1 City of Thornton 9500 Civic Center Drive Thornton, CO Attn: Jay Ruchti, Senior Planner Re: 1st Review of Submittal Materials for Willow Bend Development; CSP (Hansen #1734) Comment Responses Dear Jay: Enclosed you will find our resubmittal for the above referenced project. Below you will find our responses to your comments in bold. CURRENT PLANNING (CP) Senior Planner (Jay Ruchti, ) Conceptual Site Plan (CSP) Map: Need to modify the drawing as follows and as shown on the red lined drawings: a. Typical front setback is 20 feet, except it can be 15 feet to porch that doesn t have livable space above. Response: Comment addressed. b. Please review attached red lined drawings. Response: Comment addressed, specific responses to each comment are noted in Green text within the CSP sheets. c. Need to add a case number, CSP to the drawings as noted on red lined check print. Response: Comment addressed. d. Need to have a community meeting prior to the public hearing as required by Code. Response: As discussed in the review meeting, a public hearing will not be required since the CSP Amendment will be processed administratively. solutions. partnerships. success. t f West 2nd Avenue, Denver, Colorado
2 Page 2 of 5 e. Need to form a Home Owners Association (HOA) to maintain the detention pond/open space. Response: An HOA will be formed at a future date for maintenance responsibilities of Tracts, channel and detention pond. f. Add note to the CSP Standard Flexibility Statement: During subsequent reviews associated with the actual development of the site identified in the CSP, the planning Director and/or Development Engineering Director may allow for minor adjustments in the Final Site Plan, Subdivision Plat, and Final Landscape Plan and associated final engineering documents. The changes to the development would be due to actual site conditions, unforeseen technical issues involving infrastructure on the site and changes to the building products previously identified or described on the CSP graphic as approved. Response: Comment addressed, added to Sheet 2 of the CSP. LANDSCAPING Senior Landscape Architect (Heidi Feigal, ) See attached LA red line drawings for comments. Response: Specific responses to each comment are noted in Green text within the CSP sheets. DEVELOPMENT ENGINEERING (DE) Civil Engineer (Crystal Carlow, ) See attached DE red line drawings for comments. Response: Specific responses to each comment are noted in Green text within the CSP sheets. Comment on Traffic Study: Please submit an updated traffic study with current counts and analysis. Please see Section 100 of the Standards & Specifications, as well as the The "Traffic Report Requirements" handout provided for the report requirements. Response: An updated Traffic Study has been completed by FHU and included with this resubmittal. Thornton Fire Department (TFD) Fire Protection Engineer I (Dan Biro, ) Thornton Fire Department has reviewed the referral; see attached comment letter. The conceptual site plan amendment is not approved and requires the following corrections
3 Page 3 of 5 1. The existing well shall be capped and any storage tanks storing flammable or combustible liquids shall be removed. If the existing well and storage tanks are to remain they shall meet the following setback requirements: a. Buildings shall not be constructed within 200 ft. of existing wells. b. Buildings shall not be constructed within 350 ft. of flammable or combustible liquid tanks. School buildings (Group E occupancy) shall not be constructed within 500 ft. of flammable or combustible liquid tanks. Response: All existing and known well head have been capped and there are no existing storage tanks on site. 2. Phase 1 will need a second point of access from E. 144th Avenue or Holly Street. Please show this road on the drawing. Response: Per the request of Thornton all phasing has been removed from the CSP, an emergency access to location from Holly Street will be provided with the construction plans for Phase 1 3. Determination of fire flow requirements for proposed structures will be accordance with the IFC Appendix B. The fire flow will be based on the largest fire flow calculated area (FFCA). The FFCA is total floor area of all floors within the exterior walls and horizontal projects of the roof. Provide the FFCA so the Fire Department can review hydrant spacing. Response: All single family lots are anticipated to have a structure less than 5,000 square feet. The house product has not been developed at this time. In addition Tract M is dedicated as a future school site, floor square footage unknown at this time. 4. Where new water mains are extended along streets where hydrants are not needed for protection of structure or similar fire problems, fire hydrants shall be provided at spacing not to exceed 1,200 ft. to provide for transportation hazards. Response: Comment noted and to be addressed within the Construction Drawings. INFRASTRUCTURE ENGINEERING Senior Surveyor (Tom Starkweather, ) The Survey Section has reviewed the above mentioned items and has the following comments: 1. Several of the courses in the Legal Description do not match what is shown on the drawings. Response: Legal description updated to match the three separately owned parcels within the project boundary.
