ERS-2 Ground Segment and Operations Evolution

Size: px
Start display at page:

Download "ERS-2 Ground Segment and Operations Evolution"

Transcription

1 SpaceOps 2008 Conference (Hosted and organized by ESA and EUMETSAT in association with AIAA) AIAA ERS-2 Ground Segment and Operations Evolution D. Milligan 1, J.B. Gratadour 3, P.P. Emanuelli 2, F.J. Diekmann 1, D. Mesples 3 European Space Operations Centre, Robert Bosch Str. 5, Darmstadt, Germany J. Lerch 3, V. Bozzi 3 VEGA,Europaplatz 5, 64293Darmstadt, Germany and W. Lengert 4 ESRIN Via Galileo Galilei, Casella Postale 64, Frascati, Italy The ERS-2 satellite was launched in 1995, to provide continuity of service to the ERS-1 mission. Today, despite several major failures, ERS-2 is still operational and providing valuable data for scientific and operational purposes. This has been achieved despite the failure of all onboard science data storage and several gyros, through the use of innovative workarounds. Satellite performance in general has remained robust with high reliability despite the failures, whilst the demand for the ERS-2 products from the user community has remained high, and in some areas significantly increased. The ERS-2 ground segment was developed in the late 80s and early 90s. Since this time ground segment design and operational techniques have evolved considerably at ESOC, whilst some ERS-2 legacy systems have become harder to maintain and operate as they become outdated and obsolete. This paper presents recent updates to the ERS-2 ground segment and to the satellite operations that have boosted the return from the mission, including, the development and implementation of an ERS-2 / Envisat tandem mission requiring ERS-2 orbital change; the development and implementation of fast replanning services as a trial for GMES; the migration of certain ground segment elements, including the Flight Operations Plan; and the merging of Envisat and ERS-2 on-call engineering support teams. Acronyms BOL = Beginning of Life ERS = European Remote-Sensing satellite AMI = Active Microwave Instrument RA = Radar Altimeter ATSR = Along Track Scanning Radiometer GMES = Global Monitoring for Environment and Security ESOC = European Space Operations Centre ESRIN = ESA centre for Earth Observation ESA = European Space Agency FOP = Flight Operations Plan UTC = Co-ordinated Universal Time SPACON = SPAcecraft CONtroller MPS = Mission Planning System GOME = Global Ozone Monitoring Experiment 1 Spacecraft Operations Manager, Mission Operations Department 2 Head Earth Observation Division, Mission Operations Department 3 Spacecraft Operations Engineer, Mission Operations Department 4 Mission Manager, Earth Observation Department 1 Copyright 2008 by European Space Agency. Published by the American Institute of Aeronautics and Astronautics, Inc., with permission.

2 MARISS = European MARitime Security Services MWR = Microwave Radiometer PEP = Preferred Exploitation Plan PRARE = Precise Rate and Ranging Equipment LRR = Laser Retro Reflector IDHT = Instrument Data Handling and Transmission MGM = Mono Gyro Mode ZGM = Zero Gyro Mode DES = Digital Earth Sensor DSS = Digital Sun Sensor TTC = Tracking, Telemetry and Command HKTM = House Keeping Telemetry InSAR = Interferometric Synthetic Aperture Radar I. Introduction and Background RS-2 was launched on 21 st April 1995 as a continuation of the first European Remote Sensing satellite, ERS-1, E which was launched in July ERS-1 was developed during the 1980s with the objective of measuring the Earth's atmosphere and surface properties, both with a high degree of accuracy and on a global scale. The primary scientific reason behind acquiring such data was to increase our understanding of the Earth system (Ocean, Land, Ice and Atmosphere), in order to deepen our knowledge of the climate and improve global climate modelling. The ERS- 1 data allowed other improvements over the then state-of-the-art including: improved weather and sea-state forecasting and 'nowcasting'; a greater knowledge of the structure of the sea-floor; detailed measurements of the Earth's movements following seismic events; measurements of ice coverage; and the monitoring of pollution, dynamic coastal processes, and changes in land use. In addition, the ERS spacecraft have provided the most accurate sea surface temperature measurements on a global scale (to an accuracy of 0.1K and improving, with improved archive reprocessing algorithms). In order to ensure the continuity of ERS-1 measurements, ERS-2 s development was started in the late 1980s and the satellite was launched on 21 April Although it is essentially the same as ERS-1, the satellite includes a number of enhancements, including an extra payload instrument that measures the chemical composition of the atmosphere (GOME). ERS-2 was launched from Europe's Spaceport in French Guiana on 21 April 1995 by an Ariane 4 rocket and was injected directly into its Sun-synchronous polar orbit at an altitude of approximately 780 km. ERS-2 is a 2.5 tonne three-axis stabilised, Earth-pointing satellite, orbiting Earth with an inclination of in a period of 100 minutes, which gives it a high visibility of the Earth s surface as the planet rotates beneath the satellite's orbit. The repeat cycle can be chosen by relatively minor adjustments of the orbital inclination to modify the altitude allow the orbital track pattern on the Earth's surface to repeat itself exactly after a certain number of days, for example 3, 35 or 168, with 35 chosen for ERS-2. The current orbital characteristics are given below: - semi-major axis= km, - inclination= deg, - mean-local solar time= 10:30 A.M. (at the descending node) - repeat cycle of 35 days with 501 orbits (14 11 / 35 orbits/day). A. The ERS-2 Satellite and Ground Segment The ERS-2 spacecraft platform is based on France's SPOT (Système Probatoire d'observation de la Terre) platform, modified according to ERS power, energy-storage and attitude requirements. The solar array consists of two 5.8 x 2.4m wings, on which are mounted solar cells providing an average power of about 2.5 kilowatts at BOL. The solar array is continuously rotated to align the SA normal towards the sun. Four nickel-cadmium (NiCd) batteries are sized to allow payload operations during non-sunlit periods. Attitude measurement is performed by the attitude measurement subassembly, which is composed of a core of six single-axis gyroscopes (three redundant), two Digital Earth Sensors (DES), one being redundant, and two Digital Sun Sensors (DSS), one being redundant. The DES is used to obtain pitch and roll information from detecting the infrared Earth horizon boundary, and the DSS are aligned to point at the Sun as the satellite crosses the day/night boundary, and are used for yaw 2

3 measurements. In the nominal mode, attitude is controlled by reaction wheels and magnetic torquer bars are used for continuous wheel de-saturation, and the satellite Z face, which carries the instruments, is pointed toward the Earth, with a yaw steering offset applied (Yaw Steering Mode). Other AOCS modes used routinely are the orbit manoeuvre modes to maintain the satellite ground track. Fine Control Manoeuvres (FCMs) use the hydrazine thruster system to impart small in-plane delta-vs to control the E-W drift of the satellite close to the equator. Orbit Control Manoeuvres (OCMs) are used to correct the orbital inclination. This mode uses the thrusters to slew the satellite +/- 90deg from the nominal attitude and then impart a delta-v, to correct orbital inclination drift. The ERS-2 platform also includes thruster based acquisition modes that can be activated as part of the on-board FDIR in case of anomalies. In case of major (or multiple) failures, a satellite survival mode, known as Safe Mode, can be entered, which uses independent AOCS software and modes and, as far as possible, also independent hardware. The ERS-2 payload, except for PRARE, is mounted in the payload module, which can be seen as the top two thirds of the satellite as shown on Figure 2 (left). The payload module contains the following main elements: - AMI Active Microwave Instrument. This instrument consists of a Synthetic Aperture Radar (SAR) and a wind scatterometer (both in the C-band). - RA Radar Altimeter: This instrument takes precise measurements of the distance from the ocean surface and of wave heights. - ATSR-2 Along-Track Scanning Radiometer. Operating in the infrared and visible ranges, this instrument measures sea surface temperatures and the vegetation cover of land surfaces. - GOME Global Ozone Monitoring Experiment. This is an absorption spectrometer which measures the presence of ozone, trace gases and aerosols in the stratosphere and troposphere. - MWR Microwave Radiometer: supplies data on atmospheric humidity. - PRARE Precise Range and Range Rate Equipment. This was used for Precise Orbit Determination. - LRR Laser Retro Reflector. This is a passive instrument that can be used by ground-based laser stations to determine satellite position. - IDHT Instrument Data Handling and Transmission: This was used for temporary on-board data storage by means of two 6.5 GBit tape recorders, equivalent to the data volume acquired in one orbit. Transmission of data is at 105 Mbit/s (high rate transmission of SAR imaging data in real time), or kbit/s in low rate mode. Figure 1. Launch (left) and artist impression in orbit (right) of ERS-2 The ERS-2 flight operations are performed from ESOC, Darmstadt. S-band TTC passes are taken routinely through Kiruna and Svalbard, with Svalbard being used to fill two of the blind orbits from Kiruna, such that 12 of the 14 orbits per day contain a TTC pass. X-band instrument data is also downlinked via Kiruna, and a network of 3

