1 Lessons Learned in Model Validation for NERC Compliance usa.siemens.com/digitalgrid

2 NERC Modeling, Data, and Analysis MOD 025 2: Generator Real and Reactive Power Capability Demonstration MOD 026 1: Verification of Models for Generator Excitation Control Systems MOD 027 1: Verification of Models for Turbine/Governor and Load Control Functions, including validation of turbine droop and determination of governor s deadband MOD-033-1: Steady-State and Dynamic Power System Model Validation Page 2

3 Unit Size for NERC Model Validation Requirement (MVA) ERCOT Eastern Interconnection WECC Individual Unit Plant Individual Unit Plant Individual Unit Plant MOD-25-2 >20 >75 >20 >75 >20 >75 MOD-26-1 >50 >75 >100 >100 >75 >75 MOD-27-1 >50 >75 >100 >100 >75 >75 Page 3

4 Siemens PTI Services Onsite technical assistance for performing the tests Field tests data processing Model validation (PSS E/PSLF) Verification of generator OC excitation curve and generating unit inertia constant Adjustment of controllers parameters AVR and PSS tuning Over- and Under-excitation limiter adjustment V/Hz limiter adjustment Development of user-written models Page 4

5 MOD Generator Tests Estimated and Operating capability curve (D-curve) Page 5

6 MOD Generator Tests Measurements: Active & reactive power, voltage at unit terminals (point A) Active & reactive power, voltage at the high voltage side of the GSU (point F) Active & reactive power through the high voltage side of the auxiliary transformer (point B) Voltage at the low voltage side of the tertiary winding (point C) Active and reactive power at the high voltage side of the GSU of the other units (point D) Page 6

7 MOD Generator Excitation Control System Model Verification Open-circuit dynamic response calibration Interconnected dynamic performance calibration Validate model parameters by comparing field test records against current PSS E or PSLF dynamic models Page 7

8 MOD Generator Excitation Control System Model Verification Open-circuit dynamic response calibration Interconnected dynamic performance calibration Validate model parameters by comparing field test records against current PSS E or PSLF dynamic models Page 8

9 MOD Turbine/Governor and Load Control Functions Model Verification Validation of the speed governor response for an on-line perturbation test with synthetic speed signal of ±0.2Hz Page 9

10 Governor Modeling Improvements for Stability and Frequency Response Studies MISO Experience usa.siemens.com/digitalgrid

11 Result of NERC MOD-033 System Model Validation performed by MISO MISO uses the Eastern Interconnect Wide Model for Transient Stability Analysis. These models predicts system frequency response settling at a higher value. This difference between the simulated and the PMU recording is due to lack of deadband in the governor model. This modeling issue has been a known for a long time. Frequency in Hz Frequency nadir differs Gen trip simulated at 0.5 sec Settling frequency is optimistic. Frequency with Current Models PMU Synchrophasor data Frequency comparison on 345 kv Bus near the generator TIme in sec Page 11

12 Governor Dadband Modeling Improvement 14 governor models with deadband blocks were released in PSS E versions and 34.2 MISO did extensive testing of these new models on the Eastern Interconnection with very encouraging results IEEEG1* asymmetrical dead-band IEEEG1SDU* Page 12

13 MISO Test Results of 2020 Summer Dynamic case with New Governor Models, compared to Real Time Data Green trace represents base case with current governor models. Incorrect model prediction Hz PMU : Frequency at 345 kv Bus near Fermi Generating Plant Unit Frequency, New Governor Type, 2020SUM Frequency, Base Model, 2020SUM Settling frequency in simulation (red trace) closer to Real time data (purple trace), which is critical for any frequency related studies. Note :Some difference expected as case represents an out year scenario, not the actual system condition pre-event seconds Page 13 *MISO Dynamics model Wind at 15.6% of Pmax in MISO

14 Power Plant Model Validation using PSS E Playback Model usa.siemens.com/digitalgrid

15 PSS E Playback Model PLBVFU1 Overview The PLBVFU1 model plays back a known set of voltage and frequency signals The PLBVFU1 model acts as a generator model (with no excitation system or turbine-governor models) The played-in voltage and frequency signals must be included in a data input file Page 15

16 PSS E Playback Model Playback Model for Voltage Signal Page 16

17 PSS E Playback Model Playback Model for Frequency Signal Page 17

18 PSS E Playback Model Playback Model Example Test System Unit to be tested Playback generator Page 18

19 PSS E Playback Model Playback Model PMU data vs. PSS E simulation results Page 19

20 Contact Us Carlos Grande-Moran Principal Consultant Siemens Power Technologies International Dinemayer Silva Staff Consultant Siemens Power Technologies International usa.siemens.com/digitalgrid Page 20

Lessons Learned in Model Validation for NERC Compliance

Lessons Learned in Model Validation for NERC Compliance Lessons Learned in Model Validation for NERC Compliance usa.siemens.com/digitalgrid NERC Modeling, Data, and Analysis MOD 025 2: Generator Real and Reactive Power Capability Demonstration MOD 026 1: Verification

More information

Unit Auxiliary Transformer (UAT) Relay Loadability Report

Unit Auxiliary Transformer (UAT) Relay Loadability Report Background and Objective Reliability Standard, PRC 025 1 Generator Relay Loadability (standard), developed under NERC Project 2010 13.2 Phase 2 of Relay Loadability: Generation, was adopted by the NERC

