1 PV TOOLKIT OCUMENT #3 Planning and Building Services Solar PV Standard Plan Simplified Central/String Inverter Systems (One and TwoFamily wellings) SCOPE: Use this plan ONLY for utilityinteractive central/string inverter systems not exceeding a system AC inverter output rating of 10kW on the roof of a one or twofamily dwelling or accessory structure. The photovoltaic system must interconnect to the load side of a singlephase AC service panel of nominal 120/20Vac with a bus bar rating of 22A or less. This plan is not intended for bipolar systems, hybrid systems or systems that utilize storage batteries, charge controllers, trackers, more than two inverters or more than one C combiner (noninverterintegrated) per inverter. Systems must be in compliance with current California Building Standards Codes and local amendments of the authority having jurisdiction (AHJ). Other Articles of the California Electrical Code (CEC) shall apply as specified in MANUFACTURER S SPECIFICATION SHEETS MUST BE PROVIE for proposed inverter, modules, combiner/junction boxes and racking systems. Installation instructions for bonding and grounding equipment shall be provided, and local AHJs may require additional details. Listed and labeled equipment shall be installed and used in accordance with any instructions included in the listing or labeling (CEC 110.3). Equipment intended for use with PV system shall be identified and listed for the application (CEC 90.[]). Job Address: Permit#: Contractor/Engineer Name: License #: Signature: ate: Phone #: Total # of Inverters installed: (If more than one inverter, complete and attach the Supplemental Calculation Sheets and the Load Center Calculations if a new load center is to be used.) Inverter 1 AC Output Power Rating: Inverter 2 AC Output Power Rating (if applicable): Combined Inverter Output Power Rating: Watts Watts 10,000 Watts Location Ambient Temperatures (Check box next to which lowest expected temperature is used): 1) Lowest expected ambient temperature for the location (TL ) = Between 1 to C Lowest expected ambient temperature for the location (TL ) = Between to 10 C Average ambient high temperature (TH) = 7 C Note: For a lower TL or a higher TH, use the Comprehensive Standard Plan C Information: Module Manufacturer: Model: 2) Module V oc (from module nameplate): Volts 3) Module I sc (from module nameplate): Amps ) Module C output power under standard test conditions (STC) = Watts (STC) ) C Module Layout Identify each source circuit (string) for inverter 1 shown on the roof plan with a Tag (e.g. A,B,C, ) Number of modules per source circuit for inverter 1 Identify, by tag, which source circuits on the roof are to be paralleled (if none, put N/A) Combiner 1: Total number of source circuits for inverter 1: PV #3201 Standard Plan, Simplified Central/String Inverter Systems

2 ) Are C/C Converters used? Yes No If No, skip to Step 7. If Yes enter info below. C/C Converter Model #: Max C Output Current: Amps Max # of C/C Converters in an Input Circuit: C/C Converter Max C Input Voltage: C Output Current: Converter Max C Input Power: Watts Volts Max Volts C/C 7) Maximum System C Voltage Use A1 or A2 for systems without C/C converters, and B1 or B2 with C/C Converters. A1. Module VOC (STEP 2) = x # in series (STEP ) x 1.12 (If 1 TL C, STEP 1) = V A2. Module VOC (STEP 2) = x # in series (STEP ) x 1.1 (If TL 10 C, STEP 1) = V Table 1. Maximum Number of PV Modules in Series Based on Module Rated VOC for 00 Vdc Rated Equipment (CEC 90.7) Max. Rated Module VOC (*1.12) Max. Rated Module VOC (*1.1) Max # of Modules for 00 Vdc Use for C/C converters. The value calculated below must be less than C/C converter max C input voltage (STEP ). B1. Module VOC (STEP 2) = x # of modules per converter (STEP ) x 1.12 (If 1 TL C, STEP 1) = V B2. Module VOC (STEP 2) = x # of modules per converter (STEP ) x 1.1 (If TL 10 C, STEP 1) = V Table 2. Largest Module VOC for SingleModule C/C Converter Configurations (with 0 V AFCI Cap) (CEC 90.7 and 90.11) Max. Rated Module VOC (*1.12) Max. Rated Module VOC (*1.1) C/C Converter Max C Input (Step #) ) Maximum System C Voltage from C/C Converters to Inverter Only required if Yes in Step Maximum System C Voltage = Volts 9) Maximum Source Circuit Current Is Module ISC below 9. Amps (Step 3)? Yes No (If No, use Comprehensive Standard Plan) 10) Sizing Source Circuit Conductors Source Circuit Conductor Size = Min. #10 AWG copper conductor, 90 C wet (USE2, PV Wire, XHHW2, THWN2, RHW2) For up to conductors in roofmounted conduit exposed to sunlight at least ½ from the roof covering (CEC 310) Note: For over conductors in the conduit or mounting height of lower than ½ from the roof, use Comprehensive Plan. 11) Are PV source circuits combined prior to the inverter? Yes No If No, use Single Line iagram 1 and proceed to Step 13. If Yes, use Single Line iagram 2 with Single Line iagram and proceed to Step 12. Is source circuit OCP required? Yes No Source circuit OCP size (if needed): 1 Amps 12) Sizing PV Output Circuit Conductors If a combiner box will NOT be used (Step 11), Output Circuit Conductor Size = Min. # AWG copper conductor 13) Inverter C isconnect oes the inverter have an integrated C disconnect? Yes No If Yes, proceed to step 1. If No, the external C disconnect to be installed is rated for Amps (C) and Volts (C) PV #3201 Standard Plan, Simplified Central/String Inverter Systems

3 1) Inverter Information Manufacturer: Model: Max. Continuous AC Output Current Rating: Amps Integrated C ArcFault Circuit Protection? Yes No (If No is selected, Comprehensive Standard Plan) Grounded or Ungrounded System? Grounded Ungrounded AC Information: 1) Sizing Inverter Output Circuit Conductors and OCP Inverter Output OCP rating = Amps (Table 3) Inverter Output Circuit Conductor Size = AWG (Table 3) Table 3. Minimum Inverter Output OCP and Circuit Conductor Size Inverter Continuous Output Current Rating (Amps) (Step 1) Minimum OCP Size (Amps) Minimum Conductor Size (AWG, 7 C, Copper) ) Point of Connection to Utility Only load side connections are permitted with this plan. Otherwise, use Comprehensive Standard Plan. Is the PV OCP positioned at the opposite end from input feeder location or main OCP location? Yes No If Yes, circle the Max Combined PV System OCP(s) at 120% value as determined from Step 1 (or Step S20), bus bar Rating, and Main OCP as shown in Table. If No, circle the Max Combined PV System OCP(s) at 100% value as determined from Step 1 (or Step S20), bus bar Rating, and Main OCP as shown in Table. Per 70.12()(2): [Inverter output OCP size [Step #1 or S20] Main OCP Size] [bus size x (100% or 120%)] Table. Maximum Combined Supply OCPs Based on Bus Bar Rating (Amps) per CEC 70.12()(2) Max Combined PV System OCP(s) at 120% of Bus Bar Rating Bus Bar Rating Main OCP * 0* 0 0* 0* Max Combined PV System OCP(s) at 100% Bus Bar Rating *This value has been lowered to 0 A from the calculated value to reflect 10 kw AC size maximum. Reduction of the main breaker is not permitted with this plan. Otherwise, use Comprehensive Standard Plan. 17 & 1 & 19) Labels and Grounding and Bonding This content is covered by the labels on the next page and the Single Line iagram(s). For background information, refer to the Comprehensive Standard Plan. PV #3201 Standard Plan, Simplified Central/String Inverter Systems