4 local x-band ground stations, which in recent years has been considerably expanded (see below). X-band data is forwarded to ESRIN where different levels of products are built and then made available to the user community. Housekeeping Telemetry is also available via x-band and is forwarded to ESOC via ESRIN. B. In-flight Performance After performing flawlessly for several years, by the end of 1998, one of the six gyros of the attitude measurement system failed, and two others showed serious degradation of performance. As the AOCS design required three gyroscopes (Three-Gyro Mode) for satellite attitude control, all the redundancy was used and an additional gyro failure would have meant the end of the mission. This situation led to the development of a new operational mode in the AOCS based on the measurement of a single gyro: the Mono-Gyro Mode (MGM). The MGM development, validation and uplink activities are described in detail by Canela & Bosquillion 2. The MGM was designed to use only one gyro for the nominal mode used for routine operations (YSM). In this scheme the single gyro is used primarily to estimate the rotation rate around the z-axis, with the x and y rates being estimated by the DES (previously the DES was used in the FDIR and correction of drift). In MGM the DES is able to estimate the X & Y attitude continuously, whereas the Z attitude is only known once per orbit when the sun passes through the field of view of the DSS at the day/night boundary. Using the DES and the single gyro, the satellite rates can be continuously measured and compared with the guidance to maintain attitude control. Specific filters and gain changes were necessary and were also included in the MGM design. After a period of development and validation the MGM software was loaded onto the satellite in February Figure 2. ERS-2 configuration (left) and satellite axes (right) Although the MGM worked well, continued degradation of the remaining operational gyro caused concern and development of a Zero Gyro Mode (ZGM) was initiated. The main problem in progressing from MGM to ZGM is that the yaw attitude is only measured once per orbit on-board by the DSS, and as such it is not possible to obtain a Z rate measurement in the same way as is done for the X and Y rates from the DES, which measures the attitude at 1Hz. The innovative solution was to spin-up the X reaction wheel to high speed to obtain some gyroscopic stiffness, and transfer z disturbances into the x-y system. This system was stable enough to keep the satellite running but suffered from degraded yaw steering performance. This mode (called Extra Backup Mode EBM), was uplinked and made operational in January To improve the yaw steering performance, analysis was made of the in-flight disturbances affecting the z-axis. These were characterized and a system developed where a set of coefficients could be routinely uplinked by ground that would alter the reference wheel rates to counteract some of these disturbances and improve the overall yaw 4

5 steering performance. These coefficients are computed by ground software, using as inputs: the yaw steering information as measured by the DSS; and an independent measurement of the yaw pointing from the Doppler residual on the AMI science data, which was devised specially for the ZGM. Two further patches were uplinked in June and November of 2001 which improved the yaw steering performance to better than +/- 3deg. This has been used since to continue the mission, and despite the degraded yaw performance with respect to the original three gyro design, the mission has continued with high demand from the user community. A second major failure affecting the operational character of the mission was the failure of the prime data storage tape recorder in January A redundant recorder was available but that also failed in June of With no onboard data storage, the operations concept had to be changed to enable a reasonable global coverage to be obtained, since instrument data is now only available with the x-band downlink enabled and a local station acquiring data. From June 2003 to now, the number of local ground stations acquiring ERS-2 data has risen steadily, with 15 ground stations available for low rate x-band downlinks at the time of writing. The current network is shown below in Figure 3. As can be seen from the figure, there is now full coverage over high interest areas, such as the North Atlantic, Europe and the poles with close to full coverage in other areas. MEXICO KOUROU SINGAPORE JOHANNESBERG Figure 3. Network of low rate x-band downlink stations for ERS-2 II. Ground Segment and Operations Evolution The in-flight performance evolution described above has altered the way in which some of the routine operations are performed, mainly in the area of ZGM and Mission Planning of the x-band downlink. For ZGM, AOCS coefficients are regularly uplinked to the spacecraft based on inputs from the DSS and the yaw pointing derived from the AMI science data. A subset of x-band downlink stations is equipped to be able to deliver yaw pointing information. This information is processed via ESRIN and is used in conjunction with the DSS Yaw data downlinked in HKTM to fine tune the AOCS coefficients that are uplinked at every ground station pass. For the mission planning, improvements were made to the mission planning software, allowing the FCT to optimise the switching on/off of the x-band downlink over the ground station network. The optimisation takes into account power consumption (mainly battery energy), IDHT temperature and the switching cycle rate on the IDHT. These elements are traded-off to safely maximise return from the instruments. 5

6 A. ERS-2 Envisat Tandem InSAR Mission In the latter half of 2007 a proposal was made that would enable a new type of product to be derived by combining ERS-2 AMI and Envisat ASAR instruments to create SAR Interferometry (InSAR) images. Although ERS-2 and ERS-1 had previously operated in a tandem mode, ERS-2 and Envisat were not designed to be able to perform interferometry, since the design of the two SAR systems were different. Analysis showed however, that interferometry between the two satellites was feasible, but only if an orbital offset was introduced (see Figure 4). Since the launch of Envisat in March 2002, Envisat and ERS-2 have been flying in similar orbits with Envisat leading ERS-2 by 30 minutes (i.e. the orbital parameters for Envisat are similar to those of ERS-2 with a 10:00AM mean local solar time at descending node crossing instead of 10:30). Since it is not possible to introduce an orbital offset across the entire orbit, some pre-selection of high interest areas is required. After some discussions it was decided to focus on northern latitudes close to the northpole. This new technique enables SAR interferometry images to be obtained of glaciers and ice in northern Polar Regions, thus contributing to the measurements being made for International Polar Year. Since there is a 30 minute difference between the fly-over times of ERS-2 and Envisat, an interferometry image would detect any small, cm scale, changes in terrain. This would make possible measurements of fast-moving glaciers from space. This technique is also suitable for providing unique data for the generation of very high accuracy low relief Digital Elevation Models. The implementation of the orbital offset can be understood schematically from Figure 5. Figure 4. The introduction of an orbital offset between ERS-2 and Envisat to enable SAR interferometry The solution chosen after trade-off studies were performed, was to increase the inclination of the ERS-2 orbit slightly, introducing a 2.1km perpendicular offset, (2km ground-track), such that inter-satellite interferometry could be targeted over high northern latitudes. To achieve this, ERS-2 executed a series of inclination changing manoeuvres. Although manoeuvres were executed to initiate the orbital offset, the net cost in fuel for the interferometry campaign was close to zero. This can be understood with reference to the nominal orbit maintenance strategy. The orbit maintenance strategy of ERS-2 is similar to that on Envisat described in detail in 3,4, with the main difference being that inclination changing manoeuvres are performed in sunlight around the descending node on ERS-2. A short summary of the orbit maintenance follows, for a more detailed account see 3,4. The orbital ground track of ERS-2 (and of Envisat) has to be maintained to within +/- 1km of the reference orbit ground track. The orbit is subject to two main disturbance types that require manoeuvres to counteract: air drag; and the gravitational effect of the sun and the moon. Air drag leads to a loss in altitude, reducing the orbital period causing the orbit to drift away from the reference orbit. This is manifested mainly in equatorial regions first, as an easterly drift at ascending node crossing. The gravitational effect of the sun tends to decrease the inclination (i.e. push the inclination towards the poles). Routine orbit maintenance to counteract these disturbances is of two main types; in-plane FCMs and out-of-plane OCMs. FCMs are small in plane manoeuvres that are used to boost altitude. Depending upon air drag levels these are executed on the order of once per month. To counteract the inclination Figure 5. The ERS-2 and Envisat orbits when 6 configured for inter-satellite SAR interferometry

7 drift, out-of-plane inclination changing OCM manoeuvres are executed (see Figure 5). These are relatively infrequent (1-2 per year) but account for the vast majority of fuel use. With reference to Figure 5 it can be seen that the orbital offset required for interferometry requires extra manoeuvres of the OCM type (i.e. the orbital inclination is increased beyond what it is normally, against the Figure 6. Period of high latitude deadband excursion for inter-satellite interferometry perturbing force direction). Even though extra manoeuvres were required to initiate the orbital offset for interferometry, it can be seen that the perturbing gravitational force will eventually restore the orbit to its nominal ground track. In this way, there is no fuel required to restore the orbit after the inter-satellite interferometry campaign ends. This is the reason that the campaign could be executed for effectively no fuel cost, since the extra manoeuvres are simply manoeuvres that would have had to be executed at a later date in any case. The ERS-2 measured and predicted ground track at its northern most point during the campaign is shown above in Figure 6. The period of inter-satellite interferometry can be clearly seen as a negative excursion on the deadband. The general trend due to the perturbing gravitational force can be seen as a gradual positive deflection, with the manoeuvres shown as a sharp negative drop. The period of inter-satellite interferometry lasted for three repeat cycles, from September 2007 to mid February During this time AMI images were compared to ASAR images. The offset proved successful and an example interferometric image is shown below in figure 7. The fringes detail cm scale changes in terrain that have occurred in the time between the Envisat and ERS-2 image acquisitions (30 minutes). Such measurements are used to help understand the dynamics of fast moving glaciers. 7