More information

Operationalizing Phasor Technology. Model Validation. Webinar. Ken Martin. March 4, Presented by. Page 0

Operationalizing Phasor Technology. Model Validation. Webinar. Ken Martin. March 4, Presented by. Page 0 Operationalizing Phasor Technology Model Validation Webinar March 4, 2014 Presented by Ken Martin Page 0 Model Use and Validation for Operations and Planning Compare System Performance with Model Prediction

More information

Generator Parameter Validation (GPV)

Generator Parameter Validation (GPV) Generator Parameter Validation (GPV) NASPI Engineering Analysis Task Team Burlingame, CA March 23, 2015 Kevin Chen, Neeraj Nayak and Wayne Schmus of EPG Ryan D. Quint of Dominion Virginia Power Outline

More information

Robert W. Cummings - NERC Director of System Analysis and Reliability Initiatives William Herbsleb - Chairman of Frequency Response Standard Drafting

Robert W. Cummings - NERC Director of System Analysis and Reliability Initiatives William Herbsleb - Chairman of Frequency Response Standard Drafting Generator Governor and Information Settings Webinar Robert W. Cummings - NERC Director of System Analysis and Reliability Initiatives William Herbsleb - Chairman of Frequency Response Standard Drafting

More information

Harmonizing the Changing Resource Mix Keeping the Grid Together

Harmonizing the Changing Resource Mix Keeping the Grid Together Harmonizing the Changing Resource Mix Keeping the Grid Together Robert W. Cummings Senior Director of Engineering and Reliability Initiatives i-pcgrid March 30, 2017 NERC-IEEE Memorandum of Understanding

More information

VOLTAGE STABILITY OF THE NORDIC TEST SYSTEM

VOLTAGE STABILITY OF THE NORDIC TEST SYSTEM 1 VOLTAGE STABILITY OF THE NORDIC TEST SYSTEM Thierry Van Cutsem Department of Electrical and Computer Engineering University of Liège, Belgium Modified version of a presentation at the IEEE PES General

More information

Document C-29. Procedures for System Modeling: Data Requirements & Facility Ratings. January 5 th, 2016 TFSS Revisions Clean Open Process Posting

Document C-29. Procedures for System Modeling: Data Requirements & Facility Ratings. January 5 th, 2016 TFSS Revisions Clean Open Process Posting Document C-29 Procedures for System Modeling: January 5 th, 2016 TFSS Revisions Clean Open Process Posting Prepared by the SS-37 Working Group on Base Case Development for the Task Force on System Studies.

More information

Reliability Considerations for PPMV. Ryan Quint, NERC Dmitry Kosterev, BPA NASPI-NERC PPMV Tools Workshop October 2016

Reliability Considerations for PPMV. Ryan Quint, NERC Dmitry Kosterev, BPA NASPI-NERC PPMV Tools Workshop October 2016 Reliability Considerations for PPMV Ryan Quint, NERC Dmitry Kosterev, BPA NASPI-NERC PPMV Tools Workshop October 2016 MOD Standards Framework NERC MOD Standards Modeling, Data, and Analysis MOD-032 Data

More information

Energy-Based Damping Evaluation for Exciter Control in Power Systems

Energy-Based Damping Evaluation for Exciter Control in Power Systems Energy-Based Damping Evaluation for Exciter Control in Power Systems Luoyang Fang 1, Dongliang Duan 2, Liuqing Yang 1 1 Department of Electrical & Computer Engineering Colorado State University, Fort Collins,

More information

Uses of Synchrophasor BD NSF Workshop 2017

Uses of Synchrophasor BD NSF Workshop 2017 Uses of Synchrophasor BD NSF Workshop 2017 Bill Blevins Director Grid Coordination April 18,2017 2 ERCOT Control Room BD overview ERCOT 2001 ERCOT 2016 ERCOT PMU locations 76 PMUs at 35 locations 2014

More information

Endorsed Assignments from ERS Framework

Endorsed Assignments from ERS Framework ERSTF Completion Endorsed Assignments from ERS Framework Ref Number Title ERS Recommendatio n Ongoing Responsibility 1 Synch Inertia at Interconnection Level Measure 2 Initial Frequency Deviation Measure

More information

Demonstration of PFR Improvement September ERCOT Operations Planning

Demonstration of PFR Improvement September ERCOT Operations Planning Demonstration of PFR Improvement September 2017 ERCOT Operations Planning Agenda Overview BAL-001-TRE-1 Standard Applicability to Alternative Resources Ancillary Service Products & Dispatch Improvements

More information

Indication of Dynamic Model Validation Process

Indication of Dynamic Model Validation Process Indication of Dynamic Model Validation Process Document Identifier Written by David Cashman Document Version Draft Checked by Date of Current Issue November 2013 Approved by Jon O Sullivan Disclaimer EirGrid,

More information

Frequency Response Initiative Industry Advisory Generator Governor Frequency Response

Frequency Response Initiative Industry Advisory Generator Governor Frequency Response Frequency Response Initiative Industry Advisory Generator Governor Frequency Response Troy Blalock South Carolina Electric and Gas Bob Cummings NERC Reliability Initiatives and System Analysis Rich Bauer

