1 Part N: Code Book Questions Article 700: Emergency Systems 1.! For emergency systems, the authority having jurisdiction shall conduct or witness a test on the! complete system upon installation and periodically afterward. A shall be kept of such tests.! (a) written report! (c) written record! (b) written log! (d) chart 2.! Audible and visual signal devices shall be provided, where practicable to indicate.! (a) derangement of emergency source!! (c) that the battery charger is not functioning! (b) that the battery is carrying load!! (d) all of these 3.! All boxes and enclosures for emergency circuits shall be marked so they will be as a! component of an emergency circuit.! (a) readily identified! (c) easily sighted! (b) recognized! (d) classified 4.! Emergency lighting, emergency power, or both, in a building or group of buildings will be! available within the time required for the application, but not to exceed seconds.! (a) 5! (c) 30! (b) 10! (d) 60 5.! A storage battery supplying emergency lighting and power shall maintain not less than! 87-1/2 percent of full voltage at total load for a period of at least.! (a) 2 hours! (c) 1-1/4 hour! (b) 1-1/2 hours! (d) 1 hour 6.! Where storage batteries are used for emergency systems they shall be.! (a)!alkali or acid type! (b)!provided with automatic battery charging means! (c)! alkali or acid type and provided with automatic battery charging means! (d)!none of these

2 7.! The prime mover of an emergency generator set must.! (a)!be provided with an automatic means for starting! (b)!have on-site fuel supply sufficient to operate the prime mover at full demand for 2 hours! (c)! be provided with an automatic means of transferring from one fuel supply to another where!! dual supplies are used! (d)!all of these 8.! No other than those specified as required for emergency use, shall be supplied by! emergency lighting circuits.! (a) appliances! (c) fittings! (b) lamps! (d) appliances and lamps 9.! Emergency illumination shall include all required means of and all other lights specified as! necessary to provide required illumination.! (a) illuminated exit signs! (c) show window lighting! (b) egress lighting! (d) illuminated exit signs and egress lighting 10.!All manual switches for controlling emergency lighting in a theater or motion picture theater may! be located in.! (a)!projection booth!! (b)!on the side of the stage or platform!! (c)! projection booth on the side of the stage or platform! (d)!the lobby 11.!The branch circuit overcurrent devices in emergency circuits shall be.! (a) of the reset type only! (c) accessible to only authorized persons only! (b) a slow-blow type! (d) painted yellow 12.!The alternate source for emergency systems be required to have ground-fault protection of! equipment with automatic disconnecting means.! (a) may! (c) may not! (b) shall! (d) shall not 13.!Emergency system(s) overcurrent devices shall be with all supply side overcurrent! protective devices.! (a) interchanged! (c) manual operated! (b) GFCI protected! (d) selectively coordinated

3 Article 701: Legally Required Standby Systems 14.!Legally required standby systems are typically installed to serve loads such as.! (a)!heating and refrigeration systems! (b)!communication systems! (c)! industrial processes! (d)!any of these 15.!For a legally required standby system, power will be available for the application within.! (a) 10 seconds! (c) 60 seconds! (b) 30 seconds! (d) 2 minutes 16.!A storage battery of suitable rating and capacity to supply and maintain at not less than of! system voltage the total load of the circuits supplying legally required standby power for a period! of at least 1-1/2 hours.! (a) 100%! (c) 75%! (b) 87-1/2%! (d) 50% Article 702: Optional Standby Systems 17.!Optional standby systems are typically installed to provide an alternate source of electric power! for such loads as systems.! (a) communications! (c) data processing! (b) refrigeration! (d) any of these Article 705: Interconnected Electric Power Production Sources 18.!Induction generating equipment on systems with significant may become self-excited upon! loss of primary source and experience severe over-voltage as a result.! (a) voltage! (c) induction! (b) amperage! (d) capacitance Article 720: Circuits And Equipment (50 volts or less) 19.!Conductors operating at less than 50 volts and not covered in Articles 411, 517, 550, 551, 650, 669,! 690, 725 and 760, shall not be smaller than copper or equivalent.! (a) #12! (c) #16! (b) #14! (d) #18

4 20.!Standard lampholders on a circuit which operates at a voltage less than 50 volts shall be at least! watts.! (a) 220! (c) 550! (b) 330! (d) 660 Article 725: Remote Control, Signaling, Power Limiting (Class 1, 2, 3) 21.!A Class 2 circuit considers safety.! (a)!provides acceptable protection from electric shock! (b)!from a fire initiation standpoint! (c)! provides acceptable protection from electric shock from a fire initiation standpoint! (d)!none of these 22.!Remote control circuits for safety control equipment shall be classified as if the failure of the! equipment to operate introduces a direct fire or life hazard.! (a) Class 1! (c) Class 3! (b) Class 2! (d) none of these 23.!When installing remote control signaling circuits, shall not be considered safety control! equipment.! (a)!room thermostats! (b)!water temperature regulating devices! (c)! household heating and air-conditioning equipment! (d)!room thermostats and water temperature regulating devices 24.!A Class 1 power-limited circuit shall be supplied from a source having a rated output of not more! than 30 volts and volt-amperes.! (a) 1000! (c) 1500! (b) 1200! (d) !Class 1 circuits and power supply circuits shall be permitted to occupy the same raceway only! where the equipment powered is.! (a) low voltage! (c) functionally associated! (b) a tire alarm system! (d) A.C./D.C.

5 26.!A dry cell battery shall be considered an inherently limited power source, provided the! voltage is 30 volts or less and the capacity is equal to or less than that available from series! connected #6 carbon zinc cells.! (a) Class 1! (c) Class 3! (b) Class 2! (d) none of these 27.!Voltage markings on cables may be misinterpreted to suggest that the cables may be suitable for! Class 1 applications, therefore voltage ratings on Class 2 and 3 conductors.! (a) shall be marked accordingly! (c) shall be marked with voltage rating! (b) shall be marked Class 2 or 3! (d) shall not be marked Article 727: Instrumentation Tray Cable (ITC) 28.!Type ITC cable is permitted to be used in industrial establishments with proper supervision in! which of the following?! (a) aerial cable on a messenger! (c) directly buried where identified for the use! (b) cable trays! (d) any of these 29.!Fire alarm systems include. Article 760: Fire Alarm Systems! (a) fire detection! (c) sprinkler waterflow! (b) alarm notification! (d) all of the above 30.!A fire alarm circuit that is powered by an output voltage of not more than 600 volts is defined as a! fire alarm circuit.! (a) NPLFA! (c) FPLP! (b) PLFA! (d) FPLF 31.!Power-limited fire protective signaling circuits where installed in exposed cable, located within 7! feet of the floor, the cable shall be securely fastened in an approved manner at intervals of not! more than inches.! (a) 18! (c) 30! (b) 24! (d) 36

