Partial Discharge Measurements on 110kV Current Transformers. Case Study. Results
|
|
- Cathleen Bruce
- 5 years ago
- Views:
Transcription
1 2016 International Conference on Electrical Engineering and Automation (ICEEA 2016) ISBN: Partial Discharge Measurements on 110kV Current Transformers. Case Study. Results Cristian DAN 1 and Roman MORAR 2 1 Electrica Transilvania Sud Power Distribution Subsidiary Sibiu, Romania 2 Technical University of Cluj Napoca, Cluj Napoca, Romania Keywords: Partial discharge, PD, Instrument transformer, High voltage, 110kV, 3PARD three phase amplitude relation diagram, PRPD phase resolved PD, MPD600 partial discharge measuring system. Abstract. The case study presents a series of partial discharge measurements, reflecting the state of insulation of 110kV instrument transformers located in Sibiu county substations. Measurements were performed based on electrical method, using MPD600: an acquisition and analysis toolkit for detecting, recording, and analyzing partial discharge, product of Mtronix Precision Measuring Instruments. MPD600 consists of three acquisition units (to separate, this way, the DP signal from electromagnetic disturbances, based on the three Phase Amplitude Relation Diagram 3 PARD), an optical interface and a computer with dedicated software. The system allows measurements of partial discharge on site, even in presence of strong electromagnetic interferences because it provides synchronous acquisition from all measurement points. Measurements, with the ability to be calibrated, do render: a value subject to interpretation according to IEC : IEC : IEC :2011 and IEC : 2011; the possibility to determine the nature of the fault by identifying defective winding. Considering the results, the 110kV instrument transformer was directed to the repair shop and had the fault identified. Introduction Electrical utility industry all over the world faces a tough challenge with an ageing of the power grid component population as failure of these assets may cause interruption of power supply and also revenue losses. Insulation condition is an essential aspect for the operational reliability of high voltage equipment. Considering this, it is very important to identify the healthy units in the ageing population of equipment, as not extending service to these units will result in substantial cost savings for the power company [5]. Modern technologies and developments in signal acquisition and analysis techniques do provide new tools for diagnostic of electrical power equipment. Instrument Transformers To safely operate a power system are indispensable appliances capable of measuring electrical quantities (current, voltage, power, energy, frequency, power factor (cosφ), and so on) and also those that ensure correct functioning of the network and / or do limit proportions of possible damage to it. First are called meters, and other, protective devices. The order of magnitude of voltage and current in a power system is very diverse. Adapting both voltage or current metering systems and protective devices to this wide range of values is neither technically nor economically justified. Therefore, these devices are connected to the electrical circuitry indirectly, via current and voltage transformers instrument transformers whose construction and operation is tailored specifically to this purpose. The instrument transformers possessing a primary winding and a certain number of secondary windings, performing an isolating function (isolating the utilization current or voltage from the supply current/voltage for safety to
2 both the operator and the end device in use), change currents and voltages from one magnitude to another, suitable for power metering and protection devices. For each instrument transformer, insulation issues are fundamental and determine a priori the possible limits of their functional properties [20]. In a CIGRE survey also the used maintenance techniques prior instrument transformers failure are listed [1] in table I. Table 1. Maintenance strategy used prior to failure from 3004 reported failures. Maintenance strategy How often used Regular visual inspection 95% Check of oil level and/or pressure gauge 61% Secondary voltage monitoring for CVTs 15% Insulation resistance checks 11% DGA and/or moisture of oil 7% Thermovision inspection 4% DF measurement at mains frequency 2% PD measurement 1% Partial Discharge Measurement Partial Discharge (PD) measurement is a worldwide accepted tool for quality control of high voltage (HV) equipment [2] [3]. PD indicate partial loss of the insulating capacity and is, thereby, considered a measure of electrical ageing of the insulation system [4]. The classical measuring circuit, according to IEC60270: High voltage test techniques Partial discharge measurements, requires a coupling capacitor for the connection of the PD measurement instrument and works at a measuring frequency of several hundred khz up to one MHz [7], detecting therefore, the line based pulse propagation. Otherwise, measurements in higher frequency range (UHF) do determine the field base wave propagation. Interference Free Measurement Setup Outside screened laboratories, PD signals are very often superposed by noise pulses, a fact that makes a PD data analysis more difficult for both human experts and for software expert systems [6]. Therefore the handling of disturbances is one of the main tasks when measuring PD. Additionally, with the ongoing development of permanently installed PD monitoring systems the PD data analysis needs to become more effective to be done automatically. The effects of external interference in the measuring circuit are minimized through electrical isolation between the measuring system and the control unit. Frequency Selective, Narrow Band and Wide Band Measurement The measuring systems used today extend the measuring range historically limited to ~ 1MHz, as far as 20MHz. Within this wide frequency range, the user can select a band that has only marginal superimposed interference or none at all. 3PARD Evaluation Procedures A new field of evaluation methods is opened by fully synchronous multi-channel PD acquisition in order to gain more reliable measuring results combined with effective noise suppression. Therefore the 3-Phase-Amplitude-Relation-Diagram (3PARD) was introduced [20] as a new powerful analysis tool to distinguish between different PD sources and noise pulses when measuring 3-phase high voltage equipment [7]. Through suitable superimposition of the amplitudes, the traditional phase resolved PD (PRPD) pattern can be broken down into individual components, allowing individual sources to be singled out.
