNELL ERL

SC UNDULATOR AND SC WIGGLER FOR CORNELL ERL CBN 10-8 SC UNDULATOR AND SC WIGGLER FOR CORNELL ERL Alexander Mikhailichenko, Cornell University, CLASSE, Ithaca, NY 14853 Argonne, September 21, 2010 SRI 2010 Satellite Workshop on SC Undulators and

More information

SPECIFICATIONS FOR A 4.7 TESLA/310MM BORE ACTIVELY SHIELDED MAGNET SYSTEM

SPECIFICATIONS FOR A 4.7 TESLA/310MM BORE ACTIVELY SHIELDED MAGNET SYSTEM SPECIFICATIONS FOR A 4.7 TESLA/310MM BORE ACTIVELY SHIELDED MAGNET SYSTEM Prepared by:- Magnex Scientific Limited The Magnet Technology Centre 6 Mead Road Oxford Industrial Park Yarnton, Oxford OX5 1QU,

More information

QUARTER WAVE COAXIAL LINE CAVITY FOR NEW DELHI LINAC BOOSTER*

QUARTER WAVE COAXIAL LINE CAVITY FOR NEW DELHI LINAC BOOSTER* QUARTER WAVE COAXIAL LINE CAVITY FOR NEW DELHI LINAC BOOSTER* P.N. Prakash and A.Roy Nuclear Science Centre, P.O.Box 10502, New Delhi 110 067, INDIA and K.W.Shepard Physics Division, Argonne National Laboratory,

More information

Overview of ERL Projects: SRF Issues and Challenges. Matthias Liepe Cornell University

Overview of ERL Projects: SRF Issues and Challenges. Matthias Liepe Cornell University Overview of ERL Projects: SRF Issues and Challenges Matthias Liepe Cornell University Overview of ERL projects: SRF issues and challenges Slide 1 Outline Introduction: SRF for ERLs What makes it special

More information

Chapter 9. Magnet System. 9.1 Magnets in the Arc and Straight Sections

Chapter 9. Magnet System. 9.1 Magnets in the Arc and Straight Sections Chapter 9 Magnet System This chapter discusses the parameters and the design of the magnets to use at KEKB. Plans on the magnet power supply systems, magnet installation procedure and alignment strategies

More information

Transverse Wakefields and Alignment of the LCLS-II Kicker and Septum Magnets

Transverse Wakefields and Alignment of the LCLS-II Kicker and Septum Magnets Transverse Wakefields and Alignment of the LCLS-II Kicker and Septum Magnets LCLS-II TN-16-13 12/12/2016 P. Emma, J. Amann,K. Bane, Y. Nosochkov, M. Woodley December 12, 2016 LCLSII-TN-XXXX 1 Introduction

More information

TECHNICAL SPECIFICATIONS. FOR AN MRBR 7.0 TESLA / 160mm ACTIVELY SHIELDED ROOM TEMPERATURE BORE MAGNET SYSTEM

TECHNICAL SPECIFICATIONS. FOR AN MRBR 7.0 TESLA / 160mm ACTIVELY SHIELDED ROOM TEMPERATURE BORE MAGNET SYSTEM TECHNICAL SPECIFICATIONS FOR AN MRBR 7.0 TESLA / 160mm ACTIVELY SHIELDED ROOM TEMPERATURE BORE MAGNET SYSTEM Prepared by:- Magnex Scientific Limited The Magnet Technology Centre 6 Mead Road Oxford Industrial

More information

LCLS-II SXR Undulator Line Photon Energy Scanning

LCLS-II SXR Undulator Line Photon Energy Scanning LCLS-TN-18-4 LCLS-II SXR Undulator Line Photon Energy Scanning Heinz-Dieter Nuhn a a SLAC National Accelerator Laboratory, Stanford University, CA 94309-0210, USA ABSTRACT Operation of the LCLS-II undulator

More information

REVIEW OF HIGH POWER CW COUPLERS FOR SC CAVITIES. S. Belomestnykh

REVIEW OF HIGH POWER CW COUPLERS FOR SC CAVITIES. S. Belomestnykh REVIEW OF HIGH POWER CW COUPLERS FOR SC CAVITIES S. Belomestnykh HPC workshop JLAB, 30 October 2002 Introduction Many aspects of the high-power coupler design, fabrication, preparation, conditioning, integration

More information

REVIEW ON SUPERCONDUCTING RF GUNS

REVIEW ON SUPERCONDUCTING RF GUNS REVIEW ON SUPERCONDUCTING RF GUNS D. Janssen #, A. Arnold, H. Büttig, U. Lehnert, P. Michel, P. Murcek, C. Schneider, R. Schurig, F. Staufenbiel, J. Teichert, R. Xiang, Forschungszentrum Rossendorf, Germany.