4 Page 4 of 5 2. No existing easements are indicated in the area being developed. Response: Existing easements per the Title Documents have been added to the CSP. 3. The Legal Description in the submitted Title Commitment does not cover the entire area being developed. Response: An updated Title Commitment is included with the resubmittal which covers the entire property boundary consisting of three individual parcels. GIS SERVICES Analyst II (Valorie Plesha, ) GIS Services has reviewed the above mentioned referral and has the following preliminary comments regarding streets and addressing as they pertain to this application. STREET NAMES: Street names will be assigned by GIS once the subdivision plat is submitted, and will be based off the Denver grid, as specified by City code. Response: Comment noted. ADDRESSING: Addresses will be assigned by GIS once the subdivision plat is submitted. Response: Comment noted. XCEL ENERGY Right of Way Processor (Donna George, ) See attached comment letter. Response: All comments pertain to easements to be dedicated with the Final Plat which will be addressed. No action needed for the CSP. ADAMS 27J SCHOOLS Planning Manager (Joy Gerdom, ) See attached comment letter. Response: No action needed for the CSP from the letter. All comments noted for future consideration.
5 Page 5 of 5 Should you have any questions or comments, please feel free to contact me at (303) The resubmitted items include the following updated items: Conceptual Site Plan Drainage Plan Utility Plan Updated Traffic Study Updated Title Commitment Comment Responses on original submittal sheets (5 pdfs) Sincerely, Jansen Strawn Consulting Engineers, Inc. Josh Hooper, PE
City Development Department 9500 Civic Center Drive Thornton, Colorado FAX
City Hall City Development Department 9500 Civic Center Drive 303-538-7295 Thornton, Colorado 80229-4326 FAX 303-538-7373 www.cityofthornton.net Zach Lauterbach Evergreen Devco, Incorporated 2390 East
More informationZoning Amendment Carlson Z AP 8234 Carlson under separate cover Development Permit/Specific Use PSCo DP AP 8237 PSCo
FILED ELECTRONICALLY May 3, 2017 Ms. Lori Hight, AICP Senior Planner City Development 9500 Civic Center Drive Thornton, CO 80229 Re: Response to Comments on the Second Review of the Land Development Approvals
More information12 May CURRENT PLANNING Senior Planner (Jay Ruchti) 1. Put the case number, PLDP , in the upper right hand corner of the document.
12 May 2017 City of Thornton Attn: Jay Ruchti 9500 Civic Center Drive Thornton, CO 80229 Re: Initial Review Response to 04/19/17 Letter Dear Mr. Ruchti: This letter is in response to initial review comments
More informationA. ARTICLE 4 SKETCH PLAN REQUIREMENTS, MAJOR SUBDIVISION AND/OR LAND DEVELOPMENT
400. 402.A. ARTICLE 4 SKETCH PLAN REQUIREMENTS, MAJOR SUBDIVISION AND/OR LAND DEVELOPMENT SECTION 400 PURPOSE The purpose of the Sketch Plan is to provide an opportunity for the applicant to consult early
More informationMINOR DEVELOPMENT PERMIT SUBMITTAL REQUIREMENTS
9500 Civic Center Drive Thornton, CO 80229 CITY DEVELOPMENT DEPARTMENT 303-538-7295 developmentsubmittals@cityofthornton.net MINOR DEVELOPMENT PERMIT SUBMITTAL REQUIREMENTS Applications must contain the
More informationSite Plan/Building Permit Review
Part 6 Site Plan/Building Permit Review 1.6.01 When Site Plan Review Applies 1.6.02 Optional Pre- Application Site Plan/Building Permit Review (hereafter referred to as Site Plan Review) shall be required
More informationPLANNING AND DEVELOPMENT
OVERVIEW Effective January 1, 1992 all applications for multi-family residential and all non-residential building permits require site plan approval before permit issuance. All new developments and existing
More informationConceptual, Preliminary and Final Site Plan Review in Holladay City
Conceptual, Preliminary and Final Site Plan Review in Holladay City The City of Holladay incorporated in December, 1999 and adopted its own zoning ordinance in May, 2000. All land use decisions are made
More informationCHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS
CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS 11.01.00 Preliminary Site Plan Approval 11.01.01 Intent and Purpose 11.01.02 Review 11.01.03 Application 11.01.04 Development Site to be Unified 11.01.05
More informationDOCUMENT MINIMUM CONSTRUCTION DRAWING REQUIREMENTS FOR PRELIMINARY REVIEW/APPROVAL 1.2. GALVESTON COUNTY CONSOLIDATED DRAINAGE DISTRICT (GCCDD)
DOCUMENT 01105 FOR PRELIMINARY REVIEW/APPROVAL PART I: SUBMITTAL 1.1 CITY OF FRIENDSWOOD (COF) A. Submit four (4) copies of drawings. B. Submit by 5:00 PM a minimum of fourteen calendar days (14 cd) prior