3 Analysis of the Frequency Spectrums With these processes, it is not the amplitudes measured at various locations that are superimposed, but rather the spectral components measured selectively but still synchronously at one single location. The frequently noisy PD patterns can also be broken down into individual sources using these methods. PD Measuring System The MPD 600 as a modern type of a fully digital PD measuring system is capable of performing synchronous multi-channel PD measurements. A brief overview of the system is given below (more detailed information in the product specification [8] and type test description [9]). The measurement system consists of one or more acquisition units (Figure 1), an optical interface (FO bus-controller) and a PC including the measuring software. The PD signals are filtered, amplified and digitized. An optimum frequency band can be chosen to avoid continuous-wave disturbances and to reach a high SNR (signal-to-noise-ratio) even under noisy conditions on site. For multi-channel PD measurements several 100 acquisition units can be connected to one distributed PD system [7] (Figure 2) while a maximum number of 64 units can be operated in a fully synchronized mode. Figure 1. Components of a MPD system: measuring impedance (1), PD acquisition unit (2), optic-usb converter (3), notebook (4). Figure 2. Upgradeable to a multi -channel PD measuring system. Up to 25 phase-resolved patterns can be displayed by the software at one time. With powerful adequate accessories, as the special inductive PD sensor MCT 100 [10], a measurement range extension UHF 608 [11], the MPD system can easily be adapted to various measuring conditions. Based on PD measurements that have been performed on the instrument transformers functioning in Sibiu county substations, it has allowed Electrica Transilvania Sud to assess the condition for some of their instrument transformers and to avoid any catastrophic failures (Figure 3). Units with higher PD level were subsequently replaced.
4 Case Study Figure 3. Example of a catastrophic failure. The 110kV instrument transformers were tested due to failure of previous instrument transformer in MEDIAS / Aurel Vlaicu substation (Figure 3). With a synchronous PD acquisition system it is possible to combine the benefits of conventional PD measurements according to IEC with the advantages of PD measurements in the UHF range. With the UHF sensor able to detect the relevant PD events, the information of the IEC method can be restricted to the relevant PD signals in order to assess the pc charge value. In this, a first stage, on-site field-measurements were taken on three (3) 110kV current transformers (Figure 4) during their normal operation. Figure 4. PD testing of 110kV instrument (current) transformers The transformers were taken out of service to install the PD equipment and for charge calibration. One of the main benefits of the PD systems used is that the PD acquisition units can be placed very close to the transformer. This minimizes the required length of electrical connecting cables and allows PD signal acquisition with high bandwidth, while minimizing electromagnetic interference. Figure 5. PRPD pattern obtained, electrical PD measurement according to IEC 60270, centre frequency: 1MHz, bandwidth: 1.5MHz, all PD data. After using the built-in frequency sweep function a measuring frequency of 1MHz (1.5MHz bandwidth) was selected. The results of the PD measurements on phase 2 CT (later identified as defective), are shown in the following figures 5-7.
5 As usual for conventional on-line PD measurements the PRPD diagram shows a significant 3- phase corona cross-talk from the substation and the near overhead transmission lines. No PD activity from the transformer could be determined as the interference was in excess of 2nC. Figure 6. UHF PD measurement, center frequency: 1MHz, bandwidth: 1.5MHz. Figure 7. Gated PRPD pattern, electrical PD measurement, centre frequency: 1MHz, bandwidth: 1.5MHz. Figure 7 shows the PD activity measured with the UHF 608 extension. With the near overhead transmission lines de-energized, the recorded PD pattern showed no external interference. In order to obtain a valid PD charge information the PD results from the IEC-method had to be used [7] [13]. The external noise was successfully gated with the information from UHF PD acquisition unit. Figure 7 shows the corrected PD pattern recorded. Relevant charge level of the PD pulses was determined. As the result, exceeded from a far the permissible PD level [15], according to IEC :2012 (10pC), the 110kV instrument transformer was taken out of service, pending servicing or inspection. The 110kV current transformer was directed to the repair shop and had the fault identified (figure 8). Conclusions The state of insulation of 110kV instrument transformers can be accurately assessed by PD measurements. The presented result pointed out the high sensitivity of the PD measurement, the modeling tool developed especially on detecting incipient faults inside power equipments. The digital PD measuring system performs PD measurement even under noisy on-site conditions. Separating multiple PD sources / noise, a clear PD data analysis will be possible. Handling single PD faults, PRPD patterns and pulse sequence analysis will deliver reliable results. Synchronous multi-channel PD measurements provide new and advanced options of PD evaluation.