4 Solar PV Standard Plan Simplified Central/String Inverter Systems for One and TwoFamily wellings Markings CEC Articles 90 and 70 and CRC Section R331 require the following labels or markings be installed at these components of the photovoltaic system: WARNING OUTPUT CONNECTION; O NOT RELOCATE THIS OVERCURRENT EVICE CEC 70.12()(7) [Not required if panelboard is rated not less than sum of ampere ratings of all overcurrent devices supplying it] WARNING ELECTRIC SHOCK HAZAR. THE C CONUCTORS OF THIS PHOTOVOLTAIC SYSTEM ARE UNGROUNE AN MAY BE ENERGIZE CEC 90.3(F) [Only required for ungrounded systems] WARNING: PHOTOVOLTAIC POWER SOURCE M A C WARNING UAL POWER SOURCES SECON SOURCE IS PHOTOVOLTAIC SYSTEM RATE AC OUTPUT CURRENT AMPS AC NORMAL OPERATING VOLTAGE VOLTS CEC 90. & CEC 70.12()() PV SYSTEM AC ISCONNECT RATE AC OUTPUT CURRENT AMPS AC NORMAL OPERATING VOLTAGE VOLTS CEC 90. WARNING ELECTRIC SHOCK HAZAR IF A GROUN FAULT IS INICATE, NORMALLY GROUNE CONUCTORS MAY BE UNGROUNE AN ENERGIZE CEC 90.(C) [Normally already present on listed inverters] CRC R331.2 and CFC [Marked on junction/combiner boxes and conduit every 10 ] Code Abbreviations: California Electrical Code (CEC) California Residential Code (CRC) California Fire Code (CFC) J/Box C WARNING ELECTRIC SHOCK HAZAR O NOT TOUCH TERMINALS TERMINALS ON BOTH LINE AN LOA SIES MAY BE ENERGIZE IN THE OPEN POSITION CEC PV SYSTEM C ISCONNECT RATE MAX POWERPOINT CURRENT AC RATE MAX POWERPOINT VOLTAGE VC SHORT CIRCUIT CURRENT AC MAXIMUM SYSTEM VOLTAGE VC CEC 90.3 Informational note: ANSI Z3. provides guidelines for the design of safety signs and labels for application to products. A phenolic plaque with contrasting colors between the text and background would meet the intent of the code for permanency. No type size is specified, but 20 point (3/ ) should be considered the minimum. CEC requires a permanent plaque or directory denoting all electric power sources on or in the premises. PV #3201 Standard Plan, Simplified Central/String Inverter Systems

5 Solar PV Standard Plan Simplified Central/String Inverter System for One and TwoFamily wellings TA ESCRIPTION SOLAR PV MOULE / STRING C/C CONVERTERS INSTALLE? YES / NO (IF YES, STEPS & REQUIRE) SOURCE CIRCUIT JUNCTION BOX INSTALLE?: YES / NO SEPARATE C ISCONNECT INSTALLE?: YES / NO INTERNAL C ISCONNECT: YES / NO CENTRAL LOA CENTER INSTALLE?: YES / NO PV PROUCTION METER INSTALLE?: YES / NO *SEPARATE AC ISCONNECT INSTALLE?: YES / NO CONNECT TO #2 (USE LINE IAGRAM 2) * /onsult with your local AIJ and /or Utility SINGLELINE IAGRAM #1 NO STRINGS COMBINE PRIOR TO /IE/Y A BOX COR WIETIER SYSTEM LS ROUNE OR UNROUNE: ROUNE (LN/LUE E/) UNROUNE COR UNROUNE SYSTEMS: / O/P MUST LS/ONNE/T BOTI /ONU/TORS OC EA/I SOUR/E /LR/ULT UNROUNE /ONU/TORS MUST BE LENTLCLE PER 210.(/). WILTECLNLSIE /ONU/TORS ARE NOT PERMLTTE A/ / /B 1 M 9 MALN SERVL/E PANEL PV O/P M MALN O/P /B 2 A B / 10 LC /// /ONVERTERS ARE USE, /IE/Y TIE BOX BELOW TIE /ORRESPONLN /ONCLURATLON /ONU/TOR//ONULT S/IEULE TA ES/RLPTLON AN /ONU/TOR TYPE /ONU/TOR NUMBER OC SLZE /ONU/TORS A USE2 OR PVWLRE B / /ONULT//ABLE TYPE /ONULT SLZE ENTER N/A WIERE SULTABLE COR WIEN NOT USLN /ONULT OR /ABLE AS PERMLTTE BY /OE /// /ONVERTERS PARALLEL /// /ONVERTERS ON ONE SOUR/E /LR/ULT (CLXE UNLT VOLTAE /// /ONVERTERS) /// /ONVERTERS /// /ONVERTERS ARE ALL RUN LN SERLES (CLXE SOUR/E /LR/ULT VOLTAE /// /ONVERTERS) PV #3201 Standard Plan, Simplified Central/String Inverter Systems

6 Solar PV Standard Plan Simplified Central/String Inverter System for One and TwoFamily wellings TA ESCRIPTION SOLAR PV MOULE / STRING C/C CONVERTERS INSTALLE? YES / NO (IF YES, STEPS & REQUIRE) SOURCE CIRCUIT JUNCTION BOX INSTALLE?: YES / NO COMBINER BOX (STEPS 11 & 12 REQUIRE) SEPARATE C ISCONNECT INSTALLE?: YES / NO INTERNAL C ISCONNECT: YES / NO CENTRAL LOA CENTER INSTALLE?: YES / NO PV PROUCTION METER INSTALLE?: YES / NO *SEPARATE AC ISCONNECT INSTALLE?: YES / NO CONNECT TO #2 (USE LINE IAGRAM ) * /onsult with your local AIJ and /or Utility SINGLELINE IAGRAM #2 COMBINING STRINGS PRIOR TO /IE/Y A BOX COR WIETIER SYSTEM LS ROUNE OR UNROUNE: ROUNE (LN/LUE E/) UNROUNE COR UNROUNE SYSTEMS: / O/P MUST LS/ONNE/T BOTI /ONU/TORS OC EA/I SOUR/E /LR/ULT UNROUNE /ONU/TORS MUST BE LENTLCLE PER 210.(/). WILTECLNLSIE /ONU/TORS ARE NOT PERMLTTE. MALN SERVL/E PANEL M A/ / /B 1 9 M 10 PV O/P MALN O/P A1 B1 / /B 2 11 E A2 /OMBLNER /ONU/TOR//ONULT S/IEULE TA ES/RLPTLON AN /ONU/TOR NUMBER OC /ONULT//ABLE /ONU/TOR TYPE SLZE /ONU/TORS TYPE A1 USE2 OR PVWLRE B1 / E B2 /ONULT SLZE NON/OMBLNE STRLNS /ONU/TOR//ONULT S/IEULE (LC APPLL/ABLE) TA ES/RLPTLON AN /ONU/TOR NUMBER OC /ONULT//ABLE /ONULT SLZE /ONU/TOR TYPE SLZE /ONU/TORS TYPE A2 USE2 OR PVWLRE B2 ENTER N/A WIERE SULTABLE COR WIEN NOT USLN /ONULT OR /ABLE AS PERMLTTE BY /OE /// /ONVERTERS LC /// /ONVERTERS ARE USE, TIEY ARE RUN LN SERLES (CLXE SOUR/E /LR/ULT VOLTAE /// /ONVERTERS) PV #3201 Standard Plan, Simplified Central/String Inverter Systems