More information

Industry Webinar. Reactive Power Planning. NERC System Analysis and Modeling Subcommittee (SAMS) March 2017

Industry Webinar. Reactive Power Planning. NERC System Analysis and Modeling Subcommittee (SAMS) March 2017 Industry Webinar Reactive Power Planning NERC System Analysis and Modeling Subcommittee (SAMS) March 2017 Webinar Topics Reliability Guideline on Reactive Power Planning Webinar Topics Fundamentals of

More information

IDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form)

IDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form) IDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form) Transmission Provider: IDAHO POWER COMPANY Designated Contact Person: Jeremiah Creason Address: 1221 W. Idaho Street, Boise ID 83702 Telephone

More information

Synchrophasor Technology PMU Use Case Examples

Synchrophasor Technology PMU Use Case Examples 1 IEEE Tutorial on Use of Synchrophasors in Grid Operations - Oscillation Source Detection and Operational Use of Synchrophasors Synchrophasor Technology PMU Use Case Examples Sarma (NDR) Nuthalapati,

More information

Reliability Guideline

Reliability Guideline Reliability Guideline Power Plant Model Verification and Testing for Synchronous Machines December 2017 DRAFT NERC Report Title Report Date i Table of Contents Preface... iv Preamble... v Executive Summary...

More information

generation greater than 75 MVA (gross aggregate nameplate rating) Generation in the ERCOT Interconnection with the following characteristics:

generation greater than 75 MVA (gross aggregate nameplate rating) Generation in the ERCOT Interconnection with the following characteristics: A. Introduction 1. Title: Verification of Models and Data for Turbine/Governor and Load Control or Active Power/Frequency Control Functions 2. Number: MOD-027-1 3. Purpose: To verify that the turbine/governor

More information

Testing model data usability Excitation Systems PSS Limiters

Testing model data usability Excitation Systems PSS Limiters 1 2016 IEEE/PES General Meeting July 17 th -21 st, 2016 Boston, MA Panel Session Use of the New Revisions of IEEE Std. 421.2 and 421.5 to Satisfy International Grid Code Requirements Testing model data

More information

Sarma (NDR) Nuthalapati, PhD

Sarma (NDR) Nuthalapati, PhD SYNCHROPHASOR TECHNOLOGY PMU USE CASE EXAMPLES Sarma (NDR) Nuthalapati, PhD Research Scientist Texas A&M University, College Station, TX Control Room Solutions Task Team NASPI Work Group meeting and first

More information

Generation Interconnection Study Data Sheet Synchronous Machines

Generation Interconnection Study Data Sheet Synchronous Machines FOR INTERNAL USE ONLY GTC Project Number: Queue Date: Generation Interconnection Study Data Sheet Synchronous Machines Customers must provide the following information in its entirety. GTC will not proceed

More information

INTERCONNECTION REQUEST FOR A LARGE GENERATING FACILITY

INTERCONNECTION REQUEST FOR A LARGE GENERATING FACILITY INTERCONNECTION REQUEST FOR A LARGE GENERATING FACILITY Internal Use Only Date Received Time Received Received By: 1. The undersigned Interconnection Customer submits this request to interconnect its Large

More information

Real Time Stability Analysis at Peak Reliability. Slaven Kincic, Hongming Zhang JSIS May 2017, SLC

Real Time Stability Analysis at Peak Reliability. Slaven Kincic, Hongming Zhang JSIS May 2017, SLC Real Time Stability Analysis at Peak Reliability Slaven Kincic, Hongming Zhang JSIS May 2017, SLC Overview: Overview of Peak s DSA Application; o Set up o User Cases Transient Stability Criteria; TSAT

More information

NARUC. Summer Committee Meetings. Staff Subcommittees on Electricity & Electric Reliability

NARUC. Summer Committee Meetings. Staff Subcommittees on Electricity & Electric Reliability NARUC Summer Committee Meetings Staff Subcommittees on Electricity & Electric Reliability NARUC Summer Committee Meetings Agenda 10:00-11:00 am Tour of the Newtown Creek Biodigester Plant 1:00 2:00 pm

More information

APPENDIX 1 to LGIP INTERCONNECTION REQUEST FOR A LARGE GENERATING FACILITY

APPENDIX 1 to LGIP INTERCONNECTION REQUEST FOR A LARGE GENERATING FACILITY APPENDIX 1 to LGIP INTERCONNECTION REQUEST FOR A LARGE GENERATING FACILITY 1. The undersigned Interconnection Customer submits this request to interconnect its Large Generating Facility with Transmission

More information

Forward Looking Frequency Trends Technical Brief ERS Framework 1 Measures 1, 2, and 4: Forward Looking Frequency Analysis

Forward Looking Frequency Trends Technical Brief ERS Framework 1 Measures 1, 2, and 4: Forward Looking Frequency Analysis Forward Looking Frequency Trends Technical Brief ERS Framework 1 Measures 1, 2, and 4: Forward Looking Frequency Analysis The NERC Planning Committee and Operating Committee jointly created the Essential

More information

Analysis of Effect on Transient Stability of Interconnected Power System by Introduction of HVDC Link.

