GREEN STORMWATER INFRASTRUCTURE DRAWING REQUIREMENTS PACKET

Size: px
Start display at page:

Download "GREEN STORMWATER INFRASTRUCTURE DRAWING REQUIREMENTS PACKET"

Transcription

1 REEN STORMWATER NFRASTRUCTURE DRAWN REQUREMENTS PACKET Last Updated: September 8, 2015

2 S Drawing Requirements Document Format This document contains drawing requirements and guidelines derived from both existing PWD policies and past experience. They are presented in the following categories:. ntroduction eneral Requirements Symbology & Labeling Dimensions & Elevations... 7 V. Standard Notes... 8 V. Landscape Plans... 8 Attachments The following attachments are included at the end of this document. Attachment A: Proposed Callouts Attachment B: Proposed Symbols Attachment C: Line Types and Hatching Attachment D: Lettering Revision History This document is continuously evolving, so users should consistently make sure they are using the latest version by checking with the assigned PWD project manager. Revisions to this document are recorded here: Effective Date 9/8/2015 Description of Revision Added Revisions Table Added Relationships with Other Resources and References to the ntroduction Updated organization and formatting of packet Removed information that was redundant with Attachments Updated OOW S CAD Standards to include new standard blocks, revised line type styles, and inclusion of rendering layers mproved System & SMP numbering section Added maintenance component D s 2

3 S Drawing Requirements. ntroduction This packet provides requirements to be used in the drawing of all reen Stormwater nfrastructure (S) projects funded and/or maintained by the Philadelphia Water Department (PWD). The following information is to be used throughout the design process by PWD staff, providers of professional engineering services hired by PWD, and other agencies/partner organizations that are working with PWD. All PWD S drawings must, at a minimum, meet the standards outlined within this packet. This packet contains requirements, which must be followed, and guidelines, which are generally followed but contain exceptions. Requirements are indicated by the words must and will, while guidelines use words such as can and should. uidelines will still generally be followed and can be enforced strictly by PWD. There may be additional limitations beyond those mentioned below. Some constraints may be modified in certain circumstances, at the direction of the PWD project manager. A. Relationships with Other Resources and References The publication of the PWD S Drawing Requirements Packet follows a number of related resources. These related resources should be used by the designer for reference and additional contextual information. Always refer to the most current resources. 1. Philadelphia Water Department reen Stormwater nfrastructure CAD Standards. The Office of Watersheds (OOW) has developed a S CAD Standard that includes all necessary files for drawing to PWD S standards. The OOW S CAD standard includes templates (.DWT), pen tables (.CTB), support files (.SHX and block libraries), and a supporting manual. While this packet outlines the necessary line types, symbols, and callouts specific to S to allow consultants to develop their own CAD standard, it is highly suggested that the OOW S CAD Standards are used. Consultants under contract with OOW are required to use these standards zip Note on Other Packets : The PWD S Drawing Requirements Packet is one of three main Packets that describe the requirements for S projects funded and/or maintained by PWD: the S Design Process Workflow Packet, the S Design Requirements & uidelines Packet, and the S Drawing Requirements Packet. 2. Philadelphia Water Department reen Stormwater nfrastructure Design Process Workflow Packet. This document provides summary workflows, detailed workflows, and expanded process descriptions that describe the process for S projects funded and/or maintained by PWD. Packet_ pdf 3

4 S Drawing Requirements 3. Philadelphia Water Department reen Stormwater nfrastructure Design Requirements & uidelines Packet. This packet provides requirements and guidelines to be used in the design of S projects funded and/or maintained by PWD. Packet_ pdf 4. Philadelphia Water Department reen Stormwater nfrastructure Standard Details. This catalogue includes standard and example details required for use on PWD S projects. Standard PWD S details must be used to the maximum extent feasible. n addition to the standard PWD Details, Streets Department details for curb and driveway restoration must be included where pavement or curb restoration will be required. Details in CAD format are also available Philadelphia Water Department Water & Sewer Design Manual. This manual promotes uniformity in the presentation of water and sewer plans by establishing a general format and outlining detailed information required for the preparation of complete water and sewer contract drawings. The PWD Water & Sewer Design Manual should be used as a companion to this packet along with any specific requirements provided for the given project. Note on the Drawing Requirements in the Water & Sewer Design Manual: The PWD S Drawing Requirements Packet is based on the standards defined in the PWD Water & Sewer Design Manual. Design professionals working on PWD S may find it useful to familiarize themselves with the Water& Sewer Design Manual sections on Contract Drawings and Drawing Standards. 4

5 S Drawing Requirements. eneral Requirements A. Drawing Size 1. All drawings must be on 30 x42 paper and conform to the PWD Water Sewer Design Manual requirements except where noted below. a. Sheet 30" x 42" b. Outer Border 29" x 41" (1/2" from top, bottom, right, and left) c. nside Border 27" x 39" (1" from top, bottom, right, and left) d. Title Block 5" x 9" in lower right corner B. Drawing Scales 1. Draft the location plans at an appropriate scale to fit the site content and maintain legibility. 2. Draft the detailed site plans at a 1" = 10' scale or as approved by the PWD project manager. S on water/sewer projects may be drafted at 1 =20, if determined legible. 3. Draft the sections at a 1/4 " = 1' 0" scale or as otherwise appropriate and as approved by the PWD project manager. 4. Draft the profiles at a 1 =5 vertical scale and a 1 =10 horizontal scale or as otherwise appropriate and as approved by the PWD project manager. C. Sheet Layout 1. The Consultant s name or company logo should be included to the left of the title block on each sheet. 2. List the completion date directly below the consultant s name or logo. At each submission ensure that this date is updated to aid in version tracking. 3. During design development, label plans in accordance with their submission milestone: a. Concept Submission b. Preliminary Design c. Substantially Complete Design d. Pre Final Design 4. Final plans are to be stamped by a registered Professional Engineer in the State of Pennsylvania. 5. Provide the following on each plan drawing above the title block as shown in the PWD Water Sewer Design Manual: a. Ward number b. Sewer Plat Number c. Highway District Number d. Streets Survey District Number e. One Call Serial Number f. Outfall Number (if applicable) 6. Work numbers are to conform to the requirements outlined in Section 1 Project nitiation of the PWD Water & Sewer Design Manual. For green stormwater projects, work numbers should be given the prefix of (S) and the suffix of (), for example: S n plan view, orient the primary street horizontally across the sheet, with the north arrow oriented up in reference to the horizontal line. 8. Show connecting plan sheets with appropriate use of match lines. 9. Proposed legend must be included on all sheets. 10. Plan view, sections, and profiles should generally be included for all systems, (exception below). a. Exception: For S on water/sewer projects that include stormwater tree trenches, profiles of the tree trenches should be included as needed and a typical detail can be 5

6 S Drawing Requirements used instead. However, where systems have multiple utility crossings, non standard piping configurations, or if requested by the PWD project manager, a section or full profile must be provided. b. For S on water/sewer projects, the proposed S must be drafted in grey scale on proposed water and sewer sheets, similar to how proposed water is drawn on a proposed sewer plan. On green sheets, the proposed water and sewer must be drafted in grey scale.. Symbology & Labeling A. eneral 1. Standard PWD S symbols and labeling must be used to the maximum extent feasible. See Section B and C below and Attachments A and B. 2. f features are owned and/or maintained by entities other than PWD, ownership must be added to all relevant callouts or otherwise distinguished through a note on the design plans. B. System & SMP Numbering PWD uses a unique numbering methodology to identify S assets. The numbering begins on the design plans and in the design metrics report and then is carried over to PWD s S asset tracking system and green metrics tracking database. See Attachment A for templates of system and SMP numbering callouts. 1. Numbers are assigned sequentially based on the Project D and the systems and SMP s within a project. 2. PWD project manager will communicate Project D to the provider at the start of the project. The Project D is used in both the system and SMP numbers. System and SMP numbers will be developed by the consultant and added to the design plans after concept approval. 3. The numbering on the design plans must match the numbering submitted in the final design metrics report. 4. Labels should be bold and prominently displayed. 5. System labels are composed of the project D and the system number in the format: System [Project D] [System Number]. 6. SMP labels are composed of the SMP type, the project D, system number, and SMP number in the format: [SMP Type] [Project D] [System Number] [SMP Number]. 7. SMP types included in the SMP labeling must conform to those defined by the reporting requirements defined in S Design Requirements & uidelines Packet, Attachment. 8. The figure below illustrates how system and SMP numbers are assigned sequentially within a project and how a work number may be composed of many projects. 6

