WASHTENAW COUNTY ROAD COMMISSION

Size: px
Start display at page:

Download "WASHTENAW COUNTY ROAD COMMISSION"

Transcription

1 WASHTENAW COUNTY ROAD COMMISSION TO: FROM: Washtenaw County Board of Road Commissioners Roy D. Townsend, P.E. Managing Director SUBJECT: Staff Report to DATE: October 3, 2017 TOWNSHIP REPORT OPERATIONS REPORT A. Maintenance Scraping of gravel roads and patching of paved roads were performed throughout the county. In addition the following maintenance activities were performed in individual townships: ANN ARBOR TOWNSHIP Boom Mow Ford Road AUGUSTA TOWNSHIP Cut Trees Willis Road Drainage and Back slopes Tuttle Hill Road Repair Catch Basin Lid Tuttle Hill Road Roadside Trash Removal Arkona Road, Bemis Road, Gooding Road, Fuller Road, Hitchingham Road, Judd Road, Macey Road, Merritt Road, Munger Road, Rosbolt Road BRIDGEWATER TOWNSHIP Drainage and Back slopes Logan Road Limestone Patch Fisk Road: 11 tons Roadside Trash Removal Fisk Road DEXTER TOWNSHIP FREEDOM TOWNSHIP Fallen Trees Kothe Road Limestone Patch Limestone Patch Shoulders

2 Staff Report to Page 2 LIMA TOWNSHIP Gravel Patch Beach Road, Jerusalem Road, Lima Center Road, Trinkle Road: 54 tons Limestone Patch Fletcher Road, Jerusalem Road, Lima Center Road, Trinkle Road: 35 tons LODI TOWNSHIP Culvert Replacement Weber Road Ditching Ellsworth Road Gravel Patch Steinbach Road: 5 tons Limestone Patch Alber Road, Dell Road, Ellsworth Road, Saline Waterworks Road, Textile Road, Waters Road, Zeeb Road, Weber Road: 105 tons Ellsworth Road Limestone Resurfacing 2,204 tons LYNDON TOWNSHIP Adopt-A-Road Waterloo Road Drainage and Back slopes Boyce Road Fallen Trees Bartell Road, Beeman Road, Roe Road MANCHESTER TOWNSHIP Brush Removal Scully Road Fallen Trees Allen Road, Kirk Road, Schleweis Road, Van Tuyle Road Limestone Patch Shoulders Austin Road: 33 tons Roadside Trash Removal Wellwood Road NORTHFIELD TOWNSHIP Drainage and Back slopes Northfield Church Road, Spencer Road Limestone Patch Earhart Road, Joy Road: 101 tons PITTSFIELD TOWNSHIP Cleaned Catch Basins Deake Avenue Cleaned Pipes Silverleaf Drive Limestone Patch Bemis Road, Textile Road: 31 tons Repair Curb Heartwood Lane SALEM TOWNSHIP Boom Mow N Territorial Road, Spencer Road HMA Crush, Shape, and Resurface Old N. Territorial Road Limestone Patch Five Mile Road, Gotfredson Road, Napier Road: 141 tons

3 Staff Report to Page 3 SALINE TOWNSHIP Limestone Patch Allen Road, Arkona Road, Bethel Church Road, Bowens Road, Burtless Road, Dell Road, Goodrich Road, Jordan Road, Kirk Road, Lemm Road, Mohart Road, Schleweis Road, Tracey Road: 63 tons Limestone Patch Shoulders Jordan Road, Macon Road, Old Macon Road: 52 tons SCIO TOWNSHIP Berming Daleview Drive Drainage and Back slopes Tubbs Road Limestone Patch Knight Road, Liberty Road, Park Road: 20 tons SHARON TOWNSHIP Brush Removal Pleasant Lake Road SUPERIOR TOWNSHIP Berming Cherry Hill Road Boom Mow Cherry Hill Road, Gotfredson Road, Warren Road Concrete Repairs Harris Road Drainage & Back slopes Cherry Hill Road HMA Crush, Shape, and Resurface Vorhies Road Limestone Patch Cherry Hill Road, Gotfredson Road, Vorhies Road, Warren Road: 94 tons SYLVAN TOWNSHIP WEBSTER TOWNSHIP Ditching N Delhi Road Limestone Patch Joy Road: 20 tons YORK TOWNSHIP Ditching Crane Road Limestone Patch Arkona Road, Maple Road: 105 tons Limestone Patch Shoulders Carpenter Road Bishop Road Limestone Resurfacing 1,536 tons Crane Road Limestone Resurfacing 2,075 tons

4 Staff Report to Page 4 YPSILANTI TOWNSHIP Cleaned Pipes Cary Drive Cut Trees Borgstrom Street, Chevrolet Avenue, Huntington Drive, Jones Avenue, Wallace Road Limestone Patch Bemis Road: 50 tons Repaired Drain Fairhills Drive, Hillcrest Boulevard, Kirk Avenue Replace Drains Fairhills Drive Roadside Trash Removal Coolidge Avenue, Jones Avenue, Wallace Road NESC Updates Masonry work is 98% complete with the exterior brick completed. The concrete driveway crew has completed the driveway slab with remaining concrete flatwork to be completed the week of September 25 th and the interior concrete floor is completed. Wall panel installation has begun. The remaining stone has begun to be placed for the HMA surface completing the hard surface area. STATE TRUNKLINE Patrol Patching I-94, M-14, M-52, US-12, US-23 SHOP REPORT Shop Repairs Tires Repaired 2 New Tire Installation 7 Vehicles Serviced 6 Vehicles Serviced by Suburban Chevrolet 6 Work Orders Completed 33 Equipment Repair Note De-commissioned several pickups and sold several pieces of equipment using Govdeals.com Truck 123 Replaced diesel fuel tank Truck 331 Resealed top of engine Truck 382 & 384 Prepped trucks Gradall 881 Reassembly is proceeding Tractor 889 Replaced the steering cylinder and axle stop

5 Staff Report to Page 5 BUILDING & GROUNDS REPORT Yard One Janitorial Repaired gutters on parking garage Serviced fans and fixed lights in the salt dome Recycled haul trash Serviced rapid units in shop and parking garage Plumbing repair in main office Yard Two Yard Four Serviced furnace s Install retrofit LED lights Cleaned up brine area Serviced air compressor Installed bench top Kaiser Well Repair fence Monitored well NESC Delivered barriers for brine system Fabricated parts for brine system Wall Panel installation commenced Interior concrete floor completed Concrete driveway paving completed Aggregate base course placement commenced for HMA paving

