1 12 May 2017 City of Thornton Attn: Jay Ruchti 9500 Civic Center Drive Thornton, CO Re: Initial Review Response to 04/19/17 Letter Dear Mr. Ruchti: This letter is in response to initial review comments received from your office in a letter dated 04/19/2017. The comments are identified in italics and Langan s responses are in bold. CURRENT PLANNING Senior Planner (Jay Ruchti) 1. Put the case number, PLDP , in the upper right hand corner of the document. Response: The case number has been added to all sheets in the set. 2. Remove the signage from the documents. All signs will be reviewed by separate permit Response: Signage has been removed from plan set. The note remains on the cover sheet to specify exclude approval of the signage as part of this application. 3. Provide a bicycle rack (barn) at the main entrance. Suggest you may want space for 25 bicycles. Response: A bicycle rack has been shown near the main entrance of the building. The specified bicycle rack model is Madrax HW IG, which has a capacity for 17 bicycles. This is bicycle rack model that is typically proposed at these facilities. 4. Improve the architecture on the west side of the facility to enhance visual appeal of this side of the building, see attached drawings. At a minimum, you need to add a larger band at the bottom of the elevation and more vertical accents.

2 Page 2 of Improve the architecture on the east side of the building to enhance the visual appeal of the building. It is suggested that you look at casting the panels on the pop outs to look like stone or an ornate design pattern to provide variety and visual appeal to the west side of the building. The casting form will need to be provided for our review. The project architect will work with the general contractor to provide a form liner sample for your review. 6. Provide a detail showing the depth of reveals and the type of texture that will be used on the building. 7. Provide several cross sections showing how the building will look from the adjacent roadways. A plan entitled Building Cross Section Views (CS201) has been added to the Conceptual Site Plan set. 8. Need to provide a commercial sign package for the overall commercial area as stated in the zoning, annexation communication that was reviewed by Council. Response: A commercial sign package will be provided under separate cover following approval of the Development Permit. 9. DP GI101: a. Sheet Index Move the building elevations to the beginning of the packet followed by the site plans and landscape drawings. Response: Architectural plans have been moved closer to the front of the plan set. b. Site Data Table remove the maximum setback that can be required from the table. Response: The maximum setback requirement has been removed from the table.

3 Page 3 of 17 c. Please provide justification for the proposed FAR consistent with the newly adopted resolution by DPAB. Also, you need to provide an elevation for granting an SUP pursuant to Section of the code for a warehouse within the Regional Commercial Zoning District. Response: Justification for the proposed FAR was previously submitted to the City in an April 26 th, 2017 letter. d. Once the plan set is approved, please provide a colored elevation of the building. 360 degree architecture is required. Also, you need to provide a material sample board for our review. Response: These materials will be provided to your office after the plan set has been approved. 10. DP CS100: a. Please provide typical layout drawing for standard and handicapped parking space. Response: A figure showing typical dimensions for standard and ADA compliant parking stalls has been added to sheet CS DP CS101: a. Chain link fence shall be black vinyl coated. A black vinyl coated fence detail has been added to the plan set on sheet G300 (Material Palette) of the Conceptual Site Plan set and will be included in the civil construction drawings. 12. DP CS102: a. Please correct spelling errors in FRICO canal callouts. Response: This callout has been corrected. 13. DP CS104: a. Is the 10-ft pedestrian walkway asphalt? Response: The 10-ft pedestrian walkway is asphalt b. Six (6) of the handicap spaces in front of the building need to be van accessible. Response: The required number of van accessible parking stalls has been provided. Van accessible stalls are indicated by the word VAN in the stall.

4 Page 4 of DP AE305: a. Please provide a color rendering of the front exterior of the front exterior so we can evaluate the architectural look of the building. Response: A color rendering of the front exterior has been provided with this submission. The sample board (from comment 9d) along with the revised rendering should allow the City to evaluate the architecture. b. Pop outs need to be articulated with design detailing to provide visual appeal to the front of the building. Response: The building elevations and rendering have been revised as discussed by Trammel Crow and the City of Thornton in the comment resolution meeting on April 11, c. Provide more of the dark brown colored accents to the right side of the loading dock side of the building to improve the visual appeal of this side of the building. Response: The building elevations and rendering have been revised as discussed by Trammel Crow and the City of Thornton in the comment resolution meeting on April 11, DP AE306: a. Improve the architecture on the west side of the facility to enhance visual appeal of this side of the building, see attached drawings. At a minimum, you need to add a larger band at the bottom of the elevation and more vertical accents. Response: The building elevations and rendering have been revised as discussed by Trammel Crow and the City of Thornton in the comment resolution meeting on April 11, b. Improve the architecture on the east side of the building to enhance the visual appeal of the building. It is suggested that you look at casting the panels on the pop outs to look like stone or an ornate design pattern to provide variety and visual appeal to the west side of the building. The casting form will need to be provided for our review. Response: The building elevations and rendering have been revised as discussed by Trammel Crow and the City of Thornton in the comment resolution meeting on April 11, 2017.

5 Page 5 of 17 POLICY PLANNING Senior Policy Analyst (Martin Postma) 1. Policy Planning has reviewed the above-mentioned referral and has the following comments regarding the 2012 Thornton Comprehensive Plan and other long-range planning documents, as they pertain to the application. a. Thornton Comprehensive Plan: i. Policy Planning does not oppose the proposed Development Permit and Specific Use Permit for the Rio development. The most appropriate Future Land Use designation of the subject parcels is Regional Commercial. Response: Acknowledged ii. Although the primary intended use of the proposed development at this location is Employment Center, that particular Future Land Use designation specifically excludes large distribution warehouse uses. Regional Commercial is therefore the best land use designation available currently. It is anticipated that Future Land Use designations will be revisited during the next Thornton Comprehensive Plan update. Response: Acknowledged DEVELOPMENT ENGINEERING (DE) Project Manager (Nate Hatleback) 1. The DP approves Landscaping and architecture only. This review was limited to Landscaping as it applies to the sight triangles and some other general comments. Comments not made on grading, utilities, drainage, ect. does not constitute approval. Detailed review will be done with the first CD submittal. On the landscaping, I didn t comment on the median landscaping due to my assumption that it will not be constructed. Response: Acknowledged 2. DP CS104: a. Show current version of the Grant Street cross section. Response: The plans have been update to reflect this comment. b. Use sight distance requirements detailed in FHWA-NCHRP Report 672. Specifically Chapter 6 for the traffic circle on Grant Street. Response: A clear site area has been developed in accordance with the above reference. This clear site area is a combination of the required stopping sight distance and intersection sight distance for each approach as discussed in the reference. This area is depicted on both the site and landscaping plans.

6 Page 6 of DP CS106: a. Along Grant Street sight triangles begin 10 behind the flowline of the curb and gutter. This one, when drawn, may conflict with the monument sign. Response: The sight triangle at this driveway has been updated. The monument sign has been relocated out of the sight triangle. b. At the intersection along East 144 th Avenue and driveway leaving the parking lot use directional ramp. Response: A directional ramp has been added to this driveway. c. The left turn movement will almost certainly be a protected Sight triangle won t apply in that case. Response: The sight triangle has been removed. d. Apply this sight triangle to the outside right turn lane. Response: The plan has been updated accordingly. 4. DP LP102: a. At the intersection of East 148 th Avenue and Grant Street (typ) apply sight triangles to landscape drawings. Response: Sight Triangles have been added to all of the partial landscaping plans. 5. DP LP108: a. Along Grant Street: i. Sidewalks will have to be built out around the traffic circle with this project. Response: Sidewalks have been added to the east side of the traffic circle. ii. If the median is to be removed, revise these sheets to reflect that. Response: The median has been removed from the plans. iii. 6 tree lawn minimum. Response: The sidewalk location has been revised to reflect this requirement.

