Experience with Insertion Device Photon Beam Position Monitors at the APS
|
|
- Reginald Sparks
- 5 years ago
- Views:
Transcription
1 Experience with Insertion Device Photon Beam Position Monitors at the APS 27.6 meters (The APS has forty sectors meters total circumference)
2 Beam Position Monitors and Magnets in One Sector 18m X2 20m X2 11m X1 16m X1 Q FC BM x x x BM ID C C C C C C x C e - : Broad-band RF Beam Position Monitors (7) (Turn-by-Turn) x : Narrow-band RF Beam Position Monitors (4) (~ 300 Hz) : BM X-ray Beam Position Monitors (2 - Vertical Only) (~165 Hz) : ID X-ray Beam Position Monitors (2) (~165 Hz) FC : Fast Corrector Magnet (1) (~ 1000 Hz) C : Slow Corrector Magnets (7) (few Hz) Q : Quadrupole Magnets Bending Magnet and BPM Arrangement RFBPMs BM XBPMs #1 # (meters) (Source) Insertion Device and BPM Layout RFBPMs ID s XBPMs # 1 # (meters) (Source)
3 Insertion Device Photon Beam Position Monitor Blade Geometry Stray Radiation Sources X-ray BPMs (16, 20 meters from source) Insertion Device ID photons Main Dipole Bend Magnet 5 meters 78 mrad Legend Positron Trajectory Focusing Quadrupole Magnet Defocusing Quadrupole Magnet Sextupole Magnet Combined Function Horz./ Vert. Steering Corrector Magnet
4 Re-direction of Stray Photons by Girder Alignment* Stray radiation from upstream dipole, quadrupoles, sextupoles and correctors ID photons 77 mrad 1 mrad * Phys. Rev. ST Accel. Beams 2, (1999) Stray radiation from downstream dipole, quadrupoles, sextupoles and correctors Upstream X-ray BPM Downstream X-ray BPM P1 Blade Signal Sum Unmodified Sector 1ID Modified Sector P2 Blade Signal Sum Insertion device gap Insertion device gap
5 Raw Corrector Settings -136 Amps = -1 mrad Geometries of Canted Undulators and decker Distortions -78 mrad ID Undistorted Distorted -1 mrad mrad (= -78+1) -1 Canted, configuration mm Canted, configuration mm Canted, configuration 3
6 BPM Offset vs. Gap Lookup Tables (Vertical) Not distorted 200 m Not distorted BPM Offset vs. Gap Lookup Tables (Horizontal) Not distorted 400 m ID 20 Not distorted
7 Correction of Residual ID Photon BPM Gap-dependent Systematic Errors Background Subtraction Only Background + Exponent Corrections x (Absolute) x (Absolute) 100 microns ID 20 Gap (mm) ID 20 Gap (mm) x (Relative) x (Relative) approx. 40 microns ID 20 Gap (mm) ID 20 Gap (mm) Long Term Drift of BM and ID Photon BPM Readbacks BM ( m) Detectors 11 m from source ID ( m) Detectors 16.3 m from source
8 One-Week Angular Drift rad Local Steering Local Tunnel Air Temperature Impacts Pointing Stability Air Temp (deg. F) 8ID V. Angle ( rad) 8ID H. Angle ( rad)
9 Conceptual Design of Hard X-ray Beam Position Monitor (Top View) Cooled Cu X-ray Fluorescent Source Be. Filter Rectangular Beamline Photo-resistive Limiting Aperture Diamond Detectors (Approx. 3 x 2 mm) ~30 meters from source Side View
10 Summary An extensive accelerator re-alignment is near completion after a 6-year effort, resulting in reduced insertion device photon bpm stray radiation background signals. Correction of residual gap-dependent systematic errors is presently performed using lookup tables. Careful alignment, background subtraction, and algorithm refinement should further reduce systematic errors to the to 20 micron level (~0.5-1 rad). (but depend critically on assumptions / constraints) Development of a gold standard hard x-ray bpm located 30 meters from the source should allow achieving nrad-scale long-term pointing stability (perhaps the only way).
Orbit Stability Challenges for Storage Rings. Glenn Decker Advanced Photon Source Beam Diagnostics March 8, 2012
Orbit Stability Challenges for Storage Rings Glenn Decker Advanced Photon Source Beam Diagnostics March 8, 2012 Outline Beam stability requirements RF beam position monitor technology NSLS II developments
More informationPhysics Requirements Document Document Title: SCRF 1.3 GHz Cryomodule Document Number: LCLSII-4.1-PR-0146-R0 Page 1 of 7
Document Number: LCLSII-4.1-PR-0146-R0 Page 1 of 7 Document Approval: Originator: Tor Raubenheimer, Physics Support Lead Date Approved Approver: Marc Ross, Cryogenic System Manager Approver: Jose Chan,
More informationSession 3 Summary: Orbit Feedback
Session 3 Summary: Orbit Feedback Workshop on Ambient Ground Motion and Vibration Suppression for Low Emittance Storage Rings GM2017 12/13/2017 MMS System Design, Initial Results and Experiments with Orbit
More informationSpecification of APS Corrector Magnet Power Supplies from Closed Orbit Feedback Considerations.