7 Supplemental Calculation Sheets for Inverter #2 (Only include if second inverter is used) C Information: Module Manufacturer: S2) Module Voc (from module nameplate): Volts Model: S3) Module Isc (from module nameplate): Amps S) Module C output power under standard test conditions (STC) = Watts (STC) S) C Module Layout Identify each source circuit (string) for inverter 1 shown on the roof plan with a Tag (e.g. A,B,C, ) Number of modules per source circuit for inverter 1 Identify, by tag, which source circuits on the roof are to be paralleled (if none, put N/A) Combiner 1: Combiner 2: Total number of source circuits for inverter 1: S) Are C/C Converters used? Yes No If No, skip to Step S7. If Yes, enter info below. C/C Converter Model #: Max C Output Current: Amps Max # of C/C Converters in an Input Circuit: C/C Converter Max C Input Voltage: Max C Output Current: C/C Converter Max C Input Power: Volts Volts Watts PV #3201 Standard Plan, Simplified Central/String Inverter Systems

8 S7) Maximum System C Voltage Use A1 or A2 for systems without C/C converters, and B1 or B2 with C/C Converters. A1. Module VOC (STEP S2) = x # in series (STEP S) x 1.12 (If 1 TL C, STEP S1) = V A2. Module VOC (STEP S2) = x # in series (STEP S) x 1.1 (If TL 10 C, STEP S1) = V Table 1. Maximum Number of PV Modules in Series Based on Module Rated V OC for 00 Vdc Rated Equipment (CEC 90.7) Max. Rated Module V OC (*1.12) Max. Rated Module V OC (*1.1) Max # of Modules for 00 Vdc Use for C/C converters. The value calculated below must be less than C/C converter max C input voltage (STEP S). B1. Module VOC (STEP S2) = x # of modules per converter (STEP S) x 1.12 (If 1 TL C, STEP S1) = V B2. Module VOC (STEP S2) = x # of modules per converter (STEP S) x 1.1 (If TL 10 C, STEP S1) = V Table 2. Largest Module V OC for SingleModule C/C Converter Configurations (with 0 V AFCI Cap) (CEC 90.7 and 90.11) Max. Rated Module V OC (*1.12) Max. Rated Module V OC (*1.1) C/C Converter Max C Input (Step ) S) Maximum System C Voltage from C/C Converters to Inverter Only required if Yes in Step S Maximum System C Voltage = Volts S9) Maximum Source Circuit Current Is Module ISC below 9. Amps (Step S3)? Yes No (If No, use Comprehensive Standard Plan) S10) Sizing Source Circuit Conductors Source Circuit Conductor Size = Min. #10 AWG copper conductor, 90 C wet (USE2, PV Wire, XHHW2, THWN2, RHW2) For up to conductors in roofmounted conduit exposed to sunlight at least ½ from the roof covering (CEC 310) Note: For over conductors in the conduit or mounting height of lower than ½ from the roof, use Comprehensive Plan. S11) Are PV source circuits combined prior to the inverter? Yes No If No, use Single Line iagram 1 and proceed to Step S13. If Yes, use Single Line iagram 2 with Single Line iagram and proceed to Step S12. Is source circuit OCP required? Yes No Source circuit OCP size (if needed): 1 Amps S12) Sizing PV Output Circuit Conductors If a combiner box will NOT be used (Step S11), Output Circuit Conductor Size = Min. # AWG copper conductor S13) Inverter C isconnect oes the inverter have an integrated C disconnect? Yes No If Yes, proceed to Step S1. If No, the external C disconnect to be installed is rated for Amps (C) and Volts (C) S1) Inverter Information Manufacturer: Model: Max. Continuous AC Output Current Rating: Amps Integrated C ArcFault Circuit Protection? Yes No (If No is selected, Comprehensive Standard Plan) Grounded or Ungrounded System? Grounded Ungrounded PV #3201 Standard Plan, Simplified Central/String Inverter Systems

9 AC Information: S1) Sizing Inverter Output Circuit Conductors and OCP Inverter Output OCP rating = Amps (Table 3) Inverter Output Circuit Conductor Size = AWG (Table 3) Table 3. Minimum Inverter Output OCP and Circuit Conductor Size Inverter Continuous Output Current Rating (Amps) (Step 1) Minimum OCP Size (Amps) Minimum Conductor Size (AWG, 7 C, Copper) Load Center Calculations (Omit if a load center will not be installed for PV OCPs) S20) Load Center Output: Calculate the sum of the maximum AC outputs from each inverter. Inverter #1 Max Continuous AC Output Current Rating [STEP S1] 1.2 = Amps Inverter #2 Max Continuous AC Output Current Rating [STEP S1] 1.2 = Amps Total inverter currents connected to load center (sum of above) = Amps Conductor Size: AWG Overcurrent Protection evice: Amps Load center bus bar rating: Amps The sum of the ampere ratings of overcurrent devices in circuits supplying power to a bus bar or conductor shall not exceed 120 percent of the rating of the bus bar or conductor. PV #3201 Standard Plan, Simplified Central/String Inverter Systems

10 Solar PV Standard Plan Simplified Central/String Inverter System for One and TwoFamily wellings TA ESCRIPTION SOLAR PV MOULE / STRING C/C CONVERTERS INSTALLE? YES / NO (IF YES, STEPS & REQUIRE) SOURCE CIRCUIT JUNCTION BOX INSTALLE?: YES / NO SEPARATE C ISCONNECT INSTALLE?: YES / NO INTERNAL C ISCONNECT: YES / NO CENTRAL *SEPARATE AC ISCONNECT INSTALLE?: YES / NO TO LOA CENTER ON LINE IAGRAM 1 * /onsult with your local AIJ and /or Utility SINGLELINE IAGRAM #3 AITIONAL FOR IAGRAM #1 LNVERTER # 2 /IE/Y A BOX COR WIETIER SYSTEM LS ROUNE OR UNROUNE: ROUNE (LN/LUE E/) UNROUNE COR UNROUNE SYSTEMS: / O/P MUST LS/ONNE/T BOTI /ONU/TORS OC EA/I SOUR/E /LR/ULT UNROUNE /ONU/TORS MUST BE LENTLCLE PER 210.(/). WILTECLNLSIE /ONU/TORS ARE NOT PERMLTTE A/ / A B / LC /// /ONVERTERS ARE USE, /IE/Y TIE BOX BELOW TIE /ORRESPONLN /ONCLURATLON /// /ONVERTERS /// /ONVERTERS /ONU/TOR//ONULT S/IEULE TA ES/RLPTLON AN /ONU/TOR TYPE /ONU/TOR NUMBER OC SLZE /ONU/TORS A USE2 OR PVWLRE B / /ONULT//ABLE TYPE /ONULT SLZE ENTER N/A WIERE SULTABLE COR WIEN NOT USLN /ONULT OR /ABLE AS PERMLTTE BY /OE PARALLEL /// /ONVERTERS ON ONE SOUR/E /LR/ULT (CLXE UNLT VOLTAE /// /ONVERTERS) /// /ONVERTERS ARE ALL RUN LN SERLES (CLXE SOUR/E /LR/ULT VOLTAE /// /ONVERTERS) PV #3201 Standard Plan, Simplified Central/String Inverter Systems