7 Page 7 of DRAINAGE REPORT a. Peak runoff shall be calculated using CUHP (Colorado Urban Hydrograph Procedure) for sites larger than 90ac. b. Use override to match pond as shown on the plans. Your pond bottom looks to be much larger than what is shown here. c. Show calculations for composite imperviousness (SF-2, SF-3). d. Detention Basin Outlet Structure Design will be reviewed during civil construction plan review. e. Trickle channels not shown in off-site basins. f. Colorado law requires 97% of 5yr storm to be drained in 72hrs g. Inlet Management. Provide SF-2 and SF-3 for the sub-basins showing how the minor and major design flows were derived. h. Expand all inlet designs to show all info in the spreadsheets. i. Label outfall Q100 flows on sub-basin plan. j. Label Design points for each sub-basin. Response: The plans and report have been updated to reflect these comments. 7. UTILITY REPORT a. Include results and WaterCAD model for all four scenarios listed in Sec of the COT Standards and Specs. Response: This analysis will be included as Appendix E of the Final Utility report. Due to some technical difficulties, this appendix will be bound separate from the balance of the utility report. b. Revise water infrastructure text to reflect main in Grant St. based on recent revisions. Response: The report has been updated to reflect this comment. c. Indicated sanitary sewer size in section 4.2. Response: The report has been updated to reflect this comment. d. Sewer sizing sheets look like they're scanned in. Do you have an original electronic copy you could include for clarity? Response: Originals have been included in the revised report. e. Sewer sizing sheets: Title each page clarifying which scenario is being tested (avg. and hourly peak). Response: The sheets have been updated to reflect this comment.

8 Page 8 of 17 f. Sewer sizing sheets: Include Velocity for the expected flows in each scenario, not just the half and full velocities) Response: The sheets have been updated to reflect this comment. g. Each separate building must have it's own connection to the main and meter. This goes for water and sanitary sewer. Response: Per a May 4 th, 2017 conversation between Nate Hatleback (City of Thornton) and Taylor Nelson (Trammel Crow Companies), relief will be provided by the City for this requirement. Domestic water service to both guard houses will be served from the main building. Sanitary sewer service to both guardhouses will be served by the 8-inch private lateral which serves the main building. Per this conversation, the following modifications to the sewer line were incorporated into the plans: Extend gravity sewer as an 8-inch line to the eastern guardhouse. This line may be used accepted in the future as a public line to serve the development to the north. 400-ft maximum manhole spacing. Provide 0.2-ft drop in manholes in private lateral. City requires 0.3-ft drop in manholes in sewer main typically, but are willing to accept 0.2-ft drop for this application. h. Typ: Water easements are 20' wide centered on the main and are exclusive. Also, the easement must extend to 10' around all sides of the hydrant. In this case the fire loop conflicts with the hydrant easement. i. Relocate water main in eastern parking lot to provide required 10-ft clear easement. Response: Langan j. At the southwest building corner, the proposed electric line is within the City s water main easement. Response: Langan LANDSCAPE ARCHITECT (LA) Senior Landscape Architect (Heidi Feigal) 1. This submittal has not addressed the landscape comments from the CSP submittal and does NOT meet the submittal requirements of a Development Permit. Future submittals will not be accepted unless the plant material is labeled and there is a suitable LANDSCAPE REQUIREMENT TABLE. Expect further comments when the landscaping sheets are complete. Response: Acknowledged.

9 Page 9 of DP CS102: a. Description should read Existing Bull Run FRICO irrigation canal to be diverted into underground culvert, existing concrete channel to be removed and backfilled. Response: This note has been updated to reflect removal of the existing concrete channel. 3. DP CS106: a. Along East 144 th Avenue, at a meeting with the city, it was discussed that an access was needed here for FRICO maintenance. Has this gone away? Response: The revised plans reflect this FRICO access point. 4. DP CG100: a. Near stormwater management basin typical pipe slopes no steeper than 4:1 unless hardship can be proven. Response: A variance is requested to provide a 3:1 slope in the area of the proposed Shay Ditch headwall north of the truck driveway. The 3:1 slope in this area is to limit the extent of the retaining wall in this area. 5. DP CU100: a. Can the water line in the parking lot be relocated to the drive aisle so this north south length of island can have trees? There is already a tree restriction to the west for the ditch easement. Response: The water line has been shifted east into the parking lot to allow for trees to be planted in this island. 6. DP LP101: a. This submittal has not addressed the landscape comments from the CSP submittal and is NOT a Development Permit submittal in that the plant material is not labeled. Expect further comments when the landscaping sheets are completed. Response: Acknowledged. b. Only areas without trees and undisturbed can be non-irrigated. This will determined as construction drawings show exactly what is disturbed. c. CSP Comment trees must be in irrigated area. I do not support these trees being dripped. They do not grow to maturity.

10 Page 10 of 17 d. No trees in non-irrigated areas. e. Now that grading is shown, we do not support non-irrigated seeding on the steep slopes. Code calls for all areas to be irrigated. We need to have another discussion as my comment about irrigating the total area where trees are located was not translated apparently. 7. DP LP102: a. This document needs to have a tree mitigation schedule added to the Landscape Requirements Table. Response: Sheet LP502 Tree Mitigation Plan has been added to the plan set to address this comment. 8. DP LP103: a. Until lot develops basin can have non-irrigated dryland seed. At that time it will require irrigation and landscaping. Response: Acknowledged. 9. DP LP104: a. Bold dotted line to the left next to interstate I-25 is this a property line? If so move trees up to flatter areas of property so they will actually do some screening. Response: The trees have been relocated to the top of the slope as requested. b. Remove label for non-irrigated dryland seed, typ.

11 Page 11 of DP LP105: a. Are medians going away along Grant Street? Response: The medians have been removed from Grant Street. 11. DP LP106: a. Remove trees as discussed at meeting. Response: The trees near the Washington Street Culvert have been removed. 12. DP LP108: a. City will not maintain a fussy landscape. Points of sod not allowed in any scenario, no sod less than 6 wide. Maintenance of roundabout has not been determined yet. Response: Per meetings between Trammell Crow and City of Thornton, it was determined that the City was not willing to maintain landscaping in the traffic circle. The plans have been revised to reflect only hardscape within the traffic circle. b. Show easement for FRICO and remove trees. Response: The FRICO easement has been added to the landscape plans and trees have been removed. Root barrier has been proposed beneath shrubs within the FRICO easement. 13. DP LP109: a. Along East 146 th Avenue are there no sidewalks? Response: There are no proposed sidewalks on East 146 th Avenue. 14. DP LP110: a. Move trees at least 10 from underground pipes when you can. Response: These trees have been relocated away from the storm pipe to the maximum extent practical. 15. DP LP501: a. Use city details from website for tree planting Response: The tree planting details have been updated to reflect the City s requirements. b. For On-Site Landscape Quantities use landscape requirements format from DP handout.