6 32.!Coaxial cables for a fire alarm system shall be permitted to have copper covered steel center! conductors with a minimum of 30 percent copper and shall be listed as Type.! (a) FPLP! (c) FPL! (b) FPLR! (d) all of the above Article 770: Optical Fiber Cable And Raceways 33.!Optical fiber cables transmit light for through an optical fiber.! (a) control! (c) communications! (b) signaling! (d) all of these Article 780: Closed-Loop And Programmed Power Distribution 34.!Premise power distribution systems jointly controlled by a signaling between the energy! controlling equipment and utilization equipment is a system.! (a)!remote control, signaling, and power limited circuit! (b)!fire alarm! (c)! communication circuit! (d)!closed-loop and programmed power distribution 35.!In a closed-loop and programmed power distribution system, the outlets shall.! (a)!energize only when the load allows the completion of a loop! (b)!not be energized unless the equipment first exhibits a characteristic electrical identification! (c)! be constantly energized, as is done in existing 120/240 volt power systems! (d)!none of these 36.!For signaling circuits not exceeding 24 volts, the current required shall not exceed ampere! where protected by an overcurrent device or an inherently limited power source.! (a) 1! (c) 6! (b) 4! (d) !In closed loop distribution systems, listed hybrid cable consisting of power communications and! signaling conductors shall be permitted under a common jacket. The signaling conductors shall! not be smaller than AWG copper.! (a) #16! (c) #22! (b) #18! (d) #24

7 Article 800: Communications Circuits 38.!Selecting a primary location to achieve the shortest practical primary protector grounding! conductor will help limit potential differences between communications circuits and other! metallic systems.! (a) limiter! (c) neutral! (b) protector! (d) common 39.!The grounding conductor for communication circuits shall be connected to the.! (a) building electrode system! (c) service equipment enclosure! (b) metallic power raceway! (d) any of the above 40.!In communication circuits the bonding together of all separate electrodes.! (a)!shall not be permitted! (b)!shall be permitted with a minimum size jumper #4! (c)! shall be permitted with a minimum size jumper #6! (d)!shall be permitted with a minimum size jumper #8 41.! are typically used as enclosures for splicing or terminating telephone cables.! (a) Splice cases! (c) Octagonal boxes! (b) Terminal boxes! (d) Splice cases and terminal boxes 42.!Communication wires and cables shall be separated at least inches from conductors of any! electric light or power circuits, Class 1, or non power-limited fire alarm circuits, or medium power! network powered broadband communications circuits.! (a) 1-1/2! (c) 4! (b) 2! (d) 6 Article 810: Radio And Television Equipment 43.!Soft-drawn or medium-drawn copper, lead-in conductors for receiving antenna systems shall be! permitted where the maximum span between points of support is less than feet.! (a) 35! (c) 20! (b) 30! (d) 10

8 44.!The maximum size of a receiving station outdoor antenna conductor, where the span is 75 feet,! shall be at least if a copper-clad steel conductor is used.! (a) #10! (c) #14! (b) #12! (d) #17 45.!Indoor antennas and indoor lead-ins shall be permitted to occupy the same box or enclosure with! conductors of other wiring systems where separated from such other conductors by an effective! permanently installed.! (a) wall! (c) insulator! (b) divider! (d) barrier 46.!The grounding conductor for a TV antenna shall not be smaller than a AWG copper.! (a) #6! (c) #10! (b) #8! (d) #12 47.!The Code provides that unshielded lead-in conductors of amateur transmitting stations shall clear! the building surface which is wired over by a distance not less than inches.! (a) 1-1/2! (c) 3! (b) 2! (d) 4 48.!The protective grounding conductor for transmitting stations shall be as large as the lead-in, but! not smaller than AWG copper.! (a) #18! (c) #12! (b) #16! (d) #10 49.!The operating grounding conductor for amateur transmitting stations shall not be less than! # copper.! (a) #18! (c) #14! (b) #16! (d) #10 Article 820: Community Antenna Television And Radio Distribution Systems 50.!Coaxial cable shall be permitted to deliver low energy power to equipment directly associated! with radio frequency distribution system if the voltage is not over volts and if the current! supply is from a transformer or other device having energy limiting characteristics.! (a) 24! (c) 60! (b) 30! (d) 70.7

9 51.!Where practicable, a separation of at least feet shall be maintained between any coaxial cable! and lightning conductors.! (a) 2! (c) 4! (b) 2-1/2! (d) 6 52.!Where coaxial cable is directly buried for a community antenna television system, the cable shall! be separated at least inches from conductors of any light or power or Class 1 circuit.! (a) 2! (c) 12! (b) 6! (d) !A community antenna system grounding conductor shall not be smaller than AWG, and shall! have a current-carrying capacity approximately equal to that of the outer conductor of the coaxial! cable.! (a) #18! (c) #14! (b) #16! (d) #12 54.!A bonding jumper not smaller than copper or equivalent shall be connected between the! antenna systems grounding electrode and the power grounding electrode system at the building! or structure served where separate electrodes are used.! (a) #12! (c) #8! (b) #10! (d) #6 Chapter 9: Tables And Appendix D 55.!The percent of allowable fill for two conductors in a rigid PVC schedule 40 conduit is.! (a) 31%! (b) 40%! (c) 53%! (d) 80% 56.!Equipment grounding conductors, when installed, be included when calculating! conduit fill.! (a) should! (b) shall! (c) should not! (d) shall never 57.!When conduit nipples having a maximum length not to exceed 24 are installed between! boxes.! (a)!the nipple can be filled 75%! (b)!the nipple can be filled 60%! (c)! Table (B)(2)(a) derating does not apply! (d)!the nipple can be filled 60% and Table (B)(2)(a) derating does not apply

