DER_A Benchmark Update

Size: px
Start display at page:

Download "DER_A Benchmark Update"

Transcription

1 DER_A Benchmark Update Deepak Ramasubramanian, EPRI Anish Gaikwad, EPRI Pouyan Pourbeik, PEACE NERC LMTF October 31 st 2017 Austin, TX

2 DISCLAIMER The DER_A model is still a beta model under test and development and is right now not fully developed for use in bulk power system studies. 2

3 Power flow comparison Software Bus 1 V (pu) Ang (deg) Pg (MW) Qg (MW) Pd (MW) Qd (MW) PSLF PSS E Software Bus 2 V (pu) Ang (deg) Pg (MW) Qg (MW) Pd (MW) Qd (MW) PSLF PSS E PowerWorld Used PSS E RAW file PowerWorld Used PSS E RAW file DSA Tools Used PSLF EPC file DSA Tools Used PSLF EPC file Software Bus V (pu) Ang (deg) Pg (MW) Qg (MW) Pd (MW) Qd (MW) PSLF PSS E Software Bus V (pu) Ang (deg) Pg (MW) Qg (MW) Pd (MW) Qd (MW) PSLF PSS E PowerWorld Used PSS E RAW file PowerWorld Used PSS E RAW file DSA Tools Used PSLF EPC file DSA Tools Used PSLF EPC file 3

4 Tests completed from test protocol Test number Description A Minimum value greater than vl1 B Minimum value less than vl1 for time lesser than tvl1 C Minimum value less than vl1 for time greater than tvl1 1 D Voltage play-in Minimum value less than vl0 for time lesser than tvl0 E Minimum value less than vl0 for time greater than tvl0 F Vl1=vl0 G Similar tests on the high side of the trip logic A Minimum value less than fl for time lesser than tfl 2 B Frequency play-in Minimum value less than fl for time greater than tfl C Similar tests on the high side of the trip logic 6 In frequency response mode, change in power output to change in observed frequency 4

5 Summary of observed inconsistencies Tests 1B 1E & 1Gii 1Gv Pseudo code output doesn t match in terms of transient values. Tests 1D and 1Giv Significant difference in ramp recovery of active power, and peak of reactive power Test 1E Post disturbance power output in PowerWorld recovers to pre-disturbance level while it goes to zero in other software. 5

6 Summary of observed inconsistencies (cont d) Test 2A PSS E: Frequency multiplier value goes to zero as soon as frequency goes below threshold. Timer is involved only in assessing whether multiplier value comes back to 1 or not. Spikes in measured bus frequency Tests 2B and 2Cii PowerWorld and TSAT spikes in measured bus frequency at time of trip. Tests 2B and 2Cii PSLF Step rise in bus voltage Tests 2Ci and 2Cii PSS E Possible numerical robustness issue General issue: PowerWorld Value of frequency trip threshold is required in Hz, but GUI dialog mentions per unit. 6

7 Summary of observed inconsistencies (cont d) Test 6i and 6ii 0.2 MW difference in final steady state power output for same bus observed frequency. Test 7A Significant difference in ramp recovery of active power and bus frequency PSLF PSS E PowerWorld TSAT 7

8 Test 1A Spikes in reactive power are for at most three integration time steps with each time step being s 8

9 Test 1B Voltage magnitude at the terminal of the model 9

10 Test 1B Voltage Multiplier 10

11 Test 1B Active Power 11

12 Test 1B Reactive Power 12

13 Test 2A Bus frequency at the terminal of model 13

14 Test 2A Frequency Multiplier 14

15 Test 2A Active Power 15

16 Test 7A Terminal Voltage 16

17 Test 7A Active Power 17

18 Test 7A Reactive Power 18

19 Test 7A Bus Frequency 19

20 Future steps Tests left to be performed 3 In voltage control mode, step change in Vref0 4 In constant Q mode, step change to Qref 5 In constant power factor mode, step change to Pref to observe output P and Q 7 A B C To test the voltage source interface, with Tg = 0.02s, apply a fault on Bus 2 and/or BusX21 Xe = 0.2pu on self MVA base Xe = 0.5pu on self MVA base Xe = 0.8pu on self MVA base 1. Continue Tests 1, 2 and 6 based on feedback from these first set of tests. PSS E and PowerWorld have provided updated DLLs which address most of the issues observed. Upon receiving updated DLLs for GE-PSLF and TSAT, these tests will be re-run. Timeline for completion January Start discussion on roadmap for second phase of testing to test numerical robustness of the model. 3. Detailed information on results of all tests were presented at the WECC REMTF meeting on October 4 th The presentation can be found at 20

21 Together Shaping the Future of Electricity 21

PROPOSED MODEL SPECIFICATION FOR SIMPLE VSC-HVDC

PROPOSED MODEL SPECIFICATION FOR SIMPLE VSC-HVDC PROPOSED MODEL SPECIFICATION FOR SIMPLE VSC-HVDC TO: WECC HVDC TF & EPRI P40.016 FROM: POUYAN POURBEIK, POWER AND ENERGY, ANALYSIS, CONSULTING AND EDUCATION, PLLC (PEACE ) SUBJECT: PROPOSED MODEL SPECIFICATION

More information

Endorsed Assignments from ERS Framework

Endorsed Assignments from ERS Framework ERSTF Completion Endorsed Assignments from ERS Framework Ref Number Title ERS Recommendatio n Ongoing Responsibility 1 Synch Inertia at Interconnection Level Measure 2 Initial Frequency Deviation Measure