12 Page 12 of 17 Response: This information is now presented in the requested format. c. Amend plant list per notes from meeting. Response: The notes have been updated per meeting. d. Add TE column to Plant Palette with total at bottom that matches Landscape Requirements Table. Response: The TE column has been added to the Plant Palette. INFRASTRUCTURE ENGINEERING City Surveyor (Steve Dynes) 1. Need to provide a legal description for the project on the drawings. Response: An additional sheet including a legal description has been added to the development permit set. XCEL ENERGY Right of Way Processor (Donna George) 1. Public Service Company of Colorado (PSCo) Right of Way & Permit Referral Desk has determined there is a potential conflict with the above captioned project. Public Service Company has existing electrical transmission lines and associated land rights as shown within this property. Any activity including grading, proposed landscaping, erosion control or similar activities involving out existing right-of-way will require Public Service Company approval and must continue working with Cody Horn, Siting and Land Rights Agent at for development plan review and execution of a License Agreement. Response: Applicant will complete required coordination with Excel Energy. 2. PSCo also has existing natural gas and electric distribution facilities within the proposed project area. The property owner/developer/contractor must contact the Builder's Call Line at or (register, application can then be tracked) and complete the application process for any new natural gas or electric service, or modification to existing facilities. It is then the responsibility of the developer to contact the Designer assigned to the project for approval of design details. Additional easements may need to be acquired by separate document for new facilities. Response: Applicant will complete required coordination with Excel Energy. THORNTON FIRE DEPARTMENT (TFD) Senior Fire Protection Engineer (Bob Sullivan) 1. Proper turning radii for fire apparatus shall be confirmed on all new roadways and driveways, including all roads and driveways that are intended to act as fire apparatus access roads. This shall be done by showing a B-40R truck template moving through all turns, in both directions, on a site plan of this project, including all entrances to the site

13 Page 13 of 17 from existing roads, the gated entrances into the building, and the proposed roundabout. If the B-40R template encounters any obstacles in the process of completing the turns, then the width of the roadways shall be adjusted accordingly. A copy of the B-40R template is enclosed with this letter. Fire truck circulation plans have been added to the Conceptual Site Plan set as sheets CP101 and CP In all locations where there are gates shown across driveways (whether for daily use or for emergency access only), please clarify if the gates will be manually operated or electrically operated. In all cases, the gates shall open for a full clear width opening of at least 20 feet wide when in the full-open position. Additional requirements may apply. The minimum width of 20-ft has been provided along the fire lane. Pavement width dimensions have been provided on sheets CP101 and CP102 of the Conceptual Site Plan set. 3. As established in previous meetings for this project, on the east of the building, the two driveway aisles closest to the building shall be arranged to meet the requirements for fire apparatus access roads, including a minimum width of 20 feet wide. These two driveway aisles have been highlighted on the attached site plan. Please adjust the width of these two driveways to a minimum of 20 feet wide, and show the B-40R truck template successfully navigating these driveways, including the turns at each end of the driveways. Fire truck circulation plans have been added to the Conceptual Site Plan set as sheets CP101 and CP102. a. Both of these driveways shall also meet all other fire apparatus access road requirements, including the requirement to hold a minimum weight of 80,000 pounds, which is the weight of our fire apparatus. 4. Please clarify where in the building there will be high-piled combustible storage (HPS) located, with the HPS as defined in the International Fire Code (IFC, 2015 Edition). The proposed location(s) of the HPS inside the building will determine the requirements for

14 Page 14 of 17 fire apparatus access roads and fire department access doors around the building, in accordance with IFC Section a. For example, if there will be HPS located in the south end of the building, then there shall be adequate fire apparatus access roads and fire department access doors on the south side of the building to meet IFC requirements. The proposed driveways on the south side of the building do not currently meet fire apparatus road width requirements (the driveways in that area appear to be feet wide, as opposed to the minimum required 20 feet wide). The driveways and turns in that area may need to be widened in order to meet IFC requirements and the B-40R truck template turning movement width requirements. In addition, some additional fire department access doors may be required in the exterior wall of the building. 5. Required fire apparatus access roads shall be permanently signed and/or marked NO PARKING FIRE LANE in accordance with municipal sign/traffic standards and the following specifications: a. There shall be no parking for a distance of 15 feet on either side of a fire hydrant. b. Roads less than 26 feet wide shall be marked as fire lanes on both sides of the road. c. Roads at least 26 feet wide but less than 32 feet wide shall have at least one side of the road marked as a fire lane. d. Roads at least 32 feet wide need not have fire lane markings. e. Fire lane signs shall be spaced a maximum of feet apart from each other. f. NOTE: The DP is not required to show Fire Lane signs, however, future plan sets such as the civil construction plans for the site shall show all Fire Lane sign locations, in accordance with the requirements described above. The requirements for the Fire Lane signs may not apply in all areas where there are designated parking spots; however, this will be determined during future plan submittals for this project. Response: Acknowledged. All required Fire Lane signs shall be shown on the Civil Construction Plans.

15 Page 15 of Prior to the issuance of the building permit for this project, the following requirements shall be met: a. Adequate fire apparatus access shall be provided to at least one long side of the building during construction. At a minimum, this access shall consist of an allweather hard paved surface (such as asphalt or recycled asphalt), at least 20 feet wide, and be kept free of obstructions such as parked vehicles and construction vehicles. The road shall be maintained in good condition at all times, including refreshing any areas that deteriorate, keeping it plowed after a snowfall, etc. Please contact the Fire Department at to discuss options for providing adequate access to the building during construction. Response: A grading permit set, dated 4/19/2017, has been submitted to the City for review and approval. This plan set depicts the limits of this proposed temporary access road. b. Regarding on-site water supply during construction, as discussed during the project meeting on 4/12/2017, the Fire Department is willing to accept a partial operational on-site water system in the earlier stages of construction, consisting of active water mains and fire hydrants along one long side of the building, which shall be installed and operational prior to the issuance of the building permit. This is in lieu of having all water mains and fire hydrants installed and operational prior to the issuance of the building permit. However, the applicant must be aware that prior to final approval of the fire sprinkler system plans for this project, and prior to the issuance of the Fire Department permit for the fire sprinkler system in the building, the full on-site water supply system, including all water mains and all fire hydrants, shall be installed, operational and approved, and an on-site hydrant flow test of the new water mains and fire hydrants shall be conducted to verify that the on-site water supply is adequate for the proposed fire sprinkler system design. Please adjust the various construction schedules accordingly to accommodate these arrangements, so that there are not any scheduling conflicts as the project proceeds. Response: A grading permit set, dated 4/19/2017, has been submitted to the City for review and approval. This plan set depicts the limits of this proposed water system installed prior to building permit. c. All fire protection system installations and alterations (fire sprinkler systems, fire pumps, fire alarm systems, etc.) require a permit application submitted by a licensed contractor, including shop drawings, necessary calculations, and manufacturers specifications for system components. Installation work on individual fire protection systems shall not precede until a permit for that system is issued by the Fire Department. Plans and permit applications for all fire protection system installations and alterations shall be submitted prior to the issuance of the building permit for this project. Response: Acknowledged.

