Partial Discharge Measurements on 110kV Current Transformers. Case Study. Results

Size: px
Start display at page:

Download "Partial Discharge Measurements on 110kV Current Transformers. Case Study. Results"

Transcription

1 2016 International Conference on Electrical Engineering and Automation (ICEEA 2016) ISBN: Partial Discharge Measurements on 110kV Current Transformers. Case Study. Results Cristian DAN 1 and Roman MORAR 2 1 Electrica Transilvania Sud Power Distribution Subsidiary Sibiu, Romania 2 Technical University of Cluj Napoca, Cluj Napoca, Romania Keywords: Partial discharge, PD, Instrument transformer, High voltage, 110kV, 3PARD three phase amplitude relation diagram, PRPD phase resolved PD, MPD600 partial discharge measuring system. Abstract. The case study presents a series of partial discharge measurements, reflecting the state of insulation of 110kV instrument transformers located in Sibiu county substations. Measurements were performed based on electrical method, using MPD600: an acquisition and analysis toolkit for detecting, recording, and analyzing partial discharge, product of Mtronix Precision Measuring Instruments. MPD600 consists of three acquisition units (to separate, this way, the DP signal from electromagnetic disturbances, based on the three Phase Amplitude Relation Diagram 3 PARD), an optical interface and a computer with dedicated software. The system allows measurements of partial discharge on site, even in presence of strong electromagnetic interferences because it provides synchronous acquisition from all measurement points. Measurements, with the ability to be calibrated, do render: a value subject to interpretation according to IEC : IEC : IEC :2011 and IEC : 2011; the possibility to determine the nature of the fault by identifying defective winding. Considering the results, the 110kV instrument transformer was directed to the repair shop and had the fault identified. Introduction Electrical utility industry all over the world faces a tough challenge with an ageing of the power grid component population as failure of these assets may cause interruption of power supply and also revenue losses. Insulation condition is an essential aspect for the operational reliability of high voltage equipment. Considering this, it is very important to identify the healthy units in the ageing population of equipment, as not extending service to these units will result in substantial cost savings for the power company [5]. Modern technologies and developments in signal acquisition and analysis techniques do provide new tools for diagnostic of electrical power equipment. Instrument Transformers To safely operate a power system are indispensable appliances capable of measuring electrical quantities (current, voltage, power, energy, frequency, power factor (cosφ), and so on) and also those that ensure correct functioning of the network and / or do limit proportions of possible damage to it. First are called meters, and other, protective devices. The order of magnitude of voltage and current in a power system is very diverse. Adapting both voltage or current metering systems and protective devices to this wide range of values is neither technically nor economically justified. Therefore, these devices are connected to the electrical circuitry indirectly, via current and voltage transformers instrument transformers whose construction and operation is tailored specifically to this purpose. The instrument transformers possessing a primary winding and a certain number of secondary windings, performing an isolating function (isolating the utilization current or voltage from the supply current/voltage for safety to

2 both the operator and the end device in use), change currents and voltages from one magnitude to another, suitable for power metering and protection devices. For each instrument transformer, insulation issues are fundamental and determine a priori the possible limits of their functional properties [20]. In a CIGRE survey also the used maintenance techniques prior instrument transformers failure are listed [1] in table I. Table 1. Maintenance strategy used prior to failure from 3004 reported failures. Maintenance strategy How often used Regular visual inspection 95% Check of oil level and/or pressure gauge 61% Secondary voltage monitoring for CVTs 15% Insulation resistance checks 11% DGA and/or moisture of oil 7% Thermovision inspection 4% DF measurement at mains frequency 2% PD measurement 1% Partial Discharge Measurement Partial Discharge (PD) measurement is a worldwide accepted tool for quality control of high voltage (HV) equipment [2] [3]. PD indicate partial loss of the insulating capacity and is, thereby, considered a measure of electrical ageing of the insulation system [4]. The classical measuring circuit, according to IEC60270: High voltage test techniques Partial discharge measurements, requires a coupling capacitor for the connection of the PD measurement instrument and works at a measuring frequency of several hundred khz up to one MHz [7], detecting therefore, the line based pulse propagation. Otherwise, measurements in higher frequency range (UHF) do determine the field base wave propagation. Interference Free Measurement Setup Outside screened laboratories, PD signals are very often superposed by noise pulses, a fact that makes a PD data analysis more difficult for both human experts and for software expert systems [6]. Therefore the handling of disturbances is one of the main tasks when measuring PD. Additionally, with the ongoing development of permanently installed PD monitoring systems the PD data analysis needs to become more effective to be done automatically. The effects of external interference in the measuring circuit are minimized through electrical isolation between the measuring system and the control unit. Frequency Selective, Narrow Band and Wide Band Measurement The measuring systems used today extend the measuring range historically limited to ~ 1MHz, as far as 20MHz. Within this wide frequency range, the user can select a band that has only marginal superimposed interference or none at all. 3PARD Evaluation Procedures A new field of evaluation methods is opened by fully synchronous multi-channel PD acquisition in order to gain more reliable measuring results combined with effective noise suppression. Therefore the 3-Phase-Amplitude-Relation-Diagram (3PARD) was introduced [20] as a new powerful analysis tool to distinguish between different PD sources and noise pulses when measuring 3-phase high voltage equipment [7]. Through suitable superimposition of the amplitudes, the traditional phase resolved PD (PRPD) pattern can be broken down into individual components, allowing individual sources to be singled out.

3 Analysis of the Frequency Spectrums With these processes, it is not the amplitudes measured at various locations that are superimposed, but rather the spectral components measured selectively but still synchronously at one single location. The frequently noisy PD patterns can also be broken down into individual sources using these methods. PD Measuring System The MPD 600 as a modern type of a fully digital PD measuring system is capable of performing synchronous multi-channel PD measurements. A brief overview of the system is given below (more detailed information in the product specification [8] and type test description [9]). The measurement system consists of one or more acquisition units (Figure 1), an optical interface (FO bus-controller) and a PC including the measuring software. The PD signals are filtered, amplified and digitized. An optimum frequency band can be chosen to avoid continuous-wave disturbances and to reach a high SNR (signal-to-noise-ratio) even under noisy conditions on site. For multi-channel PD measurements several 100 acquisition units can be connected to one distributed PD system [7] (Figure 2) while a maximum number of 64 units can be operated in a fully synchronized mode. Figure 1. Components of a MPD system: measuring impedance (1), PD acquisition unit (2), optic-usb converter (3), notebook (4). Figure 2. Upgradeable to a multi -channel PD measuring system. Up to 25 phase-resolved patterns can be displayed by the software at one time. With powerful adequate accessories, as the special inductive PD sensor MCT 100 [10], a measurement range extension UHF 608 [11], the MPD system can easily be adapted to various measuring conditions. Based on PD measurements that have been performed on the instrument transformers functioning in Sibiu county substations, it has allowed Electrica Transilvania Sud to assess the condition for some of their instrument transformers and to avoid any catastrophic failures (Figure 3). Units with higher PD level were subsequently replaced.