10 58.!Where the calculated maximum number of conductors permitted in a conduit or tubing, all!of the! same size, includes a decimal fraction the next higher whole number shall be used where this! decimal is or larger.! (a).5! (b).8! (c).08! (d) !For cables that have elliptical cross section, the cross-sectional area calculation shall be based on! using of the ellipse as a circle diameter.! (a) half! (c) the major diameter! (b) the radius! (d) the circumference 60.!Which of the following statements about a #2 THHN copper conductor is correct?! (a)!its maximum operating temperature is 90 C!! (b)!it has a nylon insulation!!!! (c) its area is.067 square inches! (d)!it has a dc resistance of.319 ohms per m/ft. 61.!For uniform application of Articles 210, 215 and 220, a nominal voltage of shall be used in! computing the ampere load on a conductor.! (a) 110/220! (c) 120/240! (b) 115/230! (d) 125/250

Wisconsin Contractors Institute Continuing Education

Wisconsin Contractors Institute Continuing Education IMPORTANT NOTE: You should have received an email from us with a link and password to take your final exam online. Please check your email for this link. Be sure to check your spam folder as well. If you

More information

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 9/8/10 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 9/8/10 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions conduit? 9/8/10 ELECTRICAL CONSISTENCY MEETING Code Consistency Questions 1. Can branch circuits of different services be installed in the same Yes, see 300.3(C)(1) for conductors of different systems

More information

RADIO AND TELEVISION SATELLITE EQUIPMENT

RADIO AND TELEVISION SATELLITE EQUIPMENT ARTICLE 810 RADIO AND TELEVISION SATELLITE EQUIPMENT Introduction to Article 810 Radio and Television Satellite Equipment This article covers transmitter and receiver (antenna) equipment and the wiring

More information

CHAPTER 15 GROUNDING REQUIREMENTS FOR ELECTRICAL EQUIPMENT

CHAPTER 15 GROUNDING REQUIREMENTS FOR ELECTRICAL EQUIPMENT CHAPTER 15 GROUNDING REQUIREMENTS FOR ELECTRICAL EQUIPMENT A. General In a hazardous location grounding of an electrical power system and bonding of enclosures of circuits and electrical equipment in the

More information

American Electrical Institute

American Electrical Institute American Electrical Institute Oregon Electricians Continuing Education Grounding & Bonding (Article 250) 4 Hours American Electrical Institute PO Box 31131 Spokane, WA 99223 www.aeitraining.com Article

More information

NEC 2014 Code Changes

NEC 2014 Code Changes NEC 2014 Code Changes Articles 200-215.3 CHANGES FROM 2011 CODE ARE IN RED Chapter 2 - Wiring and Protection ARTICLE 200 Use and Identification of Grounded Conductors 200.2 General Grounded Conductors

More information

1 Exam Prep NFPA 70: National Electric Code 2011 Tabs and Highlights

1 Exam Prep NFPA 70: National Electric Code 2011 Tabs and Highlights 1 Exam Prep NFPA 70: National Electric Code 2011 Tabs and Highlights These 1 Exam Prep Tabs are based on NFPA 70: National Electrical Code, 2011. Each 1 Exam Prep Tabs sheet has five rows of Tabs. Start

More information

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 2/9/11 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 2/9/11 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions MECKLENBURG COUNTY Land Use and Environmental Service Agency Code Enforcement 2/9/11 ELECTRICAL CONSISTENCY MEETING Code Consistency Questions 1. I have a 500 KVA generator, with no overcurrent protection

More information

CONTINUING EDUC ATION

CONTINUING EDUC ATION 3 CONTINUING EDUC ATION FOR WISCONSIN ELECTRICIANS 2017 NEC Article 250 2 Hours WISCONSIN CONTRACTORS INSTITUTE N16 W23217 Stone Ridge Drive Suite 290 Waukesha, WI 53188 262-409-4282 www.wcitraining.com

More information

SOLAR PV MICROINVERTER/ACM STANDARD PLAN - COMPREHENSIVE Microinverter and ACM Systems for One- and Two- Family Dwellings

SOLAR PV MICROINVERTER/ACM STANDARD PLAN - COMPREHENSIVE Microinverter and ACM Systems for One- and Two- Family Dwellings SOLAR MICROINVERTER/M STANDARD PLAN - COMPREHENSIVE Microinverter and M Systems for One- and Two- Family Dwellings SCOPE: Use this plan ONLY for systems using utility-interactive Microinverters or Modules

More information

FTTH ENGINEERING AND INSTALLATION INTRODUCTION

FTTH ENGINEERING AND INSTALLATION INTRODUCTION 1 FTTH ENGINEERING AND INSTALLATION INTRODUCTION GROUNDING FTTH SYSTEMS AT THE HOME. By Dean Mischke, P.E., V.P. Grounding and bonding. Why are we worried about such an old school concept in the modern

More information

Article 250 Grounding & Bonding

Article 250 Grounding & Bonding Article 250 Grounding & Bonding AMERICAN ELECTRICAL INSTITUTE N16 W23217 Stone Ridge Dr. Waukesha, WI 53188 855-780-5046 www.aeitraining.com DISCLAIMER NOTE: This course is APPROVED for continuing education

More information

SAFETY AND HEALTH STANDARD ELECTRICAL GROUNDING Effective Date: 07/17/10 Standard: Document Number: KUCSH0039 Rev: 4

SAFETY AND HEALTH STANDARD ELECTRICAL GROUNDING Effective Date: 07/17/10 Standard: Document Number: KUCSH0039 Rev: 4 SAFETY AND HEALTH STANDARD ELECTRICAL GROUNDING Effective Date: 07/17/10 Standard: 16.10 Document Number: KUCSH0039 Rev: 4 16.10.1 INTRODUCTION 16.10.1.1 The intent of this standard is to ensure that continuity

More information

National Marine Manufacturers Association Compliance Specialist Examination A.C. Electrical (2018 Model Year) ABYC E-11 Supplement 56

National Marine Manufacturers Association Compliance Specialist Examination A.C. Electrical (2018 Model Year) ABYC E-11 Supplement 56 1. Two Electrical Technicians are discussing markings that are required for AC wiring. Tech A says that AC conductors must be rated for 600 volts and must have their jackets and individual conductors marked

More information

Journeyman's Practice Exam

Journeyman's Practice Exam Journeyman's Practice Exam [Time limit 4.0 hrs.] (The test is open book. I've started at the front of the Code Book and worked toward the back for instructional purposes. The real test will not be in order