11 Solar PV Standard Plan Simplified Central/String Inverter System for One and TwoFamily wellings TA ESCRIPTION SOLAR PV MOULE / STRING C/C CONVERTERS INSTALLE? YES / NO (IF YES, STEPS & REQUIRE) SOURCE CIRCUIT JUNCTION BOX INSTALLE?: YES / NO COMBINER BOX (STEPS 11 & 12 REQUIRE) SEPARATE C ISCONNECT INSTALLE?: YES / NO INTERNAL C ISCONNECT: YES / NO CENTRAL *SEPARATE AC ISCONNECT INSTALLE?: YES / NO TO LOA CENTER ON LINE IAGRAM 3 * /onsult with your local AIJ and /or Utility SINGLELINE IAGRAM # AITIONAL FOR IAGRAM #2 LNVERTER # 2 /IE/Y A BOX COR WIETIER SYSTEM LS ROUNE OR UNROUNE: ROUNE (LN/LUE E/) UNROUNE COR UNROUNE SYSTEMS: / O/P MUST LS/ONNE/T BOTI /ONU/TORS OC EA/I SOUR/E /LR/ULT UNROUNE /ONU/TORS MUST BE LENTLCLE PER 210.(/). WILTECLNLSIE /ONU/TORS ARE NOT PERMLTTE A/ / 9 A1 B1 / A2 B2 /// /ONVERTERS /OMBLNER /ONU/TOR//ONULT S/IEULE TA ES/RLPTLON AN /ONU/TOR NUMBER OC /ONULT//ABLE /ONU/TOR TYPE SLZE /ONU/TORS TYPE A1 USE2 OR PVWLRE B1 / /ONULT SLZE NON/OMBLNE STRLNS /ONU/TOR//ONULT S/IEULE (LC APPLL/ABLE) TA ES/RLPTLON AN /ONU/TOR NUMBER OC /ONULT//ABLE /ONULT SLZE /ONU/TOR TYPE SLZE /ONU/TORS TYPE A2 USE2 OR PVWLRE B2 ENTER N/A WIERE SULTABLE COR WIEN NOT USLN /ONULT OR /ABLE AS PERMLTTE BY /OE LC /// /ONVERTERS ARE USE, TIEY ARE RUN LN SERLES (CLXE SOUR/E /LR/ULT VOLTAE /// /ONVERTERS) PV #3201 Standard Plan, Simplified Central/String Inverter Systems

12 SOLAR PV STANAR PLAN Roof Layout iagram for One and TwoFamily wellings PV #3201 Standard Plan, Simplified Central/String Inverter Systems Items required: roof layout of all panels, modules, clear access pathways and approximate locations of electrical disconnecting means and roof access points.

Supplemental Calculation Sheets for Inverter #2

Supplemental Calculation Sheets for Inverter #2 Solar PV Standard Plan Simplified Central/String Inverter Systems for One and TwoFamily Dwellings (10 KW or Less) Supplemental Calculation Sheets for Inverter #2 FORM PV 3S DC Information: Module Manufacturer:

More information

SOLAR PV MICROINVERTER/ACM STANDARD PLAN - COMPREHENSIVE Microinverter and ACM Systems for One- and Two- Family Dwellings

SOLAR PV MICROINVERTER/ACM STANDARD PLAN - COMPREHENSIVE Microinverter and ACM Systems for One- and Two- Family Dwellings SOLAR MICROINVERTER/M STANDARD PLAN - COMPREHENSIVE Microinverter and M Systems for One- and Two- Family Dwellings SCOPE: Use this plan ONLY for systems using utility-interactive Microinverters or Modules

More information

Basic Information Required for Photovoltaic Plan Check Submittal *Informational Purposes Only* 2013 CEC

Basic Information Required for Photovoltaic Plan Check Submittal *Informational Purposes Only* 2013 CEC BUILDING AND SAFETY DIVISION 1685 MAIN STREET, SANTA MONICA, CA 90401 310-458-2201 Basic Information Required for Photovoltaic Plan Check Submittal *Informational Purposes Only* 2013 CEC ADMINISTRATIVE

More information

Basic Information Required for Photovoltaic Plan Check Submittal *Informational Purposes Only*

Basic Information Required for Photovoltaic Plan Check Submittal *Informational Purposes Only* 1444 West Garvey Avenue West Covina, CA 91793 Phone: 626-939-8425 Basic Information Required for Photovoltaic Plan Check Submittal *Informational Purposes Only* ADMINISTRATIVE 1. The following clearances

More information

PLOT PLAN INSTRUCTIONS ROOF MOUNT SOLAR AN ACCURATE PLOT PLAN IS NECESSARY TO PROCESS YOUR PERMIT

PLOT PLAN INSTRUCTIONS ROOF MOUNT SOLAR AN ACCURATE PLOT PLAN IS NECESSARY TO PROCESS YOUR PERMIT PLOT PLAN INSTRUCTIONS ROOF MOUNT SOLAR Building Division 1855 Placer Street, Suite 102 Redding, California 96001 Phone: (530) 225-5761 Fax: (530) 245-6468 Inspection Request Line: (530) 244-5068 Web:

More information

RESIDENTIAL SOLAR ROOF TOP EXPEDITED PERMITTING GUIDELINE. 10 KW OR LESS

RESIDENTIAL SOLAR ROOF TOP EXPEDITED PERMITTING GUIDELINE. 10 KW OR LESS RESIDENTIAL SOLAR ROOF TOP EXPEDITED PERMITTING GUIDELINE. 10 KW OR LESS INFORMATION GUIDELINE 24A May 2015 CITY OF ESCONDIDO BUILDING DIVISION 201 N. BROADWAY, ESCONDIDO, CA 92025 (760) 839-4647 Plan

More information

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 2/9/11 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 2/9/11 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions MECKLENBURG COUNTY Land Use and Environmental Service Agency Code Enforcement 2/9/11 ELECTRICAL CONSISTENCY MEETING Code Consistency Questions 1. I have a 500 KVA generator, with no overcurrent protection

More information

FSEC APPROVAL # XL15-NT

FSEC APPROVAL # XL15-NT AC GEC 4 IN SERIES TO UTILITY METER IN SERIES F-2 35A SW 60A SOLAR MODULE POWER BOX PM-25 270W 2 3 4 JUNCTION BOX 2 7 INVERTER I 6,000W 5 6 3 TO MAIN SERVICE ENTRANCE RE F. MODULES FSEC APPROVAL # XL5-NT90-02

More information

Chapter 1. Applied Grounding and Bonding. Applied Grounding and Bonding 9/18/2011. Introduction. Introduction. Paul Dobrowsky Member NEC Panel 5

Chapter 1. Applied Grounding and Bonding. Applied Grounding and Bonding 9/18/2011. Introduction. Introduction. Paul Dobrowsky Member NEC Panel 5 Applied Grounding and Bonding Paul Dobrowsky Member NEC Panel 5 1 Introduction This presentation is a representative sample from the following Chapters of Applied Grounding and Bonding. Chapter 1, Introduction

More information

CP /240-MC4 User Manual

CP /240-MC4 User Manual CP-250-60-208/240-MC4 User Manual Chilicon Power LLC Jan 2014 1 CONTENTS Important Safety Instructions... 3 Safety Instructions... 3 CP-250 Microinverter System Introduction... 4 Inverter Label Information...