More information

Real Time Stability Analysis at Peak Reliability. Slaven Kincic, Hongming Zhang JSIS May 2017, SLC

Real Time Stability Analysis at Peak Reliability. Slaven Kincic, Hongming Zhang JSIS May 2017, SLC Real Time Stability Analysis at Peak Reliability Slaven Kincic, Hongming Zhang JSIS May 2017, SLC Overview: Overview of Peak s DSA Application; o Set up o User Cases Transient Stability Criteria; TSAT

More information

Response of Grid Interconnected Solar PV inverters to Transmission System Faults

Response of Grid Interconnected Solar PV inverters to Transmission System Faults Response of Grid Interconnected Solar PV inverters to Transmission System Faults David Piper, P.E. Operations Planning & Analysis SCE Grid Control Center July 18, 2017 1 OVERVIEW 1. Overview of the event

More information

Loss of Solar Resources during Transmission Disturbances due to Inverter Settings II

Loss of Solar Resources during Transmission Disturbances due to Inverter Settings II Loss of Solar Resources during Transmission Disturbances due to Inverter Settings II Informational Webinar on Level 2 NERC Alert Ryan Quint, Senior Manager, Advanced Analytics and Modeling Rich Bauer,

More information

Lessons Learned in Model Validation for NERC Compliance

Lessons Learned in Model Validation for NERC Compliance Lessons Learned in Model Validation for NERC Compliance usa.siemens.com/digitalgrid NERC Modeling, Data, and Analysis MOD 025 2: Generator Real and Reactive Power Capability Demonstration MOD 026 1: Verification

More information

WECC CMPLDW Phase 2 Study update. LMTF April 18 th, 2017 Atlanta, GA

WECC CMPLDW Phase 2 Study update. LMTF April 18 th, 2017 Atlanta, GA WECC CMPLDW Phase 2 Study update LMTF April 18 th, 2017 Atlanta, GA Background CMPLDW load model phase 1 has been in approved WECC cases since 2013, it s the best available model to capture system oscillations,

More information

1200 MW Fault Induced Solar Photovoltaic Resource Interruption Disturbance Report

1200 MW Fault Induced Solar Photovoltaic Resource Interruption Disturbance Report 1200 MW Fault Induced Solar Photovoltaic Resource Interruption Disturbance Report Rich Bauer Associate Director Reliability Risk Management / Event Analysis Mid C Seminar July 19, 2017 Western Interconnection

More information

GMD Voltage Collapse Study

GMD Voltage Collapse Study GMD Voltage Collapse Study Terry Volkmann 2016 Fall Reliability Conference November 2, 2016 1 GMD Voltage Collapse Studies in Wisconsin and Maine Overview: Modeling shows GMD Voltage Collapse Issues: Power

More information

Reliability Guideline

Reliability Guideline Reliability Guideline Distributed Energy Resource Modeling September 2017 DRAFT NERC Report Title Report Date I Table of Contents Preface... iii Preamble... iv Purpose...1 Chapter 1: DER Dynamic Load Modeling

More information

Reliability Guideline

Reliability Guideline Reliability Guideline Distributed Energy Resource Modeling September 2017 NERC Report Title Report Date I Table of Contents Preface... iii Preamble... iv Executive Summary...1 Chapter 1: DER Dynamic Load

More information

Lessons Learned in Model Validation for NERC Compliance

Lessons Learned in Model Validation for NERC Compliance Lessons Learned in Model Validation for NERC Compliance usa.siemens.com/digitalgrid NERC Modeling, Data, and Analysis MOD 025 2: Generator Real and Reactive Power Capability Demonstration MOD 026 1: Verification

More information

The Engineering Problem. Calculating GIC Flow through the EHV System

The Engineering Problem. Calculating GIC Flow through the EHV System The Engineering Problem Calculating GIC Flow through the EHV System 1 Creating the GIC System Model Since the EHV system is a three-phase balanced network, it is only necessary to model a single-phase

More information

Fault Ride Through Technical Assessment Report Template

Fault Ride Through Technical Assessment Report Template Fault Ride Through Technical Assessment Report Template Notes: 1. This template is intended to provide guidelines into the minimum content and scope of the technical studies required to demonstrate compliance

More information

ECEN 667 Power System Stability Lecture 12: Exciter Models

ECEN 667 Power System Stability Lecture 12: Exciter Models ECEN 667 Power System Stability Lecture 12: Exciter Models Prof. Tom Overbye Dept. of Electrical and Computer Engineering Texas A&M University, overbye@tamu.edu 1 Announcements Read Chapter 4 Homework

More information

MODELING OF TRANSFORMERS IN WECC BASE CASES. For WECC SRWG By Rohan Chatterjee Electrical Engineer Transmission Planning

MODELING OF TRANSFORMERS IN WECC BASE CASES. For WECC SRWG By Rohan Chatterjee Electrical Engineer Transmission Planning MODELING OF TRANSFORMERS IN WECC BASE CASES For WECC SRWG By Rohan Chatterjee Electrical Engineer Transmission Planning rohan.chatterjee@pgn.com Present Utility Practices Problems with present practices