4 Case Study Figure 3. Example of a catastrophic failure. The 110kV instrument transformers were tested due to failure of previous instrument transformer in MEDIAS / Aurel Vlaicu substation (Figure 3). With a synchronous PD acquisition system it is possible to combine the benefits of conventional PD measurements according to IEC with the advantages of PD measurements in the UHF range. With the UHF sensor able to detect the relevant PD events, the information of the IEC method can be restricted to the relevant PD signals in order to assess the pc charge value. In this, a first stage, on-site field-measurements were taken on three (3) 110kV current transformers (Figure 4) during their normal operation. Figure 4. PD testing of 110kV instrument (current) transformers The transformers were taken out of service to install the PD equipment and for charge calibration. One of the main benefits of the PD systems used is that the PD acquisition units can be placed very close to the transformer. This minimizes the required length of electrical connecting cables and allows PD signal acquisition with high bandwidth, while minimizing electromagnetic interference. Figure 5. PRPD pattern obtained, electrical PD measurement according to IEC 60270, centre frequency: 1MHz, bandwidth: 1.5MHz, all PD data. After using the built-in frequency sweep function a measuring frequency of 1MHz (1.5MHz bandwidth) was selected. The results of the PD measurements on phase 2 CT (later identified as defective), are shown in the following figures 5-7.

5 As usual for conventional on-line PD measurements the PRPD diagram shows a significant 3- phase corona cross-talk from the substation and the near overhead transmission lines. No PD activity from the transformer could be determined as the interference was in excess of 2nC. Figure 6. UHF PD measurement, center frequency: 1MHz, bandwidth: 1.5MHz. Figure 7. Gated PRPD pattern, electrical PD measurement, centre frequency: 1MHz, bandwidth: 1.5MHz. Figure 7 shows the PD activity measured with the UHF 608 extension. With the near overhead transmission lines de-energized, the recorded PD pattern showed no external interference. In order to obtain a valid PD charge information the PD results from the IEC-method had to be used [7] [13]. The external noise was successfully gated with the information from UHF PD acquisition unit. Figure 7 shows the corrected PD pattern recorded. Relevant charge level of the PD pulses was determined. As the result, exceeded from a far the permissible PD level [15], according to IEC :2012 (10pC), the 110kV instrument transformer was taken out of service, pending servicing or inspection. The 110kV current transformer was directed to the repair shop and had the fault identified (figure 8). Conclusions The state of insulation of 110kV instrument transformers can be accurately assessed by PD measurements. The presented result pointed out the high sensitivity of the PD measurement, the modeling tool developed especially on detecting incipient faults inside power equipments. The digital PD measuring system performs PD measurement even under noisy on-site conditions. Separating multiple PD sources / noise, a clear PD data analysis will be possible. Handling single PD faults, PRPD patterns and pulse sequence analysis will deliver reliable results. Synchronous multi-channel PD measurements provide new and advanced options of PD evaluation.

6 Figure 8. PD fault. Primary connexion. References [1] State of Art Instrument Transformers, CIGRÉ Committee A3, Technical Brochure 394, Paris, [2] J.J. Smit, Trends in PD-diagnostics for Asset Management of Aging HV Infrastructures, 14th International Symposium on High Voltage Engineering, Bejing/P.R.China, August, [3] D. König, Y.N. Rao, Partial Discharges in Electrical Power Apparatus, VDE, [4] J.C. Montanari, Insulation diagnosis of high voltage apparatus by partial discharge investigation, Liu-Yeda Memorial Lecture, in Proc. IEEE ICPADM, Bali, Indonesia, [5] M.A. Talib, N. Miswan, G.K. Supramaniam, Condition Assessment of HV Equipments in Tenaga Nasional Berhad Malaysia, Instrument Transformer Measurement Forum, Salzburg, Austria, 13 October, [6] S. Tenbohlen, M. Koch, Significant parameters for determining ageing of insulation system in power transformers Diagnostic Measurements on Power Transformers Workshop, Salzburg, Austria, 13 October, [7] A. Kraetge, K. Rethmeier, M. Krüger, P. Winter, Synchronous Multi-Channel PD Measurements and the Benefits for PD Analyses, OMICRON Training, Klaus, Austria, [8] Omicron electronics, MPD600 Product Brief and Specification, Austria, [9] R. Holle, R. Plath, K. Schon and W. Lucas, Type testing a digital PD measuring system according to IEC 60270, ETG Conference on Diagnostic, Kassel, Germany, [10] Omicron electronics, MCT100 Product Brief and Specification, Austria, [11] Omicron electronics, UHF608 Product Brief and Specification, Austria, [12] Wikipedia article on Ageing, available on 31 March 2013 at: en.wikipedia.org/wiki/ageing. [13] IEC 60270, High-voltage test techniques Partial Discharge Measurements Third Edition, [14] IEC (cancels and replaces the first edition of IEC , and its Amendment 1 (2000) and Amendment 2 (2002), Instrument transformers General requirements, edition 1.0, [15] IEC , Additional Requirements for Current Transformers, Edition 1.0, [16] IEC , Additional Requirements for Inductive Voltage Transformers, Edition 1.0, [17] IEC , Additional Requirements for Combined Transformers Edition 1.0,

7 [18] IEC , Additional Requirements for Capacitive Voltage Transformers, Edition 1.0, [19] T.K. Saha, Review of modern diagnostic techniques for assessing insulation condition in aged transformers, IEEE Transactions on Dielectrics and Electrical Insulation, vol. 10, no. 5, October, [20] K.D. Plath, R. Plath, H. Emanuel, W. Kalkner, Three-phase synchronous PD measurements on transformers on site and in the laboratory, ETG Conference on Diagnosic, Berlin, Germany, 2002.