6 Figure 8. PD fault. Primary connexion. References [1] State of Art Instrument Transformers, CIGRÉ Committee A3, Technical Brochure 394, Paris, [2] J.J. Smit, Trends in PD-diagnostics for Asset Management of Aging HV Infrastructures, 14th International Symposium on High Voltage Engineering, Bejing/P.R.China, August, [3] D. König, Y.N. Rao, Partial Discharges in Electrical Power Apparatus, VDE, [4] J.C. Montanari, Insulation diagnosis of high voltage apparatus by partial discharge investigation, Liu-Yeda Memorial Lecture, in Proc. IEEE ICPADM, Bali, Indonesia, [5] M.A. Talib, N. Miswan, G.K. Supramaniam, Condition Assessment of HV Equipments in Tenaga Nasional Berhad Malaysia, Instrument Transformer Measurement Forum, Salzburg, Austria, 13 October, [6] S. Tenbohlen, M. Koch, Significant parameters for determining ageing of insulation system in power transformers Diagnostic Measurements on Power Transformers Workshop, Salzburg, Austria, 13 October, [7] A. Kraetge, K. Rethmeier, M. Krüger, P. Winter, Synchronous Multi-Channel PD Measurements and the Benefits for PD Analyses, OMICRON Training, Klaus, Austria, [8] Omicron electronics, MPD600 Product Brief and Specification, Austria, [9] R. Holle, R. Plath, K. Schon and W. Lucas, Type testing a digital PD measuring system according to IEC 60270, ETG Conference on Diagnostic, Kassel, Germany, [10] Omicron electronics, MCT100 Product Brief and Specification, Austria, [11] Omicron electronics, UHF608 Product Brief and Specification, Austria, [12] Wikipedia article on Ageing, available on 31 March 2013 at: en.wikipedia.org/wiki/ageing. [13] IEC 60270, High-voltage test techniques Partial Discharge Measurements Third Edition, [14] IEC (cancels and replaces the first edition of IEC , and its Amendment 1 (2000) and Amendment 2 (2002), Instrument transformers General requirements, edition 1.0, [15] IEC , Additional Requirements for Current Transformers, Edition 1.0, [16] IEC , Additional Requirements for Inductive Voltage Transformers, Edition 1.0, [17] IEC , Additional Requirements for Combined Transformers Edition 1.0,
7 [18] IEC , Additional Requirements for Capacitive Voltage Transformers, Edition 1.0, [19] T.K. Saha, Review of modern diagnostic techniques for assessing insulation condition in aged transformers, IEEE Transactions on Dielectrics and Electrical Insulation, vol. 10, no. 5, October, [20] K.D. Plath, R. Plath, H. Emanuel, W. Kalkner, Three-phase synchronous PD measurements on transformers on site and in the laboratory, ETG Conference on Diagnosic, Berlin, Germany, 2002.
Why partial discharge testing makes good sense
Why partial discharge testing makes good sense PD measurement and analysis have proven to be reliable for detecting defects in the insulation system of electrical assets before major damage or a breakdown
More informationDiagnostic testing of cast resin transformers
Paper of the Month Diagnostic testing of cast resin transformers Author Michael Krüger, OMICRON, Austria michael.krueger@omiconenergy.com Christoph Engelen, OMICRON, Austria christoph.engelen@omicronenergy.com
More informationPartial Discharge Measurement and Monitoring on High Voltage XLPE Cables
21, rue d Artois, F-75008 PARIS AUCKLAND 2013 http : //www.cigre.org Partial Discharge Measurement and Monitoring on High Voltage XLPE Cables Michael Krüger, Rene Hummel, Stefan Böhler, OMICRON Austria
More informationThe importance of partial discharge testing throughout the development and operation of power transformers
The importance of partial discharge testing throughout the development and operation of power transformers Ulrike Broniecki OMICRON Energy Solutions GmbH, Berlin Power transformers are exposed to intense
More informationMONTRANO. Continuous monitoring system for power transformers
MONTRANO Continuous monitoring system for power transformers Condition monitoring to extend transformer life Knowing the dielectric condition of insulation is vital Dielectric flashover of insulation in
More informationThe University of New South Wales. School of Electrical Engineering and Telecommunications. High Voltage Systems ELEC9712. Appendix Partial Discharge
The University of New South Wales School of Electrical Engineering and Telecommunications High Voltage Systems ELEC9712 Appendix Partial Discharge Content Introduction Quantities measured Test circuits
More informationOMICRON Seminar on Partial Discharge Diagnostics on HV Assets. January 30, 2018 Beirut, Lebanon
OMICRON Seminar on Partial Discharge Diagnostics on HV Assets January 30, 2018 Beirut, Lebanon Substation Asset Testing and Diagnosis LOW ACCURACY LEVEL HIGH Take better maintenance decisions through accurate
More informationComparison of capacitive and inductive sensors designed for partial discharges measurements in electrical power apparatus
Comparison of capacitive and inductive sensors designed for partial discharges measurements in electrical power apparatus Michał Kunicki 1,* 1 Opole University of Technology, ul. Prószkowska 76, 45-758
More informationMPD 600. High-End Measurement and Analysis System for Partial Discharges (PD)
MPD 600 High-End Measurement and Analysis System for Partial Discharges (PD) Partial Discharge Analysis The MPD 600 partial discharge analysis system is a precise and modular high-end toolbox for detecting,
More informationAdvanced Test Equipment Rentals ATEC (2832)
Established 1981 Advanced Test Equipment Rentals www.atecorp.com 800-404-ATEC (2832) MPD 500 Partial Discharge Measuring System for Routine Test Applications Partial Discharge Measurement The MPD 500 partial
More informationMPD 500. Partial Discharge Measuring System for Routine Test Applications
MPD 500 Partial Discharge Measuring System for Routine Test Applications Partial Discharge Measurement The MPD 500 partial discharge measuring system has been specially designed for providing fast and
More informationIRIS POWER PDTracII. Continuous On-line Partial Discharge Monitoring for Motors, Generators, Dry Type Transformers, and Air-Insulated Switchgear.
IRIS POWER PDTracII Continuous On-line Partial Discharge Monitoring for Motors, Generators, Dry Type Transformers, and Air-Insulated Switchgear. We have not found another test method that produces as much
More informationOMICRON Seminar on Substation Testing and Diagnosis. October 23, 2017 Dubai, United Arab Emirates. October 24, 2017 Abu Dhabi, United Arab Emirates
OMICRON Seminar on Substation Testing and Diagnosis October 23, 2017 Dubai, United Arab Emirates October 24, 2017 Abu Dhabi, United Arab Emirates Time Optimized Substation Asset Testing and Diagnosis Agenda
More informationIRIS POWER TGA-B. Periodic Online Partial Discharge Monitoring Instrument for Turbine Generators and Motors
IRIS POWER TGA-B Periodic Online Partial Discharge Monitoring Instrument for Turbine Generators and Motors We have not found another test method that produces as much decision support data for generator
More informationIRIS POWER PDTracII. Continuous On-line Partial Discharge Monitoring for Motors, Generators, Dry Type Transformers, and Air-Insulated Switchgear.