More information

International Technology Recommendation Panel. X-Band Linear Collider Path to the Future. RF System Overview. Chris Adolphsen

International Technology Recommendation Panel. X-Band Linear Collider Path to the Future. RF System Overview. Chris Adolphsen International Technology Recommendation Panel X-Band Linear Collider Path to the Future RF System Overview Chris Adolphsen Stanford Linear Accelerator Center April 26-27, 2004 Delivering the Beam Energy

More information

Vibration studies of a superconducting accelerating

Vibration studies of a superconducting accelerating Vibration studies of a superconducting accelerating module at room temperature and at 4.5 K Ramila Amirikas, Alessandro Bertolini, Wilhelm Bialowons Vibration studies on a Type III cryomodule at room temperature

More information

SPECIFICATION FOR A 7.0 TESLA/400MM ROOM TEMPERATURE BORE MAGNET SYSTEM

SPECIFICATION FOR A 7.0 TESLA/400MM ROOM TEMPERATURE BORE MAGNET SYSTEM SPECIFICATION FOR A 7.0 TESLA/400MM ROOM TEMPERATURE BORE MAGNET SYSTEM Prepared by:- Magnex Scientific Limited The Magnet Technology Centre 6 Mead Road Oxford Industrial Park Yarnton, Oxford OX5 1QU,

More information

A few results [2,3] obtained with the individual cavities inside their horizontal cryostats are summarized in Table I and a typical Q o

A few results [2,3] obtained with the individual cavities inside their horizontal cryostats are summarized in Table I and a typical Q o Particle Accelerators, 1990, Vol. 29, pp. 47-52 Reprints available directly from the publisher Photocopying permitted by license only 1990 Gordon and Breach, Science Publishers, Inc. Printed in the United

More information

Beam Diagnostics, Low Level RF and Feedback for Room Temperature FELs. Josef Frisch Pohang, March 14, 2011

Beam Diagnostics, Low Level RF and Feedback for Room Temperature FELs. Josef Frisch Pohang, March 14, 2011 Beam Diagnostics, Low Level RF and Feedback for Room Temperature FELs Josef Frisch Pohang, March 14, 2011 Room Temperature / Superconducting Very different pulse structures RT: single bunch or short bursts

More information

Using Higher Order Modes in the Superconducting TESLA Cavities for Diagnostics at DESY

Using Higher Order Modes in the Superconducting TESLA Cavities for Diagnostics at DESY Using Higher Order Modes in the Superconducting TESLA Cavities for Diagnostics at FLASH @ DESY N. Baboi, DESY, Hamburg for the HOM team : S. Molloy 1, N. Baboi 2, N. Eddy 3, J. Frisch 1, L. Hendrickson

More information

VIBRATING WIRE SENSORS FOR BEAM INSTRUMENTATION Suren Arutunian

VIBRATING WIRE SENSORS FOR BEAM INSTRUMENTATION Suren Arutunian VIBRATING WIRE SENSORS FOR BEAM INSTRUMENTATION Suren Arutunian Yerevan Physics Institute Yerevan Physics Institute S.Arutunian, VIBRATING WIRE SENSORS FOR BEAM INSTRUMENTATION BIW 2008, Lake Tahoe, USA

More information

Superconducting RF System. Heung-Sik Kang

Superconducting RF System. Heung-Sik Kang Design of PLS-II Superconducting RF System Heung-Sik Kang On behalf of PLS-II RF group Pohang Accelerator Laboratory Content 1. Introduction 2. Physics design 3. Cryomodules 4. Cryogenic system 5. High