Why partial discharge testing makes good sense

Why partial discharge testing makes good sense Why partial discharge testing makes good sense PD measurement and analysis have proven to be reliable for detecting defects in the insulation system of electrical assets before major damage or a breakdown

More information

Diagnostic testing of cast resin transformers

Diagnostic testing of cast resin transformers Paper of the Month Diagnostic testing of cast resin transformers Author Michael Krüger, OMICRON, Austria michael.krueger@omiconenergy.com Christoph Engelen, OMICRON, Austria christoph.engelen@omicronenergy.com

More information

Partial Discharge Measurement and Monitoring on High Voltage XLPE Cables

Partial Discharge Measurement and Monitoring on High Voltage XLPE Cables 21, rue d Artois, F-75008 PARIS AUCKLAND 2013 http : //www.cigre.org Partial Discharge Measurement and Monitoring on High Voltage XLPE Cables Michael Krüger, Rene Hummel, Stefan Böhler, OMICRON Austria

More information

The importance of partial discharge testing throughout the development and operation of power transformers

The importance of partial discharge testing throughout the development and operation of power transformers The importance of partial discharge testing throughout the development and operation of power transformers Ulrike Broniecki OMICRON Energy Solutions GmbH, Berlin Power transformers are exposed to intense

More information

MONTRANO. Continuous monitoring system for power transformers

MONTRANO. Continuous monitoring system for power transformers MONTRANO Continuous monitoring system for power transformers Condition monitoring to extend transformer life Knowing the dielectric condition of insulation is vital Dielectric flashover of insulation in

More information

The University of New South Wales. School of Electrical Engineering and Telecommunications. High Voltage Systems ELEC9712. Appendix Partial Discharge

The University of New South Wales. School of Electrical Engineering and Telecommunications. High Voltage Systems ELEC9712. Appendix Partial Discharge The University of New South Wales School of Electrical Engineering and Telecommunications High Voltage Systems ELEC9712 Appendix Partial Discharge Content Introduction Quantities measured Test circuits

More information

OMICRON Seminar on Partial Discharge Diagnostics on HV Assets. January 30, 2018 Beirut, Lebanon

OMICRON Seminar on Partial Discharge Diagnostics on HV Assets. January 30, 2018 Beirut, Lebanon OMICRON Seminar on Partial Discharge Diagnostics on HV Assets January 30, 2018 Beirut, Lebanon Substation Asset Testing and Diagnosis LOW ACCURACY LEVEL HIGH Take better maintenance decisions through accurate

More information

Comparison of capacitive and inductive sensors designed for partial discharges measurements in electrical power apparatus

Comparison of capacitive and inductive sensors designed for partial discharges measurements in electrical power apparatus Comparison of capacitive and inductive sensors designed for partial discharges measurements in electrical power apparatus Michał Kunicki 1,* 1 Opole University of Technology, ul. Prószkowska 76, 45-758

More information

MPD 600. High-End Measurement and Analysis System for Partial Discharges (PD)

MPD 600. High-End Measurement and Analysis System for Partial Discharges (PD) MPD 600 High-End Measurement and Analysis System for Partial Discharges (PD) Partial Discharge Analysis The MPD 600 partial discharge analysis system is a precise and modular high-end toolbox for detecting,

More information

Advanced Test Equipment Rentals ATEC (2832)

Advanced Test Equipment Rentals ATEC (2832) Established 1981 Advanced Test Equipment Rentals www.atecorp.com 800-404-ATEC (2832) MPD 500 Partial Discharge Measuring System for Routine Test Applications Partial Discharge Measurement The MPD 500 partial

More information

MPD 500. Partial Discharge Measuring System for Routine Test Applications

MPD 500. Partial Discharge Measuring System for Routine Test Applications MPD 500 Partial Discharge Measuring System for Routine Test Applications Partial Discharge Measurement The MPD 500 partial discharge measuring system has been specially designed for providing fast and

More information

IRIS POWER PDTracII. Continuous On-line Partial Discharge Monitoring for Motors, Generators, Dry Type Transformers, and Air-Insulated Switchgear.

IRIS POWER PDTracII. Continuous On-line Partial Discharge Monitoring for Motors, Generators, Dry Type Transformers, and Air-Insulated Switchgear. IRIS POWER PDTracII Continuous On-line Partial Discharge Monitoring for Motors, Generators, Dry Type Transformers, and Air-Insulated Switchgear. We have not found another test method that produces as much

More information

OMICRON Seminar on Substation Testing and Diagnosis. October 23, 2017 Dubai, United Arab Emirates. October 24, 2017 Abu Dhabi, United Arab Emirates

OMICRON Seminar on Substation Testing and Diagnosis. October 23, 2017 Dubai, United Arab Emirates. October 24, 2017 Abu Dhabi, United Arab Emirates OMICRON Seminar on Substation Testing and Diagnosis October 23, 2017 Dubai, United Arab Emirates October 24, 2017 Abu Dhabi, United Arab Emirates Time Optimized Substation Asset Testing and Diagnosis Agenda

More information

IRIS POWER TGA-B. Periodic Online Partial Discharge Monitoring Instrument for Turbine Generators and Motors

IRIS POWER TGA-B. Periodic Online Partial Discharge Monitoring Instrument for Turbine Generators and Motors IRIS POWER TGA-B Periodic Online Partial Discharge Monitoring Instrument for Turbine Generators and Motors We have not found another test method that produces as much decision support data for generator

More information

IRIS POWER PDTracII. Continuous On-line Partial Discharge Monitoring for Motors, Generators, Dry Type Transformers, and Air-Insulated Switchgear.

IRIS POWER PDTracII. Continuous On-line Partial Discharge Monitoring for Motors, Generators, Dry Type Transformers, and Air-Insulated Switchgear. IRIS POWER PDTracII Continuous On-line Partial Discharge Monitoring for Motors, Generators, Dry Type Transformers, and Air-Insulated Switchgear. We have not found another test method that produces as much

More information

PD Solutions. On-Line PD Measurement Devices

PD Solutions. On-Line PD Measurement Devices On-Line PD Measurement Devices 1. Longshot Device (see Figure 1) The measurement system applied is based around the wideband (0-400 MHz) HVPD- Longshot partial discharge test unit which utilizes a high-speed

More information

PULSE-SEQUENCE ANALYSIS OF PARTIAL DISCHARGES IN POWER TRANSFORMERS

PULSE-SEQUENCE ANALYSIS OF PARTIAL DISCHARGES IN POWER TRANSFORMERS PULSE-SEQUENCE ANALYSIS OF PARTIAL DISCHARGES IN POWER TRANSFORMERS Anne Pfeffer 1*, Stefan Tenbohlen 1 and Stefan Kornhuber 2 1 Institute of Power Transmission and High Voltage Technology, Pfaffenwaldring