More information

National Marine Manufacturers Association Compliance Specialist Examination A.C. Electrical (2018 Model Year) ABYC E-11 Supplement 56

National Marine Manufacturers Association Compliance Specialist Examination A.C. Electrical (2018 Model Year) ABYC E-11 Supplement 56 1. Two Electrical Technicians are discussing markings that are required for AC wiring. Tech A says that AC conductors must be rated for 600 volts and must have their jackets and individual conductors marked

More information

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 9/8/10 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 9/8/10 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions conduit? 9/8/10 ELECTRICAL CONSISTENCY MEETING Code Consistency Questions 1. Can branch circuits of different services be installed in the same Yes, see 300.3(C)(1) for conductors of different systems

More information

Energy Management Service

Energy Management Service Copyright 2013 TheSolarPlanner.com See Instructions. Energy Management Service Residential Wire Sizing Worksheet (Gauges, Lengths & Voltage Drop) Step 1: Size the source circuit conductors. This calculation

More information

Installation/User Manual

Installation/User Manual Installation/User Manual APS YC500-A Photovoltaic Grid-connected Inverter Version 4.1 1/15 APS America 1015 Hostmark St. Ste 104; Poulsbo, WA 98370 TEL: 206-855-5100 EMAIL: info@apsamerica.com WEB: www.apsamerica.com

More information

Tel: Fax:

Tel: Fax: Grid Tie Solar Inverter Operator's Manual SG-4000 1 IMPORTANT SAFETY INSTRUCTIONS SAVE THESE INSTRUCTIONS To reduce the risk of electrical shock and to ensure safe installation and operation of Grid Tie

More information

Short-Circuit Current Calculations

Short-Circuit Current Calculations Basic Point-to-Point Calculation Procedure Step. Determine the transformer full load amps (F.L.A.) from either the nameplate, the following formulas or Table : Multiplier = 00 *% Z transformer Step 2.

More information

2014 NEC Changes Part 1

2014 NEC Changes Part 1 www.garyklinka.com Page 1 of 8 Instructions: Fee $20 1. Print these pages. 2. Circle the correct answers and transfer them to the answer sheet. 3. Page down to the last page for the verification forms

More information

NEC 2014 Code Changes

NEC 2014 Code Changes NEC 2014 Code Changes Articles 200-215.3 CHANGES FROM 2011 CODE ARE IN RED Chapter 2 - Wiring and Protection ARTICLE 200 Use and Identification of Grounded Conductors 200.2 General Grounded Conductors

More information

Application Note: String sizing Conext CL Series

Application Note: String sizing Conext CL Series : String sizing Conext CL Series 965-0066-01-01 Rev A DANGER RISK OF FIRE, ELECTRIC SHOCK, EXPLOSION, AND ARC FLASH This Application Note is in addition to, and incorporates by reference, the installation

More information

APS M1P Single-phase Micro-inverter Installation and User Manual

APS M1P Single-phase Micro-inverter Installation and User Manual APS M1P Single-phase Micro-inverter Installation and User Manual Version: 1.0 ALTENERGY POWER SYSTEM, INC. All rights reserved 1 Contact Information ALTENERGY POWER SYSTEM Inc. 1 Yatai Road, Jiaxing, PR

More information

Article 225: Outside Branch Circuits And Feeders

Article 225: Outside Branch Circuits And Feeders Part C: Code Book Questions Article 225: Outside Branch Circuits And Feeders 1.! Open (individual) aerial overhead conductors shall be insulated or covered when within! feet of a building.! (a) 10! (c)

More information

NOTICE OF RULE MAKING PROCEEDINGS AND PUBLIC HEARING

NOTICE OF RULE MAKING PROCEEDINGS AND PUBLIC HEARING 1 1 1 1 1 NOTICE OF RULE MAKING PROCEEDINGS AND PUBLIC HEARING NORTH CAROLINA BUILDING CODE COUNCIL Notice of Rule-making Proceedings is hereby given by NC Building Code Council in accordance with G.S.

More information

APS M1P Single-phase Micro-inverter Installation and User Manual

APS M1P Single-phase Micro-inverter Installation and User Manual APS M1P Single-phase Micro-inverter Installation and User Manual Version: 2.0 ALTENERGY POWER SYSTEM, INC. All rights reserved 1 Contact Information ALTENERGY POWER SYSTEM Inc. 1 Yatai Road, Jiaxing, PR

More information

Code Check Electrical is a field guide to common code issues in residential

Code Check Electrical is a field guide to common code issues in residential INTRODUCTION u CODES u ABBREVIATIONS Code 3Check Electrical 5th Edition By Redwood Kardon & DOUGLAS HANSEN Illustrations & Layout: Paddy Morrissey 2008 by The Taunton Press, Inc. ISBN 978-1-60085-012-7

More information

UNITY/I TM. Installation Manual. UT3K, UT4K, UT5K and UT8K. Single-Phase Uninterruptible Power Systems

UNITY/I TM. Installation Manual. UT3K, UT4K, UT5K and UT8K. Single-Phase Uninterruptible Power Systems UNITY/I TM UT3K, UT4K, UT5K and UT8K Single-Phase Uninterruptible Power Systems Installation Manual MLS-0351C-OL Copyright 1994-1997 Best Power. All rights reserved. å IMPORTANT SAFETY INSTRUCTIONS! SAVE

More information

Electrical Wiring: Commercial, Seventh Canadian Edition

Electrical Wiring: Commercial, Seventh Canadian Edition Electrical Wiring Commercial Canadian 7th Edition Mullin SOLUTIONS MANUAL Full download at: https://testbankreal.com/download/electrical-wiring-commercialcanadian-7th-edition-mullin-solutions-manual/ Unit

More information

Short Circuit Current Calculations

Short Circuit Current Calculations Introduction Several sections of the National Electrical Code relate to proper overcurrent protection. Safe and reliable application of overcurrent protective devices based on these sections mandate that

More information

2. Determine the number of Modules/Microinverters required. (1134 modules is 2 less than 250 KW but works well with max comm.

2. Determine the number of Modules/Microinverters required. (1134 modules is 2 less than 250 KW but works well with max comm. Commercial System Design Guidelines Application Note 1. Introduction... 1 2. Determine the number of Modules/Inverters required.... 1 3. Determining the number of Microinverters per branch circuit... 1

More information

Capstone Turbine Corporation Nordhoff Street Chatsworth CA USA Phone: (818) Fax: (818) Web:

Capstone Turbine Corporation Nordhoff Street Chatsworth CA USA Phone: (818) Fax: (818) Web: Phone: (818) 734-5300 Fax: (818) 734-5320 Web: www.capstoneturbine.com Technical Reference Capstone MicroTurbine Electrical Installation 410009 Rev F (October 2013) Page 1 of 31 Capstone Turbine Corporation

More information

Photovoltaic System Commissioning and Testing A Guide for PV System Technicians and Engineers

Photovoltaic System Commissioning and Testing A Guide for PV System Technicians and Engineers 4097 PV Com & Test_CoverV3:Layout 2 28/6/12 09:41 USA Office: Seaward Group USA 6304 Benjamin Road, Suite 506, Tampa, Florida, 33634 Page 2 Part of Tel: +1 (813) 886-2775 Email: enquiry@seawardsolar.com

More information

Part VIII Electrical GENERAL REQUIREMENTS CHAPTER 33

Part VIII Electrical GENERAL REQUIREMENTS CHAPTER 33 Part VIII Electrical CHAPTER 33 GENERAL REQUIREMENTS < SECTION E3301 GENERAL E3301.1 Scope. The installation of electrical systems, equipment and components indoors and outdoors that are within the scope

More information

a) Determine the smallest, standard-sized circuit breaker that should be used to protect this branch circuit.

a) Determine the smallest, standard-sized circuit breaker that should be used to protect this branch circuit. ECET4520 Exam II Sample Exam Problems Instructions: This exam is closed book, except for the reference booklet provided by your instructor and one (8.5 x11 ) sheet of handwritten notes that may not contain

More information

American Electrical Institute

American Electrical Institute American Electrical Institute Oregon Electricians Continuing Education Grounding & Bonding (Article 250) 4 Hours American Electrical Institute PO Box 31131 Spokane, WA 99223 www.aeitraining.com Article

More information

GRID-CONNECTED SOLAR PV SYSTEMS. Design Guidelines for Accredited Installers NO BATTERY STORAGE. January 2013 (Effective 1 February 2013)