Analysis of Effect on Transient Stability of Interconnected Power System by Introduction of HVDC Link. Analysis of Effect on Transient Stability of Interconnected Power System by Introduction of HVDC Link. Mr.S.B.Dandawate*, Mrs.S.L.Shaikh** *,**(Department of Electrical Engineering, Walchand College of

More information

Operational Modeling and Model Inputs

Operational Modeling and Model Inputs Operational Modeling and Model Inputs Robert W. Cummings Director, Reliability Initiatives and System Analysis NASPI Model Validation Workshop July 11, 2013 Importance of Modeling If something in not modeled,

More information

How Full-Converter Wind Turbine Generators Satisfy Interconnection Requirements

How Full-Converter Wind Turbine Generators Satisfy Interconnection Requirements How Full-Converter Wind Turbine Generators Satisfy Interconnection Requirements Robert Nelson Senior Expert Engineering Manager and Manager of Codes, Standards, and Regulations Siemens Wind Turbines -

More information

Reliability Guideline: Generating Unit Operations During Complete Loss of Communications

Reliability Guideline: Generating Unit Operations During Complete Loss of Communications 1 1 1 1 1 1 1 1 0 1 0 1 0 1 Reliability Guideline: Generating Unit Operations During Complete Loss of Communications Preamble: It is in the public interest for the North American Electric Reliability Corporation

More information

Setting and Verification of Generation Protection to Meet NERC Reliability Standards

Setting and Verification of Generation Protection to Meet NERC Reliability Standards 1 Setting and Verification of Generation Protection to Meet NERC Reliability Standards Xiangmin Gao, Tom Ernst Douglas Rust, GE Energy Connections Dandsco LLC. Abstract NERC has recently published several

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Aggregated Generating Facilities Technical Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Aggregated Generating Facilities Technical Requirements Division 502 Technical Applicability 1(1) Section 502.1 applies to: Expedited Filing Draft August 22, 2017 the legal owner of an aggregated generating facility directly connected to the transmission system

More information

SDG&E Transmission Synchrophasor Project Update

SDG&E Transmission Synchrophasor Project Update SDG&E Transmission Synchrophasor Project Update Joint Synchronized Information Subcommittee (JSIS) Meeting Tariq Rahman, May 22-25, 2017 2006 San Diego Gas & Electric Company. All copyright and trademark

More information

Grid codes and wind farm interconnections CNY Engineering Expo. Syracuse, NY November 13, 2017

Grid codes and wind farm interconnections CNY Engineering Expo. Syracuse, NY November 13, 2017 Grid codes and wind farm interconnections CNY Engineering Expo Syracuse, NY November 13, 2017 Purposes of grid codes Grid codes are designed to ensure stable operating conditions and to coordinate the

More information

Jonathan (Xiangmin) Gao - GE Grid Solutions Douglas Rust - Dandsco LLC Presented by: Tom Ernst GE Grid Solutions

Jonathan (Xiangmin) Gao - GE Grid Solutions Douglas Rust - Dandsco LLC Presented by: Tom Ernst GE Grid Solutions Jonathan (Xiangmin) Gao - GE Grid Solutions Douglas Rust - Dandsco LLC Presented by: Tom Ernst GE Grid Solutions PRC-001: System protection coordination PRC-019: Coordination with voltage regulating control

More information

Generation and Load Interconnection Standard

Generation and Load Interconnection Standard Generation and Load Interconnection Standard Rev. 0A DRAFT Name Signature Date Prepared: Approved: VP Acceptance APEGGA Permit to Practice P-08200 TABLE OF CONTENTS 1.0 INTRODUCTION...5 1.1 Purpose...5

More information

Transmission Interconnection Requirements for Inverter-Based Generation

Transmission Interconnection Requirements for Inverter-Based Generation Transmission Requirements for Inverter-Based Generation June 25, 2018 Page 1 Overview: Every generator interconnecting to the transmission system must adhere to all applicable Federal and State jurisdictional

More information

Integration of Variable Renewable Energy

Integration of Variable Renewable Energy Integration of Variable Renewable Energy PRAMOD JAIN, Ph.D. Consultant, USAID Power the Future October 1, 2018 Almaty, Republic of Kazakhstan Venue: Almaty University of Power Engineering and Telecommunications

More information

NERC / TVA STABILITY WORKSHOP

NERC / TVA STABILITY WORKSHOP NERC / TVA STABILITY WORKSHOP CHATTANOOGA, TN MAY 23-24, 24, 2007 Robert Dintelman Utility System Efficiencies, Inc. WECC Transmission System 1996 Western Outages July 2, 1996 July 3, 1996 August 10, 1996

More information

Wide-Area Monitoring and Control of Power Systems using Real-Time Hardware-in-the-Loop Simulations

Wide-Area Monitoring and Control of Power Systems using Real-Time Hardware-in-the-Loop Simulations Wide-Area Monitoring and Control of Power Systems using Real-Time Hardware-in-the-Loop Simulations Matthew Weiss Thesis advisor: Dr. Aranya Chakrabortty 7/28/2016 1 Power grids are envisioned to be come

More information

Reliability Guideline: Generating Unit Operations During Complete Loss of Communications

Reliability Guideline: Generating Unit Operations During Complete Loss of Communications 1 1 1 1 1 1 1 1 0 1 0 1 0 1 Reliability Guideline: Generating Unit Operations During Complete Loss of Communications Preamble It is in the public interest for the North American Electric Reliability Corporation