IRIS POWER PDTracII Continuous On-line Partial Discharge Monitoring for Motors, Generators, Dry Type Transformers, and Air-Insulated Switchgear. We have not found another test method that produces as much
More informationPD Solutions. On-Line PD Measurement Devices
On-Line PD Measurement Devices 1. Longshot Device (see Figure 1) The measurement system applied is based around the wideband (0-400 MHz) HVPD- Longshot partial discharge test unit which utilizes a high-speed
More informationPULSE-SEQUENCE ANALYSIS OF PARTIAL DISCHARGES IN POWER TRANSFORMERS
PULSE-SEQUENCE ANALYSIS OF PARTIAL DISCHARGES IN POWER TRANSFORMERS Anne Pfeffer 1*, Stefan Tenbohlen 1 and Stefan Kornhuber 2 1 Institute of Power Transmission and High Voltage Technology, Pfaffenwaldring
More informationNew Techniques for the Monitoring of Transformer Condition
New Techniques for the Monitoring of Transformer Condition Thomas Prevost OMICRON electronics USA IEEE T&D Conference Chicago, Illinois April 17, 2014 Agenda Monitoring Expectations & Needs Bushing Monitoring
More informationPARTIAL DISCHARGE MEASUREMENTS ON GENERATORS USING A NOISE GATING SYSTEM
Abstract PARTIAL DISCHARGE MEASUREMENTS ON GENERATORS USING A NOISE GATING SYSTEM Q. SU Department of Electrical & Computer Systems Engineering Monash University, Clayton VIC 3168 Email: qi.su@eng.monash.edu.au
More informationSENSITIVITY ASPECTS OF ON-LINE PD DIAGNOSIS OF MV POWER CABLES
SENSITIVITY ASPECTS OF ON-LINE PD DIAGNOSIS OF MV POWER CABLES Frank WESTER, Edward GULSKI, Johan SMIT, Edwin GROOT*, Mark VAN VLIET* Delft University of Technology The Netherlands * NUON The Netherlands
More informationEFFECT OF INTEGRATION ERROR ON PARTIAL DISCHARGE MEASUREMENTS ON CAST RESIN TRANSFORMERS. C. Ceretta, R. Gobbo, G. Pesavento
Sept. 22-24, 28, Florence, Italy EFFECT OF INTEGRATION ERROR ON PARTIAL DISCHARGE MEASUREMENTS ON CAST RESIN TRANSFORMERS C. Ceretta, R. Gobbo, G. Pesavento Dept. of Electrical Engineering University of
More informationPractical aspects of PD localization for long length Power Cables
Practical aspects of PD localization for long length Power Cables M. Wild, S. Tenbohlen University of Stuttgart Stuttgart, Germany manuel.wild@ieh.uni-stuttgart.de E. Gulski, R. Jongen onsite hv technology
More informationTHE POWER OF LIFE. WinTech Partial Discharge based Predictive Intelligence of insulation system to eliminate power failure risk.
THE POWER OF LIFE WinTech Partial Discharge based Predictive Intelligence of insulation system to eliminate power failure risk. Mr. Neal Yang Pro.E.E. Engineer About Us The flaw of dielectric material
More informationAdvancements in online partial discharge monitoring and assessment of MV through EHV Substation assets
Advancements in online partial discharge monitoring and assessment of MV through EHV Substation assets Abstract: For decades it has been recognized that partial discharge assessment is an excellent method
More informationAdvanced Test Equipment Rentals ATEC (2832) CP RC. Resonance circuit for GIS testing
Established 1981 Advanced Test Equipment Rentals www.atecorp.com 800-404-ATEC (2832) CP RC Resonance circuit for GIS testing A new approach to testing gas-insulated switchgear Testing gas-insulated switchgear
More informationInnovative Test Techniques and Diagnostic Measurements to Improve the Performance and Reliability of Power System Transformers
Innovative Test Techniques and Diagnostic Measurements to Improve the Performance and Reliability of Power System Transformers Dr. Michael Krüger, Alexander Kraetge, OMICRON electronics GmbH, Austria Alexander
More informationFlorian Predl and GK Papneja OMICRON
One-day Workshop on HV insulation diagnosis by means of PD detection/measurement methods by Florian Predl and GK Papneja OMICRON Date: Time: Venue: 28 November 2016 (Monday) 9:00 17:00 (8:30 for registration)
More informationUHF PD-DIAGNOSIS AT HIGH VOLTAGE CABLE TERMINATIONS INTERNATIONAL CASE STUDIES
UHF PD-DIAGNOSIS AT HIGH VOLTAGE CABLE TERMINATIONS INTERNATIONAL CASE STUDIES D. Götz*, H.T. Putter* *Megger Germany INTRODUCTION High voltage termintions are essential components in high voltage cable
More informationAfrica Utility Week Focus Day Substation Condition Monitoring Benefits of Ultrasound
Africa Utility Week Focus Day 2014 Substation Condition Monitoring Benefits of Ultrasound Agenda Review - Substation Condition Monitoring Electrical discharge Types and origin In switchgear Results/consequences
More informationPartial Discharge Monitoring of Power Transformers by UHF Sensors
Partial Discharge Monitoring of Power Transformers by UHF Sensors S. Tenbohlen 1, M. Siegel², M. Beltle² 1 Institute of Power Transmission and High Voltage Technology (IEH), University of Stuttgart Pfaffenwaldring
More informationCONTINUOUS ON-LINE MONITORING OF PARTIAL DICHARGES IN HV DISTRIBUTION CABLES
CONTINUOUS ON-LINE MONITORING OF PARTIAL DICHARGES IN HV DISTRIBUTION CABLES Hao ZHANG, Transgrid, (Australia), hao.zhang@transgrid.com.au Zhao LIU, University of NSW, (Australia), z.liu@unsw.edu.au Toan
More informationHV AC TESTING OF SUPER-LONG CABLES
HV AC TESTING OF SUPER-LONG CABLES Stefan SCHIERIG, (Germany), schierig@highvolt.de Peter COORS, (Germany), coors@highvolt.de Wolfgang HAUSCHILD, IEC, CIGRE, (Germany), hauschild@highvolt.de ABSTRACT The