16 Page 16 of The following comments are in regard to the Final Utility Report provided with this submittal: a. The flow test results listed in the report were from a hydrant flow test conducted in March These results are now out of date because they are more than one-year-old. A new flow test has already been scheduled to obtain updated water supply information, utilizing the same water mains and fire hydrants that were used for the March 2016 flow test. The updated test results will be forwarded to the applicant as soon as they are available, which is expected to be within the next 1-2 weeks. In addition, the updated results will include required minor reductions, which account for the lowest-case anticipated static pressure in that area of the City of Thornton, and a reduction required by the State of Colorado for the design of fire sprinkler systems. The attachments in Appendix B of the report will need to be updated accordingly. Response: These calculations have been updated accordingly based on the new hydrant flow test. b. The report referenced a pressure reducing valve (PRV) in the water supply zone in which the building will be built. However, in conducting further research on this water zone, it now appears that there is no PRV in this zone. Please contact Nate Hatleback in Development Engineering to confirm this information and discuss if this may affect the original water supply information in any manner. It appears that all references to the PRV in the report can be removed from the report, including the comparison of the hydrant flow test data that compared Closed PRV to Open PRV, etc. Response: Per a conversation between Bob Sullivan (City of Thornton Deputy Fire Marshall) and Ben Randle (Harrington Group), the referenced PRV has been removed from service. The report has been updated accordingly. GIS SERVICES GIS Analyst II (Valorie Plesha) 1. GIS Services has reviewed the above-mentioned referral and has the following preliminary comments regarding streets and addressing as they pertain to this application. a. Street Names: i. The proposed street names meet the city s guidelines and are assigned. Response: Acknowledged.

17 Page 17 of 17 b. Addressing: ii. This project is assigned the address GRANT STREET. Response: Acknowledged. If you have any questions, or should you require additional information, please do not hesitate to contact me at (609) Sincerely, Langan Engineering and Environmental Services, Inc. Michael Golias, PE Project Engineer Richard Burrow, PE Senior Principal MRG:rs cc: Taylor Nelson, Trammell Crow Companies Andrew Dell, Macgregor Associates Architects NJ Certificate of Authorization No. 24GA \\langan.com\data\par\data3\ \office Data\ Development Permit Response Letter.docx

1st Review of Submittal Materials for Willow Bend Development; CSP (Hansen #1734) Comment Responses

1st Review of Submittal Materials for Willow Bend Development; CSP (Hansen #1734) Comment Responses City of Thornton 9500 Civic Center Drive Thornton, CO 80229 Attn: Jay Ruchti, Senior Planner Re: 1st Review of Submittal Materials for Willow Bend Development; CSP 2014 008 (Hansen #1734) Comment Responses

More information

City Development Department 9500 Civic Center Drive Thornton, Colorado FAX

City Development Department 9500 Civic Center Drive Thornton, Colorado FAX City Hall City Development Department 9500 Civic Center Drive 303-538-7295 Thornton, Colorado 80229-4326 FAX 303-538-7373 www.cityofthornton.net Zach Lauterbach Evergreen Devco, Incorporated 2390 East

More information

Bestall Collaborative Limited Planning Environment Construction Management Development

Bestall Collaborative Limited Planning Environment Construction Management Development November 18, 2017 Bestall Collaborative Limited Lori Hight, AICP, Senior Planner City Development Department City of Thornton City Hall 9500 Civic Center Drive Thornton, Colorado 80229-4326 RE: River Valley

More information

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN N/A Waiver (1) Four (4) copies of application form. (2) Fifteen (15) copies of plan (3) Subdivision/site plan application fee & professional review escrow deposit (4) Variance application fee & professional

More information

1. Denver Water is not the provider. [C1 Cover] Baseline Response: Revised to show Thornton Water Department as the provider.

1. Denver Water is not the provider. [C1 Cover] Baseline Response: Revised to show Thornton Water Department as the provider. Nate Hatleback Project Manager City of Thornton 303 538 7694 Nate.Hatleback@cityofthornton.net Re: Topgolf Review The City of Thornton has provided comments regarding several submittals on June 14 th,

More information

City of Massillon Site Plan Checklist

City of Massillon Site Plan Checklist City of Massillon Site Plan Checklist The following information MUST be included with all Site Plans submitted for review and processing in order to constitute a complete Site Plan Package. Incomplete

More information

Porter County Plan Commission

Porter County Plan Commission Plan Type: Development Plan Administrative DRC PC Primary Plan Administrative DRC PC Secondary Plat/Replat Administrative DRC PC PUD Conceptual Detailed Final Project Information Project Name: Developer

More information

CITY OF DES MOINES, IA PERMIT AND DEVELOPMENT CENTER 602 Robert D Ray Drive Des Moines, IA Phone:

CITY OF DES MOINES, IA PERMIT AND DEVELOPMENT CENTER 602 Robert D Ray Drive Des Moines, IA Phone: CITY OF DES MOINES, IA PERMIT AND DEVELOPMENT CENTER 602 Robert D Ray Drive Des Moines, IA 50311 Phone: 515-283-4200 Minor Site Plan list This checklist should be used as a guide in the preparation of

More information

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.)

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.) 1. Identification CITY OF FENTON 301 South Leroy Street Fenton, Michigan 48430-2196 (810) 629-2261 FAX (810) 629-2004 Site Plan Review Application Project Name Applicant Name Address City/State/Zip Phone

More information

TOWN OF AMHERST PLANNING DEPARTMENT MINOR SITE PLAN AND MINOR ADJUSTMENT REVIEW AND APPROVAL PROCEDURE

TOWN OF AMHERST PLANNING DEPARTMENT MINOR SITE PLAN AND MINOR ADJUSTMENT REVIEW AND APPROVAL PROCEDURE TOWN OF AMHERST PLANNING DEPARTMENT MINOR SITE PLAN AND MINOR ADJUSTMENT REVIEW AND APPROVAL PROCEDURE This application package includes the following: Application Procedures Application Form & Checklist

More information

Rezoning/OCP Amendment Application. Current OCP Designation. Proposed OCP Designation

Rezoning/OCP Amendment Application. Current OCP Designation. Proposed OCP Designation Development Permit Application Rezoning/OCP Amendment Application Zoning DP Area yes no Variances Requested Development Details Property Size (m² or ha) Current Zoning Current OCP Designation Proposed

More information

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS 101 General 102 Submittal Requirements A. Initial Submittal B. Second Submittal 103 Plan Requirements A. Subdivisions B. Site Plans 104 Approval of

More information

SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS

SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS INCORPORATED VILLAGE OF ROCKVILLE CENTRE BUILDING DEPARTMENT SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS Presubmission - Prior to a formal submission, the applicant should meet in person with

More information

City of Beaumont. Public Works Engineering. Street Improvement Plan Checklist REV 4/18/16

City of Beaumont. Public Works Engineering. Street Improvement Plan Checklist REV 4/18/16 City of Beaumont Public Works Engineering Project Name: TR: Project No.: Date: Street Improvement Plan Checklist Chk A. All Sheets 1. 24" x 36" 2. Signed by the engineer-of-work 3. Marked with the contact

More information

DESIGN REVIEW PROCESS AND APPLICATION

DESIGN REVIEW PROCESS AND APPLICATION DESIGN REVIEW PROCESS AND APPLICATION Design review is the first step in the process of any construction project requiring permits. The Community Redevelopment Agency (CRA) Board is responsible for ensuring

More information

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION 4.0. INTRODUCTION PART 4 STANDARD DRAWINGS FOR CONSTRUCTION In this document, Ivins City adopts the most recent edition (currently 2007), including all amendments, of the APWA Utah Chapter s Manual of

More information

SITE PLAN Application Packet (Required For All Non-Residential Development Projects)

SITE PLAN Application Packet (Required For All Non-Residential Development Projects) SITE PLAN Application Packet (Required For All Non-Residential Development Projects) Community Development Department 90 North Main Street, Tooele, UT 84074 (435) 843-2130 Fax (435) 843-2139 Dear Applicant,