More information

Part VIII Electrical GENERAL REQUIREMENTS CHAPTER 33

Part VIII Electrical GENERAL REQUIREMENTS CHAPTER 33 Part VIII Electrical CHAPTER 33 GENERAL REQUIREMENTS < SECTION E3301 GENERAL E3301.1 Scope. The installation of electrical systems, equipment and components indoors and outdoors that are within the scope

More information

Article 225: Outside Branch Circuits And Feeders

Article 225: Outside Branch Circuits And Feeders Part C: Code Book Questions Article 225: Outside Branch Circuits And Feeders 1.! Open (individual) aerial overhead conductors shall be insulated or covered when within! feet of a building.! (a) 10! (c)

More information

ELECTRIC GROUNDING AND WIRING REQUIREMENTS BOOTHS-METAL

ELECTRIC GROUNDING AND WIRING REQUIREMENTS BOOTHS-METAL BELL SYSTEM PRACTICES Plant Series SECTION 508-100-100 Issue 3, October 1970 AT&TCo Standard ELECTRIC GROUNDING AND WIRING REQUIREMENTS BOOTHS-METAL I. GENERAL 1.01 This section is reissued to: Revise

More information

Grounding and Bonding

Grounding and Bonding Grounding and Bonding 2017 Communications Academy Joe Blaschka Jr., PE Grounding/Bonding What is it? Why do we do it? What does the National Electrical Code say? What about fixed locations? What about

More information

2/15/2015. Current will always try to return to its source. In order for there to be current, there must be a complete circuit

2/15/2015. Current will always try to return to its source. In order for there to be current, there must be a complete circuit Current will always try to return to its source In order for there to be current, there must be a complete circuit Current will take as many paths or circuits available to it to return to the source The

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: Members of the NEC-Code Making Panel 16 FROM:

More information

COMMON WORK RESULTS FOR INTEGRATED AUTOMATION DESIGN AND CONSTRUCTION STANDARD

COMMON WORK RESULTS FOR INTEGRATED AUTOMATION DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

Jake Leahy s Electrical Code Connection. A look at Grounding and Bonding of Electrical Services Article Florida Building Code 5 th Edition

Jake Leahy s Electrical Code Connection. A look at Grounding and Bonding of Electrical Services Article Florida Building Code 5 th Edition Jake Leahy s Electrical Code Connection A look at Grounding and Bonding of Electrical Services Article 250 2014 Florida Building Code 5 th Edition Wiring Integrity. Completed wiring installations shall

More information

Electrical Wiring: Commercial, Seventh Canadian Edition

Electrical Wiring: Commercial, Seventh Canadian Edition Electrical Wiring Commercial Canadian 7th Edition Mullin SOLUTIONS MANUAL Full download at: https://testbankreal.com/download/electrical-wiring-commercialcanadian-7th-edition-mullin-solutions-manual/ Unit

More information

Chapter 1. Applied Grounding and Bonding. Applied Grounding and Bonding 9/18/2011. Introduction. Introduction. Paul Dobrowsky Member NEC Panel 5

Chapter 1. Applied Grounding and Bonding. Applied Grounding and Bonding 9/18/2011. Introduction. Introduction. Paul Dobrowsky Member NEC Panel 5 Applied Grounding and Bonding Paul Dobrowsky Member NEC Panel 5 1 Introduction This presentation is a representative sample from the following Chapters of Applied Grounding and Bonding. Chapter 1, Introduction

More information

Department of Labor and Industry Electrical Licensing

Department of Labor and Industry Electrical Licensing Department of Labor and Industry Electrical Licensing License Examination Guide The information in this guide is provided by the Licensing Unit of the Department of Labor and Industry to ensure that applicants

More information

Surge Protection and Grounding Issues

Surge Protection and Grounding Issues Surge Protection and Grounding Issues Presented to SCTE Chicago Chapter January 21, 2004 By: Nisar Chaudhry VP Electrical Engineering, CTO Introduction Transients caused by disturbances on the power lines

More information

NOTICE OF RULE MAKING PROCEEDINGS AND PUBLIC HEARING

NOTICE OF RULE MAKING PROCEEDINGS AND PUBLIC HEARING 1 1 1 1 1 NOTICE OF RULE MAKING PROCEEDINGS AND PUBLIC HEARING NORTH CAROLINA BUILDING CODE COUNCIL Notice of Rule-making Proceedings is hereby given by NC Building Code Council in accordance with G.S.

More information

Continued from Part 1 Rules 1 25.

Continued from Part 1 Rules 1 25. Continued from Part 1 Rules 1 25. 26 225.32 Disconnect Location The disconnecting means for a building or structure must be installed at a readily accessible location, either outside the building or structure

More information

I dedicate this book to the Lord Jesus Christ, my mentor and teacher. Proverbs 16:3 NOTICE TO THE READER ABOUT THE AUTHOR

I dedicate this book to the Lord Jesus Christ, my mentor and teacher. Proverbs 16:3 NOTICE TO THE READER ABOUT THE AUTHOR April 28, 2018 NOTICE TO THE READER The publisher does not warrant or guarantee any of the products described herein or perform any independent analysis in connection with any of the product information

More information

GENERAL SUBSCRIBER SERVICES TARIFF Pembroke Telephone Company, Inc. Third Revised Contents Sheet 1 Cancels Second Revised Contents Sheet 1

GENERAL SUBSCRIBER SERVICES TARIFF Pembroke Telephone Company, Inc. Third Revised Contents Sheet 1 Cancels Second Revised Contents Sheet 1 GENERAL SUBSCRIBER SERVICES TARIFF Pembroke Telephone Company, Inc. Section N Third Revised Contents Sheet 1 Cancels Second Revised Contents Sheet 1 N. CONNECTION WITH CERTAIN FACILITIES AND/OR EQUIPMENT

More information

A. Product Description: Stranded conductor insulated wire.

A. Product Description: Stranded conductor insulated wire. SECTION 16120CPPR CONDUCTORS AND CABLE PART 1 - GENERAL 1.1 SYSTEM DESCRIPTION A. Product Requirements: Provide products as follows: 1. All building wire shall be stranded copper (no aluminum wire). 2.