WASHTENAW COUNTY ROAD COMMISSION. SUBJECT: Staff Report for period of September 24th, 2018 thru October 7, 2018

WASHTENAW COUNTY ROAD COMMISSION. SUBJECT: Staff Report for period of September 24th, 2018 thru October 7, 2018 WASHTENAW COUNTY ROAD COMMISSION MEMO TO: CC: FROM: S. Siddall Managing Director C. Ryan Tiffany Lobbestael SUBJECT: Staff Report for period of September 24th, 2018 thru October 7, 2018 DATE: October 16,

More information

MSD STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY

MSD STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY MSD M etr o p olitan S e w e r Di s t r ict STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY 40203-1911 STANDARD DRAWINGS DIVISION

More information

Budget Committee Town of Gilmanton, New Hampshire

Budget Committee Town of Gilmanton, New Hampshire Approved Budget Committee Town of Gilmanton, New Hampshire Meeting November 14, 2018 6:00pm. Gilmanton Academy Committee Members Present: Chairman Brian Forst, Vice Chairman Anne Kirby, Joanne Melle, Grace

More information

VILLAGE OF VILLA PARK CENTRAL BOULEVARD IMPROVEMENTS LOCATION MAP (NOT TO SCALE) CORTESI AVE. MYRTLE AVE. CENTRAL BLVD.

VILLAGE OF VILLA PARK CENTRAL BOULEVARD IMPROVEMENTS LOCATION MAP (NOT TO SCALE) CORTESI AVE. MYRTLE AVE. CENTRAL BLVD. Q:\VillaPark_IL\11283000 Astor-Myrtle Sewer Separation Preliminary Design\D.4 CAD\Sheets\North\1. Cover.dwg INDEX OF SHEETS 1 COVER 2 GENERAL NOTES 3 SUMMARY OF QUANTITIES 4 ALIGNMENT 5-9 DRAINAGE AND

More information

GENESEE COUNTY ROAD COMMISSION BOARD MEETING. September 12, 2017 MINUTES

GENESEE COUNTY ROAD COMMISSION BOARD MEETING. September 12, 2017 MINUTES GENESEE COUNTY ROAD COMMISSION BOARD MEETING September 12, 2017 MINUTES CALL TO ORDER Chairperson Dickerson called the meeting of the Genesee County Board of Road Commissioners to order at 10:00 a.m. The

More information

A1.1 FOX GARAGE VAN VAN VAN VAN 11/16/ WASHINGTON BLVD ST. LOUIS, MO REVISIONS FLOOR PLAN - LEVEL /01/14

A1.1 FOX GARAGE VAN VAN VAN VAN 11/16/ WASHINGTON BLVD ST. LOUIS, MO REVISIONS FLOOR PLAN - LEVEL /01/14 BUILDING FLOOR PLAN TES: 1. ALL DIMENSIONS ARE TO FACE OF CONCRETE OR CENTERLINE OF COLUMN (U). 2. SEE ENLARGED STAIR PLANS (A2.1-A2.3) FOR DETAILED INFORMATION T SHOWN. 3. SEE FINISH ELEVATIONS (A3.1-A3.2)

More information

STANDARD BID ITEM NUMBERS

STANDARD BID ITEM NUMBERS 10701 TRAFFIC CONTROL LUMP SUM 10702 Traffic Control for Storm Sewer Installation LUMP SUM 10703 Traffic Control for Water Main Installation LUMP SUM 10704 Traffic Control for Sanitary Sewer Installation

More information

CITY OF DANA POINT DEVELOPMENT REVIEW

CITY OF DANA POINT DEVELOPMENT REVIEW Section I EARTHWORK CITY OF DANA POINT DEVELOPMENT REVIEW COST ESTIMATE UNIT PRICE LIST May 2002 Page 1 of 12 Section I EARTHWORK TABLE OF CONTENTS SECTION AND TOPICS...PAGE INTRODUCTION... i I EARTHWORK...

More information

TO WHOM IT MAY CONCERN:

TO WHOM IT MAY CONCERN: TO WHOM IT MAY CONCERN: A lot of questions are asked throughout the year as to when a building permit is required. This list may help identify some of the instances when a permit would be required: Permit

More information

STORM M ANHOLE FOR 42" PIPE AND SM ALLER JOB NO. SHEET NO. DATE MARCH 2015 OF MIN OF 3 CRSES MAX OF 5 CRSES 30"MAX 3 OR 3.5 PRECAST ECCENTIC CONC

STORM M ANHOLE FOR 42 PIPE AND SM ALLER JOB NO. SHEET NO. DATE MARCH 2015 OF MIN OF 3 CRSES MAX OF 5 CRSES 30MAX 3 OR 3.5 PRECAST ECCENTIC CONC 01-APR-2015 13:33 = I:\MSV8i\Plotting\piblack.ptb V:\201001\\C\8x11_Howell_Det\stm_det01_8x11_st01.dgn TIME = MIN 3 CRSES MAX 5 CRSES 3 OR 3.5 PRECAST ECCENTIC CONC ID PIPE GRADE A CONC FILL 4" 8" 2-0"SUMP

More information

A. Affordable Tires (Caring Nurses LLC) - Case# Conditional Use Permit for tire installation and auto repair at rd Avenue North

A. Affordable Tires (Caring Nurses LLC) - Case# Conditional Use Permit for tire installation and auto repair at rd Avenue North APPROVED MINUTES MINUTES OF THE BROOKLYN PARK PLANNING COMMISSION REGULAR MEETING March 09, 2016 Approved Minutes 1. CALL TO ORDER The meeting was called to order at 7:00 p.m. 2. ROLL CALL/ PLEDGE OF ALLEGIANCE

More information

ROUTES: 65 SECTIONS: miles in length. THE FOLLOWING ITEMS AND APPROXIMATE QUANTITIES ARE INVOLVED:

ROUTES: 65 SECTIONS: miles in length. THE FOLLOWING ITEMS AND APPROXIMATE QUANTITIES ARE INVOLVED: ARKANSAS DEPARTMENT OF TRANSPORTATION CA0801 HWY. 110 - CLINTON (WIDENING) (S) FEDERAL AID PROJECT ACNHPP-0071(31) THE PURPOSE OF THIS PROJECT IS TO WIDEN HIGHWAY 65 IN VAN BUREN COUNTY. THIS PROJECT CONSISTS