More information

LOWNDES COUNTY ENGINEERING PLAN REVIEW CHECKLIST. Design Professional: Phone: Developer: Phone: 2 nd Submittal (No Fee)

LOWNDES COUNTY ENGINEERING PLAN REVIEW CHECKLIST. Design Professional: Phone: Developer: Phone: 2 nd Submittal (No Fee) MEMORANDUM MICHAEL B. FLETCHER, P.E. COUNTY ENGINEER 327 N. Ashley Street Valdosta, GA 31601 Telephone: (229) 671-2424 Fax: (229) 245-5299 mfletcher@lowndescounty.com LOWNDES COUNTY ENGINEERING PLAN REVIEW

More information

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST YES* GENERAL SUBMISSION ITEMS Does the submission include: 1. Thirteen (13) copies of completed Application Form? 2. Thirteen (13) copies of the Preliminary

More information

PLANNING AND DEVELOPMENT

PLANNING AND DEVELOPMENT OVERVIEW Effective January 1, 1992 all applications for multi-family residential and all non-residential building permits require site plan approval before permit issuance. All new developments and existing

More information

SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV

SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV COMMUNITY DEVELOPMENT DEPARTMENT 33325 8 th Avenue South Federal Way WA 98003 253-835-2607; Fax 253-835-2609 www.cityoffederalway.com SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV USE PROCESS

More information

DEVELOPMENT SERVICES SITE PLAN SUBMITTAL 2.2.3

DEVELOPMENT SERVICES SITE PLAN SUBMITTAL 2.2.3 DEVELOPMENT SERVICES SITE PLAN SUBMITTAL 2.2.3 Unified Development Code (UDC) Article 2, Applications, Procedures and Criteria provides the steps for applying the Unified Development Code standards to

More information

SITE PLAN APPLICATION

SITE PLAN APPLICATION SITE PLAN APPLICATION SECTION 1. APPLICANT/OWNER INFORMATION Please Print or Type Applicant/Developer: City: State: Zip: Telephone: Fax: E-mail: Applicant s Status: (Check One) Owner Tenant Prospective

More information

Conceptual, Preliminary and Final Site Plan Review in Holladay City

Conceptual, Preliminary and Final Site Plan Review in Holladay City Conceptual, Preliminary and Final Site Plan Review in Holladay City The City of Holladay incorporated in December, 1999 and adopted its own zoning ordinance in May, 2000. All land use decisions are made

More information

Zoning Amendment Carlson Z AP 8234 Carlson under separate cover Development Permit/Specific Use PSCo DP AP 8237 PSCo

Zoning Amendment Carlson Z AP 8234 Carlson under separate cover Development Permit/Specific Use PSCo DP AP 8237 PSCo FILED ELECTRONICALLY May 3, 2017 Ms. Lori Hight, AICP Senior Planner City Development 9500 Civic Center Drive Thornton, CO 80229 Re: Response to Comments on the Second Review of the Land Development Approvals

More information

CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION:

CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION: CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION: LOG NO.: LEGEND REVIEW REVIEWED BY DATE / - Requirement satisfied 1 O Requirement not satisfied 2?

More information

Application for Site Plan Review

Application for Site Plan Review Application for Site Plan Review 3275 Central Blvd., Hudsonville, Michigan 49426-1450, 616.669.0200 fax 616.669.2330 It is STRONGLY recommended that any application that must go before the Planning Commission

More information

Appendix E-4. City of Fort Collins. Requirements for Utility Plans

Appendix E-4. City of Fort Collins. Requirements for Utility Plans Appendix E-4 City of Fort Collins Requirements for Utility Plans Project Name: Project Planner: Design Engineering Firm: Developer: All applications for final development plans must include final development

More information

DEPARTMENT OF COMMUNITY DEVELOPMENT SITE PLAN INFORMATION

DEPARTMENT OF COMMUNITY DEVELOPMENT SITE PLAN INFORMATION DEPARTMENT OF COMMUNITY DEVELOPMENT SITE PLAN INFORMATION 220 Clay Street Cedar Falls, Iowa 50613 General Information: Applications for developing a commercial, multi-family, or residential (in an overlay

More information

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable

More information

Existing and proposed contours at 1-foot intervals. The fill and/or excavation quantities in cubic yards.

Existing and proposed contours at 1-foot intervals. The fill and/or excavation quantities in cubic yards. PLAN REQUIREMENTS The plans for street design shall conform to the requirements of Sections 3 and 4. The following requirements shall also be shown on the plans where applicable. Road and Storm Plans:

More information

Mailing Address: Fax number: City: State: Zip: Property Owner: City: State: Zip: City: State: Zip:

Mailing Address: Fax number: City: State: Zip:   Property Owner: City: State: Zip:   City: State: Zip: / Department of Community Development ARCHITECTURAL REVIEW APPLICATION 73-510 Fred Waring Drive Palm Desert California 92260 (760) 346-0611 Fax (760) 776-6417 Applicant: Telephone: Mailing Address: Fax

More information

SECTION 3 IMPROVEMENT PLAN REQUIREMENTS

SECTION 3 IMPROVEMENT PLAN REQUIREMENTS SECTION 3 IMPROVEMENT PLAN REQUIREMENTS CONTENTS Page 3-1 Digital Submittals 3-2 3-2 Paper Size and Scale 3-2 3-3 Drafting Standard 3-2 3-4 Title Sheet 3-2 3-5 Title Block 3-3 3-6 Drainage, Sewer, Water,

More information

TOWN of LAKESHORE SITE PLAN CHECKLIST

TOWN of LAKESHORE SITE PLAN CHECKLIST TOWN of LAKESHORE SITE PLAN CHECKLIST Last Revised December 17, 2009 Project Name: Project Location: Date Submitted: Name Phone Number E-mail Address Owner: Contractor/ Engineer: ( ) ( ) Applicant: ( )

More information

CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS

CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE E-10 ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS The City of Lompoc has determined that the Engineering Division should administer and issue Encroachment

More information

Essential Skills: Reading and Interpreting Maps and Plans

Essential Skills: Reading and Interpreting Maps and Plans Essential Skills: Reading and Interpreting Maps and Plans Prepared for: NEW YORK STATE PLANNING FEDERATION April 14, 2015 Prepared by: BME ASSOCIATES Peter G. Vars, P.E. Stages of Plan Review Concept /

More information

ACSA PLAN REVIEW CHECKLIST (Guideline Only) (4) Standard water and sewer general plan notes (attached).