More informationInvestigation of PD Detection on XLPE Cables
Investigation of PD Detection on XLPE Cables Hio Nam O, T.R. Blackburn and B.T. Phung School of Electrical Engineering and Telecommunications The University New South Wales, Australia Abstract- The insulation
More informationPartial Discharge Monitoring and Diagnosis of Power Generator
Partial Discharge Monitoring and Diagnosis of Power Generator Gao Wensheng Institute of High Voltage & insulation tech. Electrical Eng. Dept., Tsinghua University Wsgao@tsinghua.edu.cn Currently preventive
More informationNEW APPROACH FOR HIGH VOLTAGE CABLE ON-SITE TESTING
NEW APPROACH FOR HIGH VOLTAGE CABLE ON-SITE TESTING Volker BERGMANN, TU-Berlin, Dep. of HV-Engineering, (Germany), bergmann@ihs.ee.tu-berlin.de Peter MOHAUPT, BAUR Pruef- und Messtechnik GmbH, (Austria),
More informationPDL 650. Acoustic PD Fault Localization in High-Voltage Equipment
PDL 650 Acoustic PD Fault Localization in High-Voltage Equipment Identifying Problems within Steel Walls As a result of increased demand for power, high voltage equipment is being subjected to ever greater
More informationDielectric analysis of high-voltage power transformers DIAGNOSIS ABSTRACT KEYWORDS. 1. Introduction
DIAGNOSIS ABSTRACT Dielectric tests have been used for decades for diagnosis of power transformers and bushings. In addition to the traditional tests at line frequency, modern types of dielectric tests
More informationON-LINE PARTIAL DISCHARGE DETECTION ON TRANSFORMERS
ON-LINE PARTIAL DISCHARGE DETECTION ON TRANSFORMERS Pantelis D. AGORIS 1, Sander MEIJER 1, Edward GULSKI 1, Johan J. SMIT 1, A. Jos L.M. KANTERS 2 1 Delft University of Technology - The Netherlands 2 TenneT
More informationMPD 600. High-end partial discharge measurement and analysis system
MPD 600 High-end partial discharge measurement and analysis system Partial discharge analysis Partial discharges: weak points in insulation systems Partial discharges, as defined by IEC 60270, are localized
More informationMaintenance & Diagnosis Strategies. for. High Voltage Substations
Maintenance & Diagnosis Strategies for High Voltage Substations 1/ 52 Robin Fischer, 28 April 2004 Diagnosis of Substation Equipment Power Transformers Instrument Transformers Switch-Gears Breakers Coils
More informationAPPLICATIONS OF ACOUSTIC LOCALIZATION TO ONLINE POWER TRANSFORMERS
APPLICATIONS OF ACOUSTIC LOCALIZATION TO ONLINE POWER TRANSFORMERS David Larochelle NDB Technologies Reasons leading to acoustic testing are different weather it is a manufacturing or field environment
More information10. DISTURBANCE VOLTAGE WITHSTAND CAPABILITY
9. INTRODUCTION Control Cabling The protection and control equipment in power plants and substations is influenced by various of environmental conditions. One of the most significant environmental factor
More informationElectrical Equipment Condition Assessment
Feature Electrical Equipment Condition Assessment Using On-Line Solid Insulation Sampling Importance of Electrical Insulation Electrical insulation plays a vital role in the design and operation of all
More informationLong lengths transmission power cables on-site testing up to 500 kv by damped AC voltages
Long lengths transmission power cables on-site testing up to 500 kv by damped AC voltages Paul P. SEITZ, Ben QUAK, Seitz Instruments AG, Niederrohrdorf, Switzerland, pps@seitz-instruments.ch Edward GULSKI,
More informationUSING DAMPED AC VOLTAGES
MODERN & TESTING DIAGNOSIS OF POWER CABLES USING DAMPED AC VOLTAGES BY EDWARD GULSKI AND ROGIER JONGEN, Onsite HV Solutions ag, Switzerland AND RALPH PATTERSON, Power Products & Solutions LLC, United States
More informationA New Approach for Transformer Bushing Monitoring. Emilio Morales Technical Application Specialist Qualitrol
A New Approach for Transformer Bushing Monitoring Emilio Morales Technical Application Specialist Qualitrol Abstract Transformer bushings are one of the most critical components of a transformer. Up to
More informationOpen Access Application of Partial Discharge Online Monitoring Technology in ± 660kV Converter Transformer
Send Orders for Reprints to reprints@benthamscience.ae 784 The Open Automation and Control Systems Journal, 2015, 7, 784-791 Open Access Application of Partial Discharge Online Monitoring Technology in
More informationPrimary Test Manager (PTM) Testing and management software for primary assets
Primary Test Manager (PTM) Testing and management software for primary assets Asset diagnostics now easier than ever How well do you know your assets? High-voltage assets are subjected to aging and wear
More informationDigital Fault Recorder Deployment at HVDC Converter Stations
Digital Fault Recorder Deployment at HVDC Converter Stations On line continuous monitoring at HVDC Converter Stations is an important asset in determining overall system performance and an essential diagnostic
More informationTHE PROPAGATION OF PARTIAL DISCHARGE PULSES IN A HIGH VOLTAGE CABLE
THE PROPAGATION OF PARTIAL DISCHARGE PULSES IN A HIGH VOLTAGE CABLE Z.Liu, B.T.Phung, T.R.Blackburn and R.E.James School of Electrical Engineering and Telecommuniications University of New South Wales
More informationMPD 600. High-end measurement and analysis system for partial discharges