More information

HIGH POWER INPUT COUPLERS FOR THE STF BASELINE CAVITY SYSTEM AT KEK

HIGH POWER INPUT COUPLERS FOR THE STF BASELINE CAVITY SYSTEM AT KEK HIGH POWER INPUT COUPLERS FOR THE STF BASELINE CAVITY SYSTEM AT KEK E. Kako #, H. Hayano, S. Noguchi, T. Shishido, K. Watanabe and Y. Yamamoto KEK, Tsukuba, Ibaraki, 305-0801, Japan Abstract An input coupler,

More information

RESULTS ON FIELD MEASUREMENTS IN A FLAT POLE MAGNET WITH THE CURRENT CARING SHEETS

RESULTS ON FIELD MEASUREMENTS IN A FLAT POLE MAGNET WITH THE CURRENT CARING SHEETS CBN 14-01 March 10, 2014 RESULTS ON FIELD MEASUREMENTS IN A FLAT POLE MAGNET WITH THE CURRENT CARING SHEETS Alexander Mikhailichenko Abstract. The results of measurements with a gradient magnet, arranged

More information

CEBAF Overview June 4, 2010

CEBAF Overview June 4, 2010 CEBAF Overview June 4, 2010 Yan Wang Deputy Group Leader of the Operations Group Outline CEBAF Timeline Machine Overview Injector Linear Accelerators Recirculation Arcs Extraction Systems Beam Specifications

More information

SRF EXPERIENCE WITH THE CORNELL HIGH-CURRENT ERL INJECTOR PROTOTYPE

SRF EXPERIENCE WITH THE CORNELL HIGH-CURRENT ERL INJECTOR PROTOTYPE SRF EXPERIENCE WITH THE CORNELL HIGH-CURRENT ERL INJECTOR PROTOTYPE M. Liepe, S. Belomestnykh, E. Chojnacki, Z. Conway, V. Medjidzade, H. Padamsee, P. Quigley, J. Sears, V. Shemelin, V. Veshcherevich,

More information

Short-Pulse X-ray at the Advanced Photon Source Overview

Short-Pulse X-ray at the Advanced Photon Source Overview Short-Pulse X-ray at the Advanced Photon Source Overview Vadim Sajaev and Louis Emery Accelerator Operations and Physics Group Accelerator Systems Division Mini-workshop on Methods of Data Analysis in

More information

Advances in CW Ion Linacs

Advances in CW Ion Linacs IPAC 2015 P.N. Ostroumov May 8, 2015 Content Two types of CW ion linacs Example of a normal conducting CW RFQ Cryomodule design and performance High performance quarter wave and half wave SC resonators

More information

SUPERCONDUCTING GANTRY AND OTHER DEVELOPMENTS AT HIMAC

SUPERCONDUCTING GANTRY AND OTHER DEVELOPMENTS AT HIMAC SUPERCONDUCTING GANTRY AND OTHER DEVELOPMENTS AT HIMAC Y. Iwata *, K. Noda, T. Shirai, T. Murakami, T. Fujita, T. Furukawa, K. Mizushima, Y. Hara, S. Suzuki, S. Sato, and K. Shouda, NIRS, 4-9-1 Anagawa,

More information

SPECIFICATIONS FOR AN MRBR 7.0 TESLA / 210MM ACTIVELY SHIELDED MAGNET SYSTEM

SPECIFICATIONS FOR AN MRBR 7.0 TESLA / 210MM ACTIVELY SHIELDED MAGNET SYSTEM SPECIFICATIONS FOR AN MRBR 7.0 TESLA / 210MM ACTIVELY SHIELDED MAGNET SYSTEM Prepared by:- Magnex Scientific Limited The Magnet Technology Centre 6 Mead Road Oxford Industrial Park Yarnton, Oxford OX5

More information

KEK ERL CRYOMODULE DEVELOPMENT

KEK ERL CRYOMODULE DEVELOPMENT KEK ERL CRYOMODULE DEVELOPMENT H. Sakai*, T. Furuya, E. Kako, S. Noguchi, M. Sato, S. Sakanaka, T. Shishido, T. Takahashi, K. Umemori, K. Watanabe and Y. Yamamoto KEK, 1-1, Oho, Tsukuba, Ibaraki, 305-0801,

More information

Engineering Challenges and Solutions for MeRHIC. Andrew Burrill for the MeRHIC Team

Engineering Challenges and Solutions for MeRHIC. Andrew Burrill for the MeRHIC Team Engineering Challenges and Solutions for MeRHIC Andrew Burrill for the MeRHIC Team Key Components Photoinjector Design Photocathodes & Drive Laser Linac Cavities 703.75 MHz 5 cell cavities 3 rd Harmonic

More information

COMPARISON OF DIFFERENT MAGNETIC MEASUREMENT TECHNIQUES.