More information

Synchrophasor Technology PMU Use Case Examples

Synchrophasor Technology PMU Use Case Examples 1 IEEE Tutorial on Use of Synchrophasors in Grid Operations - Oscillation Source Detection and Operational Use of Synchrophasors Synchrophasor Technology PMU Use Case Examples Sarma (NDR) Nuthalapati,

More information

Inverter-Based Resource Disturbance Analysis

Inverter-Based Resource Disturbance Analysis Inverter-Based Resource Disturbance Analysis Key Findings and Recommendations Informational Webinar February 15, 2018 August 16, 2016 Blue Cut Fire Disturbance Key Findings and Recommendations 2 Western

More information

Operationalizing Phasor Technology. Model Validation. Webinar. Ken Martin. March 4, Presented by. Page 0

Operationalizing Phasor Technology. Model Validation. Webinar. Ken Martin. March 4, Presented by. Page 0 Operationalizing Phasor Technology Model Validation Webinar March 4, 2014 Presented by Ken Martin Page 0 Model Use and Validation for Operations and Planning Compare System Performance with Model Prediction

More information

Unit Auxiliary Transformer (UAT) Relay Loadability Report

Unit Auxiliary Transformer (UAT) Relay Loadability Report Background and Objective Reliability Standard, PRC 025 1 Generator Relay Loadability (standard), developed under NERC Project 2010 13.2 Phase 2 of Relay Loadability: Generation, was adopted by the NERC

More information

Sarma (NDR) Nuthalapati, PhD

Sarma (NDR) Nuthalapati, PhD SYNCHROPHASOR TECHNOLOGY PMU USE CASE EXAMPLES Sarma (NDR) Nuthalapati, PhD Research Scientist Texas A&M University, College Station, TX Control Room Solutions Task Team NASPI Work Group meeting and first

More information

Modeling of Distributed Generation under Next Generation Interconnection Requirements. Anna Edwards. A thesis. Submitted in partial fulfillment of the

Modeling of Distributed Generation under Next Generation Interconnection Requirements. Anna Edwards. A thesis. Submitted in partial fulfillment of the Modeling of Distributed Generation under Next Generation Interconnection Requirements Anna Edwards A thesis Submitted in partial fulfillment of the requirements for the degree of: Master of Science in

More information

NERC Protection Coordination Webinar Series June 16, Phil Tatro Jon Gardell

NERC Protection Coordination Webinar Series June 16, Phil Tatro Jon Gardell Power Plant and Transmission System Protection Coordination Phase Distance (21) and Voltage-Controlled or Voltage-Restrained Overcurrent Protection (51V) NERC Protection Coordination Webinar Series June

More information

Texas Reliability Entity Event Analysis. Event: May 8, 2011 Loss of Multiple Elements Category 1a Event

Texas Reliability Entity Event Analysis. Event: May 8, 2011 Loss of Multiple Elements Category 1a Event Texas Reliability Entity Event Analysis Event: May 8, 2011 Loss of Multiple Elements Category 1a Event Texas Reliability Entity July 2011 Page 1 of 10 Table of Contents Executive Summary... 3 I. Event

More information

IEEE Major Revision of Interconnection Standard

IEEE Major Revision of Interconnection Standard IEEE 1547-2018 - Major Revision of Interconnection Standard NRECA & APA s Emerging Priorities in Energy Research Day, Anchorage, AK Charlie Vartanian PE Secretary, IEEE 1547 Working Group October 31, 2018

More information

Testing model data usability Excitation Systems PSS Limiters

Testing model data usability Excitation Systems PSS Limiters 1 2016 IEEE/PES General Meeting July 17 th -21 st, 2016 Boston, MA Panel Session Use of the New Revisions of IEEE Std. 421.2 and 421.5 to Satisfy International Grid Code Requirements Testing model data

More information

Modeling of GE Wind Turbine-Generators for Grid Studies

Modeling of GE Wind Turbine-Generators for Grid Studies Modeling of GE Wind Turbine-Generators for Grid Studies Prepared by: Kara Clark Nicholas W. Miller Juan J. Sanchez-Gasca Version 4.5 April 16, 2010 General Electric International, Inc. One River Road Schenectady,

More information

System Operating Limit Definition and Exceedance Clarification

System Operating Limit Definition and Exceedance Clarification System Operating Limit Definition and Exceedance Clarification The NERC-defined term System Operating Limit (SOL) is used extensively in the NERC Reliability Standards; however, there is much confusion

More information

Industry Webinar Draft Standard

Industry Webinar Draft Standard Industry Webinar Draft Standard Project 2010-13.2 Phase 2 of Relay Loadability: Generation PRC-025-1 Generator Relay Loadability December 13, 2012 Agenda Welcome, Introductions and Administrative NERC

More information

Integration of Wind Generation into Weak Grids

Integration of Wind Generation into Weak Grids Integration of Wind Generation into Weak Grids Jason MacDowell GE Energy Consulting NERC ERSTF Atlanta, GA December 10-11, 2014 Outline Conventional and Power Electronic (PE) Sources Stability limitations

More information

Study on the Improvement of the Special Protection Scheme (SPS) in the Korean power system

Study on the Improvement of the Special Protection Scheme (SPS) in the Korean power system Study on the Improvement of the Special Protection Scheme (SPS) in the Korean power system Jeonghoon Shin, Suchul Nam, Seungtae Cha, Jaegul Lee, Taekyun Kim, Junyoen Kim, Taeok Kim, Hwachang Song Abstract--This