More information

New Techniques for the Monitoring of Transformer Condition

New Techniques for the Monitoring of Transformer Condition New Techniques for the Monitoring of Transformer Condition Thomas Prevost OMICRON electronics USA IEEE T&D Conference Chicago, Illinois April 17, 2014 Agenda Monitoring Expectations & Needs Bushing Monitoring

More information

PARTIAL DISCHARGE MEASUREMENTS ON GENERATORS USING A NOISE GATING SYSTEM

PARTIAL DISCHARGE MEASUREMENTS ON GENERATORS USING A NOISE GATING SYSTEM Abstract PARTIAL DISCHARGE MEASUREMENTS ON GENERATORS USING A NOISE GATING SYSTEM Q. SU Department of Electrical & Computer Systems Engineering Monash University, Clayton VIC 3168 Email: qi.su@eng.monash.edu.au

More information

SENSITIVITY ASPECTS OF ON-LINE PD DIAGNOSIS OF MV POWER CABLES

SENSITIVITY ASPECTS OF ON-LINE PD DIAGNOSIS OF MV POWER CABLES SENSITIVITY ASPECTS OF ON-LINE PD DIAGNOSIS OF MV POWER CABLES Frank WESTER, Edward GULSKI, Johan SMIT, Edwin GROOT*, Mark VAN VLIET* Delft University of Technology The Netherlands * NUON The Netherlands

More information

EFFECT OF INTEGRATION ERROR ON PARTIAL DISCHARGE MEASUREMENTS ON CAST RESIN TRANSFORMERS. C. Ceretta, R. Gobbo, G. Pesavento

EFFECT OF INTEGRATION ERROR ON PARTIAL DISCHARGE MEASUREMENTS ON CAST RESIN TRANSFORMERS. C. Ceretta, R. Gobbo, G. Pesavento Sept. 22-24, 28, Florence, Italy EFFECT OF INTEGRATION ERROR ON PARTIAL DISCHARGE MEASUREMENTS ON CAST RESIN TRANSFORMERS C. Ceretta, R. Gobbo, G. Pesavento Dept. of Electrical Engineering University of

More information

Practical aspects of PD localization for long length Power Cables

Practical aspects of PD localization for long length Power Cables Practical aspects of PD localization for long length Power Cables M. Wild, S. Tenbohlen University of Stuttgart Stuttgart, Germany manuel.wild@ieh.uni-stuttgart.de E. Gulski, R. Jongen onsite hv technology

More information

THE POWER OF LIFE. WinTech Partial Discharge based Predictive Intelligence of insulation system to eliminate power failure risk.

THE POWER OF LIFE. WinTech Partial Discharge based Predictive Intelligence of insulation system to eliminate power failure risk. THE POWER OF LIFE WinTech Partial Discharge based Predictive Intelligence of insulation system to eliminate power failure risk. Mr. Neal Yang Pro.E.E. Engineer About Us The flaw of dielectric material

More information

Advancements in online partial discharge monitoring and assessment of MV through EHV Substation assets

Advancements in online partial discharge monitoring and assessment of MV through EHV Substation assets Advancements in online partial discharge monitoring and assessment of MV through EHV Substation assets Abstract: For decades it has been recognized that partial discharge assessment is an excellent method

More information

Advanced Test Equipment Rentals ATEC (2832) CP RC. Resonance circuit for GIS testing

Advanced Test Equipment Rentals ATEC (2832) CP RC. Resonance circuit for GIS testing Established 1981 Advanced Test Equipment Rentals www.atecorp.com 800-404-ATEC (2832) CP RC Resonance circuit for GIS testing A new approach to testing gas-insulated switchgear Testing gas-insulated switchgear

More information

Innovative Test Techniques and Diagnostic Measurements to Improve the Performance and Reliability of Power System Transformers

Innovative Test Techniques and Diagnostic Measurements to Improve the Performance and Reliability of Power System Transformers Innovative Test Techniques and Diagnostic Measurements to Improve the Performance and Reliability of Power System Transformers Dr. Michael Krüger, Alexander Kraetge, OMICRON electronics GmbH, Austria Alexander

More information

Florian Predl and GK Papneja OMICRON

Florian Predl and GK Papneja OMICRON One-day Workshop on HV insulation diagnosis by means of PD detection/measurement methods by Florian Predl and GK Papneja OMICRON Date: Time: Venue: 28 November 2016 (Monday) 9:00 17:00 (8:30 for registration)

More information

UHF PD-DIAGNOSIS AT HIGH VOLTAGE CABLE TERMINATIONS INTERNATIONAL CASE STUDIES

UHF PD-DIAGNOSIS AT HIGH VOLTAGE CABLE TERMINATIONS INTERNATIONAL CASE STUDIES UHF PD-DIAGNOSIS AT HIGH VOLTAGE CABLE TERMINATIONS INTERNATIONAL CASE STUDIES D. Götz*, H.T. Putter* *Megger Germany INTRODUCTION High voltage termintions are essential components in high voltage cable

More information

Africa Utility Week Focus Day Substation Condition Monitoring Benefits of Ultrasound

Africa Utility Week Focus Day Substation Condition Monitoring Benefits of Ultrasound Africa Utility Week Focus Day 2014 Substation Condition Monitoring Benefits of Ultrasound Agenda Review - Substation Condition Monitoring Electrical discharge Types and origin In switchgear Results/consequences

More information

Partial Discharge Monitoring of Power Transformers by UHF Sensors

Partial Discharge Monitoring of Power Transformers by UHF Sensors Partial Discharge Monitoring of Power Transformers by UHF Sensors S. Tenbohlen 1, M. Siegel², M. Beltle² 1 Institute of Power Transmission and High Voltage Technology (IEH), University of Stuttgart Pfaffenwaldring

More information

CONTINUOUS ON-LINE MONITORING OF PARTIAL DICHARGES IN HV DISTRIBUTION CABLES

CONTINUOUS ON-LINE MONITORING OF PARTIAL DICHARGES IN HV DISTRIBUTION CABLES CONTINUOUS ON-LINE MONITORING OF PARTIAL DICHARGES IN HV DISTRIBUTION CABLES Hao ZHANG, Transgrid, (Australia), hao.zhang@transgrid.com.au Zhao LIU, University of NSW, (Australia), z.liu@unsw.edu.au Toan

More information

HV AC TESTING OF SUPER-LONG CABLES

HV AC TESTING OF SUPER-LONG CABLES HV AC TESTING OF SUPER-LONG CABLES Stefan SCHIERIG, (Germany), schierig@highvolt.de Peter COORS, (Germany), coors@highvolt.de Wolfgang HAUSCHILD, IEC, CIGRE, (Germany), hauschild@highvolt.de ABSTRACT The