under contract No. W-3- WENG-38. Accordingly. the U. S. Government retains a nonsxc\usivo. roya\ty-frae \kens0 to publish or reproduce the published form of t h i s wntribution, or allow others to do w,
More informationVIBRATING WIRE SENSORS FOR BEAM INSTRUMENTATION Suren Arutunian
VIBRATING WIRE SENSORS FOR BEAM INSTRUMENTATION Suren Arutunian Yerevan Physics Institute Yerevan Physics Institute S.Arutunian, VIBRATING WIRE SENSORS FOR BEAM INSTRUMENTATION BIW 2008, Lake Tahoe, USA
More informationSpecification of the Power Supply for a 6-Pole Combined Horizontal and Vertical Corrector Magnet
LS-188 b%a contractor of the U.3. Government uncmr contract No. W-31-14ENG-38. Accordingly, the U. S. Government retains a nonexclusive. royalty-free license to publish or reproduce the published form
More informationP61 BEAMLINE. Calculations of beamline characteristics Version 2.3
P61 BEAMLINE 31-1-18 Calculations of beamline characteristics Version.3 PHOTON FLUX FROM WIGGLERS FOR P61 1E+13 13 5 15 1.E+13 1 mm x 1 mm aperture Flux (ph/s/.1%b.w.) 1E+1 1 1.E+1 P61A (m) 1E+11 11 1E+
More informationNonintercepting Diagnostics for Transverse Beam Properties: from Rings to ERLs
Nonintercepting Diagnostics for Transverse Beam Properties: from Rings to ERLs Alex H. Lumpkin Accelerator Operations Division Advanced Photon Source Presented at Jefferson National Accelerator Laboratory
More informationChapter 9. Magnet System. 9.1 Magnets in the Arc and Straight Sections
Chapter 9 Magnet System This chapter discusses the parameters and the design of the magnets to use at KEKB. Plans on the magnet power supply systems, magnet installation procedure and alignment strategies
More informationIntroduction to High-Resolution Accelerator Alignment Using X-ray Optics
Introduction to High-Resolution Accelerator Alignment Using X-ray Optics Bingxin Yang and H. Friedsam Argonne National Laboratory, Argonne, IL 60349, USA A novel alignment technique utilizing the x-ray
More informationRecent Developments of Variably Polarizing Undulators at the APS. By Mark Jaski
Recent Developments of Variably Polarizing Undulators at the APS By Mark Jaski Outline What is an Undulator IEX device Analysis Prototypes Final device EMVPU Device Analysis Prototypes Final device 2 What
More informationActivities on Beam Orbit Stabilization at BESSY II
Activities on Beam Orbit Stabilization at BESSY II J. Feikes, K. Holldack, P. Kuske, R. Müller BESSY Berlin, Germany IWBS`02 December 2002 Spring 8 BESSY: Synchrotron Radiation User Facility BESSY II:
More information3 General layout of the XFEL Facility
3 General layout of the XFEL Facility 3.1 Introduction The present chapter provides an overview of the whole European X-Ray Free-Electron Laser (XFEL) Facility layout, enumerating its main components and
More informationLCLS-II SXR Undulator Line Photon Energy Scanning
LCLS-TN-18-4 LCLS-II SXR Undulator Line Photon Energy Scanning Heinz-Dieter Nuhn a a SLAC National Accelerator Laboratory, Stanford University, CA 94309-0210, USA ABSTRACT Operation of the LCLS-II undulator
More informationAir Bearing Monochromator at APS 13-ID-E (GSECARS)
Air Bearing Monochromator at APS 13-ID-E (GSECARS) Matt Newville, Peter Eng, Mark Rivers, GSECARS, U Chicago Paul Murray, IDT Upgraded Canted Beamline at GSECARS Air-bearing monochromator Performance and
More informationInsertion Devices Lecture 4 Undulator Magnet Designs. Jim Clarke ASTeC Daresbury Laboratory
Insertion Devices Lecture 4 Undulator Magnet Designs Jim Clarke ASTeC Daresbury Laboratory Hybrid Insertion Devices Inclusion of Iron Simple hybrid example Top Array e - Bottom Array 2 Lines of Magnetic
More informationConstruction of Phase-I Insertion Devices at TPS
FACILITY STATUS 071 Construction of Phase-I Insertion Devices at TPS Taiwan Photon Source (TPS), a third-generation light source based on a 3-GeV storage ring, is featured with high brilliant insertion
More informationSystem Integration of the TPS. J.R. Chen NSRRC, Hsinchu
System Integration of the TPS J.R. Chen NSRRC, Hsinchu OUTLINE I. Main features of the TPS II. Major concerns and intersystem effects of an advanced synchrotron light source III. Subsystems and intersystem
More informationSURVEY AND ALIGNMENT FOR THE SWISS LIGHT SOURCE
1 SURVEY AND ALIGNMENT FOR THE SWISS LIGHT SOURCE F.Q. Wei, K. Dreyer, U. Fehlmann, J.L. Pochon and A. Wrulich SLS / Paul Scherrer Institute CH5232 Villigen PSI Switzerland ABSTRACT The Swiss Light Source
More informationOverview of performance and improvements to fixed exit double crystal monochromators at Diamond. Andrew Dent, Physical Science Coordinator, DLS
Overview of performance and improvements to fixed exit double crystal monochromators at Diamond Andrew Dent, Physical Science Coordinator, DLS Overview Diffraction limit Geometric magnification Source
More informationALIGNMENT METHODS APPLIED TO THE LEP MAGNET MEASUREMENTS. J. Billan, G. Brun, K. N. Henrichsen, P. Legrand, 0. Pagano, P. Rohmig and L. Walckiers.