More information

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 4: (June 10, 2013) Page 1 of 75

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 4: (June 10, 2013) Page 1 of 75 PRC-025-1 Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive general discussion

More information

ECE 422/522 Power System Operations & Planning/Power Systems Analysis II 5 - Reactive Power and Voltage Control

ECE 422/522 Power System Operations & Planning/Power Systems Analysis II 5 - Reactive Power and Voltage Control ECE 422/522 Power System Operations & Planning/Power Systems Analysis II 5 - Reactive Power and Voltage Control Spring 2014 Instructor: Kai Sun 1 References Saadat s Chapters 12.6 ~12.7 Kundur s Sections

More information

H6e - Hydro Turbine-Governor Model

H6e - Hydro Turbine-Governor Model H6e - Hydro Turbine-Governor Model Represents digital governor logic supplied by American Governor Company, as now in service in many hydro plants in the Northwest Governor logic has been refined since

More information

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 5: (August 2, 2013) Page 1 of 76

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 5: (August 2, 2013) Page 1 of 76 PRC-025-1 Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive general discussion

More information

Highgate Converter Overview. Prepared by Joshua Burroughs & Jeff Carrara IEEE PES

Highgate Converter Overview. Prepared by Joshua Burroughs & Jeff Carrara IEEE PES Highgate Converter Overview Prepared by Joshua Burroughs & Jeff Carrara IEEE PES Highgate Converter Abstract Introduction to HVDC Background on Highgate Operation and Control schemes of Highgate 22 Why

More information

Chapter -3 ANALYSIS OF HVDC SYSTEM MODEL. Basically the HVDC transmission consists in the basic case of two

Chapter -3 ANALYSIS OF HVDC SYSTEM MODEL. Basically the HVDC transmission consists in the basic case of two Chapter -3 ANALYSIS OF HVDC SYSTEM MODEL Basically the HVDC transmission consists in the basic case of two convertor stations which are connected to each other by a transmission link consisting of an overhead

More information

Fault Induced Delayed Voltage Recovery (FIDVR) Advisory

Fault Induced Delayed Voltage Recovery (FIDVR) Advisory Fault Induced Delayed Voltage Recovery (FIDVR) Advisory NERC Synchronized Measurement Subcommittee (SMS) NASPI Engineering Analysis Task Team (EATT) July 2015 Why the Advisory? The goal of this advisory

More information

Energy-Based Damping Evaluation for Exciter Control in Power Systems

Energy-Based Damping Evaluation for Exciter Control in Power Systems Energy-Based Damping Evaluation for Exciter Control in Power Systems Luoyang Fang 1, Dongliang Duan 2, Liuqing Yang 1 1 Department of Electrical & Computer Engineering Colorado State University, Fort Collins,

More information

Kestrel Power Engineering

Kestrel Power Engineering Kestrel Power Engineering 1660 Twelve Oaks Way #206, North Palm Beach, FL ph (561) 972 8049 Subject: Any questions should be directed to Les Hajagos. Leonardo Lima Kestrel Power Engineering leo@kestrelpower.com

More information

Keeping it up to Speed Off-Nominal Frequency Operations. CETAC 2018 San Ramon

Keeping it up to Speed Off-Nominal Frequency Operations. CETAC 2018 San Ramon Keeping it up to Speed Off-Nominal Frequency Operations CETAC 2018 San Ramon 1 Welcome CETAC 2018 San Ramon Valley Conference Center General Class Information: Safety/Fire evacuation In event of emergency,

More information

VOLTAGE STABILITY OF THE NORDIC TEST SYSTEM

VOLTAGE STABILITY OF THE NORDIC TEST SYSTEM 1 VOLTAGE STABILITY OF THE NORDIC TEST SYSTEM Thierry Van Cutsem Department of Electrical and Computer Engineering University of Liège, Belgium Modified version of a presentation at the IEEE PES General

More information

NERC Protection Coordination Webinar Series June 30, Dr. Murty V.V.S. Yalla

NERC Protection Coordination Webinar Series June 30, Dr. Murty V.V.S. Yalla Power Plant and Transmission System Protection ti Coordination Loss-of-Field (40) and Out-of of-step Protection (78) NERC Protection Coordination Webinar Series June 30, 2010 Dr. Murty V.V.S. Yalla Disclaimer

More information

Interfacing Power System Simulators with Geomagnetically Induced Currents (GIC) Simulation Programs. Luis Marti Hydro One, Canada

Interfacing Power System Simulators with Geomagnetically Induced Currents (GIC) Simulation Programs. Luis Marti Hydro One, Canada 1 Interfacing Power System Simulators with Geomagnetically Induced Currents (GIC) Simulation Programs Luis Marti Hydro One, Canada 2 GMD 101 Background. What is a GMD event. Effects on the power system

More information

COMPARATIVE PERFORMANCE OF SMART WIRES SMARTVALVE WITH EHV SERIES CAPACITOR: IMPLICATIONS FOR SUB-SYNCHRONOUS RESONANCE (SSR)

COMPARATIVE PERFORMANCE OF SMART WIRES SMARTVALVE WITH EHV SERIES CAPACITOR: IMPLICATIONS FOR SUB-SYNCHRONOUS RESONANCE (SSR) 7 February 2018 RM Zavadil COMPARATIVE PERFORMANCE OF SMART WIRES SMARTVALVE WITH EHV SERIES CAPACITOR: IMPLICATIONS FOR SUB-SYNCHRONOUS RESONANCE (SSR) Brief Overview of Sub-Synchronous Resonance Series