More information

Investigation of PD Detection on XLPE Cables

Investigation of PD Detection on XLPE Cables Investigation of PD Detection on XLPE Cables Hio Nam O, T.R. Blackburn and B.T. Phung School of Electrical Engineering and Telecommunications The University New South Wales, Australia Abstract- The insulation

More information

Partial Discharge Monitoring and Diagnosis of Power Generator

Partial Discharge Monitoring and Diagnosis of Power Generator Partial Discharge Monitoring and Diagnosis of Power Generator Gao Wensheng Institute of High Voltage & insulation tech. Electrical Eng. Dept., Tsinghua University Wsgao@tsinghua.edu.cn Currently preventive

More information

NEW APPROACH FOR HIGH VOLTAGE CABLE ON-SITE TESTING

NEW APPROACH FOR HIGH VOLTAGE CABLE ON-SITE TESTING NEW APPROACH FOR HIGH VOLTAGE CABLE ON-SITE TESTING Volker BERGMANN, TU-Berlin, Dep. of HV-Engineering, (Germany), bergmann@ihs.ee.tu-berlin.de Peter MOHAUPT, BAUR Pruef- und Messtechnik GmbH, (Austria),

More information

PDL 650. Acoustic PD Fault Localization in High-Voltage Equipment

PDL 650. Acoustic PD Fault Localization in High-Voltage Equipment PDL 650 Acoustic PD Fault Localization in High-Voltage Equipment Identifying Problems within Steel Walls As a result of increased demand for power, high voltage equipment is being subjected to ever greater

More information

Dielectric analysis of high-voltage power transformers DIAGNOSIS ABSTRACT KEYWORDS. 1. Introduction

Dielectric analysis of high-voltage power transformers DIAGNOSIS ABSTRACT KEYWORDS. 1. Introduction DIAGNOSIS ABSTRACT Dielectric tests have been used for decades for diagnosis of power transformers and bushings. In addition to the traditional tests at line frequency, modern types of dielectric tests

More information

ON-LINE PARTIAL DISCHARGE DETECTION ON TRANSFORMERS

ON-LINE PARTIAL DISCHARGE DETECTION ON TRANSFORMERS ON-LINE PARTIAL DISCHARGE DETECTION ON TRANSFORMERS Pantelis D. AGORIS 1, Sander MEIJER 1, Edward GULSKI 1, Johan J. SMIT 1, A. Jos L.M. KANTERS 2 1 Delft University of Technology - The Netherlands 2 TenneT

More information

MPD 600. High-end partial discharge measurement and analysis system

MPD 600. High-end partial discharge measurement and analysis system MPD 600 High-end partial discharge measurement and analysis system Partial discharge analysis Partial discharges: weak points in insulation systems Partial discharges, as defined by IEC 60270, are localized

More information

Maintenance & Diagnosis Strategies. for. High Voltage Substations

Maintenance & Diagnosis Strategies. for. High Voltage Substations Maintenance & Diagnosis Strategies for High Voltage Substations 1/ 52 Robin Fischer, 28 April 2004 Diagnosis of Substation Equipment Power Transformers Instrument Transformers Switch-Gears Breakers Coils

More information

APPLICATIONS OF ACOUSTIC LOCALIZATION TO ONLINE POWER TRANSFORMERS

APPLICATIONS OF ACOUSTIC LOCALIZATION TO ONLINE POWER TRANSFORMERS APPLICATIONS OF ACOUSTIC LOCALIZATION TO ONLINE POWER TRANSFORMERS David Larochelle NDB Technologies Reasons leading to acoustic testing are different weather it is a manufacturing or field environment

More information

10. DISTURBANCE VOLTAGE WITHSTAND CAPABILITY

10. DISTURBANCE VOLTAGE WITHSTAND CAPABILITY 9. INTRODUCTION Control Cabling The protection and control equipment in power plants and substations is influenced by various of environmental conditions. One of the most significant environmental factor

More information

Electrical Equipment Condition Assessment

Electrical Equipment Condition Assessment Feature Electrical Equipment Condition Assessment Using On-Line Solid Insulation Sampling Importance of Electrical Insulation Electrical insulation plays a vital role in the design and operation of all

More information

Long lengths transmission power cables on-site testing up to 500 kv by damped AC voltages

Long lengths transmission power cables on-site testing up to 500 kv by damped AC voltages Long lengths transmission power cables on-site testing up to 500 kv by damped AC voltages Paul P. SEITZ, Ben QUAK, Seitz Instruments AG, Niederrohrdorf, Switzerland, pps@seitz-instruments.ch Edward GULSKI,

More information

USING DAMPED AC VOLTAGES

USING DAMPED AC VOLTAGES MODERN & TESTING DIAGNOSIS OF POWER CABLES USING DAMPED AC VOLTAGES BY EDWARD GULSKI AND ROGIER JONGEN, Onsite HV Solutions ag, Switzerland AND RALPH PATTERSON, Power Products & Solutions LLC, United States

More information

A New Approach for Transformer Bushing Monitoring. Emilio Morales Technical Application Specialist Qualitrol

A New Approach for Transformer Bushing Monitoring. Emilio Morales Technical Application Specialist Qualitrol A New Approach for Transformer Bushing Monitoring Emilio Morales Technical Application Specialist Qualitrol Abstract Transformer bushings are one of the most critical components of a transformer. Up to

More information

Open Access Application of Partial Discharge Online Monitoring Technology in ± 660kV Converter Transformer

Open Access Application of Partial Discharge Online Monitoring Technology in ± 660kV Converter Transformer Send Orders for Reprints to reprints@benthamscience.ae 784 The Open Automation and Control Systems Journal, 2015, 7, 784-791 Open Access Application of Partial Discharge Online Monitoring Technology in

More information

Primary Test Manager (PTM) Testing and management software for primary assets

Primary Test Manager (PTM) Testing and management software for primary assets Primary Test Manager (PTM) Testing and management software for primary assets Asset diagnostics now easier than ever How well do you know your assets? High-voltage assets are subjected to aging and wear

More information

Digital Fault Recorder Deployment at HVDC Converter Stations

Digital Fault Recorder Deployment at HVDC Converter Stations Digital Fault Recorder Deployment at HVDC Converter Stations On line continuous monitoring at HVDC Converter Stations is an important asset in determining overall system performance and an essential diagnostic