More information

Electrical IP Red Seal Practice Exam

Electrical IP Red Seal Practice Exam Electrical IP Red Seal Practice Exam PRACTICE EXAM-3 1. What size 2 pole breaker must you use on a 3HP, 115V single phase motor? A. 40A B. 50A C. 80A. D. 100A. 2. An electrical equipment approved for use

More information

CHAPTER 2 Wiring and Protection. Article 200 Use and Identification of Grounded Conductors

CHAPTER 2 Wiring and Protection. Article 200 Use and Identification of Grounded Conductors ARTICLE 200 USE AND IDENTIFICATION OF GROUNDED CONDUCTORS 70 35 CHAPTER 2 Wiring and Protection Article 200 Use and Identification of Grounded Conductors 200-1. Scope. This article provides requirements

More information

A. Product Data: For each electrical identification product indicated.

A. Product Data: For each electrical identification product indicated. SECTION 16075 - ELECTRICAL IDENTIFICATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

Short-Circuit Current Calculations

Short-Circuit Current Calculations Basic Point-to-Point Calculation Procedure Step. Determine the transformer full load amps (F.L.A.) from either the nameplate, the following formulas or Table : Multiplier = 00 *% Z transformer Step 2.

More information

FINAL - ER 70 Electrician Regulations Answer Schedule. Question 1 Marks Reference Marking notes

FINAL - ER 70 Electrician Regulations Answer Schedule. Question 1 Marks Reference Marking notes FINAL - ER 70 Electrician Regulations Answer Schedule Notes:1. (1 mark) means that the preceding statement/answer earns 1 mark. 2. This schedule sets out the expected answers to the examination questions.

More information

Section 6: System Grounding Bill Brown, P.E., Square D Engineering Services

Section 6: System Grounding Bill Brown, P.E., Square D Engineering Services Section 6: System Grounding Bill Brown, P.E., Square D Engineering Services Introduction The topic of system grounding is extremely important, as it affects the susceptibility of the system to voltage

More information

SIMpull THHN, it slips and slides - all with NoLube.

SIMpull THHN, it slips and slides - all with NoLube. SOUTHWIRE S SIMpull THHN Southwire maintains its goal of revolutionizing the wire industry by providing its consumers with a product that is not only SIMpull but also requires NoLube. SIMpull THHN is a

More information

Wiring of the Main Distribution Panelboard

Wiring of the Main Distribution Panelboard Job Sheet 4 Wiring of the Main Distribution Panelboard OBJECTIVE To connect the service-entrance conductors. To ground the main distribution panelboard (MDP). To wire a branch circuit supplying a three-phase

More information

Tower Grounding Training For Telecommunications Networks

Tower Grounding Training For Telecommunications Networks Tower Grounding Training For Telecommunications Networks Contact us Today for a FREE quotation to deliver this course at your company?s location. https://www.electricityforum.com/onsite-training-rfq The

More information

Ameritron RCS-10 INTRODUCTION

Ameritron RCS-10 INTRODUCTION Ameritron RCS-10 INTRODUCTION The RCS-10 is a versatile antenna switch designed for 50-ohm systems. It handles high power, and sealed relays offer excellent life and connection reliability. It requires

More information

POWER DELEGATOR SERIES 7200A POWER DISTRIBUTION UNIT WITH POWER CONDITIONING GENERAL SPECIFICATIONS

POWER DELEGATOR SERIES 7200A POWER DISTRIBUTION UNIT WITH POWER CONDITIONING GENERAL SPECIFICATIONS POWER DELEGATOR SERIES 7200A POWER DISTRIBUTION UNIT WITH POWER CONDITIONING GENERAL SPECIFICATIONS 1.0 SCOPE The following specification describes the features, design, and application of the Series 7200A

More information

SECTION BUILDING WIRE AND CABLE

SECTION BUILDING WIRE AND CABLE SECTION 260519 PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Building wire and cable. 2. Wiring connectors and connections. B. RELATED SECTIONS 1. Section 26 05 53 Electrical Identification. 2. Section

More information

UNITY/I TM. Installation Manual. UT3K, UT4K, UT5K and UT8K. Single-Phase Uninterruptible Power Systems

UNITY/I TM. Installation Manual. UT3K, UT4K, UT5K and UT8K. Single-Phase Uninterruptible Power Systems UNITY/I TM UT3K, UT4K, UT5K and UT8K Single-Phase Uninterruptible Power Systems Installation Manual MLS-0351C-OL Copyright 1994-1997 Best Power. All rights reserved. å IMPORTANT SAFETY INSTRUCTIONS! SAVE

More information

SECTION ELECTRICAL IDENTIFICATION

SECTION ELECTRICAL IDENTIFICATION SECTION 16075 ELECTRICAL IDENTIFICATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS SECTION 270536 - CABLE TRAYS FOR COMMUNICATIONS SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

SECTION WIRE AND CABLES. A. The CONTRACTOR shall provide wires and cable, complete and operable, in accordance with the Contract Documents.

SECTION WIRE AND CABLES. A. The CONTRACTOR shall provide wires and cable, complete and operable, in accordance with the Contract Documents. SECTION 26 05 19 PART 1 - GENERAL 1.1 THE REQUIREMENT A. The CONTRACTOR shall provide wires and cable, complete and operable, in accordance with the Contract Documents. 1.2 CONTRACTOR SUBMITTALS A. The

More information

Overview of Grounding for Industrial and Commercial Power Systems Presented By Robert Schuerger, P.E.

Overview of Grounding for Industrial and Commercial Power Systems Presented By Robert Schuerger, P.E. Overview of Grounding for Industrial and Commercial Power Systems Presented By Robert Schuerger, P.E. HP Critical Facility Services delivered by EYP MCF What is VOLTAGE? Difference of Electric Potential

More information

ENGINEERING COMMITTEE Interface Practices Subcommittee AMERICAN NATIONAL STANDARD ANSI/SCTE

ENGINEERING COMMITTEE Interface Practices Subcommittee AMERICAN NATIONAL STANDARD ANSI/SCTE ENGINEERING COMMITTEE Interface Practices Subcommittee AMERICAN NATIONAL STANDARD ANSI/SCTE 177 2012 Specification for Braided 75 Ω, Mini-Series Quad Shield Coaxial Cable for CMTS and SDI cables NOTICE

More information

Applying the NEC to Amateur Radio. By Tim Kuhlman, PE

Applying the NEC to Amateur Radio. By Tim Kuhlman, PE Applying the NEC to Amateur Radio By Tim Kuhlman, PE KD7RUS Purpose of this Course Detail Review of the National Electrical Code as it Applies to Amateur Radio Overview of the NEC Structure Define Article