MPD 600 High-end measurement and analysis system for partial discharges Partial discharge analysis Partial discharges: weak points in insulation systems Partial discharges, as defined by IEC 60270, are
More informationMatz Ohlen Director Transformer Test Systems. Megger Sweden
Matz Ohlen Director Transformer Test Systems Megger Sweden Frequency response analysis of power transformers Measuring and analyzing data as function of frequency, variable frequency diagnostics Impedance
More informationPartial discharge diagnostics on very long and branched cable circuits
11 Nordic Insulation Symposium Stockholm, June 11-13, 2001 Partial discharge diagnostics on very long and branched cable circuits Nico van Schaik, E. Fred Steennis, Wim Boone and Dick M. van Aartrijk KEMA
More informationNOVEL METHOD FOR ON-SITE TESTING AND DIAGNOSIS OF TRANSMISSION CABELS UP TO 250KV
NOVEL METHOD FOR ON-SITE TESTING AND DIAGNOSIS OF TRANSMISSION CABELS UP TO 250KV Paul P. SEITZ, Seitz Instruments AG, (Switzerland), pps@seitz-instruments.ch Ben QUAK, Seitz Instruments AG, (Switzerland),
More informationHigh Voltage Diagnostics Sarl 4, Rue de Lac CH 1897 Le Bouveret Switzerland
High Voltage Diagnostics Sarl 4, Rue de Lac CH 1897 Le Bouveret Switzerland Company HV Diagnostics Sarl is a Swiss based company in the field of high voltage test equipment for cable testing and diagnosis.
More informationMulti-Resolution Wavelet Analysis for Chopped Impulse Voltage Measurements
Multi-Resolution Wavelet Analysis for Chopped Impulse Voltage Measurements EMEL ONAL Electrical Engineering Department Istanbul Technical University 34469 Maslak-Istanbul TURKEY onal@elk.itu.edu.tr http://www.elk.itu.edu.tr/~onal
More informationOn-line Partial Discharge Assessment and Monitoring of MV to EHV Cables
On-line Partial Discharge Assessment and Monitoring of MV to EHV Cables William Higinbotham, Neil Davies and Victor Chan EA Technology LLC, New Jersey; USA, EA Technology Pty Ltd, Brisbane Australia; EA
More informationIMPORTANCE OF ACCURATE MEASUREMENTS DURING THE LIFE CYCLE OF UTILITIES
IMPORTANCE OF ACCURATE MEASUREMENTS DURING THE LIFE CYCLE OF UTILITIES Thomas Steiner HIGHVOLT Prüftechnik Dresden GmbH Lifecycle of utilities time schedule utilities Tests during life cycle of utilities
More informationAutomated PRPD Pattern Analysis using Image Recognition
International Journal on Electrical Engineering and Informatics Volume 4, Number 3, October 2012 Automated PRPD Pattern Analysis using Image Recognition A. Müller, M. Beltle and S. Tenbohlen Institute
More informationAutotransformer Condition Monitoring Systems
Autotransformer Condition Monitoring Systems The Bidders shall offer separately the following systems of par.1 Integrated Condition Monitoring System and par.2 UHF PD Monitoring System. Two systems following
More informationCondition Assessment of High Voltage Insulation in Power System Equipment. R.E. James and Q. Su. The Institution of Engineering and Technology
Condition Assessment of High Voltage Insulation in Power System Equipment R.E. James and Q. Su The Institution of Engineering and Technology Contents Preface xi 1 Introduction 1 1.1 Interconnection of
More informationTECHIMP Technologies & Services for Diagnostics and Monitoring of High Voltage Assets
TECHIMP Technologies & Services for Diagnostics and Monitoring of High Voltage Assets Who we are TECHIMP is one of the leading providers of Condition Assessment Services Data Acquisition and Test Equipment
More informationDoble Solutions for Partial Discharge. Greg Topjian Solutions Manager
Doble Solutions for Partial Discharge Greg Topjian Solutions Manager 617-393-3129 gtopjian@doble.com Why do we need to conduct PD measurements PD a major cause of early failure for HV insulation. Partial
More informationAbstract. 1 Introduction
Using optical couplers to monitor the condition of electricity infrastructure S.G. Swingler, L. Hao, P.L. Lewin and D.J. Swaffield The Tony Davies High Voltage Laboratory, University of Southampton, Southampton
More informationPerforming reliable and reproducible frequency response measurements on power transformers
Topic Performing reliable and reproducible frequency response measurements on power transformers Prof. Dr. Stephanie Uhrig, Munich University of Applied Sciences Michael Rädler, OMICRON electronics GmbH
More informationFAULT IDENTIFICATION IN TRANSFORMER WINDING
FAULT IDENTIFICATION IN TRANSFORMER WINDING S.Joshibha Ponmalar 1, S.Kavitha 2 1, 2 Department of Electrical and Electronics Engineering, Saveetha Engineering College, (Anna University), Chennai Abstract
More informationANSE VISUAL, developed within the
ANSE VISUAL Software to Analyze Substation Robustness ANSE VISUAL, developed within the Institutional Project 1724, is a tool to analyze the robustness of electrical substations. The software carries out
More informationIN ELECTRICAL ENGINEERING - I C M E T CRAIOVA
Taking into account that power transformer is the major item of equipment in power systems, its correct operation is vital to system operation. It is well known that transformer failures are sometimes
More informationCHAPTER 5 CONCEPT OF PD SIGNAL AND PRPD PATTERN
75 CHAPTER 5 CONCEPT OF PD SIGNAL AND PRPD PATTERN 5.1 INTRODUCTION Partial Discharge (PD) detection is an important tool for monitoring insulation conditions in high voltage (HV) devices in power systems.