295 ALIGNMENT METHODS APPLIED TO THE LEP MAGNET MEASUREMENTS J. Billan, G. Brun, K. N. Henrichsen, P. Legrand, 0. Pagano, P. Rohmig and L. Walckiers. CERN, CH-1211 Geneva 23, Switzerland Introduction Electromagnets
More informationStatus and Upgrade. P. Elleaume. XVIII ESLS Workshop, November P. Elleaume, ESRF. Slide: 1
ESRF Status and Upgrade P. Elleaume Slide: 1 Statistics 2008-2010 Availability (%) Mean time between failures (hrs) Mean duration of a failure (hrs) 2008 2009 2010* 98.30 99.04 98.83 64.50 75.80 70.80
More informationSPEAR 3 - THE FIRST YEAR OF OPERATION*
SLAC-PUB-11679 SPEAR 3 - THE FIRST YEAR OF OPERATION* R. Hettel for the SSRL ASD, SSRL/SLAC, Stanford, CA 942, U.S.A. Abstract The first electrons were accumulated in the newly completed 3-GeV SPEAR 3
More informationProposal of test setup
Proposal of test setup Status of the study The Compact Linear collider (CLIC) study is a site independent feasibility study aiming at the development of a realistic technology at an affordable cost for
More informationMagnetic measurement system for superconducting final focus quadrupoles for SuperKEKB
Magnetic measurement system for superconducting final focus quadrupoles for SuperKEKB Y. Arimoto (KEK) IMMW 20 @ Diamond Light Source 2017/Jun/8 SuperKEKB Final focus magnet system Magnetic field measurement
More informationBeam Diagnostics, Low Level RF and Feedback for Room Temperature FELs. Josef Frisch Pohang, March 14, 2011
Beam Diagnostics, Low Level RF and Feedback for Room Temperature FELs Josef Frisch Pohang, March 14, 2011 Room Temperature / Superconducting Very different pulse structures RT: single bunch or short bursts
More informationShenglan Xu. GM/CA CAT Argonne National Laboratory
MECHANICAL DESIGN OF NEW DUAL PINHOLE MINI- BEAM COLLIMATOR WITH MOTORIZED PITCH AND YAW ADJUSTER PROVIDES LOWER BACKGROUND FOR X-RAY CRYSTALLOGRAPHY AT GMCA@APS Shenglan Xu GM/CA CAT Argonne National
More informationA Facility for Accelerator Physics and Test Beam Experiments
A Facility for Accelerator Physics and Test Beam Experiments Experimental Program Advisory Committee Roger Erickson for the SABER Design Team December 4, 2006 The Problem: FFTB is gone! The Final Focus
More informationLight Source Diagnostics. Hywel Owen ASTEC Daresbury Laboratory
Light Source Diagnostics Hywel Owen ASTEC Daresbury Laboratory This Talk Not a review of light source diagnostics Good summaries at EPAC/PAC/DIPAC, etc. J.Safranek (ICALHEPS 99) J.Clarke (EPAC 94) R.Hettel
More informationSources & Beam Line Optics
SSRL Scattering Workshop May 16, 2006 Sources & Beam Line Optics Thomas Rabedeau SSRL Beam Line Development Objective/Scope Objective - develop a better understanding of the capabilities and limitations
More informationCircumference 187 m (bending radius = 8.66 m)
4. Specifications of the Accelerators Table 1. General parameters of the PF storage ring. Energy 2.5 GeV (max 3.0 GeV) Initial stored current multi-bunch 450 ma (max 500 ma at 2.5GeV) single bunch 70 ma
More informationShort-Pulse X-ray at the Advanced Photon Source Overview
Short-Pulse X-ray at the Advanced Photon Source Overview Vadim Sajaev and Louis Emery Accelerator Operations and Physics Group Accelerator Systems Division Mini-workshop on Methods of Data Analysis in
More informationAttosecond Diagnostics of Muti GeV Electron Beams Using W Band Deflectors
Attosecond Diagnostics of Muti GeV Electron Beams Using W Band Deflectors V.A. Dolgashev, P. Emma, M. Dal Forno, A. Novokhatski, S. Weathersby SLAC National Accelerator Laboratory FEIS 2: Femtosecond Electron
More informationHOM Based Diagnostics at the TTF
HOM Based Diagnostics at the TTF Nov 14, 2005 Josef Frisch, Nicoleta Baboi, Linda Hendrickson, Olaf Hensler, Douglas McCormick, Justin May, Olivier Napoly, Rita Paparella, Marc Ross, Claire Simon, Tonee
More informationCERN EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH DESIGN OF PHASE FEED FORWARD SYSTEM IN CTF3 AND PERFORMANCE OF FAST BEAM PHASE MONITORS
CERN EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH CLIC Note 1007 DESIGN OF PHASE FEED FORWARD SYSTEM IN CTF3 AND PERFORMANCE OF FAST BEAM PHASE MONITORS P.K. Skowro nski, A. Andersson (CERN, Geneva), A.