COMPARISON OF DIFFERENT MAGNETIC MEASUREMENT TECHNIQUES. COMPARISON OF DIFFERENT MAGNETIC MEASUREMENT TECHNIQUES. Isaac Vasserman, Shigemi Sasaki Argonne National Laboratory, Argonne, IL 60439, USA Abstract The magnetic measurement system at APS was upgraded.

More information

Magnetic measurement system for superconducting final focus quadrupoles for SuperKEKB

Magnetic measurement system for superconducting final focus quadrupoles for SuperKEKB Magnetic measurement system for superconducting final focus quadrupoles for SuperKEKB Y. Arimoto (KEK) IMMW 20 @ Diamond Light Source 2017/Jun/8 SuperKEKB Final focus magnet system Magnetic field measurement

More information

RESEARCH DEVELOPMENT OF VIBRATING WIRE ALIGNMENT TECHNIQUE FOR HEPS

RESEARCH DEVELOPMENT OF VIBRATING WIRE ALIGNMENT TECHNIQUE FOR HEPS RESEARCH DEVELOPMENT OF VIBRATING WIRE ALIGNMENT TECHNIQUE FOR HEPS WU Lei,WANG Xiaolong, LI Chunhua, QU Huamin IHEP,CAS.19B Yuanquan Road,Shijingshan District,Beijing,100049 Abstract The alignment tolerance

More information

Brett Parker, representing the

Brett Parker, representing the Compact Superconducting Magnet Solution for the 20 mr Crossing Angle Final Focus Brett Parker, representing the Brookhaven Superconducting Magnet Division Message: Progress continues on the compact superconducting

More information

INSTRUMENTATION AND CONTROL SYSTEM FOR THE INTERNATIONAL ERL CRYOMODULE

INSTRUMENTATION AND CONTROL SYSTEM FOR THE INTERNATIONAL ERL CRYOMODULE INSTRUMENTATION AND CONTROL SYSTEM FOR THE INTERNATIONAL ERL CRYOMODULE S. M. Pattalwar, R. Bate, G. Cox, P.A. McIntosh and A. Oates, STFC, Daresbury Laboratory, Warrington, UK Abstract ALICE is a prototype

More information

STATUS OF THE KOLKATA K500 SUPERCONDUCTING CYCLOTRON

STATUS OF THE KOLKATA K500 SUPERCONDUCTING CYCLOTRON STATUS OF THE KOLKATA K500 SUPERCONDUCTING CYCLOTRON Rakesh K. Bhandari (for VECC Staff) Variable Energy Cyclotron Centre, Department of Atomic Energy, Kolkata 700 064, India Abstract A superconducting

More information

Attosecond Diagnostics of Muti GeV Electron Beams Using W Band Deflectors

Attosecond Diagnostics of Muti GeV Electron Beams Using W Band Deflectors Attosecond Diagnostics of Muti GeV Electron Beams Using W Band Deflectors V.A. Dolgashev, P. Emma, M. Dal Forno, A. Novokhatski, S. Weathersby SLAC National Accelerator Laboratory FEIS 2: Femtosecond Electron

More information

Frequency Tuning and RF Systems for the ATLAS Energy Upgrade. Gary P. Zinkann

Frequency Tuning and RF Systems for the ATLAS Energy Upgrade. Gary P. Zinkann Frequency Tuning and RF Systems for the ATLAS Energy Upgrade Outline Overview of the ATLAS Energy Upgrade Description of cavity Tuning method used during cavity construction Description and test results

More information

Proposal of test setup

Proposal of test setup Proposal of test setup Status of the study The Compact Linear collider (CLIC) study is a site independent feasibility study aiming at the development of a realistic technology at an affordable cost for

More information

attocube systems Probe Stations for Extreme Environments CRYOGENIC PROBE STATION fundamentals principles of cryogenic probe stations

attocube systems Probe Stations for Extreme Environments CRYOGENIC PROBE STATION fundamentals principles of cryogenic probe stations PAGE 88 & 2008 2007 PRODUCT CATALOG CRYOGENIC PROBE STATION fundamentals...................... 90 principles of cryogenic probe stations attocps I.......................... 92 ultra stable cryogenic probe