More information

Wind Power Facility Technical Requirements CHANGE HISTORY

Wind Power Facility Technical Requirements CHANGE HISTORY CHANGE HISTORY DATE VERSION DETAIL CHANGED BY November 15, 2004 Page 2 of 24 TABLE OF CONTENTS LIST OF TABLES...5 LIST OF FIGURES...5 1.0 INTRODUCTION...6 1.1 Purpose of the Wind Power Facility Technical

More information

Standard PRC Generator Frequency and Voltage Protective Relay Settings. A. Introduction

Standard PRC Generator Frequency and Voltage Protective Relay Settings. A. Introduction A. Introduction 1. Title: Generator Frequency and Voltage Protective Relay Settings 2. Number: PRC-024-1 3. Purpose: Ensure Generator Owners set their generator protective relays such that generating units

More information

Standard MOD Verification of Models and Data for Generator Excitation Control System or Plant Volt/Var Control Functions

Standard MOD Verification of Models and Data for Generator Excitation Control System or Plant Volt/Var Control Functions Standard MOD-026-1 Verification of Models and Data for Generator Excitation Control System or Plant Volt/Var Control Functions A. Introduction 1. Title: Verification of Models and Data for Generator Excitation

More information

Synchrophasor Technology at BPA: from Wide-Area Monitoring to Wide-Area Control

Synchrophasor Technology at BPA: from Wide-Area Monitoring to Wide-Area Control Synchrophasor Technology at BPA: from Wide-Area Monitoring to Wide-Area Control Presented by Jeff Dagle (PNNL) on behalf of BPA October 24, 2018 1 History of Synchrophasors at BPA BPA was one of the early

More information

Imperial Irrigation District System Planning ATTACHMENT A

Imperial Irrigation District System Planning ATTACHMENT A ATTACHMENT A A typical System Impact Study includes Power Flow, Transient Stability, Post-Transient Stability, and Short Circuit Analysis. If the size and/or technology type of the project is different

More information

Generation and Load Interconnection Standard

Generation and Load Interconnection Standard Generation and Load Interconnection Standard Rev. 0 DRAFT Name Signature Date Prepared: Approved: VP Acceptance APEGGA Permit to Practice P-08200 TABLE OF CONTENTS 1.0 INTRODUCTION...5 1.1 Purpose...5

More information

Southern Company Interconnection Requirements for Inverter-Based Generation

Southern Company Interconnection Requirements for Inverter-Based Generation Southern Company Interconnection Requirements for Inverter-Based Generation September 19, 2016 Page 1 of 16 All inverter-based generation connected to Southern Companies transmission system (Point of Interconnection

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Wind Aggregated Generating Facilities Technical Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Wind Aggregated Generating Facilities Technical Requirements Applicability 1(1) Section 502.1 applies to the ISO, and subject to the provisions of subsections 1(2), (3) and (4) to any: (a) a new wind aggregated generating facility to be connected to the transmission

More information

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 4: (June 10, 2013) Page 1 of 75

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 4: (June 10, 2013) Page 1 of 75 PRC-025-1 Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive general discussion

More information

Generator Voltage Protective Relay Settings

Generator Voltage Protective Relay Settings ERO Enterprise Endorsed Generator Voltage Protective Relay Settings Implementation Guidance PRC-024-2 Requirement R2 January 19, 2018 Submitting Pre-Qualified Organization: NERC Planning Committee (PC)

More information

Interconnection-Wide Oscillation Analysis: Baselining Oscillation Modes in the North American Power System Objective Purpose

Interconnection-Wide Oscillation Analysis: Baselining Oscillation Modes in the North American Power System Objective Purpose Interconnection-Wide Oscillation Analysis: Baselining Oscillation Modes in the North American Power System NERC Synchronized Measurement Subcommittee (SMS) Scope Document Objective The objective of the

More information

Wind Requirements and Testing for Steady-State Voltage and Frequency Control

Wind Requirements and Testing for Steady-State Voltage and Frequency Control 1 Wind Requirements and Testing for Steady-State Voltage and Frequency Control IEEE PES General Meeting, Boston: July 18, 2016 Steven Saylors, P.E. Senior Specialist Vestas Wind Systems 2 Voltage Control

More information

Modeling of Three-phase or Bank of Three Single Phase Three Winding Transformers Zero-phase-sequence Leakage Impedance in PSS E Short Circuit Module

Modeling of Three-phase or Bank of Three Single Phase Three Winding Transformers Zero-phase-sequence Leakage Impedance in PSS E Short Circuit Module Siemens Industry, Inc. Power Technology Issue 125 Modeling of Three-phase or Bank of Three Single Phase Three Winding Transformers Zero-phase-sequence Leakage Impedance in PSS E Short Circuit Module Carlos

More information

Standard PRC Generator Frequency and Voltage Protective Relay Settings. A. Introduction. See the Implementation Plan for PRC

Standard PRC Generator Frequency and Voltage Protective Relay Settings. A. Introduction. See the Implementation Plan for PRC A. Introduction 1. Title: Generator Frequency and Voltage Protective Relay Settings 2. Number: PRC-024-2 3. Purpose: Ensure Generator Owners set their generator protective relays such that generating units