More informationGlobal Position Feedback in SR Sources
SLS-TME-TA-2002-0212 12th August 2002 Global Position Feedback in SR Sources V. Schlott Abstract Paul Scherrer Institut, CH-5232 Villigen PSI, Switzerland Beam stability and orbit control represent key
More informationBEPCII-THE SECOND PHASE CONSTRUCTION OF BEIJING ELECTRON POSITRON COLLIDER
BEPCII-THE SECOND PHASE CONSTRUCTION OF BEIJING ELECTRON POSITRON COLLIDER C. Zhang, G.X. Pei for BEPCII Team IHEP, CAS, P.O. Box 918, Beijing 100039, P.R. China Abstract BEPCII, the second phase construction
More informationA Study of undulator magnets characterization using the Vibrating Wire technique
A Study of undulator magnets characterization using the Vibrating Wire technique Alexander. Temnykh a, Yurii Levashov b and Zachary Wolf b a Cornell University, Laboratory for Elem-Particle Physics, Ithaca,
More informationOrbit Feedback and Stability CONTENTS
CONTENTS INTRODUCTION Stability Requirements NOISE SOURCES SHORT TERM STABILITY Noise Scenarios Fast Orbit Feedbacks (Global/Local) MEDIUM TERM STABILITY Top-up Operation LONG TERM STABILITY Michael Böge
More informationSuppression of Vertical Oscillation and Observation of Flux Improvement during Top-up Injection at PLS-II
Suppression of Vertical Oscillation and Observation of Flux Improvement during Top-up Injection at PLS-II Y-G. Son, 1 J.-Y. Kim, 1 C. Mitsuda, 2 K. Kobayashi, 2 J. Ko, 1 T-Y. Lee, 1 J-Y. Choi, 1 D-E. Kim,
More informationResults of Vibration Study for LCLS-II Construction in the Research Yard 1
LCLS-TN-13-6 Results of Vibration Study for LCLS-II Construction in the Research Yard 1 Georg Gassner SLAC April 16, 2013 Abstract To study the influence of LCLS-II construction on the stability of the
More informationDark Current Kicker Studies at FLASH
Dark Current Kicker Studies at FLASH F. Obier, J. Wortmann, S. Schreiber, W. Decking, K. Flöttmann FLASH Seminar, DESY, 02 Feb 2010 History of the dark current kicker 2005 Vertical kicker was installed
More informationFLASH 2. FEL seminar. Charge: 0.5 nc. Juliane Rönsch-Schulenburg Overview of FLASH 2 Hamburg,
FLASH 2 FEL seminar Juliane Rönsch-Schulenburg Overview of FLASH 2 Hamburg, 2016-03-22 Charge: 0.5 nc Overview 1. FLASH 2 Overview 1.Layout parameters 2. Operation FLASH2. 1.Lasing at wavelengths between
More informationNew Tracking Gantry-Synchrotron Idea. G H Rees, ASTeC, RAL, U.K,
New Tracking Gantry-Synchrotron Idea G H Rees, ASTeC, RAL, U.K, Scheme makes use of the following: simple synchrotron and gantry magnet lattices series connection of magnets for 5 Hz tracking one main
More informationStatus of the 1.5 GeV Synchrotron Light Source DELTA and Related Accelerator Physics Activities
Status of the 1.5 GeV Synchrotron Light Source and Related Accelerator Physics Activities 2006 RuPAC, September 10-14, Novosibirsk Thomas Weis for the machine and accelerator physics group Dortmund University
More informationUndulator K-Parameter Measurements at LCLS
Undulator K-Parameter Measurements at LCLS J. Welch, A. Brachmann, F-J. Decker, Y. Ding, P. Emma, A. Fisher, J. Frisch, Z. Huang, R. Iverson, H. Loos, H-D. Nuhn, P. Stefan, D. Ratner, J. Turner, J. Wu,
More informationA GENERAL VIEW OF IDs TO BE INSTALLED AT ALBA FOR SECOND AND THIRD PHASE BEAM-LINES
ACDIV-2015-09 July, 2015 A GENERAL VIEW OF IDs TO BE INSTALLED AT ALBA FOR SECOND AND THIRD PHASE BEAM-LINES Josep Campmany, Josep Nicolás, Jordi Juanhuix, Jordi Marcos and Valentí Massana CELLS-ALBA Synchrotron,