More information

DESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA

DESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA DESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA 94544-1395 PUBLIC WORKS DESIGN GUIDELINES TABLE OF CONTENTS SD-100 SERIES SPECIAL DRAWINGS SD-100 8/1991 SILT

More information

Miscellaneous. Demolition

Miscellaneous. Demolition Public Improvements Miscellaneous 1 Mobilization L.S. ** 2 Clearing and Grubbing L.S. *** 3 Structural Concrete Incl. Reinforcing C.Y. $1,325.00 4 6" PVC Sleeves L.F. $26.00 Demolition 5 Remove Asphalt

More information

Government Of Newfoundland & Labrador Municipal Water, Sewer And Roads Master Construction Specifications

Government Of Newfoundland & Labrador Municipal Water, Sewer And Roads Master Construction Specifications PAGE NO. : 1 OF 4 Revision Date: July 2009 STANDARD DRAWINGS TABLE OF CONTENTS DRAWING # DESCRIPTION 0030............ Work Adjacent to Roadway 0040............ Work at the Edge of Roadway 0050............

More information

SUPPLEMENTARY STANDARD DETAIL DRAWINGS

SUPPLEMENTARY STANDARD DETAIL DRAWINGS CITY OF MAPLE RIDGE DESIGN AND CONSTRUCTION DOCUMENTS Part 4 SUPPLEMENTARY STANDARD DETAIL DRAWINGS September 2015 Updated: October 2015 THIS PAGE INTENTIONALLY LEFT BLANK City of Maple Ridge Supplementary

More information

PO Box 1089 Apex NC

PO Box 1089 Apex NC PROJECT DETAILS Dragonfly Maintenance Report Property Client Name Client Email Address Client Email Address 2 Client Email Address 3 Client Email Address 4 Number of Ponds & Pond Type Service Type Standard

More information

NRE DESIGN PARK SITE DEVELOPMENT PLANS SECTION 3 TOWNSHIP 50 SOUTH, RANGE 25 EAST CITY OF NAPLES, COLLIER COUNTY, FLORIDA

NRE DESIGN PARK SITE DEVELOPMENT PLANS SECTION 3 TOWNSHIP 50 SOUTH, RANGE 25 EAST CITY OF NAPLES, COLLIER COUNTY, FLORIDA SITE DEVELOPMENT PLANS LEGAL SUBJECT PROPERTY SECTION 3 TOWNSHIP 50 SOUTH, RANGE 25 EAST CITY, COLLIER COUNTY, FLORIDA PROPERTY OWNER: ENTERPRISE PLAZA LLC 404 CITATION PT, FL 34104 GULF MEXICO PREPARED

More information

PLANNING AND DEVELOPMENT

PLANNING AND DEVELOPMENT OVERVIEW Effective January 1, 1992 all applications for multi-family residential and all non-residential building permits require site plan approval before permit issuance. All new developments and existing

More information

RANDY SCHMELING INSPECTIONS HARDER ROAD THREE RIVERS, MI Home Mobile

RANDY SCHMELING INSPECTIONS HARDER ROAD THREE RIVERS, MI Home Mobile 1 RANDY SCHMELING INSPECTIONS 10884 HARDER ROAD THREE RIVERS, MI 49093 Home 269-244-5184 Mobile 269-625-3260 Before a permit may be issued, ALL of the following documentation must be submitted or justified

More information

dpd client assistance memo CAM Plot Plan Requirements Basic Plot Plan What is a Plot Plan?

dpd client assistance memo CAM   Plot Plan Requirements Basic Plot Plan What is a Plot Plan? dpd Seattle Department of Planning and Development formerly the Department of Design, Construction and Land Use CAM 103 client assistance memo Plot Plan Requirements November 2001 Applications for City

More information

Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02

Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02 Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02 1. INTRODUCTION This standard is written to provide the professional surveyor (Surveyor) and the client with a guideline for producing

More information

Midland County Road Commission AS AWARDED 2017 Material Bid Tablulations

Midland County Road Commission AS AWARDED 2017 Material Bid Tablulations Ace Saginaw Paving Central Asphalt Pyramid Paving Hodgins Asphalt Paving ITEM 1 HMA PAVING "/ton" Item 1.a. HMA 13A "/ton" $52.75 $43.51 $53.25 $58.00 Item 1.b. Wedging, Partial Lane "/ton" $58.25 $58.43

More information

Professionals: Peter J. Scandariato, Esq., Michael Kelly, P.E., Debbie Alaimo Lawlor, P.P. Peter Scandariato, Esq. 2/8/16 Meeting Attendance $ 250.

Professionals: Peter J. Scandariato, Esq., Michael Kelly, P.E., Debbie Alaimo Lawlor, P.P. Peter Scandariato, Esq. 2/8/16 Meeting Attendance $ 250. TOWNSHIP OF MAHWAH PLANNING BOARD REGULAR/WORK SESSION MEETING MINUTES MUNICIPAL BUILDING, 475 CORPORATE DRIVE, MAHWAH, N.J. MONDAY, MARCH 14, 2016 AT 7:30 P.M. I. CHAIRMAN S OPENING STATEMENT, ROLL CALL,

More information

Survey Requirements. Design Guidelines and Standards. June Office of the University Architect

Survey Requirements. Design Guidelines and Standards. June Office of the University Architect Design Guidelines and Standards Survey Requirements June 2004 Office of the University Architect Construction Management P.O. Box 210181 Cincinnati, Ohio 45221-0181 Table of Contents Survey Requirements

More information

GENESEE COUNTY ROAD COMMISSION BOARD MEETING MINUTES. August 21, 2018

GENESEE COUNTY ROAD COMMISSION BOARD MEETING MINUTES. August 21, 2018 GENESEE COUNTY ROAD COMMISSION BOARD MEETING MINUTES August 21, 2018 CALL TO ORDER Chairperson Kautman-Jones called the meeting of the Genesee County Board of Road Commissioners to order at 10:00 a.m.