ACSA PLAN REVIEW CHECKLIST (Guideline Only) (4) Standard water and sewer general plan notes (attached). ACSA PLAN REVIEW CHECKLIST (Guideline Only) Revised: December 3, 2015 General (1) Proper Title (2) Vicinity map on first sheet. (3) Date and latest plan revision. (4) Standard water and sewer general plan

More information

Checklist for Minor Plan Modification

Checklist for Minor Plan Modification Checklist for Minor Plan Modification All submittal information shall be provided to the Community Development Department. All submittal information shall be presented along with the Uniform Application,

More information

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS 11.01.00 Preliminary Site Plan Approval 11.01.01 Intent and Purpose 11.01.02 Review 11.01.03 Application 11.01.04 Development Site to be Unified 11.01.05

More information

1.1 GENERAL RECORD DRAWING REQUIREMENTS

1.1 GENERAL RECORD DRAWING REQUIREMENTS Page 1 of 5 VILLAGE OF ROMEOVILLE RECORD DRAWINGS CHECKLIST PART I GENERAL Record drawings are required to provide a means of schematic verification that the intent of the approved engineering design has

More information

Authorized Agent: City of Manassas Check List Attached: Contact: Address: Phone Number: Fax Number: Developer s Name: Phone Number:

Authorized Agent: City of Manassas Check List Attached: Contact:   Address: Phone Number: Fax Number: Developer s Name: Phone Number: CITY OF MANASSAS DEPARTMENT OF COMMUNITY DEVELOPMENT DEVELOPMENT SERVICES DIVISION 9027 Center Street Room 201 Manassas, Virginia, 20110 Phone: 703-257-8278 Fax: 703-257-5831 Application Date: APPLICANT

More information

Community & Economic Development Department Planning Division Frederick Street PO Box 8805 Moreno Valley, CA SUBMITAL REQUIREMENTS

Community & Economic Development Department Planning Division Frederick Street PO Box 8805 Moreno Valley, CA SUBMITAL REQUIREMENTS Community & Economic Development Department Planning Division 14177 Frederick Street PO Box 8805 Moreno Valley, CA 92552-0805 (951) 413-3206 Fax (951) 413-3210 SECOND UNITS Completed and Signed Project

More information

Anne Arundel County Dept. of Inspections and Permits Storm Drain Checklist

Anne Arundel County Dept. of Inspections and Permits Storm Drain Checklist Project Name Project Number Engineer Plans are to be designed based on the standards set forth in the Anne Arundel County Design Manual Standards and Specifications, and all other manuals as stipulated

More information

CITY OF MUSKEGO DRAFTING STANDARDS

CITY OF MUSKEGO DRAFTING STANDARDS CITY OF MUSKEGO DRAFTING STANDARDS GENERAL - These standards apply to all plans. 1. Plans must be prepared on sheets measuring 36 inch across and 22 inch to 24 inch high unless otherwise specified under

More information

BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006

BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006 Project Name: BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006 Phase: Unit: # Lots: Development Type (residential, commercial, industrial, etc.) Braselton Project No.

More information

City of Santa Paula Planning Department

City of Santa Paula Planning Department City of Santa Paula Planning Department INSTRUCTIONS FOR SUBMITTING APPLICATIONS DESIGN REVIEW, PLANNED DEVELOPMENT PERMITS, CONDITIONAL USE PERMITS AND VARIANCES A. ITEMS / DOCUMENTS REQUIRED FOR SUBMITTAL:

More information

City of Colleyville Community Development Department. Site/Landscape Plan Application Packet

City of Colleyville Community Development Department. Site/Landscape Plan Application Packet City of Colleyville Community Development Department Site/Landscape Plan Application Packet 1 Development Application Fees City of Colleyville 100 Main Street Colleyville TX 76034 817.503.1050 Zoning Zoning

More information

PLANNING Development Services Department

PLANNING Development Services Department PLANNING Development Services Department Date Stamp APPLICATION SUBMITTAL CHECKLIST for Design Review Case Number: I acknowledge that the City of Glendale requires the following items be submitted before

More information

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360)

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA 98501 (360) 754-4180 Email: cdd@ci.tumwater.wa.us WATER-SEWER-STREET-STORM (IN CITY) Submittal Checklist TUM - RCVD BY DATE STAMP APPLICANT INFORMATION

More information

Town of Westlake Construction Plans Review Checklist

Town of Westlake Construction Plans Review Checklist CONSTRUCTION PLANS CONTENTS All Drawings 24 x 36 Cover Sheet Final Plat Site Plan Demolition Plan Utility Plan Drainage Area Map and Calculations Paving Plan & Profile Sheets Storm Drain Plan & Profile

More information

CITY OF MERCER ISLAND

CITY OF MERCER ISLAND CITY OF MERCER ISLAND DEVELOPMENT SERVICES GROUP 9611 SE 36TH STREET MERCER ISLAND, WA 98040 PHONE: 206.275.7605 www.mercergov.org NONLAND USE APPLICATION- PLAN SET GUIDE The applicant for a land use approval

More information

Applying for a Site Development Review

Applying for a Site Development Review Guide What is it? Applying for a Who approves it? ensures that new buildings or land uses are compatible with their sites and with the surrounding environment, other development, and traffic circulation.

More information

Applying for a Site Development Review (Sign CVCBD only)

Applying for a Site Development Review (Sign CVCBD only) Guide Applying for a Site Development Review (Sign CVCBD only) What is it? Site Development Review ensures that new buildings or land uses are compatible with their sites and with the surrounding environment,

More information

Please remove and replace the entire Table of Contents, Section A to Section J and all Appendices.

Please remove and replace the entire Table of Contents, Section A to Section J and all Appendices. Please remove and replace the entire Table of Contents, Section A to Section J and all Appendices. The following is a list of changes to the Design Criteria: 1. A2.01 General Note 4 Utility Coordination

More information

CONCEPT REVIEW GUIDELINES

CONCEPT REVIEW GUIDELINES Department of Planning & Community Development @ Jefferson Station 1526 E. Forrest Avenue Suite 100 East Point, GA 30344 404.270.7212 (Phone) 404.765.2784 (Fax) www.eastpointcity.org CONCEPT REVIEW GUIDELINES

More information

CHAPTER 11. Plan Standards

CHAPTER 11. Plan Standards CHAPTER 11 Plan Standards A. Introduction The city requires uniform public improvement plans for ease of record keeping and understanding. The following standards govern most plan submittals to the city.

More information

MINOR SITE PLAN APPLICATION COVER SHEET

MINOR SITE PLAN APPLICATION COVER SHEET MINOR SITE PLAN APPLICATION COVER SHEET TOWN OF CLAYTON Planning Department 111 E. Second St., P.O. Box 879 Clayton, NC 27528 Phone: 919-553-5002 Fax: 919-553-1720 Name of Project: Date: Applicant Name:

More information

SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT

SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT SINGLE-FAMILY SITE PLAN INFORMATION PACKET GENERAL INFORMATION This information packet explains how your application for a single-family site plan will

More information

Maintenance of Traffic sequence of operations including any phasing and detour maps;

Maintenance of Traffic sequence of operations including any phasing and detour maps; All Local-let projects are required to have a Stage 2 submittal to the LPA Manager for review. The only exceptions are 2-lane resurfacing, striping, guardrail, and raised pavement markers, unless otherwise

More information

CITY OF DANA POINT DEVELOPMENT REVIEW

CITY OF DANA POINT DEVELOPMENT REVIEW Section I EARTHWORK CITY OF DANA POINT DEVELOPMENT REVIEW COST ESTIMATE UNIT PRICE LIST May 2002 Page 1 of 12 Section I EARTHWORK TABLE OF CONTENTS SECTION AND TOPICS...PAGE INTRODUCTION... i I EARTHWORK...