More information

WSAT Online Tool for Assessment of Secure Level of Wind Generation on the System

WSAT Online Tool for Assessment of Secure Level of Wind Generation on the System WSAT Online Tool for Assessment of Secure Level of Wind Generation on the System Dr Ivan Dudurych 4000 600 3600 480 Load, MW 3200 2800 2400 Load, MW 06/10/2006 Load, MW 29/09/2006 Wind, MW 06/10/2006 Wind,

More information

Model Verification Examples

Model Verification Examples UWIG/EnerNex DOE Wind Turbine Documentation Project Model Verification Examples Juan J. Sanchez-Gasca GE Energy Jason MacDowell GE Energy Albany, NY July, 2011 Model Verification Tests 2 EMTP-type model

More information

A NEW APPROACH FOR MODELING COMPLEX POWER SYSTEM COMPONENTS IN DIFFERENT SIMULATION TOOLS

A NEW APPROACH FOR MODELING COMPLEX POWER SYSTEM COMPONENTS IN DIFFERENT SIMULATION TOOLS A NEW APPROACH FOR MODELING COMPLEX POWER SYSTEM COMPONENTS IN DIFFERENT SIMULATION TOOLS Per-Erik Bjorklund Jiuping Pan Chengyan Yue Kailash Srivastava ABB Power Systems ABB Corporate Research ABB Corporate

More information

Analysis of Effect on Transient Stability of Interconnected Power System by Introduction of HVDC Link.

Analysis of Effect on Transient Stability of Interconnected Power System by Introduction of HVDC Link. Analysis of Effect on Transient Stability of Interconnected Power System by Introduction of HVDC Link. Mr.S.B.Dandawate*, Mrs.S.L.Shaikh** *,**(Department of Electrical Engineering, Walchand College of

More information

Transient stability improvement by using shunt FACT device (STATCOM) with Reference Voltage Compensation (RVC) control scheme

Transient stability improvement by using shunt FACT device (STATCOM) with Reference Voltage Compensation (RVC) control scheme I J E E E C International Journal of Electrical, Electronics ISSN No. (Online) : 2277-2626 and Computer Engineering 2(1): 7-12(2013) Transient stability improvement by using shunt FACT device (STATCOM)

More information

Testing and Implementation of a Source Locating method at ISO New England

Testing and Implementation of a Source Locating method at ISO New England 1 Testing and Implementation of a Source Locating method at ISO New England Slava Maslennikov Principal Analyst Business Architecture and Technology Department ISO New England smaslennikov@iso-ne.com 2

More information

Linear State Estimation

Linear State Estimation Linear State Estimation Marianna Vaiman, V&R Energy marvaiman@vrenergy.com WECC JSIS Meeting Salt Lake City, UT October 15 17, 2013 Copyright 1997-2013 V&R Energy Systems Research, Inc. All rights reserved.

More information

( ) Regional Reliability Standard ( ) Regional Criteria ( ) Policy (X) Guideline ( ) Report or other ( ) Charter M&VWG. Web URL:

( ) Regional Reliability Standard ( ) Regional Criteria ( ) Policy (X) Guideline ( ) Report or other ( ) Charter M&VWG. Web URL: Document name Category Guideline Template Document date June 17, 2015 Adopted/approved by Date adopted/approved Custodian (entity responsible for maintenance and upkeep) Stored/filed Previous name/number

More information

( ) usable, minor formatting/editing required ( ) modification needed ( ) superseded by ( ) other ( ) obsolete/archived)

( ) usable, minor formatting/editing required ( ) modification needed ( ) superseded by ( ) other ( ) obsolete/archived) Document name Category Model Validation Report for May 16, 2014 RAS Event ( ) Regional Reliability Standard ( ) Regional Criteria ( ) Policy ( ) Guideline (X) Report or other ( ) Charter Document date

More information

G. KOBET, I. GRANT, G. GOZA Tennessee Valley Authority USA. R. GIRGIS, M. ESPINDOLA ABB Corporation USA SUMMARY

G. KOBET, I. GRANT, G. GOZA Tennessee Valley Authority USA. R. GIRGIS, M. ESPINDOLA ABB Corporation USA SUMMARY 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2016 Grid of the Future Symposium Assessment of the Impact of GMD on the TVA 500 kv Grid & Power Transformers Part II:

More information

1

1 Guidelines and Technical Basis Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive

More information

Grid codes and wind farm interconnections CNY Engineering Expo. Syracuse, NY November 13, 2017

Grid codes and wind farm interconnections CNY Engineering Expo. Syracuse, NY November 13, 2017 Grid codes and wind farm interconnections CNY Engineering Expo Syracuse, NY November 13, 2017 Purposes of grid codes Grid codes are designed to ensure stable operating conditions and to coordinate the

More information

SDG&E Transmission Synchrophasor Project Update

SDG&E Transmission Synchrophasor Project Update SDG&E Transmission Synchrophasor Project Update Joint Synchronized Information Subcommittee (JSIS) Meeting Tariq Rahman, May 22-25, 2017 2006 San Diego Gas & Electric Company. All copyright and trademark

More information

Stability Enhancement for Transmission Lines using Static Synchronous Series Compensator