GRID-CONNECTED SOLAR PV SYSTEMS. Design Guidelines for Accredited Installers NO BATTERY STORAGE. January 2013 (Effective 1 February 2013) GRID-CONNECTED SOLAR PV SYSTEMS NO BATTERY STORAGE Design Guidelines for Accredited Installers January 2013 (Effective 1 February 2013) These guidelines have been developed by Clean Energy Council. They

More information

Calculating AC Line Voltage Drop for S230 Microinverters with Engage Cables

Calculating AC Line Voltage Drop for S230 Microinverters with Engage Cables TECHNICAL BRIEF Calculating AC Line Voltage Drop for S230 Microinverters with Engage Cables Overview This technical brief presents voltage rise guidelines for dedicated PV branch circuits and methods for

More information

Wisconsin Contractors Institute Continuing Education

Wisconsin Contractors Institute Continuing Education IMPORTANT NOTE: You should have received an email from us with a link and password to take your final exam online. Please check your email for this link. Be sure to check your spam folder as well. If you

More information

Traditional PWM vs Morningstar s TrakStar MPPT Technology

Traditional PWM vs Morningstar s TrakStar MPPT Technology Traditional PWM vs Morningstar s TrakStar MPPT Technology Morningstar s MPPT charge controllers use our patented TrakStar advanced control MPPT algorithm to harvest maximum power from a Solar Array s peak

More information

System Components and Accessories

System Components and Accessories OutBack Panel Mount Breakers Panel mounted hydraulic-magnetic type breakers that can be used for DC sources, inverters or load circuits. Model Current Voltage Branch Terminals Width Rating Rating Circuit

More information

GENERATOR INTERCONNECTION APPLICATION Category 3 For All Projects with Aggregate Generator Output of More Than 150 kw but Less Than or Equal to 550 kw

GENERATOR INTERCONNECTION APPLICATION Category 3 For All Projects with Aggregate Generator Output of More Than 150 kw but Less Than or Equal to 550 kw GENERATOR INTERCONNECTION APPLICATION Category 3 For All Projects with Aggregate Generator Output of More Than 150 kw but Less Than or Equal to 550 kw ELECTRIC UTILITY CONTACT INFORMATION Consumers Energy

More information

3Ø Short-Circuit Calculations

3Ø Short-Circuit Calculations 3Ø Short-Circuit Calculations Why Short-Circuit Calculations Several sections of the National Electrical Code relate to proper overcurrent protection. Safe and reliable application of overcurrent protective

More information

Department of Labor and Industry Electrical Licensing

Department of Labor and Industry Electrical Licensing Department of Labor and Industry Electrical Licensing License Examination Guide The information in this guide is provided by the Licensing Unit of the Department of Labor and Industry to ensure that applicants

More information

INTELLIMETER REGISTER

INTELLIMETER REGISTER INTELLIMETER REGISTER MODEL RG2 INSTALLATION AND CONNECTIONS INSTALLATION MANUAL WARNING: Any work on or near energized metering equipment can present a danger of electrical shock. All work on these products

More information

Connecting the Power of the Sun. DC Disconnects for Solar Photovoltaic Installations. DC disconnects for. solar photovoltaic installations

Connecting the Power of the Sun. DC Disconnects for Solar Photovoltaic Installations. DC disconnects for. solar photovoltaic installations Connecting the Power of the Sun DC Disconnects for Solar Photovoltaic Installations DC disconnects for solar photovoltaic installations Solar energy is heating up Interest in renewable energy sources has

More information

Table of Contents. Power Distribution Blocks & Terminal Blocks with High Short-Circuit Current Ratings. Technical Assistance

Table of Contents. Power Distribution Blocks & Terminal Blocks with High Short-Circuit Current Ratings. Technical Assistance Power Distribution Blocks & Terminal Blocks with High Short-Circuit Current Ratings Table of Contents Page Selection Table.... 2 Power Distribution Blocks PDBFS Series....................................3-8

More information

Code Red: Notable Changes in the 2011 NEC

Code Red: Notable Changes in the 2011 NEC : Notable Changes in the 2011 NEC By Rebekah Hren and Brian Mehalic Few articles are as subject to change from one Code cycle to the next as those applying to PV systems and interconnected power sources.

More information

Calculating AC Line Voltage Drop for M215 Microinverters with Engage Cables

Calculating AC Line Voltage Drop for M215 Microinverters with Engage Cables Technical Brief Calculating AC Line Voltage Drop for M215 Microinverters with Engage Cables Summary Enphase Microinverters, like all utility interactive inverters, sense the current from the AC grid and

More information

Installation requirements

Installation requirements Installation requirements for SUNNY CENTRAL 500U 1 Contents This document describes the requirements which have to be observed for the installation site of the Sunny Central 500U. The installation and

More information

60 cell LG300N1K-G4. Key Features. High Power Output. Enhanced Performance Warranty. Outstanding Durability. Aesthetic Roof

60 cell LG300N1K-G4. Key Features. High Power Output. Enhanced Performance Warranty. Outstanding Durability. Aesthetic Roof EN LG300N1K-G4 60 cell LG s new module, NeON 2 Black, adopts Cello technology. Cello technology replaces 3 busbars with 12 thin wires to enhance power output and reliability. NeON 2 Black demonstrates

More information

Grounding Recommendations for On Site Power Systems

Grounding Recommendations for On Site Power Systems Grounding Recommendations for On Site Power Systems Revised: February 23, 2017 2017 Cummins All Rights Reserved Course Objectives Participants will be able to: Explain grounding best practices and code

More information

DC PV Arc fault detection Unit

DC PV Arc fault detection Unit DC PV Arc fault detection Unit Installation, usage and other information Author: Peter v. Galen, Product Manager Date: 15-09-2014 Revision: B 1. Introduction The National Electrical Code 2011 states arc-fault

More information

ECET Fall 2017 Name: _ Lab Assignment #01

ECET Fall 2017 Name: _ Lab Assignment #01 ECET 4520 - Fall 2017 Name: _ Lab Assignment #01 General Instructions: This assignment is to be completed individually. All answers/work required for each problem should be neatly written in the space

More information

Article 700: Emergency Systems. 2.! Audible and visual signal devices shall be provided, where practicable to indicate.

Article 700: Emergency Systems. 2.! Audible and visual signal devices shall be provided, where practicable to indicate. Part N: Code Book Questions Article 700: Emergency Systems 1.! For emergency systems, the authority having jurisdiction shall conduct or witness a test on the! complete system upon installation and periodically

More information

SECTION PANELBOARDS

SECTION PANELBOARDS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 24 16 PANELBOARDS SPEC WRITER NOTE: Delete between // --- // if not applicable to project. Also, delete any other item or paragraph not applicable in the section

More information

Photovoltaic / Solar Array Simulation Solution

Photovoltaic / Solar Array Simulation Solution PRODUCT BROCHURE Photovoltaic / Solar Array Simulation Solution Keysight s Photovoltaic / Solar Simulation Solution can help you maximize the per formance of your inverter MPPT algorithms and circuits

More information

GENERATOR INTERCONNECTION APPLICATION Category 5 For All Projects with Aggregate Generator Output of More Than 2 MW

GENERATOR INTERCONNECTION APPLICATION Category 5 For All Projects with Aggregate Generator Output of More Than 2 MW GENERATOR INTERCONNECTION APPLICATION Category 5 For All Projects with Aggregate Generator Output of More Than 2 MW ELECTRIC UTILITY CONTACT INFORMATION Consumers Energy Interconnection Coordinator 1945