More information

FLASH at DESY. FLASH. Free-Electron Laser in Hamburg. The first soft X-ray FEL operating two undulator beamlines simultaneously

FLASH at DESY. FLASH. Free-Electron Laser in Hamburg. The first soft X-ray FEL operating two undulator beamlines simultaneously FLASH at DESY The first soft X-ray FEL operating two undulator beamlines simultaneously Katja Honkavaara, DESY for the FLASH team FEL Conference 2014, Basel 25-29 August, 2014 First Lasing FLASH2 > First

More information

Superconducting RF Cavity Performance Degradation after Quenching in Static Magnetic Field

Superconducting RF Cavity Performance Degradation after Quenching in Static Magnetic Field Superconducting RF Cavity Performance Degradation after Quenching in Static Magnetic Field T. Khabiboulline, D. Sergatskov, I. Terechkine* Fermi National Accelerator Laboratory (FNAL) *MS-316, P.O. Box

More information

Circumference 187 m (bending radius = 8.66 m)

Circumference 187 m (bending radius = 8.66 m) 4. Specifications of the Accelerators Table 1. General parameters of the PF storage ring. Energy 2.5 GeV (max 3.0 GeV) Initial stored current multi-bunch 450 ma (max 500 ma at 2.5GeV) single bunch 70 ma

More information

Fiducialization of Superconducting Radio Frequency Cryomodules at Jefferson Lab

Fiducialization of Superconducting Radio Frequency Cryomodules at Jefferson Lab Fiducialization of Superconducting Radio Frequency Cryomodules at Jefferson Lab C. J. Curtis, J. Dahlberg, W. Oren, J. Preble, K. Tremblay. Thomas Jefferson National Accelerator Facility, Virginia, U.S.A.

More information

Amit Roy Director, IUAC

Amit Roy Director, IUAC SUPERCONDUCTING RF DEVELOPMENT AT INTER-UNIVERSITY ACCELERATOR CENTRE (IUAC) (JOINT PROPOSAL FROM IUAC & Delhi University (DU)) Amit Roy Director, IUAC to be presented by Kirti Ranjan (DU / Fermilab) Overview

More information

Physical Properties Measurement System (PPMS): Detailed specifications: Basic unit cryogen- free

Physical Properties Measurement System (PPMS): Detailed specifications: Basic unit cryogen- free Physical Properties Measurement System (PPMS): A Cryogen-free Physical Properties Measurement system that operates over a wider range of temperature and magnetic fields: fully automated/computer controlled

More information

Cryogenic Testing of Superconducting Corrector Magnets for the LHC Main Dipole

Cryogenic Testing of Superconducting Corrector Magnets for the LHC Main Dipole Cryogenic Testing of Superconducting Corrector Magnets for the LHC Main Dipole A.M. Puntambekar SC Tech Lab, AAMD Div. Raja Ramanna Centre For Advanced Technology, Indore Workshop on Cryogenic Science

More information

CAGE CAVITY: A LOW COST, HIGH PERFORMANCE SRF ACCELERATING STRUCTURE*

CAGE CAVITY: A LOW COST, HIGH PERFORMANCE SRF ACCELERATING STRUCTURE* CAGE CAVITY: A LOW COST, HIGH PERFORMANCE SRF ACCELERATING STRUCTURE* J. Noonan, T.L. Smith, M. Virgo, G.J. Waldsmidt, Argonne National Laboratory J.W. Lewellen, Los Alamos National Laboratory Abstract

More information

Cryogenics for Large Accelerators

Cryogenics for Large Accelerators Cryogenics for Large Accelerators Dr. Sergiy Putselyk Deutsches Elektronen-Synchrotron (DESY) MKS Division Notkestrasse 85 22607 Hamburg (Germany) Phone: +49 40 89983492 Fax: +49 40 89982858 E-Mail: Sergiy.Putselyk@desy.de

More information

MULTIPACTING IN THE CRAB CAVITY

MULTIPACTING IN THE CRAB CAVITY MULTIPACTING IN TH CRAB CAVITY Y. Morita, K. Hara, K. Hosoyama, A. Kabe, Y. Kojima, H. Nakai, KK, 1-1, Oho, Tsukuba, Ibaraki 3-81, JAPAN Md. M. Rahman, K. Nakanishi, Graduate University for Advanced Studies,