7 S Drawing Requirements Work Number Project D 20 Project D 302 Project D 55 System 20 1 System System System 55 1 Rain arden SMP Planter SMP Tree Trench SMP Planter SMP Bump out SMP Planter SMP Tree Trench SMP Tree Trench SMP Figure: Relationship between work numbers, projects, systems, and SMPs C. Maintenance Component D s PWD uses a unique numbering methodology to identify S components, such as inlets, pipes, cleanouts, observation wells, and other hard structures. Similar to the system and SMP numbering, the component D s are subsequently carried over to PWD s S asset tracking system. See Attachment A for templates of component D callouts. 1. Numbers are assigned by the PWD S Maintenance roup. S Maintenance will mark up the design plans with the appropriate component D s during substantially complete design review. 2. The provider should incorporate these mark ups into the final plan sets. 3. Component D s are typically included in a tabular format on the design sheets.. Dimensions & Elevations Comprehensive dimensioning of S plans is critical to achieving accurate construction and calculation of green storage metrics. Designers should ensure that sufficient dimensions are provided to determine compliance with design requirements. 1. All controlling and designed elevations must be dimensioned in plan or profile view, as appropriate. ncluding, but not limited to, the following: a. Top of stone b. Bottom of stone c. Top of soil d. nlet grate or BC and TC elevations e. nvert of grates (rim elevation) of domed risers and overflow control structure f. nverts of inlet pipe connections g. Pipe inverts (distribution, underdrain, and sewer laterals) h. Top of earthen berms (porous pavement and rain gardens) 7

8 S Drawing Requirements i. nverts of trench drains j. Top of planter walls k. rade elevations for new sidewalk and paving (direction and cross slope) 2. Lengths and widths of all proposed items must be dimensioned in plan view from a fixed reference point to allow for construction. V. Standard Notes The following standard notes must be included on all S plans: 1. All distances shown are in district standard measurement. Payment for all work will be based upon that standard. 2. The locations and elevations of the existing utilities are approximate. The elevations of the existing utilities must be field checked during construction. 3. All sidewalks and curbing to be replaced in kind along full limits of construction to next existing joint or as directed by PWD. 4. Sufficient Erosion and Sedimentation Control Measures must be installed and maintained by the Contractor as to prevent standing water or sedimentation of stormwater systems. Systems determined by PWD to be inadequately protected and thereby compromised must be replaced to the extent required by PWD (up to and including full replacement) at no additional cost to PWD. V. Landscape Plans 1. Trees and woody shrubs must be shown in simple plan view graphics showing the plant material at mature size. 2. Herbaceous plants may be shown either by use of individual graphics or by use of a solid closed polyline showing the extent of a single species massing. The plant symbol with quantity should be noted within the polyline if possible. Example PV (22) would note Panicumvirgatum, switchgrass in a massing of twenty two plants. Polylines next to each other should not overlap, but allow white space between each other for graphic clarity. The quantity for each species massing must correlate with its spacing noted in the Planting Schedule. f a mix is specified, a detail plan should be provided with the layout. 3. The bottom of basin and extent of ponding area must be shown. 4. The extent of stone storage areas under plantings must be shown. 5. The size of plants listed in the plant schedule must match the nursery trade. For example, trees are sold in a range of caliper such as "2 2 ½" rather than given as an exact measurement. 6. Existing plants that are located within the view frame should be shown at their current size. 8

9 S Drawing Requirements Attachment A: Proposed Callouts These are common proposed callouts for S construction plans. The callouts are followed by the general information used to populate them. The format of these callouts is important for informing PWD s S records and will be strictly enforced.

10 CALLOUT VARABLES The callout library was created to be applicable to numerous proposed and existing features in a green stormwater infrastructure project. This table has been created to assist the user in determining the appropriate information to complete these callouts for a specific project. Callout variables are typically enclosed within angle brackets, < and > and the contents describe the information that the user will insert. n cases where the user is expected to insert a numeric value, the letter X is used as a placeholder. Different levels of detail are displayed using callouts in the various views shown on a project plan sheet. enerally location plans show only existing feature callouts. Plan views show existing feature callouts along with proposed features callouts omitting detailed design information. Profiles and sections views include more design details for proposed features such as elevations. Variable Possible Values XX,XXX Drainage Area (SF) XX-X System dentifier XX-X-X Unique SMP dentifier +XX.XX Elevation -XX Plan Sheet <SURFACE TYPE> PERVOUS MPERVOUS BASN NFLTRATON COLUMN BLUE ROOF NFLTRATON/STORAE BUMP-OUT TRENCH CSTERN/RAN- PERVOUS PAVN BARREL PLANTER <SMP TYPE> DEPAVN RAN ARDEN DRANAE WELL STORMWATER TREE REEN UTTER SWALE REEN ROOF TREE TRENCH WETLAND <NLET STYLE> <SEWER STYLE> <UTLTY NAME> <PROTECTON> HWY RATE NLET CTY NLET OM NLET STANDARD REEN NLET OTHER (Custom nlets) VCP Brick RCP Water as Sewer Verizon Storm Sewer SEPTA PECo WTH WATER QUALTY NSERT WTHOUT WATER QUALTY NSERT WTH SUMP WTH SUMP AND WATER QUALTY NSERT TC RM <TOP> RATE <CONNECTON> <SMP TYPE> <NLET STYLE> +XX.XX <UNDERDRAN> X/X ORFCE SOLD CAP X N NV. ELEV.+XX.XX FROM <CONNECTON> X OUT NV. ELEV. +XX.XX TO <CONNECTON> <FEATURES> WER WALL ELEV. +XX.XX X N NV. ELEV. +XX.XX CORED NTO NLET WTH <UNDERDRAN> <PROTECTON> WTH WHEELSTOP <WHEELSTOP> WTHOUT WHEELSTOP

11 ATTRBUTE CALLOUTS NLETS AND MANHOLES EXSTN UTLTY CALLOUTS OBJECTS SHOWN ABOVE WERE NSERTED NTO MODEL SPACE AND SET TO A VEWPORT SCALE OF 1"=10'.

12 SURFACE TYPE CALLOUTS STE FEATURE CALLOUTS OBJECTS SHOWN ABOVE WERE NSERTED NTO MODEL SPACE AND SET TO A VEWPORT SCALE OF 1"=10'.

13 PLAN VEW - EXSTN UTLTY CALLOUTS PLAN VEW - EXSTN FEATURES CALLOUTS (TO BE REMOVED) OBJECTS SHOWN ABOVE WERE NSERTED NTO MODEL SPACE AND SET TO A VEWPORT SCALE OF 1"=10'.

14 PLAN VEW - SMP CALLOUTS <SMP TYPE> XXX-X-X OBSERVATON WELL (TYP.) LMTS OF 40 ML. EOMEMBRANE LNER (TYP.) EARTHEN SPLLWAY X' WDE, +XX.XX CREST ELEV. PLAN VEW - SMP NLET CALLOUTS X' <NLET STYLE> NLET X"xX' TRENCH RATE (SEE DETAL ON -XX) X" DOMED RSER (SEE DETAL ON -XX) CONTROL STRUCTURE <NLET STYLE> (SEE DETAL ON -XX) SUBSURFACE CONTROL STRUCTURE (SEE DETAL ON -XX) JUNCTON CHAMBER (SEE DETAL ON -XX) RECONNECT TO EXSTN VCP NLET PPE WTH CONC. COLLAR RECONNECT TO EXSTN SEWER WTH CONC. SADDLE OBJECTS SHOWN ABOVE WERE NSERTED NTO MODEL SPACE AND SET TO A VEWPORT SCALE OF 1"=10'.

15 PLAN VEW - SMP PPE CALLOUTS CLEANOUT (TYP.) ANT-SEEP COLLAR (TYP.) 22.5 BEND (TYP.) X" SOLD HDPE X% SLOPE X" SOLD HDPE DSTRBUTON X.X% SLOPE X" PERFORATED HDPE X% SLOPE X" PERFORATED HDPE DSTRBUTON X.X% SLOPE X" SOLD DUCTLE RON DSTRBUTON PPE FOR STREET CROSSN X HDPE WYE FTTN WTHN 18 MAX. OF <NLET STYLE> NLET PLAN VEW - SMP MSC. CALLOUTS CONCRETE APRON (SEE DETAL ON -XX) SPLASH PAD (SEE DETAL ON -XX) X" WDE CONCRETE CHANNEL (SEE DETAL ON -XX) PLAN VEW - STE RESTORATON CALLOUTS REPLACE CURB RAMP (SEE SPECFCATONS) REPLACE DRVEWAY (SEE SPECFCATONS) RESTORE RASS STRP WTH STRAHT EDE PLAN VEW - COMPONENT LABELN # OBJECTS SHOWN ABOVE WERE NSERTED NTO MODEL SPACE AND SET TO A VEWPORT SCALE OF 1"=10'.

16 *SEE APPENDX C FOR NSTRUCTONS FOR CHANN THE LEADER HEAD. OBJECTS SHOWN ABOVE WERE NSERTED NTO MODEL SPACE AND SET TO A VEWPORT SCALE OF 1"=10'.