More information

This page is intentionally left blank

This page is intentionally left blank This page is intentionally left blank This page is intentionally left blank MnDOT Metro District Fact Sheet Mpls./St. Paul District Offices: Roseville-Water's Edge (HQ), Golden Valley, Oakdale mndot.gov/metro/

More information

STANDARD DETAILS Crow Canyon Road San Ramon, CA Telephone: (925) Fax: (925)

STANDARD DETAILS Crow Canyon Road San Ramon, CA Telephone: (925) Fax: (925) STANDARD DETAILS 2401 Crow Canyon Road San Ramon, CA 94583 Telephone: (925) 973-2670 Fax: (925) 838-3937 CITY OF SAN RAMON STANDARD DETAILS INDEX CONCRETE WORK NAME DRAWING # Curb, Gutter & Sidewalk C-1

More information

Applying for a Site Development Review

Applying for a Site Development Review Guide What is it? Applying for a Who approves it? ensures that new buildings or land uses are compatible with their sites and with the surrounding environment, other development, and traffic circulation.

More information

CHAPTER 11. Plan Standards

CHAPTER 11. Plan Standards CHAPTER 11 Plan Standards A. Introduction The city requires uniform public improvement plans for ease of record keeping and understanding. The following standards govern most plan submittals to the city.

More information

MARQUETTE GREENWAY TRAIL

MARQUETTE GREENWAY TRAIL ------ ------ TRAFFIC DATA A.A.D.T. (2010) A.A.D.T. (ED 2022) D.H.V. (2022) DIRECTIONAL DISTRIBUTION TRUCKS N/A N/A N/A N/A N/A DESIGN DATA DESIGN SPEED DESIGN CRITERIA FUNCTIONAL CLASSIFICATION RURAL/URBAN

More information

Article 4 PROCEDURES for PLOT PLAN and SITE PLAN REVIEW

Article 4 PROCEDURES for PLOT PLAN and SITE PLAN REVIEW Article 4 PROCEDURES for PLOT PLAN and SITE PLAN REVIEW Section 4.01 Purpose It is the intent of this Article to specify standards, application and data requirements, and the review process which shall

More information

Florida's Turnpike Enterprise Roadway Phase III (90%) & Phase IV (100%) Check List Per FDM and TDH Part 3

Florida's Turnpike Enterprise Roadway Phase III (90%) & Phase IV (100%) Check List Per FDM and TDH Part 3 Notes to Reviewers Section 301 Design Exceptions, Variation, and Technical Memorandums Special directives date and source Key Sheet Section 302 Location Map w/ location of project on map All applicable

More information

SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT

SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT SINGLE-FAMILY SITE PLAN INFORMATION PACKET GENERAL INFORMATION This information packet explains how your application for a single-family site plan will

More information

M I N N E S O T A D O T BID TABULATION SUMMARY JOB PAGE 1 ON 01/14/97 MINNESOTA PROJECT NO.S: DPI 015-8(021) DPI 015-8(022)

M I N N E S O T A D O T BID TABULATION SUMMARY JOB PAGE 1 ON 01/14/97 MINNESOTA PROJECT NO.S: DPI 015-8(021) DPI 015-8(022) BID TABULATION SUMMARY JOB 970010 PAGE 1 STATE PROJECT NO. 27-618-70 BIDS RECEIVED UNTIL 2:00 P.M. ON 01/14/97 MINNESOTA PROJECT NO.S: DPI 015-8(021) DPI 015-8(022) AT THE JUNCTION OF AUTO CLUB ROAD AND

More information

MICHIGAN DESIGN MANUAL ROAD DESIGN CHAPTER

MICHIGAN DESIGN MANUAL ROAD DESIGN CHAPTER 1.01 DEVELOPMENT METHODS 1.01.01 References 1.01.02 General 1.01.03 Survey and Mapping Methods 1.02 PLAN SHEETS MICHIGAN DESIGN MANUAL 1.02.01 Title Sheet A. Project Location B. Traffic Data C. Project

More information

Manhole or Catch Basin Type A & B Cone Sections Precast - Design F Manhole or Catch Basin Cover (Reducer Cone Section Precast) Design D

Manhole or Catch Basin Type A & B Cone Sections Precast - Design F Manhole or Catch Basin Cover (Reducer Cone Section Precast) Design D MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (14-02) MANUAL: Standard

More information

ARMOUR TOWNSHIP SITE PLAN APPLICATION REQUIREMENTS

ARMOUR TOWNSHIP SITE PLAN APPLICATION REQUIREMENTS SITE PLAN CONTROL ARMOUR TOWNSHIP SITE PLAN APPLICATION REQUIREMENTS Site Plan Control is a process involving municipal approval of the lay-out, design and appearance of certain new developments, as authorized

More information

Survey Control Point Observations

Survey Control Point Observations Level Name SURVEY_CTRL SURVEY_CTRL_CHK_NODE SURVEY_CTRL_NODE SURVEY_CTRL_OBS SURVEY_CTRL_REF_SYM SURVEY_CTRL_SETUPS SURVEY_CTRL_SYM SURVEY_CTRL_TXT SURVEY_DTM_BREAKLINE SURVEY_DTM_BREAKLINE_NODE SURVEY_DTM_CHECK_NODE

More information

Zoning District: R-1, R-2, and R-4 Applicant: Exeter Rose Farm, LLC, 953 Islington Street #23D Portsmouth, NH 03801

Zoning District: R-1, R-2, and R-4 Applicant: Exeter Rose Farm, LLC, 953 Islington Street #23D Portsmouth, NH 03801 2220.00, Town Planner Town Planning Office, Town of Exeter 10 Front Street Exeter, NH 03833 Re: Exeter Rose Farm Subdivision Design Review Engineering Services Exeter, New Hampshire Site Information: Tax

More information

The Board of County Road Commissioners of the County of Kent met in the. The regular meeting was called to order by Commissioner Rambo, Chairman

The Board of County Road Commissioners of the County of Kent met in the. The regular meeting was called to order by Commissioner Rambo, Chairman 1500 Scribner Avenue, NW Grand Rapids, MI 49504 The Board of County Road Commissioners of the County of Kent met in the Road Commission Offices. The regular meeting was called to order by Commissioner

More information

CHICAGO LANDMARKS PERMIT APPLICATION AND PRE-PERMIT SUBMISSION REQUIREMENTS

CHICAGO LANDMARKS PERMIT APPLICATION AND PRE-PERMIT SUBMISSION REQUIREMENTS CHICAGO LANDMARKS PERMIT APPLICATION AND PRE-PERMIT SUBMISSION REQUIREMENTS The Commission on Chicago Landmarks reviews all permit applications for work to designated and proposed Chicago Landmarks and