More information

Central Electronics Model 600L Linear Amplifier

Central Electronics Model 600L Linear Amplifier INTRODUCTION This manual has been reproduced by James Lawrence, NA5RC, a 600L owner. Text no longer applicable such as insurance claim with the carrier has been deleted. Some capitalization and grammar

More information

a) Determine the smallest, standard-sized circuit breaker that should be used to protect this branch circuit.

a) Determine the smallest, standard-sized circuit breaker that should be used to protect this branch circuit. ECET4520 Exam II Sample Exam Problems Instructions: This exam is closed book, except for the reference booklet provided by your instructor and one (8.5 x11 ) sheet of handwritten notes that may not contain

More information

Electrical requirements for plans on all new homes, additions, remodels & Service upgrades

Electrical requirements for plans on all new homes, additions, remodels & Service upgrades CHERRY HILLS VILLAGE COLORADO Electrical requirements for plans on all new homes, additions, remodels & Service upgrades Due to the size and uniqueness of homes built in Cherry Hills Village, a policy

More information

Grounding and Bonding of Service Equipment

Grounding and Bonding of Service Equipment Grounding and Bonding of Service Equipment 1. Grounding means: attached to an earth ground. 2. Bonding means: physically connected to insure electrical continuity. NEC 250.4 1. Grounding: Electrical Systems

More information

SECTION CABLE TRAYS

SECTION CABLE TRAYS SECTION 16139 CABLE TRAYS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,

More information

INTRODUCTION...xiii Author s Comments...xiii Exam Preparation...xiii Difficult Concepts...xiv Textbook Errors and Corrections...xv Internet...

INTRODUCTION...xiii Author s Comments...xiii Exam Preparation...xiii Difficult Concepts...xiv Textbook Errors and Corrections...xv Internet... INTRODUCTION...xiii Author s Comments...xiii Exam Preparation...xiii Difficult Concepts...xiv Textbook Errors and Corrections...xv Internet...xv UNIT 1 ELECTRICIAN S MATH AND BASIC ELECTRICAL FORMULAS...1

More information

2014 NEC Changes Part 1

2014 NEC Changes Part 1 www.garyklinka.com Page 1 of 8 Instructions: Fee $20 1. Print these pages. 2. Circle the correct answers and transfer them to the answer sheet. 3. Page down to the last page for the verification forms

More information

EPG. by Chris C. Kleronomos

EPG. by Chris C. Kleronomos April 1994 EFFECTIVE EQUIPMENT GROUNDING ECOS Electronics Corporation by Chris C. Kleronomos The quality of the electrical wiring and grounding in a facility containing sensitive electronic equipment is

More information

Outdoor Installation 2: Lightning Protection and Grounding

Outdoor Installation 2: Lightning Protection and Grounding Outdoor Installation 2: Lightning Protection and Grounding Training materials for wireless trainers This one hour talk covers lightning protection, grounding techniques and problems, and electrolytic incompatibility.

More information

SBCA Industry Standards Subcommittee. Specification for 75 Ω Flexible RF Coaxial Drop Cable for Direct Broadcast Satellite (DBS) Installations

SBCA Industry Standards Subcommittee. Specification for 75 Ω Flexible RF Coaxial Drop Cable for Direct Broadcast Satellite (DBS) Installations SBCA Industry Standards Subcommittee Document: SBCA Series 6 Recommended Practices Date of Issue: Specification for 75 Ω Flexible RF Coaxial Drop Cable for Direct Broadcast Satellite (DBS) Installations

More information

SECTION INTERCOMMUNICATIONS SYSTEMS. A. Section Includes: Manually switched intercommunications systems with the following components:

SECTION INTERCOMMUNICATIONS SYSTEMS. A. Section Includes: Manually switched intercommunications systems with the following components: SECTION 275123 INTERCOMMUNICATIONS SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: Manually switched intercommunications systems with the following components: 1. Master stations (EXISTING).

More information

National Radio Astronomy Observatory Socorro, NM EVLA Memorandum 41 Lightning Protection for Fiber Optic Cable. T. Baldwin June 05, 2002

National Radio Astronomy Observatory Socorro, NM EVLA Memorandum 41 Lightning Protection for Fiber Optic Cable. T. Baldwin June 05, 2002 National Radio Astronomy Observatory Socorro, NM 87801 EVLA Memorandum 41 Lightning Protection for Fiber Optic Cable T. Baldwin June 05, 2002 Summary Double-armor triple-sheath fiber optic cable will be

More information

Unit 3 Magnetism...21 Introduction The Natural Magnet Magnetic Polarities Magnetic Compass...21

Unit 3 Magnetism...21 Introduction The Natural Magnet Magnetic Polarities Magnetic Compass...21 Chapter 1 Electrical Fundamentals Unit 1 Matter...3 Introduction...3 1.1 Matter...3 1.2 Atomic Theory...3 1.3 Law of Electrical Charges...4 1.4 Law of Atomic Charges...4 Negative Atomic Charge...4 Positive

More information

Chapter 1 Electrical Theory and Part C Series Parallel and Code Questions Multiwire Branch Circuits Unit 1 Electrician s Math

Chapter 1 Electrical Theory and Part C Series Parallel and Code Questions Multiwire Branch Circuits Unit 1 Electrician s Math Chapter 1 Electrical Theory and Code Questions 1 Unit 1 Electrician s Math and Basic Electrical Formulas 3 Part A Electrician s Math 3 1 1 Fractions 3 1 2 Kilo 4 1 3 Knowing Your Answer 4 1 4 Multiplier

More information

Electrical Occupations

Electrical Occupations Job Ready Assessment Blueprint Electrical Occupations Test Code: 3029 / Version: 01 Copyright 2011. All Rights Reserved. General Assessment Information Blueprint Contents General Assessment Information

More information

Preface...x Chapter 1 Electrical Fundamentals

Preface...x Chapter 1 Electrical Fundamentals Preface...x Chapter 1 Electrical Fundamentals Unit 1 Matter...3 Introduction...3 1.1 Matter...3 1.2 Atomic Theory...3 1.3 Law of Electrical Charges...4 1.4 Law of Atomic Charges...5 Negative Atomic Charge...5

More information

SECTION EMERGENCY RESPONDER RADIO COVERAGE SYSTEMS

SECTION EMERGENCY RESPONDER RADIO COVERAGE SYSTEMS 510.1 Emergency responder radio coverage in new buildings. Approved radio coverage for emergency responders shall be provided within all buildings meeting any one of the following conditions: 1. There

More information

CATALOG OF PRODUCTS. Your Best Supplier of Electrical Cables

CATALOG OF PRODUCTS. Your Best Supplier of Electrical Cables CATALOG OF PRODUCTS Isolated Copper Wire THHN/MTW/THWN-2 600V, single conductor having flame-retardant and heat-resistant thermoplastic insulation with a jacket of extruded nylon or equivalent material.