More information

AN EXAMPLE OF A STANDARD ARC FLASH PPE LABELING STRATEGY

AN EXAMPLE OF A STANDARD ARC FLASH PPE LABELING STRATEGY The Electrical Power Engineers Qual-Tech Engineers, Inc. 201 Johnson Road Building #1 Suite 203 Houston, PA 15342-1300 Phone 724-873-9275 Fax 724-873-8910 www.qualtecheng.com AN EXAMPLE OF A STANDARD ARC

More information

Article 250 Grounding & Bonding

Article 250 Grounding & Bonding Article 250 Grounding & Bonding AMERICAN ELECTRICAL INSTITUTE N16 W23217 Stone Ridge Dr. Waukesha, WI 53188 855-780-5046 www.aeitraining.com DISCLAIMER NOTE: This course is APPROVED for continuing education

More information

EPG. by Chris C. Kleronomos

EPG. by Chris C. Kleronomos April 1994 EFFECTIVE EQUIPMENT GROUNDING ECOS Electronics Corporation by Chris C. Kleronomos The quality of the electrical wiring and grounding in a facility containing sensitive electronic equipment is

More information

Jake Leahy s Electrical Code Connection. A look at Grounding and Bonding of Electrical Services Article Florida Building Code 5 th Edition

Jake Leahy s Electrical Code Connection. A look at Grounding and Bonding of Electrical Services Article Florida Building Code 5 th Edition Jake Leahy s Electrical Code Connection A look at Grounding and Bonding of Electrical Services Article 250 2014 Florida Building Code 5 th Edition Wiring Integrity. Completed wiring installations shall

More information

Electrical requirements for plans on all new homes, additions, remodels & Service upgrades

Electrical requirements for plans on all new homes, additions, remodels & Service upgrades CHERRY HILLS VILLAGE COLORADO Electrical requirements for plans on all new homes, additions, remodels & Service upgrades Due to the size and uniqueness of homes built in Cherry Hills Village, a policy

More information

Presented in Electrical & Computer Engineering University of New Brunswick Fredericton, NB, Canada The Photovoltaic Cell

Presented in Electrical & Computer Engineering University of New Brunswick Fredericton, NB, Canada The Photovoltaic Cell Presented in Electrical & Computer Engineering University of New Brunswick Fredericton, NB, Canada Introduction The The concept and PVA Characteristics Modeling Operating principles Control strategies

More information

PREFACE ********************************************************** IT IS NOT INTENDED THAT THESE STANDARDS BE COPIED AND USED AS A SPECIFICATION!

PREFACE ********************************************************** IT IS NOT INTENDED THAT THESE STANDARDS BE COPIED AND USED AS A SPECIFICATION! PREFACE This publication has been prepared as a guide for Architectural and Engineering (A&E) firms in the preparation of documents for the design and construction of new structures and the remodeling

More information

Calculating AC Line Voltage Rise for IQ-Series Micros with Q Cable

Calculating AC Line Voltage Rise for IQ-Series Micros with Q Cable TECHNICAL BRIEF Calculating AC Line Voltage Rise for IQ-Series Micros with Q Cable Overview This technical brief presents voltage rise guidelines for dedicated PV branch circuits and methods for calculating

More information

Bulletin Filming in Minnesota

Bulletin Filming in Minnesota 443 Lafayette Road N. St. Paul, Minnesota 55155 www.doli.state.mn.us www.electricity.state.mn.us MINNESOTA DEPARTMENT OF LABOR & INDUSTRY (651) 284-5064 1-800-DIAL-DLI Fax: (651) 284-5749 TTY: (651) 297-4198

More information

Licensed Electricians Practical Assessment (LEP)

Licensed Electricians Practical Assessment (LEP) Licensed Electricians Practical Assessment (LEP) Surname: Given Names: Date: Time: Location: Assessment Time (includes reading and preparation time): At the end of this time you will be asked to stop.

More information

Declaration of Conformity

Declaration of Conformity for SkyBox True Hybrid Energy System Purpose The intent of this document is to specify that the OutBack model listed below conforms to the following standards for grid-interactive inverter/chargers intended

More information

2/15/2015. Current will always try to return to its source. In order for there to be current, there must be a complete circuit

2/15/2015. Current will always try to return to its source. In order for there to be current, there must be a complete circuit Current will always try to return to its source In order for there to be current, there must be a complete circuit Current will take as many paths or circuits available to it to return to the source The

More information

TABLE OF CONTENT

TABLE OF CONTENT Page : 1 of 34 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT SCOPE 3 REFERENCES

More information

EE Grid-Tied PV Systems. Y. Baghzouz Spring 2011

EE Grid-Tied PV Systems. Y. Baghzouz Spring 2011 EE 495-695 Grid-Tied PV Systems Y. Baghzouz Spring 2011 Applicable Codes & Standards Most Important: NEC IEEE Std 1547 Summary of Content of NEC NEC (Voltage Drop Requirement) NEC requires that the voltage

More information

Understanding Temperature Effects on Crystalline PV Modules

Understanding Temperature Effects on Crystalline PV Modules Understanding Temperature Effects on Crystalline PV Modules The following is a discussion on temperature and how it affects solar module voltages and power output. This is particularly important in solar-battery

More information

Advanced Pulse WattNode - Option PV (Photovoltaic)

Advanced Pulse WattNode - Option PV (Photovoltaic) Continental Control Systems LLC Manual Supplement: July 2008 Advanced Pulse WattNode - Option PV (Photovoltaic) With Option PV, a single WNB-3Y-208-P Advanced Pulse WattNode can measure the net energy

More information

Licensed Electricians Practical Assessment (LEP)

Licensed Electricians Practical Assessment (LEP) Licensed Electricians Practical Assessment (LEP) Surname: Date: Given Names: Time: Assessment Time (includes 10 minutes reading time): At the end of this time you will be asked to stop. 4 hours Have you

More information

Company Directive STANDARD TECHNIQUE: SD1E/2. Technical Requirements for Customer Export Limiting Schemes

Company Directive STANDARD TECHNIQUE: SD1E/2. Technical Requirements for Customer Export Limiting Schemes Company Directive STANDARD TECHNIQUE: SD1E/2 Technical Requirements for Customer Export Limiting Schemes Policy Summary This Standard Technique specifies the requirements for customer owned Export Limitation

More information

Chapter 6. WIRING SYSTEMS Safe Electrical Design

Chapter 6. WIRING SYSTEMS Safe Electrical Design Chapter 6 WIRING SYSTEMS Safe Electrical Design Topic 6-3 CABLE SELECTION BASED ON CURRENT CARRYING CAPACITY REQUIREMENTS INSTALLATION CONDITIONS Current carrying capacity (CCC) is the maximum continuous

More information

Power-One Aurora PLUS and PLUS-HV Series Inverters: guide to the sizing of photovoltaic generators with Aurora Designer and PowerOne String Tool

Power-One Aurora PLUS and PLUS-HV Series Inverters: guide to the sizing of photovoltaic generators with Aurora Designer and PowerOne String Tool Power-One Aurora PLUS and PLUS-HV Series Inverters: guide to the sizing of photovoltaic generators with Aurora Designer and PowerOne String Tool Author: Gianluca Marri Approver: Antonio Rossi Date: 2012/05/03

More information

Bulletin Voltage drop in single dwelling units Rule 8-102

Bulletin Voltage drop in single dwelling units Rule 8-102 Bulletin 8-6-0 Voltage drop in single dwelling units Rule 8-102 Scope Issued February 2014 (1) Background (2) Application of voltage drop for branch circuits in single dwelling units a) Determination of