More information

Roll Call: Jerry Funk- P; Dan Secrest -P; Brenda Davis-P; Ed Kent-P Kris Ringwalt- P; Jesse Fischer-P

Roll Call: Jerry Funk- P; Dan Secrest -P; Brenda Davis-P; Ed Kent-P Kris Ringwalt- P; Jesse Fischer-P MINUTES March 18, 2009 The regular meeting of the Warsaw Village Council was held on Wednesday March 18, 2009. The meeting was called to order by Mayor Ron Davis who led the Pledge of Allegiance and Ed

More information

City of Hamilton INFORMATION FOR CONDITIONAL USE PERMIT

City of Hamilton INFORMATION FOR CONDITIONAL USE PERMIT City of Hamilton INFORMATION FOR CONDITIONAL USE PERMIT There is a $200.00 non-refundable fee for each request. Requests must be completed and submitted to the Public Works Department, City of Hamilton,

More information

CHARLES COUNTY GOVERNMENT ITB NO ST. MARK S PUMP STATION UPGRADE

CHARLES COUNTY GOVERNMENT ITB NO ST. MARK S PUMP STATION UPGRADE CHARLES COUNTY GOVERNMENT Department of Fiscal and Administrative Services Purchasing Division Telephone: 301-645-0656 August 30, 2016 ITB NO. 17-07 ST. MARK S PUMP STATION UPGRADE ADDENDUM NUMBER THREE

More information

Documents: Response letter and attachments, Prepared by: AMEC Massachusetts, Inc., Dated February 17, 2016.

Documents: Response letter and attachments, Prepared by: AMEC Massachusetts, Inc., Dated February 17, 2016. GCG ASSOCIATES, INC. CIVIL ENGINEERING AND LAND SURVEYING 84 Main Street Wilmington, Massachusetts 01887 Phone: (978) 657-9714 Fax: (978) 657-7915 February 23, 2016 Mr. Nathaniel Strosberg, Town Planner

More information

7000 Fifteen Mile Road Sterling Heights, Michigan

7000 Fifteen Mile Road Sterling Heights, Michigan 7000 Fifteen Mile Road Sterling Heights, Michigan Industrial Building With Excess Land and Rail Access As exclusive agents, we are pleased to offer the following property for lease: 128,648 Sq. Ft. Completely

More information

Standard Plate 7036 is discontinued. It is replaced by Standard Plan Pedestrian Curb Ramp Details.

Standard Plate 7036 is discontinued. It is replaced by Standard Plan Pedestrian Curb Ramp Details. DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management & Technical Support, Design Support Section TRANSMITTAL LETTER NO. (12-02) MANUAL: Standard Plates DATED: May 11, 2012 SUBJECT: Standard

More information

DELINEATOR REFERENCE POINT 200' TYPICAL SPACING (YELLOW DELINEATORS) END OF MERGE LANE TAPER DELINEATOR REFERENCE POINT

DELINEATOR REFERENCE POINT 200' TYPICAL SPACING (YELLOW DELINEATORS) END OF MERGE LANE TAPER DELINEATOR REFERENCE POINT 200' TYP. 600' < EACH SIDE BOTH ROADWAYS END OF MERGE LANE TAPER TYPICAL FOR ALL 2-LANE MERGES EXCEPT WHERE THERE IS A MERGE FROM THE RIGHT AND NO OFFSET IN THE THROUGH LANES END OF MERGE LANE TAPER 200'

More information

SUBJECT: Standard Plate Turf Establishment Areas (at Pipe Culvert Ends)

SUBJECT: Standard Plate Turf Establishment Areas (at Pipe Culvert Ends) MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (14-01) MANUAL: Standard

More information

STANDARD CATCH BASIN GUTTER LINE CB INLET FRAME & GRATE, GROUTED TO GRADE RINGS AS REQ'D CONCRETE CURB FINISHED GRADE ASPHALT MAX 50 MIN

STANDARD CATCH BASIN GUTTER LINE CB INLET FRAME & GRATE, GROUTED TO GRADE RINGS AS REQ'D CONCRETE CURB FINISHED GRADE ASPHALT MAX 50 MIN CB INLET FRAME & GRATE, GROUTED TO GRADE RINGS AS REQ'D ASPHALT 20 GUTTER LINE CONCRETE CURB FINISHED GRADE PRECAST GRADE RINGS, 2 50 100 MAX PRECAST CB LID GROUT ALL AROUND CB LEAD, INSIDE & OUTSIDE OF

More information

TREE 2 PROTECTION DISTANCE M TREE PROTECTION DISTANCE- SHALLOW WINDOW WELL (UNDER 4', FROM GRADE) OPEN TO ABOVE OPEN TO ABOVE MECHANICAL ROOM

TREE 2 PROTECTION DISTANCE M TREE PROTECTION DISTANCE- SHALLOW WINDOW WELL (UNDER 4', FROM GRADE) OPEN TO ABOVE OPEN TO ABOVE MECHANICAL ROOM 164.96 1435 PROPERTY LINE 5200 TREE 3 PROTECTION DISTANCE- 5.2 M TREE 2 PROTECTION DISTANCE- 3.25 M 3250 LINE OF 4275 478 250 1000 164.97 3650 2750 1065 1685 250 2615 135 SHALLOW (UNDER 4', FROM GRADE)

More information

KELLY WEST HOMEOWNERS ASSOCIATION c/o CAS, Inc N. Salem Street Apex, NC Phone: (919) <> Fax: (919)

KELLY WEST HOMEOWNERS ASSOCIATION c/o CAS, Inc N. Salem Street Apex, NC Phone: (919) <> Fax: (919) KELLY WEST HOMEOWNERS ASSOCIATION c/o CAS, Inc. 1930 N. Salem Street Apex, NC 27523 Phone: (919) 377-7711 Fax: (919) 367-7715 KELLY WEST ARCHITECTURAL STANDARDS & CONTROL SPECIFICATIONS CLOTHESLINES

More information

24" Dia. 36" Dia. WE BUILD CONFIDENCE

24 Dia. 36 Dia. WE BUILD CONFIDENCE WE BUILD CONFIDENCE WE BUILD CONFIDENCE PRECAST STRUCTURES SERVE AS KEY COMPONENTS OF OUR UTILITY AND TRANSPORTATION INFRASTRUCTURE. AND MAKING THE INDUSTRY S BEST PRECAST PRODUCTS TAKES DEDICATION, ATTENTION