More information

THE PROPAGATION OF PARTIAL DISCHARGE PULSES IN A HIGH VOLTAGE CABLE

THE PROPAGATION OF PARTIAL DISCHARGE PULSES IN A HIGH VOLTAGE CABLE THE PROPAGATION OF PARTIAL DISCHARGE PULSES IN A HIGH VOLTAGE CABLE Z.Liu, B.T.Phung, T.R.Blackburn and R.E.James School of Electrical Engineering and Telecommuniications University of New South Wales

More information

MPD 600. High-end measurement and analysis system for partial discharges

MPD 600. High-end measurement and analysis system for partial discharges MPD 600 High-end measurement and analysis system for partial discharges Partial discharge analysis Partial discharges: weak points in insulation systems Partial discharges, as defined by IEC 60270, are

More information

Matz Ohlen Director Transformer Test Systems. Megger Sweden

Matz Ohlen Director Transformer Test Systems. Megger Sweden Matz Ohlen Director Transformer Test Systems Megger Sweden Frequency response analysis of power transformers Measuring and analyzing data as function of frequency, variable frequency diagnostics Impedance

More information

Partial discharge diagnostics on very long and branched cable circuits

Partial discharge diagnostics on very long and branched cable circuits 11 Nordic Insulation Symposium Stockholm, June 11-13, 2001 Partial discharge diagnostics on very long and branched cable circuits Nico van Schaik, E. Fred Steennis, Wim Boone and Dick M. van Aartrijk KEMA

More information

NOVEL METHOD FOR ON-SITE TESTING AND DIAGNOSIS OF TRANSMISSION CABELS UP TO 250KV

NOVEL METHOD FOR ON-SITE TESTING AND DIAGNOSIS OF TRANSMISSION CABELS UP TO 250KV NOVEL METHOD FOR ON-SITE TESTING AND DIAGNOSIS OF TRANSMISSION CABELS UP TO 250KV Paul P. SEITZ, Seitz Instruments AG, (Switzerland), pps@seitz-instruments.ch Ben QUAK, Seitz Instruments AG, (Switzerland),

More information

High Voltage Diagnostics Sarl 4, Rue de Lac CH 1897 Le Bouveret Switzerland

High Voltage Diagnostics Sarl 4, Rue de Lac CH 1897 Le Bouveret Switzerland High Voltage Diagnostics Sarl 4, Rue de Lac CH 1897 Le Bouveret Switzerland Company HV Diagnostics Sarl is a Swiss based company in the field of high voltage test equipment for cable testing and diagnosis.

More information

Multi-Resolution Wavelet Analysis for Chopped Impulse Voltage Measurements

Multi-Resolution Wavelet Analysis for Chopped Impulse Voltage Measurements Multi-Resolution Wavelet Analysis for Chopped Impulse Voltage Measurements EMEL ONAL Electrical Engineering Department Istanbul Technical University 34469 Maslak-Istanbul TURKEY onal@elk.itu.edu.tr http://www.elk.itu.edu.tr/~onal

More information

On-line Partial Discharge Assessment and Monitoring of MV to EHV Cables

On-line Partial Discharge Assessment and Monitoring of MV to EHV Cables On-line Partial Discharge Assessment and Monitoring of MV to EHV Cables William Higinbotham, Neil Davies and Victor Chan EA Technology LLC, New Jersey; USA, EA Technology Pty Ltd, Brisbane Australia; EA

More information

IMPORTANCE OF ACCURATE MEASUREMENTS DURING THE LIFE CYCLE OF UTILITIES

IMPORTANCE OF ACCURATE MEASUREMENTS DURING THE LIFE CYCLE OF UTILITIES IMPORTANCE OF ACCURATE MEASUREMENTS DURING THE LIFE CYCLE OF UTILITIES Thomas Steiner HIGHVOLT Prüftechnik Dresden GmbH Lifecycle of utilities time schedule utilities Tests during life cycle of utilities

More information

Automated PRPD Pattern Analysis using Image Recognition

Automated PRPD Pattern Analysis using Image Recognition International Journal on Electrical Engineering and Informatics Volume 4, Number 3, October 2012 Automated PRPD Pattern Analysis using Image Recognition A. Müller, M. Beltle and S. Tenbohlen Institute

More information

Autotransformer Condition Monitoring Systems

Autotransformer Condition Monitoring Systems Autotransformer Condition Monitoring Systems The Bidders shall offer separately the following systems of par.1 Integrated Condition Monitoring System and par.2 UHF PD Monitoring System. Two systems following

More information

Condition Assessment of High Voltage Insulation in Power System Equipment. R.E. James and Q. Su. The Institution of Engineering and Technology

Condition Assessment of High Voltage Insulation in Power System Equipment. R.E. James and Q. Su. The Institution of Engineering and Technology Condition Assessment of High Voltage Insulation in Power System Equipment R.E. James and Q. Su The Institution of Engineering and Technology Contents Preface xi 1 Introduction 1 1.1 Interconnection of

More information

TECHIMP Technologies & Services for Diagnostics and Monitoring of High Voltage Assets

TECHIMP Technologies & Services for Diagnostics and Monitoring of High Voltage Assets TECHIMP Technologies & Services for Diagnostics and Monitoring of High Voltage Assets Who we are TECHIMP is one of the leading providers of Condition Assessment Services Data Acquisition and Test Equipment

More information

Doble Solutions for Partial Discharge. Greg Topjian Solutions Manager

Doble Solutions for Partial Discharge. Greg Topjian Solutions Manager Doble Solutions for Partial Discharge Greg Topjian Solutions Manager 617-393-3129 gtopjian@doble.com Why do we need to conduct PD measurements PD a major cause of early failure for HV insulation. Partial

More information

Abstract. 1 Introduction

Abstract. 1 Introduction Using optical couplers to monitor the condition of electricity infrastructure S.G. Swingler, L. Hao, P.L. Lewin and D.J. Swaffield The Tony Davies High Voltage Laboratory, University of Southampton, Southampton

More information

Performing reliable and reproducible frequency response measurements on power transformers

Performing reliable and reproducible frequency response measurements on power transformers Topic Performing reliable and reproducible frequency response measurements on power transformers Prof. Dr. Stephanie Uhrig, Munich University of Applied Sciences Michael Rädler, OMICRON electronics GmbH

More information

FAULT IDENTIFICATION IN TRANSFORMER WINDING

FAULT IDENTIFICATION IN TRANSFORMER WINDING FAULT IDENTIFICATION IN TRANSFORMER WINDING S.Joshibha Ponmalar 1, S.Kavitha 2 1, 2 Department of Electrical and Electronics Engineering, Saveetha Engineering College, (Anna University), Chennai Abstract