8 Figure 7. Example InSAR image constructed from ERS-2 and Envisat SAR images. Image shows the Kangerdlugssuaq Glacier in Greenland. Courtesy of E. Rignot, NASA-JPL. B. Fast re-planning as a trial GMES service 1. Routine planning by PEP Routine mission planning at ESOC starts with the reception of the weekly PEP (Preferred Exploitation Plan) from ESRIN, received typically mid-week. The weekly PEP contains one week of AMI image requests, starting on the Friday of the following week. The other AMI modes, and all other instruments, are scheduled by ESOC based on global zones and on the seasonal illumination. Nominally on Monday, the schedule for Tuesday to Thursday is planned. After this, additional 24 hour periods are added to the schedule each day of the working week. Three times per day the Spacecraft Controller (SPACON) uplinks commands from the schedule to the satellite to keep the onboard queue topped up. This process ensures that at any time between 12 and 24 hours worth of MPS scheduled payload commands are in the on-board time-tagged-queue. 2. Mid term re- planning updates by Delta-PEP If ESRIN receives AMI image requests for a time which is already covered by a weekly PEP delivered to ESOC, then a Delta PEP containing one or more image requests can be sent to ESOC. Delta PEPs can also cancel image requests for various reasons, like ground station unavailability or to allow the addition of another image in the same orbit, subject to the AMI image duration constraints (maximum 2 minutes in eclipse, 12 minutes per orbit, 10 minutes consecutive). The Delta PEP can contain image requests that are up to 14 days in the future, if it is issued on the same day as a weekly PEP and the image is scheduled for the last day of the weekly PEP. Delta PEP requests a few days in the future can be fulfilled easily by generating or regenerating the schedule for that day. 8

9 3. Short term re-planning by Emergency-PEP (Fast Replanning) Delta PEPs that contain image requests less than 36 hours in the future are called Emergency PEPs (EPEP) and are undertaken by ERS-2 for high priority customers like the International "Space and Major Disasters" Charter 6 or for European Maritime Security Services (MARISS) 5 by following the fast re-planning procedure developed in August Such requests are approved by the Mission Manager in ESRIN, and are executed if sufficient time for rescheduling and uplink remains, and there are no conflicts with high priority activities. Figure 8. Overview of the planning cycles over two weeks, with examples for DPEPs with 13 and 2 day notice EPEPs received before noon of working days at ESOC are processed immediately. When an EPEP is received, an MPS schedule for the orbit containing the new image will either be already in the control room awaiting uplink or onboard the satellite. Therefore, when an image request is received via EPEP, and nothing is on board yet for the time of its execution, the Mission Planner instructs the SPACON to disregard the existing schedule and suspend uplink of further payload commands until the new schedule has been generated and sent to the control room. If commands are already on board, the only option is for the engineer to delete all commands in the on-board payload queue and uplink the new schedule containing the new image and associated high rate X-band downlink commands. The overall planning concept is illustrated in Figure 8. An example of the fast re-planning performance obtained can be seen from a request received by ESOC in October as part of a trial GMES service (ERS-2 and Envisat are providing GMES services until the launch of the Sentinels 7 ). On 24 th of October 2007, ESOC received an image request for GMES MARISS 5 trials at noon (11 UTC), the commands were uplinked 6 hours later and the image was successfully acquired after 11 hours, at 21:57 UTC. This fast replanning is combined with Near Real Time (NRT) processing to achieve a performance already within the GMES timeliness requirements for Sentinel-1, which will be the Sentinel for day/night all weather radar services 7. An example fast replanning timeline is shown in Figure 9. Figure 9 Example timeline of a fast re-planning. 9

10 C. Migration of the FOP from FOPS to MOIS FOPS, the system used to maintain the procedures in the ERS-2 FOP (Flight Operation Plan), was developed before the launch of ERS-1, in FOPS is a text based procedure writing tool with some similarities to html (see figure 10). In 2007, ERS-2 was the only mission still using FOPS at ESOC. In the intervening 16 years, the MOIS system became the ESOC standard, and had evolved with the experience of the flying missions to a state which offered many potential advantages to over FOPS. Expected improvements in employing this tool, included: - Direct access to the operations database (ODB) - Automatic enforcement of operational rules - Consistency of the FOP and the ODB - Configuration control - Release of FOP Figure 10 FOPS based procedure working environment (left) and output format (right) Also to be considered was the positive effect of ERS-2 moving to the ESOC standard system, which would increase synergy with other missions. This facilitates knowledge and cost sharing, and staff mobility between ERS-2 and other ESOC missions. In particular, it would benefit team sharing with Envisat (see below), a project being developed at the time. Such advantages were traded-off with the expected disadvantages, the main disadvantage being the effort involved in moving to a new FOP procedure maintenance tool. Bearing in mind also that even on a mission that has been flying for thirteen years, both new procedures, and procedure updates, are continually required; the outcome of the trade-off favoured migration. The development to "tailor" MOIS for ERS2 so that it could be integrated in the ERS2 ground segment started in January It focused mainly on the importation and utilisation of the ODB and the implementation of ERS2 specific constraints. Fortunately, the structure of the ERS2 database is similar to the one of Envisat; thus it was possible to re-use much of the development performed to tailor MOIS to Envisat. An importer tool was also developed to automatically convert a procedure from the FOPS to the MOIS format. The importer tool was an important addition to what is normally in the MOIS tool suite, in that it created a first draft MOIS version automatically from the FOPS procedure, which contained all the important information (e.g. TC content, TM checks). This version was then checked by the FCT responsible, who would run the MOIS consistency checks and finish organising the procedure in the MOIS format. The first version of MOIS for ERS2 was delivered in March The validation of the MOIS system was performed by the FCT. It involved a test of the functionalities affected by the tailoring and the conversion of a set of FOPS procedures. MOIS tailoring was accepted in July From this time onwards, new procedures and procedure updates have been written in the MOIS system. 10

11 Figure 11 Example MOIS format procedure (working environment and output format are the same) With new procedures and procedure updates written in the MOIS format (see figure 11) the FOP contains procedures of both types. Migration of the complete FOP to the new format entails a significant effort, but has some important benefits, perhaps one of the most important being the positive effect on team training. With a mission that has been flying for thirteen years, the team is made up of members who did not develop the FOP and were not present at launch. A FOP migration necessarily entails a detailed review, and the migration process put in place also included validation of the MOIS format procedures on the simulator, before being made operational. To manage the migration, a system was put in place where each procedure was assigned with a reference number, a responsible engineer and a level of priority for the migration. Procedure migration is then a background engineer task, performed in the absence of high priority operational work. At the time of writing, the FOP migration is on-going. As expected, the migration represents a significant effort, but it has proven valuable: in term of training and in terms of improving existing procedures that have been indirectly affected by the failures and the evolutions on the spacecraft that have occurred since launch. D. Cross training between Envisat and ERS2 Flight Control Teams (FCTs) ERS-2 and Envisat flight operations share many synergies. Both platforms are based on the French SPOT design, with Envisat being an evolved version of the ERS-2 SPOT platform. The payloads present on both missions also share many commonalities, with Envisat flying the next generation of some of the instruments flown on ERS-2 (e.g. AMI / ASAR, RA / RA2, ATSR2 / AATSR). In the ground segment both missions use similar infrastructure (e.g. SCOS 1B). For these reasons, and for increased efficiency of operations with possible further mission extensions for both missions, a system of cross-training was introduced to initiate integration of the FCTs of both missions. On ERS-2, in terms of satellite expertise, the FCT is split into payload and platform specialists, with two team members sharing the platform subsystems and three team members sharing the payload (with one payload team member assigned 50% to Envisat). Since 12 passes are taken per day, out of a possible 14, seven days per week; the on-console monitoring and commanding is performed by spacecraft controllers (SPACONs), who work on a shift rotor providing support 24/7. The SPACONs are shared with Envisat, which can be done without conflicts due to the fact that the orbits of ERS-2 and Envisat are synchronised (i.e. an ERS-2 pass follows 30 minutes after an Envisat one). To ensure full expertise during working hours on the various subsystems, instruments and ground segment elements; a matrix of responsibilities involving the concept of a Prime and Back-up engineer for each element is used. In case of problems outside of working hours, a system of engineering on-call support is in place, where one payload engineer and one platform engineer was on-call for both missions (i.e. four engineers were on-call at any one time). Previously the FCTs of Envisat and ERS-2 were almost entirely separate entities. The goal of the on-call integration was to integrate on-call engineering support, such that there would be one platform on-call and one payload on-call engineer serving both missions. The levels of engineering support were reviewed and a third level of responsibility assigned: 1. Prime Operations Engineer: ESOC expert on subsystem/instrument/ground segment element. Responsible for Procedures / Reporting / Interfaces. 11