Stability Enhancement for Transmission Lines using Static Synchronous Series Compensator Stability Enhancement for Transmission Lines using Static Synchronous Series Compensator Ishwar Lal Yadav Department of Electrical Engineering Rungta College of Engineering and Technology Bhilai, India

More information

Industry Webinar. Reactive Power Planning. NERC System Analysis and Modeling Subcommittee (SAMS) March 2017

Industry Webinar. Reactive Power Planning. NERC System Analysis and Modeling Subcommittee (SAMS) March 2017 Industry Webinar Reactive Power Planning NERC System Analysis and Modeling Subcommittee (SAMS) March 2017 Webinar Topics Reliability Guideline on Reactive Power Planning Webinar Topics Fundamentals of

More information

Generator Parameter Validation (GPV)

Generator Parameter Validation (GPV) Generator Parameter Validation (GPV) NASPI Engineering Analysis Task Team Burlingame, CA March 23, 2015 Kevin Chen, Neeraj Nayak and Wayne Schmus of EPG Ryan D. Quint of Dominion Virginia Power Outline

More information

Geomagnetic Disturbances. IEEE PES Chicago Chapter Technical Presentation March 12, Alan Engelmann Transmission Planning ComEd.

Geomagnetic Disturbances. IEEE PES Chicago Chapter Technical Presentation March 12, Alan Engelmann Transmission Planning ComEd. Geomagnetic Disturbances IEEE PES Chicago Chapter Technical Presentation March 12, 2014 Alan Engelmann Transmission Planning ComEd GMD Background Solar Disturbances Impacts Monitoring Events 2 Solar Disturbances

More information

WECC Data Preparation Manual

WECC Data Preparation Manual WECC Data Preparation Manual for Interconnection-wide Cases Applicable to the 2017 Base Case Compilation Schedule System Review Work Group Technical Studies Subcommittee 155 North 400 West, Suite 200 Salt

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Wind Aggregated Generating Facilities Technical Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Wind Aggregated Generating Facilities Technical Requirements Applicability 1(1) Section 502.1 applies to the ISO, and subject to the provisions of subsections 1(2), (3) and (4) to any: (a) a new wind aggregated generating facility to be connected to the transmission

More information

LD7830 VSEN GND ISEN COMP

LD7830 VSEN GND ISEN COMP 8/17/2012 High Power Factor Flyback LED Controller with HV Start-up REV: 01a General Description The LD7830 is a HV start-up Flyback PFC controller, specially designed for LED lighting appliances. It operates

More information

Simulations of open phase conditions on the high voltage side of YNd05-power plant transformers

Simulations of open phase conditions on the high voltage side of YNd05-power plant transformers Simulations of open phase conditions on the high voltage side of YNd05-power plant transformers Disclaimer: All information presented in the report, the results and the related computer program, data,

More information

ReliabilityFirst Regional Criteria 1. Disturbance Monitoring and Reporting Criteria

ReliabilityFirst Regional Criteria 1. Disturbance Monitoring and Reporting Criteria ReliabilityFirst Regional Criteria 1 Disturbance Monitoring and Reporting Criteria 1 A ReliabilityFirst Board of Directors approved good utility practice document which are not reliability standards. ReliabilityFirst

More information

IEEE Std Bulk System Opportunities from New Distributed Energy Resource Interconnection and Interoperability Standards

IEEE Std Bulk System Opportunities from New Distributed Energy Resource Interconnection and Interoperability Standards IEEE Std 1547-2018 Bulk System Opportunities from New Distributed Energy Resource Interconnection and Interoperability Standards Clayton Stice, ERCOT Jens C. Boemer, EPRI (on behalf of SCC21) NERC SPIDER

More information

Level 6 Graduate Diploma in Engineering Electrical Energy Systems

Level 6 Graduate Diploma in Engineering Electrical Energy Systems 9210-114 Level 6 Graduate Diploma in Engineering Electrical Energy Systems Sample Paper You should have the following for this examination one answer book non-programmable calculator pen, pencil, ruler,

More information

GOV/AVR Model Validation Process

GOV/AVR Model Validation Process GOV/AVR Model Validation Process Aaron Lin, Power System Engineer Nyuk-Min Vong, Principal Engineer Introduction 1. Model validation process 2. Data needed for model validation 3. System security analysis

More information

WECC Data Preparation Manual

WECC Data Preparation Manual WECC Data Preparation Manual for Interconnection-wide Cases Applicable to the 2016 Base Case Compilation Schedule System Review Work Group Technical Studies Subcommittee 155 North 400 West, Suite 200 Salt

More information

BPS-Connected Inverter-Based Resource Performance

BPS-Connected Inverter-Based Resource Performance 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Reliability Guideline BPS-Connected Inverter-Based Resource Performance May 2018 20 21 22 23 24 25 26 27 28 29 NERC Report Title Report Date I 30 31 32 33

More information

A New Hybrid Approach to Thevenin Equivalent Estimation for Voltage Stability Monitoring

A New Hybrid Approach to Thevenin Equivalent Estimation for Voltage Stability Monitoring Presented at 015 IEEE PES General Meeting, Denver, CO A New Hybrid Approach to Thevenin Equivalent Estimation for Voltage Stability Monitoring Mark Nakmali School of Electrical and Computer Engineering

More information

Thyristor-Based HVDC Link. RECTIFIER scope to observe the DC Fault protection action. Restart the simulation. Inverter 5-55