More informationDESIGN REVIEW PROCESS AND APPLICATION
DESIGN REVIEW PROCESS AND APPLICATION Design review is the first step in the process of any construction project requiring permits. The Community Redevelopment Agency (CRA) Board is responsible for ensuring
More informationCITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS
DEVELOPMENT APPLICATION PROCESS I. Technical Advisory Committee (TAC) 1. Submit TAC Review Application (See Page 3 for TAC Review Application Requirements) 2. Review of TAC Review Application by Technical
More informationChecklist for Tentative Subdivision Map
Checklist for Tentative Subdivision Map All submittal information shall be provided to the Community Development Department. All submittal information shall be presented along with the Uniform Application,
More informationSUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV
COMMUNITY DEVELOPMENT DEPARTMENT 33325 8 th Avenue South Federal Way WA 98003 253-835-2607; Fax 253-835-2609 www.cityoffederalway.com SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV USE PROCESS
More informationApplying for a Site Development Review (Sign CVCBD only)
Guide Applying for a Site Development Review (Sign CVCBD only) What is it? Site Development Review ensures that new buildings or land uses are compatible with their sites and with the surrounding environment,
More informationPLANNING DEPARTMENT SUBMITTAL REQUIREMENTS FOR CONDITIONAL USE PERMITS CLASS 4 DEVELOPMENT REVIEW PROCESS. A. Written Material
PLANNING DEPARTMENT 970.668.4200 0037 Peak One Dr. PO Box 5660 www.summitcountyco.gov Frisco, CO 80443 SUBMITTAL REQUIREMENTS FOR CONDITIONAL USE PERMITS CLASS 4 DEVELOPMENT REVIEW PROCESS Per the provisions
More informationCITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS
DEVELOPMENT APPLICATION PROCESS Development Applications are reviewed by the El Mirage Technical Advisory Committee (TAC) to ensure Building, Engineering and Zoning compliance before scheduling public
More informationSITE PLAN Application Packet (Required For All Non-Residential Development Projects)
SITE PLAN Application Packet (Required For All Non-Residential Development Projects) Community Development Department 90 North Main Street, Tooele, UT 84074 (435) 843-2130 Fax (435) 843-2139 Dear Applicant,
More informationSANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS
SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS All plans for sanitary sewer main extensions, improvements and modifications
More informationLOWNDES COUNTY ENGINEERING PLAN REVIEW CHECKLIST. Design Professional: Phone: Developer: Phone: 2 nd Submittal (No Fee)
MEMORANDUM MICHAEL B. FLETCHER, P.E. COUNTY ENGINEER 327 N. Ashley Street Valdosta, GA 31601 Telephone: (229) 671-2424 Fax: (229) 245-5299 mfletcher@lowndescounty.com LOWNDES COUNTY ENGINEERING PLAN REVIEW
More informationCommunity & Economic Development Department Planning Division Frederick Street PO Box 8805 Moreno Valley, CA SUBMITAL REQUIREMENTS
Community & Economic Development Department Planning Division 14177 Frederick Street PO Box 8805 Moreno Valley, CA 92552-0805 (951) 413-3206 Fax (951) 413-3210 SECOND UNITS Completed and Signed Project
More informationSITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS
INCORPORATED VILLAGE OF ROCKVILLE CENTRE BUILDING DEPARTMENT SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS Presubmission - Prior to a formal submission, the applicant should meet in person with
More informationPRELIMINARY PLAT CHECK LIST
Name of Proposed Subdivision: The following items must be included with the initial submittal of a Preliminary Plat: Application, filled out completely Project Narrative Pre-application Conference Report
More informationCITY OF RICHMOND SUBDIVISION PLAT AND PUBLIC INFRASTRUCTURE SUBMITTAL, REVIEW AND APPROVAL PROCEDURES
SUBDIVISION PLAT AND PUBLIC INFRASTRUCTURE SUBMITTAL, REVIEW AND APPROVAL PROCEDURES CITY OF RICHMOND 112 JACKSON STREET RICHMOND, TEXAS 77469 PHONE: 281-232-6871 FAX: 281-238-1215 CITY OF RICHMOND PUBLIC
More informationCHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN
N/A Waiver (1) Four (4) copies of application form. (2) Fifteen (15) copies of plan (3) Subdivision/site plan application fee & professional review escrow deposit (4) Variance application fee & professional
More informationApplying for a Site Development Review
Guide What is it? Applying for a Who approves it? ensures that new buildings or land uses are compatible with their sites and with the surrounding environment, other development, and traffic circulation.