More information

Smart Inverter Testing for Autonomous Grid

Smart Inverter Testing for Autonomous Grid Smart Inverter Testing for Autonomous Grid John Mead, PE Pacific Gas and Electric Company Applied Technology Services, San Ramon READ AND DELETE For best results with this template, use PowerPoint 2003

More information

Southern Company Interconnection Requirements for Inverter-Based Generation

Southern Company Interconnection Requirements for Inverter-Based Generation Southern Company Interconnection Requirements for Inverter-Based Generation September 19, 2016 Page 1 of 16 All inverter-based generation connected to Southern Companies transmission system (Point of Interconnection

More information

Certificate of Compliance

Certificate of Compliance Certificate of Compliance Certificate: 2572294 Master Contract: 173688 Project: 2721900 Date Issued: April 24, 2014 Issued to: Power-One, Inc 3201 E Harbour Dr Phoenix, AZ 85034 USA The products listed

More information

NORTH CAROLINA INTERCONNECTION REQUEST. Utility: Designated Contact Person: Address: Telephone Number: Address:

NORTH CAROLINA INTERCONNECTION REQUEST. Utility: Designated Contact Person: Address: Telephone Number:  Address: NORTH CAROLINA INTERCONNECTION REQUEST Utility: Designated Contact Person: Address: Telephone Number: Fax: E-Mail Address: An is considered complete when it provides all applicable and correct information

More information

DP&L s Technical Requirements for Interconnection and Parallel Operation of Distributed Generation

DP&L s Technical Requirements for Interconnection and Parallel Operation of Distributed Generation DP&L s Technical Requirements for Interconnection and Parallel Operation of Distributed Generation Technical Requirements for Interconnection and Parallel Operation of Distributed Generation Single Phase

More information

Duration of resource: 23 Minutes. Year of Production: Stock code: VEA12041

Duration of resource: 23 Minutes. Year of Production: Stock code: VEA12041 ADDITIONAL RESOURCES We use electrical circuits every day. In the home, the car, at work and school they are a vital part of our lives. This program covers the basics of electrical circuits in detail.

More information

New Tools for PV Array Commissioning and Troubleshooting

New Tools for PV Array Commissioning and Troubleshooting New Tools for PV Array Commissioning and Troubleshooting June 30, 2011 Paul Hernday Applications Engineer paul@solmetric.com cell 707-217-3094 Bryan Bass Sales Engineer bryan@solmetric.com Solmetric Solutions

More information

String Configuration Tool Help!

String Configuration Tool Help! String Configuration Tool Help! (Siento, esto solo está en inglés) 1 Intended Use and Disclaimer Thank you for using the Fronius String Configuration Tool ( FSC Tool ) for North America. Fronius USA provides

More information

Installation Manual DOC R1 Date: 05/27/99. Plug-in Meter Installation Manual

Installation Manual DOC R1 Date: 05/27/99. Plug-in Meter Installation Manual Installation Manual DOC-4004-5015-R1 Date: 05/27/99 Plug-in Meter Installation Manual Document Number: Doc-4004-5015-R1 Document Release Date: 5/99 Copyright 1999 TeCom Inc. All rights reserved. No part

More information

This document covers common questions concerning the design of an effectively grounded system.

This document covers common questions concerning the design of an effectively grounded system. This document covers common questions concerning the design of an effectively grounded system. To prevent against temporary overvoltage conditions when a line-to-ground fault occurs on the power grid.

More information

Laboratory 2: PV Module Current-Voltage Measurements

Laboratory 2: PV Module Current-Voltage Measurements Laboratory 2: PV Module Current-Voltage Measurements Introduction and Background The current-voltage (I-V) characteristic is the basic descriptor of photovoltaic device performance. A fundamental understanding

More information

SECTION OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY

SECTION OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 05 73 OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY SPEC WRITER NOTE: Delete between // -- // if not applicable to project. Also, delete any other item or

More information

PVCHECK Rel /01/13

PVCHECK Rel /01/13 Meter for safety, functionality and performance on PV plants Pag 1 of 6 The multifunction instrument PVCHECK performs prompt and safe electrical checks required for a PV system (DC section) and controls

More information

InfraStruXure Manager v4.x Addendum: Building Management System Integration

InfraStruXure Manager v4.x Addendum: Building Management System Integration InfraStruXure Manager v4.x Addendum: Building Management System Integration Introduction This addendum explains the integration of the APC InfraStruXure Manager Appliance with a Building Management System

More information

TECHNICAL BRIEF North America

TECHNICAL BRIEF North America TECHNICAL BRIEF North America Planning for a Commercial IQ Microinverter System The Enphase IQ Microinverter system is inexpensive to install and provides a wide range of new installation options to solar

More information

Journeyman's Practice Exam

Journeyman's Practice Exam Journeyman's Practice Exam [Time limit 4.0 hrs.] (The test is open book. I've started at the front of the Code Book and worked toward the back for instructional purposes. The real test will not be in order

More information

B. Manufacturers: Square-D, G.E. or Westinghosue.

B. Manufacturers: Square-D, G.E. or Westinghosue. SECTION 16470 - PANELBOARDS PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. General: Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

3.1 Overview of ATCO Electric s URD System Design

3.1 Overview of ATCO Electric s URD System Design Page: 3-1 3.0 URD DESIGN GUIDELINES 3.1 Overview of ATCO Electric s URD System Design ATCO Electric s design for distribution power supply to URD areas is a primary looped supply system. This is generically

More information

STANDARD COMMENTS 2016 ELECTRICAL PLAN REVIEW CHECK LIST

STANDARD COMMENTS 2016 ELECTRICAL PLAN REVIEW CHECK LIST STANDARD COMMENTS 2016 ELECTRICAL PLAN REVIEW CHECK LIST Item Comments 1. The electrical plan check is approved and ready to have the electrical permit issued, pending the building permit being issued.

More information

New Tools for PV Array Commissioning and Troubleshooting

New Tools for PV Array Commissioning and Troubleshooting New Tools for PV Array Commissioning and Troubleshooting Solmetric PVA-600 Megger MIT430 Paul Hernday Applications Engineer paul@solmetric.com cell 707-217-3094 April 5, 2012 Audio is available by telephone

More information

MIG240 MICRO INVERTER INSTALLATION MANUAL 4J.JMIUL.03A

MIG240 MICRO INVERTER INSTALLATION MANUAL 4J.JMIUL.03A MIG240 MICRO INVERTER INSTALLATION MANUAL 4J.JMIUL.03A FCC Compliance This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to part 15 of the FCC Rules.

More information

Understanding Solar Energy Teacher Page

Understanding Solar Energy Teacher Page Understanding Solar Energy Teacher Page Photovoltaic Power Output & I-V Curves Student Objective The student: will be able to determine the voltage, current and power of a given PV module given the efficiency,

More information

SUGGESTED SPECIFICATION for Series 300 Automatic Transfer Switches

SUGGESTED SPECIFICATION for Series 300 Automatic Transfer Switches SUGGESTED SPECIFICATION for Series 300 Automatic Transfer Switches PART 1 GENERAL 1.01 Scope Furnish and install automatic transfer switches (ATS) with number of poles, amperage, voltage, and withstand

More information

PROVINCE.OF BRITISH COLUMBIA. ORDER OF THE LIEUTENANfelOVERNOR IN COUNCIL

PROVINCE.OF BRITISH COLUMBIA. ORDER OF THE LIEUTENANfelOVERNOR IN COUNCIL PROVINCE.OF BRITISH COLUMBIA ORDER OF THE LIEUTENANfelOVERNOR IN COUNCIL Order in Council No. 0640 Approved and Oidered a -1.1995 cieuisvunigott3mor Executive Council Chambers, Victoria On the recommendation