More information

Response of Grid Interconnected Solar PV inverters to Transmission System Faults

Response of Grid Interconnected Solar PV inverters to Transmission System Faults Response of Grid Interconnected Solar PV inverters to Transmission System Faults David Piper, P.E. Operations Planning & Analysis SCE Grid Control Center July 18, 2017 1 OVERVIEW 1. Overview of the event

More information

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 5: (August 2, 2013) Page 1 of 76

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 5: (August 2, 2013) Page 1 of 76 PRC-025-1 Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive general discussion

More information

EXCITATION SYSTEM MODELS OF GENERATORS OF BALTI AND EESTI POWER PLANTS

EXCITATION SYSTEM MODELS OF GENERATORS OF BALTI AND EESTI POWER PLANTS Oil Shale, 2007, Vol. 24, No. 2 Special ISSN 0208-189X pp. 285 295 2007 Estonian Academy Publishers EXCITATION SYSTEM MODELS OF GENERATORS OF BALTI AND EESTI POWER PLANTS R. ATTIKAS *, H.TAMMOJA Department

More information

Power Plant and Transmission System Protection Coordination

Power Plant and Transmission System Protection Coordination Technical Reference Document Power Plant and Transmission System Protection Coordination NERC System Protection and Control Subcommittee Revision 1 July 2010 Table of Contents 1. Introduction... 1 1.1.

More information

Integration of Wind Generation into Weak Grids

Integration of Wind Generation into Weak Grids Integration of Wind Generation into Weak Grids Jason MacDowell GE Energy Consulting NERC ERSTF Atlanta, GA December 10-11, 2014 Outline Conventional and Power Electronic (PE) Sources Stability limitations

More information

LARGE-SCALE WIND POWER INTEGRATION, VOLTAGE STABILITY LIMITS AND MODAL ANALYSIS

LARGE-SCALE WIND POWER INTEGRATION, VOLTAGE STABILITY LIMITS AND MODAL ANALYSIS LARGE-SCALE WIND POWER INTEGRATION, VOLTAGE STABILITY LIMITS AND MODAL ANALYSIS Giuseppe Di Marzio NTNU giuseppe.di.marzio@elkraft.ntnu.no Olav B. Fosso NTNU olav.fosso@elkraft.ntnu.no Kjetil Uhlen SINTEF

More information

Power Plant and Transmission System Protection Coordination

Power Plant and Transmission System Protection Coordination Agenda Item 5.h Attachment 1 A Technical Reference Document Power Plant and Transmission System Protection Coordination Draft 6.9 November 19, 2009 NERC System Protection and Control Subcommittee November

More information

Simulations of open phase conditions on the high voltage side of YNd05-power plant transformers

Simulations of open phase conditions on the high voltage side of YNd05-power plant transformers Simulations of open phase conditions on the high voltage side of YNd05-power plant transformers Disclaimer: All information presented in the report, the results and the related computer program, data,

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION North American Electric Reliability Corporation ) ) Docket No. RM13-11-000 INFORMATIONAL FILING OF THE NORTH AMERICAN ELECTRIC RELIABILITY

More information

Study of Frequency Response in Power System with Renewable Generation and Energy Storage

Study of Frequency Response in Power System with Renewable Generation and Energy Storage Study of Frequency Response in Power System with Renewable Generation and Energy Storage Atia Adrees, Member, IEEE and Jovica V. Milanović, Fellow, IEEE School of Electrical and Electronic Engineering

More information

Tertiary Winding Design in wye-wye Connected Transformers Restricted Siemens Energy 2013 All rights reserved.

Tertiary Winding Design in wye-wye Connected Transformers Restricted Siemens Energy 2013 All rights reserved. Pomona, CA, May 24 & 25, 2016 Tertiary Winding Design in wye-wye Connected Transformers Scope of Presentation > Tertiary vs. Stabilizing Winding? Tertiary vs. Stabilizing Winding? Need for Stabilizing

More information

WECC Data Preparation Manual

WECC Data Preparation Manual WECC Data Preparation Manual for Interconnection-wide Cases Applicable to the 2016 Base Case Compilation Schedule System Review Work Group Technical Studies Subcommittee 155 North 400 West, Suite 200 Salt

More information

Standard MOD Verification of Models and Data for Generator Excitation Control Sys tem or Plant Volt/Var Control Functions

Standard MOD Verification of Models and Data for Generator Excitation Control Sys tem or Plant Volt/Var Control Functions Standard MOD-026-1 Verification of Models and Data for Generator Excitation Control Sys tem or Plant Volt/Var Control Functions Standard Development Roadmap This section is maintained by the drafting team

More information

Texas Reliability Entity Event Analysis. Event: May 8, 2011 Loss of Multiple Elements Category 1a Event

Texas Reliability Entity Event Analysis. Event: May 8, 2011 Loss of Multiple Elements Category 1a Event Texas Reliability Entity Event Analysis Event: May 8, 2011 Loss of Multiple Elements Category 1a Event Texas Reliability Entity July 2011 Page 1 of 10 Table of Contents Executive Summary... 3 I. Event

More information

A Fundamental Study of Applying Wind Turbines for Power System Frequency Control

A Fundamental Study of Applying Wind Turbines for Power System Frequency Control A Fundamental Study of Applying Wind Turbines for Power System Frequency Control CFES Annual Conference February 26, 2015 Felipe Wilches-Bernal and Joe H. Chow Rensselaer Polytechnic Institute 2/26/2015