Thyristor-Based HVDC Link. RECTIFIER scope to observe the DC Fault protection action. Restart the simulation. Inverter 5-55 Thyristor-Based HVDC Link RECTIFIER scope to observe the DC Fault protection action. Restart the simulation. Inverter 5-55 5 Transients and Power Electronics in Power Systems Figure 5-13: DC Line Fault

More information

TSAT. Transient Security Assessment Tool. Model Manual. A product of

TSAT. Transient Security Assessment Tool. Model Manual. A product of TSAT Transient Security Assessment Tool Model Manual A product of Powertech Labs Inc. Surrey, British Columbia Canada www.powertechlabs.com www.dsatools.com DISCLAIMER OF WARRANTIES AND LIMITATION OF LIABILITIES

More information

Arizona Public Service Company and the Transmission Partnership for National Electric Power Company of Jordan

Arizona Public Service Company and the Transmission Partnership for National Electric Power Company of Jordan Arizona Public Service Company and the Transmission Partnership for National Electric Power Company of Jordan Mark Hackney October 5-8, 2009 Amman, Jordan Energy Control Center Layout 2 Energy Control

More information

TTC Study for: the PEGS-Ambrosia Lake 230 kv Line and the PEGS-Bluewater 115 kv Line

TTC Study for: the PEGS-Ambrosia Lake 230 kv Line and the PEGS-Bluewater 115 kv Line TTC Study for: the PEGS-Ambrosia Lake 230 kv Line and the PEGS-Bluewater 115 kv Line Vince Leung March 27, 2017 Reviewed by Johnny Nguyen Table of Contents Background 2 Objective 3 Base Case Assumptions

More information

Implementation of Revised IEEE Standard 1547

Implementation of Revised IEEE Standard 1547 MAY 31, 2017 HOLYOKE, MASSACHUSETTS Implementation of Revised IEEE Standard 1547 Presentation to ISO-TO Operations Committee David Forrest Key Points As New England adds significant amounts of Distributed

More information

Interconnection-Wide Oscillation Analysis: Baselining Oscillation Modes in the North American Power System Objective Purpose

Interconnection-Wide Oscillation Analysis: Baselining Oscillation Modes in the North American Power System Objective Purpose Interconnection-Wide Oscillation Analysis: Baselining Oscillation Modes in the North American Power System NERC Synchronized Measurement Subcommittee (SMS) Scope Document Objective The objective of the

More information

Stability Issues of Smart Grid Transmission Line Switching

Stability Issues of Smart Grid Transmission Line Switching Preprints of the 19th World Congress The International Federation of Automatic Control Stability Issues of Smart Grid Transmission Line Switching Garng. M. Huang * W. Wang* Jun An** *Texas A&M University,

More information

Slow Coherency Based Controlled Islanding in Large Power Systems

Slow Coherency Based Controlled Islanding in Large Power Systems Slow Coherency Based Controlled Islanding in Large Power Systems Vijay Vittal Ira A. Fulton Chair Professor Department of Electrical Engineering Arizona State University PSERC Webinar February 18, 2014

More information

NERC Requirements for Setting Load-Dependent Power Plant Protection: PRC-025-1

NERC Requirements for Setting Load-Dependent Power Plant Protection: PRC-025-1 NERC Requirements for Setting Load-Dependent Power Plant Protection: PRC-025-1 Charles J. Mozina, Consultant Beckwith Electric Co., Inc. www.beckwithelectric.com I. Introduction During the 2003 blackout,

More information

IDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form)

IDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form) IDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form) Transmission Provider: IDAHO POWER COMPANY Designated Contact Person: Jeremiah Creason Address: 1221 W. Idaho Street, Boise ID 83702 Telephone

More information

Forward Looking Frequency Trends Technical Brief ERS Framework 1 Measures 1, 2, and 4: Forward Looking Frequency Analysis

Forward Looking Frequency Trends Technical Brief ERS Framework 1 Measures 1, 2, and 4: Forward Looking Frequency Analysis Forward Looking Frequency Trends Technical Brief ERS Framework 1 Measures 1, 2, and 4: Forward Looking Frequency Analysis The NERC Planning Committee and Operating Committee jointly created the Essential

More information

How Full-Converter Wind Turbine Generators Satisfy Interconnection Requirements

How Full-Converter Wind Turbine Generators Satisfy Interconnection Requirements How Full-Converter Wind Turbine Generators Satisfy Interconnection Requirements Robert Nelson Senior Expert Engineering Manager and Manager of Codes, Standards, and Regulations Siemens Wind Turbines -

More information

Standard MOD Verification of Models and Data for Generator Excitation Control Sys tem or Plant Volt/Var Control Functions

Standard MOD Verification of Models and Data for Generator Excitation Control Sys tem or Plant Volt/Var Control Functions Standard MOD-026-1 Verification of Models and Data for Generator Excitation Control Sys tem or Plant Volt/Var Control Functions Standard Development Roadmap This section is maintained by the drafting team

More information

Online Oscillation Management at ISO New England

Online Oscillation Management at ISO New England NASPI. SEPTEMBER 27,2017 Online Oscillation Management at ISO New England SLAVA MASLENNIKOV XIAOCHUAN LUO FRANKIE ZHANG IZUDIN LELIC EUGENE LITVINOV PMU Infrastructure at ISO New England Installed in 2012