More informationAspects of PD interpretation in HV power cables. by Edward Gulski, Piotr Cichecki, Rogier Jongen
Aspects of PD interpretation in HV power cables by Edward Gulski, Piotr Cichecki, Rogier Jongen General There are several aspects having influence on the diagnostic information and the condition judgment
More informationTransformer Shunt Fault Detection using Two Techniques
Transformer Shunt Fault Detection using Two Techniques Swathy Sasikumar 1, Dr. V. A. Kulkarni 2 P.G. Student, Department of Electrical Engineering, Government College of Engineering, Aurangabad, Maharashtra,
More informationThe Application of Partial Discharge Measurement and Location on CGIS
International Journal on Electrical Engineering and Informatics Volume 4, Number 3, October 2012 The Application of Partial Discharge Measurement and Location on CGIS Min-Yen Chiu¹, Keng-Wei Liang¹, Chang-Hsing
More informationNETWORK INNOVATION COMPETITION ANGLE-DC PROJECT HOLISTIC CIRCUIT CONDITION MONITORING SYSTEM REPORT
NETWORK INNOVATION COMPETITION PROJECT HOLISTIC CIRCUIT CONDITION MONITORING SYSTEM REPORT NOVEMBER 17 Version: 1.0 Authored by: Andrew Moon Engineering Consultant and Project Manager Kevin Smith Lead
More informationKEYWORDS On-line diagnostics, cable termination, partial discharge (PD), ultra-high frequency (UHF), sensitivity check.
2, rue d Artois, F-758 PARIS B-2 CIGRE 28 http : //www.cigre.org Application of UHF method for on-line PD diagnostics of cable terminations T. KLEIN Pfisterer Kontaktsysteme GmbH Germany D. DENISSOV, W.
More informationMPD 500. Partial discharge measurement system for routine test applications
MPD 500 Partial discharge measurement system for routine test applications Partial discharge testing The MPD 500 partial discharge measuring system has been specially designed for providing fast and reliable
More informationEffective Maintenance Test Techniques and Diagnostic Measurements to Improve the Performance and Reliability of Power System Transformers
Effective Maintenance Test Techniques and Diagnostic Measurements to Improve the Performance and Reliability of Power System Transformers Alexander Dierks, Herman Viljoen, Alectrix (Pty) Ltd, South Africa
More informationPD Diagnostic Applications and TechImp solutions
PD Diagnostic Applications and TechImp solutions Condition Assessment Solutions for Electrical Systems. PD based innovative tools for the Condition Based Maintenance. MD-04.05.004 - rev. 00-29/08/2006
More informationAlternative Coupling Method for Immunity Testing of Power Grid Protection Equipment
Alternative Coupling Method for Immunity Testing of Power Grid Protection Equipment Christian Suttner*, Stefan Tenbohlen Institute of Power Transmission and High Voltage Technology (IEH), University of
More informationPHG 70 TD PD / PHG 80 TD PD
PHG 70 TD PD / PHG 80 TD PD BAUR VLF test and diagnostics system Functions Universal test and diagnostics system flexible, modular, extendable Cutting-edge testing and diagnostics technology: VLF truesinus
More informationState of the Art and Future Trends of Unconventional PD-Measurement at Power Transformers
Journal of Energy and Power Engineering 8 (2014) 1093-1098 D DAVID PUBLISHING State of the Art and Future Trends of Unconventional PD-Measurement at Power Transformers Jürgen Fabian 1, Martin Neuwersch
More informationChapter 7 Conclusion 7.1 General
Chapter 7 7.1 General The mechanical integrity of a transformer winding is challenged by several mechanisms. Many dielectric failures in transformers are direct results of reduced mechanical strength due
More informationPractical Experience in On-Line Partial Discharge Measurements of MV Switchgear Systems
Practical Experience in On-Line Partial Discharge Measurements of MV Switchgear Systems Z. Berler, I. Blokhintsev, A. Golubev, G. Paoletti, V. Rashkes, A. Romashkov Cutler-Hammer Predictive Diagnostics
More informationMPD 600. High-end partial discharge measurement and analysis system
MPD 600 High-end partial discharge measurement and analysis system Partial discharge analysis Partial discharges: weak points in insulation systems Partial discharges, as defined by IEC 60270, are localized
More informationCDAX 605 High Precision Capacitance & Dissipation Factor Test Set
CDAX 605 High Precision Capacitance & Dissipation Factor Test Set 1 Tan delta and capacitance measurements Hi V A Lo Ground C HL Measure with AC test signal, use Ohms law to calculate: Dissipation factor
More informationEffective maintenance test techniques for power transformers