17 OBJECTS SHOWN ABOVE WERE NSERTED NTO MODEL SPACE AND SET TO A VEWPORT SCALE OF 1"=10'.

18 OBJECTS SHOWN ABOVE WERE NSERTED NTO MODEL SPACE AND SET TO A VEWPORT SCALE OF 1"=10'.

19 SECTON - EXSTN UTLTY CALLOUTS SECTON - SMP NLET CALLOUTS X' <NLET STYLE> NLET <PROTECTON> <TOP> ELEV. +XX.XX X" OUT NV. ELEV. +XX.XX TO <CONNECTON> X' <NLET STYLE> NLET <PROTECTON> <TOP> ELEV. +XX.XX X" N NV. ELEV. +XX.XX FROM <CONNECTON> X" OUT NV. ELEV. +XX.XX TO <CONNECTON> (SUPPORT AND PROTECT-SEE SPECFCATONS) SECTON - EXSTN FEATURES CALLOUTS X' <NLET STYLE> NLET <TOP> ELEV. +XX.XX X" N NV. ELEV. +XX.XX CORED NTO NLET <UNDERDRAN> FROM <CONNECTON> X" OUT NV. ELEV. +XX.XX TO SEWER X" N NV. ELEV. +XX.XX CORED NTO WTH <UNDERDRAN> FROM <CONNECTON> (TO BE REMOVED) XX" DOMED RSER (SEE DETAL ON -XX) <TOP> ELEV. +XX.XX <PROTECTON> TO <CONNECTON> (PROTECT - SEE SPECFCATONS) SUBSURFACE CONTROL STRUCTURE (SEE DETAL ON -XX) <FEATURES> CONTROL STRUCTURE <NLET STYLE> (SEE DETAL ON -XX) <TOP> ELEV. +XX.XX <FEATURES> * SECTON - SMP CALLOUTS <SMP TYPE> XXX-X-X (SEE DETAL ON -XX) <SMP TYPE> XXX-X-X TOP OF STONE +XX.XX TOP OF STONE N CARTWAY +XX.XX BOTTOM OF STONE +XX.XX 6" THCK SAND LAYER JUNCTON CHAMBER (SEE DETAL ON -XX) <TOP> ELEV. +XX.XX <FEATURES> SECTON - SMP PPE CALLOUTS ANT-SEEP COLLAR (TYP.) CLEANOUT (TYP.) 22.5 BEND (TYP.) OBSERVATON WELL (TYP.) X" SOLD HDPE DSTRBUTON X.X% SLOPE TREE PT (SEE TYPCAL DETAL ON -XX) SECTON - STE RESTORE CALLOUTS REPLACE CURB RAMP (SEE SPECFCATONS) X" SOLD HDPE X% SLOPE X" PERFORATED HDPE DSTRBUTON X.X% SLOPE X" PERFORATED HDPE X% SLOPE X" SOLD DUCTLE RON DSTRBUTON PPE FOR STREET CROSSN REPLACE DRVEWAY (SEE SPECFCATONS) RESTORE RASS STRP WTH STRAHT EDE X HDPE WYE FTTN WTHN 18 MAX. OF <NLET STYLE> NLET DRANAE AREA CALLOUT <SURFACE TYPE> DRANAE AREA TO SYSTEM <XX-X> XX,XXX SF SECTON - SMP MSC. CALLOUTS X" WDE CONCRETE CHANNEL (SEE DETAL ON -XX) CONCRETE APRON (SEE DETAL ON -XX) *SEE APPENDX C FOR NSTRUCTONS FOR CHANN THE LEADER HEAD. OBJECTS SHOWN ABOVE WERE NSERTED NTO MODEL SPACE AND SET TO A VEWPORT SCALE OF 1"=10'.

20 S Drawing Requirements Attachment B: Proposed Symbols These are common proposed symbols for S construction plans. The specific symbols are important for informing PWD s S records along with plan clarity and will be strictly enforced.

21 PROPOSED LEEND (1 OF 2) 10 SCALE 10 SCALE W/ DUAL TRAP NLET PROPOSED LEEND PROPOSED LEEND PERFORATED PPE SOLD PPE 4 FT. REEN CTY NLET PERFORATED PPE SOLD PPE 4 FT. REEN CTY NLET CLEANOUT OBSERVATON WELL 4 FT. REEN HHWAY RATE NLET CLEANOUT OBSERVATON WELL 4 FT. REEN HHWAY RATE NLET ANT-SEEP COLLAR 4 4 FT. OPEN MOUTH RATE NLET ANT-SEEP COLLAR 4 4 FT. OPEN MOUTH RATE NLET STORMWATER TRENCH R DENOTES PROPOSED NLET TO BE RECONNECTED STORMWATER TRENCH 6 6 FT. DUAL TRAP NLET C/R NEW CURB RAMP # TREE PT C/R NEW CURB RAMP R DENOTES PROPOSED NLET TO BE RECONNECTED # TREE PT 20 SCALE 20 SCALE W/ DUAL TRAP NLET PROPOSED LEEND PROPOSED LEEND PERFORATED PPE SOLD PPE 4 FT. REEN CTY NLET PERFORATED PPE SOLD PPE 4 FT. REEN CTY NLET CLEANOUT OBSERVATON WELL 4 FT. REEN HHWAY RATE NLET CLEANOUT OBSERVATON WELL 4 FT. REEN HHWAY RATE NLET ANT-SEEP COLLAR 4 4 FT. OPEN MOUTH RATE NLET ANT-SEEP COLLAR 4 4 FT. OPEN MOUTH RATE NLET STORMWATER TRENCH R DENOTES PROPOSED NLET TO BE RECONNECTED STORMWATER TRENCH 6 6 FT. DUAL TRAP NLET C/R NEW CURB RAMP # TREE PT C/R NEW CURB RAMP R DENOTES PROPOSED NLET TO BE RECONNECTED # TREE PT LEENDS SHOWN ARE PRNTED AT FULL SCALE FROM PAPER SPACE.

22 PROPOSED LEEND PROPOSED LEEND (2 OF 2) 30 SCALE 30 SCALE W/ DUAL TRAP NLET PROPOSED LEEND PERFORATED PPE SOLD PPE 4 FT. REEN CTY NLET PERFORATED PPE SOLD PPE 4 FT. REEN CTY NLET CLEANOUT OBSERVATON WELL 4 FT. REEN HHWAY RATE NLET CLEANOUT OBSERVATON WELL 4 FT. REEN HHWAY RATE NLET ANT-SEEP COLLAR 4 4 FT. OPEN MOUTH RATE NLET ANT-SEEP COLLAR 4 4 FT. OPEN MOUTH RATE NLET C/R STORMWATER TRENCH NEW CURB RAMP R DENOTES PROPOSED NLET TO BE RECONNECTED # TREE PT C/R STORMWATER TRENCH NEW CURB RAMP 6 R 6 FT. DUAL TRAP NLET DENOTES PROPOSED NLET TO BE RECONNECTED # TREE PT PROPOSED LEEND 40 SCALE 40 SCALE W/ DUAL TRAP NLET PROPOSED LEEND PERFORATED PPE SOLD PPE 4 FT. REEN CTY NLET PERFORATED PPE SOLD PPE 4 FT. REEN CTY NLET CLEANOUT OBSERVATON WELL 4 FT. REEN HHWAY RATE NLET CLEANOUT OBSERVATON WELL 4 FT. REEN HHWAY RATE NLET ANT-SEEP COLLAR 4 4 FT. OPEN MOUTH RATE NLET ANT-SEEP COLLAR 4 4 FT. OPEN MOUTH RATE NLET C/R STORMWATER TRENCH NEW CURB RAMP R DENOTES PROPOSED NLET TO BE RECONNECTED # TREE PT C/R STORMWATER TRENCH NEW CURB RAMP 6 R 6 FT. DUAL TRAP NLET DENOTES PROPOSED NLET TO BE RECONNECTED # TREE PT LEENDS SHOWN ARE PRNTED AT FULL SCALE FROM PAPER SPACE.

23 PROPOSED LEEND - CUSTOM PROPOSED LEEND PERFORATED PPE SOLD PPE CLEANOUT OBSERVATON WELL ANT-SEEP COLLAR STORMWATER TRENCH 4 FT. CTY NLET 6 FT. CTY NLET 4 FT. HHWAY RATE NLET C/R NEW CURB RAMP 6 FT. HHWAY RATE NLET DOMED RSER 4 4 FT. OPEN MOUTH RATE NLET OVERFLOW STRUCTURE 6 FT. OPEN MOUTH RATE NLET # CONCRETE APRON TREE PT 6 R 6 FT. DUAL TRAP NLET DENOTES PROPOSED NLET TO BE RECONNECTED ROCK CONSTRUCTON ENTRANCE 4 DENOTES REEN NLET DENOTES 4' NLET SF 6 DENOTES 6' NLET SF SF SOL STOCKPLE NFLTRATON COLUMN ROCK FLTER OUTLET CURB CUT LEENDS SHOWN ARE PRNTED AT FULL SCALE FROM PAPER SPACE.