More information

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil ing Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST The following checklist consists of the minimum requirements for preparation

More information

MAJOR GRADING PLAN CHECKLIST

MAJOR GRADING PLAN CHECKLIST MAJOR GRADING PLAN CHECKLIST PUBLIC WORKS DEPARTMENT / ENGINEERING DIVISION 8130 Allison Avenue, La Mesa, CA 91942 Phone: (619) 667-1166 Fax: (619) 667-1380 Grading plans shall address both rough grading

More information

ACWWA DRAWING SUBMITTAL INFORMATION - UTILITY DRAWING REQUIREMENTS

ACWWA DRAWING SUBMITTAL INFORMATION - UTILITY DRAWING REQUIREMENTS ACWWA DRAWING SUBMITTAL INFORMATION - UTILITY DRAWING REQUIREMENTS Detailed construction drawings for system extensions shall be prepared for approval with a submittal to the Authority. All construction

More information

Site Plan/Building Permit Review

Site Plan/Building Permit Review Part 6 Site Plan/Building Permit Review 1.6.01 When Site Plan Review Applies 1.6.02 Optional Pre- Application Site Plan/Building Permit Review (hereafter referred to as Site Plan Review) shall be required

More information

PRECISE GRADING PLAN CHECKLIST

PRECISE GRADING PLAN CHECKLIST PRECISE GRADING PLAN CHECKLIST PUBLIC WORKS DEPARTMENT / ENGINEERING DIVISION 8130 Allison Avenue, La Mesa, CA 91942 Phone: 619. 667.1166 Fax: 619. 667.1380 Grading plans shall address both rough grading

More information

CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET

CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET THE FOLLOWING PACKET CONTAINS: PETITION FOR NONRESIDENTIAL DEVELOPMENT SITE PLAN AND COMMUNITY DESIGN REVIEW SCHEDULE OF DATES

More information

Anne Arundel County Dept. of Inspections and Permits Water Sewer Plan Checklist

Anne Arundel County Dept. of Inspections and Permits Water Sewer Plan Checklist Project Name Project Number Engineer Plans are to be designed based on the standards set forth in the Anne Arundel County Design Manual Standards and Specifications, and all other manuals as stipulated

More information

September 21, Mannik Smith Group 1771 North Dixie Highway Monroe, Michigan RE: LA Fitness City File No.: CVLP

September 21, Mannik Smith Group 1771 North Dixie Highway Monroe, Michigan RE: LA Fitness City File No.: CVLP CITY OF ANN ARBOR, MICHIGAN Public Services Area / Engineering 301 E. Huron Street, P.O. Box 8647 Ann Arbor, Michigan 48107 Phone (734) 794-6410 Fax (734) 994-1744 Web: www.a2gov.org Printed on recycled

More information

City of Madison Site Plan Verification

City of Madison Site Plan Verification City of Madison Site Plan Verification PROJECT: LNDSPR-2016-00061 Review Status Reviewer Reviewed Engineering Mapping Lori Zenchenko Jun 28 2016 Engineering Review Main Office Brenda Stanley Jun 28 2016

More information

CITY OF SCHENECTADY NEW YORK CITY PLANNING COMMISSION

CITY OF SCHENECTADY NEW YORK CITY PLANNING COMMISSION CITY OF SCHENECTADY NEW YORK CITY PLANNING COMMISSION Christine S. Primiano, Principal Planner Room 14, City Hall, Jay Street SCHENECTADY, NY 12305-1938 518.382.5147 cprimiano@schenectadyny.gov www.cityofschenectady.com

More information

Government Of Newfoundland & Labrador Municipal Water, Sewer And Roads Master Construction Specifications

Government Of Newfoundland & Labrador Municipal Water, Sewer And Roads Master Construction Specifications PAGE NO. : 1 OF 4 Revision Date: July 2009 STANDARD DRAWINGS TABLE OF CONTENTS DRAWING # DESCRIPTION 0030............ Work Adjacent to Roadway 0040............ Work at the Edge of Roadway 0050............

More information

3. DESIGN SPECIFICATIONS

3. DESIGN SPECIFICATIONS Schedule H to Bylaw 7452, Subdivision Bylaw Page 10 3. DESIGN SPECIFICATIONS 3.1 General 3.1.1 The Design Specifications apply to the design of sanitary sewers, storm drains, waterworks, roadways, and

More information

City of Hamilton INFORMATION FOR CONDITIONAL USE PERMIT

City of Hamilton INFORMATION FOR CONDITIONAL USE PERMIT City of Hamilton INFORMATION FOR CONDITIONAL USE PERMIT There is a $200.00 non-refundable fee for each request. Requests must be completed and submitted to the Public Works Department, City of Hamilton,

More information

Zoning District: R-1, R-2, and R-4 Applicant: Exeter Rose Farm, LLC, 953 Islington Street #23D Portsmouth, NH 03801

Zoning District: R-1, R-2, and R-4 Applicant: Exeter Rose Farm, LLC, 953 Islington Street #23D Portsmouth, NH 03801 2220.00, Town Planner Town Planning Office, Town of Exeter 10 Front Street Exeter, NH 03833 Re: Exeter Rose Farm Subdivision Design Review Engineering Services Exeter, New Hampshire Site Information: Tax

More information

Miscellaneous. Demolition

Miscellaneous. Demolition Public Improvements Miscellaneous 1 Mobilization L.S. ** 2 Clearing and Grubbing L.S. *** 3 Structural Concrete Incl. Reinforcing C.Y. $1,325.00 4 6" PVC Sleeves L.F. $26.00 Demolition 5 Remove Asphalt

More information

MASTER PLAN PHASE: MINOR SUBDIVISION APPLICATION COVER SHEET

MASTER PLAN PHASE: MINOR SUBDIVISION APPLICATION COVER SHEET TOWN OF CLAYTON Planning Department 111 E. Second St., P.O. Box 879 Clayton, NC 27528 Phone: 919-553-5002 Fax: 919-553-1720 MASTER PLAN PHASE: MINOR SUBDIVISION APPLICATION COVER SHEET Name of Project:

More information

Article 4 PROCEDURES for PLOT PLAN and SITE PLAN REVIEW

Article 4 PROCEDURES for PLOT PLAN and SITE PLAN REVIEW Article 4 PROCEDURES for PLOT PLAN and SITE PLAN REVIEW Section 4.01 Purpose It is the intent of this Article to specify standards, application and data requirements, and the review process which shall

More information

Survey Requirements. Design Guidelines and Standards. June Office of the University Architect

Survey Requirements. Design Guidelines and Standards. June Office of the University Architect Design Guidelines and Standards Survey Requirements June 2004 Office of the University Architect Construction Management P.O. Box 210181 Cincinnati, Ohio 45221-0181 Table of Contents Survey Requirements

More information

dpd client assistance memo CAM Plot Plan Requirements Basic Plot Plan What is a Plot Plan?

dpd client assistance memo CAM   Plot Plan Requirements Basic Plot Plan What is a Plot Plan? dpd Seattle Department of Planning and Development formerly the Department of Design, Construction and Land Use CAM 103 client assistance memo Plot Plan Requirements November 2001 Applications for City

More information

Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project

Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project Bureau of Engineering SURVEY DIVISION REQUEST FOR TOPOGRAPHIC SURVEY Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project Caltrans involvement (must

More information

Operating Standards Attachment to Development Application

Operating Standards Attachment to Development Application Operating Standards Attachment to Development Application Planning & Development Services 2255 W Berry Ave. Littleton, CO 80120 Phone: 303-795-3748 Mon-Fri: 8am-5pm www.littletongov.org SITE DEVELOPMENT

More information

Owner / Architect Certification of Complete Documentation for the Additions and Remodels Conditional Approval Review

Owner / Architect Certification of Complete Documentation for the Additions and Remodels Conditional Approval Review Step 1: Request for Conditional Approval, page 1 of 5 Owner / Architect Certification of Complete Documentation for the Additions and Remodels Conditional Approval Review I,, the Property Owner, or Owner