More information

Agenda. Earthing of Telecom Installations using Single Point Earthing. Reference Documents. How many earths? Earthing Issue...

Agenda. Earthing of Telecom Installations using Single Point Earthing. Reference Documents. How many earths? Earthing Issue... Earthing of Telecom Installations using Single Point Earthing R. Saji Kumar DGM (IT) O/o The Chief General Manager Trivandrum Agenda Reference Documents Earthing Issue & the Problems Earthing Principle

More information

14 AWG 2 AWG: 600 Volt

14 AWG 2 AWG: 600 Volt INDUSTRIAL AUTOMATION & PROCESS CONTROL CABLES 18.70 600V Type MC Metal Clad and Teck-Style Cables Overview Metal Clad Interlocked PVC Outer Jacket Teck-Style PVC Outer Jacket Introduction Polyester Wrap

More information

ER 87 Electrician Regulations Answer Schedule. Question 1 Marks Reference Marking notes. (1 mark) ESR 27(2) (2 marks) ESR 74A(1AA)

ER 87 Electrician Regulations Answer Schedule. Question 1 Marks Reference Marking notes. (1 mark) ESR 27(2) (2 marks) ESR 74A(1AA) ER 87 Electrician Regulations Answer Schedule Notes:1. (1 mark) means that the preceding statement/answer earns 1 mark. 2. This schedule sets out the expected answers to the examination questions. The

More information

Emergency responder radio coverage in new buildings. California Fire Code Section is hereby amended to read:

Emergency responder radio coverage in new buildings. California Fire Code Section is hereby amended to read: Sunnyvale 2013 Fire Code Section 510 16.52.510. Emergency responder radio coverage. (a) Emergency responder radio coverage in new buildings. California Fire Code Section 510.1 is hereby amended to read:

More information

TekLink TL100 with Passive Infrared Sensing System Overview

TekLink TL100 with Passive Infrared Sensing System Overview TekLink TL100 with Passive Infrared Sensing System Overview 1.0 Control Systems CS 1 TekLink TL100 with Infrared Application Guide Contents 1.0 Introduction 2 2.0 Basic Operating Principles 3 3.0 Normal

More information

A statistical survey of common-mode noise

A statistical survey of common-mode noise A statistical survey of common-mode noise By Jerry Gaboian Characterization Engineer, High Performance Linear Department Introduction In today s high-tech world, one does not have to look very far to find

More information

2011 / Circuit Tracer

2011 / Circuit Tracer INSTRUCTION MANUAL 2011 / 00521 Circuit Tracer Read and understand all of the instructions and safety information in this manual before operating or servicing this tool. 52044992 2008 Greenlee Textron

More information

SECTION WIREWAYS FOR RADIOLOGY EQUIPMENT

SECTION WIREWAYS FOR RADIOLOGY EQUIPMENT PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 05 36 WIREWAYS FOR RADIOLOGY EQUIPMENT SPEC WRITER NOTE: Delete between //----// if not applicable to project. Also, delete any other item or paragraph not applicable

More information

A short, off-center fed dipole for 40 m and 20 m by Daniel Marks, KW4TI

A short, off-center fed dipole for 40 m and 20 m by Daniel Marks, KW4TI A short, off-center fed dipole for 40 m and 20 m by Daniel Marks, KW4TI Version 2017-Nov-7 Abstract: This antenna is a 20 to 25 foot long (6.0 m to 7.6 m) off-center fed dipole antenna for the 20 m and

More information

SECTION PANELBOARDS

SECTION PANELBOARDS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 24 16 PANELBOARDS SPEC WRITER NOTE: Delete between // --- // if not applicable to project. Also, delete any other item or paragraph not applicable in the section

More information

2017 NEC TABLE OF CONTENTS

2017 NEC TABLE OF CONTENTS Article 90 Introduction 90.1 Purpose (A) Practical Safeguarding (B) Adequacy (C) Relation to Other International Standards 90.2 Scope (A Covered (B) Not Covered (C) Special Permission 90.3 Code Arrangement

More information

Telecommunication Wiring Questions

Telecommunication Wiring Questions Telecommunication Wiring Questions 1. is the process of modifying a carrier frequency in rhythm to the audio frequency. A, Modulation B. Amplitude C. Change of phase D. Interference 2. is the property

More information

SECTION COMMUNICATIONS ELECTRICAL POWER DISTRIBUTION

SECTION COMMUNICATIONS ELECTRICAL POWER DISTRIBUTION SECTION 16715 COMMUNICATIONS ELECTRICAL POWER DISTRIBUTION PART 1 - GENERAL 1.01 SECTION DESCRIPTION AND BASIC REQUIREMENTS A. The Electrical Power Distribution System provides power distribution from

More information

6. Internal lightning protection

6. Internal lightning protection 6. Internal lightning protection 6.1 Equipotential bonding for metal installations Equipotential bonding according to IEC 60364-4- 41 and IEC 60364-5-54 Equipotential bonding is required for all newly

More information

THHN12STGN500 THHN 12 STR Green 500

THHN12STGN500 THHN 12 STR Green 500 3804 South Street 75964-7263, TX Nacogdoches Phone: 936-569-7941 Fax: 936-560-4685 AllenWatson@elliottelectric.com Catalog Number Manufacturer Description Weight per unit Product Category Features Conductor

More information

UNION COUNTY ENGINEER DIVISION OF BUILDING REGULATIONS

UNION COUNTY ENGINEER DIVISION OF BUILDING REGULATIONS UNION COUNTY ENGINEER DIVISION OF BUILDING REGULATIONS Residential Pool Permit Requirements FEES: A nonrefundable permit application fee of $25.25 and a nonrefundable plan review fee of $40.40 will be