Effective maintenance test techniques for power transformers by Alexander Dierks, Herman Viljoen, Alectrix, South Africa, and Dr. Michael Krüger, Omicron Electronics, Austria Due to ever-increasing pressure
More informationNEW MV CABLE ACCESSORY WITH EMBEDDED SENSOR TO CHECK PARTIAL DISCHARGE ACTIVITY
NEW MV CABLE ACCESSORY WITH EMBEDDED SENSOR TO CHECK PARTIAL DISCHARGE ACTIVITY Lorenzo PERETTO Luigi FODDAI Simone ORRU Luigi PUDDU Altea Switzerland ENEL Italy ENEL Italy REPL Italy lperetto@alteasolutions.com
More informationCable testing and diagnostics
Cable testing and diagnostics To ensure the flow Cost-optimised maintenance through cable diagnostics The sheath and cable testing supports you in assessing whether a cable system is safe and ready to
More informationH V T E S T S O L U T I O N S PA RT N E RS F O R H V & E M C
H V T E S T S O L U T I O N S PA RT N E RS F O R H V & E M C S O L U T I O N S Y O U R S O U R C E F O R T O P Q U A L I T Y T E S T E Q U I P M E N T w w w. h v t e c h n o l o g i e s. c o m Company
More information1409. Comparison study between acoustic and optical sensors for acoustic wave
1409. Comparison study between acoustic and optical sensors for acoustic wave Malik Abdulrazzaq Alsaedi Department of Electrical, Faculty of Engineering, University of Misan, Amarah, Iraq E-mail: maliksaady@yahoo.com
More informationPartial Discharge Patterns in High Voltage Insulation
22 IEEE International Conference on Power and Energy (PECon), 2-5 December 22, Kota Kinabalu Sabah, Malaysia Partial Discharge Patterns in High Voltage Insulation Hazlee Illias, Teo Soon Yuan, Ab Halim
More informationCable test vans and systems
Cable test vans and systems Prepared for anything BAUR s cable fault location and diagnostics systems Would you like to test and assess new installations and existing cable locations efficiently? To rectify
More informationSpecialists in HV and MV test and diagnostics. Testing in Substations
Specialists in HV and MV test and diagnostics Testing in Substations Testing in Substations Testing in Substations At 4fores we specialize in the diagnosis and measurement of all types of existing technologies
More informationInvestigating Mechanical Integrity in Power Transformer Using Sweep Frequency Response Analysis (SFRA)
Investigating Mechanical Integrity in Power Transformer Using Sweep Frequency Response Analysis (SFRA) Priti G 1*, Sindekar AS 2 P.G. Scholar, Department of Electrical Engineering, Government College of
More informationPRY-CAM BREAKTHROUGH TECHNOLOGY FOR CONDITION ASSESSMENT AND ASSET MANAGEMENT
PRY-CAM BREAKTHROUGH TECHNOLOGY FOR CONDITION ASSESSMENT AND ASSET MANAGEMENT WELCOME TO PRY-CAM A REVOLUTION IN PARTIAL DISCHARGE MANAGEMENT The worlds of partial discharge (PD) measurement, asset management
More informationOn-Site Partial Discharge Monitoring using the differential LEMKE PROBE LDP-5 and its accessories
Workshop 2000, lexandria, Virginia, 13 & 14 September 2000 paper No.: 8 On-Site Partial Discharge Monitoring using the differential LEMKE PROE and its accessories Dirk Russwurm, HV Technologies, Inc. bstract
More informationCable test vans and systems
Cable test vans and systems Prepared for anything BAUR s cable fault location and diagnostics systems Would you like to test and assess new installations and existing cable locations efficiently? To rectify
More informationABB Power Products Service
Raben Naidoo, Technology days, May 21-22th, 2014, Cape Town, South Africa, Enhanced availability of transformers via transformer remote monitoring - TEC ABB Power Products Service Why a session on availability?
More informationInvestigations on a Combined Resonance/VLF HV Test System Partial Discharge (PD) characteristics at VLF and DAC voltages
Investigations on a Combined Resonance/VLF HV Test System Partial Discharge (PD) characteristics at VLF and DAC voltages F. Petzold, H.T. Putter, D. Götz, H. Schlapp, S. Markalous SebaKMT GmbH Baunach/Radeburg,
More informationTECHIMP Power Transformer Monitoring
TECHIMP Power Transformer Monitoring Kontakt: Martin Hesse Techimp Germany GmbH i.g. E-Mail: mhesse@techimp.com Tel.: +49 5724 391 007 Mobil: +49 170 2364 735 PD Monitoring of Power Transformers Power
More informationA1-209 EXPERIENCES IN IDENTIFICATION OF PARTIAL DISCHARGE PATTERNS IN LARGE HYDROGENERATORS
21, rue d'artois, F-75008 Paris http://www.cigre.org A1-209 Session 2004 CIGRÉ EXPERIENCES IN IDENTIFICATION OF PARTIAL DISCHARGE PATTERNS IN LARGE HYDROGENERATORS CARLOS AZUAJE* WILLIAM TORRES C.V.G.
More information