More information

HOM/LOM Coupler Study for the ILC Crab Cavity*

HOM/LOM Coupler Study for the ILC Crab Cavity* SLAC-PUB-1249 April 27 HOM/LOM Coupler Study for the ILC Crab Cavity* L. Xiao, Z. Li, K. Ko, SLAC, Menlo Park, CA9425, U.S.A Abstract The FNAL 9-cell 3.9GHz deflecting mode cavity designed for the CKM

More information

Couplers for Project X. S. Kazakov, T. Khabiboulline

Couplers for Project X. S. Kazakov, T. Khabiboulline Couplers for Project X S. Kazakov, T. Khabiboulline TTC meeting on CW-SRF, 2013 Requirements to Project X couplers Cavity SSR1 (325MHz): Cavity SSR2 (325MHz): Max. energy gain - 2.1 MV, Max. power, 1 ma

More information

Tuning systems for superconducting cavities at Saclay

Tuning systems for superconducting cavities at Saclay Tuning systems for superconducting cavities at Saclay 1 MACSE: 1990: tuner in LHe bath at 1.8K TTF: 1995 tuner at 1.8K in the insulating vacuum SOLEIL: 1999 tuner at 4 K in the insulating vacuum Super-3HC:

More information

Micro-manipulated Cryogenic & Vacuum Probe Systems

Micro-manipulated Cryogenic & Vacuum Probe Systems Janis micro-manipulated probe stations are designed for non-destructive electrical testing using DC, RF, and fiber-optic probes. They are useful in a variety of fields including semiconductors, MEMS, superconductivity,

More information

Tests of the Spoke Cavity RF Source and Cryomodules in Uppsala

Tests of the Spoke Cavity RF Source and Cryomodules in Uppsala FREIA Report 2012/03 October 2012 DEPARTMENT OF PHYSICS AND ASTRONOMY UPPSALA UNIVERSITY Tests of the Spoke Cavity RF Source and Cryomodules in Uppsala ESS TDR Contribution R. Ruber, T. Ekelöf, R.A. Yogi.

More information

The Latest Status of NSLS-II Insertion Devices

The Latest Status of NSLS-II Insertion Devices Journal of Physics: Conference Series OPEN ACCESS The Latest Status of NSLS-II Insertion Devices To cite this article: Toshi Tanabe et al 2014 J. Phys.: Conf. Ser. 493 012031 Recent citations - Reduction

More information

Figure 1. TAMU1 dipole cross-section. Figure 2. Completed TAMU1 dipole and group that built it.

Figure 1. TAMU1 dipole cross-section. Figure 2. Completed TAMU1 dipole and group that built it. Testing of TAMU1 Dipole Team that built it: C. Battle, R. Blackburn, N. Diaczenko, T. Elliott, R. Gaedke, W. Henchel, E. Hill, M. Johnson, H. Kautzky, J. McIntyre, P. McIntyre, A. Sattarov Team that tested

More information

Development of a 20-MeV Dielectric-Loaded Accelerator Test Facility

Development of a 20-MeV Dielectric-Loaded Accelerator Test Facility SLAC-PUB-11299 Development of a 20-MeV Dielectric-Loaded Accelerator Test Facility S.H. Gold, et al. Contributed to 11th Advanced Accelerator Concepts Workshop (AAC 2004), 06/21/2004--6/26/2004, Stony

More information

SIGNAL ELECTRIC FIELD MAGNETIC FIELD # 1 (#2) #3 (# 4) WAVEGUIDE VACUUM CHAMBER BEAM PIPE VACUUM CHAMBER

SIGNAL ELECTRIC FIELD MAGNETIC FIELD # 1 (#2) #3 (# 4) WAVEGUIDE VACUUM CHAMBER BEAM PIPE VACUUM CHAMBER New Microwave Beam Position Monitors for the TESLA Test Facility FEL T. Kamps and R. Lorenz DESY Zeuthen, Platanenallee 6, D-15738 Zeuthen Abstract. Beam-based alignment is essential for the operation