More informationCharlotte-Mecklenburg Planning Department Review Fees
Charlotte-Mecklenburg Planning Department Review Fees (Rezoning / Subdivision / Zoning Administration) (July 1, 2010 June 30, 2011) FEES EFFECTIVE JULY 1, 2010 REZONING APPLICATION, CONDITIONAL ZONING
More informationItem 2. September 28, 2017
September 28, 2017 Item 2 Applicant: Georgetown Development Location: 190 N 1100 W Prepared by: Sean Conroy, Community Development Director Public Hearing: No Zone: PRD-1 Attachments: 1. Findings. 2. Project
More informationWILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305
WILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305 COMMUNITY DEVELOPMENT SERVICES (954) 390-2180 FAX: (954) 567-6069 This package includes: General Submittal Procedures Submittal
More informationChecklist for Minor Plan Modification
Checklist for Minor Plan Modification All submittal information shall be provided to the Community Development Department. All submittal information shall be presented along with the Uniform Application,
More informationMinor Site Plan Review Process
Minor Site Plan Review Process Pre-Application Conference Community Meeting (optional) Submit Application Determination of Completeness Staff Report (optional) Technical Review Committee Decision Notice
More informationAPPLICATION FOR SITE PREPARATION PERMIT
Engineering Division 550 Landa Street New Braunfels, Texas 78130 (830) 221-4020 1. Subdivision/Plat Name: Location Description/ Nearest Intersection: Acreage: APPLICATION FOR SITE PREPARATION PERMIT No.
More informationArticle 4 PROCEDURES for PLOT PLAN and SITE PLAN REVIEW
Article 4 PROCEDURES for PLOT PLAN and SITE PLAN REVIEW Section 4.01 Purpose It is the intent of this Article to specify standards, application and data requirements, and the review process which shall
More informationPLANNING Development Services Department
PLANNING Development Services Department Date Stamp APPLICATION SUBMITTAL CHECKLIST for Design Review Case Number: I acknowledge that the City of Glendale requires the following items be submitted before
More informationSUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT
SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT SINGLE-FAMILY SITE PLAN INFORMATION PACKET GENERAL INFORMATION This information packet explains how your application for a single-family site plan will
More informationRecommended Changes to the Public Hearing Draft Zoning Ordinance
DATE: December 6, 2016 TO: Village of Oak Park FROM: Arista Strungys SUBJECT: Recommended Changes Recommended Changes to the Public Hearing Draft Zoning Ordinance ZONING MAP» Edit to remove right-of-way
More informationOakland County Michigan Register of Deeds Plat Engineering, GIS, & Remonumentation Dept. Ph: (248) Fax (248)
Oakland County Michigan Register of Deeds Plat Engineering, GIS, & Remonumentation Dept. Ph: (248)-858-1447 Fax (248)-858-7466 Requirements Needed for Final Condominium Approval General Requirements. 1
More informationCONCEPT REVIEW GUIDELINES
Department of Planning & Community Development @ Jefferson Station 1526 E. Forrest Avenue Suite 100 East Point, GA 30344 404.270.7212 (Phone) 404.765.2784 (Fax) www.eastpointcity.org CONCEPT REVIEW GUIDELINES
More informationMULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST
MULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST This application lists the content and format of the submittal requirements to initiate the Design Review process. An incomplete application will not be
More informationDOUGLAS COUNTY SUBDIVISION RESOLUTION Table of Contents 10/29/91 TABLE OF CONTENTS
ARTICLE 1 TABLE OF CONTENTS ADMINISTRATIVE PROVISIONS Page 101 Short Title... 1-1 102 Purpose... 1-1 103 Control Over Platting... 1-2 104 Authority... 1-3 105 Jurisdiction... 1-3 106 Interpretation...
More informationDEVELOPMENT SERVICES SITE PLAN SUBMITTAL 2.2.3
DEVELOPMENT SERVICES SITE PLAN SUBMITTAL 2.2.3 Unified Development Code (UDC) Article 2, Applications, Procedures and Criteria provides the steps for applying the Unified Development Code standards to
More information1.1 GENERAL RECORD DRAWING REQUIREMENTS
Page 1 of 5 VILLAGE OF ROMEOVILLE RECORD DRAWINGS CHECKLIST PART I GENERAL Record drawings are required to provide a means of schematic verification that the intent of the approved engineering design has
More informationBestall Collaborative Limited Planning Environment Construction Management Development
November 18, 2017 Bestall Collaborative Limited Lori Hight, AICP, Senior Planner City Development Department City of Thornton City Hall 9500 Civic Center Drive Thornton, Colorado 80229-4326 RE: River Valley
More informationFREMONT COUNTY. APPLICATION FOR ZONE CHANGE #2 USE DESIGNATION PLAN (Requires Subsequent Approval of ZC #2 Final Designation Plan) 1.