12 2. Backup Operations Engineer: Good knowledge of subsystem / instrument /ground segment element & procedures. Able to take up duties of the Prime when the Prime is absent. 3. On-call Engineer: Possesses sufficient knowledge and training to run all 'first-line' urgent operations in contingency cases With the above roles defined, the duties of the on-call engineer are then to recover from recurrent well known anomalies with recovery procedures clearly identified and to perform any first-line urgent operations that are required to put the satellite into a safe state. This definition was then used to design a cross training campaign for the engineers of the Envisat and ERS-2 teams, whereby ERS-2 team members are trained on Envisat on-call activities and visa versa. This activity lasted a few months and from mid 2007 the on-call engineering support service for ERS-2 and Envisat has been integrated. In addition to the positive effect of reducing the time spent on-call for an individual team member, the system has also improved the knowledge sharing between the missions to the benefit of both. III. Conclusion Despite the onboard failures of gyros and onboard data storage occurring between 1999 and 2003, user demand for ERS-2 products has remained high, and in some areas significantly increased. Recent updates to the ERS-2 ground segment and to the satellite operations have boosted the return from the mission. The synergy between ERS- 2 and Envisat has been increased in both operations and exploitation for the user community. In particular, the development and implementation of the ERS-2 / Envisat tandem InSAR mission, where ERS-2 s orbit was changed slightly to allow ERS-2 and Envisat to work in concert, has seen the development of an entirely new product. InSAR images obtained between Envisat and ERS-2 detail cm scale movements in terrain occurring in a 30 minute timescale, useful for the study of fast moving glaciers. On the ground segment side, the development and implementation of fast replanning services has returned timeliness performance in line with GMES, with MARISS requests being executed in 11 hours. The migration of certain ground segment elements, including the Flight Operations Plan; and the merging of Envisat and ERS-2 on-call engineering support teams has further enhanced operational robustness and efficiency. The ERS-2 mission was recently extended until Acknowledgments The authors would like to thank experts at ESTEC and the industrial team at Astrium SaS for their support and contribution to the ongoing success of the mission. The authors would also like to thank the members of previous flight control teams who have looked after the satellite since launch. References 1 Francis, C. R. et al, The ERS-2 Spacecraft and its Payload, ESA Bulletin no. 83, August Canela, M, Bosquillon de Frescheville, F, Implementation of a Single Gyroscope Attitude and Orbit Control System on ERS-2, Envisat / ERS-2 Symposium, Gotheburg, Sweden, October Milligan, D, et al Envisat Flight Experience: FDIR and Lifetime Optimisation, The 9th International Conference on Space Operations, Rome,, June 19-23, Milligan, D, et al ENVISAT PLATFORM OPERATIONS: PROVIDING A PLATFORM FOR SCIENCE Envisat Symposium, Montreux, Switzerland, April European MARItime Security Services (MARISS): 6 International Charter "Space and Major Disasters": 7 Bargellini, P, et al The GMES-Sentinels Flight Operations Segment, The 10th International Conference on Space Operations, Heidelberg,,. 12

SAR missions for oceanography at the European Space Agency

SAR missions for oceanography at the European Space Agency SAR missions for oceanography at the European Space Agency ERS-1, ERS-2, Envisat, Sentinel-1A, Sentinel-1B, ESA 3 rd Party Missions (ALOS) Prepared by ESA teams and ESA supporting companies ESA and SAR

More information

How to access EO data

How to access EO data How to access EO data PAC USF USF PDHS LRAC USCF PDCC Europe s expanding EO Capability Continuity & Evolution Wind Scatterometer (Low rate) all weather; day and night SAR Antenna (C-Band, 5.3 GHz) image

More information

REVIEW OF THE IMPACT OF ERS-2 PILOTING MODES ON THE SAR DOPPLER STABILITY

REVIEW OF THE IMPACT OF ERS-2 PILOTING MODES ON THE SAR DOPPLER STABILITY REVIEW OF THE IMPACT OF ERS-2 PILOTING MODES ON THE SAR DOPPLER STABILITY N.Miranda (1), B.Rosich (2), C. Santella (3), M. Grion (3) (1) Serco Spa, via Galileo Galilei, 00044 Frascati, Italy, nuno.miranda@esa.int

More information

Copernicus Introduction Lisbon, Portugal 13 th & 14 th February 2014

Copernicus Introduction Lisbon, Portugal 13 th & 14 th February 2014 Copernicus Introduction Lisbon, Portugal 13 th & 14 th February 2014 Contents Introduction GMES Copernicus Six thematic areas Infrastructure Space data An introduction to Remote Sensing In-situ data Applications

More information

Integral R. Southworth ESA/ESOC Integral Users Group Meeting, ESTEC, 19/1/2012 Mission Extension Operations Review, 2012

Integral R. Southworth ESA/ESOC Integral Users Group Meeting, ESTEC, 19/1/2012 Mission Extension Operations Review, 2012 Integral R. Southworth ESA/ESOC Integral Users Group Meeting, ESTEC, 19/1/2012 Mission Extension Operations Review, 2012 Integral IUG 19/1/2012 ESA/ESOC OPS-OA Page 1 Spacecraft Status From MEOR 2010 Changes

More information

On the stability of Amazon rainforest backscattering during the ERS-2 Scatterometer mission lifetime

On the stability of Amazon rainforest backscattering during the ERS-2 Scatterometer mission lifetime On the stability of Amazon rainforest backscattering during the ERS- Scatterometer mission lifetime R. Crapolicchio (), P. Lecomte () () Serco S.p.A. c/o ESA-ESRIN Via Galileo Galilei 44 Frascati Italy

More information

The Sentinel-1 Constellation

The Sentinel-1 Constellation The Sentinel-1 Constellation Evert Attema, Sentinel-1 Mission & System Manager AGRISAR and EAGLE Campaigns Final Workshop 15-16 October 2007 ESA/ESTECNoordwijk, The Netherlands Sentinel-1 Programme Sentinel-1

More information

European Space Agency and IPY

European Space Agency and IPY European Space Agency and IPY ESA supports IPY 2007-2008 activities: First ESA step was a dedicated Announcement Opportunity (AO) for EO data provision in support IPY, released in 2006, with data provision

More information

Sentinel-1 System Overview

Sentinel-1 System Overview Sentinel-1 System Overview Dirk Geudtner, Rámon Torres, Paul Snoeij, Malcolm Davidson European Space Agency, ESTEC Global Monitoring for Environment and Security (GMES) EU-led program aiming at providing

More information

ASSESSMENT BY ESA OF GCOS CLIMATE MONITORING PRINCIPLES FOR GMES

ASSESSMENT BY ESA OF GCOS CLIMATE MONITORING PRINCIPLES FOR GMES Prepared by ESA Agenda Item: III.5 Discussed in WG3 ASSESSMENT BY ESA OF GCOS CLIMATE MONITORING PRINCIPLES FOR GMES The ESA Sentinel missions are being designed for the GMES services, with special emphasis

More information

HEMERA Constellation of passive SAR-based micro-satellites for a Master/Slave configuration

HEMERA Constellation of passive SAR-based micro-satellites for a Master/Slave configuration HEMERA Constellation of passive SAR-based micro-satellites for a Master/Slave HEMERA Team Members: Andrea Bellome, Giulia Broggi, Luca Collettini, Davide Di Ienno, Edoardo Fornari, Leandro Lucchese, Andrea

More information

National Aeronautics and Space Administration Jet Propulsion Laboratory California Institute of Technology

National Aeronautics and Space Administration Jet Propulsion Laboratory California Institute of Technology QuikSCAT Mission Status QuikSCAT Follow-on Mission 2 QuikSCAT instrument and spacecraft are healthy, but aging June 19, 2009 will be the 10 year launch anniversary We ve had two significant anomalies during

More information

MICROSCOPE Mission operational concept

MICROSCOPE Mission operational concept MICROSCOPE Mission operational concept PY. GUIDOTTI (CNES, Microscope System Manager) January 30 th, 2013 1 Contents 1. Major points of the operational system 2. Operational loop 3. Orbit determination

More information

Envisat and ERS missions: data and services

Envisat and ERS missions: data and services FRINGE 2005 Workshop Envisat and ERS missions: and services Henri LAUR Envisat Mission Manager Our top objective: ease access to Earth Observation Common objective for all missions handled by ESA: Envisat,

More information

Remote sensing radio applications/ systems for environmental monitoring

Remote sensing radio applications/ systems for environmental monitoring Remote sensing radio applications/ systems for environmental monitoring Alexandre VASSILIEV ITU Radiocommunication Bureau phone: +41 22 7305924 e-mail: alexandre.vassiliev@itu.int 1 Source: European Space