More information

LUSI Pulse Picker System

LUSI Pulse Picker System ENGINEERING SPECIFICATION DOCUMENT (ESD) Doc. No. SP-391-001-50 R0 LUSI SUB-SYSTEM DCO LUSI Pulse Picker System Rick Jackson Design Engineer, Author Signature Date Marc Campell DCO Design Engineer Signature

More information

200 MHz 350 MHz 750 MHz Linac2 RFQ2 202 MHz 0.5 MeV /m Weight : 1000 kg/m Ext. diameter : 45 cm

200 MHz 350 MHz 750 MHz Linac2 RFQ2 202 MHz 0.5 MeV /m Weight : 1000 kg/m Ext. diameter : 45 cm M. Vretenar, CERN for the HF-RFQ Working Group (V.A. Dimov, M. Garlasché, A. Grudiev, B. Koubek, A.M. Lombardi, S. Mathot, D. Mazur, E. Montesinos, M. Timmins, M. Vretenar) 1 1988-92 Linac2 RFQ2 202 MHz

More information

MuCool Test Area Experimental Program Summary

MuCool Test Area Experimental Program Summary MuCool Test Area Experimental Program Summary Alexey Kochemirovskiy The University of Chicago/Fermilab Alexey Kochemirovskiy NuFact'16 (Quy Nhon, August 21-27, 2016) Outline Introduction Motivation MTA

More information

DEVELOPMENT OF CAPACITIVE LINEAR-CUT BEAM POSITION MONITOR FOR HEAVY-ION SYNCHROTRON OF KHIMA PROJECT

DEVELOPMENT OF CAPACITIVE LINEAR-CUT BEAM POSITION MONITOR FOR HEAVY-ION SYNCHROTRON OF KHIMA PROJECT DEVELOPMENT OF CAPACITIVE LINEAR-CUT BEAM POSITION MONITOR FOR HEAVY-ION SYNCHROTRON OF KHIMA PROJECT Ji-Gwang Hwang, Tae-Keun Yang, Seon Yeong Noh Korea Institute of Radiological and Medical Sciences,

More information

Recent Developments of Variably Polarizing Undulators at the APS. By Mark Jaski

Recent Developments of Variably Polarizing Undulators at the APS. By Mark Jaski Recent Developments of Variably Polarizing Undulators at the APS By Mark Jaski Outline What is an Undulator IEX device Analysis Prototypes Final device EMVPU Device Analysis Prototypes Final device 2 What

More information

Experience with Insertion Device Photon Beam Position Monitors at the APS

Experience with Insertion Device Photon Beam Position Monitors at the APS Experience with Insertion Device Photon Beam Position Monitors at the APS 27.6 meters (The APS has forty sectors - 1104 meters total circumference) Beam Position Monitors and Magnets in One Sector 18m

More information

THE HIGH LUMINOSITY PERFORMANCE OF CESR WITH THE NEW GENERATION SUPERCONDUCTING CAVITY

THE HIGH LUMINOSITY PERFORMANCE OF CESR WITH THE NEW GENERATION SUPERCONDUCTING CAVITY Presented at the 1999 Particle Accelerator Conference, New York City, NY, USA, March 29 April 2 CLNS 99/1614 / SRF 990407-03 THE HIGH LUMINOSITY PERFORMANCE OF CESR WITH THE NEW GENERATION SUPERCONDUCTING

More information

ELECTRON BEAM DIAGNOSTICS AND FEEDBACK FOR THE LCLS-II*

ELECTRON BEAM DIAGNOSTICS AND FEEDBACK FOR THE LCLS-II* THB04 Proceedings of FEL2014, Basel, Switzerland ELECTRON BEAM DIAGNOSTICS AND FEEDBACK FOR THE LCLS-II* Josef Frisch, Paul Emma, Alan Fisher, Patrick Krejcik, Henrik Loos, Timothy Maxwell, Tor Raubenheimer,

More information

Residual Resistivity Ratio (RRR) Measurements of LHC Superconducting NbTi Cable Strands

Residual Resistivity Ratio (RRR) Measurements of LHC Superconducting NbTi Cable Strands EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH European Laboratory for Particle Physics Large Hadron Collider Project LHC Project Report 896 Residual Resistivity Ratio (RRR) Measurements of LHC Superconducting

More information

Liquid Helium Heat Load Within the Cornell Mark II Cryostat

Liquid Helium Heat Load Within the Cornell Mark II Cryostat SRF 990615-07 Liquid Helium Heat Load Within the Cornell Mark II Cryostat E. Chojnacki, S. Belomestnykh, and J. Sears Floyd R. Newman Laboratory of Nuclear Studies Cornell University, Ithaca, New York

More information

Design of the magnets for the MAX IV project. Martin Johansson, Beam Dynamics meets Magnets-II workshop, Bad Zurzach, Dec.