24 S Drawing Requirements Attachment C: Line Types and Hatching The following line types include and build upon the line types described in the PWD Water and Sewer Design Manual. The following hatching is to be used to properly demonstrate plan features.

25 BASE PLAN TEMPLATE LAYERS X X X X X X X X X X X X X X X

26 EXSTN LNETYPES AND HATCHN LOCATON / PLAN VEW TEM COLOR LNE/ HATCH TYPE SCALE HATCH ANLE HOUSE LNE 1 CONTNUOUS CURB LNE 4 CONTNUOUS PECo LNE 22 PECo LNE* AS LNE 51 AS LNE* VERZON LNE 30 VERZON LNE* SEPTA LNE 221 SEPTA LNE* SEWER LNE 70 SEWER LNE* WATER LNE 151 WATER LNE* SEPARATE SEWER LNE 70, 112 SEWER LNE* AND SANTARY SEWER LNE STEAM 2 STEAM* TREE LNE 7 TREELNE SHRUB LNE 7 SHRUBLNE PROPERTY BOUNDARY 2 PROPERTY BOUNDARY* BULDN LNE 6 BULDN LNE FENCE 7 FENCELNEX X X X X X X X X X EASEMENT 251 EASEMENT* RALROAD 181 RALROAD* RASS 253 RASS 3.5 VARES TOPO 7 TOPO* NOTE: SET DSPLAY ORDER FOR ALL HATCHN TO THE BACK *USER DEFNED LNETYPE. PLEASE REFER TO THE CADD STANDARDS MANUAL FOR LNETYPE LOADN NSTRUCTONS. OBJECTS SHOWN ARE SET TO A VEWPORT SCALE OF 1"=10'.

27 EX-DMS-ROW EX-NLET EX-PROF-NLET EX-PROF-UTL-COMM EX-PROF-UTL-ELEC EX-PROF-UTL-AS EX-PROF-UTL-NLET EX-PROF-UTL-SEPTA EX-PROF-UTL-SEWER EX-PROF-UTL-WATER EX-STREETSCAPE EX-TEXT EX-UTL-SEWER -ANT SEEP COLLAR -BULDN -BULDN-HATCH -CONC APRON -CONC APRON-HATCH -CURB -CURB-FUTURE -CURB RAMP -CURB RAMP-HATCH -CURB RAMP TEXT -DEMOLTON XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX -DMS -DMS-LOCATON -DRANAE AREA DA DA DA DA DA DA DA -DRANAE AREA-TEXT -DRWY-HATCH -EROSON CONTROL -EROSON CONTROL-TEXT -FENCE X X X X X X X X X X -RADE -HATCH -HDPE LNER -NLET -NLET-HATCH -NLET-LABELS -LA-BEDLNE -LA-DETAL -LA-RASS-L -LA-RASS-SM -LA-HATCH -LA-HERBACEOUS -LA-ORNAMENTAL -LA-SHRUB-L -LA-SHRUB-SM -LA-TEXT -LA-TREE-L -LA-TREE-SM -LEEND -LOD LOD LOD LOD LOD LOD LOD -LOD_SF LOD/SF LOD/SF LOD/SF LOD/SF -MATCHLNE -NOTES -PAVE RESTORE -PERVOUS PAVE -PPE -PPE-HATCH -PPE-PERFORATED -PLANTER BOX -PROFLE-RD -SAND-HATCH -SAWCUT -SCALE -SECTON -SLT FENCE SF SF SF SF SF -SPLASH PAD -SPOT ELEV -STREETSCAPE -SYSTEM -SYSTEM-HATCH -TEXT -TEXT-COMP LBL -TEXT-DRANAE AREA -TEXT-LOCATON PLAN -TEXT-MATCHLNE -TEXT-MSC -TEXT-PLAN -TOPO -TOPO-TEXT -TREE -TREE-TEXT -TRENCH DRAN -TRENCH DRAN-RATE -UTL-SEWER -UTL-WATER DESN TEMPLATE LAYERS R-DRANAE AREA R-RASS R-REEN ROOF R-NFLTRATON BASN R-PAVEMENT 1 R-PAVEMENT 2 R-PAVEMENT 3 R-PLANTER 1 R-PLANTER 2 R-PLANTER 3 R-PLANTER 4 R-PLAY SURFACE R-RAN ARDEN 1 R-RAN ARDEN 2 R-RAN ARDEN 3 R-RAN ARDEN 4 R-RAN ARDEN 5 R-RAN ARDEN 6 R-RAN ARDEN 7 R-SPRAYPARK 1 R-SPRAYPARK 2 R-SPRAYPARK 3 R-STREETS R-SWALE R-TEXT R-TEXT FLOW ARROW R-TEXT MAP TTLE R-TEXT NUMBERS R-TREE TRENCH 1 R-TREE TRENCH 2 R-TREES -WALL -WER

28 PROPOSED LNETYPES AND HATCHN LOCATON / PLAN VEW PROFLE VEW (1" = 10') SECTON VEW ( 1 4" = 1') TEM COLOR LNE/ HATCH TYPE SCALE HATCH ANLE LNE/ HATCH TYPE SCALE HATCH ANLE LNE/ HATCH TYPE SCALE HATCH ANLE TRENCH OUTLNE 4 W = 0.5 CONT. CONT. TRENCH HATCH 151 DOTS FOR 20 SCALE LOC. PLAN: 10 FOR 30 SCALE LOC. PLAN: 15 FOR 40 SCALE LOC. PLAN: 20 N/A N/A N/A N/A N/A N/A SOLD PPE 4 CONTNUOUS CONT. CONT. PERFORATED PPE 4 PERFORATED PPE* CONT. CONT. PERF. DST. PPE HATCH 7 N/A N/A N/A HEX HEX PERF. UNDERDRAN HATCH 7 N/A N/A N/A HEX HEX STONE HATCH 252 N/A N/A N/A RAVEL RAVEL SOL HATCH 252 N/A N/A N/A EARTH EARTH SAND HATCH 3 N/A N/A N/A AR-SAND AR-SAND CONCRETE HATCH 252 N/A N/A N/A AR-CONC AR-CONC RASS RASS RASS RASS VARES PROPOSED PAVEMENT 222 AR-CONC FOR 20 SCALE LOC. PLAN: 1 FOR 30 SCALE LOC. PLAN: 5 FOR 40 SCALE LOC. PLAN: 10 N/A N/A N/A N/A N/A N/A PERVOUS PAVERS/ ASPHALT 222 TRAN FOR 20 SCALE LOC. PLAN: 5 FOR 30 SCALE LOC. PLAN: 10 FOR 40 SCALE LOC. PLAN: 15 N/A N/A N/A N/A N/A N/A PROPOSED FENCE 11 FENCELNEX FENCELNE X FENCELNE X X X X X X DWY REPLACE OUTLNE 2 CONTNUOUS CONT. CONT. DRVEWAY REPLACE HATCH 254 LNE 0.5 VARES N/A N/A N/A N/A N/A N/A DRANAE AREA OUTLNE 241 DA DA* DA N/A N/A N/A N/A N/A N/A LMT OF DSTURBANCE 241 LOD LOD* LOD N/A N/A N/A N/A N/A N/A EOMEMBRANE LNER 252 PLAST 10 N/A N/A N/A N/A N/A N/A N/A WER* WER WER WER 4 SF* SLT FENCE 15 SF SF N/A N/A N/A N/A N/A N/A LOD/SLT FENCE 241 LOD SF* LOD/SF N/A N/A N/A N/A N/A N/A PAVEMENT RESTORATON 222 DASHED2 N/A N/A N/A N/A N/A N/A SAWCUT LNE 222 DVDE2 N/A N/A N/A N/A N/A N/A DEMOLTON LNE 1 DEMOLTON* XXXXXXXXXXXXXXX N/A N/A N/A N/A N/A N/A *USER DEFNED LNETYPE. PLEASE REFER TO THE CAD STANDARDS MANUAL FOR LNETYPE LOADN NSTRUCTONS. NOTE: SET DSPLAY ORDER FOR ALL HATCHN TO THE BACK OBJECTS SHOWN ARE SET TO A VEWPORT SCALE OF 1"=10'.

29 S Drawing Requirements Attachme ent D: Lettering The following details the proper lettering style for text on a drawing.