More informationRotating Coil Measurement Errors*
Rotating Coil Measurement Errors* Animesh Jain Superconducting Magnet Division Brookhaven National Laboratory, Upton, NY 11973, USA 2 nd Workshop on Beam Dynamics Meets Magnets (BeMa2014) December 1-4,
More informationSUPERCONDUCTING GANTRY AND OTHER DEVELOPMENTS AT HIMAC
SUPERCONDUCTING GANTRY AND OTHER DEVELOPMENTS AT HIMAC Y. Iwata *, K. Noda, T. Shirai, T. Murakami, T. Fujita, T. Furukawa, K. Mizushima, Y. Hara, S. Suzuki, S. Sato, and K. Shouda, NIRS, 4-9-1 Anagawa,
More informationCheck the LCLS Project website to verify 2 of 7 that this is the correct version prior to use.
1. Introduction: The XTOD Offset System (OMS) is designed to direct the LCLS FEL beam to the instruments and experimental stations, while substantially reducing the flux of unwanted radiation which accompanies
More informationPrecision RF Beam Position Monitors for Measuring Beam Position and Tilt Progress Report
Precision RF Beam Position Monitors for Measuring Beam Position and Tilt Progress Report UC Berkeley Senior Personnel Yury G. Kolomensky Collaborating Institutions Stanford Linear Accelerator Center: Marc
More informationEFFECTS OF FRINGE FIELDS AND INSERTION DEVICES REVEALED THROUGH EXPERIMENTAL FREQUENCY MAP ANALYSIS*
EFFECTS OF FRINGE FIELDS AND INSERTION DEVICES REVEALED THROUGH EXPERIMENTAL FREQUENCY MAP ANALYSIS* P. Kuske, BESSY, Berlin, Germany Abstract Following the pioneering work at the ALS [1] frequency map
More informationBeam Loss Monitoring (BLM) System for ESS
Beam Loss Monitoring (BLM) System for ESS Lali Tchelidze European Spallation Source ESS AB lali.tchelidze@esss.se March 2, 2011 Outline 1. BLM Types; 2. BLM Positioning and Calibration; 3. BLMs as part
More informationRF Design of Normal Conducting Deflecting Cavity
RF Design of Normal Conducting Deflecting Cavity Valery Dolgashev (SLAC), Geoff Waldschmidt, Ali Nassiri (Argonne National Laboratory, Advanced Photon Source) 48th ICFA Advanced Beam Dynamics Workshop
More information12 GeV Upgrade Project DESIGN SOLUTIONS DOCUMENT. Upgrade Hall A
12 GeV Upgrade Project DESIGN SOLUTIONS DOCUMENT Upgrade Hall A Version 1.2 July 28, 2010 DESIGN SOLUTIONS DOCUMENT Upgrade Hall A APPROVALS Approved by: 12 GeV Upgrade Control Account Manager, Hall A
More informationELECTRON BEAM DIAGNOSTICS AND FEEDBACK FOR THE LCLS-II*
THB04 Proceedings of FEL2014, Basel, Switzerland ELECTRON BEAM DIAGNOSTICS AND FEEDBACK FOR THE LCLS-II* Josef Frisch, Paul Emma, Alan Fisher, Patrick Krejcik, Henrik Loos, Timothy Maxwell, Tor Raubenheimer,
More informationLattice Design for PRISM-FFAG. A. Sato Osaka University for the PRISM working group
Lattice Design for PRISM-FFAG A. Sato Osaka University for the PRISM working group contents PRISM overview PRISM-FFAG dynamics study & its method PRISM Phase Rotated Intense Slow Muon source Anticipated
More informationCTPPS Detector Performance
CTPPS Detector Performance Run 2016 Data summary SiStrips Performance Data Quality Radiation Damage Alignment Optics Validation Acceptance Diamond Performance Data Quality Data consistency checks Run 2017
More informationDesign and performance of the vacuum chambers for the undulator of the VUV FEL at the TESLA test facility at DESY
Nuclear Instruments and Methods in Physics Research A 445 (2000) 442}447 Design and performance of the vacuum chambers for the undulator of the VUV FEL at the TESLA test facility at DESY U. Hahn *, P.K.