More information

ANSE VISUAL, developed within the

ANSE VISUAL, developed within the ANSE VISUAL Software to Analyze Substation Robustness ANSE VISUAL, developed within the Institutional Project 1724, is a tool to analyze the robustness of electrical substations. The software carries out

More information

IN ELECTRICAL ENGINEERING - I C M E T CRAIOVA

IN ELECTRICAL ENGINEERING - I C M E T CRAIOVA Taking into account that power transformer is the major item of equipment in power systems, its correct operation is vital to system operation. It is well known that transformer failures are sometimes

More information

CHAPTER 5 CONCEPT OF PD SIGNAL AND PRPD PATTERN

CHAPTER 5 CONCEPT OF PD SIGNAL AND PRPD PATTERN 75 CHAPTER 5 CONCEPT OF PD SIGNAL AND PRPD PATTERN 5.1 INTRODUCTION Partial Discharge (PD) detection is an important tool for monitoring insulation conditions in high voltage (HV) devices in power systems.

More information

Aspects of PD interpretation in HV power cables. by Edward Gulski, Piotr Cichecki, Rogier Jongen

Aspects of PD interpretation in HV power cables. by Edward Gulski, Piotr Cichecki, Rogier Jongen Aspects of PD interpretation in HV power cables by Edward Gulski, Piotr Cichecki, Rogier Jongen General There are several aspects having influence on the diagnostic information and the condition judgment

More information

Transformer Shunt Fault Detection using Two Techniques

Transformer Shunt Fault Detection using Two Techniques Transformer Shunt Fault Detection using Two Techniques Swathy Sasikumar 1, Dr. V. A. Kulkarni 2 P.G. Student, Department of Electrical Engineering, Government College of Engineering, Aurangabad, Maharashtra,

More information

The Application of Partial Discharge Measurement and Location on CGIS

The Application of Partial Discharge Measurement and Location on CGIS International Journal on Electrical Engineering and Informatics Volume 4, Number 3, October 2012 The Application of Partial Discharge Measurement and Location on CGIS Min-Yen Chiu¹, Keng-Wei Liang¹, Chang-Hsing

More information

NETWORK INNOVATION COMPETITION ANGLE-DC PROJECT HOLISTIC CIRCUIT CONDITION MONITORING SYSTEM REPORT

NETWORK INNOVATION COMPETITION ANGLE-DC PROJECT HOLISTIC CIRCUIT CONDITION MONITORING SYSTEM REPORT NETWORK INNOVATION COMPETITION PROJECT HOLISTIC CIRCUIT CONDITION MONITORING SYSTEM REPORT NOVEMBER 17 Version: 1.0 Authored by: Andrew Moon Engineering Consultant and Project Manager Kevin Smith Lead

More information

KEYWORDS On-line diagnostics, cable termination, partial discharge (PD), ultra-high frequency (UHF), sensitivity check.

KEYWORDS On-line diagnostics, cable termination, partial discharge (PD), ultra-high frequency (UHF), sensitivity check. 2, rue d Artois, F-758 PARIS B-2 CIGRE 28 http : //www.cigre.org Application of UHF method for on-line PD diagnostics of cable terminations T. KLEIN Pfisterer Kontaktsysteme GmbH Germany D. DENISSOV, W.

More information

MPD 500. Partial discharge measurement system for routine test applications

MPD 500. Partial discharge measurement system for routine test applications MPD 500 Partial discharge measurement system for routine test applications Partial discharge testing The MPD 500 partial discharge measuring system has been specially designed for providing fast and reliable

More information

Effective Maintenance Test Techniques and Diagnostic Measurements to Improve the Performance and Reliability of Power System Transformers

Effective Maintenance Test Techniques and Diagnostic Measurements to Improve the Performance and Reliability of Power System Transformers Effective Maintenance Test Techniques and Diagnostic Measurements to Improve the Performance and Reliability of Power System Transformers Alexander Dierks, Herman Viljoen, Alectrix (Pty) Ltd, South Africa

More information

PD Diagnostic Applications and TechImp solutions

PD Diagnostic Applications and TechImp solutions PD Diagnostic Applications and TechImp solutions Condition Assessment Solutions for Electrical Systems. PD based innovative tools for the Condition Based Maintenance. MD-04.05.004 - rev. 00-29/08/2006

More information

Alternative Coupling Method for Immunity Testing of Power Grid Protection Equipment

Alternative Coupling Method for Immunity Testing of Power Grid Protection Equipment Alternative Coupling Method for Immunity Testing of Power Grid Protection Equipment Christian Suttner*, Stefan Tenbohlen Institute of Power Transmission and High Voltage Technology (IEH), University of

More information

PHG 70 TD PD / PHG 80 TD PD

PHG 70 TD PD / PHG 80 TD PD PHG 70 TD PD / PHG 80 TD PD BAUR VLF test and diagnostics system Functions Universal test and diagnostics system flexible, modular, extendable Cutting-edge testing and diagnostics technology: VLF truesinus

More information

State of the Art and Future Trends of Unconventional PD-Measurement at Power Transformers

State of the Art and Future Trends of Unconventional PD-Measurement at Power Transformers Journal of Energy and Power Engineering 8 (2014) 1093-1098 D DAVID PUBLISHING State of the Art and Future Trends of Unconventional PD-Measurement at Power Transformers Jürgen Fabian 1, Martin Neuwersch

More information

Chapter 7 Conclusion 7.1 General

Chapter 7 Conclusion 7.1 General Chapter 7 7.1 General The mechanical integrity of a transformer winding is challenged by several mechanisms. Many dielectric failures in transformers are direct results of reduced mechanical strength due

More information

Practical Experience in On-Line Partial Discharge Measurements of MV Switchgear Systems

Practical Experience in On-Line Partial Discharge Measurements of MV Switchgear Systems Practical Experience in On-Line Partial Discharge Measurements of MV Switchgear Systems Z. Berler, I. Blokhintsev, A. Golubev, G. Paoletti, V. Rashkes, A. Romashkov Cutler-Hammer Predictive Diagnostics

More information

MPD 600. High-end partial discharge measurement and analysis system

MPD 600. High-end partial discharge measurement and analysis system MPD 600 High-end partial discharge measurement and analysis system Partial discharge analysis Partial discharges: weak points in insulation systems Partial discharges, as defined by IEC 60270, are localized