30 0% SLOPE 0.10" ANT-SEEP COLLARS (TYP) CLEANOUT (TYP) RESTORE RASS STRP WTH STRAHT EDE TREE PT (SEE TYPCAL DETAL ON SHEET -29) PROPOSED CALLOUTS, UPPER CASE, ARAL BOLD FONT A 8" PERFORATED HDPE DSTRBUTON 0.5% SLOPE C/R NLET 4' HWY RATE NLET 22'-8" ECT TO EXSTN VCP PE WTH CONC. COLLAR PROPOSED DMENSONS, ARAL BOLD FONT 136' A 10' 0.24" 71ST STREET

Ecological Restoration Drafting & Design Guidelines

Ecological Restoration Drafting & Design Guidelines Ecological Restoration Drafting & Design Guidelines Version 2.0 July 2017 Philadelphia Water Ecological Restoration Drafting & Design Guidelines Table of Contents 1.0 INTRODUCTION...2 2.0 GENERAL PLAN

More information

City of Massillon Site Plan Checklist

City of Massillon Site Plan Checklist City of Massillon Site Plan Checklist The following information MUST be included with all Site Plans submitted for review and processing in order to constitute a complete Site Plan Package. Incomplete

More information

CHAPTER 11. Plan Standards

CHAPTER 11. Plan Standards CHAPTER 11 Plan Standards A. Introduction The city requires uniform public improvement plans for ease of record keeping and understanding. The following standards govern most plan submittals to the city.

More information

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST YES* GENERAL SUBMISSION ITEMS Does the submission include: 1. Thirteen (13) copies of completed Application Form? 2. Thirteen (13) copies of the Preliminary

More information

MSD STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY

MSD STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY MSD M etr o p olitan S e w e r Di s t r ict STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY 40203-1911 STANDARD DRAWINGS DIVISION

More information

Appendix DRAWING STANDARDS

Appendix DRAWING STANDARDS Philadelphia Water Department DRAWIN STANDARDS Water & Sewer Design Manual Appendix II a Drawing Size and Borders (Water) b Drawing Size and Borders (Sewer) c Title Block (Water Drawing) d Title Block

More information

Survey Data and TOPO Checklist

Survey Data and TOPO Checklist Checklists Survey Data and TOPO Preliminary Plan Field Review Plans o Field Review Erosion Control Right-of-Way and Utility Meeting Plans Final Plan Field Review Plans Methods of Plan Markups Plan-in-Hand

More information

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN N/A Waiver (1) Four (4) copies of application form. (2) Fifteen (15) copies of plan (3) Subdivision/site plan application fee & professional review escrow deposit (4) Variance application fee & professional

More information

Sewer Line Extension Permit Design Checklist

Sewer Line Extension Permit Design Checklist CHECKLIST C1 Revised 4/7/2017 Sewer Line Extension Permit Design Checklist DISCLAIMER - This checklist is provided to Consulting Engineers for the express purpose of assisting them in compiling sewer line

More information

CONSTRUCTION CERTIFICATION PACKAGE

CONSTRUCTION CERTIFICATION PACKAGE Purpose: The intent of this Construction Certification Package is to ensure that acceptable documentation is maintained during the construction of stormwater management practices (SMPs). For general information

More information

MINIMUM DRAWING REQUIREMENTS FOR WATER AND SEWER LINE PROJECTS

MINIMUM DRAWING REQUIREMENTS FOR WATER AND SEWER LINE PROJECTS Public Works Department Water & Wastewater Services WATER & WASTEWATER ENGINEERING DIVISION 2555 West Copans Road Pompano Beach, Florida 33369 954-831-0745 FAX 954-831-0798/0925 MINIMUM DRAWING REQUIREMENTS

More information

SCHEDULE 10 ENGINEERING DRAWING SUBMISSION

SCHEDULE 10 ENGINEERING DRAWING SUBMISSION SCHEDULE 10 ENGINEERING DRAWING SUBMISSION Subdivision, Development and Servicing Bylaw No. 1535 10. ENGINEERING DRAWING SUBMISSIONS TABLE OF CONTENTS 1.0 General 3 1.1. Introduction 3 1.2. General Requirements

More information

LOWNDES COUNTY ENGINEERING PLAN REVIEW CHECKLIST. Design Professional: Phone: Developer: Phone: 2 nd Submittal (No Fee)

LOWNDES COUNTY ENGINEERING PLAN REVIEW CHECKLIST. Design Professional: Phone: Developer: Phone: 2 nd Submittal (No Fee) MEMORANDUM MICHAEL B. FLETCHER, P.E. COUNTY ENGINEER 327 N. Ashley Street Valdosta, GA 31601 Telephone: (229) 671-2424 Fax: (229) 245-5299 mfletcher@lowndescounty.com LOWNDES COUNTY ENGINEERING PLAN REVIEW

More information

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil ing Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST The following checklist consists of the minimum requirements for preparation

More information

Council Policy Engineering Drawing Submission Requirements

Council Policy Engineering Drawing Submission Requirements POLICY 265 City of Kelowna 1435 Water Street Kelowna, BC V1Y 1J4 250 469-8500 kelowna.ca Council Policy Engineering Drawing Submission Requirements APPROVED June 4, 2001 RESOLUTION: R375/10/04/26 REPLACING:

More information

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil ing Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST The following checklist consists of the minimum requirements for preparation

More information

Minimum Drawing & Electronic Submittal Requirements For Record Drawings /As-Builts

Minimum Drawing & Electronic Submittal Requirements For Record Drawings /As-Builts Minimum Drawing & Electronic Submittal Requirements For Record Drawings /As-Builts PUBLIC WORKS ENGINEERING DEPARTMENT Revised: February 1, 2017 MINIMUM DRAWING REQUIREMENTS A. GENERAL PLAN REQUIREMENTS:

More information

CITY OF MUSKEGO DRAFTING STANDARDS

CITY OF MUSKEGO DRAFTING STANDARDS CITY OF MUSKEGO DRAFTING STANDARDS GENERAL - These standards apply to all plans. 1. Plans must be prepared on sheets measuring 36 inch across and 22 inch to 24 inch high unless otherwise specified under

More information

DIVISION A GENERAL AND DRAFTING ENGINEERING STANDARDS

DIVISION A GENERAL AND DRAFTING ENGINEERING STANDARDS CITY OF ALBANY DEPARTMENT OF PUBLIC WORKS DIVISION A GENERAL AND DRAFTING ENGINEERING STANDARDS Prepared By PUBLIC WORKS DEPARTMENT ALBANY, OREGON 97321 Telephone: (541) 917-7676 TABLE OF CONTENTS A 1.00

More information

UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1

UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1 UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1 ENGINEERING STANDARDS FOR UTILITY AND STREET CONSTRUCTION PLANS MARCH 2014 CONSTRUCTION PLAN SHEET FORMAT REQUIREMENTS REPRODUCIBLE MYLAR 1.

More information

Anne Arundel County Dept. of Inspections and Permits Storm Drain Checklist

Anne Arundel County Dept. of Inspections and Permits Storm Drain Checklist Project Name Project Number Engineer Plans are to be designed based on the standards set forth in the Anne Arundel County Design Manual Standards and Specifications, and all other manuals as stipulated

More information

Guidelines and Checklist For SAWS Sanitary Sewer. Developmental Engineering Division

Guidelines and Checklist For SAWS Sanitary Sewer. Developmental Engineering Division Guidelines and Checklist For SAWS Sanitary Sewer Developmental Engineering Division INITIAL CONSIDERATIONS UTILITY SERVICE AGREEMENT Utility Service Agreement A Utility Service Agreement (USA) will be

More information

Washington County Road Engineering Plan Submittal/Review Checklist

Washington County Road Engineering Plan Submittal/Review Checklist Washington County Road Engineering Plan Submittal/Review Checklist Washington County Land Use Case File Number: Parcel(s): Developer/Owner Name(s): Developer/Owner E-mail(s): The following elements should

More information

Zoning District: R-1, R-2, and R-4 Applicant: Exeter Rose Farm, LLC, 953 Islington Street #23D Portsmouth, NH 03801

Zoning District: R-1, R-2, and R-4 Applicant: Exeter Rose Farm, LLC, 953 Islington Street #23D Portsmouth, NH 03801 2220.00, Town Planner Town Planning Office, Town of Exeter 10 Front Street Exeter, NH 03833 Re: Exeter Rose Farm Subdivision Design Review Engineering Services Exeter, New Hampshire Site Information: Tax

More information

PLANNING AND DEVELOPMENT

PLANNING AND DEVELOPMENT OVERVIEW Effective January 1, 1992 all applications for multi-family residential and all non-residential building permits require site plan approval before permit issuance. All new developments and existing

More information

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil ing Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST The following checklist consists of the minimum requirements for

More information

APPENDIX 4. Checklists. Township of King Design Criteria and Standard Detail Drawings

APPENDIX 4. Checklists. Township of King Design Criteria and Standard Detail Drawings APPENDIX 4 Checklists Township of King Design Criteria and Standard Detail Drawings Township of King Design Criteria and Standard Detail Drawings APPENDIX 4 CHECKLISTS Engineering Submissions : The following

More information

Porter County Plan Commission

Porter County Plan Commission Plan Type: Development Plan Administrative DRC PC Primary Plan Administrative DRC PC Secondary Plat/Replat Administrative DRC PC PUD Conceptual Detailed Final Project Information Project Name: Developer