More informationEMMA the World's First Non-Scaling FFAG Accelerator
EMMA the World's First Non-Scaling FFAG Accelerator Susan Smith STFC Daresbury Laboratory CONTENTS Introduction Contents What are ns-ffags? and Why EMMA? The international collaboration EMMA goals and
More informationProduction Measurements of Magnets for the NSLS-II Storage Ring*
Production Measurements of Magnets for the NSLS-II Storage Ring* Animesh Jain Superconducting Magnet Division Brookhaven National Laboratory, Upton, NY 11973 17 th International Magnetic Measurement Workshop
More informationAn Overview of MAX IV Insertion Devices & Magnetic Measurement System. Hamed Tarawneh On behalf of Insertion Devices Team
An Overview of MAX IV Insertion Devices & Magnetic Measurement System Hamed Tarawneh On behalf of Insertion Devices Team MAX IV IDs & MagLab 1 Outlook: MAX IV Facility. ID Magnet Lab @ MAX IV. IDs @ 3
More informationFIRST INDIRECT X-RAY IMAGING TESTS WITH AN 88-mm DIAMETER SINGLE CRYSTAL
FERMILAB-CONF-16-641-AD-E ACCEPTED FIRST INDIRECT X-RAY IMAGING TESTS WITH AN 88-mm DIAMETER SINGLE CRYSTAL A.H. Lumpkin 1 and A.T. Macrander 2 1 Fermi National Accelerator Laboratory, Batavia, IL 60510
More informationHall C Polarimetry at 12 GeV Dave Gaskell Hall C Users Meeting January 14, 2012
Hall C Polarimetry at 12 GeV Dave Gaskell Hall C Users Meeting January 14, 2012 1. Møller Polarimeter 2. Compton Polarimeter Hall C 12 GeV Polarimetry Møller Polarimeter 6 GeV operation: uses 2 quads to
More informationOPERATION OF A SINGLE PASS, BUNCH-BY-BUNCH X-RAY BEAM SIZE MONITOR FOR THE CESR TEST ACCELERATOR RESEARCH PROGRAM*
OPERATION OF A SINGLE PASS, BUNCH-BY-BUNCH X-RAY BEAM SIZE MONITOR FOR THE CESR TEST ACCELERATOR RESEARCH PROGRAM* N.T. Rider, M. G. Billing, M.P. Ehrlichman, D.P. Peterson, D. Rubin, J.P. Shanks, K. G.
More informationUpper limit of the electron beam energy at the CEBAF 2D injector spectrometer and its functionality
Upper limit of the electron beam energy at the CEBAF 2D injector spectrometer and its functionality Jonathan Dumas 1,2, Joe Grames 2, Eric Voutier 1 December 16, 28 JLAB-TN-8-86 1 Laboratoire de Physique
More informationAngular Drift of CrystalTech (1064nm, 80MHz) AOMs due to Thermal Transients. Alex Piggott
Angular Drift of CrystalTech 38 197 (164nm, 8MHz) AOMs due to Thermal Transients Alex Piggott July 5, 21 1 .1 General Overview of Findings The AOM was found to exhibit significant thermal drift effects,
More informationVibrating Wire R&D for Alignment of Multipole Magnets in NSLS-II
Vibrating Wire R&D for Alignment of Multipole Magnets in NSLS-II 10 th International Workshop on Accelerator Alignment February 11-15, 2008, Tsukuba, Japan Animesh Jain for the NSLS-II magnet team Collaborators
More informationCOMMISSIONING STATUS AND FURTHER DEVELOPMENT OF THE NOVOSIBIRSK MULTITURN ERL*
COMMISSIONING STATUS AND FURTHER DEVELOPMENT OF THE NOVOSIBIRSK MULTITURN ERL* O.A.Shevchenko #, V.S.Arbuzov, E.N.Dementyev, B.A.Dovzhenko, Ya.V.Getmanov, E.I.Gorniker, B.A.Knyazev, E.I.Kolobanov, A.A.Kondakov,
More informationInitial Beam Phasing of the SRF Cavities in LCLS-II
Introduction Initial Beam Phasing of the SRF Cavities in LCLS-II P. Emma Nov. 28, 2016 One of the more challenging aspects of commissioning the LCLS-II accelerator is in the initial phasing of the SRF
More informationA Superconducting Helical Undulator-Based FEL Prototype Cryomodule
A Superconducting Helical Undulator-Based FEL Prototype Cryomodule E. Gluskin PI, APS/ANL P. Emma Co-PI, SLAC, Y. Ivanyushenkov Co-PI, APS/ANL Sep. 19, 2016 1. Introduction and Motivation Undulators serve
More informationExperiences of the QSBPM System on MAX II
Experiences of the QSBPM System on MAX II Peter Röjsel MAX-lab, Lund University, Lund, Sweden Abstract. The MAX II is a third-generation synchrotron radiation source. The first beamline is in operation
More informationTest Results using Iris and Airy Disc for the BPM Alignment of SCSS (SPring-8 Compact SASE Source) Prototype Accelerator
Test Results using Iris and Airy Disc for the BM Alignment of SCSS (Sring-8 Compact SASE Source) rototype Accelerator S. Matsui, C.Zhang, M.Yabshi, S.Goto,.Kimura JASRI (Japan Synchrotron Radiation Research