More information

CDAX 605 High Precision Capacitance & Dissipation Factor Test Set

CDAX 605 High Precision Capacitance & Dissipation Factor Test Set CDAX 605 High Precision Capacitance & Dissipation Factor Test Set 1 Tan delta and capacitance measurements Hi V A Lo Ground C HL Measure with AC test signal, use Ohms law to calculate: Dissipation factor

More information

Effective maintenance test techniques for power transformers

Effective maintenance test techniques for power transformers Effective maintenance test techniques for power transformers by Alexander Dierks, Herman Viljoen, Alectrix, South Africa, and Dr. Michael Krüger, Omicron Electronics, Austria Due to ever-increasing pressure

More information

NEW MV CABLE ACCESSORY WITH EMBEDDED SENSOR TO CHECK PARTIAL DISCHARGE ACTIVITY

NEW MV CABLE ACCESSORY WITH EMBEDDED SENSOR TO CHECK PARTIAL DISCHARGE ACTIVITY NEW MV CABLE ACCESSORY WITH EMBEDDED SENSOR TO CHECK PARTIAL DISCHARGE ACTIVITY Lorenzo PERETTO Luigi FODDAI Simone ORRU Luigi PUDDU Altea Switzerland ENEL Italy ENEL Italy REPL Italy lperetto@alteasolutions.com

More information

Cable testing and diagnostics

Cable testing and diagnostics Cable testing and diagnostics To ensure the flow Cost-optimised maintenance through cable diagnostics The sheath and cable testing supports you in assessing whether a cable system is safe and ready to

More information

H V T E S T S O L U T I O N S PA RT N E RS F O R H V & E M C

H V T E S T S O L U T I O N S PA RT N E RS F O R H V & E M C H V T E S T S O L U T I O N S PA RT N E RS F O R H V & E M C S O L U T I O N S Y O U R S O U R C E F O R T O P Q U A L I T Y T E S T E Q U I P M E N T w w w. h v t e c h n o l o g i e s. c o m Company

More information

1409. Comparison study between acoustic and optical sensors for acoustic wave

1409. Comparison study between acoustic and optical sensors for acoustic wave 1409. Comparison study between acoustic and optical sensors for acoustic wave Malik Abdulrazzaq Alsaedi Department of Electrical, Faculty of Engineering, University of Misan, Amarah, Iraq E-mail: maliksaady@yahoo.com

More information

Partial Discharge Patterns in High Voltage Insulation

Partial Discharge Patterns in High Voltage Insulation 22 IEEE International Conference on Power and Energy (PECon), 2-5 December 22, Kota Kinabalu Sabah, Malaysia Partial Discharge Patterns in High Voltage Insulation Hazlee Illias, Teo Soon Yuan, Ab Halim

More information

Cable test vans and systems

Cable test vans and systems Cable test vans and systems Prepared for anything BAUR s cable fault location and diagnostics systems Would you like to test and assess new installations and existing cable locations efficiently? To rectify

More information

Specialists in HV and MV test and diagnostics. Testing in Substations

Specialists in HV and MV test and diagnostics. Testing in Substations Specialists in HV and MV test and diagnostics Testing in Substations Testing in Substations Testing in Substations At 4fores we specialize in the diagnosis and measurement of all types of existing technologies

More information

Investigating Mechanical Integrity in Power Transformer Using Sweep Frequency Response Analysis (SFRA)

Investigating Mechanical Integrity in Power Transformer Using Sweep Frequency Response Analysis (SFRA) Investigating Mechanical Integrity in Power Transformer Using Sweep Frequency Response Analysis (SFRA) Priti G 1*, Sindekar AS 2 P.G. Scholar, Department of Electrical Engineering, Government College of

More information

PRY-CAM BREAKTHROUGH TECHNOLOGY FOR CONDITION ASSESSMENT AND ASSET MANAGEMENT

PRY-CAM BREAKTHROUGH TECHNOLOGY FOR CONDITION ASSESSMENT AND ASSET MANAGEMENT PRY-CAM BREAKTHROUGH TECHNOLOGY FOR CONDITION ASSESSMENT AND ASSET MANAGEMENT WELCOME TO PRY-CAM A REVOLUTION IN PARTIAL DISCHARGE MANAGEMENT The worlds of partial discharge (PD) measurement, asset management

More information

On-Site Partial Discharge Monitoring using the differential LEMKE PROBE LDP-5 and its accessories

On-Site Partial Discharge Monitoring using the differential LEMKE PROBE LDP-5 and its accessories Workshop 2000, lexandria, Virginia, 13 & 14 September 2000 paper No.: 8 On-Site Partial Discharge Monitoring using the differential LEMKE PROE and its accessories Dirk Russwurm, HV Technologies, Inc. bstract

More information

Cable test vans and systems

Cable test vans and systems Cable test vans and systems Prepared for anything BAUR s cable fault location and diagnostics systems Would you like to test and assess new installations and existing cable locations efficiently? To rectify

More information

ABB Power Products Service

ABB Power Products Service Raben Naidoo, Technology days, May 21-22th, 2014, Cape Town, South Africa, Enhanced availability of transformers via transformer remote monitoring - TEC ABB Power Products Service Why a session on availability?

More information

Investigations on a Combined Resonance/VLF HV Test System Partial Discharge (PD) characteristics at VLF and DAC voltages

Investigations on a Combined Resonance/VLF HV Test System Partial Discharge (PD) characteristics at VLF and DAC voltages Investigations on a Combined Resonance/VLF HV Test System Partial Discharge (PD) characteristics at VLF and DAC voltages F. Petzold, H.T. Putter, D. Götz, H. Schlapp, S. Markalous SebaKMT GmbH Baunach/Radeburg,

More information

TECHIMP Power Transformer Monitoring

TECHIMP Power Transformer Monitoring TECHIMP Power Transformer Monitoring Kontakt: Martin Hesse Techimp Germany GmbH i.g. E-Mail: mhesse@techimp.com Tel.: +49 5724 391 007 Mobil: +49 170 2364 735 PD Monitoring of Power Transformers Power

More information

A1-209 EXPERIENCES IN IDENTIFICATION OF PARTIAL DISCHARGE PATTERNS IN LARGE HYDROGENERATORS

A1-209 EXPERIENCES IN IDENTIFICATION OF PARTIAL DISCHARGE PATTERNS IN LARGE HYDROGENERATORS 21, rue d'artois, F-75008 Paris http://www.cigre.org A1-209 Session 2004 CIGRÉ EXPERIENCES IN IDENTIFICATION OF PARTIAL DISCHARGE PATTERNS IN LARGE HYDROGENERATORS CARLOS AZUAJE* WILLIAM TORRES C.V.G.

More information