FREMONT COUNTY APPLICATION FOR ZONE CHANGE #2 USE DESIGNATION PLAN (Requires Subsequent Approval of ZC #2 Final Designation Plan) 1. Project Name: 2. Applicant: Address: City: State: Zip Code: Telephone
More informationSITE PLAN APPLICATION
SITE PLAN APPLICATION SECTION 1. APPLICANT/OWNER INFORMATION Please Print or Type Applicant/Developer: City: State: Zip: Telephone: Fax: E-mail: Applicant s Status: (Check One) Owner Tenant Prospective
More informationTown of Skowhegan Application For Development Review
Town of Skowhegan Application For Development Review Return to: Skowhegan Planning Office 225 Water St., Skowhegan, ME 04976 (207) 474-6904 skowcodesec@skowhegan.org To be filled in by Staff: Project Name:
More informationB.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST
B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST YES* GENERAL SUBMISSION ITEMS Does the submission include: 1. Thirteen (13) copies of completed Application Form? 2. Thirteen (13) copies of the Preliminary
More informationINTENT An Administrative Site Plan is required for the following situations, excluding single-family detached development:
SECTION 13-400 ADMINISTRATIVE SITE PLAN 13-401 INTENT An Administrative Site Plan is required for the following situations, excluding single-family detached development: A. All development on vacant land
More informationTown of Mount Pleasant PRELIMINARY Design Review Submittal Check List June 1, 2014
Town of Mount Pleasant PRELIMINARY Design Review Submittal Check List June 1, 2014 This form is to be completed by either applicant or their representative and submitted with Preliminary Review plans.
More informationPorter County Plan Commission
Plan Type: Development Plan Administrative DRC PC Primary Plan Administrative DRC PC Secondary Plat/Replat Administrative DRC PC PUD Conceptual Detailed Final Project Information Project Name: Developer
More informationOperating Standards Attachment to Development Application
Operating Standards Attachment to Development Application Planning & Development Services 2255 W Berry Ave. Littleton, CO 80120 Phone: 303-795-3748 Mon-Fri: 8am-5pm www.littletongov.org SITE DEVELOPMENT
More informationCITY OF DES MOINES, IA PERMIT AND DEVELOPMENT CENTER 602 Robert D Ray Drive Des Moines, IA Phone:
CITY OF DES MOINES, IA PERMIT AND DEVELOPMENT CENTER 602 Robert D Ray Drive Des Moines, IA 50311 Phone: 515-283-4200 Minor Site Plan list This checklist should be used as a guide in the preparation of
More informationCity of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA Phone: Fax:
City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA 93436 Phone: 805-875-8220 Fax: 805-875-8198 RESIDENTIAL BUILDING PLANS SUBMITTAL REQUIREMENTS A. APPLICATION PROCESS
More informationMASTER PLAN PHASE: MINOR SUBDIVISION APPLICATION COVER SHEET
TOWN OF CLAYTON Planning Department 111 E. Second St., P.O. Box 879 Clayton, NC 27528 Phone: 919-553-5002 Fax: 919-553-1720 MASTER PLAN PHASE: MINOR SUBDIVISION APPLICATION COVER SHEET Name of Project:
More informationAPPLICATION FOR PLANNED UNIT DEVELOPMENT (PUD) DEVELOPMENT PLAN
209 S. Main Street Marysville, Ohio 43040 Phone: (937) 645-7350 Fax: (937) 645-7351 www.marysvilleohio.org APPLICATION FOR PLANNED UNIT DEVELOPMENT (PUD) DEVELOPMENT PLAN *** IMPORTANT INFORMATION ~ Please
More informationMINOR SITE PLAN APPLICATION COVER SHEET
MINOR SITE PLAN APPLICATION COVER SHEET TOWN OF CLAYTON Planning Department 111 E. Second St., P.O. Box 879 Clayton, NC 27528 Phone: 919-553-5002 Fax: 919-553-1720 Name of Project: Date: Applicant Name:
More informationSECTION 9.00 AS-BUILT DRAWING REQUIREMENTS SUB-INDEX