More information

Primary POC: Prof. Hyochoong Bang Organization: Korea Advanced Institute of Science and Technology KAIST POC

Primary POC: Prof. Hyochoong Bang Organization: Korea Advanced Institute of Science and Technology KAIST POC Title: Demonstration of Optical Stellar Interferometry with Near Earth Objects (NEO) using Laser Range Finder by a Nano Satellite Constellation: A Cost effective approach. Primary POC: Prof. Hyochoong

More information

ERS-2 SAR CYCLIC REPORT

ERS-2 SAR CYCLIC REPORT ERS-2 SAR CYCLIC REPORT C YCLE 101 14-DEC-2004 to 18-JAN-2005 Orbit 50456 to 50957 Prepared by: PCS SAR TEAM Issue: 1.0 Reference: Date of Issue Status: Document type: Technical Note Approved by: T A B

More information

Industry Day of the Copernicus Sentinel-5 and Jason-CS Projects

Industry Day of the Copernicus Sentinel-5 and Jason-CS Projects Industry Day of the Copernicus Sentinel-5 and Jason-CS Projects With the present announcement, the European Space Agency and Astrium GmbH Satellites (Germany) inform the EMITS Users (European Companies

More information

ERS-2 Wind Scatterometer Cyclic Report

ERS-2 Wind Scatterometer Cyclic Report ERS- Wind Scatterometer Cyclic Report From 11 th May 9 to 15 th June 9 Cycle 147 Prepared by: G. De Chiara (scat@eo-sppa.org) Inputs from: H. Hersbach (ECMWF) Issue: 1. Reference ERSE-SPPA-EOPG-TN-9-6

More information

Sentinel-1 Calibration and Performance

Sentinel-1 Calibration and Performance Sentinel-1 Calibration and Performance Paul Snoeij Evert Attema Björn Rommen Nicolas Floury Berthyl Duesmann Malcolm Davidson Ramon Torres European Space Agency Sentinel-1 Mission Objectives Component

More information

How to Access EO Data

How to Access EO Data How to Access EO Data Andrea Minchella 29 June 2009, D1L1 ESA CAT-1 EO Principal Investigator ESA PIs and Projects 1-10 projects 11-20 projects 21-40 projects 41-60 projects 61-100 projects 101-200 projects

More information

ESA Sensor Performance, Products and Algorithms

ESA Sensor Performance, Products and Algorithms ESA Sensor Performance, Products and Algorithms Bojan R. Bojkov Head, Sensor Performance, Products and Algorithms Ground Segment and Mission Operations Department ESRIN, Frascati, Italy ESA EO missions

More information

THE ERS-2 SCATTEROMETER: INSTRUMENT AND DATA PERFORMANCES ASSESSMENT SINCE THE BEGINNING OF THE MISSION.

THE ERS-2 SCATTEROMETER: INSTRUMENT AND DATA PERFORMANCES ASSESSMENT SINCE THE BEGINNING OF THE MISSION. THE ERS- SCATTEROMETER: INSTRUMENT AND DATA PERFORMANCES ASSESSMENT SINCE THE BEGINNING OF THE MISSION. R. Crapolicchio (1), G. De Chiara (1), A. Paciucci (1), P. Lecomte () (1) Serco S.p.A. Via Sciadonna

More information

CubeSat Integration into the Space Situational Awareness Architecture

CubeSat Integration into the Space Situational Awareness Architecture CubeSat Integration into the Space Situational Awareness Architecture Keith Morris, Chris Rice, Mark Wolfson Lockheed Martin Space Systems Company 12257 S. Wadsworth Blvd. Mailstop S6040 Littleton, CO

More information

: IDEAS ENVISAT AATSR Consolidated Level 0 Dataset Completeness Analysis

: IDEAS ENVISAT AATSR Consolidated Level 0 Dataset Completeness Analysis Customer : Contract No : WP No : ESRIN 21525/08/I-OL 10000 Document Ref : Issue Date : Issue : 19 December 2013 1.0 Title : ENVISAT AATSR Consolidated Level 0 Dataset Completeness Analysis Abstract : This

More information

OPTIMAL OPERATIONS PLANNING FOR SAR SATELLITE CONSTELLATIONS IN LOW EARTH ORBIT

OPTIMAL OPERATIONS PLANNING FOR SAR SATELLITE CONSTELLATIONS IN LOW EARTH ORBIT 1 OPTIMAL OPERATIONS PLANNING FOR SAR SATELLITE CONSTELLATIONS IN LOW EARTH ORBIT S. De Florio, T. Zehetbauer, and Dr. T. Neff DLR - Microwaves and Radar Institute, Oberpfaffenhofen, Germany ABSTRACT Satellite

More information

Challenging, innovative and fascinating

Challenging, innovative and fascinating O3b 2.4m antennas operating in California. Photo courtesy Hung Tran, O3b Networks Challenging, innovative and fascinating The satellite communications industry is challenging, innovative and fascinating.

More information

Information furnished in conformity with the Convention on Registration of Objects Launched into Outer Space

Information furnished in conformity with the Convention on Registration of Objects Launched into Outer Space United Nations Secretariat Distr.: General 9 September 2003 Original: English Committee on the Peaceful Uses of Outer Space Information furnished in conformity with the Convention on Registration of Objects

More information

Active microwave systems (1) Satellite Altimetry

Active microwave systems (1) Satellite Altimetry Remote Sensing: John Wilkin Active microwave systems (1) Satellite Altimetry jwilkin@rutgers.edu IMCS Building Room 214C 732-932-6555 ext 251 Active microwave instruments Scatterometer (scattering from

More information

ERS-2 SAR CYCLIC REPORT

ERS-2 SAR CYCLIC REPORT 28TH SEPTEMBER 2009-2ND NOVEMBER 2009 (CYCLE 151) PUBLIC SUMMARY prepared by/préparé par IDEAS SAR Team reference/réference IDEAS-BAE-OQC-REP-0245 issue/édition 9 revision/révision 0 date of issue/date

More information

GNSS Reflectometry and Passive Radar at DLR

GNSS Reflectometry and Passive Radar at DLR ACES and FUTURE GNSS-Based EARTH OBSERVATION and NAVIGATION 26./27. May 2008, TU München Dr. Thomas Börner, Microwaves and Radar Institute, DLR Overview GNSS Reflectometry a joined proposal of DLR and

More information

ERS-2 Wind Scatterometer Cyclic Report

ERS-2 Wind Scatterometer Cyclic Report ERS- Wind Scatterometer Cyclic Report From 16 th July 7 to th August 7 Cycle 18 Prepared by: G. De Chiara (scat@dpqc.org) Approved by: R. Crapolicchio (scat@dpqc.org) Inputs from: H. Hersbach (ECMWF) Issue:

More information

Compact High Resolution Imaging Spectrometer (CHRIS) siraelectro-optics

Compact High Resolution Imaging Spectrometer (CHRIS) siraelectro-optics Compact High Resolution Imaging Spectrometer (CHRIS) Mike Cutter (Mike_Cutter@siraeo.co.uk) Summary CHRIS Instrument Design Instrument Specification & Performance Operating Modes Calibration Plan Data

More information

The Global Imager (GLI)

The Global Imager (GLI) The Global Imager (GLI) Launch : Dec.14, 2002 Initial check out : to Apr.14, 2003 (~L+4) First image: Jan.25, 2003 Second image: Feb.6 and 7, 2003 Calibration and validation : to Dec.14, 2003(~L+4) for

More information

Sounding the Atmosphere Ground Support for GNSS Radio-Occultation Processing

Sounding the Atmosphere Ground Support for GNSS Radio-Occultation Processing Sounding the Atmosphere Ground Support for GNSS Radio-Occultation Processing Atmospheric Sounding René Zandbergen & John M. Dow Navigation Support Office, Ground Systems Engineering Department, Directorate

More information

Remote Sensing: John Wilkin IMCS Building Room 211C ext 251. Active microwave systems (1) Satellite Altimetry

Remote Sensing: John Wilkin IMCS Building Room 211C ext 251. Active microwave systems (1) Satellite Altimetry Remote Sensing: John Wilkin wilkin@marine.rutgers.edu IMCS Building Room 211C 732-932-6555 ext 251 Active microwave systems (1) Satellite Altimetry Active microwave instruments Scatterometer (scattering

More information

Microwave Sensors Subgroup (MSSG) Report

Microwave Sensors Subgroup (MSSG) Report Microwave Sensors Subgroup (MSSG) Report Feb 17-20, 2014, ESA ESRIN, Frascati, Italy DONG, Xiaolong, MSSG Chair National Space Science Center Chinese Academy of Sciences (MiRS,NSSC,CAS) Email: dongxiaolong@mirslab.cn