More information

ADMINISTRATIVE PERMIT SUBMITTAL REQUIREMENTS

ADMINISTRATIVE PERMIT SUBMITTAL REQUIREMENTS ADMINISTRATIVE PERMIT SUBMITTAL REQUIREMENTS DEVELOPMENT DESIGN REVIEW (DDR) Number of Copies Application Form 1 Supplemental Project Information Questionnaire 1 Assessor s Parcel Map (with property outlined)

More information

APPENDIX D: DRAWING SUBMISSION STANDARDS

APPENDIX D: DRAWING SUBMISSION STANDARDS 1.0 FIRST SUBMISSION CONCEPTUAL DESIGN Once the Developer has obtained approval for a Development Application where Park or Open Space improvements are required, a detailed Park or Open Space submission

More information

A. ARTICLE 4 SKETCH PLAN REQUIREMENTS, MAJOR SUBDIVISION AND/OR LAND DEVELOPMENT

A. ARTICLE 4 SKETCH PLAN REQUIREMENTS, MAJOR SUBDIVISION AND/OR LAND DEVELOPMENT 400. 402.A. ARTICLE 4 SKETCH PLAN REQUIREMENTS, MAJOR SUBDIVISION AND/OR LAND DEVELOPMENT SECTION 400 PURPOSE The purpose of the Sketch Plan is to provide an opportunity for the applicant to consult early

More information

Minor Site Plan Review Process

Minor Site Plan Review Process Minor Site Plan Review Process Pre-Application Conference Community Meeting (optional) Submit Application Determination of Completeness Staff Report (optional) Technical Review Committee Decision Notice

More information

CITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS

CITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS DEVELOPMENT APPLICATION PROCESS Development Applications are reviewed by the El Mirage Technical Advisory Committee (TAC) to ensure Building, Engineering and Zoning compliance before scheduling public

More information

LARAMIE COUNTY PLANNING & DEVELOPMENT OFFICE 3966 Archer Pkwy Cheyenne, WY Phone (307) Fax (307)

LARAMIE COUNTY PLANNING & DEVELOPMENT OFFICE 3966 Archer Pkwy Cheyenne, WY Phone (307) Fax (307) 3966 Archer Pkwy Cheyenne, WY 82009 planning@laramiecounty.com Phone (307) 633-4303 Fax (307) 633-4616 SITE PLAN REVIEW PROCESS 1. Pre-Application Meeting: The applicant shall meet with a Laramie County

More information

DOCUMENT MINIMUM CONSTRUCTION DRAWING REQUIREMENTS FOR PRELIMINARY REVIEW/APPROVAL 1.2. GALVESTON COUNTY CONSOLIDATED DRAINAGE DISTRICT (GCCDD)

DOCUMENT MINIMUM CONSTRUCTION DRAWING REQUIREMENTS FOR PRELIMINARY REVIEW/APPROVAL 1.2. GALVESTON COUNTY CONSOLIDATED DRAINAGE DISTRICT (GCCDD) DOCUMENT 01105 FOR PRELIMINARY REVIEW/APPROVAL PART I: SUBMITTAL 1.1 CITY OF FRIENDSWOOD (COF) A. Submit four (4) copies of drawings. B. Submit by 5:00 PM a minimum of fourteen calendar days (14 cd) prior

More information

CITY OF MERCER ISLAND DEVELOPMENT SERVICES GROUP 9611 SE 36 th Street, Mercer Island, WA (206)

CITY OF MERCER ISLAND DEVELOPMENT SERVICES GROUP 9611 SE 36 th Street, Mercer Island, WA (206) CITY OF MERCER ISLAND DEVELOPMENT SERVICES GROUP 9611 SE 36 th Street, Mercer Island, WA 98040 (206) 275-7605 SUBMITTAL REQUIREMENTS FOR DESIGN COMMISSION APPROVAL & SIGNAGE APPROVAL PURPOSE: Design Commission

More information

CITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS

CITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS DEVELOPMENT APPLICATION PROCESS I. Technical Advisory Committee (TAC) 1. Submit TAC Review Application (See Page 3 for TAC Review Application Requirements) 2. Review of TAC Review Application by Technical

More information

City of Romulus Administrative Review Committee (ARC) Sketch Plan Submittal Checklist and Review Process

City of Romulus Administrative Review Committee (ARC) Sketch Plan Submittal Checklist and Review Process Administrative Review Committee (ARC) Sketch Plan Submittal Checklist and Review Process SUBMISSION CHECKLIST For submission of all ARC Sketch Plan projects the following must be provided: Signed ARC Sketch

More information

City of Vaughan Engineering Department DESIGN STANDARD DRAWINGS

City of Vaughan Engineering Department DESIGN STANDARD DRAWINGS City of Vaughan Engineering Department DESIGN STANDARD DRAWINGS March 2004 STANDARD DRAWINGS Partners With The Environment March 2004 FORWARD The March 2004 version of the City of Vaughan Design Standard

More information

CHECKLIST 9-O. 24. Area of project in square feet and acres? C-1 d

CHECKLIST 9-O. 24. Area of project in square feet and acres? C-1 d Development Name: Submitted by: Highlands County Engineering Department Improvement Plan Checklist Date Received: Due Date: Y N E N / S O A Permits/Approvals 1. Copy of water management district permit

More information

SCHEDULE 10 ENGINEERING DRAWING SUBMISSION

SCHEDULE 10 ENGINEERING DRAWING SUBMISSION SCHEDULE 10 ENGINEERING DRAWING SUBMISSION Subdivision, Development and Servicing Bylaw No. 1535 10. ENGINEERING DRAWING SUBMISSIONS TABLE OF CONTENTS 1.0 General 3 1.1. Introduction 3 1.2. General Requirements

More information

City of Miami Planning and Zoning Department UDRB SUBMITTAL CHECK LIST

City of Miami Planning and Zoning Department UDRB SUBMITTAL CHECK LIST City of Miami Planning and Zoning Department UDRB SUBMITTAL CHECK LIST One 11 x 17 signed and sealed original set and 11 copies must be submitted to the Planning and Zoning Department inclusive of all

More information

Washington County Road Engineering Plan Submittal/Review Checklist

Washington County Road Engineering Plan Submittal/Review Checklist Washington County Road Engineering Plan Submittal/Review Checklist Washington County Land Use Case File Number: Parcel(s): Developer/Owner Name(s): Developer/Owner E-mail(s): The following elements should

More information

DEVELOPMENT PLAN CHECKLIST

DEVELOPMENT PLAN CHECKLIST Project Identification Information: DEVELOPMENT PLAN CHECKLIST 1.0 GENERAL 1.1 Additional information as required by specific Land Use 1.2 All sheets to include sheet number ( of ) 1.3 Seal and signature

More information

UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1

UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1 UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1 ENGINEERING STANDARDS FOR UTILITY AND STREET CONSTRUCTION PLANS MARCH 2014 CONSTRUCTION PLAN SHEET FORMAT REQUIREMENTS REPRODUCIBLE MYLAR 1.

More information

MINIMUM DRAWING REQUIREMENTS FOR WATER AND SEWER LINE PROJECTS

MINIMUM DRAWING REQUIREMENTS FOR WATER AND SEWER LINE PROJECTS Public Works Department Water & Wastewater Services WATER & WASTEWATER ENGINEERING DIVISION 2555 West Copans Road Pompano Beach, Florida 33369 954-831-0745 FAX 954-831-0798/0925 MINIMUM DRAWING REQUIREMENTS

More information