More information

Final ballot January BOT adoption February 2015

Final ballot January BOT adoption February 2015 Standard PRC-024-21(X) Generator Frequency and Voltage Protective Relay Settings Standard Development Timeline This section is maintained by the drafting team during the development of the standard and

More information

Improvement of Rotor Angle Stability and Dynamic Performance of AC/DC Interconnected Transmission System

Improvement of Rotor Angle Stability and Dynamic Performance of AC/DC Interconnected Transmission System Improvement of Rotor Angle Stability and Dynamic Performance of AC/DC Interconnected Transmission System 1 Ramesh Gantha 1, Rasool Ahemmed 2 1 eee Kl University, India 2 AsstProfessor, EEE KL University,

More information

900 MW Fault Induced Solar Photovoltaic Resource Interruption Disturbance Report

900 MW Fault Induced Solar Photovoltaic Resource Interruption Disturbance Report 900 MW Fault Induced Solar Photovoltaic Resource Interruption Disturbance Report Southern California Event: October 9, 2017 Joint NERC and WECC Staff Report February 2018 NERC Report Title Report Date

More information

An Improved Method of Adaptive Under Voltage Load Shedding

An Improved Method of Adaptive Under Voltage Load Shedding 2016 International Conference on Material Science and Civil Engineering (MSCE 2016) ISBN: 978-1-60595-378-6 An Improved Method of Adaptive Under oltage Load Shedding Hao ZHENG 1,, Ying-ke ZHAO 1, Zhi-qian

More information

A Review on Mid-point Compensation of a Two-machine System Using STATCOM

A Review on Mid-point Compensation of a Two-machine System Using STATCOM Volume-4, Issue-2, April-2014, ISSN No.: 2250-0758 International Journal of Engineering and Management Research Available at: www.ijemr.net Page Number: 109-115 A Review on Mid-point Compensation of a

More information

LD7752B 6/11/2013. Green-Mode PWM Controller with HV Start-Up Circuit and Soft Start time Adjustment. Features. General Description.

LD7752B 6/11/2013. Green-Mode PWM Controller with HV Start-Up Circuit and Soft Start time Adjustment. Features. General Description. 6/11/2013 Green-Mode PWM Controller with HV Start-Up Circuit and Soft Start time Adjustment REV. 00 General Description The brings high performance, highly integrated functions, protections and EMI-improve

More information

Standard PRC Generator Frequency and Voltage Protective Relay Settings. A. Introduction

Standard PRC Generator Frequency and Voltage Protective Relay Settings. A. Introduction A. Introduction 1. Title: Generator Frequency and Voltage Protective Relay Settings 2. Number: PRC-024-1 3. Purpose: Ensure Generator Owners set their generator protective relays such that generating units

More information

Wind Power Facility Technical Requirements CHANGE HISTORY

Wind Power Facility Technical Requirements CHANGE HISTORY CHANGE HISTORY DATE VERSION DETAIL CHANGED BY November 15, 2004 Page 2 of 24 TABLE OF CONTENTS LIST OF TABLES...5 LIST OF FIGURES...5 1.0 INTRODUCTION...6 1.1 Purpose of the Wind Power Facility Technical

More information

STUDY AND SIMULATION OF THE UNIFIED POWER FLOW CONTROLLER (UPFC) IN POWER SYSTEM

STUDY AND SIMULATION OF THE UNIFIED POWER FLOW CONTROLLER (UPFC) IN POWER SYSTEM IETJOURAL ofegieerig &TECHOLOGY Winter 2011 STUDY AD SIMULATIO OF THE UIFIED POWER FLOW COTROLLER (UPFC) I POWER SYSTEM Ragini Malviya' co co L{) I (J) Z (j) (j) The main objectives Abstract of Flexible

More information

Short Circuit Modeling for Inverter-Based Resources

Short Circuit Modeling for Inverter-Based Resources Short Circuit Modeling for Inverter-Based Resources Evangelos Farantatos Sr. Technical Leader Transmission Operations & Planning NERC Power Plant Modeling & Verification Task Force (PPMVTF) November 6

More information

Power Plant and Transmission System Protection Coordination of-field (40) and Out-of. of-step Protection (78)

Power Plant and Transmission System Protection Coordination of-field (40) and Out-of. of-step Protection (78) Power Plant and Transmission System Protection Coordination Loss-of of-field (40) and Out-of of-step Protection (78) System Protection and Control Subcommittee Protection Coordination Workshop Phoenix,

More information

ETAP PowerStation. Electrical Transient Analyzer Program. ETAP PowerStation. Short Circuit Analysis. ANSI Standard 3-Phase Fault Currents

ETAP PowerStation. Electrical Transient Analyzer Program. ETAP PowerStation. Short Circuit Analysis. ANSI Standard 3-Phase Fault Currents Page: 1 Electrical Transient Analyzer Program Short Circuit Analysis ANSI Standard 3-Phase Fault Currents Number of Buses: Swing Generator Load Total 1 0 4 5 Number of Branches: XFMR2 XFMR3 Reactor Line/Cable

More information

Static Synchronous Compensator (STATCOM) for the improvement of the Electrical System performance with Non Linear load 1

Static Synchronous Compensator (STATCOM) for the improvement of the Electrical System performance with Non Linear load 1 Static Synchronous Compensator (STATCOM) for the improvement of the Electrical System performance with Non Linear load MADHYAMA V. WANKHEDE Department Of Electrical Engineering G. H. Raisoni College of

More information