More information

Plan Submittal Checklist for Permit Projects Compliance Required Information. (Answer Yes or Not Applicable (NA)) Yes NA

Plan Submittal Checklist for Permit Projects Compliance Required Information. (Answer Yes or Not Applicable (NA)) Yes NA Note: This Checklist has been created to assist in and maintain a uniform review of Construction Design Documents for projects done under permit with the County. This document has been created by the Permit

More information

Tooker Family Residence

Tooker Family Residence 110 25 90 E B M U D (N) POP-UP DRAIN + DRAIN ROCK BASIN DISCHARGE OF SURFACE DRAINS AND DOWNSPOUTS - SHEET FLOW ACROSS LANDSCAPE NOTE: SEE SHEET S2.0.1 FOR FOUNDATION + RAIN WATER DRAINAGE DESIGN 143.57'

More information

RECORD OF PROCEEDINGS MINUTES OF JACKSON TOWNSHIP BOARD OF TRUSTEES MEETING NOVEMBER 27, 2018

RECORD OF PROCEEDINGS MINUTES OF JACKSON TOWNSHIP BOARD OF TRUSTEES MEETING NOVEMBER 27, 2018 RECORD OF PROCEEDINGS MINUTES OF JACKSON TOWNSHIP BOARD OF TRUSTEES MEETING NOVEMBER 27, 2018 Hawke called the meeting to order at 4:05 p.m. at the Jackson Township Hall with all Trustees, Fiscal Officer,

More information

Legal Description & Site Plan Requirements and Layouts

Legal Description & Site Plan Requirements and Layouts Legal Description & Site Plan Requirements and Layouts Plot Plan * A plot plan shows the location of a house from an aerial view. * The site plan, also known as a plot or lot plan includes: 1. Site plan

More information

CITY OF SAN MARCOS ENGINEERING DIVISION

CITY OF SAN MARCOS ENGINEERING DIVISION AN APPLICANT S GUIDE TO PROCEDURES FOR: CITY OF SAN MARCOS ENGINEERING DIVISION ENGINEER S COST ESTIMATE USING UNIT PRICES FOR BOND PURPOSES-REVISED NOVEMBER 9, 2006 (Calculations are already set-up in

More information

ARTICLE 5 PLOT PLANS & SITE PLAN REVIEW

ARTICLE 5 PLOT PLANS & SITE PLAN REVIEW ARTICLE ARTICLE PLOT PLANS & SITE PLAN REVIEW Section.0 Purpose The purpose of this article is to specify the documents and/or drawings required for plot plans and site plan review so as to ensure that

More information

MAY J. Collins Engineering Associates, LLC San Jose Blvd. Jacksonville, Florida 32223

MAY J. Collins Engineering Associates, LLC San Jose Blvd. Jacksonville, Florida 32223 PROJECT LOCATION: 95 NOCATEE PARKWAY PONTE VEDRA, FL. 38 J. Collins Engineering Associates, LLC 56-3 San Jose Blvd. Jacksonville, Florida 32223 NOT TO SCALE 904-262-42 sm sm ON DRAWING WHERE SECTION OR

More information

SUBJECT: Standard Plate 9102 Turf Establishment Areas At Pipe Culvert Ends

SUBJECT: Standard Plate 9102 Turf Establishment Areas At Pipe Culvert Ends MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (17-03) MANUAL: Standard

More information

Chairman called regular meeting to order; Mr. Lawson led all in attendance in Prayer and pledge of allegiance.

Chairman called regular meeting to order; Mr. Lawson led all in attendance in Prayer and pledge of allegiance. The Brooks County Board of Commissioners met for its Monthly Workshop and Regular Monthly Meeting on Monday, March 5, 2012 at 5:00 p.m. in the Commissioners Meeting Room located at the Brooks County Office

More information

PUBLIC WORKS DEPARTMENT. File: E-2000 July 11, Town of Whitby Design Criteria and Engineering Standard Drawing Revisions

PUBLIC WORKS DEPARTMENT. File: E-2000 July 11, Town of Whitby Design Criteria and Engineering Standard Drawing Revisions PUBLIC WORKS DEPARTMENT File: E-2000 July 11, 2011 To: All Manual Holders and Engineering Standard Drawing Revisions Please find attached a list of the revisions to the and the Engineering Standard Drawings.

More information

MACHINTO SINGLE VANITY SINK ASSEMBLY INSTRUCTIONS. 1. Storage. 1. Keep marble top in its crate until installation.

MACHINTO SINGLE VANITY SINK ASSEMBLY INSTRUCTIONS. 1. Storage. 1. Keep marble top in its crate until installation. 1. Storage 1. Keep marble top in its crate until installation. 2. Store crate vertically in a place safe from being hit or knocked over. 3. Do not stack anything on top of the crate. 2. Opening crate 1.

More information

BUTLER COUNTY BOARD OF COMMISSIONERS Tuesday, May 29, 2018

BUTLER COUNTY BOARD OF COMMISSIONERS Tuesday, May 29, 2018 BUTLER COUNTY BOARD OF COMMISSIONERS Tuesday, May 29, 2018 CALL TO ORDER Commission Chairman Dan Woydziak called the Butler County Board of Commissioners to order at 9:00 a.m. Present were Commissioner

More information

VARIANCE APPLICATION (NO SITE PLAN OR SUBDIVISION)

VARIANCE APPLICATION (NO SITE PLAN OR SUBDIVISION) VARIANCE APPLICATION (NO SITE PLAN OR SUBDIVISION) 190-66. General procedure for completeness review. A. In order to be determined complete for review by the Board, all of the required information must

More information

Item 2. September 28, 2017

Item 2. September 28, 2017 September 28, 2017 Item 2 Applicant: Georgetown Development Location: 190 N 1100 W Prepared by: Sean Conroy, Community Development Director Public Hearing: No Zone: PRD-1 Attachments: 1. Findings. 2. Project

More information

MAJOR GRADING PLAN CHECKLIST

MAJOR GRADING PLAN CHECKLIST MAJOR GRADING PLAN CHECKLIST PUBLIC WORKS DEPARTMENT / ENGINEERING DIVISION 8130 Allison Avenue, La Mesa, CA 91942 Phone: (619) 667-1166 Fax: (619) 667-1380 Grading plans shall address both rough grading

More information

What Plans Do I Need for a Building Permit?