More information

Standard PRC Coordination of Generating Unit or Plant Voltage Regulating Controls with Generating Unit or Plant Capabilities and Protection

Standard PRC Coordination of Generating Unit or Plant Voltage Regulating Controls with Generating Unit or Plant Capabilities and Protection Standard Development Roadmap This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed:

More information

Synchrophasor Solutions Deployment at PG&E Off-Line Analysis

Synchrophasor Solutions Deployment at PG&E Off-Line Analysis Synchrophasor Solutions Deployment at PG&E Off-Line Analysis Vahid Madani - PG&E Manu Parashar - ALSTOM Grid October 24, 2013 Outline Offline Engineering Applications at PG&E Post Event Analysis (May 30

More information

Excitation systems and automatic voltage regulators

Excitation systems and automatic voltage regulators ELEC0047 - Power system dynamics, control and stability Excitation systems and automatic voltage regulators Thierry Van Cutsem t.vancutsem@ulg.ac.be www.montefiore.ulg.ac.be/~vct November 2017 1 / 16 Overview

More information

MANITOBA HYDRO TRANSMISSION SYSTEM INTERCONNECTION REQUIREMENTS. July 2016 Version 4

MANITOBA HYDRO TRANSMISSION SYSTEM INTERCONNECTION REQUIREMENTS. July 2016 Version 4 MANITOBA HYDRO TRANSMISSION SYSTEM INTERCONNECTION REQUIREMENTS July 2016 Version 4 This page intentionally blank LEGISLATIVE AUTHORITY Section 15.0.3(1) of The Manitoba Hydro Act (C.C.S.M. c. H190) authorizes

More information

Final ballot January BOT adoption February 2015

Final ballot January BOT adoption February 2015 Standard PRC-024-21(X) Generator Frequency and Voltage Protective Relay Settings Standard Development Timeline This section is maintained by the drafting team during the development of the standard and

More information

Power Plant and Transmission System Protection Coordination Fundamentals

Power Plant and Transmission System Protection Coordination Fundamentals Power Plant and Transmission System Protection Coordination Fundamentals NERC Protection Coordination Webinar Series June 2, 2010 Jon Gardell Agenda 2 Objective Introduction to Protection Generator and

More information

Application Of Power System Stabilizer At Serir Power Plant

Application Of Power System Stabilizer At Serir Power Plant Vol. 3 Issue 4, April - 27 Application Of Power System Stabilizer At Serir Power Plant *T. Hussein, **A. Shameh Electrical and Electronics Dept University of Benghazi Benghazi- Libya *Tawfiq.elmenfy@uob.edu.ly

More information

Post-Event Analysis of a Compound Event in the ERCOT System Using Synchrophasor Data

Post-Event Analysis of a Compound Event in the ERCOT System Using Synchrophasor Data 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2014 Grid of the Future Symposium Post-Event Analysis of a Compound Event in the ERCOT System Using Synchrophasor Data

More information

Overview of Synchrophasor Applications. Dmitry Kosterev Bonneville Power Administration

Overview of Synchrophasor Applications. Dmitry Kosterev Bonneville Power Administration Overview of Synchrophasor Applications Dmitry Kosterev Bonneville Power Administration 1 Recognition of the Synchrophasor Technology at the World-Wide Stage: BPA synchrophasor project received 2013 Platt

More information

MANITOBA HYDRO TRANSMISSION SYSTEM INTERCONNECTION REQUIREMENTS. April 2009 Version 2

MANITOBA HYDRO TRANSMISSION SYSTEM INTERCONNECTION REQUIREMENTS. April 2009 Version 2 MANITOBA HYDRO TRANSMISSION SYSTEM INTERCONNECTION REQUIREMENTS April 2009 Version 2 LEGISLATIVE AUTHORITY Section 15(5) of The Manitoba Hydro Act authorizes Manitoba Hydro to set, coordinate and enforce

More information

Use of the Power System Outlook (PSO) and SMART 1 Programs to View PSLF Dynamic Simulation Data Files

Use of the Power System Outlook (PSO) and SMART 1 Programs to View PSLF Dynamic Simulation Data Files 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2014 Grid of the Future Symposium Use of the Power System Outlook (PSO) and SMART 1 Programs to View PSLF Dynamic Simulation

More information

IEEE sion/1547revision_index.html

IEEE sion/1547revision_index.html IEEE 1547 IEEE 1547: Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces http://grouper.ieee.org/groups/scc21/1547_revi sion/1547revision_index.html

More information

WECC Data Preparation Manual

WECC Data Preparation Manual WECC Data Preparation Manual for Interconnection-wide Cases Applicable to the 2017 Base Case Compilation Schedule System Review Work Group Technical Studies Subcommittee 155 North 400 West, Suite 200 Salt

More information

An Introduction to Completing a NERC PRC-019 Study for Traditional and Distributed Generation Sources

An Introduction to Completing a NERC PRC-019 Study for Traditional and Distributed Generation Sources An Introduction to Completing a NERC PRC-019 Study for Traditional and Distributed Generation Sources Matthew Manley and Tony Limon POWER Engineers, Inc. Abstract -- NERC PRC standards have been implemented