Design of the magnets for the MAX IV project. Martin Johansson, Beam Dynamics meets Magnets-II workshop, Bad Zurzach, Dec. Design of the magnets for the MAX IV project Martin Johansson, Beam Dynamics meets Magnets-II workshop, Bad Zurzach, 01-04 Dec. 2014 MAX IV 3 GeV ring magnets key aspects: Relatively small magnet aperture

More information

Review of the magnetic measurement technique (experience of the SLC, LEP, CEBAF)

Review of the magnetic measurement technique (experience of the SLC, LEP, CEBAF) Review of the magnetic measurement technique (experience of the SLC, LEP, CEBAF) N.A.Morozov Workshop on the TESLA spectrometer, Dubna, 13-14 October 2003 1..Stanford Linear Collider (SLC) To implement

More information

HIGHER ORDER MODES FOR BEAM DIAGNOSTICS IN THIRD HARMONIC 3.9 GHZ ACCELERATING MODULES *

HIGHER ORDER MODES FOR BEAM DIAGNOSTICS IN THIRD HARMONIC 3.9 GHZ ACCELERATING MODULES * HIGHER ORDER MODES FOR BEAM DIAGNOSTICS IN THIRD HARMONIC 3.9 GHZ ACCELERATING MODULES * N. Baboi #, N. Eddy, T. Flisgen, H.-W. Glock, R. M. Jones, I. R. R. Shinton, and P. Zhang # # Deutsches Elektronen-Synchrotron

More information

Commissioning of the ALICE SRF Systems at Daresbury Laboratory Alan Wheelhouse, ASTeC, STFC Daresbury Laboratory ESLS RF 1 st 2 nd October 2008

Commissioning of the ALICE SRF Systems at Daresbury Laboratory Alan Wheelhouse, ASTeC, STFC Daresbury Laboratory ESLS RF 1 st 2 nd October 2008 Commissioning of the ALICE SRF Systems at Daresbury Laboratory Alan Wheelhouse, ASTeC, STFC Daresbury Laboratory ESLS RF 1 st 2 nd October 2008 Overview ALICE (Accelerators and Lasers In Combined Experiments)

More information

K band Focal Plane Array: Mechanical and Cryogenic Considerations Steve White,Bob Simon, Mike Stennes February 20, 2008 COLD ELECTRONICS

K band Focal Plane Array: Mechanical and Cryogenic Considerations Steve White,Bob Simon, Mike Stennes February 20, 2008 COLD ELECTRONICS K band Focal Plane Array: Mechanical and Cryogenic Considerations Steve White,Bob Simon, Mike Stennes February 20, 2008 CRYOGENICS AND DEWAR DESIGN The dewar outside dimension must be less than the 36

More information

Development of a Vibration Measurement Method for Cryocoolers

Development of a Vibration Measurement Method for Cryocoolers REVTEX 3.1 Released September 2 Development of a Vibration Measurement Method for Cryocoolers Takayuki Tomaru, Toshikazu Suzuki, Tomiyoshi Haruyama, Takakazu Shintomi, Akira Yamamoto High Energy Accelerator

More information

Construction of Phase-I Insertion Devices at TPS

Construction of Phase-I Insertion Devices at TPS FACILITY STATUS 071 Construction of Phase-I Insertion Devices at TPS Taiwan Photon Source (TPS), a third-generation light source based on a 3-GeV storage ring, is featured with high brilliant insertion

More information

Precision RF Beam Position Monitors for Measuring Beam Position and Tilt Progress Report

Precision RF Beam Position Monitors for Measuring Beam Position and Tilt Progress Report Precision RF Beam Position Monitors for Measuring Beam Position and Tilt Progress Report UC Berkeley Senior Personnel Yury G. Kolomensky Collaborating Institutions Stanford Linear Accelerator Center: Marc

More information