More information

CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET

CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET THE FOLLOWING PACKET CONTAINS: PETITION FOR NONRESIDENTIAL DEVELOPMENT SITE PLAN AND COMMUNITY DESIGN REVIEW SCHEDULE OF DATES

More information

Rezoning/OCP Amendment Application. Current OCP Designation. Proposed OCP Designation

Rezoning/OCP Amendment Application. Current OCP Designation. Proposed OCP Designation Development Permit Application Rezoning/OCP Amendment Application Zoning DP Area yes no Variances Requested Development Details Property Size (m² or ha) Current Zoning Current OCP Designation Proposed

More information

DESIGN REVIEW BOARD APPLICATION EXTERIOR PLAN / LANDSCAPE PLAN

DESIGN REVIEW BOARD APPLICATION EXTERIOR PLAN / LANDSCAPE PLAN 209 S. Main Street Marysville, Ohio 43040 Phone: (937) 645-7350 Fax: (937) 645-7351 www.marysvilleohio.org DESIGN REVIEW BOARD APPLICATION EXTERIOR PLAN / LANDSCAPE PLAN *** IMPORTANT INFORMATION Please

More information

3. The PAC (Permit Application Center) will notify the design professional of plan review results.

3. The PAC (Permit Application Center) will notify the design professional of plan review results. Planning and Development Dept. Infrastructure Division P.O. Box 11706, or 155 Johnston Street Rock Hill, South Carolina 29731-1706 Phone: 803-329-5515 FAX: 803-329-7228 www.cityofrockhill.com AS-BUILT

More information

DRAFTING STANDARDS 9.00 DRAFTING STANDARDS

DRAFTING STANDARDS 9.00 DRAFTING STANDARDS DRAFTING STANDARDS 9.00 DRAFTING STANDARDS Final plans shall conform in appearance, format, accuracy, and quality to the standards used in the Springfield Engineering Division. Additional standards shall

More information

Project Name: County File No.: Checked by: For: Date:

Project Name: County File No.: Checked by: For: Date: Project Name: County File No.: Checked by: For: Date: Print name Firm or agency Items noted in the checklist shall be considered the minimum amount of information necessary for submission of construction

More information

Mailing Address: Fax number: City: State: Zip: Property Owner: City: State: Zip: City: State: Zip:

Mailing Address: Fax number: City: State: Zip:   Property Owner: City: State: Zip:   City: State: Zip: / Department of Community Development ARCHITECTURAL REVIEW APPLICATION 73-510 Fred Waring Drive Palm Desert California 92260 (760) 346-0611 Fax (760) 776-6417 Applicant: Telephone: Mailing Address: Fax

More information

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION 4.0. INTRODUCTION PART 4 STANDARD DRAWINGS FOR CONSTRUCTION In this document, Ivins City adopts the most recent edition (currently 2007), including all amendments, of the APWA Utah Chapter s Manual of

More information

PRELIMINARY PLAT CHECK LIST

PRELIMINARY PLAT CHECK LIST Name of Proposed Subdivision: The following items must be included with the initial submittal of a Preliminary Plat: Application, filled out completely Project Narrative Pre-application Conference Report

More information

Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02

Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02 Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02 1. INTRODUCTION This standard is written to provide the professional surveyor (Surveyor) and the client with a guideline for producing

More information

SECTION 6A ROADWAY PLAN PREPARATION

SECTION 6A ROADWAY PLAN PREPARATION SECTION 6A ROADWAY PLAN PREPARATION Table of Contents Page No 6A.1 GENERAL...1 6A.2 PRELIMINARY PLANS...3 6A.2.1 PRELIMINARY PLAN SHEETS...3 6A.2.2 PRELIMINARY PROFILE SHEETS...4 6A.3 PHASE A PLANS...4

More information

City of Hamilton INFORMATION FOR CONDITIONAL USE PERMIT

City of Hamilton INFORMATION FOR CONDITIONAL USE PERMIT City of Hamilton INFORMATION FOR CONDITIONAL USE PERMIT There is a $200.00 non-refundable fee for each request. Requests must be completed and submitted to the Public Works Department, City of Hamilton,

More information

Record Drawing Standards for Projects Version 2.1

Record Drawing Standards for Projects Version 2.1 for Projects Version 2.1 Updated September 21, 2016 Department: Spatial Data Group Engineering & Maintenance 1. INTRODUCTION... 1 2. GENERAL STANDARDS... 1 2.1 Drawing Standards... 1 2.2 Digital Submission

More information

APPLICATION FOR CERTIFICATE OF APPROPRIATENESS IN THE HISTORIC DESIGN REVIEW DISTRICT

APPLICATION FOR CERTIFICATE OF APPROPRIATENESS IN THE HISTORIC DESIGN REVIEW DISTRICT 209 South Main Street Marysville, Ohio 43040 Phone: (937) 645-7350 Fax: (937) 645-7351 www.marysvilleohio.org APPLICATION FOR CERTIFICATE OF APPROPRIATENESS IN THE HISTORIC DESIGN REVIEW DISTRICT *** IMPORTANT

More information

INTENT An Administrative Site Plan is required for the following situations, excluding single-family detached development:

INTENT An Administrative Site Plan is required for the following situations, excluding single-family detached development: SECTION 13-400 ADMINISTRATIVE SITE PLAN 13-401 INTENT An Administrative Site Plan is required for the following situations, excluding single-family detached development: A. All development on vacant land

More information

APPENDIX D: DRAWING SUBMISSION STANDARDS

APPENDIX D: DRAWING SUBMISSION STANDARDS 1.0 FIRST SUBMISSION CONCEPTUAL DESIGN Once the Developer has obtained approval for a Development Application where Park or Open Space improvements are required, a detailed Park or Open Space submission

More information

APPENDIX K DEPARTMENT OF PLANNING AND CODE ENFORCEMENT SUBDIVISION APPLICATION CENTER SUBMITTAL CHECKLIST

APPENDIX K DEPARTMENT OF PLANNING AND CODE ENFORCEMENT SUBDIVISION APPLICATION CENTER SUBMITTAL CHECKLIST VI-K -1 of 8 APPENDIX K DEPARTMENT OF PLANNING AND CODE ENFORCEMENT SUBDIVISION APPLICATION CENTER SUBMITTAL CHECKLIST Final Submittal Major Subdivision Project Name Subdivision Number Location (Street

More information

Grease Interceptor Design Checklist

Grease Interceptor Design Checklist CHECKLIST C2 Revised 5/2/2016 Grease Interceptor Design Checklist Public Works DISCLAIMER - This checklist is provided to Consulting Engineers for the express purpose of assisting them in compiling private

More information

Specifications for Land Surveys January 2014 Version

Specifications for Land Surveys January 2014 Version Specifications for Land Surveys January 2014 Version 01.2014 BROWARD COLLEGE Page 1 of 15 SPECIFICATIONS FOR LAND SURVEYS January 2014 Broward College (BC) requires surveys to be performed from time to

More information

ACWWA DRAWING SUBMITTAL INFORMATION - UTILITY DRAWING REQUIREMENTS

ACWWA DRAWING SUBMITTAL INFORMATION - UTILITY DRAWING REQUIREMENTS ACWWA DRAWING SUBMITTAL INFORMATION - UTILITY DRAWING REQUIREMENTS Detailed construction drawings for system extensions shall be prepared for approval with a submittal to the Authority. All construction

More information

CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS

CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE E-10 ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS The City of Lompoc has determined that the Engineering Division should administer and issue Encroachment

More information

September 21, Mannik Smith Group 1771 North Dixie Highway Monroe, Michigan RE: LA Fitness City File No.: CVLP

September 21, Mannik Smith Group 1771 North Dixie Highway Monroe, Michigan RE: LA Fitness City File No.: CVLP CITY OF ANN ARBOR, MICHIGAN Public Services Area / Engineering 301 E. Huron Street, P.O. Box 8647 Ann Arbor, Michigan 48107 Phone (734) 794-6410 Fax (734) 994-1744 Web: www.a2gov.org Printed on recycled

More information

STORM M ANHOLE FOR 42" PIPE AND SM ALLER JOB NO. SHEET NO. DATE MARCH 2015 OF MIN OF 3 CRSES MAX OF 5 CRSES 30"MAX 3 OR 3.5 PRECAST ECCENTIC CONC

STORM M ANHOLE FOR 42 PIPE AND SM ALLER JOB NO. SHEET NO. DATE MARCH 2015 OF MIN OF 3 CRSES MAX OF 5 CRSES 30MAX 3 OR 3.5 PRECAST ECCENTIC CONC 01-APR-2015 13:33 = I:\MSV8i\Plotting\piblack.ptb V:\201001\\C\8x11_Howell_Det\stm_det01_8x11_st01.dgn TIME = MIN 3 CRSES MAX 5 CRSES 3 OR 3.5 PRECAST ECCENTIC CONC ID PIPE GRADE A CONC FILL 4" 8" 2-0"SUMP