More information

Initial Application Form for Connection of Distributed Generation (>10kW)

Initial Application Form for Connection of Distributed Generation (>10kW) Please complete the following information and forward to Vector Contact Details Primary Contact (who we should contact for additional information) Contact person Company name Contact numbers Daytime: Cell

More information

GMD Voltage Collapse Study

GMD Voltage Collapse Study GMD Voltage Collapse Study Terry Volkmann 2016 Fall Reliability Conference November 2, 2016 1 GMD Voltage Collapse Studies in Wisconsin and Maine Overview: Modeling shows GMD Voltage Collapse Issues: Power

More information

Kestrel Power Engineering

Kestrel Power Engineering Kestrel Power Engineering 1660 Twelve Oaks Way #206, North Palm Beach, FL ph (561) 972 8049 Subject: Any questions should be directed to Les Hajagos. Leonardo Lima Kestrel Power Engineering leo@kestrelpower.com

More information

DER_A Benchmark Update

DER_A Benchmark Update DER_A Benchmark Update Deepak Ramasubramanian, EPRI Anish Gaikwad, EPRI Pouyan Pourbeik, PEACE NERC LMTF October 31 st 2017 Austin, TX DISCLAIMER The DER_A model is still a beta model under test and development

More information

Kestrel Power Engineering

Kestrel Power Engineering [Type text] [Type text] [Type text] Kestrel Power Engineering 1660 Twelve Oaks Way #206, North Palm Beach, FL, 33408 ph (516) 972-8049 01 Subject: Steady State Calculations for This memo compares the steady

More information

FACILITY CONNECTION REQUIREMENTS

FACILITY CONNECTION REQUIREMENTS Portland General Electric Facility Connection Requirements - Generation Resources FACILITY CONNECTION REQUIREMENTS FOR GENERATION RESOURCES PORTLAND GENERAL ELECTRIC PORTLAND, OREGON JULY 12, 2013 REVISION

More information

IJSER. Fig-1: Interconnection diagram in the vicinity of the RajWest power plant

IJSER. Fig-1: Interconnection diagram in the vicinity of the RajWest power plant International Journal of Scientific & Engineering Research, Volume 5, Issue 7, July-2014 696 AN INVESTIGATION ON USE OF POWER SYSTEM STABILIZER ON DYNAMIC STABILITY OF POWER SYSTEM Mr. Bhuwan Pratap Singh

More information

Step-Response Tests of a Unit at Atatürk Hydro Power Plant and Investigation of the Simple Representation of Unit Control System

Step-Response Tests of a Unit at Atatürk Hydro Power Plant and Investigation of the Simple Representation of Unit Control System Step-Response Tests of a Unit at Atatürk Hydro Power Plant and Investigation of the Simple Representation of Unit Control System O.B.Tör, U. Karaağaç, and, E. Benlier Information Technology and Electronics

More information

Deleted: 9 4 anuary ... [1] Deleted: much more. Formatted ... [2] Formatted Table. Formatted: Indent: Left: 0.06 cm

Deleted: 9 4 anuary ... [1] Deleted: much more. Formatted ... [2] Formatted Table. Formatted: Indent: Left: 0.06 cm (Comparison based on GB Grid Code Issue 4 Revision 13 only and ENSTO - E RFG Internal Version dated 6 June 01) (Note Does not include other Industry Codes) Table compares the GB Grid Code with the ENTSO-E

More information

NERC Requirements for Setting Load-Dependent Power Plant Protection: PRC-025-1

NERC Requirements for Setting Load-Dependent Power Plant Protection: PRC-025-1 NERC Requirements for Setting Load-Dependent Power Plant Protection: PRC-025-1 Charles J. Mozina, Consultant Beckwith Electric Co., Inc. www.beckwithelectric.com I. Introduction During the 2003 blackout,

More information

Low Frequency Local mode Oscillations in NER Grid, Validation using Model based analysis and Mitigation

Low Frequency Local mode Oscillations in NER Grid, Validation using Model based analysis and Mitigation Low Frequency Local mode Oscillations in NER Grid, Validation using Model based analysis and Mitigation T S Singh, A Mallick, Rahul Chakrabarti, Momai Dey, Jerin Jacob Presented by : Rahul Chakrabarti

More information

Deployment and Initial Experience with Oscillation Detection Application at Bonneville Power Administration

Deployment and Initial Experience with Oscillation Detection Application at Bonneville Power Administration Deployment and Initial Experience with Oscillation Detection Application at Bonneville Power Administration Dmitry Kosterev, Ashley Donahoo, Nick Leitschuh BPA Jeff Dagle, Frank Tuffner PNNL Dan Trudnowski

More information

Power Plant and Transmission System Protection Coordination of-field (40) and Out-of. of-step Protection (78)

Power Plant and Transmission System Protection Coordination of-field (40) and Out-of. of-step Protection (78) Power Plant and Transmission System Protection Coordination Loss-of of-field (40) and Out-of of-step Protection (78) System Protection and Control Subcommittee Protection Coordination Workshop Phoenix,

More information

GOV/AVR Model Validation Process

GOV/AVR Model Validation Process GOV/AVR Model Validation Process Aaron Lin, Power System Engineer Nyuk-Min Vong, Principal Engineer Introduction 1. Model validation process 2. Data needed for model validation 3. System security analysis