More informationSupplementary Information
Supplementary Information Supplementary Figure 1. Modal simulation and frequency response of a high- frequency (75- khz) MEMS. a, Modal frequency of the device was simulated using Coventorware and shows
More informationBPM, Wire-Scanner, OTR/YAG Screens, and Collimator Polarity Conventions
BPM, Wire-Scanner, OTR/YAG Screens, and Collimator Polarit Conventions Beam Position Monitors (BPMs) The Beam Position Monitors (BPMs) in the beamline are used to measure transverse ( and ) electron beam
More informationSub-ps (and sub-micrometer) developments at ELETTRA
Sub-ps (and sub-micrometer) developments at ELETTRA Mario Ferianis SINCROTRONE TRIESTE, Italy The ELETTRA laboratory ELETTRA is a 3 rd generation synchrotron light source in Trieste (I) since 1993 up to
More informationLHC MAGNET POLARITIES
CEN CH-1211 Geneva 23 Switzerland the Large Hadron Collider project 9LHC Project Document No. CEN Div./Group or Supplier/Contractor Document No. AB/CO, LHC/TCP, AT/MEL EDMS Document No. 90041 Date: 2005-08-09
More informationRESEARCH DEVELOPMENT OF VIBRATING WIRE ALIGNMENT TECHNIQUE FOR HEPS
RESEARCH DEVELOPMENT OF VIBRATING WIRE ALIGNMENT TECHNIQUE FOR HEPS WU Lei,WANG Xiaolong, LI Chunhua, QU Huamin IHEP,CAS.19B Yuanquan Road,Shijingshan District,Beijing,100049 Abstract The alignment tolerance
More informationOperation of a Single Pass, Bunch-by-bunch x-ray Beam Size Monitor for the CESR Test Accelerator Research Program. October 3, 2012
Operation of a Single Pass, Bunch-by-bunch x-ray Beam Size Monitor for the CESR Test Accelerator Research Program October 3, 2012 Goals Goals For This Presentation: 1.Provide an overview of the efforts
More informationTECHNICAL CHALLENGES OF THE LCLS-II CW X-RAY FEL *
TECHNICAL CHALLENGES OF THE LCLS-II CW X-RAY FEL * T.O. Raubenheimer # for the LCLS-II Collaboration, SLAC, Menlo Park, CA 94025, USA Abstract The LCLS-II will be a CW X-ray FEL upgrade to the existing
More informationFeedback Requirements for SASE FELS. Henrik Loos, SLAC IPAC 2010, Kyoto, Japan
Feedback Requirements for SASE FELS Henrik Loos, SLAC, Kyoto, Japan 1 1 Henrik Loos Outline Stability requirements for SASE FELs Diagnostics for beam parameters Transverse: Beam position monitors Longitudinal:
More informationSIGNAL ELECTRIC FIELD MAGNETIC FIELD # 1 (#2) #3 (# 4) WAVEGUIDE VACUUM CHAMBER BEAM PIPE VACUUM CHAMBER
New Microwave Beam Position Monitors for the TESLA Test Facility FEL T. Kamps and R. Lorenz DESY Zeuthen, Platanenallee 6, D-15738 Zeuthen Abstract. Beam-based alignment is essential for the operation
More informationLCLS UNDULATOR COMMISSIONING, ALIGNMENT, AND PERFORMANCE *
LCLS UNDULATOR COMMISSIONING, ALIGNMENT, AND PERFORMANCE * H.-D. Nuhn # for the LCLS Commissioning Team, SLAC National Accelerator Laboratory, Stanford, CA 94309, U.S.A. Abstract The LCLS x-ray FEL has
More informationHIGH MAGNETIC FIELD SUPERCONDUCTING MAGNETS FABRICATED IN BUDKER INP FOR SR GENERATION
HIGH MAGNETIC FIELD SUPERCONDUCTING MAGNETS FABRICATED IN BUDKER INP FOR SR GENERATION K.V. Zolotarev *, A.M. Batrakov, S.V. Khruschev, G.N. Kulipanov, V.H. Lev, N.A. Mezentsev, E.G. Miginsky, V.A. Shkaruba,
More informationElectron Cloud Mitigation Investigations at CesrTA
Electron Cloud Mitigation Investigations at CesrTA Joseph Calvey 8/9/2010 Introduction The density and distribution of the electron cloud can depend strongly on several parameters that can vary substantially
More informationDiamond X-ray Rocking Curve and Topograph Measurements at CHESS
Diamond X-ray Rocking Curve and Topograph Measurements at CHESS G. Yang 1, R.T. Jones 2, F. Klein 3 1 Department of Physics and Astronomy, University of Glasgow, Glasgow, UK G12 8QQ. 2 University of Connecticut
More informationION PRODUCTION AND RF GENERATION IN THE DARHT-II BEAM DUMP
ION PRODUCTION AND RF GENERATION IN THE DARHT-II BEAM DUMP M. E. Schulze, C.A. Ekdahl Los Alamos National Laboratory, Los Alamos, NM 87545, USA T.P. Hughes, C. Thoma Voss Scientific LLC, Albuquerque, NM
More informationMagnet Stability (and Reproducibility).