More information

ERS/ENVISAT ASAR Data Products and Services

ERS/ENVISAT ASAR Data Products and Services ERS/ENVISAT ASAR Data Products and Services Andrea Celentano Business Manager celentan@eurimage.com What is Eurimage? Founded in 1989 Current shareholders: Since 1989 Commercial Partner of the European

More information

Sentinel-1 Overview. Dr. Andrea Minchella

Sentinel-1 Overview. Dr. Andrea Minchella Dr. Andrea Minchella 21-22/01/2016 ESA SNAP-Sentinel-1 Training Course Satellite Applications Catapult - Electron Building, Harwell, Oxfordshire Contents Sentinel-1 Mission Sentinel-1 SAR Modes Sentinel-1

More information

ADM-AEOLUS: an Innovative Operations Concept

ADM-AEOLUS: an Innovative Operations Concept SpaceOps 2006 Conference AIAA 2006-5506 ADM-AEOLUS: an Innovative Operations Concept P. Bargellini * and P. P. Emanuelli European Space Operations Centre (ESOC-ESA), Darmstadt, Germany S. Mejnertsen European

More information

SAR Interferometry Capabilities of Canada's planned SAR Satellite Constellation

SAR Interferometry Capabilities of Canada's planned SAR Satellite Constellation SAR Interferometry Capabilities of Canada's planned SAR Satellite Constellation Dirk Geudtner, Guy Séguin,, Ralph Girard Canadian Space Agency RADARSAT Follow-on Program CSA is in the middle of a Phase

More information

MERIS US Workshop. 14 July 2008

MERIS US Workshop. 14 July 2008 MERIS US Workshop 14 July 2008 MERIS US Workshop 08:10-08:55 08:55-09:10 H. Laur (ESA) Agenda a.m. ENVISAT/MERIS mission status, access to MERIS data and distribution policy Discussion 09:10-09:40 09:40-10:00

More information

Status of Sentinel-1 and acquisition plans for GFOI

Status of Sentinel-1 and acquisition plans for GFOI Status of Sentinel-1 and acquisition plans for GFOI Frank Martin Seifert, Pierre Potin, Johannes Roeder, ESA Earth Observation Programme 5 th Space Data Coordination, ESRIN, Frascati, 24 February 2014

More information

EPS Bridge Low-Cost Satellite

EPS Bridge Low-Cost Satellite EPS Bridge Low-Cost Satellite Results of a Concept Study being performed for Dr. Hendrik Lübberstedt OHB-System AG OpSE Workshop Walberberg 8th November 2005 EPS Bridge Key System Requirements Minimum

More information

GEOMETRIC RECTIFICATION OF EUROPEAN HISTORICAL ARCHIVES OF LANDSAT 1-3 MSS IMAGERY

GEOMETRIC RECTIFICATION OF EUROPEAN HISTORICAL ARCHIVES OF LANDSAT 1-3 MSS IMAGERY GEOMETRIC RECTIFICATION OF EUROPEAN HISTORICAL ARCHIVES OF LANDSAT -3 MSS IMAGERY Torbjörn Westin Satellus AB P.O.Box 427, SE-74 Solna, Sweden tw@ssc.se KEYWORDS: Landsat, MSS, rectification, orbital model

More information

Passive Microwave Sensors LIDAR Remote Sensing Laser Altimetry. 28 April 2003

Passive Microwave Sensors LIDAR Remote Sensing Laser Altimetry. 28 April 2003 Passive Microwave Sensors LIDAR Remote Sensing Laser Altimetry 28 April 2003 Outline Passive Microwave Radiometry Rayleigh-Jeans approximation Brightness temperature Emissivity and dielectric constant

More information

THE RESEARCH AND DEVELOPMENT OF THE USM NANOSATELLITE FOR REMOTE SENSING MISSION

THE RESEARCH AND DEVELOPMENT OF THE USM NANOSATELLITE FOR REMOTE SENSING MISSION THE RESEARCH AND DEVELOPMENT OF THE USM NANOSATELLITE FOR REMOTE SENSING MISSION Md. Azlin Md. Said 1, Mohd Faizal Allaudin 2, Muhammad Shamsul Kamal Adnan 2, Mohd Helmi Othman 3, Nurulhusna Mohamad Kassim

More information

Power modeling and budgeting design and validation with in-orbit data of two commercial LEO satellites

Power modeling and budgeting design and validation with in-orbit data of two commercial LEO satellites SSC17-X-08 Power modeling and budgeting design and validation with in-orbit data of two commercial LEO satellites Alan Kharsansky Satellogic Av. Raul Scalabrini Ortiz 3333 piso 2, Argentina; +5401152190100

More information

Remote Sensing: John Wilkin IMCS Building Room 211C ext 251. Active microwave systems (1) Satellite Altimetry

Remote Sensing: John Wilkin IMCS Building Room 211C ext 251. Active microwave systems (1) Satellite Altimetry Remote Sensing: John Wilkin wilkin@marine.rutgers.edu IMCS Building Room 211C 732-932-6555 ext 251 Active microwave systems (1) Satellite Altimetry Active microwave instruments Scatterometer (scattering

More information

Proba-V QWG#7 Flight & GS status. 3 4 May 2018 ACRI, Sophia-Antipolis

Proba-V QWG#7 Flight & GS status. 3 4 May 2018 ACRI, Sophia-Antipolis Proba-V QWG#7 Flight & GS status 3 4 May 2018 ACRI, Sophia-Antipolis Orbit status Slide 2 Orbit status LTDN evolution: 7 May 2013: 10:44:30 1 Dec. 2014: 10:51:08 26 Apr. 2017: 10:36:26 Oct 2017: 10:30

More information

The studies began when the Tiros satellites (1960) provided man s first synoptic view of the Earth s weather systems.

The studies began when the Tiros satellites (1960) provided man s first synoptic view of the Earth s weather systems. Remote sensing of the Earth from orbital altitudes was recognized in the mid-1960 s as a potential technique for obtaining information important for the effective use and conservation of natural resources.

More information

Microwave Remote Sensing (1)

Microwave Remote Sensing (1) Microwave Remote Sensing (1) Microwave sensing encompasses both active and passive forms of remote sensing. The microwave portion of the spectrum covers the range from approximately 1cm to 1m in wavelength.

More information

Automation challenges of the Mission Planning System and the Ground Station Network within the TerraSAR-X/TanDEM-X Ground Segment

Automation challenges of the Mission Planning System and the Ground Station Network within the TerraSAR-X/TanDEM-X Ground Segment DLR.de Chart 1 Automation challenges of the Mission Planning System and the Ground Station Network within the TerraSAR-X/TanDEM-X Ground Segment F. Mrowka, R. Metzig, B. Schättler, R. Kahle, C. Lenzen,

More information

Biomass, a polarimetric interferometric P-band SAR mission

Biomass, a polarimetric interferometric P-band SAR mission Biomass, a polarimetric interferometric P-band SAR mission M. Arcioni, P. Bensi, M. Fehringer, F. Fois, F. Heliere, N. Miranda, K. Scipal Fringe 2015, ESRIN 27/03/2015 The Biomass Mission 1. Biomass was

More information

The Nemo Bus: A Third Generation Nanosatellite Bus for Earth Monitoring and Observation

The Nemo Bus: A Third Generation Nanosatellite Bus for Earth Monitoring and Observation The Nemo Bus: A Third Generation Nanosatellite Bus for Earth Monitoring and Observation FREDDY M. PRANAJAYA Manager, Advanced Systems Group S P A C E F L I G H T L A B O R A T O R Y University of Toronto

More information

Sub-Mesoscale Imaging of the Ionosphere with SMAP

Sub-Mesoscale Imaging of the Ionosphere with SMAP Sub-Mesoscale Imaging of the Ionosphere with SMAP Tony Freeman Xiaoqing Pi Xiaoyan Zhou CEOS Workshop, ASF, Fairbanks, Alaska, December 2009 1 Soil Moisture Active-Passive (SMAP) Overview Baseline Mission

More information

B ==================================== C

B ==================================== C Satellite Space Segment Communication Frequencies Frequency Band (GHz) Band Uplink Crosslink Downlink Bandwidth ==================================== C 5.9-6.4 3.7 4.2 0.5 X 7.9-8.4 7.25-7.7575 0.5 Ku 14-14.5

More information

Satellite Sub-systems

Satellite Sub-systems Satellite Sub-systems Although the main purpose of communication satellites is to provide communication services, meaning that the communication sub-system is the most important sub-system of a communication

More information

Interferometric Cartwheel 1

Interferometric Cartwheel 1 The Interferometric CartWheel A wheel of passive radar microsatellites for upgrading existing SAR projects D. Massonnet, P. Ultré-Guérard (DPI/EOT) E. Thouvenot (DTS/AE/INS/IR) Interferometric Cartwheel