More information

MAJOR GRADING PLAN CHECKLIST

MAJOR GRADING PLAN CHECKLIST MAJOR GRADING PLAN CHECKLIST PUBLIC WORKS DEPARTMENT / ENGINEERING DIVISION 8130 Allison Avenue, La Mesa, CA 91942 Phone: (619) 667-1166 Fax: (619) 667-1380 Grading plans shall address both rough grading

More information

TABLE OF CONTENTS 1200 PLAN PREPARATION

TABLE OF CONTENTS 1200 PLAN PREPARATION 1200 PLAN PREPARATION TABLE OF CONTENTS PAGE 1201 General Plan Sheet Information... 12-1 1201.1 Introduction... 12-1 1201.2 Unit of Measure... 12-1 1201.3 Plan Sheet Materials and File Format... 12-1 1201.4

More information

Oil-Water Separator Design Checklist

Oil-Water Separator Design Checklist CHECKLIST C3 Revised 5/2/2016 Oil-Water Separator Design Checklist DISCLAIMER - This checklist is provided to Consulting Engineers for the express purpose of assisting them in compiling private oil-water

More information

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360)

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA 98501 (360) 754-4180 Email: cdd@ci.tumwater.wa.us WATER-SEWER-STREET-STORM (IN CITY) Submittal Checklist TUM - RCVD BY DATE STAMP APPLICANT INFORMATION

More information

3. DESIGN SPECIFICATIONS

3. DESIGN SPECIFICATIONS Schedule H to Bylaw 7452, Subdivision Bylaw Page 10 3. DESIGN SPECIFICATIONS 3.1 General 3.1.1 The Design Specifications apply to the design of sanitary sewers, storm drains, waterworks, roadways, and

More information

1 MUNICIPAL INFRASTRUCTURE

1 MUNICIPAL INFRASTRUCTURE Engineering Design Criteria & Standard Drawings Page 5 1 MUNICIPAL INFRASTRUCTURE 1.1 Drawing & Submission Requirements 1.1.1 General This section discusses the requirements for the submission of engineering

More information

Plan Preparation Checklist

Plan Preparation Checklist Appendix D Plan Preparation Checklist It is the responsibility of the Designer to complete and submit this checklist along with all required drawings for OUC (EFP) Review. All drawings submitted for OUC

More information

City of Kitchener Infrastructure Services Department Engineering Services Division. CAD Standards for Engineering

City of Kitchener Infrastructure Services Department Engineering Services Division. CAD Standards for Engineering City of Kitchener Infrastructure Services Department Engineering Services Division CAD Standards for Engineering Printed: October 29, 2012 Revision History Revision Description Date Layer revisions. June

More information

PRECISE GRADING PLAN CHECKLIST

PRECISE GRADING PLAN CHECKLIST PRECISE GRADING PLAN CHECKLIST PUBLIC WORKS DEPARTMENT / ENGINEERING DIVISION 8130 Allison Avenue, La Mesa, CA 91942 Phone: 619. 667.1166 Fax: 619. 667.1380 Grading plans shall address both rough grading

More information

Please remove and replace the entire Table of Contents, Section A to Section J and all Appendices.

Please remove and replace the entire Table of Contents, Section A to Section J and all Appendices. Please remove and replace the entire Table of Contents, Section A to Section J and all Appendices. The following is a list of changes to the Design Criteria: 1. A2.01 General Note 4 Utility Coordination

More information

SECTION 9.00 AS-BUILT DRAWING REQUIREMENTS SUB-INDEX

SECTION 9.00 AS-BUILT DRAWING REQUIREMENTS SUB-INDEX SECTION 9.00 AS-BUILT DRAWING REQUIREMENTS SUB-INDEX 9.00 AS-BUILT DRAWING REQUIREMENTS 9.01 As-Built Check List 1 Supp 1 2016 Supp # 2 Aug. 2017 AS-BUILT DRAWING REQUIREMENTS As-Built Review Fee is $200.00

More information

KC Water Rules and Regulations For Water Main Extensions and Relocations

KC Water Rules and Regulations For Water Main Extensions and Relocations KC Water Rules and Regulations For Water Main Extensions and Relocations MAY 2017 NOTE: Changes from 2016 are highlighted in yellow and appear on Pages 5, 8, 10-11, 13, and 15. Additional changes made

More information

City of Beaumont. Public Works Engineering. Street Improvement Plan Checklist REV 4/18/16

City of Beaumont. Public Works Engineering. Street Improvement Plan Checklist REV 4/18/16 City of Beaumont Public Works Engineering Project Name: TR: Project No.: Date: Street Improvement Plan Checklist Chk A. All Sheets 1. 24" x 36" 2. Signed by the engineer-of-work 3. Marked with the contact

More information

Part 1 - Common Comments on Erosion and Sediment Control Plans (Walter Hamilton, SDID)

Part 1 - Common Comments on Erosion and Sediment Control Plans (Walter Hamilton, SDID) COMMON ERRORS Typical Site Review issues Part 1 - Common Comments on Erosion and Sediment Control Plans (Walter Hamilton, SDID) E&S Phase I Constructability (PFM 11-0109.3) Safety during construction and

More information

STATE UNIVERSITY CONSTRUCTION FUND

STATE UNIVERSITY CONSTRUCTION FUND DIRECTIVE 1C-12 Issue date: August 2012 1. General SURVEY, MAPPING AND UTILITY LOCATING This Directive has been developed as a general guide for the survey and mapping effort required for Fund projects.

More information

Authorized Agent: City of Manassas Check List Attached: Contact: Address: Phone Number: Fax Number: Developer s Name: Phone Number:

Authorized Agent: City of Manassas Check List Attached: Contact:   Address: Phone Number: Fax Number: Developer s Name: Phone Number: CITY OF MANASSAS DEPARTMENT OF COMMUNITY DEVELOPMENT DEVELOPMENT SERVICES DIVISION 9027 Center Street Room 201 Manassas, Virginia, 20110 Phone: 703-257-8278 Fax: 703-257-5831 Application Date: APPLICANT

More information

CITY OF SALEM DEPARTMENT OF PUBLIC WORKS ADMINISTRATIVE RULES CHAPTER 109 DIVISION 002 DRAFTING AND DRAWING STANDARDS

CITY OF SALEM DEPARTMENT OF PUBLIC WORKS ADMINISTRATIVE RULES CHAPTER 109 DIVISION 002 DRAFTING AND DRAWING STANDARDS CITY OF SALEM DEPARTMENT OF PUBLIC WORKS ADMINISTRATIVE RULES CHAPTER 109 DIVISION 002 DRAFTING AND DRAWING STANDARDS SECTION 2.1 INTRODUCTION... 1 (a) Objective...1 (b) Applicability...1 2.2 SUBMITTAL

More information

DIGITAL DATA SUBMISSION STANDARDS Procedures and Guidelines

DIGITAL DATA SUBMISSION STANDARDS Procedures and Guidelines DIGITAL DATA SUBMISSION STANDARDS Procedures and Guidelines 2014 Citizens Wastewater of Westfield - GIS Digital Standards Table of Contents Introduction... 3 Definitions and Terms... 3 Reference Documents...

More information

MAINTENANCE HOLES, CATCH BASINS AND DITCH INLETS - MTC FORM 407 INDEX

MAINTENANCE HOLES, CATCH BASINS AND DITCH INLETS - MTC FORM 407 INDEX 407-1 - MAINTENANCE HOLES, CATCH BASINS AND DITCH INLETS - MTC FORM 407 INDEX 407-1.1 GENERAL Tender Items Specifications Standard Drawings 407-1.1.1 Frame and Grate Selection 407-1.1.2 Selection of Structure

More information

B17. Sewer Site Plans BULLETIN

B17. Sewer Site Plans BULLETIN BULLETIN B17 Revised 5/2/2016 Sewer Site Plans Public Works This bulletin is designed to assist you in submitting the required documentation for sewer site plans to the Pierce County Sewer Division in

More information

CITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS

CITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS CITY OF LA MARQUE CHAPTER 2 -------------------------------------------- GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS CHAPTER 2 ------------------------------------------------

More information

BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006

BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006 Project Name: BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006 Phase: Unit: # Lots: Development Type (residential, commercial, industrial, etc.) Braselton Project No.

More information

Charlotte County Utilities DESCRIPTION

Charlotte County Utilities DESCRIPTION As-built Drawings / Surveyor 1. Electronic copy of survey data in tabular form of the utility assets 2. A signed and sealed letter with the following statement: "I hereby certify that the as-built location

More information

Design Deliverables. Summary. A. Expectations for Design Deliverables:

Design Deliverables. Summary. A. Expectations for Design Deliverables: Design Deliverables Summary A. Expectations for Design Deliverables: The Design Team is obligated to advance and deliver the project with a professional manner and standard of care that meets the expectations

More information

Documents: Response letter and attachments, Prepared by: AMEC Massachusetts, Inc., Dated February 17, 2016.