SECTION 9.00 AS-BUILT DRAWING REQUIREMENTS SUB-INDEX 9.00 AS-BUILT DRAWING REQUIREMENTS 9.01 As-Built Check List 1 Supp 1 2016 Supp # 2 Aug. 2017 AS-BUILT DRAWING REQUIREMENTS As-Built Review Fee is $200.00
More informationPlanning Permit Application LAND USE PRELIMINARY APPLICATION (LUP)
Planning Permit Application LAND USE PRELIMINARY APPLICATION (LUP) 415 W 6 th ST ~ Vancouver, WA 98660 PO Box 1995 ~ Vancouver, WA 98668 Phone (360) 487-7800 www.cityofvancouver.us Type Of Work Type I
More information10010 RECORD DRAWING INFORMATION
SECTION 10000 RECORD DRAWING CHECK LIST All entities who construct public infrastructure, private streets, private storm drain collection systems and travel lanes, shall submit to the Town of Cary Engineering
More informationSECTION 2 GENERAL REQUIREMENTS
SECTION 2 GENERAL REQUIREMENTS 2-1 ENGINEER REQUIRED: All plans and specifications for Improvements which are to be accepted for maintenance by the County and private, on-site drainage and grading shall
More informationACWWA DRAWING SUBMITTAL INFORMATION - UTILITY DRAWING REQUIREMENTS
ACWWA DRAWING SUBMITTAL INFORMATION - UTILITY DRAWING REQUIREMENTS Detailed construction drawings for system extensions shall be prepared for approval with a submittal to the Authority. All construction
More informationTOWN OF AMHERST PLANNING DEPARTMENT MINOR SITE PLAN AND MINOR ADJUSTMENT REVIEW AND APPROVAL PROCEDURE
TOWN OF AMHERST PLANNING DEPARTMENT MINOR SITE PLAN AND MINOR ADJUSTMENT REVIEW AND APPROVAL PROCEDURE This application package includes the following: Application Procedures Application Form & Checklist
More informationSite Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.)
1. Identification CITY OF FENTON 301 South Leroy Street Fenton, Michigan 48430-2196 (810) 629-2261 FAX (810) 629-2004 Site Plan Review Application Project Name Applicant Name Address City/State/Zip Phone
More informationAPPENDIX D: DRAWING SUBMISSION STANDARDS
1.0 FIRST SUBMISSION CONCEPTUAL DESIGN Once the Developer has obtained approval for a Development Application where Park or Open Space improvements are required, a detailed Park or Open Space submission
More informationHillside & Foothills Development Application
Hillside & Foothills Development Application This box for office use only File #: Cross Referenced File(s): Fee: Zone(s): Are Pre-Application materials attached? Yes No This application is a request to
More informationCHECKLIST THE FOLLOWING INFORMATION AND DOCUMENTATION MUST BE SUBMITTED TO DEVELOPMENT SERVICES BEFORE YOUR APPLICATION CAN BE PROCESSED.
CHECK LIST MOBILEHOME PERMANENT FOUNDATION BUILDING PERMIT SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT 1810 E. HAZELTON AVENUE, STOCKTON CA 95205 BUSINESS PHONE: (209) 468-3121 INSPECTION REQUEST-24
More informationSUBDIVISION PLAT APPLICATION
SUBDIVISION PLAT APPLICATION ONLY COMPLETE SUBMISSIONS WILL BE PROCESSED CITY OF PORT ST. LUCIE P&Z File No. PLANNING & ZONING DEPARTMENT Fee (Nonrefundable)$ (772)871-5212 FAX: (772)871-5124 Receipt #.......................................
More informationDeveloper Design Review Submittal Requirements - SECTION 5
Developer Design Review Submittal Requirements - SECTION 5 5.0 Developer Design Review 1.0 Procedures for Submittals - All Housing Types 1. Submittals shall be by the Guest Builder or authorized agent
More informationCity of Santa Paula Planning Department
City of Santa Paula Planning Department INSTRUCTIONS FOR SUBMITTING APPLICATIONS DESIGN REVIEW, PLANNED DEVELOPMENT PERMITS, CONDITIONAL USE PERMITS AND VARIANCES A. ITEMS / DOCUMENTS REQUIRED FOR SUBMITTAL:
More informationdpd client assistance memo CAM Plot Plan Requirements Basic Plot Plan What is a Plot Plan?