What Plans Do I Need for a Building Permit? What Plans Do I Need for a Building Permit? 6 CITY OF PORTLAND, OREGON - BUREAU OF DEVELOPMENT SERVICES 1900 SW 4th Avenue, Por tland, Oregon 97201 503-823-7300 www.portlandoregon.gov/bds This brochure

More information

MACHINTO FLOATING DOUBLE VANITY SINK ASSEMBLY INSTRUCTIONS. 1. Storage. 1. Keep marble top in its crate until installation.

MACHINTO FLOATING DOUBLE VANITY SINK ASSEMBLY INSTRUCTIONS. 1. Storage. 1. Keep marble top in its crate until installation. 1. Storage 1. Keep marble top in its crate until installation. 2. Store crate vertically in a place safe from being hit or knocked over. 3. Do not stack anything on top of the crate. 2. Opening crate 1.

More information

Application for Site Plan Review

Application for Site Plan Review Application for Site Plan Review 3275 Central Blvd., Hudsonville, Michigan 49426-1450, 616.669.0200 fax 616.669.2330 It is STRONGLY recommended that any application that must go before the Planning Commission

More information

Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project

Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project Bureau of Engineering SURVEY DIVISION REQUEST FOR TOPOGRAPHIC SURVEY Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project Caltrans involvement (must

More information

BY DAYTON SUPERIOR. Form Liner CONCRETE TEXTURE SYSTEM

BY DAYTON SUPERIOR. Form Liner CONCRETE TEXTURE SYSTEM BY DAYTON SUPERIOR Form Liner CONCRETE TEXTURE SYSTEM Form Liner Textured concrete saves time, labor and material by providing structural and architectural functions in a single medium. This advantage

More information

MINOR SUBDIVISION. [ ] [ ] [ ] [ ] B. Dimensions, bearings and curve data for all property lines and easements.

MINOR SUBDIVISION. [ ] [ ] [ ] [ ] B. Dimensions, bearings and curve data for all property lines and easements. MINOR SUBDIVISION 190-69. Minor subdivisions. In addition to the requirements indicated in 190-67 (SEE BELOW), the information below shall be shown on the plans for all minor subdivision applications.

More information

Operating Standards Attachment to Development Application

Operating Standards Attachment to Development Application Planning & Development Services 2255 W Berry Ave. Littleton, CO 80120 Phone: 303-795-3748 Mon-Fri: 8am-5pm www.littletongov.org Operating Standards Attachment to Development Application 1 SKETCH PLANS

More information

September 21, Mannik Smith Group 1771 North Dixie Highway Monroe, Michigan RE: LA Fitness City File No.: CVLP

September 21, Mannik Smith Group 1771 North Dixie Highway Monroe, Michigan RE: LA Fitness City File No.: CVLP CITY OF ANN ARBOR, MICHIGAN Public Services Area / Engineering 301 E. Huron Street, P.O. Box 8647 Ann Arbor, Michigan 48107 Phone (734) 794-6410 Fax (734) 994-1744 Web: www.a2gov.org Printed on recycled

More information

Nacoochee Hills Property Owners Association, Inc. PO Box 356 Sautee-Nacoochee, GA 30571

Nacoochee Hills Property Owners Association, Inc. PO Box 356 Sautee-Nacoochee, GA 30571 Nacoochee Hills Property Owners Association, Inc. PO Box 356 Sautee-Nacoochee, GA 30571 Architectural and Landscape Control Committee Procedures 2017 Version 1 of 11 To Nacoochee Hills Building Site Owners:

More information

Current Standard Plates including Transmittal Letters are available on the web at:

Current Standard Plates including Transmittal Letters are available on the web at: MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (17-04) MANUAL: Standard

More information

Permits (Submitted to Permit Counter) APPLICATION CHECKLIST

Permits (Submitted to Permit Counter) APPLICATION CHECKLIST Permits (Submitted to Permit Counter) APPLICATION CHECKLIST SUBMITTAL REQUIREMENTS: 1. Completed signed and notarized Development Services Department Permit Application, submit to Permit Counter. 2. Copy

More information

BESSEY Training BESSEY Tools North America Alvin Products: Lab Metal, Lab Solvent

BESSEY Training BESSEY Tools North America Alvin Products: Lab Metal, Lab Solvent BESSEY Training BESSEY Tools North America Alvin Products: Lab Metal, Lab Solvent Page 1-1 Lab Metal A ready to use, aluminum filled metal repair, filler and patching compound. Easy to use Ready to use

More information

Maintenance of Traffic sequence of operations including any phasing and detour maps;

Maintenance of Traffic sequence of operations including any phasing and detour maps; All Local-let projects are required to have a Stage 2 submittal to the LPA Manager for review. The only exceptions are 2-lane resurfacing, striping, guardrail, and raised pavement markers, unless otherwise

More information

UTILITY SERVICE/REPAIR PERMIT

UTILITY SERVICE/REPAIR PERMIT Form M-21 Revised: September TRANSPORTATION COMMISSION OF WYOMING and its UTILITY SERVICE/REPAIR PERMIT 1. Parties. The parties to this License are, hereinafter referred to as Permittee, whose address

More information

Porter County Plan Commission

Porter County Plan Commission Plan Type: Development Plan Administrative DRC PC Primary Plan Administrative DRC PC Secondary Plat/Replat Administrative DRC PC PUD Conceptual Detailed Final Project Information Project Name: Developer

More information

Applying for a Site Development Review (Sign CVCBD only)

Applying for a Site Development Review (Sign CVCBD only) Guide Applying for a Site Development Review (Sign CVCBD only) What is it? Site Development Review ensures that new buildings or land uses are compatible with their sites and with the surrounding environment,

More information

DETAIL CROFT FARM OUTBUILDING RESTORATION TOWNSHIP OF CHERRY HILL, NEW JERSEY

DETAIL CROFT FARM OUTBUILDING RESTORATION TOWNSHIP OF CHERRY HILL, NEW JERSEY 2x DIMENSIONAL LUMBER SISTER/SCAB REINFORCEMENT MEMBER 060523 3/8" A304 BOLT @ 8" O.C., STAGGERED EXISTING FRAMING MEMBER SECTION PROVIDE MIN EDGE DISTANCES AS SHOWN, TYP. ELEVATION REFER TO IFICATION

More information

11/06/2014 Pay Items - 1

11/06/2014 Pay Items - 1 Pay Item Description Pay Unit 90701 Mobilization.... LS 91101 Excavation.... L.F. 91102 Excavation.... mi 91103 Excavation.... LS 91104 Borrow..... C.Y. 91105 Borrow..... LS 91106 Existing Trail Restoration...