Documents: Response letter and attachments, Prepared by: AMEC Massachusetts, Inc., Dated February 17, 2016. GCG ASSOCIATES, INC. CIVIL ENGINEERING AND LAND SURVEYING 84 Main Street Wilmington, Massachusetts 01887 Phone: (978) 657-9714 Fax: (978) 657-7915 February 23, 2016 Mr. Nathaniel Strosberg, Town Planner

More information

List of Figures. List of Forms

List of Figures. List of Forms City of Columbia Engineering Regulations PART 1: SUBMISSION OF PLANS Table of Contents Paragraph Description Page No. 1.1 General 1-1 1.2 Engineer s Report 1-1 1.3 Plans 1-3 1.4 Revisions to Approved Plan

More information

CITY OF VISTA STANDARD DRAWINGS

CITY OF VISTA STANDARD DRAWINGS CITY OF VISTA STANDARD DRAWINGS May, 2015 THIS SHEET INTENTIONALLY LEFT BLANK TABLE OF CONTENTS MODIFICATIONS Modifications to San Diego Regional Standard Drawings DRAINAGE STRUCTURES DRN 01 Corrugated

More information

Pipe Product Catalog Table of Contents

Pipe Product Catalog Table of Contents Pipe Product Catalog Table of Contents Section A: Drawing #: Page Description A1 Reinforced Concrete Pipe A3 Storm Manhole Sizing Chart (48" - 96") A3.1 Storm Manhole Sizing Chart (108" - 144") A4 48"

More information

1.1 GENERAL RECORD DRAWING REQUIREMENTS

1.1 GENERAL RECORD DRAWING REQUIREMENTS Page 1 of 5 VILLAGE OF ROMEOVILLE RECORD DRAWINGS CHECKLIST PART I GENERAL Record drawings are required to provide a means of schematic verification that the intent of the approved engineering design has

More information

NWP of 9 Enclosure

NWP of 9 Enclosure A l b a n y Linn County Tax Lots S03W8BD0050 S03W8BA003 S03W8BA00700 Albany, OR 973 G e o R e s o u r c e s, L L C 000 0 000 000 Feet Scale: :,000 FIGURE : LOCATION MAP Scale: " =,000' Source: Albany GIS

More information

Harris County Flood Control District. CAD Standards Manual

Harris County Flood Control District. CAD Standards Manual Harris County Flood Control District CAD Standards Manual September 2016 HCFCD CAD Standards Manual!"#$ Table of Contents 1.1 INTRODUCTION... 5 1.2 REFERENCES... 5 1.3 IMPLEMENTATION... 5 2. PLAN REQUIREMENTS

More information

APPLICATION FOR SITE PLAN CONTROL

APPLICATION FOR SITE PLAN CONTROL APPLICATION FOR SITE PLAN CONTROL Section 41 of the Planning Act, RSO 1990, as amended A Pre-Application Consultation with City staff is encouraged prior to submission of this application. This application

More information

Type A. BWSC CAD Standards for Site Plans (Design and As-Built) Format. Scale. Fonts, Linetypes, Shapes

Type A. BWSC CAD Standards for Site Plans (Design and As-Built) Format. Scale. Fonts, Linetypes, Shapes BWSC CAD Standards for Site Plans (Design and As-Built) Type A The following CAD standards are for Type A application and involve no work in Public Street, except for connection(s) to the Boston Water

More information

SITE PLAN APPLICATION

SITE PLAN APPLICATION SITE PLAN APPLICATION SECTION 1. APPLICANT/OWNER INFORMATION Please Print or Type Applicant/Developer: City: State: Zip: Telephone: Fax: E-mail: Applicant s Status: (Check One) Owner Tenant Prospective

More information

STANDARD BID ITEM NUMBERS

STANDARD BID ITEM NUMBERS 10701 TRAFFIC CONTROL LUMP SUM 10702 Traffic Control for Storm Sewer Installation LUMP SUM 10703 Traffic Control for Water Main Installation LUMP SUM 10704 Traffic Control for Sanitary Sewer Installation

More information

5.7 Plan Documentation and Supporting Information.

5.7 Plan Documentation and Supporting Information. 5.7 and Supporting Information. In any case where the and Supporting Information for a Development Plan requires the submission of a Site Plan, Overall Plan, Landscape Plan, Building Elevations, Sign Plan

More information

City of Colleyville Community Development Department. Site/Landscape Plan Application Packet

City of Colleyville Community Development Department. Site/Landscape Plan Application Packet City of Colleyville Community Development Department Site/Landscape Plan Application Packet 1 Development Application Fees City of Colleyville 100 Main Street Colleyville TX 76034 817.503.1050 Zoning Zoning

More information

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS 101 General 102 Submittal Requirements A. Initial Submittal B. Second Submittal 103 Plan Requirements A. Subdivisions B. Site Plans 104 Approval of

More information

CITY OF VISTA STANDARD DRAWINGS

CITY OF VISTA STANDARD DRAWINGS CITY OF VISTA STANDARD DRAWINGS May, 2015 THIS SHEET INTENTIONALLY LEFT BLANK TABLE OF CONTENTS MODIFICATIONS Modifications to San Diego Regional Standard Drawings DRAINAGE STRUCTURES DRN 01 Corrugated

More information

10010 RECORD DRAWING INFORMATION

10010 RECORD DRAWING INFORMATION SECTION 10000 RECORD DRAWING CHECK LIST All entities who construct public infrastructure, private streets, private storm drain collection systems and travel lanes, shall submit to the Town of Cary Engineering

More information

Town of Westlake Construction Plans Review Checklist

Town of Westlake Construction Plans Review Checklist CONSTRUCTION PLANS CONTENTS All Drawings 24 x 36 Cover Sheet Final Plat Site Plan Demolition Plan Utility Plan Drainage Area Map and Calculations Paving Plan & Profile Sheets Storm Drain Plan & Profile

More information

Essential Skills: Reading and Interpreting Maps and Plans

Essential Skills: Reading and Interpreting Maps and Plans Essential Skills: Reading and Interpreting Maps and Plans Prepared for: NEW YORK STATE PLANNING FEDERATION April 14, 2015 Prepared by: BME ASSOCIATES Peter G. Vars, P.E. Stages of Plan Review Concept /

More information

Clarifications in italics added July 2018

Clarifications in italics added July 2018 SECTION 10000 RECORD DRAWING CHECKLIST Clarifications in italics added July 2018 All entities who construct public infrastructure, private streets, private storm drain collection systems and travel lanes,

More information

Construction Plan Reading Basics & Applications

Construction Plan Reading Basics & Applications Construction Plan Reading Basics & Applications July 12 th, 2016 / 4 p.m. Richland County Transportation Penny Office Instructor Ben W. Lewis, PE Welcome & Introductions Instructor Ben W. Lewis, PE Project

More information

Appendix E-4. City of Fort Collins. Requirements for Utility Plans

Appendix E-4. City of Fort Collins. Requirements for Utility Plans Appendix E-4 City of Fort Collins Requirements for Utility Plans Project Name: Project Planner: Design Engineering Firm: Developer: All applications for final development plans must include final development

More information

A. ARTICLE 4 SKETCH PLAN REQUIREMENTS, MAJOR SUBDIVISION AND/OR LAND DEVELOPMENT

A. ARTICLE 4 SKETCH PLAN REQUIREMENTS, MAJOR SUBDIVISION AND/OR LAND DEVELOPMENT 400. 402.A. ARTICLE 4 SKETCH PLAN REQUIREMENTS, MAJOR SUBDIVISION AND/OR LAND DEVELOPMENT SECTION 400 PURPOSE The purpose of the Sketch Plan is to provide an opportunity for the applicant to consult early

More information

City of Vaughan Engineering Department DESIGN STANDARD DRAWINGS

City of Vaughan Engineering Department DESIGN STANDARD DRAWINGS City of Vaughan Engineering Department DESIGN STANDARD DRAWINGS March 2004 STANDARD DRAWINGS Partners With The Environment March 2004 FORWARD The March 2004 version of the City of Vaughan Design Standard

More information

Bestall Collaborative Limited Planning Environment Construction Management Development

Bestall Collaborative Limited Planning Environment Construction Management Development November 18, 2017 Bestall Collaborative Limited Lori Hight, AICP, Senior Planner City Development Department City of Thornton City Hall 9500 Civic Center Drive Thornton, Colorado 80229-4326 RE: River Valley

More information

CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION:

CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION: CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION: LOG NO.: LEGEND REVIEW REVIEWED BY DATE / - Requirement satisfied 1 O Requirement not satisfied 2?

More information