dpd Seattle Department of Planning and Development formerly the Department of Design, Construction and Land Use CAM 103 client assistance memo Plot Plan Requirements November 2001 Applications for City
More informationCity of Massillon Site Plan Checklist
City of Massillon Site Plan Checklist The following information MUST be included with all Site Plans submitted for review and processing in order to constitute a complete Site Plan Package. Incomplete
More informationLARAMIE COUNTY PLANNING & DEVELOPMENT OFFICE 3966 Archer Pkwy Cheyenne, WY Phone (307) Fax (307)
3966 Archer Pkwy Cheyenne, WY 82009 planning@laramiecounty.com Phone (307) 633-4303 Fax (307) 633-4616 SITE PLAN REVIEW PROCESS 1. Pre-Application Meeting: The applicant shall meet with a Laramie County
More informationResidential Room Addition / Remodel Submittal Requirement Checklist
City of Elko Building Department 1753 College Avenue Elko, Nevada 89801 (775) 777-7220 fax (775) 777-7229 Residential Room Addition / Remodel Submittal Requirement Checklist TWO COMPLETE SETS OF PROPERLY
More informationLast Name: First Name: M.I:
ARCHITECTURE DESIGN REVIEW BOARD APPLICATION OFFICE USE ONLY APPLICATION # Permit # Fee Collected $ 1. Filing Status Initial Submission Amendment Withdrawal 2. Cost of Construction (Industry Standards)
More informationPLANNED SIGN PROGRAM SUBMITTAL REQUIREMENTS
PLANNED SIGN PROGRAM SUBMITTAL REQUIREMENTS City of Greenwood Village Community Development Department 6060 S. Quebec Street Greenwood Village, CO 80111-4591 (303) 486-5783; FAX (303) 773-1238 SUBMITTAL
More informationMINOR SUBDIVISION. [ ] [ ] [ ] [ ] B. Dimensions, bearings and curve data for all property lines and easements.
MINOR SUBDIVISION 190-69. Minor subdivisions. In addition to the requirements indicated in 190-67 (SEE BELOW), the information below shall be shown on the plans for all minor subdivision applications.
More informationDEPARTMENT OF COMMUNITY DEVELOPMENT SITE PLAN INFORMATION
DEPARTMENT OF COMMUNITY DEVELOPMENT SITE PLAN INFORMATION 220 Clay Street Cedar Falls, Iowa 50613 General Information: Applications for developing a commercial, multi-family, or residential (in an overlay
More informationCity of Colleyville Community Development Department. Site/Landscape Plan Application Packet
City of Colleyville Community Development Department Site/Landscape Plan Application Packet 1 Development Application Fees City of Colleyville 100 Main Street Colleyville TX 76034 817.503.1050 Zoning Zoning
More informationProcedure to Petition for Plat Review and Site Plan Review
Economic Development Department (734) 676-7104 or (734) 676-7109 Procedure to Petition for Plat Review and Site Plan Review All site plans shall be submitted to the Economic Development Department to be
More informationDiscretionary Project Submittal Requirements
Discretionary Project Submittal Requirements City of American Canyon Community Development Department 4381 Broadway, Suite 201, American Canyon, CA 94503 Telephone: (707) 647-4336 Fax: (707) 643-2355 Information
More informationFOR MORE INFORMATION:
T OWN OF H OLLY S PRINGS ACCESSORY/TEMPORARY USE, BUILDING, STRUCTURE, OR LIGHTING PACKET General Information A Concept Plan Review Meeting must be held in accordance with the Petition Submittal Deadline
More informationAPPLICATION FOR SITE PLAN REVIEW
APPLICATION FOR SITE PLAN REVIEW ONLY COMPLETE SUBMISSIONS WILL BE PROCESSED CITY OF PORT ST. LUCIE P&Z File No. PLANNING & ZONING DEPARTMENT Fees (Nonrefundable) $ Arch.: $ (772) 871-5212 FAX: (772) 871-5124
More informationNEW SINGLE FAMILY HOMES
NEW SINGLE FAMILY HOMES Your submission must include the following to be accepted as a complete application: 1 copy of the deed and / or purchase and sales agreement if you have owned the property less
More informationNON-RESIDENTIAL DEVELOPMENT
GENERAL REQUIREMENTS (Print or Type) Name of Proposed Project: Location of Project: Legal Description of Project (Assessor s Parcel No. or T, R,S): Staff Use Only FILE NO.: RELATED FILES: Applicant s Name:
More informationDEVELOPMENT REVIEW COMMENTS LAND DISTURBANCE PERMIT (LDP) CLEARING CLEARING & GRUBBING GRADING. Date Reviewed by. Project Name
GWINNETT COUNTY Department of Planning and Development One Justice Square 446 West Crogan Street Suite 150 1 st Floor Lawrenceville, GA 30046 Phone: 678.518.6000 Fax: 678.518.6240 www.gwinnettcounty.com