More information

THHN2BK2500 THHN 2 STR Black 2500

THHN2BK2500 THHN 2 STR Black 2500 3804 South Street 75964-7263, TX Nacogdoches Phone: 936-569-7941 Fax: 936-560-4685 AllenWatson@elliottelectric.com Catalog Number Manufacturer Description Weight per unit Product Category Features Conductor

More information

UBC Technical Guidelines Section Edition Medium-Voltage Transformers Page 1 of 5

UBC Technical Guidelines Section Edition Medium-Voltage Transformers Page 1 of 5 Page 1 of 5 1.0 GENERAL 1.1 Coordination Requirements.1 UBC Energy & Water Services.2 UBC Building Operations 1.2 Description.1 UBC requirements for Substation Transformers. 2.0 MATERIAL AND DESIGN REQUIREMENTS

More information

CBSE TEST PAPER-01 CLASS - X Science (Electricity and its Effects)

CBSE TEST PAPER-01 CLASS - X Science (Electricity and its Effects) CBSE TEST PAPER-01 CLASS - X Science (Electricity and its Effects) 1. Which two circuit components are connected in parallel in the following circuit diagram? - >. < < 2. A metallic conductor has loosely

More information

high RESISTANCE GROUNDING SYSTEM the power to protect www. ElectricalPartManuals. com Instruction Manual C-102

high RESISTANCE GROUNDING SYSTEM the power to protect www. ElectricalPartManuals. com Instruction Manual C-102 G e m i n i high RESISTANCE GROUNDING SYSTEM the power to protect Instruction Manual C-102 HIGH RESISTANCE GROUNDING SYSTEM Gemini is a unique, fail safe, all-in-one neutral grounding system, combining

More information

6419X Conduit Cable. Dungannon Electrical Wholesale Tel: Page 1 of 10

6419X Conduit Cable. Dungannon Electrical Wholesale Tel: Page 1 of 10 6419X Conduit Cable Application: Industrial and commercial wiring, these cables are intended for installation in trunking and conduit. They may also be used inside fixed, protected installations such as

More information

GROUNDED ELECTRICAL POWER DISTRIBUTION. Excerpt from Inverter Charger Series Manual BY: VIJAY SHARMA ENGINEER

GROUNDED ELECTRICAL POWER DISTRIBUTION. Excerpt from Inverter Charger Series Manual BY: VIJAY SHARMA ENGINEER GROUNDED ELECTRICAL POWER DISTRIBUTION Excerpt from Inverter Charger Series Manual BY: VIJAY SHARMA ENGINEER .0 Conductors for Electrical Power Distribution For single-phase transmission of AC power or

More information

ECET Fall 2017 Name: _ Lab Assignment #01

ECET Fall 2017 Name: _ Lab Assignment #01 ECET 4520 - Fall 2017 Name: _ Lab Assignment #01 General Instructions: This assignment is to be completed individually. All answers/work required for each problem should be neatly written in the space

More information

SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-I) UNDERGROUND NETWORK GROUNDING. Rev. 01

SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-I) UNDERGROUND NETWORK GROUNDING. Rev. 01 SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-I) UNDERGROUND NETWORK GROUNDING Rev. 01 This specification is property of SEC and subject to change or modification without any notice

More information

Grounding for Power Quality

Grounding for Power Quality Presents Grounding for Power Quality Grounding for Power Quality NEC 250.53 states that ground resistance should be less than 25 ohms. Is this true? Grounding for Power Quality No! NEC 250.53 states

More information

Basic Information Required for Photovoltaic Plan Check Submittal *Informational Purposes Only*

Basic Information Required for Photovoltaic Plan Check Submittal *Informational Purposes Only* 1444 West Garvey Avenue West Covina, CA 91793 Phone: 626-939-8425 Basic Information Required for Photovoltaic Plan Check Submittal *Informational Purposes Only* ADMINISTRATIVE 1. The following clearances

More information

SECTION 3 BASIC AUTOMATIC CONTROLS UNIT 12 BASIC ELECTRICITY AND MAGNETISM. Unit Objectives. Unit Objectives 2/29/2012

SECTION 3 BASIC AUTOMATIC CONTROLS UNIT 12 BASIC ELECTRICITY AND MAGNETISM. Unit Objectives. Unit Objectives 2/29/2012 SECTION 3 BASIC AUTOMATIC CONTROLS UNIT 12 BASIC ELECTRICITY AND MAGNETISM Unit Objectives Describe the structure of an atom. Identify atoms with a positive charge and atoms with a negative charge. Explain

More information

Descriptions RoHS Compatible; Applicable Standard ASTM B3, ASTM B8, ASTM B787, Federal Specification A-A-59544, NFPA 70, NEMA WC-70

Descriptions RoHS Compatible; Applicable Standard ASTM B3, ASTM B8, ASTM B787, Federal Specification A-A-59544, NFPA 70, NEMA WC-70 3804 South Street 75964-7263, TX Nacogdoches Phone: 936-569-7941 Fax: 936-560-4685 THHN12S0LBK500 THHN 12 Sol Black 500 Southwire Company Catalog Number Manufacturer Description Weight per unit Product

More information

THHN6WH500 THHN 6 STR White 500. Features Conductor Size Current Rating 55 AMPERE (60 DEG C), 65 AMPERE (75 DEG C), 75 AMPERE (90 DEG C)

THHN6WH500 THHN 6 STR White 500. Features Conductor Size Current Rating 55 AMPERE (60 DEG C), 65 AMPERE (75 DEG C), 75 AMPERE (90 DEG C) 3804 South Street 75964-7263, TX Nacogdoches Phone: 936-569-7941 Fax: 936-560-4685 Catalog Number Manufacturer Description Weight per unit Product Category THHN6WH500 THHN 6 STR White 500 Southwire Company

More information

Descriptions RoHS Compatible; Applicable Standard ASTM B3, ASTM B8, ASTM B787, Federal Specification A-A-59544, NFPA 70, NEMA WC-70

Descriptions RoHS Compatible; Applicable Standard ASTM B3, ASTM B8, ASTM B787, Federal Specification A-A-59544, NFPA 70, NEMA WC-70 3804 South Street 75964-7263, TX Nacogdoches Phone: 936-569-7941 Fax: 936-560-4685 THHN500BK500 THHN 500 STR Black 500 Southwire Company Catalog Number Manufacturer Description Weight per unit Product

More information