More information

Case 1 - ENVISAT Gyroscope Monitoring: Case Summary

Case 1 - ENVISAT Gyroscope Monitoring: Case Summary Code FUZZY_134_005_1-0 Edition 1-0 Date 22.03.02 Customer ESOC-ESA: European Space Agency Ref. Customer AO/1-3874/01/D/HK Fuzzy Logic for Mission Control Processes Case 1 - ENVISAT Gyroscope Monitoring:

More information

Outernet: Development of a 1U Platform to Enable Low Cost Global Data Provision

Outernet: Development of a 1U Platform to Enable Low Cost Global Data Provision Outernet: Development of a 1U Platform to Enable Low Cost Global Data Provision Introduction One of the UK s leading space companies, and the only wholly UK-owned Prime contractor. ISO 9001:2008 accredited

More information

The Multi-Mission Satellite Operations at the NSPO Ground Segment

The Multi-Mission Satellite Operations at the NSPO Ground Segment P Road, Conference (Hosted and organized by ESA and EUMETSAT in association with AIAA) AIAA 2008-3228 The Multi-Mission Satellite Operations at the NSPO Ground Segment NSPO, 8F, 9 Prosperity 1P Shin-Fa

More information

Integrating Spaceborne Sensing with Airborne Maritime Surveillance Patrols

Integrating Spaceborne Sensing with Airborne Maritime Surveillance Patrols 22nd International Congress on Modelling and Simulation, Hobart, Tasmania, Australia, 3 to 8 December 2017 mssanz.org.au/modsim2017 Integrating Spaceborne Sensing with Airborne Maritime Surveillance Patrols

More information

ENVISAT Microwave Radiometer Assessment Report Cycle 051 04-09-2006 09-10-2006 Prepared by : M. DEDIEU, CETP L. EYMARD, LOCEAN/IPSL E. OBLIGIS, CLS OZ. ZANIFE, CLS F. FERREIRA, CLS Checked by : Approved

More information

ASAR WIDE-SWATH SINGLE-LOOK COMPLEX PRODUCTS: PROCESSING AND EXPLOITATION POTENTIAL

ASAR WIDE-SWATH SINGLE-LOOK COMPLEX PRODUCTS: PROCESSING AND EXPLOITATION POTENTIAL ASAR WIDE-SWATH SINGLE-LOOK COMPLEX PRODUCTS: PROCESSING AND EXPLOITATION POTENTIAL Ralph Cordey (1), Tim Pearson (2), Yves-Louis Desnos (3), Betlem Rosich-Tell (3) (1) European Space Agency, ESTEC, Keplerlaan

More information

Phone: , Fax: , Germany

Phone: , Fax: , Germany The TET-1 Satellite Bus A High Reliability Bus for Earth Observation, Scientific and Technology Verification Missions in LEO Pestana Conference Centre Funchal, Madeira - Portugal 31 May 4 June 2010 S.

More information

The use of satellite images to forecast agricultural

The use of satellite images to forecast agricultural The use of satellite images to forecast agricultural Luxembourg, 12.03.2014 r. Tomasz Milewski NUTS for Poland: NUTS 1 macro-regions (grup of province, voivodships) (6), NUTS 2 - regions (province,

More information

OVERVIEW OF THE ALOS SATELLITE SYSTEM

OVERVIEW OF THE ALOS SATELLITE SYSTEM OVERVIEW OF THE ALOS SATELLITE SYSTEM Presented to The Symposium for ALOS Data Application Users @Kogakuin University, Tokyo, Japan Mar. 27, 2001 Takashi Hamazaki Senior Engineer ALOS Project National

More information

CSA Report on Earth Observation

CSA Report on Earth Observation CSA Report on Earth Observation Dr. Satish K. Srivastava WGCV Chair & CSA Member of WGCV Canadian Space Agency Presented at College Park, MD, USA Sep 30 th to Oct 2 nd, 2014 RADARSAT-2 Spacecraft Health

More information

Microwave Sensors Subgroup (MSSG) Report

Microwave Sensors Subgroup (MSSG) Report Microwave Sensors Subgroup (MSSG) Report CEOS WGCV-35 May 13-17, 2013, Shanghai, China DONG, Xiaolong, MSSG Chair CAS Key Laboratory of Microwave Remote Sensing National Space Science Center Chinese Academy

More information

DRONACHARYA GROUP OF INSTITUTIONS, GREATER NOIDA. SATELLITE COMMUNICATIONS (EEC 021) QUESTION BANK

DRONACHARYA GROUP OF INSTITUTIONS, GREATER NOIDA. SATELLITE COMMUNICATIONS (EEC 021) QUESTION BANK DRONACHARYA GROUP OF INSTITUTIONS, GREATER NOIDA. SATELLITE COMMUNICATIONS (EEC 021) QUESTION BANK 1. Write the advantages and disadvantages of Satellite Communication. 2. Distinguish between active and

More information

RADARSAT-1 Satellite

RADARSAT-1 Satellite RADARSAT-1 Satellite Summary: RADARSAT-1 is an advanced Earth observation satellite project developed by the Canadian Space Agency (CSA) to monitor environmental change and to support resource sustainability.

More information

NON-PHOTOGRAPHIC SYSTEMS: Multispectral Scanners Medium and coarse resolution sensor comparisons: Landsat, SPOT, AVHRR and MODIS

NON-PHOTOGRAPHIC SYSTEMS: Multispectral Scanners Medium and coarse resolution sensor comparisons: Landsat, SPOT, AVHRR and MODIS NON-PHOTOGRAPHIC SYSTEMS: Multispectral Scanners Medium and coarse resolution sensor comparisons: Landsat, SPOT, AVHRR and MODIS CLASSIFICATION OF NONPHOTOGRAPHIC REMOTE SENSORS PASSIVE ACTIVE DIGITAL

More information

THE SUSTAINABILITY OF THE RAPIDEYE REMOTE SENSING CONSTELLATION

THE SUSTAINABILITY OF THE RAPIDEYE REMOTE SENSING CONSTELLATION THE SUSTAINABILITY OF THE RAPIDEYE REMOTE SENSING CONSTELLATION Enrico Stoll (1), Kam Shahid (1), Erika Paasche (1), Marcus Apel (1) (1) BlackBridge, Kurfürstendamm 22, 10719 Berlin, Germany; +49.30.609.8300{-415,

More information

IDEAS - RA2/MWR/DORIS instruments events during ENVISAT mission

IDEAS - RA2/MWR/DORIS instruments events during ENVISAT mission Error! Unknown document property name. Customer : Contract No : WP No : ESRIN 21525/08/I-OL Document Ref : Issue Date : Issue : IDEAS-SER-OQC-REP-1090 09/05/2013 1.7 Title : IDEAS - RA2/MWR/DORIS instruments

More information

Miguel A. Aguirre. Introduction to Space. Systems. Design and Synthesis. ) Springer

Miguel A. Aguirre. Introduction to Space. Systems. Design and Synthesis. ) Springer Miguel A. Aguirre Introduction to Space Systems Design and Synthesis ) Springer Contents Foreword Acknowledgments v vii 1 Introduction 1 1.1. Aim of the book 2 1.2. Roles in the architecture definition

More information

EARTH OBSERVATION CONCEPT INVOLVING PORTABLE DATA RECEIVING AND PROCESSING EQUIPMENTS WOM-8 SYSTEM ABSTRACT

EARTH OBSERVATION CONCEPT INVOLVING PORTABLE DATA RECEIVING AND PROCESSING EQUIPMENTS WOM-8 SYSTEM ABSTRACT EARTH OBSERVATION CONCEPT INVOLVING PORTABLE DATA RECEIVING AND PROCESSING EQUIPMENTS WOM-8 SYSTEM D~CIO CASTILHO CEBALLOS BRAZILIAN NATIONAL SPACE RESEARCH INSTITUTE P.O. BOX 515 - S.J. CAMPOS - SP BRAZIL

More information

EE 529 Remote Sensing Techniques. Introduction

EE 529 Remote Sensing Techniques. Introduction EE 529 Remote Sensing Techniques Introduction Course Contents Radar Imaging Sensors Imaging Sensors Imaging Algorithms Imaging Algorithms Course Contents (Cont( Cont d) Simulated Raw Data y r Processing

More information

Remote sensing of the oceans Active sensing

Remote sensing of the oceans Active sensing Remote sensing of the oceans Active sensing Gravity Sea level Ocean tides Low frequency motion Scatterometry SAR http://daac.gsfc.nasa.gov/campaign_docs/ocdst/what_is_ocean_color.html Shape of the earth

More information

Coexistence of fixed and space services at 2 GHz

Coexistence of fixed and space services at 2 GHz July 2012, issue 2.0.0 4RF Application Note Coexistence of fixed and space services at 2 GHz Contents 1. Introduction 2 2. Use of 2 GHz band by space services 3 3. Coexistence options for 2 GHz space services

More information

TanDEM-X. 1. Mission Overview. Science Meeting No SAR Imaging Modes & Performance 3. Satellite Design Overview 4. Launcher 5.