More information

Marcus Moziah Garvey Elementary School

Marcus Moziah Garvey Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Housing Authority of Utah County

Housing Authority of Utah County Legend Springville Site Vicinity Map (not to scale) Planning Department 110 South Main Street Phone (801) 491-7861 Fax (801) 489-2716 Community Development Director - J Fred Aegerter Public Works Department

More information

OVER-HEIGHT FENCE/RETAINING WALL CERTIFICATION APPLICATION

OVER-HEIGHT FENCE/RETAINING WALL CERTIFICATION APPLICATION OVER-HEIGHT FENCE/RETAINING WALL CERTIFICATION APPLICATION Application information below to be completed by Applicant/Agent//Owner APN PROPERTY ADDRESS PROPERTY LOCATION (if no address) APPLICANT S NAME

More information

CITY OF WAPATO NORTH WAPATO LIFT STATION REPLACEMENT CITY OFFICIALS. JUAN OROZCO Mayor. ROBERTO REYNA Mayor Pro Tem

CITY OF WAPATO NORTH WAPATO LIFT STATION REPLACEMENT CITY OFFICIALS. JUAN OROZCO Mayor. ROBERTO REYNA Mayor Pro Tem YAKIMA COUNTY WASHINGTON CITY OFFICIALS JUAN OROZCO Mayor ROBERTO REYNA Mayor Pro Tem TONY GUZMAN RALPH SANCHEZ TONY GAYTAN DORA ALVAREZ-ROA FRANK JAIME City Council KEITH WORKMAN ROBIN CORDOVA Clerk-Treasurer

More information

6 YEAR TRANSPORTATION IMPROVEMENT PROGRAM

6 YEAR TRANSPORTATION IMPROVEMENT PROGRAM YAKIMA COUNTY PUBLIC SERVICES DEPARTMENT 6 YEAR TRANSPORTATION IMPROVEMENT PROGRAM 2018 2023 COUNTY COMMISSIONERS J. Rand Elliott Ron Anderson Michael D. Leita DIRECTOR Vern M. Redifer, P.E. COUNTY ENGINEER

More information

OCTOBER 5,2015 REGULAR MEETING MINUTES- RESOLUTION

OCTOBER 5,2015 REGULAR MEETING MINUTES- RESOLUTION The meeting was called to order at 6:00 p.m. with the following members present: Trustees-Mike Farrell and Roger Miller; Fiscal officer -Kristen sinatra, Road superintendent Chris Brockway, zoning Inspector-Marty

More information

CONTRACT 1 DISTRICT G WATER STORAGE TANK EASTHAM, MASSACHUSETTS DECEMBER 2014 LIST OF DRAWINGS EASTHAM TOWN ADMINISTRATOR

CONTRACT 1 DISTRICT G WATER STORAGE TANK EASTHAM, MASSACHUSETTS DECEMBER 2014 LIST OF DRAWINGS EASTHAM TOWN ADMINISTRATOR LIST OF DRAWINGS DISTRICT G TANK SITE LOCATION I G-1 GENERAL NOTES AND LEGEND SHEILA VANDERHOEF C-1 EXISTING CONDITIONS PLAN BOARD OF SELECTMEN C-2 PROPOSED WATER STORAGE TANK SITE PLAN CD - 2 CONSTRUCTION

More information

Mailing Address: Fax number: City: State: Zip: Property Owner: City: State: Zip: City: State: Zip:

Mailing Address: Fax number: City: State: Zip:   Property Owner: City: State: Zip:   City: State: Zip: / Department of Community Development ARCHITECTURAL REVIEW APPLICATION 73-510 Fred Waring Drive Palm Desert California 92260 (760) 346-0611 Fax (760) 776-6417 Applicant: Telephone: Mailing Address: Fax

More information

City of Regina Standard Construction Specification SECTION 2999 LISTING OF ROADWAY STANDARD DRAWINGS

City of Regina Standard Construction Specification SECTION 2999 LISTING OF ROADWAY STANDARD DRAWINGS City of Regina Standard Construction Specification SECTION 2999 LISTING OF ROADWAY STANDARD DRAWINGS R-1 Alternate Pavement Structures July/10 R-2 Typical Cross Sections for Asphaltic Concrete Pavements

More information

ST JAMES EXTRA WIDE VANITY SINK ASSEMBLY INSTRUCTIONS. 1. Storage. 1. Keep marble top in it s crate until installation.

ST JAMES EXTRA WIDE VANITY SINK ASSEMBLY INSTRUCTIONS. 1. Storage. 1. Keep marble top in it s crate until installation. 1. Storage 1. Keep marble top in it s crate until installation. 2. Store crate vertically in a place safe from being hit or knocked over 3. Do not stack anything on top of the crate. 2. Opening crate 1.

More information

RECORD OF PROCEEDINGS Minutes of Union Township Trustees Addendum

RECORD OF PROCEEDINGS Minutes of Union Township Trustees Addendum I RECORD OF PROCEEDINGS Minutes of Union Township Trustees Addendum AVT"" E"AL RI ANK INC. FORM NO.1 0148 Held~ J_u_l---"y~1_4---",----- ~20 0 9 The Union Township Trustees met in Regular session on Tuesday,

More information

GCG ASSOCIATES, INC. February 8, Mr. Nathaniel Strosberg, Town Planner 101 Main Street Town of Ashland Ashland, MA 01721

GCG ASSOCIATES, INC. February 8, Mr. Nathaniel Strosberg, Town Planner 101 Main Street Town of Ashland Ashland, MA 01721 GCG ASSOCIATES, INC. CIVIL ENGINEERING AND LAND SURVEYING 84 Main Street Wilmington, Massachusetts 01887 Phone: (978) 657-9714 Fax: (978) 657-7915 February 8, 2016 Mr. Nathaniel Strosberg, Town Planner

More information

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN N/A Waiver (1) Four (4) copies of application form. (2) Fifteen (15) copies of plan (3) Subdivision/site plan application fee & professional review escrow deposit (4) Variance application fee & professional

More information