More informationSUBMIT YOUR PIC APPLICATION:
INTRODUCTION TO PROPERTY IMPROVEMENT COMMITTEE ( PIC ) APPLICATION FOR REDMOND RIDGE EAST HOMEOWNERS ASSSOCIATION Welcome to the Property Improvement Committee (PIC) Application process. The PIC must approve
More informationAPPENDIX K DEPARTMENT OF PLANNING AND CODE ENFORCEMENT SUBDIVISION APPLICATION CENTER SUBMITTAL CHECKLIST
VI-K -1 of 8 APPENDIX K DEPARTMENT OF PLANNING AND CODE ENFORCEMENT SUBDIVISION APPLICATION CENTER SUBMITTAL CHECKLIST Final Submittal Major Subdivision Project Name Subdivision Number Location (Street
More informationAnne Arundel County Dept. of Inspections and Permits Water Sewer Plan Checklist
Project Name Project Number Engineer Plans are to be designed based on the standards set forth in the Anne Arundel County Design Manual Standards and Specifications, and all other manuals as stipulated
More informationADMINISTRATIVE PERMIT SUBMITTAL REQUIREMENTS
ADMINISTRATIVE PERMIT SUBMITTAL REQUIREMENTS DEVELOPMENT DESIGN REVIEW (DDR) Number of Copies Application Form 1 Supplemental Project Information Questionnaire 1 Assessor s Parcel Map (with property outlined)
More informationC I T Y O F M c K I N N E Y PLANNING
C I T Y O F M c K I N N E Y PLANNING 221 N. TENNESSEE STR EE T, McKI NNEY, TEXA S 75069 CONTENTS Approval Process Flowchart FAQs Letter of Intent Requirements Façade Plan Submittal Checklist Non-Residential
More informationOperating Standards Attachment to Development Application
Planning & Development Services 2255 W Berry Ave. Littleton, CO 80120 Phone: 303-795-3748 Mon-Fri: 8am-5pm www.littletongov.org Operating Standards Attachment to Development Application 1 SKETCH PLANS
More informationP.L. 1999, CHAPTER 258, approved October 15, 1999 Assembly, No (First Reprint)
P.L., CHAPTER, approved October, Assembly, No. 0 (First Reprint) 0 0 0 AN ACT concerning the approval and filing of maps and amending P.L.0, c.. BE IT ENACTED by the Senate and General Assembly of the
More informationList of Figures. List of Forms
City of Columbia Engineering Regulations PART 1: SUBMISSION OF PLANS Table of Contents Paragraph Description Page No. 1.1 General 1-1 1.2 Engineer s Report 1-1 1.3 Plans 1-3 1.4 Revisions to Approved Plan
More informationb. Building Areas or Building Pads having an average grade steeper than 5% (some elevation information may be required to verify grade).
Snyderville Basin G. Site Plan Requirements: Three (3) copies of a site plan, a minimum size of 11" x 17" (must be legible) and a maximum size of 36" x 48" shall be submitted with all building permit applications
More informationPLOT PLAN/ CONDITIONAL USE PERMIT
March Joint Powers Authority Planning Department 23555 Meyer Drive Riverside, CA 92518 P: (951) 656-7000 F: (951) 697-6703 SUBMITTAL REQUIREMENTS PLOT PLAN/ CONDITIONAL USE PERMIT SUBMITTAL REQUIREMENTS
More informationApplication for Site Plan Review
Application for Site Plan Review 3275 Central Blvd., Hudsonville, Michigan 49426-1450, 616.669.0200 fax 616.669.2330 It is STRONGLY recommended that any application that must go before the Planning Commission
More informationComment. Issue. 07/31/ Accessible parking required at the training center 2014 FBC accessibility 208 Comment
[Flags]Control No: 1981-00190 Project Manager: LFUSTER Application No: ZV/DOA/CA-2017-00572 s On Application Agency Date Entered s and Responses Version 7 as on 8/9/2017 7:50:56 AM Resolved AIRPORTS 03/16/2017
More informationPROJECT ENTITLEMENT APPLICATION
GENERAL REQUIREMENTS (Print or Type) Name of Proposed Project: Location of Project: Legal Description of Project (Assessor s Parcel/Allotment No., Township/Range/Section): Staff Use Only CASE NO.: RELATED
More informationMINIMUM DRAWING REQUIREMENTS FOR WATER AND SEWER LINE PROJECTS
Public Works Department Water & Wastewater Services WATER & WASTEWATER ENGINEERING DIVISION 2555 West Copans Road Pompano Beach, Florida 33369 954-831-0745 FAX 954-831-0798/0925 MINIMUM DRAWING REQUIREMENTS
More informationMinor Site Plan Application and Checklist Land Disturbing Activities
Minor Site Plan Application and Checklist Land Disturbing Activities INSTRUCTIONS: Please provide the requested information below. The Development Services Department reviews each site plan submittal based