TanDEM-X. 1. Mission Overview. Science Meeting No SAR Imaging Modes & Performance 3. Satellite Design Overview 4. Launcher 5. TanDEM-X Science Meeting No. 1 Dresden 15.5.2006 Wolfgang Pitz EADS Astrium GmbH D-88039 Friedrichshafen 1. Mission Overview 2. SAR Imaging Modes & Performance 3. Satellite Design Overview 4. Launcher

More information

Microsatellite Constellation for Earth Observation in the Thermal Infrared Region

Microsatellite Constellation for Earth Observation in the Thermal Infrared Region Microsatellite Constellation for Earth Observation in the Thermal Infrared Region Federico Bacci di Capaci Nicola Melega, Alessandro Tambini, Valentino Fabbri, Davide Cinarelli Observation Index 1. Introduction

More information

S3 Product Notice Altimetry

S3 Product Notice Altimetry S3 Product Notice Altimetry Mission Sensor Product S3-A SRAL / MWR LAND L2 NRT, STC and NTC Product Notice ID Issue/Rev Date Version 1.0 Preparation S3A.PN-STM-L2L.04 13-Dec-2017 This Product Notice was

More information

PROPOSAL FOR A NEW HYPER SPECTRAL IMAGING MICRO SATELLITE: SVALBIRD

PROPOSAL FOR A NEW HYPER SPECTRAL IMAGING MICRO SATELLITE: SVALBIRD PROPOSAL FOR A NEW HYPER SPECTRAL IMAGING MICRO SATELLITE: SVALBIRD Fred Sigernes 1, Udo Renner 2, Stephan Roemer 2, Jörn-Hendrik Bleif 2, Dag Arne Lorentzen 1, Stefan Claes 1, Reidar Nordheim 3, Frank

More information

Microwave Remote Sensing

Microwave Remote Sensing Provide copy on a CD of the UCAR multi-media tutorial to all in class. Assign Ch-7 and Ch-9 (for two weeks) as reading material for this class. HW#4 (Due in two weeks) Problems 1,2,3 and 4 (Chapter 7)

More information

ABSTRACT Global Analysis of EnviSat Burst Echoes over Inland Water Berry, P.A.M (1)., Freeman, J.A. (1) (1) E.A.P.R.S Laboratory, De Montfort University, The Gateway, Leicester, LE1 9BH, UK Email: pamb@dmu.ac.uk,

More information

Small Satellites: The Execution and Launch of a GPS Radio Occultation Instrument in a 6U Nanosatellite

Small Satellites: The Execution and Launch of a GPS Radio Occultation Instrument in a 6U Nanosatellite Small Satellites: The Execution and Launch of a GPS Radio Occultation Instrument in a 6U Nanosatellite Dave Williamson Director, Strategic Programs Tyvak Tyvak: Satellite Solutions for Multiple Organizations

More information

Airbus DS ESA Phase-0 L5 Spacecraft/Orbital Concept Overview. Emanuele Monchieri 6 th March 2017

Airbus DS ESA Phase-0 L5 Spacecraft/Orbital Concept Overview. Emanuele Monchieri 6 th March 2017 Airbus DS ESA Phase-0 L5 Spacecraft/Orbital Concept Overview Emanuele Monchieri 6 th March 2017 Airbus DS ESA Phase-0 L5 Spacecraft/Orbital Concept Overview Contents L5 Mission Outline Mission Concept

More information

The Integral Operational Ground Segment

The Integral Operational Ground Segment The Integral Operational Ground Segment P. Maldari Mission Operations Department, ESA Directorate of Technical and Operational Support, ESOC, Darmstadt, Germany The mission profile The International Gamma-Ray

More information

SPACE. (Some space topics are also listed under Mechatronic topics)

SPACE. (Some space topics are also listed under Mechatronic topics) SPACE (Some space topics are also listed under Mechatronic topics) Dr Xiaofeng Wu Rm N314, Bldg J11; ph. 9036 7053, Xiaofeng.wu@sydney.edu.au Part I SPACE ENGINEERING 1. Vision based satellite formation

More information

COPERNICUS COLLABORATIVE GROUND SEGMENT TO SUPPORT MARITIME SITUATIONAL AWARENESS

COPERNICUS COLLABORATIVE GROUND SEGMENT TO SUPPORT MARITIME SITUATIONAL AWARENESS COPERNICUS COLLABORATIVE GROUND SEGMENT TO SUPPORT MARITIME SITUATIONAL AWARENESS D. Krause*, E. Schwarz, H. Damerow, German Aerospace Center (DLR), German Remote Sensing Data Center (DFD), Kalkhorstweg

More information

National Aeronautics and Space Administration. Landsat Update. Jeff Masek, NASA GSFC Jim Irons, NASA GSFC. April 3, 2012 LCLUC Meeting.

National Aeronautics and Space Administration. Landsat Update. Jeff Masek, NASA GSFC Jim Irons, NASA GSFC. April 3, 2012 LCLUC Meeting. National Aeronautics and Space Administration Landsat Update Jeff Masek, NASA GSFC Jim Irons, NASA GSFC April 3, 2012 LCLUC Meeting www.nasa.gov Agenda Landsat-5/7 Update LDCM / Landsat-8 Mission Status

More information

ENVISAT Microwave Radiometer Assessment Report Cycle 045 07-02-2006 13-03-2006 Prepared by : M. DEDIEU, CETP L. EYMARD, LOCEAN/IPSL E. OBLIGIS, CLS OZ. ZANIFE, CLS F. FERREIRA, CLS Checked by : Approved

More information

EnviSat ENVISAT RA-2 AND MWR PRODUCTS AND ALGORITHMS USER GUIDE. Doc. No.: RA-TN-ESR-GS-0013 Issue: 1.0 Date: 4 April 2000 Page: 1 / 13

EnviSat ENVISAT RA-2 AND MWR PRODUCTS AND ALGORITHMS USER GUIDE. Doc. No.: RA-TN-ESR-GS-0013 Issue: 1.0 Date: 4 April 2000 Page: 1 / 13 Page: 1 / ENVISAT RA-2 AND MWR PRODUCTS AND ALGORITHMS USER GUIDE J. Benveniste and M.P. Milagro ESA/ESRIN 1 Page: 2 / Table of Content 1 Scope..3 2 Instruments Overview.4 2.1 Second Generation Radar Altimeter

More information

SATELLIT COMMUNICATION

SATELLIT COMMUNICATION QUESTION BANK FOR SATELLITE COMMUNICATION UNIT I 1) Explain Kepler s laws. What are the fords that give rise to these laws? 2) Explain how a satellite is located with respect to earth. 3) Describe antenna

More information

FPGA Implementation of Safe Mode Detection and Sun Acquisition Logic in a Satellite

FPGA Implementation of Safe Mode Detection and Sun Acquisition Logic in a Satellite FPGA Implementation of Safe Mode Detection and Sun Acquisition Logic in a Satellite Dhanyashree T S 1, Mrs. Sangeetha B G, Mrs. Gayatri Malhotra 1 Post-graduate Student at RNSIT Bangalore India, dhanz1ec@gmail.com,

More information

THE OFFICINE GALILEO DIGITAL SUN SENSOR

THE OFFICINE GALILEO DIGITAL SUN SENSOR THE OFFICINE GALILEO DIGITAL SUN SENSOR Franco BOLDRINI, Elisabetta MONNINI Officine Galileo B.U. Spazio- Firenze Plant - An Alenia Difesa/Finmeccanica S.p.A. Company Via A. Einstein 35, 50013 Campi Bisenzio

More information

TanDEM-X SAR System Verification

TanDEM-X SAR System Verification TanDEM-X SAR System Verification Mathias Weigt, Ulrich Steinbrecher, Thomas Kraus, Johannes Böer, Benjamin Bräutigam 07-09 November 2011 Overview Monostatic Commissioning Phase Verification of Power/Thermal

More information

Polar Communications & Weather (PCW) Mission. Guennadi Kroupnik, Canadian Space Agency

Polar Communications & Weather (PCW) Mission. Guennadi Kroupnik, Canadian Space Agency Polar Communications & Weather (PCW) Mission Guennadi Kroupnik, Canadian Space Agency Mission Objectives Reliable communications and navigations services in the high latitudes (North of 70º) to ensure:

More information

SNIPE mission for Space Weather Research. CubeSat Developers Workshop 2017 Jaejin Lee (KASI)

SNIPE mission for Space Weather Research. CubeSat Developers Workshop 2017 Jaejin Lee (KASI) SNIPE mission for Space Weather Research CubeSat Developers Workshop 2017 Jaejin Lee (KASI) New Challenge with Nanosatellites In observing small-scale plasma structures, single satellite inherently suffers

More information