Magnet Stability (and Reproducibility). Neil Marks, ASTeC, STFC, Daresbury Laboratory, & U. of Liverpool, The Cockcroft Institute, Daresbury, Warrington WA4 4AD, U.K. n.marks@dl.ac.uk With advice and/or
More informationNano Beam Position Monitor
Introduction Transparent X-ray beam monitoring and imaging is a new enabling technology that will become the gold standard tool for beam characterisation at synchrotron radiation facilities. It allows
More informationTransverse Wakefields and Alignment of the LCLS-II Kicker and Septum Magnets
Transverse Wakefields and Alignment of the LCLS-II Kicker and Septum Magnets LCLS-II TN-16-13 12/12/2016 P. Emma, J. Amann,K. Bane, Y. Nosochkov, M. Woodley December 12, 2016 LCLSII-TN-XXXX 1 Introduction
More informationStatus of the PRad Experiment (E )
Status of the PRad Experiment (E12-11-106) NC A&T State University Outline Experimental apparatus, current status Installation plan Draft run plan Summary PRad Experimental Setup Main detectors and elements:
More informationMAGNETIZED IRON MUON SffiELDS. R. H. March University of Wisconsin ABSTRACT
-1- SS-8 2271 MAGNETZED RON MUON SffiELDS R. H. March University of Wisconsin ABSTRACT A magnetic shield in the form of a gapless "B" magnet of length 6 to 1 0 meters is proposed as a muon shield as an
More informationDesign of Photon Beamlines at the European XFEL
Design of Photon Beamlines at the European XFEL Harald Sinn (THOCI1) FEL 2010 Malmö August 26, 2010 Construction progress at the European XFEL www.xfel.eu Experimental Hall in Schenefeld Injector building
More informationCEBAF Overview June 4, 2010
CEBAF Overview June 4, 2010 Yan Wang Deputy Group Leader of the Operations Group Outline CEBAF Timeline Machine Overview Injector Linear Accelerators Recirculation Arcs Extraction Systems Beam Specifications
More informationAdvanced Photon Source Monopulse rf Beam Position Monitor Front-End Upgrade*
Advanced Phon Source Monopulse rf Beam Position Monir Front-End Upgrade* Robert M. Lill and Glenn A. Decker Advanced Phon Source, Argonne National Laborary 9700 South Cass Avenue, Argonne, Illinois 60439
More informationDESIGN AND BEAM DYNAMICS STUDIES OF A MULTI-ION LINAC INJECTOR FOR THE JLEIC ION COMPLEX
DESIGN AND BEAM DYNAMICS STUDIES OF A MULTI-ION LINAC INJECTOR FOR THE JLEIC ION COMPLEX Speaker: P.N. Ostroumov Contributors: A. Plastun, B. Mustapha and Z. Conway HB2016, July 7, 2016, Malmö, Sweden
More informationStretched Wire Test Setup 1)
LCLS-TN-05-7 First Measurements and Results With a Stretched Wire Test Setup 1) Franz Peters, Georg Gassner, Robert Ruland February 2005 SLAC Abstract A stretched wire test setup 2) has been implemented
More informationA Prototype Wire Position Monitoring System
LCLS-TN-05-27 A Prototype Wire Position Monitoring System Wei Wang and Zachary Wolf Metrology Department, SLAC 1. INTRODUCTION ¹ The Wire Position Monitoring System (WPM) will track changes in the transverse
More informationProgress of the A P S High Heat Load X-ray Beam Position Monitor Development
Progress of the A P S High Heat Load X-ray Beam Position Monitor Development Deming Shu, Juan B m a z a, Hai Ding, Tuncer M Kuzay, and Mohan Rammathan Experimenta Faciities Division Advanced Photon Source
More informationDesign of the magnets for the MAX IV project. Martin Johansson, Beam Dynamics meets Magnets-II workshop, Bad Zurzach, Dec.
Design of the magnets for the MAX IV project Martin Johansson, Beam Dynamics meets Magnets-II workshop, Bad Zurzach, 01-04 Dec. 2014 MAX IV 3 GeV ring magnets key aspects: Relatively small magnet aperture
More information